Part / Vol Page No Clause No Subject . 1 Pre Filled Agreed Terms and Conditions 19 6.b Only single order covering complete scope of supply & services will be issued (indicating supply and services portion separately). Order for supply and services shall not be split Kindly give separate order for Supply and Installation . FOLLOW RFQ TERMS. 2 Pre Filled Agreed Terms and Conditions 20 10 - a / b Price Reduction Schedule: Acceptable , if delay is attributable to us . Please Confirm . CONFIRMED 3 Pre Filled Agreed Terms and Conditions 21 17 Firmness of Price Price variation shalll be applicable for the delay not attributable to Voltas . PRICES SHOULD REMAIN FIRM. 4 Pre Filled Agreed Terms and Conditions 21 18 - c Quoted prices shall remain firm and fixed on account of FE variation and Custom Duty Variation, till complete execution of the order. FE variation shall be on you . Kindly confirm . NOT ACCEPTABLE. 5 Pre Filled Agreed Terms and Conditions 22 30 SETTLEMENT OF DISPUTE BETWEEN GOVT. DEPT./ PUBLIC SECTOR UNDERTAKING Arbitration shall be Tri - Partite Arbitration as per Arbitration and Conciliation Act 1996 . Kindly confirm . ARBRITATION SHALL BE AS PER CL. 34 OF GPC 6 Special Commercial Notes on RFQ 28 22 Integrity Pact Kindy provide the format of the integrity pact . REFER PG.291 FOR THE FORMAT 7 RFQ 4 Part 1 - IX ) Fresh Bank Solvency Certificate, date of issue of this certificate should not be earlier than 1 year from the date of Opening of Techno-commercial part. Kindly provide the format for solvency if any , in the absence of the same kindly note that solvency shall not be specifically addressed to EIL . ACCEPTABLE. 8 RFQ 5 10 Delivery / Completion Period . We understood that site readiness means the readiness of the site to our site activities , kindly note that site readiness shall be parallel with our supply of materials . Kindly confirm . FOLLOW RFQ TERMS STRCITLY. 9 Part III - Section : B.4.1 - Scope of Work for Mechanical / Rotary 394 1.23.3 The performance tests for the A/c plant shall be done during peak summer and with a minimum of 10 days continuous running after complete installation and commissioning of the units including ducting Perfomance test shall be done inline with the project completion schedule . Also kindly confirm that the power ,water and load for the 10 days running after complete installation shall be provided by you . Kindly confirm . Performance testing shall be done during peak summer after complete installation and commissioning. Before start of performance testing, the system shall be continuously running for a minimum of 10 days duration. Power and water required for Performance testing shall be provided by Client. However necessary equipment to generate artificial LOAD shall be arranged by vendor during the Performance tests. 10 Part III - Section : B.4.1 - Scope of Work for Mechanical / Rotary 396 1.23.9 Separate supply and return air ducting shall be provided. Kindly note that wherever false ceiling is there , return air ducting is not considered by us . Kindly confirm . Return Air ducting need to be considered for all locations as per MR requirement. Flow of Return air above false ceiling to AHU room is not acceptable. 11 Part : V - Section : 3.3 - Standard specification for Air Handling Unit 431 3.3 Casing shall be made of sandwiched panels of 22GCRCA powder coated sheet steel from outside & 24 G galvanized sheet steel on inside with 25mmT.F. quality thermocol insulation in between. Acoustic insulation liner shall be provided to restrict noise levels within limits specified. Panel construction is 25 mm thick puff insulation , no separte acoustic liner provided . Kindly confirm . Panel construction shall be as per Tender requirement. Kindly follow the same. Pre-Bidder Queries SL No Reference Of RFQ Documents Bidder's Query EIL'S Reply

Upload: vuongngoc

Post on 27-Jun-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pre-Bidder Queries - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A133/RFQ/A133...be specifically addressed to EIL . ... piping, electrical accessories, instruments,

Part /

Vol Page No Clause No Subject .

1Pre Filled Agreed

Terms and Conditions 19 6.b

Only single order covering complete scope of supply &

services will be

issued (indicating supply and services portion separately).

Order for supply

and services shall not be split

Kindly give separate order for Supply and Installation . FOLLOW RFQ TERMS.

2Pre Filled Agreed

Terms and Conditions 20 10 - a / b Price Reduction Schedule:

Acceptable , if delay is attributable to us . Please

Confirm . CONFIRMED

3Pre Filled Agreed

Terms and Conditions 21 17 Firmness of Price

Price variation shalll be applicable for the delay not

attributable to Voltas . PRICES SHOULD REMAIN FIRM.

4Pre Filled Agreed

Terms and Conditions 21 18 - c

Quoted prices shall remain firm and fixed on account of FE

variation and

Custom Duty Variation, till complete execution of the order.

FE variation shall be on you . Kindly confirm . NOT ACCEPTABLE.

5Pre Filled Agreed

Terms and Conditions 22 30

SETTLEMENT OF DISPUTE BETWEEN GOVT. DEPT./

PUBLIC SECTOR UNDERTAKING

Arbitration shall be Tri - Partite Arbitration as per

Arbitration and Conciliation Act 1996 . Kindly confirm .

ARBRITATION SHALL BE AS PER

CL. 34 OF GPC

6Special Commercial

Notes on RFQ 28 22 Integrity Pact Kindy provide the format of the integrity pact . REFER PG.291 FOR THE FORMAT

7 RFQ 4 Part 1 - IX )

Fresh Bank Solvency Certificate, date of issue of this

certificate should not be earlier

than 1 year from the date of Opening of Techno-commercial

part.

Kindly provide the format for solvency if any , in the

absence of the same kindly note that solvency shall not

be specifically addressed to EIL .

ACCEPTABLE.

8 RFQ 5 10 Delivery / Completion Period .

We understood that site readiness means the

readiness of the site to our site activities , kindly note

that site readiness shall be parallel with our supply of

materials . Kindly confirm .

FOLLOW RFQ TERMS STRCITLY.

9

Part III - Section : B.4.1 -

Scope of Work for

Mechanical / Rotary

394 1.23.3

The performance tests for the A/c plant shall be done

during peak summer and with a minimum of 10 days

continuous running after complete installation and

commissioning of the units including ducting

Perfomance test shall be done inline with the project

completion schedule . Also kindly confirm that the

power ,water and load for the 10 days running after

complete installation shall be provided by you . Kindly

confirm .

Performance testing shall be done

during peak summer after complete

installation and commissioning.

Before start of performance testing,

the system shall be continuously

running for a minimum of 10 days

duration.

Power and water required for

Performance testing shall be

provided by Client. However

necessary equipment to generate

artificial

LOAD shall be arranged by

vendor during the Performance

tests.

10

Part III - Section : B.4.1 -

Scope of Work for

Mechanical / Rotary

396 1.23.9 Separate supply and return air ducting shall be provided. Kindly note that wherever false ceiling is there , return

air ducting is not considered by us . Kindly confirm .

Return Air ducting need to be

considered for all locations as per

MR requirement. Flow of Return air

above false ceiling to AHU room is

not acceptable.

11

Part : V - Section : 3.3 -

Standard specification

for Air Handling Unit

431 3.3

Casing shall be made of sandwiched panels of 22GCRCA

powder coated sheet steel from outside & 24 G galvanized

sheet steel on inside with 25mmT.F. quality thermocol

insulation in between. Acoustic insulation liner shall be

provided to restrict noise levels within limits specified.

Panel construction is 25 mm thick puff insulation , no

separte acoustic liner provided . Kindly confirm .

Panel construction shall be as per

Tender requirement. Kindly follow

the same.

Pre-Bidder Queries

SL

No

Reference Of RFQ Documents

Bidder's Query EIL'S Reply

Page 2: Pre-Bidder Queries - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A133/RFQ/A133...be specifically addressed to EIL . ... piping, electrical accessories, instruments,

12

Part : V - Section : 3.3 -

Standard specification

for Air Handling Unit

432 3.4Copper tube gauge thickness shall not be less than 22

SWG

Copper tube thickness will be 25 gauge ( 0.5 mm ) .

Kindly confirm . Follow Tender Requirement

13

Part : V - Section : 3.3 -

Standard specification

for Air Handling Unit

433 3.5

Fan impeller shall be backward/ forward curved, with

aerofoil design. Impeller blades shall be made of aluminium.

Fan scroll shall be of heavy gauge aluminium or M.S. with

epoxy coating and with die formed inlet for achieving

uniform airflow. The impeller shall be fixed to the shaft with

taper lock connections. Fan shafts shall be of solid,cold

rolled carbon steel ground and polished.

Fan casing is made of GI sheet steel without coating .

Fan impeller material is MS and not aluminium . Please

Confirm .

Follow Tender Requirement

14

Part : V - Section : 3.3 -

Standard specification

for Air Handling Unit

433 3.5

AHU manufacturer shall provide performance curvesand

noise levels for the fans in accordance

with BS 848.

Fan perfomance and noise data as per manufacturer

standard ( AMCA ) .

Noted. However, vendor to restrict

Noise levels and fan outlet velocity

of AHU fan as per Tender

requirement.

15

PART V - Section 3.3

STANDARD

SPECIFICATION FOR

AIR CONDITIONING

PLANT

401

All air conditioning area having exposed roof shall be

provided with under deck insulation

with minimum 50mm thickness.

As per the job specification for HVAC underdeck

insulation shall be provided by the purchaser .

Noted. Underdeck insulation of Roof

is not in scope of HVAC vendor.

16

Part III - Section : B.4.1 -

Scope of Work for

Mechanical / Rotary

396 1.23.10

Contractor shall carry out complete erection of the system

including equipment, ducting,

piping, electrical accessories, instruments, MCC-s, panels,

cabling, instrument air tubing, all

support structures, access platforms, walkways, civil

foundations, lighting, insulation etc.

Primary supports like civil supports , bridges or any

kind of trenches shall not be in our scope . Also basic

engineering for civil foundation for equipments alons

shall be provided by us .

Noted. RCC/PCC foundation of

HVAC equipments are not in

vendor's scope. However, Civil

works like supply and fixing of

supports for ducting, piping,

electrical and control cables,

breaking and making of opening in

the walls, grouting of all the

equipment including supply of

grouting material, etc. are in

vendor's scope.

17

Part V - Section : 3.3 -

Standard specification

for Cooling Tower

457 3.4 Fill supports : GRP grid / PVC coated steel wires . All frame works are MS hot dip galvanized , hence PVC

coating is not required . Follow Tender Requirement

18

Part V - Section : 3.3 -

Standard specification

for Cooling Tower

458 3.4 Hot water distribution basin Not applicable in counter flow towers . Follow Tender Requirement

19

Part V - Section : 3.3 -

Standard specification

for Cooling Tower

459 3.11.2

Doors and walkways shall be provided at basin level for

access to the tower internals and

interior walls.

Internal walkway is not required . Kindly confirm . Follow Tender Requirement

20

Part V - Section : 3.3 -

Standard specification

for Cooling Tower

459 3.12.9

Fan and shaft shall be supported by heavy duty self-

aligning, grease packed bearings with

moisture proof seals.

Fans shall be direct driven . ( Fans directly coupled

with extended motor shaft ) . Follow Tender Requirement

21

Part V - Section : 3.3 -

Standard specification

for Cooling Tower

460 4.3

Site performance testing of the cooling tower shall be

carried out according to CTI-ATC-105.

The evaluation of cooling tower performance from field test

data will be done by reference

performance curves as given in CTI bulletin.Vendor shall

furnish necessary performance curves during drawing/ data

submission for approval.The duration of performance test

shall be minimum 72 hours after reaching steady state

conditions

We offer CTI certified Cooling towers . Hence site

perfomance testing of the cooling towers need not be

done . Kindly confirm .

Site performance testing of the

Cooling tower shall be performed as

per Tender requirement.

Page 3: Pre-Bidder Queries - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A133/RFQ/A133...be specifically addressed to EIL . ... piping, electrical accessories, instruments,

22

Part III - Section : B.4.1 -

Scope of Work for

Mechanical / Rotary

395 1.23.8The system shall be provided with filters (10

microns with chemical filtration as required)

Chemical filters shall be provided for the control where

AC is coming . We have not considered chemical filters

for ventilation systems .

Noted. Chemical Filters are not

required for Ventilation system of

Switch Board Room of Substation

Building. However, chemical filters

are required for AC system (for VFD

Room and Engineer's Room) in

Substation Building. The same is

clearly indicated in Annexure-1 to

Job Specification for HVAC System

(Doc No - A133-086-16-44-SP-4210

atached with MR/RFQ)

23

Part III - Section : B.4.1 -

Scope of Work for

Mechanical / Rotary

397

Rerouting of existing cables, which are fouling with new

cable schedule shall be done

where applicable.

Kindly note that rerouting of cables shall not be in our

scope . Similarly dismantling of any pipes , ducts and

foundations etc also are not in our scope .

Noted

24

Part III - Section : B.4.1 -

Scope of Work for

Mechanical / Rotary

396 1.23.10

Contractor shall carry out complete erection of the system

including equipment, ducting,

piping, electrical accessories, instruments, MCC-s, panels,

cabling, instrument air tubing, all

support structures, access platforms, walkways, civil

foundations, lighting, insulation etc.

Primary supports like supports , bridges for pipes ,

ducts ect or any kind of trenches shall not be in our

scope . Civil works of any kind is completely excluded

from our scope . However the basic details for civil

foundations shall be provided by us .

Noted. RCC/PCC foundation of

HVAC equipments are not in

vendor's scope. However, Civil

works like supply and fixing of

supports for ducting, piping,

electrical and control cables,

breaking and making of opening in

the walls, grouting of all the

equipment including supply of

grouting material, etc. are in

vendor's scope.

25Job Specification for

HVAC 337 7 Heat load summary.

Kindy provide your heat load working sheet as

considerable variationts arise in our heat load

estimation .

Refer Cl-8.6 of Job Specification for

HVAC system (Doc No - A133-086-

16-44-SP-4210 attached with

MR/RFQ), Bidder to cross check the

estimated plant capacity before

accepting the same. However, the

minimum plant capacity shall be as

indicated in MR/RFQ. Also, bidder

to submit heat load calculation

during detailed engineering stage

for equipment selecation and air

distribution purpose.

26Job Specification for

HVAC

Kindly provide the list of rooms to be Air conditioned ,

along with their respective TR and Air flow required .

Kindly also confirm whether lobby and corridor needs to

be air conditioned as indictaed in the diagram .

All the areas/rooms to be air

conditioned are properly indicated in

Architectural Drawings of Control

Room and Substation Building. Also

refer tentative duct layout drawing

attached with MR/RFQ for list of

rooms to be air conditioned along

with air distribution table. Note that

this air distribution schedule is

indicative only for guidance to

bidder. Detailed Heat Load

Calculations shall be carried out by

Vendor during detailed engineering

stage and exact air distribution

schedule shall be finalised.

Page 4: Pre-Bidder Queries - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A133/RFQ/A133...be specifically addressed to EIL . ... piping, electrical accessories, instruments,

27Job Specification for

HVAC 336 6.2 Inside Design Conditions - 6 mm wc of positive pressure .

Kindly clarify whether the dehumidified CFM indicated

by you for AHU is incoporating the capacity to maintain

this 6 mm wc pressurization .

The dehumidified CFM indicated in

the MR is based on the heat load

calculation. Architectural

constructional details (e.g doors,

windows etc.) of the buildings shall

be as per architectural drawings

attached with the MR. Vendor to

select suitable equipment to meet

the over pressurisation requirement

as per MR.

28 Vendor List 525

Kindly provide the vendor list for Static Equipment (

Fabrication Equipment ), Heat Transfer Equipment and

Miscellaneous as the same were missing .

Vendor List applicable Mechaniocal

Equipment, Rotary Equipment and

Piping for HVAC system are

provided in Vendor List (Doc No -

44NC-4600:00:R:01:0005) attached

with MR/RFQ. Items for which

vendor list are not available, bidder

to provide PTR as indicated in cl.

no. 12.1 of Job Specification doc.

no. A133-086-16-44-SP-4210.

29 Earnest Money Deposit . We do understand that EMD is not required during the

time of bidding . Kindly confirm . EMD NOT REQUIRED.

30 Vendor List Kind approve the following vendors for Centrifugal

blowers - Kruger , Nicotra . Follow Tender Requirement

31 Vendor Llist Kindy approve the following vendor for Air Handliing

Duct - Voltas . Noted

32 Vendor Llist Kindly approved the following vendor for sheet metal

duct - Voltas . Noted

33

Part III - Section : B.4.1 -

Scope of Work for

Mechanical / Rotary

396 7 Portable emrgency lights . Kindly specify the areas / quantities , description for the

same .

Lighting for the system is excluded

from the scope of the MR.

34

Part III - Section : B.4.1 -

Scope of Work for

Mechanical / Rotary

396 10

The fire dampers must have 90 minutes fire rating

(resistance) and shall be operated

pneumatically or with solenoid valves and actuated by

smoke detector. However the

opening shall be in manual mode. The design temperature

of fire dampers shall be 450

o C

Kindly note that Manual opening is not possible in

Pneumatic or solenoid actuators . Kindy clarify .Follow Tender Requirement

35

Part III - Section : B.4.1 -

Scope of Work for

Mechanical / Rotary

396 10

The fire dampers must have 90 minutes fire rating

(resistance) and shall be operated

pneumatically or with solenoid valves and actuated by

smoke detector. However the

opening shall be in manual mode. The design temperature

of fire dampers shall be 450

o C

Kindly note that the compressed air for pneumatic

actuators shall be provided by you at the location of

each dampers . Kindly confirm .

Compressed air/instrument air with

battery limit conditions as specified

in Cl - 9.1, Sl No - 3 of Job

Specification for HVAC System (Doc

No - A133-086-16-44-SP-4210)

shall be made available at a single

point within 1m from Building at

grade level for both Control Room

and Substation Building. Further

distribution of Instrument air at each

and every fire damper is in vendor's

scope refer Cl No - 9.2 of Job

Specification for HVAC System).

Page 5: Pre-Bidder Queries - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A133/RFQ/A133...be specifically addressed to EIL . ... piping, electrical accessories, instruments,

36

Part III - Section : B.4.1 -

Scope of Work for

Mechanical / Rotary

396 16

Following first aid equipments shall be provided.

1 First aid kit, breathing apparatus, fire blankets.

2 Hand operated extinguishers (Halon/ equivalent).

3 CO

2fire extinguishers for substation building and office area.

4 Flameproof torches, water-jet blankets.

Kindly clarify whether these first aid kits are needed to

be maintained during execution during the site or shall

be supplied as a part of the scope .

Follow Tender Requirement. The

following shall be supplied as part of

supply with HVAC equipment.

Additionally First Aid Kid shall be

maintained during construction as

per standard practuice / Tender

Requirement.

37

Part III - Section : B.4.1 -

Scope of Work for

Mechanical / Rotary

397 1.26All Equipment unitization shall be carried out at respective

vendor’ s shop.

Kindly note that equipments such as AHU , Cooling

towers etc and also for other equioments wherever is

required shall be brought to the site in disassemble

condition and assembly will be done in the site .

Equipment unitization shall be

carried out at respective vendor’ s

shop to the maximum possible

extent.

38Kindly specify the location of earth pit , so that we can

calculate our earthing accordingly .

Refer electrical scope of work doc.

(A133-086-16-50-SOW-4210), one

number Earth Plate inside VAM and

switchboard room of substation

building and AHU room of Control

Room building for air-conditioning

and pressurization systems shall be

provided by purchaser. However,

equipment earthing of all bidder

supplied equipments and

connecting the same to the

purchaser earth plates shall be in

the scope of the bidder.

39Kindly specify the location of drain points till where we

have to provide our drain piping .

Floor Trap/Drain Point in AC Plant

Room & AHU Rooms are clearly

shown in Architural Drawings of

Control Room and Substation

Building.

40

Part V - Section : B.3.3 -

Scope of Work for Air

Conditioning Plant .

404 Make up water tank .

Kindly confirm that the make up water will be made

available by you at the make up water . Piping from

make up water shall be in our scope.

Service water to be provided at

battery limit shall be used as make-

up water for cooling tower. Service

water with battery limit conditions as

specified in Cl - 9.1, Sl No - 4 of Job

Specification for HVAC System (Doc

No - A133-086-16-44-SP-4210)

shall be made available at a single

point within 1m distance from

building at grade level for both

Control Room and Substation

Building. Further distribution of

service water to Pan Humidifier and

Make-up water for cooling tower

shall be in vendor's scope.

41

TERMS &

CONDITIONS FOR

INSTALLATION/SITE

WORK

57 9

Construction power shall be arranged by the

CONTRACTOR at his own cost. Contractor

should arrange adequate no. of DG Sets, suitable for usage

at site.

10.0

Kindly provide construction power , power for

commissioning and power for site usage free of cost .

Kindly confirm .

TO CONTRACTOR'S ACCOUNT(

REFER TERMS & CONDITIONS

TO Site work cl. 9.0)

Page 6: Pre-Bidder Queries - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A133/RFQ/A133...be specifically addressed to EIL . ... piping, electrical accessories, instruments,

42Job Specification for

HVAC 344 Special tools and tackles

Our offer shall be inclusive of the special tools and

tackles provided in the list given by only . We have

studied and found that these tools and tackles for the

system and we are not going to consider any exxtra

tools and tackles . Kindly confirm .

Bidder needs to supply, as

minimum, Special Tools & Tackles,

as listed in Cl No - 16.4 of Job

Specification for HVAC System.

However, any other special tools &

tackles, as deemed necessary by

Bidder for their supplied system

shall also be included by them.

43

PRESENT

COMMITMENTS

(CONCURRENT

COMMITMENT)

15 Concurrent commitments .

Kindly note that the schedule which will be submitted

by us in the provided format shall be indicative only ,

subjectable to variation under mutual consent and the

same shall not be taken as a commitment .

PLEASE PROVIDE DETAILS OF

SIMILAR ORDERS UNDER

PROGRESS.

44

Part 1 : Section : 8

Title : Mandatory spare

list .

585 Mandatory spare list . - 44NC-4600-0000/N.02/0028/A4

Our offer for mandatory spare list shall be strictly based

on this any no other extra mandatory spares shall be

provided . Kindly confirm . Also as per the technical

check list , the mandatory spare list 44NC-

46000000/N.02/0028/A4 shall be submitted after the

award of the contract .

Mandatory Spare List shall be as

per Annexure -2A/B of Technical

Checklist for HVAC System.

Mandatory Spares shall strictly

include all the items listed in

Annexure - 2A/B only. However,

during bidding stage, Bidder need

not to submit detailed list of

Mandatory spares with their offer

(as the quantity are not finalised

during bidding stage). However,

Bidder to submit signed and

stamped copy of Annexure-2A/B

along with their offer.

45

Vendor Data

Requirements for HVAC

systems .

350 12Utility consumption figures (with power

consumption)

Kindly note that the submitted consumption figure shall

be indicative only and the same may vary during detail

engineering . Kindly confirm . Also please confirm that

there is no penalty for any variation in power

consumption from indicated one during bidding .

Noted

46

Vendor Data

Requirements for HVAC

systems .

349 20 Any other test report , as required . Kindly define specifically , as the same can be

accomodated in our offer .

Any other test report as per

approved QAP/ITP, shall be

submitted by vendor.

47

Vendor Data

Requirements for HVAC

systems .

349 10Equipment load data and foundation / anchor plan with

pocket details .

Kindly note that the same shall be submitted after the

award of the contract . Please confirm .

Vendor to provide tentative details

alongwith bid for our concurren

downstream engineering.

48Job Specification for

HVAC 347 Annexure I

Kindly note that high side equipment shall be supplied

based on this Annexure only . Please confirm .

The minimum capacity of High side

equipment shall be as per Annexure-

1 to Job Specification for HVAC

System.

49 Kindly provide the specifictaion conditions for pumps .

Refer Cl - 4.11 of Standard

Specification for Refrigeration Plant

(Doc no - 44NC-4600-

0000/M.02/0041/A4) attached with

MR/RFQ.

50Job Specification for

HVAC 347 Annexure I

Kindly provide the external static for AHU and

centrifugal blowers for ventilation system .

The same need to be calculated by

bidder based on maintaining internal

static pressure (as required) and

ducting/diffuser/dampers/air

filters/etc. pressure drop.

Page 7: Pre-Bidder Queries - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A133/RFQ/A133...be specifically addressed to EIL . ... piping, electrical accessories, instruments,

51Job Specification for

HVAC 336 3.0 - b) Exclusions- AC Plant room & Pressurisation room buildings. Kindly elaborate .

Civil constructional works for AC

Plant Room and Pressurisation

Room Building shall not be in scope

of Bidder.

52

Standard specification

for Air Conditioning unit

.

403 4.7 - Humidifier Unit

3mm thick carbon steel sheets is not available in the

market (as a standard ) , we shall provide 3mm thick

M.S sheet and sizes of the angels will as per the KW

capacity and not 25x25x6 mm. Kindly confirm .

Follow Tender Requirement

53

Scope of work (

Instrumentation ) HVAC

system .

746 1.1.2 Local Gauge boards. Kindly elaborate .

Local Gauge board is applicable for

mounting of local instruments like

pressure and temperature gauges

etc.

54Job Specification for

HVAC 342 13.1

All equipment shall be subjected to stage wise expediting,

inspection and testing at

vendor’s/sub-vendor’s works by Owner / PMC /

Authorised third party inspection

agency. Vendor shall submit Quality Assurance (QA)

procedure before

commencement of fabrication for review. Approved QA

procedure shall form the

basis for equipment inspection.

Stage wise expediting / inspection shall be provided for

only VAM . Kindly confirm . Also kindly provide your

QAP for various equipments so that we can incorporate

the same in our offer .

Stage wise expediting / inspection

shall be carried out for all the major

equipment as per approved QAP.

QAP shall be submitted by Bidder

for review by EIL/PMC/CPCL

55

Control room - Ground

and basement floor

plans .

Kindly specify whether any ventilation system is

requred in clean room , battery rooms , toilet and cable

cellar .

Ventalation requirement for Clean

room, Battery Room, Toilet & Cable

celler shall be taken care by others.

56

Substation ( Coker

Block ) - Ground Floor

plan and elevation .

Kindly specify whether any ventilation system is

requred in cable cellar , pressurisation room , LTG

Trafo room , Transformer room , Battery room .

Ventalation requirement for able

cellar , pressurisation room , LTG

Trafo room , Transformer room ,

Battery room shall be taken care by

others.

57

Job Specification for

HVAC system - 2.

Scope of Supply &

Services

3 of 18 6 Dedicated induced draft type cooling tower

Is this means 1No. Working VAM is having dedicated

cooling tower & also 1No. Standby VAM is having

dedicated cooling tower.

There shall be one (1) common

counterflow induced draft type

cooling tower catering to both

Vapour Absorption Machines.

58 3 of 18 7 Insulated expansion tank Insulated chilled water expansion tank shall be gravity

feed type.

Insulated chilled water expansion

tank shall be as per Cl No - 4.10 of

Standard Specification for Air

Conditioning Plant (Doc No - 44NC-

4600-0000/M.02/0040 /A4) attached

with MR/RFQ

59 3 of 18 9Low water level switch interlocked to water heater & float

valve on make-up water line.

Since we are using float valve on make-up water line

there is no need of low water level switch. Make-up

water supply shall start based on the mechanical

action. No interlock with water heater required.

Follow Tender Requirement.

Interlock with water heater is

required to prevent heater turning

on at low water level.

60 4 of 18 17 Civil works In client's scope

Follow Tender Requirement. Minor

Civil works as indicated in scope of

work shall be in Bidder's scope

Page 8: Pre-Bidder Queries - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A133/RFQ/A133...be specifically addressed to EIL . ... piping, electrical accessories, instruments,

61 4 of 18 28 Split AC with blast proof capacitor We provide Voltas make split AC with brust proof

capacitor

Follow Tender Requirement. Bidder

to supply Split AC with Blast proof

capacitor. Also note that, Bidder to

provide PTR for the same as per Cl

No - 14.1 of Job Specification for

HVAC System.

62 2.2 Scope of Service

6 of 18 k Statutory approvals, If any Client's Scope

Statutory approvals of vendor's

supplied items shall be in their

scope. e.g. LP steam supply piping

shall be of PMS class A22A (IBR

Class) and statutory approval for the

same is in bidder's scope.

63 3.0 Exclusion

6 of 18 d Steam, Instrument air & service water Client to specify battery limits

Refer - Battery Limit/Interface

provided in Cl No - 9.2 of Job

Specification for HVAC System.

646.1 Outside Design

Condition

7 of 18 Air Quality Client to give exact air quality to be considered

GX air quality as per ISA S71.04 to

be followed as a minimum. However

bidder shall take measurement of

the outdoor air quality at site and

submit the same. If, the measured

actual value is worse than the GX

level, bidder to follow the measured

actual value.

658.0 Technical

Requirements

10 of 18 8.13 Fire/ Smoke detectors Client's Scope

Noted. Refer Cl - 4.9.5 of Standard

Specification for Air-conditioning

Plant (Doc No -44NC-4600-

0000/M.02/0040/A4), signal from fire

and gas panel shall be made

available at local control panel in

the form of potential free contact.

11 of 18 8.20 Fire fighting system Client's Scope

Noted. Refer Cl - 8.20 of Job

Specification for HVAC System, AC

system shall be interlocked with fire

fighting system. Also refer Cl - 4.9.5

of Standard Specification for Air-

conditioning Plant (Doc No -44NC-

4600-0000/M.02/0040/A4), signal

from fire and gas panel shall be

made available at local control

panel in the form of potential free

contact.

66

13.0 Inspection, Testing

& Performance

Guarantee

12 of 18 13.1Stage wise inspection shall be offered only for major

equipments like VAM.

Stage wise expediting / inspection

shall be carried out for all the major

equipment.

QAP shall be submitted by Bidder

for review by EIL/PMC/CPCL

Page 9: Pre-Bidder Queries - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A133/RFQ/A133...be specifically addressed to EIL . ... piping, electrical accessories, instruments,

13.4

If client is not ready with full load then Voltas is not

responsible for creating any type of artifical load. We

shall demonstrate the performance of the system on

available load.

Power and water required for

Performance testing shall be

provided by Client.

Necessary equipment for generating

artificail LOAD shall be arranged by

vendor during the Performance

tests.

67 Annexure - 1 17 of 18 86-M-06 Chemical Filter UnitCapacity of chemical filter should be 4800 CFM i.e 10%

of total CFM.

Fresh air quantity shall also be

calculated based on 5 ACPH for

Control room. Fresh air quantity

based on 5 ACPH comes out to be

12500 CFM as indicated in the

Annexure-1

68

Standard Specification

for chilled water plant

(Vapour Absorption

Type)

Doc. No. 44NC-

4600-

0000/M.02/0030/A4

69 2.0 Codes & Standards 3 of 8 2.1 ASME Sec. VIII Div. I - Unfired pressure vessel

We are manufacturing Vapour Absorption Machine

(VAM) with M/s Hitachi technology being our technical

collarator. Which in turn follows Japanses Industrial

Standards (JIS). Hence ASME Sec. VIII Div. I & TEMA-

B codes/ standards are not applicable.

Follow Tender Requirement

TEMA - B - Shell & tube type heat exchangers Follow Tender Requirement

API 685

We are using canned motor pumps in our Vapour

Absorption Machine (VAM). These are Japanese make

& are as per manufactruer's standard. Hence API 685

codes/ standards are not applicable. We are using

vaccum pump which is rotary type & hence API 685 is

not applicable.

Follow Tender Requirement

API 610

We are using centrifugal pumps for normal water

application. Hence we propose standard (i.e non API)

centrifugal pumps. However is still client insist going for

API 610 pumps, then let us know the edition to be

consider.

Follow Tender Requirement

703.0 Technical

Requirements3 of 8 3.7

Steam inlet control valve shall be provided with isolation

valve, manual bypass valve & steam traps

This being single effect VAM, we shall provide steam

drain (Condensate) control valve instead of steam

control valve. Steam traps shall be provided on the

steam line. However we do not recommend to install

manual bypass valve for control valve as manual

oepration of steam drain control (condensate) is not

allowed.

Follow Tender Requirement

4 of 8 3.9 Control panel

c On/ Off switch for all pumpsNot provided as individual pump operation is not

allowed.

Bidder shall follow PMC

specification requirement attached

with MR

fAlarm buzzer with first-out type annunciation windows &

reset push buttons

We are providing 2 x 40 charater LCD display control

panel with LED indication. Hence annunciation

windows are not considered/ applicable.

Bidder shall follow PMC

specification requirement attached

with MR

Page 10: Pre-Bidder Queries - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A133/RFQ/A133...be specifically addressed to EIL . ... piping, electrical accessories, instruments,

4 of 8 3.11 Automatic quick shut off valve on cooling water system

We are providing pressurized soft spray nozzle system

in Absorber section. So even if VAM machine trips

there is no flow of lithium bromide in the Absorber.

Hence even the cooling water passes through Absorber

there is no possibility of crystallization in the VAM. Plus

we are giving interlock between cooling water inlet

temperature & cooling tower fan. Whenever cooling

water inlet temperature goes below specified limit

cooling tower fans are cut-off. Resulting in prevention

of crystallization. Hence Automoatic quick shut-off

valve is not requirement in our machine. Therefore not

provided.

Follow Tender Requirement

5 of 8 3.12.2 Safety Features

4 Chilled water temperature high N.A Follow Tender Requirement

6 Low cooling water temperature Cooling tower fan cut-off. Inlet valve closed - N.A Follow Tender Requirement

8 Steam pressure low N.A Follow Tender Requirement

5 of 8 3.12.4 Refrigerant level control shall be provided in the evaporator

DAM arrangement is provided instead of automatic

control valve.Follow Tender Requirement

6 of 8 3.16.3

We shall provide high & low level switch. Condensate

transfer pumps (1W + 1S) shall turn on when

condensate level reaches high level & shall stop when

level reaches low level. Standby pump shall come in

operation automatically on tripping of working pump.

Not acceptable. Follow Tender

requirement.

71 4.0 Inspection & Testing 6 of 8 4.1/ 4.2/ 4.3

Inspection & testing shall be done as per previous

project execute at M/s CPCL/ with M/s EIL.

Not acceptable. Follow Tender

requirement.

72

5.0 Protection &

Painting 7 of 8

5.1 Sand blasting

Since VAM is having delicate rubber & glass parts

installed on its body normal wire brush cleaning is

applicable. Sand blasting is not recommended as it

damages the above said delicate parts.

Sand blasting shall be used for

cleaning to the maximum possible

extent (whereever technically

feasible)

73 Mandatory Spares List 66 of 91

Doc. No. 44NC-

4600-

0000/N.02/0028

25.0

The above mandatroy spare list is applicable to the total

quantity of installed units under each tag no.

Is this means that we have to supply 10% tubes

considering both VAM machines. Please confirm.

Bidder to consider 10% tube

individually for both the VAM

74

Approved Vednor List

(Instrumentation)

Doc. No. A133-086-

16-51-SP-21

11 of 11 12.1

Control system shall be microprocessor based control

system dedicated for each machine.

Microprocessor based control system/ panel shall be of

M/s Micro Power control with Microprocessor from M/s

Softhard Automation. Same is provided in previous

project executed at M/s CPCL/ with M/s EIL.

For microprocessor based control

system, it is specified as Vendor

standard and field proven

microprocessor based control

system shall be used. The same

shall be complied with. Necessary

PTR reference shall be furnished

along with offer documents.75 Vendor list - Electrical

2 of 22 3 Switch Board - Drawout typeIs MCC panel to be manufatruered by direct OEM OR

their system house/ dealer is acceptable.

Fixed type PDB is in bidder's scope

as per cl. no. 5.1 of job specification

A133-086-16-50-SP-4210. The list

of vendors for the fixed type

switchboards is given in the vendor

list attached with the MR.

76 Mechnical Equipments 9 of 13 34 Refrigeration System - Vapour Absorption

We shall follow our standard make list for internal