Analysis and Design of Pre- Engineered
Buildings For Industrial Shed
Submitted By:Shubham V. Parab 1202016Akshay A. Nikam 1202019Sujit H. Sonwalkar 1202015Aniket K. Mane 1202032
Under the guidance of :Prof.P.M.Mohite
ObjectivesTo study pre engineered building.To prepare a model of P.E.B.To analyze structure using Staad Pro.To design sections, connections etc.To study the effect of P.E.B. for following
issues:To reduce complexity on site.To achieve accuracy.Speed of work.
Pre Engineered BuildingSteel buildings in which excess steel is
avoided by Tapering the sections.Tapering is done as per Bending Moment
requirements.Components are manufactured in factory and
assembled on site.Larger plate dimensions are used in areas of
higher load effects.
Plan
Elevation
Problem statementInternal dimensions of building: l=60 m, b=15
mHeight of building up to eaves level= 6 mLocation of building= Islampur (pune region)Type of roofing = G.I.sheetsArea of opening (permeability of building 5% to
20%)Angle of rafter = < 100
Spacing between two columns = 6 mNumber of frames = 10
Load calculationDead load:1. Wight of purlin :5 kg/m2
2. Weight of sheeting :5 kg/m2
Total weight :10 kg/m2=0.1kN/m2
3. Self weight of tapered section
Live loadLive load =0.75 kN/m2 (Angle lesthan 10
0) = 0.75*6
Live load =4.5 kN/m2
Collateral load:Collateral load = 0.2* 6 =1.2 KN/M
(Assumed)
Wind load
Load cominationLoad combination of strength:(D.L.+L.L.)*1.5+1.05 *C.L.(D.L.+W.L.S.)*1.5(D.L.+W.R.P.)*1.5(D.L.+W.R.S.)*1.5(D.L.+W.P.P.)*1.5(D.L.+W.P.S.)*1.5(D.L.+L.L.)*1.2+1.05*C.L.+0.6* W.L.P.(D.L.+L.L.)*1.2+1.05*C.L.+0.6* W.L.S.(D.L.+L.L.)*1.2+1.05*C.L.+0.6* W.R.P.(D.L.+L.L.)*1.2+1.05*C.L.+0.6* W.R.S.(D.L.+L.L.)*1.2+1.05*C.L.+0.6* W.P.P.(D.L.+L.L.)*1.2+1.05*C.L.+0.6* W.P.S.
Load combination of serviceability: (D.L.+L.L.+C.L.)*1D.L.* 1+(L.L.+C.L+W.L.P.)*0.8D.L.* 1+(L.L.+C.L+W.L.S.)*0.8D.L.* 1+(L.L.+C.L+W.R.P.)*0.8D.L.* 1+(L.L.+C.L+W.R.S.)*0.8D.L.* 1+(L.L.+C.L+W.P.P.)*0.8D.L.* 1+(L.L.+C.L+W.P.S.)*0.8 (D.L.+W.L.P.)*1 (D.L.+W.L.S.)*1 (D.L.+W.R.P.)*1 (D.L.+W.R.S.)*1 (D.L.+W.P.P.)*1 (D.L.+W.P.S.)*1
B.M.D.
CONVENTIONAL BUILDING
PRE ENGINEERED BUILDING
Results Sl. No. Description PEB
CSB1 Steel Take Off (kN) 12.194 84.5952 Support Reaction (kN) 10.62 375.5823 Maximum deflection (mm) 39.48 8.6114 Maximum Shear Force (kN) 66.894 453.9815 Maximum Moment (kNm) 175.52 908.577
AdvantagesPEB System is zero maintenance & superior
in strength than conventional.Lower Cost.Quality Control.Large Clear Spans.strict quality control environment, thereby
ensuring superior quality & finish.Easier to incorporate future expansions
DisadvantagesNot used for multi-storey building.Technical person is required on site.Special Machinery is required.Design of member takes more time.
ConclusionUsing of PEB instead of CSB may be reducing
the steel quantity.Reduction in the steel quantity definitely
reducing the dead load.Reduction in the dead load reducing the size
of Foundation.Using of PEB increase the Aesthetic view of
structure.
ApplicationsWARE HOUSESINDUSTRIAL SHEDSFACTORIESWORKSHOPSOFFICESGAS STATIONSVEHICLE PARKING SHEDSSHOW ROOMSAIRCRAFT HANGERSSCHOOLSSPORTS AND RECREATIONAL FACILITIES
Erecting P.E.B.
Reference Limit State Design in Structural Steel- M. Y .
Shiyekar.Pre-Engineered metal Buildings the latest trend
in building construction‖ by K.K.Mitra – Gen. Manager (marketing) Lloyd Insulations (India) Limited
IS : 800 - 2007 :- General Construction In Steel - Code of Practice.
IS : 875 (Part 1) - 1987 :- Code of Practice for Design Loads (Other Than Earthquake) for Buildings
IS : 875 (Part 2) - 1987 :- Code of Practice for Design Loads (Other Than Earthquake) for Buildings and Structures- Live Loads.
IS : 875 (Part 3) - 1987 :- Code of Practice for Design Loads (Other Than Earthquake) for Buildings and Structures- Wind Loads.