PresentationApril 2016

Page 2: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

Doğu Star Elektrik Üretim A.Ş.

- Malatya Landfill Rehabilitation, Energy Producing and Landfill

Maintenance,

- 3,6 MWe Input Power

- Decomposing Plant – Waste Transfer Stations – Gasification Plant

Permissions and Desing Works On Going , Start up is planning to July

2016 .

- «Landfill Gas Treatment Project» supported by TUBITAK

Karya Enerji

- Wind Power Projects,16 Project supporting works in Turkey.

NOV Enerji

- Sivas Landfill Rehabilitation, Energy Producing and Landfill Actuating,

- 1,4 Mwe Input Power, It is planning to be 2,8 Mwe at Nov 2016,

- Decomposing plant will be start up at Aug 2016.

Our Associations

2

Page 3: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

Boğazköy Enerji Üretim Ltd.

- Amasya Landfill Energy Producing, Waste Decomposing and

Recycling Works,

- 1,2MW Input Power, It is planning to be 2,4 Mwe at 2017

NOVAS Enerji

- Tokat Landfill Energy Producing, Waste Decomposing and

Recycling Works,

- 1,0MWe Input Power,

NOVTEK Enerji

- İskenderun Landfill Energy Producing,

- 2,8MWe Input Power, It is planning to be 4,2 Mwe Input Power at

the end of 2016.

- Alokone Co,.Limited

- Master Distributer in all the Arab Countries.

İştiraklerimiz

3

Page 4: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

,

Intelligent and Local Solutions to Renewable

Energy...

* The main aim of NOVTEK Energy is producing the clean

energy by using local foundations according the

international standards. Eventually it will provide us clean

and intelligent solutions to a big problem such as Global

Energy Need.

* Novtek has more than 100 qualified employees, also

doesn’t importing the technology by local supporting

projects such as TUBITAK projects.

Page 5: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

Energy In Turkey and some other Countries …

5

Only the rate of 255,4 MW is fountained biomass...

The Percentage biomass to Total Power is only%0,38.

The Target of Biomass is %10-15 in Europe.

The potential is more in Turkey so it marks moreinvestments and more innovation.

Total Input Power at 2015 70.380MW.

Page 6: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

6

More than 600 Mw Wind Energy licence andproject works.

More than 100 qualified employees.

Target is more than 30 MW input power in 5 years.

Daily 2000 tons of solid waste management andrecycling.

Total Input Power 12 Mwe in Turkey.

NOVTEK Enerji

Page 7: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

Our Projects…

Page 8: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

Malatya Plant (3,6MWe Running)

Page 9: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

Amasya Plant (1,2MWe Running)

Page 10: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

Sivas Plant (1,4 Mwe Running)

Page 11: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

Erbaa Plant (1,2 Mwe Running)

Page 12: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

İskenderun Plant (2,8 Mwe Running)

Page 13: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

LANDFILL GAS Energy Production - 1

13

Gas Collecting – Rigol / Re-InjectionSystem

• Supply the efficient gas flowing by the placedvertical and horizontal holed pipes systems.

• Isolations to supply environmentalrehabilitation and prevent oxygen entrees tosystem.

• Collecting the leakage and thanks to thisprevent the environmental destroyingeffects.

Page 14: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

14

Gas Collecting – Booster

• Aspire the gas constantly to energyproducing system.

• Determine the all physcial andchemical conditions of gas by thesensors which supplies the energyproducing efficiency and reducing allthe environmental risks.

LANDFILL GAS Energy Production - 2

Page 15: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

15

Gas Motors

• High Tech motors using the biogas toproduce the energy.

• 7/24 monitoring system whichprovides the step in outside theplant.

LANDFILL GAS Energy Production - 2

Page 16: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

16

Waste CharacterizationMake waste characterization according tolocal and seasonal conditions. Accordingto characterization desing thedecomposing and RDF plants.

Waste DecomposingTurn to recycable waste andRDF to economy so provide theaid the economy.

Increasing theLandfill ZoneLifetime

Energy ProducingHigh efficient energyproducing by thedecomposted solid waste.

Integrated Waste Management

Compounds

Page 17: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

Waste Characterization

• It takes 60 days to characterize the

waste arround the province..

• Characterization works is driving by the

qualified expert from the commonly

Europe..

17

By the Waste Characterizations...

Decide and

Desing Biogas

Energy Producing

System.

Decide and Desing

Decomposting

Details.

Integrated Waste Management Steps

I – Waste Characterization

Page 18: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

Construction of

Decomposing Plant

After the characterization, it starts

that the design and updated

engineering works to construct the

best solution of waste

decomposing plant

18

Decomposing Plant

Incoming Profit

from the RDF.

Use the economically

recycable wastes.

Integrated Waste Management Steps

II – Waste Decomposing

Page 19: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

Integrated Waste Management Steps

19

Waste Decomposing Compounds

• Manuel decomposing.

• Manyetic seperator

• Paper etc. press machine,

• Plastic PVC press machine,

• PET / PP / PE press machine,

• Aluminium / iron press machine,

• Temporal Warehouse for recylingcompounds.

• Vehicle loading zone

Waste Decomposing

Page 20: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

20

Zone lifetime will be increase 2 or

3 time by Integrated Waste

Management

Decreasing the

construction costs

Decreasing the total

cost

Integrated Waste Management Steps

III – Increasing the Lanfill Zone Lifetime

Page 21: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

Enerji Üretimi

• High Efficienct energy producing bythe Digester technologies

• Not only energy producing but alsohigh tempreture producing.

• Composting outputs can be usedas fertilizers and contruct theglasshouse what will use the wastetempereture

• Accordingly, 2 times moreefficiency compare with the onlyLFG based energy producing.

21

Producing the High Efficient Energy

by the Decomposting Wastes.

Under controlled

waste

management, Low

risks.

Decreasing the

maintain cost

approximately %50.

Integrated Waste Management Steps

IV – Energy Producing

Page 22: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

Integrated Waste Management Steps

Page 23: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

What We Need to Know to Desing and Feasibilty:

• What is the population of the area that we accept the wastes?

• How many tones waste will accept the plant per day?

• What is the age of the plant? Can you give the average waste mass?

• Have you ever make a characterization work?

• Do you accept the mixed or decompostingwaste localy?

Page 24: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,

What We Need to Know to Desing and Feasibilty:

• Can give the arithmetic population incerasingvalue?

• Is there any other plant in province where produce the energy from Landfillgas?

• Is there any Biogas plant over the province?

• Do you have organised landfill? Do you have any plan to construct?

Page 25: Presentation April 2016 - biowaste2energy.com…شروع تحويل النفايات لكهرباء... · Presentation April 2016. Doğu Star Elektrik Üretim A.Ş. - Malatya LandfillRehabilitation,