Client Name: XXX Conclusion Inspection Number: L076523 PASSED Report Date: 28 July 2016 Page 1 of 33 Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7 Pre-Shipment Inspection Report I. GENERAL INFORMATION Service Performed: Pre-Shipment Inspection Client: XXX Supplier: XXX Factory: XXX Product Name: Lock & Lock MiNi Blender P.O. No.: 4900010870 Item No.: EJM331 Destination Country: XXX Inspection Date: 27 July 2016 Inspection Location: China Reference Sample: No Sample II. INSPECTION SUMMARY Passed Failed Pending N/A A. Quantity B. Workmanship C. On-Site Tests D. Product Specification E. Packing F. Marking & Labeling G. Client Special Requirement Workmanship Summary Inspection Standard: ANSI/ASQ Z1.4 Critical Major Minor Sampling Plan: Normal, Single AQL: Not Allowed 2.5 4.0 Inspection Level: Level II Accepted: 0 10 14 Order Quantity: 6504 Found: 0 2 8 Available Quantity: 6504 pcs (100%) Result Within AQL Sample Size: 200 III. Remarks Problem Remarks: 1. Nil General Remarks: 2. For CDF check, the result was as below table, Component Actual Conform to CDF or not Plug Guangzhou xxx Qiu, HQ-B201, AC 250V, 2.5A,VDE Conform Power cord Guangxxx Qiu,H03VVH2-F, 2x0.5mm2,VDE Conform X capacitor Dain, MPX, 0.39uF, AC 275V, X2,T110,VDE Conform

Upload: others

Post on 27-Mar-2020

59 views

Category:

Documents


2 download

TRANSCRIPT

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 1 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Pre-Shipment Inspection Report

I. GENERAL INFORMATION

Service Performed: Pre-Shipment Inspection

Client: XXX

Supplier: XXX

Factory: XXX

Product Name: Lock & Lock MiNi Blender

P.O. No.: 4900010870

Item No.: EJM331

Destination Country: XXX

Inspection Date: 27 July 2016

Inspection Location: China

Reference Sample: No Sample

II. INSPECTION SUMMARY

Passed Failed Pending N/A

A. Quantity

B. Workmanship

C. On-Site Tests

D. Product Specification

E. Packing

F. Marking & Labeling

G. Client Special Requirement

Workmanship Summary

Inspection Standard: ANSI/ASQ Z1.4 Critical Major Minor

Sampling Plan: Normal, Single AQL: Not Allowed 2.5 4.0

Inspection Level: Level II Accepted: 0 10 14

Order Quantity: 6504 Found: 0 2 8

Available Quantity: 6504 pcs (100%) Result Within AQL

Sample Size: 200

III. Remarks

Problem Remarks:

1. Nil

General Remarks:

2.

For CDF check, the result was as below table,

Component Actual Conform to CDF or not

Plug Guangzhou xxx Qiu, HQ-B201, AC 250V, 2.5A,VDE

Conform

Power cord Guangxxx Qiu,H03VVH2-F, 2x0.5mm2,VDE

Conform

X capacitor Dain, MPX, 0.39uF, AC 275V, X2,T110,VDE

Conform

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 2 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Y capacitor JEC,JY, 4700uF, 300V, Y2,VDE Conform

Motor Harvest, H5425M23, 220-240V, 50/60Hz,250W, Class B

Conform

Thermal link for motor Changzhou xxx KW-A2, 105°C, 250V,VDE

Conform

Internal wire SHUNDE xxxx, 1015, 20-24AWG, 105°C, 600V

Conform

Micro-switch Zhongshanxxxx, WS-3, 250V, 3A,TUV

Conform

3. The Logo sticker on the bottle was skew in 30% of selected samples. It was confirmed by client.

4. All gift boxes were not sealed well inside the carton and it was confirmed by client. Please refer to below photo for details.

5. For plastic bottle water leakage test, as client's requirement, the bottle was filled in max water level and horizontal placed for 10mins and the result was OK.

6. No silica gel including in the package.

7. When the inspector left the factory, the factory had not started re-packing the inspected samples. Only one carton was re-packed for reference.

8. The factory was requested to repair, replace the defective products our inspector found during the inspection.

Factory Information:

9.

Factory cooperation: □ Good - Enough manpower to assist, and good cooperation.

Average - Enough manpower to assist. □ Poor - Manpower, equipment or document not provided timely.

10.

Number of workers in factory: □ Less than 50 people □ 50-100 people □ 100-500 people □ 500-1000 people

□ More than 1000 people

Unknown

11.

The observed level of production/manufacturing activity at the inspection site was: □ Extremely busy

Normal activity □ Low activity □ N/A (Reasons: Inspection was held at warehouse or port. / Inspector had no access to workshops. / Factory was

unwilling to disclose information, etc)

12.

Inspector's opinion on the factory: □ Good - The factory was neat and tidy. The testing equipment was well maintained and calibrated.

Average - The factory was tidy, and the testing equipment ran normally. □ Poor - The factory was messed, the basic testing equipment was not available / not workable.

Sample Collection Record:

13. No sample was collected on site.

Photos:

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 3 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Remark 3, The Logo sticker on the bottle was skew in 30%

of selected samples. Remark 3, The Logo sticker on the bottle was skew in 30%

of selected samples.

Remark 3, The Logo sticker on the bottle was skew in 30%

of selected samples. Remark 3, The Logo sticker on the bottle was skew in 30%

of selected samples.

Remark 4, All gift boxes were not sealed well inside the

carton, but client have confirmed it on site. Remark 4, All gift boxes were not sealed well inside the

carton, but client have confirmed it on site.

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 4 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

IV. CONCLUSION

PASSED

PASSED - Conform to Client's Requirement PENDING - Subject to Client's Evaluation FAILED - Not Conform to Client's Requirement

Approved by : Tony Lee, Manager of Report Reviewing

Inspector & Report Reviewer:

Inspector(s): Jenson Liu Report Reviewer: Second Zeng

Should you have any question, please contact us:

Ellen Yao Account Manager E: [email protected] T: +86-20-89089938-823 M: +86-13826082485

Clara Chen Vice General Manager-Customer Service E: [email protected] T: +86-20-89089928-802 M: +86-13600063774

Note: 1. This report reflects our findings at the time and the place of inspection based on random samples selected. 2. This inspection was carried out to the best of our knowledge and abilities, and our responsibility is limited to the exercise of reasonable one. 3. This report does not relieve the sellers from their contractual obligations nor does it prejudice buyer's right for compensation for any apparent and/or hidden defects not detected during our inspection or occurring thereafter. 4. This report does not evidence shipment. 5. Our services are subject to the General Conditions of Service of V-Trust, which is shown at our website and can be sent to you upon written request. 6. This report's inspection results only relate to the samples as (randomly picked) by our inspector. 7. This report is complete and its content may not be reproduced. ************************************************************************************************************************************************************** Please find our inspection details from next page.

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 5 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

A. QUANTITY

Quantity Unit: pcs

P.O. Item Order Qty

Qty / Carton

Order Cartons

Quantity Breakdown Sample Size

Packed Unpacked Unfinished Packed Unpacked

4900010870

EJM331 6504 6 1084 6504 0 0 200 0

Total: 6504 - 1084 6504 0 0 200 0

Selected Cartons :

34 Cartons were selected randomly on site. No carton number in shipping mark.

Carton No.:

/ / / / / / / / / / /

Result: Passed

Remark:

B. WORKMANSHIP

Inspection Standard: ANSI/ASQ Z1.4 AQL Accepted Total Found Result

Sampling Plan: Normal, Single Critical: Not Allowed 0 0 Passed

Inspection Level: Level II Major: 2.5 10 2 Passed

Sample Size: 200 pcs Minor: 4.0 14 8 Passed

Workmanship Defectives / Function Inspection Findings

Description Critical Major Minor

For Item EJM331 (4900010870) Sample Size: 200 pcs

1. The feet was not flat (gap about 1mm) 2

2. Scratch mark on body 4

3. Bits inside sticker 1

4. Scratch mark on bottle 2

5. Sticker out of position 1

Total found: 0 2 8

Accepted: 0 10 14

Sample size: 200 200 200

Result: Passed

Remark:

Note: Defective is defined as a unit of product that contains one or more defects. A Defect is defined as any non-conformance of the inspected unit of product with specified requirements. A single defect is taken into account per each defective unit; only one most serious defect is taken into account per each defective unit.

1 Defect photos of Items: EJM331 (4900010870)

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 6 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

The feet was not flat (gap about 1mm) The feet was not flat (gap about 1mm)

Scratch mark on body Scratch mark on body

Scratch mark on body Scratch mark on body

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 7 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Bits inside sticker Scratch mark on bottle

Scratch mark on bottle Sticker out of position

C. ON-SITE TESTS

Description Method Sample Size Result / Reading

1. Function check

1. According to the description on the item's box and in the instruction manual. 2. Test the power on/off function 5 times 3. Test the indicator light if applicable. 4. Speed dial function test if applicable 5. Safety switch test if applicable 6. Normal power consumption, normal speed level, normal noise level, no Malfunction No critical malfunction

200 pcs Passed

2. Assembly check

Assemble the unit according to the description. (e.g. user manual or instruction sheet or any packing). Easy to assemble

200 pcs Passed

3. Fatigue Test 20times for each button, plug and switch. No damage or block

8 pcs Passed

4. Rub Check

Use cotton dripped with water, rub the marking on rating label and silk-screen printing or electro-plating by hand for 15 seconds. Marking is clear after the rub, no peel off or lite

2 pcs Passed

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 8 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

upward on rating label.

5. Tape Check

Use the 3M (600) gummed tape to paste total cover the printing or electro-plating, peel the tape at 90°±30° rapidly; Marking is clear after the test, no peel off on plating.

2 pcs Passed

6. Stability Test

Place the product in the most unfavorable position under normal use 10degree incline, the product does not cause a plane inclined plate slide. No overturn or tip over

3 pcs Passed

7. Running Test Max setting, for 4 hours running. No malfunction and safety issue

3 pcs Passed

8. Carton drop test One corner, three edges, six sides, at height of

30inch (﹤9.5kg) on the cement floor. No unit drop out, no any damage on unit.

1 carton Passed

9. Hi-pot test 1S, setting. 3500V for class II; 1500V for class I No breakdown

200 pcs Passed

10. Input Power check

Motor appliance: within +20% of 25W~300W, Rated: 250W Within tolerance

200 pcs

Passed Without load: 110-

150W With load: 200-260W

Lock motor: 550W(max)

11. Pull test and Strain relief for power cord

25 times, for 2s, displacement≤2mm with pull force:

30N (≤1kg), 60N(1-4kg) or 100N (﹥4kg) Within tolerance

3 pcs Passed

12. Internal test

According to the BOM provided by client. 1. Take all related picture to show each main component and prepare a list of them. 2. Check and show the quality of welding. 3 .If the earth pin or any pin is not connected to a wire; fail the test and put an important remark. IF the product is a class 2 product and only the earth pin is not linked to a cable, test result should not change but write an important remark. No damage on component

3 pcs Passed

13. Abnormal test

-- Lock the motor for motor-operation products -- Switch on the product until it reaches overload condition Fuse shall work and no safety issue.

1 pc Passed

14. Standby/Off powe test for ErP

The standby power should less than 1W or the off power should less than 0.5W Within tolerance

200 pcs Passed

off power:0.1W and no standby power

15. Spark check Should no spark during switch on/off, running, spring operation or any other operation No failure

200 pcs Passed

16. Smell check

When the appliance is OFF, there is no unpleasant smell. When the appliance is switched ON at Max. Power, there is no burning smell. When open the unit, there is no odor inside the unit. No failure

200 pcs Passed

17. Application test Use food for real function check No failure

3 pcs Passed

18. Noise level check

Apply rated voltage at highest setting. 1m away, use the noise meter to measure. Mark the background noise level. (sound pressure level) Actual recording or compare the requirements.

3 pcs Actual Finding

81-88dB

19. Rotation speed check

Use tachometers, aligning the maximum speed of the blade and reading.

3 pcs Actual finding #01:20054rpm

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 9 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Actual recording or compare the requirements. #02:21139rpm #03:24037rpm

20. Low voltage start up check

85 % rated voltage, should start up normally No failure

3 pcs Passed

21. Water capacity check

Fill water to the Max level marking, Check the capacity by weight or volume, within ±5% tolerance No failure

3 pcs Passed 505ml

22. Water leakage check

Fill with water, oil or other available liquid for 4hours, should no leakage No failure

20pcs Passed

Result: Passed

Remark:

*Refer to V-Trust Work Instruction: VTR-WI-CZ-1000.

D. PRODUCT SPECIFICATION

Client's Spec. Ref. Sample 1# Sample 2# Sample 3# Sample

Item No.: EJM331 (4900010870)

L×W×H (mm) 113.6x111.6x374 / 113.2x111.1x375 113.2x111.1x375 113.2x111.1x375

Net Weight (kg) 1.14 / 1.14 1.13 1.14

Gift box size (cm)

/ / 27.5x13.5x22 27.5x13.5x22 27.5x13.5x22

Gift box weight (kg)

1.35 / 1.41 11.39 11.41

Cord length (cm)

/ / 75 75 75

Result: Passed. The actual measuring difference was within client's tolerance.

Remark:

E. PACKING

Package Details

Item No. Qty / Carton Carton Size (L×W×H, cm)

Gross Weight (kgs)

Qty / Inner box

Marking / Spec.

Actual Marking / Spec.

Actual Marking / Spec.

Actual Marking / Spec.

Actual

EJM331 (4900010870)

6 6 41.5x28.8x46.5 42x29x46 8.65 8.88 / /

Export Carton Details

Fastening Metal Staples No Nylon Band No

Material Cardboard Corrugated Paper Plies 5-ply

Packing Method

Each set with accessories, warranty card and IM packed with poly bag and cardboard into a gift box and then 6pcs gift box packed into a carton

Assortment Method

No assortment

Result: Passed. The actual measuring difference was within client's tolerance.

Remark:

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 10 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

F. MARKING & LABELING

Barcode/Labeling/Printing

Name Location Result

Barcode Gift Box Passed

Rating label Unit Passed

Warning word/marking Unit,Gift Box Passed

Logo Unit,Carton,Gift Box Passed

Instruction manual and documentation check Shi Provided By

The functionality description in English on the instruction manual is adopted on the actual unit.

Client, Factory Passed

The components of inspected samples were compared with the provided CDF.

Factory Passed

Shipping Marks

Shipping Marks (on 2 Side ) Passed

Side Marks (on 2 Side ) Passed

Inner Box Marks (on 0 Side ) N/A

Result: Passed

Remark:

G. CLIENT SPECIAL REQUIREMENT

Client Requirements Result

1. Nil N/A

Result: N/A, No client special requirement

Remark:

H. PHOTOS

1 Photos of EJM331 (4900010870)

Carton Shipping mark

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 11 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Side mark Shipping mark

Side mark Open

Gift box Gift box

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 12 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Gift box Gift box

Gift box Gift box

Gift box Gift box

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 13 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Gift box Gift box

Gift box Gift box

Gift box Gift box

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 14 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Open Packing

Poly bag All parts

Warranty card Warranty card

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 15 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Instruction manual Instruction manual

Instruction manual Instruction manual

Instruction manual Instruction manual

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 16 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Instruction manual Instruction manual

Lid Detail

Detail Bottle

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 17 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Bottle Bottle

Bottle Bottle

Main body Front

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 18 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Switch Logo

Side Back

Side Top

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 19 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Blade Detail

Detail Detail

Detail Detail

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 20 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Bottom Feet

Rating label Cord

Cord Plug

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 21 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Plug Assembly

Nil

Assembly Nil

2 Photos of On-Site Tests

Internal check Internal check

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 22 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Internal check Internal check

Internal check Internal check

Internal check Internal check

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 23 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Internal check Internal check

Internal check Hi pot test

Hi pot test Power consumption test

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 24 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Power consumption test Power consumption test

Power consumption test Off power test

Off power test Low voltage start

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 25 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Low voltage start Motor rotational speed test

Motor rotational speed test Motor rotational speed test

Motor rotational speed test Application test

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 26 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Application test Application test

Application test Application test

Abnormal test Abnormal test

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 27 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Capacity check Tape test

Barcode scan test Barcode scan test

Stability test Cord pull test

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 28 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Cord pull test Noise check

Noise check Noise check

Noise check Noise check

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 29 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Running test Leakage test

Leakage test Leakage test

Leakage test Leakage test

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 30 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Leakage test Drop test

Nil

Drop test Nil

3 Photos of Other Information

Goods in warehouse Goods in warehouse

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 31 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Goods selection Inspection site

Inspection site Inspection site

Inspection site Stamp

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 32 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Calibration label Weight check

Weight check Weight check

Weight check Weight check

Client Name: XXX Conclusion

Inspection Number: L076523 PASSED

Report Date: 28 July 2016

Page 33 of 33

Address: 1507-1509 West Tower, Poly World Trade Centre, 1000 Xingang Road E., Guangzhou, China Tel: +86-20-89089938 Fax: +86-20-89089025 E-mail: [email protected] Website: www.v-trust.com

V-TRUST Copyright © All Rights Reserved VTR-QR-CZ-RF-003 V7

Weight check Size check

Size check Size check

Nil

Size check Nil

*********************************************** This is The End of the Report *******************************************