presentation 60th bgjf exhibitor meeting - eng 60th bgjf_exhibitor meeting.pdf · form subject...
TRANSCRIPT
General Information
Fair Name : 60th BANGKOK GEMS & JEWELRY FAIR
Venue : IMPACT Muang Thong Thani
Fair Duration : 6 – 10 September 2017
Trade day : 6 – 8 September 201710.00 – 18.00 hrs.
Public day : 9 September 201710.00 – 18.00 hrs.
Public day : 9 September 2017 10.00 – 17.00 hrs.
Organizer : Department of International Trade Promotion (DITP)Ministry of Commerce
Construction Period 2 – 5 September 2017
The Person Concerned Date Time
Raw Space Only Unofficial Contractor
2 September 2017 18.00 - 24.00 hrs.
3 - 5 September 2017 08.00 - 24.00 hrs.
All Exhibitors 5 September 2017 09.00 - 21.00 hrs.
Dismantling 10 – 11 September 2017
The Person Concerned Date Time
Exhibition Closes 10 September 2017 17.00 hrs.
Turn off Electricity 10 September 2017 19.00 hrs.
Exhibitors Unofficial Contractor
10 September 2017 21.00 - 24.00 hrs.
11 September 2017 08.00 - 18.00 hrs.
Special Stand Construction (Raw Space)
Rules & Regulations
1. Send the floorplan, perspective and picture of booth with Form F2 within
4 August 2017
2. Send the guarantee cashier cheque with Form F2.1 within 11 August
2017
3. District booth height is 4 meters.
4. The booth must have its own panels, if the design is higher than 2.5
meters, it has to be decorated both side nicely, sticker nor logo is not
allowed to be installed in the space.
Rules & Regulations
5. The booth must be carpeted or laid with some form of flooring.
6. Special design with aluminium standard system, the design must be
different from the standard booth of the fair in terms of beautification and
decoration.
Official Contractor :
XCON Co., Ltd. Tel. +66 2275 5312 to 3
Special Design for Approval :Mr. Nattapoom Chansenniwong Ext. 212Mr. Somnuk Artwong Ext. 213
E-mail : [email protected]
Performance Bond : Raw Space Only
• “Cashier Cheque” 5,000 THB/ 9 Sq.m.
• Address to XCON Co., Ltd. with Form F2.1 within 11 August 2017
• Refund Cashier Cheque within 15 days after the exhibition
finish if no damage on site.
Contractor Badge Claiming Procedure :
• Design approval
• Deposit cashier cheque
• Claim contractor badge
Procedure of Construction
Procedure :
1. Verify document of approval at P9. (Near the lake)
- Approved construction plan
- Deposited cashier cheque
2. Stand by for the que to go to the exhibition hall.
3. Must wear the badge everytime while onsite.
P9
Exhibitor Service
Exhibitor Service 1Raw GG ‐ XX
Exhibitor Service 2Raw Q ‐ FF
Exhibitor Service 3Raw A ‐ P
Standard Booth
Standard Booth
Type A Type B Type C
Standard Booth
Form F3 – F3.2Deadline : 1 August 2017
Furniture Service
Form F4 – F4.3Deadline : 1 August 2017
Please complete and return this copy to :International : Ms. Chayaanan Kanesawararak / Ms. Kris Vargas
Local : Mr. Suppachoke Klaywong / Mr. Jirapat Pobkaew
XCON CO., LTD.92, 94, 96 Vibhavadee‐Rangsit Rd.,Dindaeng, Dindaeng, Bangkok 10400
Tel : +66(0)‐2275‐5312‐3, +66(0)‐2276‐1831‐4 Ext. 204 / 206 / 205 / 203Fax : +66(0)‐2691‐8873, +66(0)‐2277‐6075
E‐mail : [email protected] / [email protected]@xcon.co.th / [email protected]
Diamond Pavilion
Type A Type B Type C
Diamond PavilionStandard BoothForm S1 – S1.2
Deadline : 1 August 2017
Diamond PavilionFurniture ServiceForm S2 – S3
Deadline : 1 August 2017
Please complete and return this copy to :Mr. Jirapat Pobkaew
XCON CO., LTD.92, 94, 96 Vibhavadee‐Rangsit Rd., Dindaeng, Dindaeng,
Bangkok 10400Tel : +66(0)‐2275‐5312‐3, +66(0)‐2276‐1831‐4 Ext. 203
Fax : +66(0)‐2691‐8873, +66(0)‐2277‐6075
E‐mail : [email protected]
Deadline of Order Form
Form Subject Return to Deadline Page Status
F1 Exhibitor Badge EVENT THAI 20 AUG 2017 54Must
Return
F2 Raw Space Construction XCON 4 AUG 2017 55Must
Return
F2.1 Performance Bond XCON 11 AUG 2017 56Must
Return
F3 - F3.2 Standard Booth XCON 1 AUG 2017 58Must
Return
F4 - F4.3 Furniture Rental XCON 1 AUG 2017 62 Additional
F5 Lighting for Standard Booth Only ADDEX 1 AUG 2017 68 Additional
F5.1 - F5.4 Electrical Service ADDEX 1 AUG 2017 69 Additional
F6 Audio Equipment Rental ADDEX 1 AUG 2017 74 Additional
F7 Special Security Service ISS 15 AUG 2017 75 Additional
F8 CCTV Service ISS 15 AUG 2017 76 Additional
Form Subject Return to Deadline Page Status
F9 - F9.5
Freight Forwarder Service(Precious Items)
BRINKS 1 SEP 2017 77 Additional
F10 – F10.4 FERRARI 30 AUG 2017 83 Additional
F11 – F11.3 G4S 10 AUG 2017 88 Additional
F12 – F12.4 MALCA-AMIT 1 SEP 2017 92 Additional
F13 – F13.2Freight Forwarder Service(General Items)
TRANS AIR CARGO
23 AUG 2017 97 Additional
F14 Safe Box Rental Service CHUBB 18 AUG 2017 100 Additional
F15Credit Card Terminal
BBL 1 SEP 2017 101 Additional
F16 Krungsri 23 AUG 2017 102 Additional
Form Subject Return to Deadline Page Status
F17 – F17.3 Internet & Telephone Service IMPACT 1 AUG 2017 103 Additional
F18 Booth Cleaning Service IMPACT 20 AUG 2017 110 Additional
F19Confirmation Letter for Custom Purpose (International Exhibitor Only)
DITP 17 AUG 2017 111Must
Return
F20 Move-Out Permit DITP 17 AUG 2017 112 Additional
THANK YOU