Presentation aboutResponsibilities of LiftingEngineer and Safe Lifting
REGARDS:
ENGR SYEDSHAH
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 2/22
Introduction
The role of the lifting team, which includes the lifting Engineer, crane operator, rigger
crucial to ensure safe lifting activities at workplaces. Many of past accidents had show
planning, co-ordination and supervision of the lifting work could have prevented the a
needless loss of lives. In particular,
the role of the lifting Engineer & supervisor is key especially given the collaborativ
work and the importance of ensuring that The various parties are trained and compe
they carry out their roles safely and effectively. this presentation will not only prov
roles and responsibilities of lifting Engineer & upervisor but also information on c
associated with lifting, "ifting #lans, $isk %ssessment $%', #ermit-to-(ork #T(
afe (ork #rocedures (#',
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 3/22
Skills, interests and qualities
%s a lift engineer, you will need)
%n understanding of engineering drawings and principles
kills in electrical and*or mechanical work
E+cellent problem-solving skills
ood communication and customer care skills
ood organi!ational skills to plan workloads
The ability to work without close supervision
IT skills for updating records and writing reports
amiliarity with %/ packages if involved in design work
% willingness to work fle+ibly
%n awareness of industry guidelines on health and safety
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 4/22
Common Systemic Lapses Involving LiftingActivities
%ccidents involving lifting activities occur due to many reasons. 0owever, investigations into such
reveal that the primary causes could be attributed to poor planning, supervision and co-ordination o
operations
%bsence or lack of $% prior to lifting operation.
"ack of implementation of relevant control measures identified in $%.
%bsence or lack of proper "ifting #lan for each lifting operation.
%bsence or lack of a #T( system to manage the lifting operation.
ailure to adopt a proper rigging method for the lifting operation.
#oor maintenance of lifting e1uipment e.g., safety devices, lifting gears'.
%nd many more
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 5/22
Responsibilities of Lifting Engineer &Supervisor
#lanning and coordination of lifting operation
Early preliminary study and budgeting for heavy lifting pro2ects
/eveloping detailed lifting and load out plans) cranes selection and working circumstances, r
"ifting lugs and lifting beams design and other steel structure design.
alculating 3#, .4.. and weight theoretically and physically using synchronous hydrauli %ssembly and dismantling of heavy cranes according to manufacturer manual.
upervising e+ecution of heavy lifting and load out operations.
%ttending heavy lifting meetings both internally and e+ternally with direct client interface.
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 6/22
Responsibilities of Lifting Engineer &Supervisor
Inspection of cranes and lifting e1uipment as they are delivered to site, including inspection of c
maintenance records etc.
#rovide technical support to pro2ect manager as well as to lifting supervisors.
/eveloping complete drawings and technical documents and calculation sheets
ensuring that the ground conditions are safe for any lifting operation to be performed by mobile
be present during all lifting operations5 and
if unsafe conditions are reported to him, to take suitable measures to rectify the conditions so th
operation can be conducted safely.
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 7/22
Common a!ards Associated "it# $nsecureSlippage of Loads
any accidents occurred due to unsecured loads or loads t#at slipped o' durifollo"ing are some common #a!ards associated "it# lifting of loads*
defective or damaged lifting gears suc# as slings, #ooks, inserts, eyes, s#a
improper rigging of loads+
lack of proper receptacles for loose loads suc# as bricks+ or
under capacity of lifting gears(
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 8/22
Risk Assessment and ermit-to-.ork
0a!ard Identification
$isk Evaluation
$isk ontrol
#ermit-to-(ork #T(' ystem is a system to manage and control certain types of ha!ardous
lifting operations. The contractor6s supervisor coordinating the lifting operation is to apply f
carry out the lifting operation. In the application for #T(, he should state the scope and conthe lifting operation is to be carried out. %n independent inspection is then conducted on-site
appropriate control measures have been taken to mitigate any foreseeable risks. %fter confir
measures have indeed been taken, the application would then be approved by an authori!ed
etc
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 9/22
re-use Inspection of LiftingEquipment
"ifting Engineer must ensure that the crane operator conduct pre-use inspection before each lifting ope
that the e1uipment is suitable, safe and correctly installed for the lifting operation. The pre-use checks
visual inspection of the lifting e1uipment5
functional test of the lifting e1uipment5
functional test of the safety system and devices5 and
functional test of the emergency stop device.
"ifting gears must also be inspected to ensure that they are free of any faults or defects before any lifti
begin.
"ifting supervisor must not allow the lifting operation to be carried out if any defects are spotted durin
checks by the crane operator until all the faults of the cranes are fully rectified. imilarly, lifting gears
if defects are spotted and reported by the riggers.
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 10/22
re-use Inspection of LiftingEquipment
%n authori!ed e+aminer must also be engaged to inspect the lifting e1uipment)
%fter modification or repairs of its load bearing components5
(hen there is a change in e1uipment configuration, such as alteration of the boom le
crane height5 or %fter an incident or accident involving the lifting e1uipment.
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 11/22
Selection of Lifting /ears for Lifting0perations
actors affecting the choice of lifting gear for each lifting operation are)
(eight and type of load5
%vailable lifting points5
#osition of the centre of gravity of load5
Mode of use
Environment factors e.g., wind speed conditions'.
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 12/22
Estimation of .eig#t of Load
The following may be used as a general guidance to estimate the weight of load going to be lifted
operation.
heck if the weight is marked on the load.
heck if the weight is indicated on any documentation
e.g., shipping documents'.
heck if the weight is indicated on the construction
drawing of the load.
If the load is still on a trailer or truck, weigh it physically
over a bridge.
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 13/22
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 14/22
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 15/22
Sample Lifting lan
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 16/22
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 17/22
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 18/22
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 19/22
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 20/22
Standard & Codes
%ME %78.7 afety ode for Elevators and Escalators
%9I %:;.; <ehicle-Mounted Elevating and $otating %erial /evices
%9I %:;.= Manually #ropelled Elevating (ork #latforms
%9I %:;.> 3oom-upported Elevating (ork #latforms
%9I %:;.? elf-#ropelled Elevating (ork #latforms
%ME %7;@.7 afety $e1uirements for #owered #latforms for 3uilding Maintenance
%ME 3=@.; 4verhead and antry ranes Top $unning 3ridge, ingle or Multiple irder, Top
$unning Trolley 0oist'
%ME 3=@.= onstruction Tower ranes
%ME [email protected] #ortal, Tower, and #illar ranes
%ME 3=@.> Mobile and "ocomotive ranes
8/18/2019 Presentation about lifting
http://slidepdf.com/reader/full/presentation-about-lifting 21/22
• %ME 3=@.? /erricks• %ME [email protected] 3ase-Mounted /rum 0oists• %ME [email protected] loating ranes and loating /erricks• %ME [email protected]@ 0ooks• %ME [email protected] Monorails and Cnderhung ranes•
%ME [email protected]= torage*$etrieval *$' Machines and %ssociated E1uipment• %ME [email protected] ide 3oom Tractors• %ME [email protected]? 4verhead 0oists Cnderhung'• %ME [email protected] 4verhead and antry ranes Top $unning 3ridge,• ingle irder, Cnderhung 0oist'• %ME 3=@.;@ 3elow-the-0ook "ifting /evices• %ME 3=@.;; %rticulating 3oom ranes• %ME 3=@.;= #ersonnel "ifting ystems• %#I pec. ; %#I pecification for 4ffshore ranes• %#I $#;/ 4peration and Maintenance of 4ffshore ranes• %9I* %E D8?> rane "oad tability Test ode• %E-M-@@7 tructural /esign riteria for 9on-3uilding tructures• 7;-%M-@@8 abrication of tructural and Miscellaneous teel• %E-M-@@B /esign riteria for "ifting E1uipment• . I. 8.@;A Marine and 4ffshore rane, 0oist, and $igging 4perations• . I. 8.@;> Mobile 0eavy E1uipment 4perator Testing and ertification• . I. 8.@;8 rane uspended #ersonnel #latform 4perations Manbasket'• . I. 8.@;B rane "ifts) Types and #rocedures