pre-bidder queries - eiltenders.eil.co.in/newtenders/userdata/doc_repository/a133/rfq/a133...be...
TRANSCRIPT
Part /
Vol Page No Clause No Subject .
1Pre Filled Agreed
Terms and Conditions 19 6.b
Only single order covering complete scope of supply &
services will be
issued (indicating supply and services portion separately).
Order for supply
and services shall not be split
Kindly give separate order for Supply and Installation . FOLLOW RFQ TERMS.
2Pre Filled Agreed
Terms and Conditions 20 10 - a / b Price Reduction Schedule:
Acceptable , if delay is attributable to us . Please
Confirm . CONFIRMED
3Pre Filled Agreed
Terms and Conditions 21 17 Firmness of Price
Price variation shalll be applicable for the delay not
attributable to Voltas . PRICES SHOULD REMAIN FIRM.
4Pre Filled Agreed
Terms and Conditions 21 18 - c
Quoted prices shall remain firm and fixed on account of FE
variation and
Custom Duty Variation, till complete execution of the order.
FE variation shall be on you . Kindly confirm . NOT ACCEPTABLE.
5Pre Filled Agreed
Terms and Conditions 22 30
SETTLEMENT OF DISPUTE BETWEEN GOVT. DEPT./
PUBLIC SECTOR UNDERTAKING
Arbitration shall be Tri - Partite Arbitration as per
Arbitration and Conciliation Act 1996 . Kindly confirm .
ARBRITATION SHALL BE AS PER
CL. 34 OF GPC
6Special Commercial
Notes on RFQ 28 22 Integrity Pact Kindy provide the format of the integrity pact . REFER PG.291 FOR THE FORMAT
7 RFQ 4 Part 1 - IX )
Fresh Bank Solvency Certificate, date of issue of this
certificate should not be earlier
than 1 year from the date of Opening of Techno-commercial
part.
Kindly provide the format for solvency if any , in the
absence of the same kindly note that solvency shall not
be specifically addressed to EIL .
ACCEPTABLE.
8 RFQ 5 10 Delivery / Completion Period .
We understood that site readiness means the
readiness of the site to our site activities , kindly note
that site readiness shall be parallel with our supply of
materials . Kindly confirm .
FOLLOW RFQ TERMS STRCITLY.
9
Part III - Section : B.4.1 -
Scope of Work for
Mechanical / Rotary
394 1.23.3
The performance tests for the A/c plant shall be done
during peak summer and with a minimum of 10 days
continuous running after complete installation and
commissioning of the units including ducting
Perfomance test shall be done inline with the project
completion schedule . Also kindly confirm that the
power ,water and load for the 10 days running after
complete installation shall be provided by you . Kindly
confirm .
Performance testing shall be done
during peak summer after complete
installation and commissioning.
Before start of performance testing,
the system shall be continuously
running for a minimum of 10 days
duration.
Power and water required for
Performance testing shall be
provided by Client. However
necessary equipment to generate
artificial
LOAD shall be arranged by
vendor during the Performance
tests.
10
Part III - Section : B.4.1 -
Scope of Work for
Mechanical / Rotary
396 1.23.9 Separate supply and return air ducting shall be provided. Kindly note that wherever false ceiling is there , return
air ducting is not considered by us . Kindly confirm .
Return Air ducting need to be
considered for all locations as per
MR requirement. Flow of Return air
above false ceiling to AHU room is
not acceptable.
11
Part : V - Section : 3.3 -
Standard specification
for Air Handling Unit
431 3.3
Casing shall be made of sandwiched panels of 22GCRCA
powder coated sheet steel from outside & 24 G galvanized
sheet steel on inside with 25mmT.F. quality thermocol
insulation in between. Acoustic insulation liner shall be
provided to restrict noise levels within limits specified.
Panel construction is 25 mm thick puff insulation , no
separte acoustic liner provided . Kindly confirm .
Panel construction shall be as per
Tender requirement. Kindly follow
the same.
Pre-Bidder Queries
SL
No
Reference Of RFQ Documents
Bidder's Query EIL'S Reply
12
Part : V - Section : 3.3 -
Standard specification
for Air Handling Unit
432 3.4Copper tube gauge thickness shall not be less than 22
SWG
Copper tube thickness will be 25 gauge ( 0.5 mm ) .
Kindly confirm . Follow Tender Requirement
13
Part : V - Section : 3.3 -
Standard specification
for Air Handling Unit
433 3.5
Fan impeller shall be backward/ forward curved, with
aerofoil design. Impeller blades shall be made of aluminium.
Fan scroll shall be of heavy gauge aluminium or M.S. with
epoxy coating and with die formed inlet for achieving
uniform airflow. The impeller shall be fixed to the shaft with
taper lock connections. Fan shafts shall be of solid,cold
rolled carbon steel ground and polished.
Fan casing is made of GI sheet steel without coating .
Fan impeller material is MS and not aluminium . Please
Confirm .
Follow Tender Requirement
14
Part : V - Section : 3.3 -
Standard specification
for Air Handling Unit
433 3.5
AHU manufacturer shall provide performance curvesand
noise levels for the fans in accordance
with BS 848.
Fan perfomance and noise data as per manufacturer
standard ( AMCA ) .
Noted. However, vendor to restrict
Noise levels and fan outlet velocity
of AHU fan as per Tender
requirement.
15
PART V - Section 3.3
STANDARD
SPECIFICATION FOR
AIR CONDITIONING
PLANT
401
All air conditioning area having exposed roof shall be
provided with under deck insulation
with minimum 50mm thickness.
As per the job specification for HVAC underdeck
insulation shall be provided by the purchaser .
Noted. Underdeck insulation of Roof
is not in scope of HVAC vendor.
16
Part III - Section : B.4.1 -
Scope of Work for
Mechanical / Rotary
396 1.23.10
Contractor shall carry out complete erection of the system
including equipment, ducting,
piping, electrical accessories, instruments, MCC-s, panels,
cabling, instrument air tubing, all
support structures, access platforms, walkways, civil
foundations, lighting, insulation etc.
Primary supports like civil supports , bridges or any
kind of trenches shall not be in our scope . Also basic
engineering for civil foundation for equipments alons
shall be provided by us .
Noted. RCC/PCC foundation of
HVAC equipments are not in
vendor's scope. However, Civil
works like supply and fixing of
supports for ducting, piping,
electrical and control cables,
breaking and making of opening in
the walls, grouting of all the
equipment including supply of
grouting material, etc. are in
vendor's scope.
17
Part V - Section : 3.3 -
Standard specification
for Cooling Tower
457 3.4 Fill supports : GRP grid / PVC coated steel wires . All frame works are MS hot dip galvanized , hence PVC
coating is not required . Follow Tender Requirement
18
Part V - Section : 3.3 -
Standard specification
for Cooling Tower
458 3.4 Hot water distribution basin Not applicable in counter flow towers . Follow Tender Requirement
19
Part V - Section : 3.3 -
Standard specification
for Cooling Tower
459 3.11.2
Doors and walkways shall be provided at basin level for
access to the tower internals and
interior walls.
Internal walkway is not required . Kindly confirm . Follow Tender Requirement
20
Part V - Section : 3.3 -
Standard specification
for Cooling Tower
459 3.12.9
Fan and shaft shall be supported by heavy duty self-
aligning, grease packed bearings with
moisture proof seals.
Fans shall be direct driven . ( Fans directly coupled
with extended motor shaft ) . Follow Tender Requirement
21
Part V - Section : 3.3 -
Standard specification
for Cooling Tower
460 4.3
Site performance testing of the cooling tower shall be
carried out according to CTI-ATC-105.
The evaluation of cooling tower performance from field test
data will be done by reference
performance curves as given in CTI bulletin.Vendor shall
furnish necessary performance curves during drawing/ data
submission for approval.The duration of performance test
shall be minimum 72 hours after reaching steady state
conditions
We offer CTI certified Cooling towers . Hence site
perfomance testing of the cooling towers need not be
done . Kindly confirm .
Site performance testing of the
Cooling tower shall be performed as
per Tender requirement.
22
Part III - Section : B.4.1 -
Scope of Work for
Mechanical / Rotary
395 1.23.8The system shall be provided with filters (10
microns with chemical filtration as required)
Chemical filters shall be provided for the control where
AC is coming . We have not considered chemical filters
for ventilation systems .
Noted. Chemical Filters are not
required for Ventilation system of
Switch Board Room of Substation
Building. However, chemical filters
are required for AC system (for VFD
Room and Engineer's Room) in
Substation Building. The same is
clearly indicated in Annexure-1 to
Job Specification for HVAC System
(Doc No - A133-086-16-44-SP-4210
atached with MR/RFQ)
23
Part III - Section : B.4.1 -
Scope of Work for
Mechanical / Rotary
397
Rerouting of existing cables, which are fouling with new
cable schedule shall be done
where applicable.
Kindly note that rerouting of cables shall not be in our
scope . Similarly dismantling of any pipes , ducts and
foundations etc also are not in our scope .
Noted
24
Part III - Section : B.4.1 -
Scope of Work for
Mechanical / Rotary
396 1.23.10
Contractor shall carry out complete erection of the system
including equipment, ducting,
piping, electrical accessories, instruments, MCC-s, panels,
cabling, instrument air tubing, all
support structures, access platforms, walkways, civil
foundations, lighting, insulation etc.
Primary supports like supports , bridges for pipes ,
ducts ect or any kind of trenches shall not be in our
scope . Civil works of any kind is completely excluded
from our scope . However the basic details for civil
foundations shall be provided by us .
Noted. RCC/PCC foundation of
HVAC equipments are not in
vendor's scope. However, Civil
works like supply and fixing of
supports for ducting, piping,
electrical and control cables,
breaking and making of opening in
the walls, grouting of all the
equipment including supply of
grouting material, etc. are in
vendor's scope.
25Job Specification for
HVAC 337 7 Heat load summary.
Kindy provide your heat load working sheet as
considerable variationts arise in our heat load
estimation .
Refer Cl-8.6 of Job Specification for
HVAC system (Doc No - A133-086-
16-44-SP-4210 attached with
MR/RFQ), Bidder to cross check the
estimated plant capacity before
accepting the same. However, the
minimum plant capacity shall be as
indicated in MR/RFQ. Also, bidder
to submit heat load calculation
during detailed engineering stage
for equipment selecation and air
distribution purpose.
26Job Specification for
HVAC
Kindly provide the list of rooms to be Air conditioned ,
along with their respective TR and Air flow required .
Kindly also confirm whether lobby and corridor needs to
be air conditioned as indictaed in the diagram .
All the areas/rooms to be air
conditioned are properly indicated in
Architectural Drawings of Control
Room and Substation Building. Also
refer tentative duct layout drawing
attached with MR/RFQ for list of
rooms to be air conditioned along
with air distribution table. Note that
this air distribution schedule is
indicative only for guidance to
bidder. Detailed Heat Load
Calculations shall be carried out by
Vendor during detailed engineering
stage and exact air distribution
schedule shall be finalised.
27Job Specification for
HVAC 336 6.2 Inside Design Conditions - 6 mm wc of positive pressure .
Kindly clarify whether the dehumidified CFM indicated
by you for AHU is incoporating the capacity to maintain
this 6 mm wc pressurization .
The dehumidified CFM indicated in
the MR is based on the heat load
calculation. Architectural
constructional details (e.g doors,
windows etc.) of the buildings shall
be as per architectural drawings
attached with the MR. Vendor to
select suitable equipment to meet
the over pressurisation requirement
as per MR.
28 Vendor List 525
Kindly provide the vendor list for Static Equipment (
Fabrication Equipment ), Heat Transfer Equipment and
Miscellaneous as the same were missing .
Vendor List applicable Mechaniocal
Equipment, Rotary Equipment and
Piping for HVAC system are
provided in Vendor List (Doc No -
44NC-4600:00:R:01:0005) attached
with MR/RFQ. Items for which
vendor list are not available, bidder
to provide PTR as indicated in cl.
no. 12.1 of Job Specification doc.
no. A133-086-16-44-SP-4210.
29 Earnest Money Deposit . We do understand that EMD is not required during the
time of bidding . Kindly confirm . EMD NOT REQUIRED.
30 Vendor List Kind approve the following vendors for Centrifugal
blowers - Kruger , Nicotra . Follow Tender Requirement
31 Vendor Llist Kindy approve the following vendor for Air Handliing
Duct - Voltas . Noted
32 Vendor Llist Kindly approved the following vendor for sheet metal
duct - Voltas . Noted
33
Part III - Section : B.4.1 -
Scope of Work for
Mechanical / Rotary
396 7 Portable emrgency lights . Kindly specify the areas / quantities , description for the
same .
Lighting for the system is excluded
from the scope of the MR.
34
Part III - Section : B.4.1 -
Scope of Work for
Mechanical / Rotary
396 10
The fire dampers must have 90 minutes fire rating
(resistance) and shall be operated
pneumatically or with solenoid valves and actuated by
smoke detector. However the
opening shall be in manual mode. The design temperature
of fire dampers shall be 450
o C
Kindly note that Manual opening is not possible in
Pneumatic or solenoid actuators . Kindy clarify .Follow Tender Requirement
35
Part III - Section : B.4.1 -
Scope of Work for
Mechanical / Rotary
396 10
The fire dampers must have 90 minutes fire rating
(resistance) and shall be operated
pneumatically or with solenoid valves and actuated by
smoke detector. However the
opening shall be in manual mode. The design temperature
of fire dampers shall be 450
o C
Kindly note that the compressed air for pneumatic
actuators shall be provided by you at the location of
each dampers . Kindly confirm .
Compressed air/instrument air with
battery limit conditions as specified
in Cl - 9.1, Sl No - 3 of Job
Specification for HVAC System (Doc
No - A133-086-16-44-SP-4210)
shall be made available at a single
point within 1m from Building at
grade level for both Control Room
and Substation Building. Further
distribution of Instrument air at each
and every fire damper is in vendor's
scope refer Cl No - 9.2 of Job
Specification for HVAC System).
36
Part III - Section : B.4.1 -
Scope of Work for
Mechanical / Rotary
396 16
Following first aid equipments shall be provided.
1 First aid kit, breathing apparatus, fire blankets.
2 Hand operated extinguishers (Halon/ equivalent).
3 CO
2fire extinguishers for substation building and office area.
4 Flameproof torches, water-jet blankets.
Kindly clarify whether these first aid kits are needed to
be maintained during execution during the site or shall
be supplied as a part of the scope .
Follow Tender Requirement. The
following shall be supplied as part of
supply with HVAC equipment.
Additionally First Aid Kid shall be
maintained during construction as
per standard practuice / Tender
Requirement.
37
Part III - Section : B.4.1 -
Scope of Work for
Mechanical / Rotary
397 1.26All Equipment unitization shall be carried out at respective
vendor’ s shop.
Kindly note that equipments such as AHU , Cooling
towers etc and also for other equioments wherever is
required shall be brought to the site in disassemble
condition and assembly will be done in the site .
Equipment unitization shall be
carried out at respective vendor’ s
shop to the maximum possible
extent.
38Kindly specify the location of earth pit , so that we can
calculate our earthing accordingly .
Refer electrical scope of work doc.
(A133-086-16-50-SOW-4210), one
number Earth Plate inside VAM and
switchboard room of substation
building and AHU room of Control
Room building for air-conditioning
and pressurization systems shall be
provided by purchaser. However,
equipment earthing of all bidder
supplied equipments and
connecting the same to the
purchaser earth plates shall be in
the scope of the bidder.
39Kindly specify the location of drain points till where we
have to provide our drain piping .
Floor Trap/Drain Point in AC Plant
Room & AHU Rooms are clearly
shown in Architural Drawings of
Control Room and Substation
Building.
40
Part V - Section : B.3.3 -
Scope of Work for Air
Conditioning Plant .
404 Make up water tank .
Kindly confirm that the make up water will be made
available by you at the make up water . Piping from
make up water shall be in our scope.
Service water to be provided at
battery limit shall be used as make-
up water for cooling tower. Service
water with battery limit conditions as
specified in Cl - 9.1, Sl No - 4 of Job
Specification for HVAC System (Doc
No - A133-086-16-44-SP-4210)
shall be made available at a single
point within 1m distance from
building at grade level for both
Control Room and Substation
Building. Further distribution of
service water to Pan Humidifier and
Make-up water for cooling tower
shall be in vendor's scope.
41
TERMS &
CONDITIONS FOR
INSTALLATION/SITE
WORK
57 9
Construction power shall be arranged by the
CONTRACTOR at his own cost. Contractor
should arrange adequate no. of DG Sets, suitable for usage
at site.
10.0
Kindly provide construction power , power for
commissioning and power for site usage free of cost .
Kindly confirm .
TO CONTRACTOR'S ACCOUNT(
REFER TERMS & CONDITIONS
TO Site work cl. 9.0)
42Job Specification for
HVAC 344 Special tools and tackles
Our offer shall be inclusive of the special tools and
tackles provided in the list given by only . We have
studied and found that these tools and tackles for the
system and we are not going to consider any exxtra
tools and tackles . Kindly confirm .
Bidder needs to supply, as
minimum, Special Tools & Tackles,
as listed in Cl No - 16.4 of Job
Specification for HVAC System.
However, any other special tools &
tackles, as deemed necessary by
Bidder for their supplied system
shall also be included by them.
43
PRESENT
COMMITMENTS
(CONCURRENT
COMMITMENT)
15 Concurrent commitments .
Kindly note that the schedule which will be submitted
by us in the provided format shall be indicative only ,
subjectable to variation under mutual consent and the
same shall not be taken as a commitment .
PLEASE PROVIDE DETAILS OF
SIMILAR ORDERS UNDER
PROGRESS.
44
Part 1 : Section : 8
Title : Mandatory spare
list .
585 Mandatory spare list . - 44NC-4600-0000/N.02/0028/A4
Our offer for mandatory spare list shall be strictly based
on this any no other extra mandatory spares shall be
provided . Kindly confirm . Also as per the technical
check list , the mandatory spare list 44NC-
46000000/N.02/0028/A4 shall be submitted after the
award of the contract .
Mandatory Spare List shall be as
per Annexure -2A/B of Technical
Checklist for HVAC System.
Mandatory Spares shall strictly
include all the items listed in
Annexure - 2A/B only. However,
during bidding stage, Bidder need
not to submit detailed list of
Mandatory spares with their offer
(as the quantity are not finalised
during bidding stage). However,
Bidder to submit signed and
stamped copy of Annexure-2A/B
along with their offer.
45
Vendor Data
Requirements for HVAC
systems .
350 12Utility consumption figures (with power
consumption)
Kindly note that the submitted consumption figure shall
be indicative only and the same may vary during detail
engineering . Kindly confirm . Also please confirm that
there is no penalty for any variation in power
consumption from indicated one during bidding .
Noted
46
Vendor Data
Requirements for HVAC
systems .
349 20 Any other test report , as required . Kindly define specifically , as the same can be
accomodated in our offer .
Any other test report as per
approved QAP/ITP, shall be
submitted by vendor.
47
Vendor Data
Requirements for HVAC
systems .
349 10Equipment load data and foundation / anchor plan with
pocket details .
Kindly note that the same shall be submitted after the
award of the contract . Please confirm .
Vendor to provide tentative details
alongwith bid for our concurren
downstream engineering.
48Job Specification for
HVAC 347 Annexure I
Kindly note that high side equipment shall be supplied
based on this Annexure only . Please confirm .
The minimum capacity of High side
equipment shall be as per Annexure-
1 to Job Specification for HVAC
System.
49 Kindly provide the specifictaion conditions for pumps .
Refer Cl - 4.11 of Standard
Specification for Refrigeration Plant
(Doc no - 44NC-4600-
0000/M.02/0041/A4) attached with
MR/RFQ.
50Job Specification for
HVAC 347 Annexure I
Kindly provide the external static for AHU and
centrifugal blowers for ventilation system .
The same need to be calculated by
bidder based on maintaining internal
static pressure (as required) and
ducting/diffuser/dampers/air
filters/etc. pressure drop.
51Job Specification for
HVAC 336 3.0 - b) Exclusions- AC Plant room & Pressurisation room buildings. Kindly elaborate .
Civil constructional works for AC
Plant Room and Pressurisation
Room Building shall not be in scope
of Bidder.
52
Standard specification
for Air Conditioning unit
.
403 4.7 - Humidifier Unit
3mm thick carbon steel sheets is not available in the
market (as a standard ) , we shall provide 3mm thick
M.S sheet and sizes of the angels will as per the KW
capacity and not 25x25x6 mm. Kindly confirm .
Follow Tender Requirement
53
Scope of work (
Instrumentation ) HVAC
system .
746 1.1.2 Local Gauge boards. Kindly elaborate .
Local Gauge board is applicable for
mounting of local instruments like
pressure and temperature gauges
etc.
54Job Specification for
HVAC 342 13.1
All equipment shall be subjected to stage wise expediting,
inspection and testing at
vendor’s/sub-vendor’s works by Owner / PMC /
Authorised third party inspection
agency. Vendor shall submit Quality Assurance (QA)
procedure before
commencement of fabrication for review. Approved QA
procedure shall form the
basis for equipment inspection.
Stage wise expediting / inspection shall be provided for
only VAM . Kindly confirm . Also kindly provide your
QAP for various equipments so that we can incorporate
the same in our offer .
Stage wise expediting / inspection
shall be carried out for all the major
equipment as per approved QAP.
QAP shall be submitted by Bidder
for review by EIL/PMC/CPCL
55
Control room - Ground
and basement floor
plans .
Kindly specify whether any ventilation system is
requred in clean room , battery rooms , toilet and cable
cellar .
Ventalation requirement for Clean
room, Battery Room, Toilet & Cable
celler shall be taken care by others.
56
Substation ( Coker
Block ) - Ground Floor
plan and elevation .
Kindly specify whether any ventilation system is
requred in cable cellar , pressurisation room , LTG
Trafo room , Transformer room , Battery room .
Ventalation requirement for able
cellar , pressurisation room , LTG
Trafo room , Transformer room ,
Battery room shall be taken care by
others.
57
Job Specification for
HVAC system - 2.
Scope of Supply &
Services
3 of 18 6 Dedicated induced draft type cooling tower
Is this means 1No. Working VAM is having dedicated
cooling tower & also 1No. Standby VAM is having
dedicated cooling tower.
There shall be one (1) common
counterflow induced draft type
cooling tower catering to both
Vapour Absorption Machines.
58 3 of 18 7 Insulated expansion tank Insulated chilled water expansion tank shall be gravity
feed type.
Insulated chilled water expansion
tank shall be as per Cl No - 4.10 of
Standard Specification for Air
Conditioning Plant (Doc No - 44NC-
4600-0000/M.02/0040 /A4) attached
with MR/RFQ
59 3 of 18 9Low water level switch interlocked to water heater & float
valve on make-up water line.
Since we are using float valve on make-up water line
there is no need of low water level switch. Make-up
water supply shall start based on the mechanical
action. No interlock with water heater required.
Follow Tender Requirement.
Interlock with water heater is
required to prevent heater turning
on at low water level.
60 4 of 18 17 Civil works In client's scope
Follow Tender Requirement. Minor
Civil works as indicated in scope of
work shall be in Bidder's scope
61 4 of 18 28 Split AC with blast proof capacitor We provide Voltas make split AC with brust proof
capacitor
Follow Tender Requirement. Bidder
to supply Split AC with Blast proof
capacitor. Also note that, Bidder to
provide PTR for the same as per Cl
No - 14.1 of Job Specification for
HVAC System.
62 2.2 Scope of Service
6 of 18 k Statutory approvals, If any Client's Scope
Statutory approvals of vendor's
supplied items shall be in their
scope. e.g. LP steam supply piping
shall be of PMS class A22A (IBR
Class) and statutory approval for the
same is in bidder's scope.
63 3.0 Exclusion
6 of 18 d Steam, Instrument air & service water Client to specify battery limits
Refer - Battery Limit/Interface
provided in Cl No - 9.2 of Job
Specification for HVAC System.
646.1 Outside Design
Condition
7 of 18 Air Quality Client to give exact air quality to be considered
GX air quality as per ISA S71.04 to
be followed as a minimum. However
bidder shall take measurement of
the outdoor air quality at site and
submit the same. If, the measured
actual value is worse than the GX
level, bidder to follow the measured
actual value.
658.0 Technical
Requirements
10 of 18 8.13 Fire/ Smoke detectors Client's Scope
Noted. Refer Cl - 4.9.5 of Standard
Specification for Air-conditioning
Plant (Doc No -44NC-4600-
0000/M.02/0040/A4), signal from fire
and gas panel shall be made
available at local control panel in
the form of potential free contact.
11 of 18 8.20 Fire fighting system Client's Scope
Noted. Refer Cl - 8.20 of Job
Specification for HVAC System, AC
system shall be interlocked with fire
fighting system. Also refer Cl - 4.9.5
of Standard Specification for Air-
conditioning Plant (Doc No -44NC-
4600-0000/M.02/0040/A4), signal
from fire and gas panel shall be
made available at local control
panel in the form of potential free
contact.
66
13.0 Inspection, Testing
& Performance
Guarantee
12 of 18 13.1Stage wise inspection shall be offered only for major
equipments like VAM.
Stage wise expediting / inspection
shall be carried out for all the major
equipment.
QAP shall be submitted by Bidder
for review by EIL/PMC/CPCL
13.4
If client is not ready with full load then Voltas is not
responsible for creating any type of artifical load. We
shall demonstrate the performance of the system on
available load.
Power and water required for
Performance testing shall be
provided by Client.
Necessary equipment for generating
artificail LOAD shall be arranged by
vendor during the Performance
tests.
67 Annexure - 1 17 of 18 86-M-06 Chemical Filter UnitCapacity of chemical filter should be 4800 CFM i.e 10%
of total CFM.
Fresh air quantity shall also be
calculated based on 5 ACPH for
Control room. Fresh air quantity
based on 5 ACPH comes out to be
12500 CFM as indicated in the
Annexure-1
68
Standard Specification
for chilled water plant
(Vapour Absorption
Type)
Doc. No. 44NC-
4600-
0000/M.02/0030/A4
69 2.0 Codes & Standards 3 of 8 2.1 ASME Sec. VIII Div. I - Unfired pressure vessel
We are manufacturing Vapour Absorption Machine
(VAM) with M/s Hitachi technology being our technical
collarator. Which in turn follows Japanses Industrial
Standards (JIS). Hence ASME Sec. VIII Div. I & TEMA-
B codes/ standards are not applicable.
Follow Tender Requirement
TEMA - B - Shell & tube type heat exchangers Follow Tender Requirement
API 685
We are using canned motor pumps in our Vapour
Absorption Machine (VAM). These are Japanese make
& are as per manufactruer's standard. Hence API 685
codes/ standards are not applicable. We are using
vaccum pump which is rotary type & hence API 685 is
not applicable.
Follow Tender Requirement
API 610
We are using centrifugal pumps for normal water
application. Hence we propose standard (i.e non API)
centrifugal pumps. However is still client insist going for
API 610 pumps, then let us know the edition to be
consider.
Follow Tender Requirement
703.0 Technical
Requirements3 of 8 3.7
Steam inlet control valve shall be provided with isolation
valve, manual bypass valve & steam traps
This being single effect VAM, we shall provide steam
drain (Condensate) control valve instead of steam
control valve. Steam traps shall be provided on the
steam line. However we do not recommend to install
manual bypass valve for control valve as manual
oepration of steam drain control (condensate) is not
allowed.
Follow Tender Requirement
4 of 8 3.9 Control panel
c On/ Off switch for all pumpsNot provided as individual pump operation is not
allowed.
Bidder shall follow PMC
specification requirement attached
with MR
fAlarm buzzer with first-out type annunciation windows &
reset push buttons
We are providing 2 x 40 charater LCD display control
panel with LED indication. Hence annunciation
windows are not considered/ applicable.
Bidder shall follow PMC
specification requirement attached
with MR
4 of 8 3.11 Automatic quick shut off valve on cooling water system
We are providing pressurized soft spray nozzle system
in Absorber section. So even if VAM machine trips
there is no flow of lithium bromide in the Absorber.
Hence even the cooling water passes through Absorber
there is no possibility of crystallization in the VAM. Plus
we are giving interlock between cooling water inlet
temperature & cooling tower fan. Whenever cooling
water inlet temperature goes below specified limit
cooling tower fans are cut-off. Resulting in prevention
of crystallization. Hence Automoatic quick shut-off
valve is not requirement in our machine. Therefore not
provided.
Follow Tender Requirement
5 of 8 3.12.2 Safety Features
4 Chilled water temperature high N.A Follow Tender Requirement
6 Low cooling water temperature Cooling tower fan cut-off. Inlet valve closed - N.A Follow Tender Requirement
8 Steam pressure low N.A Follow Tender Requirement
5 of 8 3.12.4 Refrigerant level control shall be provided in the evaporator
DAM arrangement is provided instead of automatic
control valve.Follow Tender Requirement
6 of 8 3.16.3
We shall provide high & low level switch. Condensate
transfer pumps (1W + 1S) shall turn on when
condensate level reaches high level & shall stop when
level reaches low level. Standby pump shall come in
operation automatically on tripping of working pump.
Not acceptable. Follow Tender
requirement.
71 4.0 Inspection & Testing 6 of 8 4.1/ 4.2/ 4.3
Inspection & testing shall be done as per previous
project execute at M/s CPCL/ with M/s EIL.
Not acceptable. Follow Tender
requirement.
72
5.0 Protection &
Painting 7 of 8
5.1 Sand blasting
Since VAM is having delicate rubber & glass parts
installed on its body normal wire brush cleaning is
applicable. Sand blasting is not recommended as it
damages the above said delicate parts.
Sand blasting shall be used for
cleaning to the maximum possible
extent (whereever technically
feasible)
73 Mandatory Spares List 66 of 91
Doc. No. 44NC-
4600-
0000/N.02/0028
25.0
The above mandatroy spare list is applicable to the total
quantity of installed units under each tag no.
Is this means that we have to supply 10% tubes
considering both VAM machines. Please confirm.
Bidder to consider 10% tube
individually for both the VAM
74
Approved Vednor List
(Instrumentation)
Doc. No. A133-086-
16-51-SP-21
11 of 11 12.1
Control system shall be microprocessor based control
system dedicated for each machine.
Microprocessor based control system/ panel shall be of
M/s Micro Power control with Microprocessor from M/s
Softhard Automation. Same is provided in previous
project executed at M/s CPCL/ with M/s EIL.
For microprocessor based control
system, it is specified as Vendor
standard and field proven
microprocessor based control
system shall be used. The same
shall be complied with. Necessary
PTR reference shall be furnished
along with offer documents.75 Vendor list - Electrical
2 of 22 3 Switch Board - Drawout typeIs MCC panel to be manufatruered by direct OEM OR
their system house/ dealer is acceptable.
Fixed type PDB is in bidder's scope
as per cl. no. 5.1 of job specification
A133-086-16-50-SP-4210. The list
of vendors for the fixed type
switchboards is given in the vendor
list attached with the MR.
76 Mechnical Equipments 9 of 13 34 Refrigeration System - Vapour Absorption
We shall follow our standard make list for internal