MAKING MADHYA PRADESH A GOLDEN STATE
7 Priorities of Hon’ble Chief Minister Shri Shivraj Singh Chouhan:
* Power, Road and Water.* Making agriculture a profitable venture.* Encourage Industrialists to invest in M.P.* Women empowerment.* Good Governance with special focus on poverty alleviation.* Education and Health.* Internal Security in the state.
State GDP
1781 17601928 1930
2285 23742598
29023167
3612
1781 1657 1775 17061901 1959 2086 2185 2300 2428
0
500
1000
1500
2000
2500
3000
3500
4000
1999-2000
2000-01
2001-02
2002-03
2003-04
2004-05
2005-06
2006-07
2007-08
2008-09
(Am
ou
nt
in D
oll
ar
Mil
lio
n)
Current Price Fixed Price (1999-2000)
Source: Economic Survey of Madhya Pradesh (2008-2009)
Current Prices GDP 1999-2000 Rs. 80145 Cr. GDP 2008-2009 Rs. 162540 Cr.
GDP 2008-2009 Rs. 109260 Cr.Fixed Prices GDP 1999-2000 Rs. 80145 Cr.
Per Capital Income on Current and Fixed Price (1999-2000)
275 264282 273
318 322344
375401
450
275248 260
242264 267 279 286 296 306
0
50
100
150
200
250
300
350
400
450
500
1999-2000
2000-01
2001-02
2002-03
2003-04
2004-05
2005-06
2006-07
2007-08
2008-09
(Am
ou
nt
in U
S D
oll
ar)
Current Price Fixed Price (1999-2000)
Source: Economic Survey of Madhya Pradesh (2008-2009)
POLICY INITIATIVES & REFORMS 2004 ONWARDS- MADHYA PRADESH
Industrial Promotion Policy 2004 amended in 2007Food Processing Policy 2008IT Policy 2006Captive Power Policy with AmendmentsForest Policy 2005Non-Conventional Energy Policy 2006Small Hydro Energy Policy 2006Waste Land (Non Forest) Policy 2006Housing Policy 2007Wine Policy 2007Multiplex Policy 2001 amended in 2006
The State is striving for further policy Reforms …
- Madhya Pradesh Government has passed Madhya Pradesh
Investment Facilitation Act 2008, for simplifying the regulatory
frame work.
- Combined Application Form is being designed to give
necessary clearances to the projects at initial stage.
- Self Certification at the time of submission of Combined
Application Form.
- Time limit for processing of applications is being prescribed.
IMPORTANT INITIATIVES FOR EASE OF DOING IMPORTANT INITIATIVES FOR EASE OF DOING BUSINESSBUSINESS
Investor Friendly AdministrationInvestor Friendly Administration
• The Chief Minister chairs an Apex Committee for mega projects. The committee has so far given clearances to 129 mega projects worth approx Rs. 75971 Crore.
• The Chief Secretary chairs the Project Clearance & Implementation Board (PCIB) for speedy clearances of project proposals & monitoring progress. PCIB has so far given clearances to 122 project proposals worth approximately Rs. 182130/- Cr.
• Websites for Investment Promotion : www.mptrifac.org
( Table 12.12 of CMIE, Sep., 2009)
Nos Rs. CrUS $ billion
(approx)
Manufacturing 123 66883 13.93
Mining 36 8220 1.71
Power 65 172461 35.92
Services 281 30077 6.26
Irrigation 40 9995 2.49
Real Estate 20 31782 6.62
Total 565 319418 66.93
Center for Monitoring Indian Economy (CMIE) has commended the State for robust growth
Total potential investment as of September, 2009.
M.P. : Total Investment Proposals proposed & at various stages of implementation
Units where Production has already Started (2008-2009)
Name Rs. Cr.
JP Cement 872
Abhishek Industries 350
Bridge Stone Ltd (Expansion), 260
Lugong India Ltd. 250
K.S. Oils 180
Lupin Pharmaceuticals, SEZ Indore 175
Cummins Turbo, SEZ Indore 156
New Tech Pipes Ltd., SEZ Indore 120
Regent Drugs 108
LT Overseas 60
SSA International Ltd. 45
Contd..
Name Rs. Cr.
JCO Gas Pipe Ltd. 60
Mount Everest Breweries 75
Sonic Biochem, SEZ Indore 45
Godrej Consumer Product (Expansion) 56
J Corps Ltd. 70
VRS Foods Ltd. 50
Innovative Clad Solutions Ltd (LN Mittal Grp) 35
Sebesco Bakers 15
GEI Power Ltd. 12
Total 2994
Units where Production has already Started (2008-2009)
Major Proposed Mega Investments Under ImplementationMajor Proposed Mega Investments Under Implementation(Manufacturing Sector)(Manufacturing Sector)
Name Rs. Cr.
BORL (Bina Refineries) 10,378
Hindustan Aluminium Co (Aditya Birla Grp.) Phase I Phase II
7,70012,300
ACC Cement 1,260
Satna Cement 1200
Prism Cement 800
Jay Pee Rewa Cement 650
Bridgestone 600
Bhilai J.P. Cement Ltd. 421
Nahar Poly Films Ltd. 300
KJS Cement Pvt. Ltd., 750
Euro Bond Industries Pvt. Ltd. 1100
TOTAL 37459
Bina Refinery Project : Status as on 30th Sept, 2009
Approved Project Cost : 10,378.00 Cr.
Overall Commitment : 10,357.59 Cr.
Overall Expenditure : 8,527.53 Cr.
Overall Physical Progress : 96.4%
Commercial production likely to commence by end March 2010
- Land Cost Advantage
US $1= Rs.48=00 approxUS $1= Rs.48=00 approx
0
1000
2000
3000
4000
5000
6000
7000
8000
Series1 400 800 1400 2200 2300 4500 7500
MP SEZ Indore Noida Manesar FaridabadGurgaon PH
VIGurgaon PH I-
V
Rs. per sq/Mtr
MP Average Land Cost $ 8/- Sq Meter
MP SEZ Land Cost $ 16/- Sq Meter
ADVANTAGE MADHYA PRADESH
- Peaceful Labour (Man days lost is less than 0.5% of the total man days available)
- 90000 Professionals per annum
- No Regionalism
- Land Banks Identified
ADVANTAGE MADHYA PRADESH
• The State is well connected with the rest of India
• 425 trains passing through the State on a daily basis.
• The total length of roads spanning MP is 67,600 kms.**
• National highways of 5,200 kms run through the State.*
• 18 National highways .• The total length of State
highways in the State is 9,885 kms.**
• Convenient linkages to western ports i.e. Kandla Port, Jawahar Lal Nehru Port Trust.
• 25 airstrips.**
• Convenient air links from key Indian cities like Delhi & Mumbai to Bhopal, Jabalpur, Gwalior, Indore and Khajuraho.
• 5 operational airports.
• Indore airport has the capability of handling international cargo.
• International airports to start functioning at Bhopal/Indore by 2010.
Advantage M P ENABLING INFRASTRUCTURE
*Source: Department of Road Transport & Shipping (morth.nic.in) **Source: www.destinationmadhyapradesh.com
Opportunities:
• Technically Wind Power Proven Sites: 1200 MW
• Technically Proven Total small hydel Power Sites: 410 MW
• Biomass based power: 308 MW
24 hrs power supply available to industries on Independent HT feeders.
Advantage M.P. POWER
WORLD CLASS INFRASTRUCTURE AT INDUSTRY’S DOORSTEP … SEZ AT MADHYA
PRADESH (INDORE)First green field operational SEZ…2500 acres
MP SEZ Act..
Developed land for allotment
Power available at competitive rates
…a globally competitive investment destination
Notified SEZ’s in the State 5 Nos which includes Agro & Agro Based Products SEZ at Umariya – Dungariya Jabalpur
SEZ proposals in the state for which formal
approval granted by the Board of approvals
11 Nos
FACILITIES BEING PROVIDED AT AUTO CLUSTER AT INDORE
Technical Library
Workshop
Quality Consultancy
Testing & Calibration
Waste Disposal Site
Tool Room
Training Institute
Auto Testing Track (Pithampur)Auto Testing Track (Pithampur)
Investment under implementation -$150 million
Opportunities: World class Auto Testing Track will open up opportunities in related sectors.
MINERALS AVAILABLE
LimestoneCoalCoal bed Methane..DiamondsManganese, Copper, DolomiteZincIron OreBauxite
Proposed Investment Nodes in M.P.Proposed Investment Nodes in M.P.
Phase-1: MIR
A. Pithampur-Dhar-Mhow
Investment Region
(MIR)
B. Ratlam-Nagda Investment
Region
Phase-2: IR
A. Shajapur-Dewas
Industrial Area (IR)
B. Neemuch-Nayagaon
Industrial Area
DELHI MUMBAI INDUSTRIAL CORRIDOR PROJECT (DMIC PROJECT)
Economic Corridor : A corridor between Indore Airport & Pithampur on 22 km of length is being developed. Economic & commercial activities are proposed to be setup up
to 300 meters on either side of the corridor.
Knowledge City : Knowledge city (Education Hub) on 419 Ha of land is being developed at Ujjain. World class education institutes, research centers, training centers in various discipline are proposed to be set up in this Knowledge City.
Water Management: Improvement of Water Supply and Waste Water Management in Pithampur Industrial Area.
Integrated Multi- Modal Logistics Hub is being developed to meet the logistic demands of Indore & Pithampur at Pithampur on 176 Ha of land.
EARLY BIRD PROJECTS under EARLY BIRD PROJECTS under Pithampur-Dhar-Mhow Investment Region Pithampur-Dhar-Mhow Investment Region
Early Bird Project Early Bird Project under Shajapur-Dewas Investment Nodeunder Shajapur-Dewas Investment Node
Power Equipment Manufacturing Hub is proposed to be developed on
4000 acres and would be comprehensive in nature.
The site is located in western part of Madhya Pradesh in Distt. Rajgarh
and is well connected by Road (NH-3) and Railway.
No land acquisition and major R&R issues as the land is available at
one place and is in government possession.
Will encompass firms of all sizes and types engaged in various
manufacturing, testing with key support functions.
Other Proposed Projects (DMIC)
Water Supply from Narmada:
Proposed area of investment region is 370 sq km. Fresh water demand anticipated at 530 MLD by year 2041, which would be arranged from Narmada.
Commercial and Facility node in SEZ and Pithampur Industrial Area: Need of investment region to be met by creating commercial
and other facilities in SEZ Indore non processing zone and Pithampur Industrial area.
Incubation Park:
To facilitate research based innovations in manufacturing sector and merge it with knowledge economy through research and development initiatives.
ABUNDANT & DIVERSITY IN AGRICULTURE
Incredible Biodiversity
India’s 60% SOYABEAN (4.7mt)…40% Grams grown in MP
Spices : GARLIC,CORIANDER, CHILLI
Commercial grade POTATO & WHEAT
Rare MEDICINAL plants