preconstruction services – role of a cm · that’s why it’s critical to bring your cm into the...

2
Construction projects are not cookie-cutter affairs where one plan fits all. It’s easy to assume that because a construction manager (CM) does this for a living, any and all issues should be immediately and easily solved. But each new project brings fresh challenges and nuances. That’s why it’s critical to bring your CM into the preconstruction process as early as possible – allowing your entire project team to work together from the beginning to ensure issues are discussed and addressed well before a shovel hits the ground. Elements of Preconstruction When done correctly, preconstruction planning is a thoroughly collaborative process that includes the CM, architect, owner, and engineers/consultants. Each discipline has its own unique set of skills and perspectives to bring to the table. Below are some of the many services and skills that a CM can provide during preconstruction. Feasibility and Constructability Working independently or collaborating with the architect and consultants, a CM will usually begin the preconstruction process by developing feasibility studies and constructability analyses based on the project scope, program requirements, site constraints, and available budget. The depth and importance of these activities varies as the project evolves. The CM will review, discuss, and make recommendations regarding the systems, materials, details, and components being considered for the project. Communication A successful preconstruction planning process is all about communication – keeping all team members informed as choices are considered and decisions are made. During planning, the construction manager will prepare a decision-making framework of systems and materials, preliminary construction budgets, and cost models to assist the project team in the development and finalization of design. During schematic and design development, there are regular meetings with the architect and consultants to advise on site use and improvements; selection of materials, building systems and equipment; construction feasibility; availability of labor and materials; adherence to the budget; and construction time requirements. Value Engineering Achieving the desired goals through the most economical means is the objective of most construction projects. Value engineering is an insightful, creative exercise, not one that merely sets out to reduce scope or costs. A skilled CM is a partner in the process and proactively identifies areas where money is being spent unwisely, searches for alternates, and recommends materials and methods that are cost-effective yet maintain the integrity of the design intent. The owner then decides which ideas to incorporate into the project. Budget Understanding and proactively dealing with budget constraints during preconstruction is critical for success. Construction managers crunch the numbers to determine the estimated project cost based on all information gathered to date. A CM must look forward and anticipate any and all reasonable, foreseeable costs that will be incurred during the course of construction. If necessary, modifications may be incorporated very early in the process without adding exorbitant costs or design time. Milestone budget updates are done when schematic and design Preconstruction Services – Role of a CM By Eric P. Greene As seen in New England Real Estate Journal Construction shot of Kimball Towers, located in Burlington, Massachusetts. Photograph by Dave Desroches. new england real estate journal spotlight/2009 forecast january 30 - february 5, 2009 13b Visit the paper online nerej.com Preconstuction services and the role of a construction manager so project moves smoothly Erland Construction eg Eric Greene spotlight/construction management sp Construction projects are not cookie-cutter affairs where one plan fits all. It’s easy to assume that because a construction manager (CM) does this for a living, any and all issues should be immediately and easily solved. But each new project brings fresh challenges and nuances. That’s why it’s critical to bring your CM into the preconstruction process as early as possible – allowing your entire project team to work together from the beginning to ensure issues are discussed and addressed well before a shovel hits the ground. Elements of Preconstruction When done correctly, precon- struction planning is a thoroughly collaborative process that includes the CM, architect, owner, and engi- neers/consultants. Each discipline has its own unique set of skills and perspectives to bring to the table. engineering is an insightful, creative exercise, not one that merely sets out to reduce scope or costs.A skilled CM is a partner in the process and proac- tively identifies areas where money is being spent unwisely, searches for alternates, and recommends materials and methods that are cost-effective yet maintain the integrity of the design intent. The owner then decides which ideas to incorporate into the project. Budget – Understanding and proactively dealing with budget con- straints is critical for success. CMs crunch the numbers to determine the estimated project cost based on all information gathered to date. A CM must look forward and anticipate any and all reasonable, foreseeable costs that will be incurred during the course of construction. If necessary, modi- fications may be incorporated very early in the process without adding exorbitant costs or design time. Mile- stone budget updates are done when schematic and design development documents are issued. Subsequent budgets are tracked against the initial budget so that changes to the original estimate are reviewed and understood by all. Schedule – Many projects have firm deadlines with significant impli- cations if they are missed. The CM is responsible for developing a master project schedule that is used as a tool for planning and monitoring the progress of the preconstruction and construction process. It coordinates and integrates items such as the architect’s design process, permitting time frames, various budget reviews, and owner action items with the construction schedule. Requirements for phased construction or site restric- tions are addressed and incorporated into the schedule. Critical dates are established, including dates for procurement of long lead items and critical elements of work such as subcontract awards, shop drawings, sample preparation and submission, fabrication time, field assembly, and installation. Site Assessment and Logistics - CMs perform site assessments of existing conditions and establish a construction site mobilization plan. These plans incorporate procedures for truck traffic and delivery schedules that minimize disturbance to adjacent neighborhoods. If the project is within an occupied facility, it’s critical to fully understand the client’s usage of the space and incorporate that knowledge into the plans. The primary objective is always to provide a safe site with the least disruption possible during construction. Construction projects are such costly and sensitive endeavors that it makes sense to have the team member responsible for actual construction involved from the beginning. When an experienced and attentive construc- tion manager is involved in a project during the early planning stages, the risk of having budget, schedule, qual- ity, safety, permitting, or logistical issues is greatly reduced. Eric Greene is regional manager of Erland Construction, East Wind- sor, Conn. Erland’s Branching Out TO CONNECTICUT & WESTERN MASSACHUSETTS

Upload: others

Post on 27-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Preconstruction Services – Role of a CM · That’s why it’s critical to bring your CM into the preconstruction process as early ... to ensure issues are discussed and addressed

Construction projects are not cookie-cutter affairs where one plan fits all. It’s easy to assume that because a construction manager (CM) does this for a living, any and all issues should be immediately and easily solved. But each new project brings fresh challenges and nuances. That’s why it’s critical to bring your CM into the preconstruction process as early as possible – allowing your entire project team to work together from the beginning to ensure issues are discussed and addressed well before a shovel hits the ground.

Elements of Preconstruction When done correctly, preconstruction planning is a thoroughly collaborative process that includes the CM, architect, owner, and engineers/consultants. Each discipline has its own unique set of skills and perspectives to bring to the table. Below are some of the many services and skills that a CM can provide during preconstruction.

Feasibility and Constructability Working independently or collaborating with the architect and consultants, a CM will usually begin the preconstruction process by developing feasibility studies and constructability analyses based on the project scope, program requirements, site constraints, and available budget. The depth and importance of these activities varies as the project evolves. The CM will review, discuss, and make recommendations regarding the systems, materials, details, and components being considered for the project.

Communication A successful preconstruction planning process is all about communication – keeping all team members informed as choices are considered and decisions are made. During planning, the construction manager will prepare a decision-making framework of systems and materials, preliminary construction budgets, and cost models to assist the project team in the development and finalization of design. During schematic and design development, there are regular meetings with the architect and consultants to advise on site use and improvements; selection of materials, building systems and equipment; construction feasibility; availability of labor and materials; adherence to the budget; and construction time requirements.

Value Engineering Achieving the desired goals through the most economical means is the objective of most construction projects. Value engineering is an insightful, creative

exercise, not one that merely sets out to reduce scope or costs. A skilled CM is a partner in the process and proactively identifies areas where money is being spent unwisely, searches for alternates, and recommends materials and methods that are cost-effective yet maintain the integrity of the design intent. The owner then decides which ideas to incorporate into the project.

Budget Understanding and proactively dealing with budget constraints during preconstruction is critical for success. Construction managers crunch the numbers to determine the estimated project cost based on all information gathered to date. A CM must look forward and anticipate any and all reasonable, foreseeable costs that will be incurred during the course of construction. If necessary, modifications may be incorporated very early in the process without adding exorbitant costs or design time. Milestone budget updates are done when schematic and design

Preconstruction Services – Role of a CM

By Eric P. Greene

As seen in New England Real Estate Journal

Construction shot of Kimball Towers, located in Burlington, Massachusetts. Photograph by Dave Desroches.

new england real estate journal • spotlight/2009 forecast • january 30 - february 5, 2009 13bVisit the paper online nerej.com

Preconstuction services and the role of a construction manager so project moves smoothly

Erland Construction

eg Eric Greene

spotlight/construction management sp

Construction projects are not cookie-cutter affairs where one plan fi ts all. It’s easy to assume that because a construction manager (CM) does this for a living, any and all issues should be immediately and easily solved. But each new project brings fresh challenges and nuances. That’s why it’s critical to bring your CM into the preconstruction process as early as possible – allowing your entire project team to work together from the beginning to ensure issues are discussed and addressed well before a shovel hits the ground.

Elements of PreconstructionWhen done correctly, precon-

struction planning is a thoroughly collaborative process that includes the CM, architect, owner, and engi-neers/consultants. Each discipline has its own unique set of skills and perspectives to bring to the table. Below are some of the many services and skills that a CM can provide dur-ing preconstruction.

•Feasibility and Constructabil-ity – Working independently or collaborating with the architect and consultants, a CM will usually be-gin the preconstruction process by developing feasibility studies and constructability analyses based on the project scope, program requirements, site constraints, and available budget. The depth and importance of these activities varies as the project evolves. The CM will review, discuss, and make recommendations regarding the systems, materials, details, and components being considered for the project.

•Communication – A successful preconstruction planning process is all about communication – keep-ing all team members informed as choices are considered and decisions are made. During planning, the CM will prepare a decision-making framework of systems and materials, preliminary construction budgets, and cost models to assist the project team in the development and fi nalization of design. During schematic and design development, there are regu-lar meetings with the architect and consultants to advise on site use and improvements; selection of materials, building systems and equipment; construction feasibility; availability of labor and materials; adherence to the budget; and construction time requirements.

•Value Engineering – Achieving the desired goals through the most economical means is the objective of most construction projects. Value

engineering is an insightful, creative exercise, not one that merely sets out to reduce scope or costs. A skilled CM is a partner in the process and proac-tively identifi es areas where money is being spent unwisely, searches for alternates, and recommends materials and methods that are cost-effective yet maintain the integrity of the design intent. The owner then decides which ideas to incorporate into the project.

•Budget – Understanding and proactively dealing with budget con-straints is critical for success. CMs crunch the numbers to determine the estimated project cost based on all information gathered to date. A CM must look forward and anticipate any and all reasonable, foreseeable costs that will be incurred during the course of construction. If necessary, modi-

fi cations may be incorporated very early in the process without adding exorbitant costs or design time. Mile-stone budget updates are done when schematic and design development documents are issued. Subsequent budgets are tracked against the initial budget so that changes to the original estimate are reviewed and understood by all.

•Schedule – Many projects have fi rm deadlines with signifi cant impli-cations if they are missed. The CM is responsible for developing a master project schedule that is used as a tool for planning and monitoring the progress of the preconstruction and construction process. It coordinates and integrates items such as the architect’s design process, permitting time frames, various budget reviews,

and owner action items with the construction schedule. Requirements for phased construction or site restric-tions are addressed and incorporated into the schedule. Critical dates are established, including dates for procurement of long lead items and critical elements of work such as subcontract awards, shop drawings, sample preparation and submission, fabrication time, fi eld assembly, and installation.

•Site Assessment and Logistics - CMs perform site assessments of existing conditions and establish a construction site mobilization plan. These plans incorporate procedures for truck traffi c and delivery schedules that minimize disturbance to adjacent neighborhoods. If the project is within an occupied facility, it’s critical to fully

understand the client’s usage of the space and incorporate that knowledge into the plans. The primary objective is always to provide a safe site with the least disruption possible during construction.

Construction projects are such costly and sensitive endeavors that it makes sense to have the team member responsible for actual construction involved from the beginning. When an experienced and attentive construc-tion manager is involved in a project during the early planning stages, the risk of having budget, schedule, qual-ity, safety, permitting, or logistical issues is greatly reduced.

Eric Greene is regional manager of Erland Construction, East Wind-sor, Conn.

Erland Construction, Inc. | www.erland.com83 Second Avenue | Burlington, Massachusetts 01803 | t: 781.272.9440 | f:781.272.0601

One Hartfield Boulevard, Suite 102 | East Windsor, Connecticut 06088 | t: 860.292.8583 | f: 860.292.8692

Program Management | Construction Management | Design/Build

Building Solutions Through Commitment and Teamwork

Erland’s Branching OutTO CONNECTICUT & WESTERN MASSACHUSETTS

Scanlon Hall at Westfield State CollegeWestfield, MassachusettsPhotography: Bruce T. Martin

Field House and Wellness Center at Springfield CollegeSpringfield, MassachusettsPhotography: Dave Desroches

Campus Union at Springfield CollegeSpringfield, MassachusettsRendering: Symmes Maini & McKee

Field House and Wellness Center at Springfield CollegeSpringfield, MassachusettsPhotography: Dave Desroches

Page 2: Preconstruction Services – Role of a CM · That’s why it’s critical to bring your CM into the preconstruction process as early ... to ensure issues are discussed and addressed

development documents are issued. Subsequent budgets are tracked against the initial budget so that changes to the original estimate are reviewed and understood by all.

Schedule Many projects have firm deadlines with significant implications if they are missed. The CM is responsible for developing a master project schedule that is used as a tool for planning and monitoring the progress of the preconstruction and construction process. It coordinates and integrates items such as the architect's design process, permitting time frames, various budget reviews, and owner action items with the construction schedule. Requirements for phased construction or site restrictions are addressed and incorporated into the schedule. Critical dates are established, including dates for procurement of long lead items and critical elements of work such as subcontract awards, shop drawings, sample preparation and submission, fabrication time, field assembly, and installation.

Site Assessment and Logistics CMs perform site assessments of existing conditions and establish a construction site mobilization plan. The CM works closely with the owner and its representatives to develop comprehensive plans for use of the site during construction. These plans incorporate procedures for truck traffic and delivery schedules that minimize disturbance to adjacent neighborhoods. If the project is within an occupied facility, it’s critical to fully understand the client’s usage of the space and incorporate that knowledge into the plans. The primary objective is always to provide a safe site with the least disruption possible during construction.

Construction projects are such costly and sensitive endeavors that it makes sense to have the team member responsible for actual construction involved from the beginning. When an experienced and attentive construction manager is involved in a project during the early planning stages, the risk of having budget, schedule, quality, safety, permitting, or logistical issues is greatly reduced.

About the Author

Eric Greene joined Erland Construction in 2008 as Regional Manager of Erland’s office in East Windsor, Connecticut. He has over 26 years of experience in the commercial construction industry with over 100 projects in the academic, residential, healthcare, and corporate market sectors on his impressive resume.

1

2