Post-Ec/Io Poor EC/IO & Call Drop: Location- Karya Road
Observation: Poor EcIo Plot and Call DropAnalysis: During pre drive site Nonapukur Tram depot was fluctuated due to power issue.Action Taken After restoration the Nonapukur Tramdepot site we have re-driven the route.No call drop observed and EcIo also improved.
Drop Call
Pre - Ec/Io
MOS Plot
Post Ec/Io Poor MOS value, EC/IO & Call Drop: Location- Makardah
Observation: Call Drop , Poor EcIo & Poor MOS value at this location. .Analysis: During Pre drive the site Makardah was fluctuated due to power issue.Action Taken: After restoration the Makardah site we have re-driven the route.No call drop observed.MOS value as well as EcIo also improved.
Drop Call
Pre-Ec/Io
Pre-EcIo Post- Ec/Io Poor EcIo: Location- ShankhNagar
Observation: Poor EcIo & Call Drop.Analysis: During Pre Drive the Shankhanagar site was fluctuated due to High Temperature issue.Action Taken: After restoration the Shankhanagar site we have re-driven the route. No call drop observed and EcIo also improved.
Pre EcIo Post-EcIo Poor MOS value, EC/IO & Call Drop: Location- Jaffapur
Observation: Poor MOS value and EcIo.Analysis:During Pre drive the site Jaffar pur was fluctuated due to power issue. Action taken: After restoration the Jaffarpur site we have re-driven the route. No call drop observed .MOS value as well as EcIo also improved.
Call Drop
Mos Value
Poor EC/IO & Call Drop: Location- Sainik Nagar
Call Drop
Observation: Call Drop , Poor EcIo & Mos Value .Analysis:During pre drive EcIo and MOS value was poor due to T1 and T2 alarm at site Sainik Nagar’s Gamma Sector. Action Plan: Re-drive carried out after removing the T1 and T2 alarm of site SAINIKNAGAR. No call drop found.
Pre-EcIo Post-EcIo
Poor EC/IO & Call Drop: Location- Near Singur Area
Call Drop
Observation: Call Drop and Poor EcIo.Analysis: Call Drop and poor EcIo at this location as poor coverage area.Near by Sites Singur is 5.1KM and Bhusan is 6.8KM away from circled patch area.Hence New site is required to improve coverage .Dependency: RCOM
5.1Km
6.8Km
8
Poor EC/IO & MOS Value: Location- Near Howrah Mayapuri
Observation: Poor EcIo and MOS Value at this location.Analysis: During pre Drive poor EcIo and MOS value observed as the serving site Howrah Mayapuri Cinema having Hardware Alarm (AFT Issue). Action Taken: Re-Drive will be carried out once the H/W alarm removed.
Pre-EcIo