28
PREFEASIBILITY REPORT OF Khub Limestone Mine (ML Area: 9.66Ha) Proposed Production:475,095 TPA of Limestone, and 1,74,420 TPA of Sandstone AT Village,Lumshnong, Tehsil Khliehriat, Distt. East Jaintia Hills, Meghalaya. Project Proponent Cement Manufacturing Co. Ltd. Cement Manufacturing Company Limited 281, Deepali, Pitam Pura,Delhi Environmental Consultant M/s Perfact Enviro Solutions Pvt Ltd (NABET Registered vide list of accredited consultants organizations Rev 27/8 th February, 2015 at S.No-113 5th Floor, NN Mall, MangalamPalace Sector 3, Rohini, New Delhi Phone No.: 011-47528467, Fax: 011-47528434 [email protected]

Upload: others

Post on 07-Apr-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

PREFEASIBILITY REPORT

OF

Khub Limestone Mine (ML Area: 9.66Ha)

Proposed Production:475,095 TPA of Limestone, and 1,74,420 TPA

of Sandstone

AT

Village,Lumshnong, Tehsil Khliehriat,

Distt. East Jaintia Hills, Meghalaya.

Project Proponent

Cement Manufacturing Co. Ltd.

Cement Manufacturing Company Limited 281, Deepali, Pitam Pura,Delhi

Environmental Consultant M/s Perfact Enviro Solutions Pvt Ltd

(NABET Registered vide list of accredited consultants organizations

Rev 27/8thFebruary, 2015 at S.No-113

5th Floor, NN Mall, MangalamPalace Sector 3, Rohini, New Delhi

Phone No.: 011-47528467, Fax: 011-47528434

[email protected]

2

Table of Contents

1. Executive summary

2. Introduction of the project/ Background information

3. Project Description

4. Site Analysis

5. Planning Brief

6. Proposed Infrastructure

7. Rehabilitation and Resettlement (R & R) Plan

8. Project Schedule & Cost Estimates

9. Analysis of Proposal (Final Recommendations)

3

PREFEASIBILITY REPORT

1.Executive Summary

Introduction of the project/ Background information

The state Govt. granted two mining leases for Khub-I,4.96 ha & Khub-II, 4.70 ha to CMCL

for meeting the limestone requirement of the cement plant CMCL. Two mining leases were

applied for the amalgamation to the state Govt. on 08-12-2006 and permitted. Mining plan for

the amalgamated Khub mine of 9.66 hectares is under preparation

The Narpuh reserved forest was declared as wildlife sanctuary which falls within 5 km. As

general condition is applicable on the project therefore the project is considered as Category

“A” project. The Project will be submitted to MOEF for Environment Clearance.

Total proposed production of Limestone from the amalgamated mine will be 475,095 TPA,

Limestone and 1,74,420 TPA, Sand Stone for running Cement plant. CMCL has entrusted

M/s Perfact Enviro Solutions Private Ltd., New Delhi, for the preparation of EIA/EMP

report.

The production from Khub-I (4.96 ha) started in 2004 & from Khub-II in 2006. So far

1,893,565.299 MT have been produced from Khub-I & 3,042,248.486 MT from Khub-II

(upto May, 2014). The yearly production was within permitted quantity as per mining plan.

In all 71 persons will be directly employed, besides substantial amount of indirect

employment will be generated in the form of dhabas, transporters etc. which will improve the

economic conditions of the area.

Location details

The lease area falls in Survey of India Topo sheet No.83 C/8 with Latitude 250 948 to

250104.3N & Longitude 9202205.3 to 9202223.6E. The lease area is near village

Lumshnong, tehsil Khliehriat, Dist. East Jaintia Hills in Meghalaya state.

4

The lease area is situated at a distance 1 km west of NH-44 connecting Shillong to Silchar.

The nearest railway station at a distance of 38.5 km from Lumshnong is Badarpur.

Magnitude of Operations & Extent of Mechanization:

Working for limestone is done by adopting mechanized opencast method. It is proposed to

produce a maximum of 4,75,095 TPA, Limestone and 174420 MTPA, Sandstone from the

lease area of 9.66 ha by way of progressive mining plan as per the approval from the IBM. It

is a mechanized mine with deep hole drilling-blasting and loading through excavators to

tipper. Apart from these equipments water tanker will be provided for sprinkling.

Raw Materials required:

Total of 43 KLD of water will be required, out of which 3 KLD will be utilized for drinking

& domestic purposes, 25 KLD will be utilized for mining & allied activities including dust

suppression, and 15 KLD for plantation.

The total diesel requirement will be 800 KLD

Geology and Reserves:

The different litho units of the area belong to Jaintia series of Eocene age. The limestone unit

belongs to sylhet stage of Jaintia series of middle Eocene age.

Three bands of limestone occur in the area, which are known as Prang, Umlatdoh and

Lakadong limestone bands. These are separated by Narpuh sandstone and Lakadong

sandstone. The topmost limestone band i.e Prang limestone occurs further south of the

prospect.

The total mineable reserves are of the order of 17.60 million tones.

The average grade of limestone is having CaO 44.50-48.50%, MgO 1.50-3.00%, SiO2 -2.50-

3.0%, Al2O

31.50-2.50% & Fe

2O

31.00-2.00%

Proposed Production & life of mine:

The proposed annual production will be @475,095 TPA, Lime Stone and 174420 TPA, Sand

Stone and life of mine will be about 12 years.

5

Waste Generation and Disposal: There is no overburden.

Site Analysis:

Connectivity:

The lease area is situated at a distance 1 km west of NH-44 from 67.5 Km stone connecting

Shillong to Silchar. The nearest railway station at a distance of 38.5km from Lumshnong is

Badarpur on Guwahati-Lumding-Silchar meter gauge section of N.E.F. Railway.

Land Form, Land use and Land ownership: The land is private waste land. It is non-forest, non-agricultural. The consent of land owners

of the land by CMCL and the mine is operated since year 2000.

Topography:

Topography of the ML area and its surroundings are rugged and mountainous. Maximum

and minimum contours passing through the area are 546 m and 520 m respectively. South-

Western part of the area is at a higher elevation with respect to south-eastern part. A

perennial nallah flows about 400 m. south of the southern lease boundary.

Existing land use pattern:

All the land is private waste land. It is non-forest, nonagricultural. At present 8.09 ha land is

mined out land and remaining 1.57 ha land is virgin or undisturbed.

Infrastructure:

At present the infrastructure available in the mine area are service roads, workshop building,

canteen, power line, sub post office, primary & middle school. Weekly market is at

Lumshnong The nearest road is at distance of 1Km in the East. Nearest railway station is

Badarpur at distance of 38.5 Km. The nearest airport is at Silchar at 67.5 Km.

Climatic data from secondary sources:

The climate in the study area is typically tropical. The region experiences tropical monsoonic

climate that varies from western to eastern part of the plateau. Jaintia Hills District has

tropical climate characterized by high rainfall and humidity, generally warm summer and

moderately cold winter. The lower elevated areas experience fairly high temperature for most

part of the year having a mean maximum of 230C to 260C and a mean minimum of 120C to

6

170C. The mean summer temperature is 260C and the mean winter temperature is 90 C. The

mean annual rainfall varies from 4,000-6,000 mm with most rainfall concentrated from May

to September.

Social Infrastructure:

The study area of buffer zone is having social infrastructure facilities like hospital, schools,

electricity, potable water, transport facilities, post & communication etc. These facilities have

been strengthened as CSR activities and the reachable distances to facilities of social

infrastructure has been reduced.

Planning Brief

A mining project is much different than other industrial projects. Therefore its planning part

also differs. In case of mining, the lease is granted only after an approved mining plan is

submitted to the government. It is an opencast mechanized mining and the salient features are

as below.

Mechanized open cast mining with drilling & blasting will be undertaken with the help of

Excavator /loader and dumper.

Bench height will be kept at 6 m & width 20 m. The maximum strength of workers will be

71persons. Most of the employees will be from local area. The plantation will be made within

and outside the lease for improving the environment. The company is involved in CSR

activities like running of school, hospital, sports and other cultural activities.

Proposed Infrastructure:

Under the Corporate Social Responsibility, lessee will continue to provide infrastructure

support to nearby schools and other community needs

Green belt is proposed to be developed in safety zone and plantation will be carried out.

Besides this, it is also proposed that a plantation drive in the surrounding will be undertaken

with the total involvement of community, which is expected to give better survival rates.

As far as drinking water is concerned, it would be apt to reiterate here that residential

accommodation will not be provided to its workers as there is a colony nearby. The main

drinking water requirement will be of mine workers. The proposed strength is 71. It can be

7

seen that daily domestic and drinking water requirement will be about 3 KLD. The drinking

water is provided from CMCL Plant.. There is no overburden.

The power required for mine is for lighting on haul road, mining lease area and office. The

requirement is roughly 0.5 MW. The supply is Meghalaya State Electricity R & R plan will

be implemented as per the rules laid down in National R & R Policy, 2007.

Project Schedule & Cost Estimates.

The proposed mining activity will commence immediately on getting environment clearance

and approval of mining plan. The total project cost of mining is about Rs.675 Lakhs.

Analysis of proposal (Final Recommendations):

The project is proposed in the barren land. It will be captive mine for its cement plant. It will

be provided direct employment up to 71 persons, and preference will be given to local

people. Further, the share of indirect employment will likely increase the purchasing power,

dhabas and retail shops etc. is largely shared by local residents. The most important aspect of

the project is the land under mining is almost barren thus it does not create a negative impact

on the livelihood of residents. Further, taxes are earned by the state government in the form

of royalty.

2. Introduction of the project/ Background information

Cement Manufacturing Company Ltd (CMCL) is an ISO 9001:2000 certified Public Limited

Company with Registered office and works at Lumshnong, East Jaintia Hills district,

Meghalaya. CMCL was accorded approval for setting up a 900 TPD cement plant at

Lumshnong village, East Jaintia Hills district Meghalaya by the Govt. of Meghalaya in the

year 2002 and subsequently was accorded approval for expanding the capacity to 3000 TPD

in the year 2003.

The state Govt. granted two mining leases vide letter no. 47/2008/23, dated 22/07/2004 for

4.96 hectares and vide letter no. MG/21/2003/394 dated 04/07/2005 for 4.70 hectares for

meeting the limestone requirement of the cement plant CMCL. As per EIA Notification 2006,

8

Environment Clearance is not required for area < 5 ha, hence no environmental clearance for

individual mines was obtained.

Two mining leases were applied for the amalgamation to the state Govt. on 08-12-2006 and

State Govt. permitted amalgamation vide letter no. MG.98/2008/23 dated 01/04/2009

(Annexure-2). Mining plan for the amalgamated mine along with the progressive mine

closure plan over the combined area of 9.66 hectares is under preparation.

CMCL had applied to obtain Environment Clearance from SEIAA, Meghalaya, on

24.04.2013 SEIAA granted the TOR under Category “B”. The Public hearing was conducted

on 12/06/2014. Thereafter, before the final the final appraisal by SEAC, the Narpuh reserved

forest was declared as wildlife sanctuary. As such general condition became applicable on

this project also therefore the project is now considered as Category “A” project. Therefore,

project will be submitted to MOEF for Environmental Clearance.

Total production of Limestone from amalgamated mine will be 4,75,095 TPA, Lime Stone

and 1,74,420 TPA,, Sand Stone for running Cement plant which is 3.50 km from the pit head,

CMCL has engaged M/s Perfact Enviro Solutions Private Ltd., New Delhi, for the

preparation of Environment Impact Assessment study and Environmental Management Plan

through Terms of Reference (TOR).

Brief description and nature of the project

CMCL proposes to amalgamate two existing limestone mine Khub-I (4.96 ha) and Khub-II (4.96 ha)

based on state-of-the-art technology at the said mining lease area in East Jaintia Hills District of

Meghalaya.

DETAILS OF LIMESTONE MINE ARE GIVEN BELOW

Topography and Drainage

Topography of the ML area and its surroundings are rugged and mountainous. Maximum

and minimum contours passing through the area are 546 m and 520 m respectively. South-

Western part of the area is at a higher elevation with respect to south-eastern part. It is

represented in lease plan and surface drainage plan (Plate-7). A perennial nallah flows about

400 m. south of the southern lease boundary.

Regional Geology

9

The State of Meghalaya comprising eight districts covers an area of approximately 22,429 sq

km bordered to its North and East by the State of Assam and South and West by Bangladesh.

The state presents a picturesque landscape of plateau, ravines, rivulets, lakes and water falls

and magnificent gorges even exceeding 60 m. depth in Khasi Hills. Shillong the state capital

is located at an elevation of 1800 m in the central part of Khasi Hills. The rock formations of

the area fall under Jaintia series of Eocene age.

The Regional Stratigraphic Succession is as follows:

Age Group/Series Stage Rock types

Oligocene Barail Series -- Sandstone & Shale.

Upper Eocene Garo Group Kopili Formation Grey shale with alternate layers of

Sandstone & Siltstone

Lower to Middle

Eocene

Jaintia Group Sylhet Limestone Prang Limestone

Narpuh Sandstone

UmlatdohLimestone

Lakadong Sandstone

Lakadong Limestone.

Local Geology:

The amalgamated area under report falls under Survey of India Toposheet No. 83 C/8 and

located near village Lumshnong (250 948 to 250104.3N & 9202205.3 to 9202223.6E).

The minimum and maximum elevation of the area varies from 520m to 546m above M.S.L.

The different litho units of the area belong to Jaintia series of Eocene age. The limestone unit

belongs to sylhet stage of Jaintia series of middle Eocene age.

Three bands of limestone occur in the area, which are known as Prang, Umlatdoh and

Lakadong limestone bands. These are separated by Narpuh sandstone and Lakadong

sandstone. The topmost limestone band i.e Prang limestone occurs further south of the

prospect.

Based on surface and sub-surface data generated during the exploration work, the following

rock types are encountered in the area.

Sandstone & Shale, Grey shale with alternate layers of Sandstone & Siltstone, Prang

Limestone, Narpuh Sandstone, Umlatdoh Limestone, Lakadong Sandstone, Lakadong

Limestone.

Exploration work already carried out

10

The prospecting operation over 9.66 hectares consisted of following broad activities:

1. Topographic Survey

2. Surface Geological Mapping

3. Surface Sampling and Analysis

4. Drilling, Sampling & Analysis

5. Reserve Estimation

Based on the above study and information collected from the area, Geological plan

was prepared on a scale of 1:1000 and updated with two new bore hole data i.e K2-2A

in 4.70Ha and K1-2A in 4.96 Ha.

After incorporating lithological contacts, dip (4 to 50 towards South), strike (E-W) of

the insitu body, out-crops of different lithological units on surface plan the Geological

Plan and section was updated on a Scale of 1:1000. Geological plan is enclosed as

annexure.

Two bore holes were drilled up to the bottom of limestone.

Proposed exploration :

In order to prove the continuity & persistence of ore deposits below

sandstone band i.e below 430 mRL (Khub-I) and 450 MRL (Khub-II) the

following bore holes were proposed.

Proposed exploration-Khub-I (4.96 Ha)

S.

No.

Year Proposed

Bore hole

Angle of

Bore hole

Depth of bore

hole from 430

mRL

1 2015-16 CMCL-1 Vertical 50 mtr.

2 2015-16 CMCL-2 Vertical 60 mtr.

3 2015-16 CMCL-3 Vertical 50 mtr.

Proposed exploration –Khub-II (4.70 Ha)

11

Estimation of Reserves:

The total reserve s/resources estimated in million tones & the details are given in the

following table.

(in million tonnes)

Category Khub-I Khub-II Total

Limestone Sand

Stone

Limestone Sand

Stone

Limestone Sandstone

Measured

Mineral

Resources (331)

5.61 0.25 4.26 0.39 9.87 0.64

Proved Mineral

Reserve (111)

3.19 0.18 2.17 0.22 5.36 0.40

The average grade of limestone is as follows.

CaO - 46.5 to 53.2%

MgO - 1.02 to 3.91%

SiO2 - 2.50-4.50%

Al2O

3 - 1.50-2.50%

Fe2O

3 - 1.00-2.00%

Life of mine: Life of mine is about12 years.

Need for the project and its importance to the country and / or region & Demand- Supply Gap.

Sl.

No.

Year Proposed

Bore hole

Angle of

Bore hole

Depth of bore

hole from 450

mRL

1 2015-16 CMCL-5 Vertical 60 mtr.

2 2015-16 CMCL-6 Vertical 60 mtr.

3 2015-16 CMCL-7 Vertical 60 mtr.

12

Need of the project

The limestone being the main raw material for manufacturing of cement is always in demand

in a developing country like ours. The existence of project will cater the needs of cement

production,

Demand-Supply Gap:

8 to 10 % growth of cement is taking place in the country; therefore there will be always

demand of limestone in the country. The mine under reference is a captive mine of Cement

Manufacturing Co. Ltd.

Imports vs. Indigenous production/ Export possibility.

It is the captive lime stone mine to the Cement Manufacturing Co. Ltd. Limestone will be

supplied directly to cement plant. Therefore the mine is for indigenous production and no

import is being made. There are no chances of export either.

Employment Generation

71 persons will be directly employed, Besides substantial amount of indirect employment

will be generated in the form of dhabas, transporters etc. which will improve the economic

conditions of the area.

Yearly Production data from 2004-05 to 2014-15

As mentioned earlier, the mines Khub –I & II are amalgamated with an area of 9.66 ha,

however, the mines Khub-I and Khub-II have been under operation since 2004-05.

Production from these mines are given as under.

Year Khub-I (4.96 ha) (TPA) Khub-II (4.96 ha) (TPA)

2004-05 46,297.710 -

2005-06 3,80,626.325 -

2006-07 6,55,558.484 6,657.425

2007-08 1,56,516.520 3,68,981.520

13

2008-09 1,29,371.850 5,78,525.540

2009-10 79,228.780 3,46,566.660

2010-11 1,54,419.810 5,43,617.630

2011-12 89,003.580 6,32,502.800

2012-13 1,78,858.45 4,75,841.020

2013-14 23,682.79 89,555.900

Total 1,893,565.299 (TPA) 3,042,248.486 (TPA)

3. Project Description

(i) Type of Project including interlinked and interdependent project, if any:

This is a mining project of limestone mine with opencast mechanized mining. This is a

captive mine of cement plant. The pre-existing mines of Khub-I (4.96 ha) & Khub-II (4.70

ha) are proposed to be amalgamated to Khub mine of 9.66 ha.

(ii) Interlinked Projects:

This is a captive limestone mine to the Cement Manufacturing Co. Ltd. The cement plant is

located at a distance of 3 Km.

(iii) Lease Details:

Name of owner: M/s Cement Manufacturing Co. Ltd.

(Mr. Devender Bansal, Resident Director, nominated owner)

Address: Village Lumshnong, P.O. Khliehriat,

Dist. East Jaintia Hills

Lease area: 9.66 ha.

Date of grant: Yet to be granted. LOI issued vide letter No.MG-98/2008/23, dated

01.04.2009.

(iv)Location details:

The geographical location of mining lease area is given in the following Table.

14

Khub-I Limestone mine Khub-II Limestone mine Khub Limestone

mine(amalgamated)

State Meghalaya State Meghalaya State Meghalaya

District East Jaintia

hills District

East Jaintia

hills District

East Jaintia

hills

Village Lumshong Village Lumshong Village Lumshong

Lease Area 4.96 ha Lease Area 4.70 ha Lease Area 9.66 ha

Toposheet

No.

83C/8 Toposheet

No.

83C/8 Toposheet

No.

83C/8

Latitude 250

1016N Latitude

250

1016N Latitude

250 948 to

250104.3N

Longitude

9202252 E

Longitude

9202252 E

Longitude

9202205.3

to

9202223.6E

Altitude

550 m

AMSL Altitude

546m

AMSL Altitude

520 m AMSL

to 546m

AMSL

The geographical location map is given in Annexue-2.

There is no public road or railway line within the M.L area. The lease area is situated at a

distance 1 km west of NH-44 connecting Shillong to Silchar. The nearest railway station is

Badarpur at a distance of 38.5km, which is on Guwahati-Lumding-Silchar meter gauge

section of N.E.F. Railway. The surface plan is shown in Annexure -3. Topography of the ML

area and its surroundings are rugged and mountainous. Maximum and minimum contours

passing through the area are 546m and 520m respectively with graters relief of 20m. South-

Western part of the area is at a higher elevation with respect to south-eastern part. The nearest

airport at Silchar is 67.5 kms and Guwahati at about 211 kms from Lumshong village.

(v) Details of alternative sites:

This is a site specific project and it is a captive mine for the Cement Manufacturing Co. Ltd.

cement plant.

(vi) Size or Magnitude of Operations:

15

Working for limestone is done by adopting mechanized opencast method. It is proposed to

produce a maximum of 4,75,095 TPA Lime Stone , I,74,420 TPA Sand Stone from the lease

area of 9.66 ha by way of progressive mining plan as per the approval from the IBM.

Salient Features of the Mode of Working:

Mechanized open cast mining will be undertaken with the help of Excavator /loader

and dumper.

Bench height will be kept at 6 m.

The width of ultimate width will not be less than bench height, however, working

bench will have a width around 20 m

Drilling& blasting will be taken up. Excavator and dumpers/trucks combination will

be used for removal of excavated material

(vii) Project description with process details (a schematic diagram/flow chart

showing the project layout, components of the project etc. should be given)

The mine will be worked by Mechanized Opencast Method of working. Heavy earth

moving machinery in conjunction with deep hole drilling and blasting will be

utilized for the mining. The height of the bench will be kept of 6 Meters and width of

the bench will be kept 20 Meters.

The blast holes of 115 mm dia will be drilled using hydraulic drills. The blast holes

will be drilled in staggered pattern keeping burden of 3.0 to 4.0 Meters and spacing

of 4.0 to 6.0 Meters.

The blast holes will be charged with ANFO/slurry explosives/SME along with prime

charges. Almost 30 % of blast hole depth will be stemmed for effective blasting and

to reduce noise and fly rock. The explosives will be blasted by using non–electric

detonators (NONEL). This enables bottom initiation in the holes and with this

technique each hole is blasted separately by providing delay in each hole. The

bottom initiation and delay in each hole not only control the throw of the blast but

also reduce the ground vibration and noise pollution.

The mine working will be highly mechanized. For operations like drilling,

excavating and hauling, heavy earth moving machineries viz. drill machine,

16

hydraulic excavator and dumpers will be used. Hydraulic drill machine will be used

for drilling 115 mm dia blast holes. Hydraulic Excavators will be used for loading of

blasted material. The dumpers of 25 tons payload will be used for transporting of and

limestone to cement plant at 3 Km. distance.

(viii) Extent of Mechanization and List of Equipments.

It will be a mechanized mine with deep hole drilling-blasting and loading through excavators

to tipper. Apart from these equipments water tanker will be provided for sprinkling. The list

of equipment is given below;

List of Equipments:

1. Hydraulic Excavator:-

Make : VOLVO.

Model : EC 290 BLC - 01 Nos.

2. Hydraulic Excavator:-

Make : L&T Komatsu,

Model : PC-200 - 01 No.

3. Hydraulic Breaker HB 1200 :-

Make : Atlas Copco – 01 No.

4. TIPPRS:-

Make : TATA

Model : 2516 HYVA - 06 Nos. capacity – 18MT

5. Screw Compressor

Make : ATLAS COPCO,

Model : XAH 210 –02 No. ;

130-210 Ltr/Second Used with Crawler Drill ROC-203 – 01 No.;

17

Crawler Drill,

Make : Atlas Copco,

Model : ROC-203 – 02 No. 115mm dia hole drill.

6. Bull Dozer:-

Make : BEML,

Model : D-50 – 01 No.

7. Water Tanker 10KL capacity Mounted on TATA Chassis – 01 No.

8. Maintenance Van – 01 No.

(ix) Raw Materials required along with estimated quantity.:

Total of 43 KLD of water will be required, out of which 3KLD will be utilized for drinking &

domestic purposes, 25KLD will be utilized for mining & allied activities including dust

suppression, and 15 KLD for plantation.

The total diesel requirement will be 800 LPD

.(x) Market and Mode of transport:

All the limestone from mine to cement plant at a distance of 3 Km. will be transported by

trucks.

Raw material required for finished product.

It is a captive mine of Cement Manufacturing Co. Ltd. Cement Plant. It requires namely fuel

oil, explosives & water. The diesel requirement is 800 LPD. Water requirement for drinking

& domestic use, mining activities including sprinkling, &plantation use will be 3KLD,

25KLD, &15KLDrespectively.

(xi) Resource Optimization/Recycling:

18

Limestone mineral from the mine will be optimally mined and will be utilized for cement

production. High grade & low grade benches will be mined to produce acceptable grade of

limestone. Thus conservation aspect of mineral will be of paramount importance.

(xii) Schematic representation of the feasibility which gives information of EIA purpose.

Detailed Schematic representation of the feasibility covering the purpose of EIA will be

given in EIA report.

4. Site Analysis:

(i) Connectivity:

The lease area is situated at a distance 1 km west of NH-44 from 67.5 Km stone connecting

Shillong to Silchar. The nearest railway station at a distance of 38.5km from Lumshnong is

Badarpur on Guwahati-Lumding-Silchar meter gauge section of N.E.F. Railway. The road

distances of the major towns from the mine are as under.

Jowai : 35.40 Km

Badarpur : 38.5 Km

Silchar :67.5 Km

(ii) Land Form, Land use and Land ownership: The land is private waste land. It is non-forest, non-agricultural. Consent for mining from the

land owners of the land have already been obtained

(iii) Topography (alongwith map:

Topography of the ML area and its surroundings are rugged and mountainous. Maximum

and minimum contours passing through the area are 546 m and 520 m respectively. South-

Western part of the area is at a higher elevation with respect to south-eastern part. A

perennial nallah flows about 400 m. south of the southern lease boundary.

(iv) Existing land use pattern:

The total lease area of 9.66 ha is private waste land. Out of this 8.09 ha is mined out area and

remaining 1.57 ha is undisturbed. In the mined out area, the ramps have been made which

19

acts as haul road and joins approach road for mineral transportation from mine to the cement

plant at 3 Km. distance.

(v) Existing Infrastructure:

At present the infrastructure available in the mine area are service roads, workshop building,

canteen, power line for lighting, sub post office, primary & middle school. Weekly market is

at Lumshnong. The nearest road is at distance of 1Km. in East. Nearest railway station is

Badarpur at distance of 38.5 Km. The nearest airport is at Silchar at 67.5 Km.

(vi) Soil Classification:

There is no top soil available in ML area and it was already removed.

(vii) Climatic data from secondary sources:

The climate in the study area is typically tropical. The region experiences tropical monsoonic

climate that varies from western to eastern part of the plateau. Jaintia Hills District has

tropical climate characterized by high rainfall and humidity, generally warm summer and

moderately cold winter. The lower elevated areas experience fairly high temperature for most

part of the year having a mean maximum of 230 C to 260 C and a mean minimum of 120 C to

170 C. The mean summer temperature is 260 and the mean winter temperature is 90 C. The

mean annual rainfall varies from 4,000-6,000 mm with most rainfall concentrated from May

to September.

(viii) Social Infrastructure:

Educational Facilities

All the villages in the study area have some education facility. It wa found that eduacational

facilities have been further strengthened in the study area. Vidya Bharti School has been

established upto Xth level from this year by CMCL.Preference od admission is given to the

employees and villagers of Lumshnong .

Medical Facilities:

Only 2 villages were having medical facilities within 10 Km. study area. Based on the survey

made in the study area, medical facilities have been further strengthened now and number of

private doctors are also practicing in the study area. Medical Aid Centre, with 4 beds have

20

been provided by CMCL at the Plant site. Two MBBS doctors, compounder, dentist, trained

nurses and lab technicians are provided in CMCL hospital. Local people are given free

medicine available in the hospital. Hospital is equipped with X-Ray machine and blood test

facilities. Regular medical camps are organized by CMCL in the local nearby villages. Two

ambulances are available 24 hrs. in the CMCL hospital.

Electric Power Availability

Most of the villages (71%) in the study area had access to power supply. Based on the survey

made in the study area, facilities have further improved now.

Potable Water

All the villages in the study area have water supply for domestic purposes. The wells, tanks

and Hand-pumps are the dominant sources of drinking water throughout the study area. Some

villages have tapped water facility. Based on the survey made in the study area, facilities

have further improved now. Surface water source like fountain or spring is not available. On

request from villagers tanker with drinking water is also provided by CMCL during summer.

Transport Facilities

The main mode of transportation is by road. About 65% villages in the study area had

access to bus service and private taxi services. Facilities were available within 10 Km. At

present, transport facilities in the study area have been improved significantly.

Post and Telegraph Facilities

Except 2 villages of study area have post office facility at 5-10 Km. The cement plant and

mine have telephone facilities. Villages on the main road have public phone facilities. The

communication facilities in villages in the study area are very poor and need improvement.

Based on the survey made in the study area, facilities have further improved now at a

distance of less than 5 Km.

5. Planning Brief

A mining project is much different than other industrial projects. Therefore its planning part

also differs. In case of mining, the lease is granted only after an approved mining plan is

21

submitted to the government. It is an opencast mechanized mining and the salient features are

as below.

Mechanized open cast mining will be undertaken with the help of Excavator

/loader and dumper.

Bench height will be kept at 6 m.

The width of ultimate width will not be less than bench height, however,

working bench will have a width around 20 m

Drilling blasting will be taken up on a tested designed pattern for optimum

utility.

Excavator and dumpers/trucks combination will be used for removal of

excavated material

The maximum strength of workers will be 71persons. Most of the employees

will be from local area.

The plantation will be made within and outside the lease for improving the

environment.

The company is involved in CSR activities like running of school, hospital,

sports and other cultural activities.

Limestone from this mine will be utilized to produce cement which is of great

importance for infrastructure development of the state.

6. Proposed Infrastructure:

Physical Infrastructure:

No additional significant infrastructure is expected due to proposed mining activity. However

under the Corporate Social Responsibility, lessee will continue to provide infrastructure

support to nearby schools and other community needs

Green Belt / Afforestation:

Green belt is proposed to be developed along the periphery of lease area in the statutory

width of 7.5 m. Plantation will be carried out in an area of 1.57 ha. Besides this, it is also

22

proposed that a plantation drive in the surrounding will be undertaken with the total

involvement of community, which is expected to give better survival rates.

Drinking Water Management ( Source & Supply of Water ):

As far as drinking water is concerned, it would be apt to reiterate here that residential

accommodation will not be provided to its workers as there is a colony nearby. The main

drinking water requirement will be of mine workers. The proposed strength is 71. It can be

seen that daily domestic and drinking water requirement will be about 3 KLD. The drinking

water is provided from CMCL Plant..

Sewerage System:

It is not significant as residential accommodation will not be provided within the mining

lease.

Solid Waste Management:

There is no overburden.

Power requirement:

The power required for mine is for lighting on haul road, mining lease area and office. The

requirement is roughly0.5 MW. The supply is Meghalaya State Electricity Board.

7. Rehabilitation and resettlement (R & R Plan )

R & R plan will be implemented as per the rules laid down in National R & R Policy, 2007.

8. Project Schedule & Cost Estimates.

Likely date of start of construction and likely date of completion:

The proposed mining activity will commence immediately on getting environment clearance

and approval of mining plan.

Project cost along with analysis in terms of economic viability of the project:

23

The Total project cost of mining is about Rs.675Lakhs. The limestone will be dispatched

directly to the cement plant through trucks at a distance of 3 Km. The cost of limestone is Rs

70 per tone.

9. Analysis of proposal (Final Recommendations):

The project is proposed in the barren land. It will be captive mine for its cement plant. It will

provide direct employment to 71 persons. About 60% of the total employment will be given

to locals. Further, the share of indirect employment will likely increase the purchasing power,

dhabas and retail shops etc. is largely shared by local residents. The most important aspect of

the project is the land under mining is almost barren thus not creating a negative impact on

the livelihood of residents. Furthermore, taxes are earned by the state government in the form

of royalty.

24

Annexure-I Letter of Amalgamation

25

Annexure-II LOCATION PLAN

26

SURFACE-GEOLOGICAL PLAN Annexure-III

27

Annexure-IV CONCEPTUAL PLAN

28

Annexure-V: 10 Km Buffer Zone