Prepared by: Ayah Yasin
SUPERVISOR Dr. HAFEZ SHAHEEN
PROJECT 2 : FALL 2012-2013
Wastewater Collection system for Anin
1
OBJECTIVES
In my project the following objectives have been achieved:
1. Contribute to solving the environmental problems in Anin village that is due to un-safe disposal of wastewater.
2. Design of a Wastewater collection system.
2
METHODOLOGY
Identify the problem. Determine the objective. Collect data and drawings for study area. Collect data by report, questionnaires. Data analysis and processing using excel and
AutoCAD programs. Model selection. Building the model. Sewer design(pipe diameter and length,
nodes elevation and location) .3
METHODOLOGY
4
Project 1:
In the first part of the project I have collected the data that have been applied in the project, this data include:
Water consumption : 100L/c/d. Average number of capita per family is 5.6
(PCBS). Current population is 4150. The disposal of wastewater in Anin is done by
cesspits.
5
PROJECT 1:
In this part, also, I have calculated the following data:
Population growth rate:2.89. Future population:9450capita. Peak factor:3.04. the peak flow:3335 m3 /d
6
PROJECT 1:
I have determined the design determinants, this determinants are:
design period :28 years (2012-2040). Wastewater production factor: 0.85. Formula have been used : Manning formula
(V=(1/n)*R2/3*S1/2 ). The velocity in the range of 0.6-3 m/s. minimum pipe diameter :8 in (200mm). Infiltration rate :5% of peak flow. Manholes spacing between the range 30-100 m. 7
PROJECT 2:
In the second part of the project I have designed the sewer network using SewerCAD program.
The design steps are : calculating the load for each manhole
using excel sheet, based on :1. The population of the area which is equal the
area multiplied by the village population density.
2. Find the population for the designed year using the following equation:
Pn= P(1+ r)^n8
PROJECT 2:
Using the hourly peak factor 2, and daily peak factor 1.5.
Determining the manholes location according to:
Every change in the pipe size, grade, or alignment. The distance between manholes in my project do not exceed 50m.
9
INPUT DATA TO SEWERCAD:
Minimum and maximum velocity:
10
INPUT DATA TO SEWERCAD:
Minimum and maximum cover:
11
INPUT DATA TO SEWERCAD:
Minimum and maximum slope:
12
OUTPUT RESULTS
13
Making analysis for the output results and modify the non-logical results for: manholes, velocities, slopes and diameters.
Printing the out put results1-TablesI. 1-pipes
II. 2-manholes
2- profiles
14
THANK YOU
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
THANK YOU
32