table of contents - eiltenders.eil.co.in/newtenders/userdata/doc_repository/a096/rfq/a096... ·...
TRANSCRIPT
Click on the Document Title to go to that section of the document
Table of ContentsDocument Number Rev. Document Title Page
NumberA096-090-WB-MR-3425
A VALVE: LT/CRYO (GATE GLOB E CHECK) 2
6-44-0052 6 Technical notes for valves. 66-81-0004 5 ITP for valves 266-78-0003 0 Specification for Documentation Requirement from Suppliers 336-78-0001 0 Specification for Quality Mgt. System Requirements from Bidders 456-81-0001 2 Standard specification for Positive Material Identification (PMI) at
Supplier's Works54
A096-6-44-0006-3425
0 SPECS FOR MR OR PACKAGE INPUT 62
A096-090-16-43-ATR-3425
A ADDITIONAL TECHNICAL REQUIREMENTS 75
Page 1 of 77
Thi
s dr
awin
g an
d de
sign
it c
over
s ar
e pr
oper
ty o
f E
NG
INE
ER
S IN
DIA
LIM
ITE
D. T
hey
are
mer
ely
loan
ed o
n th
e bo
rrow
er's
exp
ress
agr
eem
ent t
hat i
t will
not
be
repr
oduc
ed, c
opie
d, e
xhib
ited
nor
used
exce
pt in
the
limite
d w
ay a
nd p
riva
te u
se p
erm
itted
by
wri
tten
cons
ent g
iven
by
the
lend
er to
the
borr
ower
for
the
inte
nded
use
. EIL
-164
1-51
5 R
ev.0
A4-
210x
297
EIL
- 5
88 A
- 2
16 x
279
ENGINEERS INDIA LIMITED
NEW DELHI
Project:
Client:
PETROCHEM COMPLEX
GAIL LTD.
Requisition No. Rev
A096-090-WB-MR-3425 A
Page 1 of 4
MATERIAL REQUISITION (TOP SHEET)
ITEM: VALVE: LT/CRYO(GATE GLOBE CHECK)
Issue Status 1. -> Entire Requisition Issued
2. -> Only Revised Pages are Issued
(Fill 1 or 2 from below in this bracket)
DOCUMENT NUMBER(Always quote this document number given below as reference)
A096 090 WB 3425MR 17/09/2013 16/43A
JOB NO. UNIT/AREA
COST CENTRE
DOCCODE
SR.NO. REV DATE ORIGINATINGDIVN./DEPT
VENDOR NAME VENDOR CODE
Material to be delivered at (job site) GAIL LTD., PATA UP within the delivery period specified in the "Request For
Quotation" (RFQ).
Notes :This page is a record of all the Revisions of this Requisition.
The nature of the Revision is briefly stated in the "Details" column below, the Requisition in its entirety shall beconsidered for contractual purposes.
When a Requisition is revised, only the revised pages may be issued.
When revised pages only are issued, the revised pages shall form part of the original Requisition. The original requisition alongwith the revised pages shall be considered in its entirety for contractual purposes.
REV. DATE BY CHK. APPD.
A 17/09/2013 ISSUED FOR BIDS
DETAILS
[ ]
Vendors are required to quote strictly as per technical specifications / notes stipulated in the material requisition. Theoffers with deviations are likely to be summarily rejected.
1.
2.
3.
4.
5.
MR Category :I
SSP MMK AK
This is a system generated approved document and does not require signature
Page 2 of 77
Thi
s dr
awin
g an
d de
sign
it c
over
s ar
e pr
oper
ty o
f E
NG
INE
ER
S IN
DIA
LIM
ITE
D. T
hey
are
mer
ely
loan
ed o
n th
e bo
rrow
er's
exp
ress
agr
eem
ent t
hat i
t will
not
be
repr
oduc
ed, c
opie
d, e
xhib
ited
nor
used
exce
pt in
the
limite
d w
ay a
nd p
riva
te u
se p
erm
itted
by
wri
tten
cons
ent g
iven
by
the
lend
er to
the
borr
ower
for
the
inte
nded
use
. EIL
-164
1-51
5 R
ev.0
A4-
210x
297
EIL
- 5
88 A
- 2
16 x
279
ENGINEERS INDIA LIMITED
NEW DELHI
Project:
Client:
PETROCHEM COMPLEX
GAIL LTD.
Requisition No. Rev
A096-090-WB-MR-3425 A
Page 2 of 4
LIST OF ATTACHMENT
DOCUMENT TITLESR. NO DOCUMENT NO.REVISION
NO. DATE 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
TECHNICAL NOTES FOR VALVES
INSPECTION AND TEST PLAN FORVALVES
STANDARD SPECIFICATION FORPOSITIVE MATERIALIDENTIFICATION (PMI) ATSUPPLIER'S WORK
SPECIFICATION FOR QUALITYMANAGEMENT SYSTEM REQUIREMENTSFROM BIDDERS
SPECIFICATION FOR DOCUMENTATIONREQUIREMENTS FROM SUPPLIERS
ADDITIONAL TECHNICALREQUIREMENTS
VALVE MATERIAL SPECIFICATION
VALVESHEET NO.51046
VALVESHEET NO.51303
VALVESHEET NO.51403
VALVESHEET NO.51446
VALVESHEET NO.52046
VALVESHEET NO.52303
VALVESHEET NO.52403
VALVESHEET NO.52446
VALVESHEET NO.52949
VALVESHEET NO.53046
VALVESHEET NO.53303
VALVESHEET NO.53403
VALVESHEET NO.53446
6-44-0052
6-81-0004
6-81-0001
6-78-0001
6-78-0003
A096-090-16-43-ATR-3425
A096-6-44-0006-3425
A096-6-44-06-51046
A096-6-44-06-51303
A096-6-44-06-51403
A096-6-44-06-51446
A096-6-44-06-52046
A096-6-44-06-52303
A096-6-44-06-52403
A096-6-44-06-52446
A096-6-44-06-52949
A096-6-44-06-53046
A096-6-44-06-53303
A096-6-44-06-53403
A096-6-44-06-53446
6
5
2
0
0
A
0
5
5
5
5
5
5
5
5
0
5
5
5
5
04/08/2010
17/06/2013
20/10/2011
04/06/2009
04/06/2009
17/09/2013
17/09/2013
30/06/2009
30/06/2009
30/06/2009
30/06/2009
30/06/2009
30/06/2009
30/06/2009
30/06/2009
22/03/2012
30/06/2009
30/06/2009
30/06/2009
30/06/2009
Page 3 of 77
Thi
s dr
awin
g an
d de
sign
it c
over
s ar
e pr
oper
ty o
f E
NG
INE
ER
S IN
DIA
LIM
ITE
D. T
hey
are
mer
ely
loan
ed o
n th
e bo
rrow
er's
exp
ress
agr
eem
ent t
hat i
t will
not
be
repr
oduc
ed, c
opie
d, e
xhib
ited
nor
used
exce
pt in
the
limite
d w
ay a
nd p
riva
te u
se p
erm
itted
by
wri
tten
cons
ent g
iven
by
the
lend
er to
the
borr
ower
for
the
inte
nded
use
. EIL
-164
1-51
5 R
ev.0
A4-
210x
297
EIL
- 5
88 A
- 2
16 x
279
ENGINEERS INDIA LIMITED
NEW DELHI
Project:
Client:
PETROCHEM COMPLEX
GAIL LTD.
Requisition No. Rev
A096-090-WB-MR-3425 A
Page 3 of 4
MR ATTACHMENTSR.NO. DETAIL DESCRIPTION QTY. U. RATE TOT.VALUE CDD
VLV.GATE, SHEET 51046, CRYO
VLV.GATE, SHEET 51303, LT
VLV.GATE, SHEET 51403, LT
VLV.GATE, SHEET 51446, CRYO
VLV.GLOBE, SHEET 52046, CRYO
VLV.GLOBE, SHEET 52303, LT
VLV.GLOBE, SHEET 52403, LT
VLV.GLOBE, SHEET 52446, CRYO
VLV.GLOBE, SHEET 52949, CRYO
VLV.CHECK, SHEET 53046, CRYO
Item Description:
Item Description:
Item Description:
Item Description:
Item Description:
Item Description:
Item Description:
Item Description:
Item Description:
Item Description:
51046ZZZ4081ZZZZZ(CC:4879161623)
51303ZZZ509ZZZZZZ(CC:4877261713)
51303ZZZ515ZZZZZZ(CC:4877262913)
51403ZZZ511ZZZZZZ(CC:4877262123)
51403ZZZ5151ZZZZZ(CC:4877292923)
51403ZZZ515ZZZZZZ(CC:4877262923)
51403ZZZ5181ZZZZZ
51446ZZZ409ZZZZZZ(CC:4879471723)
51446ZZZ4152ZZZZZ(CC:4879492923)
51446ZZZ415ZZZZZZ(CC:4879472923)
52046ZZZ408ZZZZZZ(CC:4889141623)
52303ZZZ509ZZZZZZ(CC:4887891713)
52403ZZZ515ZZZZZZ(CC:4887892923)
52446ZZZ415ZZZZZZ(CC:4889202923)
52949ZZZ404ZZZZZZ
53046ZZZ405ZZZZZZ(CC:4829270943)
1.5 INCH, LOCK OPEN
2.0 INCH
6.0 INCH
3.0 INCH
6.0 INCH, LOCK OPEN
6.0 INCH
12.0 INCH, LOCK OPEN
2.0 INCH
6.0 INCH, LOCK CLOSED
6.0 INCH
1.5 INCH
2.0 INCH
6.0 INCH
6.0 INCH
0.5 INCH
0.75 INCH
6 NOS
3 NOS
3 NOS
2 NOS
1 NOS
1 NOS
1 NOS
4 NOS
1 NOS
2 NOS
6 NOS
1 NOS
1 NOS
1 NOS
16 NOS
12 NOS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
ITEMCODE/CLIENT CODE(CC)
Page 4 of 77
Thi
s dr
awin
g an
d de
sign
it c
over
s ar
e pr
oper
ty o
f E
NG
INE
ER
S IN
DIA
LIM
ITE
D. T
hey
are
mer
ely
loan
ed o
n th
e bo
rrow
er's
exp
ress
agr
eem
ent t
hat i
t will
not
be
repr
oduc
ed, c
opie
d, e
xhib
ited
nor
used
exce
pt in
the
limite
d w
ay a
nd p
riva
te u
se p
erm
itted
by
wri
tten
cons
ent g
iven
by
the
lend
er to
the
borr
ower
for
the
inte
nded
use
. EIL
-164
1-51
5 R
ev.0
A4-
210x
297
EIL
- 5
88 A
- 2
16 x
279
ENGINEERS INDIA LIMITED
NEW DELHI
Project:
Client:
PETROCHEM COMPLEX
GAIL LTD.
Requisition No. Rev
A096-090-WB-MR-3425 A
Page 4 of 4
MR ATTACHMENTSR.NO. DETAIL DESCRIPTION QTY. U. RATE TOT.VALUE CDD
VLV.CHECK, SHEET 53303, LT
VLV.CHECK, SHEET 53403, LT
VLV.CHECK, SHEET 53446, CRYO
Item Description:
Item Description:
Item Description:
53046ZZZ406ZZZZZZ(CC:4829241143)
53303ZZZ515ZZZZZZ(CC:4834142913)
53403ZZZ509ZZZZZZ(CC:4834141723)
53446ZZZ415ZZZZZZ(CC:4835232923)
1.0 INCH
6.0 INCH
2.0 INCH
6.0 INCH
16 NOS
1 NOS
2 NOS
1 NOS
17
18
19
20
ITEMCODE/CLIENT CODE(CC)
Page 5 of 77
Page 6 of 77
Page 7 of 77
Page 8 of 77
Page 9 of 77
Page 10 of 77
Page 11 of 77
Page 12 of 77
Page 13 of 77
Page 14 of 77
Page 15 of 77
Page 16 of 77
Page 17 of 77
Page 18 of 77
Page 19 of 77
Page 20 of 77
Page 21 of 77
Page 22 of 77
Page 23 of 77
Page 24 of 77
Page 25 of 77
■_71 I for.fvfn.1)
ENGINEERS INDIA LIMITED (A Govt of India Undertaking}
INSPECTION AND TEST PLAN FOR
VALVES
STANDARD SPECIFICATION NO.
6-81-0004 Rev. 5
Page 1 of 7
fktorr a -crteTur
INSPECTION AND TEST PLAN FOR
VALVES
5. 17.06,2013 REVISED AND RE-ISSUED TKK RKS SCG DM
4 15.07.2011 REVISED AND RE-ISSUED TKK SCG AKC DM
3 30.06.2010 REVISED AND RE-ISSUED RKB VKJ SKP ND
2 31.01.2008 REVISED AND RE-ISSUED CS SS MVKK VC
1 05.10.2005 QUANTUM OF CHECK & SCOPE OF INSPECTION REVISED SS MVKK SY VJN
Rev. No. Date Purpose
Prepared by
Checked by
Standards Committee Convenor
Standards Bureau Chairman
Approved by
Format No. 8-00-0001-F7 Rev. 0 Copyright EIL — All rights reserved
Page 26 of 77
fg-zrr iffaeg eieM1,751,275141
STANDARD SPECIFICATION NO.
6-81-0004 Rev. 5
Page 2 of 7
ei ENGINEERS INDIA LIMITED IA Govt of India Undertaking)
INSPECTION AND TEST PLAN FOR
VALVES
Abbreviations:
CEIL Certification Engineers International Limited MRT Mechanical Run Test
CIMFR Central Institute of Mining & Fuel Research NDT Non Destructive Testing
CE Carbon Equivalent NPSH Net Positive Suction Head
DFT Dry Film Thickness PO Purchase Order
DPT Dye Penetrant Testing PESO Petroleum Explosive Safety Organization
DHT De-hydrogen Heat Treatment PQR Procedure Qualification Record
ERTL Electronics Regional Test Laboratory PR Purchase Requisition
FCRI Fluid Control Research Institute PMI Positive Material Identification
HT Heat Treatment RT Radiography Testing
HIC Hydrogen Induced Cracking SSCC Sulphide Stress Corrosion Cracking
ITP Inspection and Test Plan TC Test Certificate
IP Ingress Protection TPI or TPIA Third Party Inspection Agency
IHT Intermediate Heat Treatment UT Ultrasonic Testing
IC Inspection Certificate VDR Vendor Data Requirement
IGC Inter Granular Corrosion WPS Welding Procedure Specification
MPT/MT Magnetic Particle Testing WPQ Welders Performance Qualification
MTC Material Test Certificate
Inspection Standards Committee
Convenor : Mr. S C Gupta
Members:
Mr. R.K. Singh
Mr. Rajeev Kumar Mr. Himangshu Pal Mr. Neeraj Mathur
Mr. T Kamalakannan Mr. Deepak Gupta (Project) Mr. Mayank Jain
Format No. 8-00-0001-F7 Rev.O Copyright EIL — All rights reserved
Page 27 of 77
k31 eJ ENGINEERS fg- zrr la154tg INDIA LIMITED
(A Govt of India Undertaking)
INSPECTION AND TEST PLAN FOR
VALVES
STANDARD SPECIFICATION NO.
6-81-0004 Rev. 5
Page 3 of 7
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing requirements of Valves.
2.0 REFERENCE DOCUMENTS
PO/PR/Standards referred therein/ Job specifications /Approved documents.
3.0 INSPECTION AND TEST REQUIREMENTS
SL NO
STAGE/ ACTIVITY CHARACTERISTICS QUANTUM OF
CHECK RECORD
SCOPE OF INSPECTION
SUB SUPPLIER
SUPPLIER EIL/TPIA
1.0 Procedure
1.1
Hydrostatic Test, Heat Treatment, NDT,
Helium Leak Test And
Other Procedures
Documented Procedures 100% Procedure Documents
- H R
1.2 WPS,PQR & WPQ Welding Parameters & Qualification Record
100% WPS,PQR
&WPQ - H
W- New R- Existing
1.3 Pre-Qualification Tests Fire safe,
Cryogenic & Other Test as applicable
As per PR / Purchase Specification
Acceptance Report
- H H
(If new)
Format No. 8-00-0001-F7 Rev.O Copyright EIL — All rights reserved
Page 28 of 77
17177R FRIVU ‘7,1.3,195 +1)
STANDARD SPECIFICATION NO.
6-81-0004 Rev. 5
Page 4 of 7
k31 elei ENGINEERS
la 5V--ar faireg INDIA LIMITED IA Govt Al India Undertaking)
INSPECTION AND TEST PLAN FOR
VALVES
SL NO
STAGE/ ACTIVITY CHARACTERISTICS QUANTUM OF
CHECK RECORD
SCOPE OF INSPECTION
SUB SUPPLIER
SUPPLIER EIL/TPIA
2.0 Material Inspection
2.1. Castings & Forgings
(Body, Bonnet, Disc, Stem, Body ring)
Chemical ,Mechanical , Heat Treatment,
NDT,IGC & Other Properties as applicable
100% Test
Certificates H R R
2.2 Castings & Forgings
(Body, Bonnet, Disc, Stem, Body ring) Visual & Dimension 100%
Inspection Report
H H -
2.3. Body and Bonnet Castings Radiography Examination
As per PR / Purchase Specification
Films and report
H R R
2.4 Bars for Trim material Chemical Analysis Each Heat Test
Certificates& Lab Report
H R -
2.5 Gaskets, Gear units, Fasteners, Gland,
Packings, etc. Physical / Chemical
Properties 100%
Test Certificates& Lab Report
H R -
2.6 Actuators as applicable Performance ,
Statutory Certificates as 100% nspection
Test Certificates , Inspection
report
H H R
Format No. 8-00-0001-F7 Rev.O Copyright EIL — All rights reserved
Page 29 of 77
,511faJt.-1' IHIF kora,' MI ,10, H )
ENGINEERS INDIA LIMITED (A Goer of India Undertaking)
INSPECTION AND TEST PLAN FOR
VALVES
STANDARD SPECIFICATION NO.
6-81-0004 Rev. 5
Page 5 of 7
SL NO
STAGE/ ACTIVITY CHARACTERISTICS QUANTUM OF
CHECK RECORD
SCOPE OF INSPECTION
SUB SUPPLIER
SUPPLIER EIL/TPIA
3.0 In Process Inspection
3.1 Welding Welding Parameters as
per WPS / PQR 100%
Inspection Reports
- H -
3.2 Machining of components Visual / Dimension 100% Inspection
Reports - H -
4.0 Final Inspection
4.1 Hydrostatic / Pneumatic Test and
Helium Leak test as applicable Leak Check
As per PR / Purchase Specification
Test Report - (Note 1) H
RW
4.2 Visual / Dimension Surface & Dimension Check
100% Test Report - H RW
(Note 1)
4.3 Functional Test for Actuator Operated
Valves Satisfactory Performance
100% Test Report - H RW
Format No. 8-00-0001-F7 Rev.O
Copyright EL — All rights reserved
Page 30 of 77
14-7,eWOwmt JxRIM
STANDARD SPECIFICATION NO.
6-81-0004 Rev. 5
Page 6 of 7
ENGINEERS 5fgziT 254-"d5 INDIA LIMITED
(A Govt of India Undertaking(
INSPECTION AND TEST PLAN FOR
VALVES
SL NO
STAGE/ ACTIVITY CHARACTERISTICS QUANTUM OF
CHECK RECORD
SCOPE OF INSPECTION SUB
SUPPLIER SUPPLIER EIL/TPIA
4.4 PMI Check Chemical
As per EIL Spec. 6-81-0001
Inspection Report
- H RW
4.5 Strip Check(As applicable) Verify Components & Differential hardness if
applicable
As per PR / Purchase Specification
Inspection Report
- H RW
(Note 1)
4.6 Final Stamping Stamping Of Accepted
Valves
Stamping of Valves which are witnessed
by EIL/TPIA.
Inspection rt Report
- H H
(Note-1)
5.0 Painting
5.1 Painting and Color coding as applicable Visual / DFT Check 100% Inspection
Report - H -
6.0 Documentation & IC
6.1 Documentation & Inspection
Certificate(IC)
Review of Stage Inspection Reports /
Test Reports & Issue of IC
100% Supplier TC
& IC - H H
Format No. 8-00-0001-F7 Rev.O
Copyright EIL — All rights reserved
Page 31 of 77
eleage ,711,5R17,17
STANDARD SPECIFICATION NO.
6-81-0004 Rev. 5
Page 7 of 7
k3t ei ENGINEERS $'fgar 254-eg INDIA LIMITED
IA Govt of India UndettakIng)
INSPECTION AND TEST PLAN FOR
VALVES
Legend: H- Hold (Do not proceed without approval), P-Perform, RW - Random Witness (As specified or 10% ( min.1 no. of each size and type of Bulk item)), R-Review, W-Witness (Give due notice, work may proceed after scheduled date).
NOTES (As applicable): 1. For Non NACE &Non Hydrogen service Carbon Steel Valves up to size 12" will be accepted on review of Supplier Test Certificates. Supplier Test
Certificate to be reviewed by EIL/TPIA. 2. This document describes the generic test requirements. Any additional test or Inspection scope if specified in contract documents shall also be
applicable.(Unless otherwise agreed upon) 3. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred there in /Job Specification /Approved Documents.
Format No. 8-00-0001-F7 Rev.O
Copyright EIL — All rights reserved
Page 32 of 77
Page 33 of 77
Page 34 of 77
Page 35 of 77
Page 36 of 77
Page 37 of 77
Page 38 of 77
Page 39 of 77
Page 40 of 77
Page 41 of 77
Page 42 of 77
Page 43 of 77
Page 44 of 77
Page 45 of 77
Page 46 of 77
Page 47 of 77
Page 48 of 77
Page 49 of 77
Page 50 of 77
Page 51 of 77
Page 52 of 77
Page 53 of 77
151fRiseAstigat efaleg
ENGINEERSINI NA LIMITED/A “nul Ina. Lnden.,),
STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PMI) AT
SUPPLIER'S WORKS
STANDARD SPECIFICATION No.
6 -81 -0001 Rev. 2Page I of 8
c 1T covingii 4,flcomoict) TIPTth LI 111
f'6g itta-vr
STANDARD SPECIFICATION
FORPOSITIVE MATERIAL
IDENTIFICATION(PMI)
AT SUPPLIER'S WORKS
40D., 15,
2 20.10.11 REVISED AND RE-ISSUED AKC DM
1 15.07.08 REVISED AND RE-ISSUED NKR SSL SKP VC
0 07.12.00 ISSUED AS STANDARD SPECIFICATION AKC AKB AKB MI
Standards StandardsRev.No Date Purpose Prepared
byChecked
byCommitteeConvenor
BureauChairman
Approved by
Formal No. 8-00-0001-F1 Rev. 0 Copyright EIL — All rights reserved
Page 54 of 77
151M-ae? le. ' ENGINEERSimegver INDIA LIMITEDyin eRaWanJelwill Govl of India Undertakno
STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PM I) AT
SUPPLIER'S WORKS
STANDARD SPECIFICATION No.6-81-0001 Rev. 2
Page 2 of 8
Abbreviations:
API American Petroleum InstituteAS Alloy SteelLSTK Lump Sum Turn KeyPMI Positive Material IdentificationSch ScheduleSS Stainless SteelTPI or TPIA Third Party Inspection Agency
Inspection Standards Committee
Convenor: Mr.AK Chaudhary
Members: Mr. SS LotayMr. SC GuptaMr. RK SinghMr. Rajeev KumarMr. Anoop GoelMr. G SureshMr. G Poornachandra RaoMr. MP Jain (Projects)
Format No. 8-00-0001-F1 Rev. 0 Copyright EIL — All rights reserved
Page 55 of 77
STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PMI) AT
SUPPLIER'S WORKS
151M4-e?fte ENGINEERSOgrir tfigtegW INDIA LIMITED
Gorl of India undertaking}
STANDARD SPECIFICATION No.
6-81-0001 Rev. 2Page 3 of 8
CONTENTS
1.0 SCOPE 4
2.0 REFERENCE DOCUMENTS 4
3.0 DEFINITIONS 4
4.0 PMI EXAMINATION 5
5.0 ACCEPTABLE METHODS FOR PMI 5
6.0 EXTENT OF PMI EXAMINATION 6
7.0 RECORDING AND DOCUMENTATION 7
8.0 MARKING 7
Copyright EIL —All rights reservedFormat No. 8-00-0001-F1 Rev. 0Page 56 of 77
STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PMT) AT
SUPPLIER'S WORKS
/ft ENCJNEERSbeire,altateg '-‘60- 1 INDIA LIMITED
STANDARD SPECIFICATION No.
6-81-0001 Rev. 2Page 4 of 8
1.0 SCOPE
1.1 This specification applies to the requirements for Positive Material Identification (PMI) to beperformed at the Supplier's works on Metallic Materials procured either directly by theOwner/EIL/ LSTK contractor or indirectly through the sub-Suppliers.
1.2 Any post order deviation from this specification must be approved by Owner/EIL in theDeviation/ Waiver Permit format (No. 5-0000-0180-F1) enclosed with Material Requisition.
1.3 This specification covers the procedures and methodology to be adopted to assure that thechemical composition of the material is consistent with the material specifications as specifiedin purchase documents using 'Alloy Analyzer' at the time of final inspection before dispatch.
1.4 The scope of this specification shall include but shall not be limited to Positive MaterialIdentification (PMI) to be performed on Materials listed below:
1.4.1 For alloy Steel materials as below:Alloy Steel Pipes including Clad PipesAlloy Steel Flanges & ForgingsAlloy Steel Fittings including Clad FittingsAlloy Steel FastenersAlloy Cast & Forged steel valvesAlloy Steel Instrumentation Items (Control Valves, Safety Valves etc.)Longitudinal Pipe & Fittings Welds.Gaskets (for Ring Type Joints)
1.4.2 For Carbon Steel materials as below:All Carbon Steel Piping items under NACE or HIC or H2Carbon Steel flanges and valves (Rating 900# and above)Carbon Steel Pipes & fittings for following thicknesses:Size 1"- 2" NB : Sch 160 & aboveSize 3" NB : Sch XS & aboveSize 4" - 12" NB : Sch 120 & above
Following items shall be excluded from scope of PMI examination.
Gaskets other than for Ring Type JointsInternal Components of Valves
1.5 All grades of material supplies including Stainless Steels shall be liable for PMI test at site. Incase of any defective materials being found at site, the Supplier shall be responsible to effectreplacement of such defective materials at project site without any delays to the satisfaction ofEIL site RCM (Resident Construction Manager).
2.0 REFERENCE DOCUMENTS
2.1 API Recommended Practice 578 (First Edition, May 1999) - Material Verification Program forNew and Existing Alloy Piping Systems.
3.0 DEFINITIONS
3.1 Supplier: Any Supplier or Manufacturer on whom an order is placed for the supply of referreditems. This definition shall also include any sub-Supplier or manufacturer on whom a sub-orderis placed by the Supplier.
Copyright EIL — All rights reservedFormat No. 8-00-0001-F1 Rev. 0
Page 57 of 77
STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PM I) AT
SUPPLIER'S WORKS
SaIRCIELM—; ENGINEERSPar taiReZ VW INDIA LIMITED
STANDARD SPECIFICATION No.
6-81-0001 Rev. 2Page 5 of 8
3.2 Inspection Lot: A group of items offered for inspection covered under same size, Heat andHeat treatment lot.
3.3 Alloy Material: Any metallic material (including welding filler materials) that containsalloying elements such as chromium, nickel, molybdenum or vanadium, which are intentionallyadded to enhance mechanical or physical properties and/or corrosion resistance.
4.0 PMI EXAMINATION
4.1 The Supplier shall submit a procedure of PMI to comply with the requirements of thisSpecification Approval of PMI Procedure shall be obtained from Owner/EIL/TPIA prior tocommencing manufacture/ inspection of product.
4.2 PMI examination of materials is independent of any certification, markings or colour codingthat may exist and is aimed at verifying that the alloy used are as per specified grades.
4.3 The Supplier shall identify all incoming alloy materials and maintain full traceability of all alloymaterials, including all off-cuts. Transfer of identification marks shall be undertaken prior tocutting to ensure maintenance of identification on off-cuts.
4.4 The Supplier shall ensure that all alloy materials are segregated and stored in separatelyidentified locations to prevent the mix up of materials of different alloy specifications or alloymaterial with carbon steel. Non ferro-magnetic materials shall be segregated at all times fromferro-magnetic materials.
4.5 PMI examination is subject to surveillance inspection by Owner/EIL/TPIA.
5.0 ACCEPTABLE METHODS FOR PMI
5.1 The method used for PMI examination shall provide a quantitative determination of the alloyingelements like chromium, nickel, molybdenum or vanadium in Alloy Steel items.
5.2 Instruments or methods used for PMI examination shall be able to provide quantitative,recordable, elemental composition results for positive identification of alloying elementspresent.
5.3 The acceptable instruments for alloy analyzer shall be either "Portable X-Ray fluorescence" or"Optical Emission" type each capable of verifying the percentage of alloy elements withinspecified range.
5.4 Chemical spot testing, magnets, alloy sorters and other methods using eddy current ortriboelectric testing methods are not acceptable for PMI examination.
5.5 The PMI instrument used shall have the sensitivity to detect the alloying elements in thespecified range.
5.6 All PMI instruments shall have been serviced within a 6 month period of the time of use toverify the suitability of batteries, sources etc., and the data of the last service shall be stated onthe PMI Report Form (Sample enclosed).
5.7 Each analyzer must be calibrated according to the manufacturer's specification at the beginningand end of each shift. Instrument must be checked against known standard for each alloy typeto be inspected during the shift.
Copyright EIL — All rights reservedFormat No. 8-00-0001-F1 Rev. 0
Page 58 of 77
STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PMI) AT
SUPPLIER'S WORKS
ISillaZreqe ENGINEERSs'Ig7e2eg W INDIA UMITED
Govt a Inaa Undenakingi
STANDARD SPECIFICATION No.
6-81-0001 Rev. 2Page 6 of 8
5.8 Certified samples, with full traceability, of a known alloy materials shall be available for use asa random spot check on the instrument calibration.
5.9 The surfaces to be examined shall be prepared by light grinding or abrasive paper and solventcleaner. Evidence of Arc burn resulting from examination shall be removed by light grinding orabrasive paper. No permanent marks, which are injurious to the usage of product in service, areacceptable.
5.10 Alloy Steel ring type joint Gaskets shall be inspected by using portable X-Ray fluorescenceinstrument.
5.11 Testing shall be done as per the procedures outlined by the manufactures of alloy analyzerbeing used. Modification of these procedures if any must be approved by Owner/EIL.
5.12 The persons performing PMI shall demonstrate their capabilities to the satisfaction ofOwner/EIL/TPIA visiting engineer. If the Supplier has qualified operator on their rolls, he mayperform the examination. Otherwise PMI examination shall be sub-contracted to an independenttesting agency approved by EIL.
5.13 Whenever material is identified as not meeting requirements by the visiting engineer a rejectionnote shall be issued.
6.0 EXTENT OF PMI EXAMINATION
Following sampling plans shall be applicable for PMI examination of various items.
Flanges, Fittings 100%Valves, RTJ Gaskets
Pipes 100% (for pipes procured from traders).
2 random samples drawn from eachSize/Heat/Lot (for pipes procured directly from mills)
C. Fasteners
Lot Size Sample Size
Upto 100 2% (Min 2)101 to 500 1% (Min 3)501 and above 0.5% (Min 5)
Note:
For Welded Pipes and Fittings, PMI shall be performed on Base Metal as well asweldments.
Whenever any sample drawn to PMI test on the basis of percentage selection in B & Cabove, fails to meet specification requirements, 100% of items of lot shall be tested forPMI.
Copyright EIL — All rights reservedFormat No. 8-00-0001-F1 Rev. 0Page 59 of 77
STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PMI) AT
SUPPLIER'S WORKS
i.311-aelti. ENGINEERS
ogrir EiRtegi INDIA LIMITEDIA Go' at India Undertaking)
STANDARD SPECIFICATION No.6-81-0001 Rev. 2
Page 7 of 8
7.0 RECORDING AND DOCUMENTATION
The results of PMI examination shall be recorded in a Report Format as enclosed with thisspecification.
8.0 MARKING
8.1 All alloy materials tested by PMI shall be identified using either of the following methods byindicating "PMI OK"
Bar Code/Hologram StickerA low stress stamp marking
Copyright EIL — All rights reservedFormat No. 8-00-0001-F1 Rev. 0Page 60 of 77
STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PMI) AT
SUPPLIER'S WORKS
012-ael ie ENGINEERSst",ar &Reg W INDIALIMTED
GOA Of India undertakng)
STANDARD SPECIFICATION No.6-81-0001 Rev. 2
Page 8 of 8
POSITIVE MATERIAL IDENTIFICATION REPORTBULK MATERIALS
Page of
Project: Client Job No.
PMI Report No. Supplier/Sub-Supplier
Purchase Order No. Testing Agency
PurchaseRequisition No:
PMI Location
Bulk Item Type (as per Requisition)
Material Specification/Grade
Number of items in Lot
Requisition Item No./ Description Major content, Weight Percent RemarksAccept/Reject
Element Cr Mo Ni V
Specified Range
Actual observations
Instrument Type / ID
Last Service Date Inspection Agency Witnessed By
Copyright EIL — All rights reservedFormat No. 8-00-0001-F1 Rev. 0Page 61 of 77
VALVE MATERIAL SPECIFICATION
GAIL LTD.Client :
PETROCHEM COMPLEXProject :
PATA UPLocation :
16/43Dept./Sect. :
JOB SPECIFICATION NO.
A096-6-44-0006 Rev. 0
Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1
Page 1 of 13
51046
51046
TAG NO. :
SHEET REV. NO.
DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009
2 3 4 5
NOTES
45678
TESTING SHALL BE AS PER BS 6364 ALSO. VALVE SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364 (NON COLD BOX APPLICATION).VENDOR SHALL CERTIFY SUITABILITY OF THE VALVE FOR INTENDED SERVICE CONDITIONS.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVES AS PER API-602 AND TESTING AS PER API-598 & BS-6364 ARE ALSO ACCEPTABLE.
BODY
BONNET
STEM
WEDGE DISC
BODY SEAT RING
STEM PACKING
HAND WHEEL
BONNET BOLTS
BONNET NUTS
BONNET GASKET
SPECIAL SERVICECONDITIONS
BACK SEAT &SHOULDER
OTHERS
HYDROSTATIC TESTPRESSURE
TEST PRESSUREWITH AIR
FORGED
BOLTED
RISING
SOLID
RENEWABLE
RENEWABLE WITHVALVE OPEN ONSTREAM
NON RISING
CRYO
INTEGRAL
O.S & Y. (NOTE 5)
BODY : 2900 PSIG
80 PSIG
ASTM A 182 GR.F304
ASTM A 182 GR.F304
SS 304/ SS 316; (NO CASTING)
STELLITED
STELLITED
CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS
MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON
ASTM A320 GR B8 CL.2 (IMPACT TESTED)
ASTM A194 GR.8 (IMPACT TESTED)
SP WND SS316-GRAFOIL FILLER
MIN TEMP -196 DEG C.
SEAT : 2125 PSIG
Sheet No. 1 of 1
800 API 602/ ISO 15761RATING :SIZE RANGE : ENDS :
12
3
THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.
STANDARD:MFGRS CAT/FIG:
RATING: ENDS:
SIGNATURE&
SEALOF MANUFACTURER
GATE VALVE SPECIFICATION MANUF'S OFFER
DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL
STANDARD : 0.5" TO 1.5" SW 3000 TO B-16.11
PIPING CLASS : A2K, B2K, D2K
Tag No: 51046
(For category -II MRs only )
Page 62 of 77
VALVE MATERIAL SPECIFICATION
GAIL LTD.Client :
PETROCHEM COMPLEXProject :
PATA UPLocation :
16/43Dept./Sect. :
JOB SPECIFICATION NO.
A096-6-44-0006 Rev. 0
Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1
Page 2 of 13
51303
51303
TAG NO. :
SHEET REV. NO.
DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009
2 3 4 5
NOTES
45678
TESTING SHALL BE AS PER BS-6364 ALSO. VALVES SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364(FOR NONCOLD BOX APPLICATION). 20 % VALVE CASTINGS SHALL UNDERGO RADIOGRAPHIC EXAMINATION.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVES AS PER API-600 AND TESTING AS PER API-598 & BS-6364 ARE ALSO ACCEPTABLE.
BODY
BONNET
STEM
WEDGE DISC
BODY SEAT RING
STEM PACKING
HAND WHEEL
BONNET BOLTS
BONNET NUTS
BONNET GASKET
REQUIREMENT OFGEAR OPERATOR
REQUIREMENT OFRADIOGRAPHY
SPECIAL SERVICECONDITIONS
BACK SEAT &SHOULDER
OTHERS
HYDROSTATIC TESTPRESSURE
TEST PRESSUREWITH AIR
CAST
BOLTED
RISING
FLEXIBLE
NON-RENEWABLE/RENEWABLE
RENEWABLE WITHVALVE OPEN ONSTREAM
NON RISING
LT
O.S & Y.
BODY : 400 PSIG
80 PSIG
ASTM A 352 GR.LCB
ASTM A 352 GR.LCB
SS 304 / SS316; (NO CASTING)
STELLITED
STELLITED
CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS
MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON
ASTM A320 GR L7
ASTM A194 GR.4/GR 7
SP WND SS316-GRAFOIL FILLER/CORRUGATEDSS316
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
MIN. TEMP. -45 DEG.C.
SS304 / SS316
SEAT : 300 PSIG
Sheet No. 1 of 1
150 API 600/ ISO 10434RATING :SIZE RANGE : ENDS :
12
3
THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.
STANDARD:MFGRS CAT/FIG:
RATING: ENDS:
SIGNATURE&
SEALOF MANUFACTURER
GATE VALVE SPECIFICATION MANUF'S OFFER
DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL
STANDARD : 2.0" TO 24.0" FLGD TO B-16.5 RF/125AARH
PIPING CLASS : A45A, A46A, A4A
Tag No: 51303
(For category -II MRs only )
Page 63 of 77
VALVE MATERIAL SPECIFICATION
GAIL LTD.Client :
PETROCHEM COMPLEXProject :
PATA UPLocation :
16/43Dept./Sect. :
JOB SPECIFICATION NO.
A096-6-44-0006 Rev. 0
Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1
Page 3 of 13
51403
51403
TAG NO. :
SHEET REV. NO.
DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009
2 3 4 5
NOTES
456
78
TESTING SHALL BE AS PER BS-6364 ALSO. VALVES SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364 (NON COLD BOX APPLICATION)20% VALVE CASTINGS UPTO 16" AND 100% VALVE CASTINGS 18" AND ABOVE SHALL UNDERGORADIOGRAPHIC EXAMINATION.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVES AS PER API-600 AND TESTING AS PER API-598 & BS-6364 ARE ALSO ACCEPTABLE.
BODY
BONNET
STEM
WEDGE DISC
BODY SEAT RING
STEM PACKING
HAND WHEEL
BONNET BOLTS
BONNET NUTS
BONNET GASKET
REQUIREMENT OFGEAR OPERATOR
REQUIREMENT OFRADIOGRAPHY
SPECIAL SERVICECONDITIONS
BACK SEAT &SHOULDER
OTHERS
HYDROSTATIC TESTPRESSURE
TEST PRESSUREWITH AIR
CAST
BOLTED
RISING
FLEXIBLE
RENEWABLE/NON-RENEWABLE
RENEWABLE WITHVALVE OPEN ONSTREAM
NON RISING
LT
O.S & Y.
BODY : 1050 PSIG
80 PSIG
ASTM A 352 GR.LCB
ASTM A 352 GR.LCB
SS 304 / SS316; (NO CASTING)
STELLITED
STELLITED
CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS
MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON
ASTM A320 GR L7
ASTM A194 GR 4/GR 7
SP WND SS316-GRAFOIL FILLER
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
MIN TEMP -45 DEG.C.
SS 304 / SS316
SEAT : 775 PSIG
Sheet No. 1 of 1
300 API 600/ ISO 10434RATING :SIZE RANGE : ENDS :
12
3
THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.
STANDARD:MFGRS CAT/FIG:
RATING: ENDS:
SIGNATURE&
SEALOF MANUFACTURER
GATE VALVE SPECIFICATION MANUF'S OFFER
DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL
STANDARD : 2.0" TO 24.0" FLGD TO B-16.5 RF/125AARH
PIPING CLASS : B45A, B46A, B4A
Tag No: 51403
(For category -II MRs only )
Page 64 of 77
VALVE MATERIAL SPECIFICATION
GAIL LTD.Client :
PETROCHEM COMPLEXProject :
PATA UPLocation :
16/43Dept./Sect. :
JOB SPECIFICATION NO.
A096-6-44-0006 Rev. 0
Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1
Page 4 of 13
51446
51446
TAG NO. :
SHEET REV. NO.
DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009
2 3 4 5
NOTES
456
789
1011
TESTING SHALL BE AS PER BS 6364 ALSO. VALVES SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364 (NON COLD BOX APPLICATION).20% VALVE CASTINGS UPTO 16" AND 100% VALVE CASTINGS 18" AND ABOVE SHALL UNDERGORADIOGRAPHIC EXAMINATION.VENDOR SHALL CERTIFY SUITABILITY OF THE VALVE FOR INTENDED SERVICE. ALL CASTINGS SHALL BE SOLUTION HEAT TREATED. WELD REPAIRS, IF ANY, SHALL BE CARRIED OUT BEFORE SOLUTION HEAT TREATMENT.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVES AS PER API-600 AND TESTING AS PER API-598 & BS-6364 ARE ALSO ACCEPTABLE.
BODY
BONNET
STEM
WEDGE DISC
BODY SEAT RING
STEM PACKING
HAND WHEEL
BONNET BOLTS
BONNET NUTS
BONNET GASKET
REQUIREMENT OFGEAR OPERATOR
REQUIREMENT OFRADIOGRAPHY
SPECIAL SERVICECONDITIONS
BACK SEAT &SHOULDER
OTHERS
HYDROSTATIC TESTPRESSURE
TEST PRESSUREWITH AIR
CAST
BOLTED
RISING
FLEXIBLE
NON-RENEWABLE/RENEWABLE
RENEWABLE WITHVALVE OPEN ONSTREAM
NON RISING
CRYO
O.S & Y.
BODY : 1100 PSIG
80 PSIG
ASTM A 351 GR CF8
ASTM A 351 GR.CF8
SS 304/ SS316; (NO CASTING)
STELLITED
STELLITED
CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS
MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON
ASTM A320 GR B8 CL 2 (IMPACT TESTED)
ASTM A194 GR 8 (IMPACT TESTED)
SP WND SS316-GRAFOIL FILLER
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
MIN TEMP -196 DEG.C.
SS304
SEAT : 800 PSIG
Sheet No. 1 of 1
300 API 600/ ISO 10434RATING :SIZE RANGE : ENDS :
12
3
THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.
STANDARD:MFGRS CAT/FIG:
RATING: ENDS:
SIGNATURE&
SEALOF MANUFACTURER
GATE VALVE SPECIFICATION MANUF'S OFFER
DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL
STANDARD : 2.0" TO 24.0" FLGD TO B-16.5 RF/125AARH
PIPING CLASS : B2K
Tag No: 51446
(For category -II MRs only )
Page 65 of 77
VALVE MATERIAL SPECIFICATION
GAIL LTD.Client :
PETROCHEM COMPLEXProject :
PATA UPLocation :
16/43Dept./Sect. :
JOB SPECIFICATION NO.
A096-6-44-0006 Rev. 0
Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1
Page 5 of 13
52046
52046
TAG NO. :
SHEET REV. NO.
DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009
2 3 4 5
NOTES
45678
TESTING SHALL BE AS PER BS 6364 ALSO. VALVE SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364 (NON COLD BOX APPLICATION)VENDOR SHALL CERTIFY SUITABILITY OF THE VALVE FOR THE INTENDED SERVICE.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVES AS PER BS-5352 AND TESTING AS PER BS 6755(PART-I) & BS-6364 ARE ALSO ACCEPTABLE.
BODY
BONNET
STEM
DISC
BODY SEAT RING
STEM PACKING
HAND WHEEL
BONNET BOLTS
BONNET NUTS
BONNET GASKET
OTHERS
SPECIAL SERVICECONDITIONS
BACK SEAT &SHOULDER
HYDROSTATIC TESTPRESSURE
TEST PRESSUREWITH AIR
FORGED
BOLTED
RISING
LOOSE PLUG TYPE
RENEWABLE/NONRENEWABLE
RENEWABLE WITHVALVE OPEN ONSTREAM
RISING
O S & Y
CRYO
INTEGRAL
BODY : 2900 PSIG
80 PSIG
ASTM A 182 GR.F304
ASTM A 182 GR.F304
SS 304/ SS 316; (NO CASTING)
STELLITED
STELLITED
CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS
MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON
ASTM A320 GR B8 CL 2 (IMPACT TESTED)
ASTM A194 GR.8 (IMPACT TESTED)
SP WND SS316-GRAFOIL FILLER
MIN TEMP -196 DEG. C.
SEAT : 2125 PSIG
Sheet No. 1 of 1
800 BS EN ISO 15761RATING :SIZE RANGE : ENDS :
12
3
THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.
STANDARD:MFGRS CAT/FIG:
RATING: ENDS:
SIGNATURE&
SEALOF MANUFACTURER
GLOBE VALVE SPECIFICATION MANUF'S OFFER
DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL
STANDARD : 0.5" TO 1.5" SW 3000 TO B-16.11
PIPING CLASS : A2K, B2K, D2K
Tag No: 52046
(For category -II MRs only )
Page 66 of 77
VALVE MATERIAL SPECIFICATION
GAIL LTD.Client :
PETROCHEM COMPLEXProject :
PATA UPLocation :
16/43Dept./Sect. :
JOB SPECIFICATION NO.
A096-6-44-0006 Rev. 0
Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1
Page 6 of 13
52303
52303
TAG NO. :
SHEET REV. NO.
DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009
2 3 4 5
NOTES
45678
TESTING SHALL BE AS PER BS EN 12266-1 & BS-6364. VALVES SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364(FOR NONCOLD BOX APPLICATION). 20% VALVE CASTING SHALL UNDERGO RADIOGRAPHIC EXAMINATION.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVE TESTING AS PER BS 6755 (PART-I) & BS-6364 IS ALSO ACCEPTABLE.
BODY
BONNET
STEM
DISC
BODY SEAT RING
STEM PACKING
HAND WHEEL
BONNET BOLTS
BONNET NUTS
BONNET GASKET
REQUIREMENT OFGEAR OPERATOR
REQUIREMENT OFRADIOGRAPHY
OTHERS
SPECIAL SERVICECONDITION
BACK SEAT &SHOULDER
HYDROSTATIC TESTPRESSURE
TEST PRESSUREWITH AIR
CAST
BOLTED
RISING
LOOSE PLUGTYPE/BALL TYP
RENEWABLE/NONRENEWABLE
RENEWABLE WITHVALVE OPEN ONSTREAM
RISING
O S & Y
LT
BODY : 400 PSIG
80 PSIG
ASTM A 352 GR.LCB
ASTM A 352 GR.LCB
SS 304 / SS316; (NO CASTING)
STELLITED
STELLITED
CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS
MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON
ASTM A320 GR.L7
ASTM A194 GR.4 / GR.7
SP WND SS316-GRAFOIL FILLER/CORRUGATEDSS316
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
MIN TEMP. -45 DEG. C.
SS 304 / SS316
SEAT : 300 PSIG
Sheet No. 1 of 1
150 BS-1873RATING :SIZE RANGE : ENDS :
12
3
THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.
STANDARD:MFGRS CAT/FIG:
RATING: ENDS:
SIGNATURE&
SEALOF MANUFACTURER
GLOBE VALVE SPECIFICATION MANUF'S OFFER
DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL
STANDARD : 2.0" TO 16.0" FLGD TO B-16.5 RF/125AARH
PIPING CLASS : A45A, A46A, A4A
Tag No: 52303
(For category -II MRs only )
Page 67 of 77
VALVE MATERIAL SPECIFICATION
GAIL LTD.Client :
PETROCHEM COMPLEXProject :
PATA UPLocation :
16/43Dept./Sect. :
JOB SPECIFICATION NO.
A096-6-44-0006 Rev. 0
Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1
Page 7 of 13
52403
52403
TAG NO. :
SHEET REV. NO.
DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009
2 3 4 5
NOTES
45678
TESTING SHALL BE AS PER BS EN 12266-1 & BS-6364 VALVES SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364 (NON COLD BOX APPLICATION). 20% VALVE CASTINGS SHALL UNDERGO RADIOGRAPHIC EXAMINATION.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVE TESTING AS PER BS 6755 (PART-I) & BS-6364 IS ALSO ACCEPTABLE.
BODY
BONNET
STEM
DISC
BODY SEAT RING
STEM PACKING
HAND WHEEL
BONNET BOLTS
BONNET NUTS
BONNET GASKET
REQUIREMENT OFGEAR OPERATOR
REQUIREMENT OFRADIOGRAPHY
OTHERS
SPECIAL SERVICECONDITION
BACK SEAT &SHOULDER
HYDROSTATIC TESTPRESSURE
TEST PRESSUREWITH AIR
CAST
BOLTED
RISING
LOOSE PLUGTYPE/BALL TYP
RENEWABLE/NONRENEWABLE
RENEWABLE WITHVALVE OPEN ONSTREAM
RISING
O S & Y
LT
BODY : 1050 PSIG
80 PSIG
ASTM A 352 GR.LCB
ASTM A 352 GR.LCB
SS 304 / SS316; (NO CASTING)
STELLITED
STELLITED
CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS
MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON
ASTM A320 GR L7
ASTM A194 GR 4 / GR.7
SP WND SS316-GRAFOIL FILLER
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
MIN TEMP -45 DEG. C.
SS 304 / SS316
SEAT : 775 PSIG
Sheet No. 1 of 1
300 BS-1873RATING :SIZE RANGE : ENDS :
12
3
THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.
STANDARD:MFGRS CAT/FIG:
RATING: ENDS:
SIGNATURE&
SEALOF MANUFACTURER
GLOBE VALVE SPECIFICATION MANUF'S OFFER
DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL
STANDARD : 2.0" TO 12.0" FLGD TO B-16.5 RF/125AARH
PIPING CLASS : B45A, B46A, B4A
Tag No: 52403
(For category -II MRs only )
Page 68 of 77
VALVE MATERIAL SPECIFICATION
GAIL LTD.Client :
PETROCHEM COMPLEXProject :
PATA UPLocation :
16/43Dept./Sect. :
JOB SPECIFICATION NO.
A096-6-44-0006 Rev. 0
Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1
Page 8 of 13
52446
52446
TAG NO. :
SHEET REV. NO.
DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009
2 3 4 5
NOTES
456789
1011
TESTING SHALL BE AS PER BS EN 12266-1 & BS 6364. VALVES SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364 (NON COLD BOX APPLICATION). 20% VALVE CASTINGS SHALL UNDERGO RADIOGRAPHIC EXAMINATION.VENDOR SHALL CERTIFY SUITABILITY OF THE VALVE FOR THE INTENDED SERVICE. ALL CASTINGS SHALL BE SOLUTION HEAT TREATED. WELD REPAIR, IF ANY, SHALL BE CARRIED OUT BEFORE SOLUTION HEAT TREATMENT.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVE TESTING AS PER BS 6755 (PART-I) & BS-6364 IS ALSO ACCEPTABLE.
BODY
BONNET
STEM
DISC
BODY SEAT RING
STEM PACKING
HAND WHEEL
BONNET BOLTS
BONNET NUTS
BONNET GASKET
REQUIREMENT OFGEAR OPERATOR
REQUIREMENT OFRADIOGRAPHY
OTHERS
SPECIAL SERVICECONDITIONS
BACK SEAT &SHOULDER
HYDROSTATIC TESTPRESSURE
TEST PRESSUREWITH AIR
CAST
BOLTED
RISING
LOOSE PLUGTYPE/BALL TYP
RENEWABLE/NONRENEWABLE
RENEWABLE WITHVALVE OPEN ONSTREAM
RISING
O S & Y
CRYO
BODY : 1100 PSIG
80 PSIG
ASTM A 351 GR CF8
ASTM A 351 GR.CF8
SS 304/ SS 316; (NO CASTING)
STELLITED
STELLITED
CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS
MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON
ASTM A320 GR B8 CL 2 (IMPACT TESTED)
ASTM A194 GR.8 (IMPACT TESTED)
SP WND SS316-GRAFOIL FILLER
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
MIN TEMP -196 DEG. C.
SS304
SEAT : 800 PSIG
Sheet No. 1 of 1
300 BS-1873RATING :SIZE RANGE : ENDS :
12
3
THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.
STANDARD:MFGRS CAT/FIG:
RATING: ENDS:
SIGNATURE&
SEALOF MANUFACTURER
GLOBE VALVE SPECIFICATION MANUF'S OFFER
DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL
STANDARD : 2.0" TO 12.0" FLGD TO B-16.5 RF/125AARH
PIPING CLASS : B2K
Tag No: 52446
(For category -II MRs only )
Page 69 of 77
VALVE MATERIAL SPECIFICATION
GAIL LTD.Client :
PETROCHEM COMPLEXProject :
PATA UPLocation :
16/43Dept./Sect. :
JOB SPECIFICATION NO.
A096-6-44-0006 Rev. 0
Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1
Page 9 of 13
52949
52949
TAG NO. :
SHEET REV. NO.
DATE 22/03/2012
0
NOTES
456789
10
TESTING SHALL BE AS PER API-598 & BS-6364.20% VALVE CASTING SHALL UNDERGO RADIOGRAPHIC EXAMINATION. ALL CASTINGS SHALL BE SOLUTION HEAT TREATED. WELD REPAIRS, IF ANY, SHALL BE CARRIED OUT BEFORE SOLUTION HEAT TREATMENT.VALVES SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364(FOR NONCOLD BOX APPLICATION).VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSOVENDOR SHALL CERTIFY SUITABILITY OF THE VALVE FOR THE INTENDED SERVICE.
BODY
BONNET
STEM
DISC
BODY SEAT RING
STEM PACKING
HAND WHEEL
BONNET BOLTS
BONNET NUTS
BONNET GASKET
REQUIREMENT OFGEAR OPERATOR
REQUIREMENT OFRADIOGRAPHY
OTHERS
SPECIAL SERVICECONDITION
BACK SEAT &SHOULDER
HYDROSTATIC TESTPRESSURE
TEST PRESSUREWITH AIR
CAST
BOLTED
RISING
LOOSE PLUGTYPE/BALL TYP
RENEWABLE/NONRENEWABLE
RENEWABLE WITHVALVE OPEN ONSTREAM
RISING
O S & Y
BODY : 1100 PSIG
80 PSIG
ASTM A 351 GR.CF8M
ASTM A 351 GR.CF8M
SS 316
SS 316
SS 316
CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS
MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON
ASTM A193 GR B8M CL. 2 (IMPACT TESTED)
ASTM A194 GR 8M (IMPACT TESTED)
SP WND SS316-GRAFOIL FILLER
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
MIN. TEMP -110 DEG.C. & MAX. TEMP. 343 DEG.C
SS316
SEAT : 800 PSIG
Sheet No. 1 of 1
300 ANSI-B-16.34RATING :SIZE RANGE : ENDS :
12
3
THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.
STANDARD:MFGRS CAT/FIG:
RATING: ENDS:
SIGNATURE&
SEALOF MANUFACTURER
GLOBE VALVE SPECIFICATION MANUF'S OFFER
DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL
STANDARD : 0.5" TO 12.0" FLGD TO B-16.5 RF/125AARH
PIPING CLASS : B92K
Tag No: 52949
(For category -II MRs only )
Page 70 of 77
VALVE MATERIAL SPECIFICATION
GAIL LTD.Client :
PETROCHEM COMPLEXProject :
PATA UPLocation :
16/43Dept./Sect. :
JOB SPECIFICATION NO.
A096-6-44-0006 Rev. 0
Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1
Page 10 of 13
53046
53046
TAG NO. :
SHEET REV. NO.
DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009
2 3 4 5
NOTES
45678
TESTING SHALL BE AS PER BS 6364 ALSO.VENDOR SHALL CERTIFY SUITABILITY OF THE VALVE FOR INTENDED SERVICE.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVES SHALL BE OF STANDARD BORE DESIGN.VALVES AS PER BS-5352 AND TESTING AS PER BS 6755(PART-I) & BS-6364 IS ALSO ACCEPTABLE .
BODY
COVER
DISC/PISTON
BODY SEAT RING
DISC HINGE/HINGEPIN
COVER STUD BOLT
COVER NUT
COVER GASKET
TYPE
OTHERS
SPECIAL SERVICECONDITIONS
WASHER,NUT,PIN
HYDROSTATIC TESTPRESSURE
TEST PRESSUREWITH AIR
FORGED
BOLTED
RENEWABLE/NON-RENEWABLE
LIFT CHECK TYPE
CRYO
BODY : 2900 PSIG
ASTM A 182 GR.F304
ASTM A 182 GR.F304
STELLITED
STELLITED
ASTM A320 GR B8 CL 2 (IMPACT TESTED)
ASTM A194 GR 8 (IMPACT TESTED)
SP WND SS316-GRAFOIL FILLER
MIN TEMP -196 DEG. C.
SEAT : 2125 PSIG
Sheet No. 1 of 1
800 BS EN ISO 15761RATING :SIZE RANGE : ENDS :
12
3
THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.
STANDARD:MFGRS CAT/FIG:
RATING: ENDS:
SIGNATURE&
SEALOF MANUFACTURER
CHECK VALVE SPECIFICATION MANUF'S OFFER
DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL
STANDARD : 0.5" TO 1.5" SW 3000 TO B-16.11
PIPING CLASS : A2K, B2K, D2K
Tag No: 53046
(For category -II MRs only )
Page 71 of 77
VALVE MATERIAL SPECIFICATION
GAIL LTD.Client :
PETROCHEM COMPLEXProject :
PATA UPLocation :
16/43Dept./Sect. :
JOB SPECIFICATION NO.
A096-6-44-0006 Rev. 0
Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1
Page 11 of 13
53303
53303
TAG NO. :
SHEET REV. NO.
DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009
2 3 4 5
NOTES
4567
TESTING SHALL BE AS PER BS EN 12266-1 & BS-6364. 20% VALVE CASTINGS SHALL UNDERGO RADIOGRAPHIC EXAMINATION.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVE TESTING AS PER BS 6755 (PART-I) & BS-6364 IS ALSO ACCEPTABLE.
BODY
COVER
DISC
BODY SEAT RING
DISC HINGE
HINGE PIN
COVER STUD BOLT
COVER NUT
COVER GASKET
BY PASSES
TYPE
REQUIREMENT OFRADIOGRAPHY
OTHERS
SPECIAL SERVICECONDITIONS
WASHER,NUT,PIN
HYDROSTATIC TESTPRESSURE
TEST PRESSUREWITH AIR
CAST
BOLTED
RENEWABLE/NON-RENEWABLE
SWING CHECK TYPE
LT
BODY : 400 PSIG
ASTM A 352 GR.LCB
ASTM A 352 GR.LCB
STELLITED
STELLITED
A352 GR LCB/SS304/SSS316
SS304 / SS316(NO CASTING)
ASTM A320 GR L7
ASTM A194 GR 4/GR 7
SP WND SS316-GRAFOIL FILLER
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
MIN TEMP. -45 DEG. C.
SS 304 / SS316 (NO CASTING)
SEAT : 300 PSIG
Sheet No. 1 of 1
150 BS-1868RATING :SIZE RANGE : ENDS :
12
3
THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.
STANDARD:MFGRS CAT/FIG:
RATING: ENDS:
SIGNATURE&
SEALOF MANUFACTURER
CHECK VALVE SPECIFICATION MANUF'S OFFER
DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL
STANDARD : 2.0" TO 24.0" FLGD TO B-16.5 RF/125AARH
PIPING CLASS : A45A, A46A, A4A
Tag No: 53303
(For category -II MRs only )
Page 72 of 77
VALVE MATERIAL SPECIFICATION
GAIL LTD.Client :
PETROCHEM COMPLEXProject :
PATA UPLocation :
16/43Dept./Sect. :
JOB SPECIFICATION NO.
A096-6-44-0006 Rev. 0
Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1
Page 12 of 13
53403
53403
TAG NO. :
SHEET REV. NO.
DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009
2 3 4 5
NOTES
45
67
TESTING SHALL BE AS PER BS EN 12266-1 & BS-6364.20% VALVE CASTINGS UPTO 16" AND 100% VALVE CASTINGS 18" AND ABOVE SHALL UNDERGORADIOGRAPHIC EXAMINATION.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVE TESTING AS PER BS 6755 (PART-I) & BS-6364 IS ALSO ACCEPTABLE.
BODY
COVER
DISC
BODY SEAT RING
HINGE PIN
DISC HINGE
COVER STUD BOLT
COVER NUT
COVER GASKET
BY PASSES
TYPE
REQUIREMENT OFRADIOGRAPHY
OTHERS
SPECIAL SERVICECONDITIONS
WASHER,NUT,PIN
HYDROSTATIC TESTPRESSURE
TEST PRESSUREWITH AIR
CAST
BOLTED
RENWABLE/NON-RENEWABLE
SWING CHECK TYPE
LT
BODY : 1050 PSIG
ASTM A 352 GR.LCB
ASTM A 352 GR.LCB
STELLITED
STELLITED
SS304 / SS316(NO CASTING)
SS 304/SS 316/A352 GR LCB
ASTM A320 GR L7
ASTM A194 GR 4/GR 7
SP WND SS316-GRAFOIL FILLER
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
MIN TEMP -45 DEG. C.
SS 304 / SS316(NO CASTING)
SEAT : 775 PSIG
Sheet No. 1 of 1
300 BS-1868RATING :SIZE RANGE : ENDS :
12
3
THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.
STANDARD:MFGRS CAT/FIG:
RATING: ENDS:
SIGNATURE&
SEALOF MANUFACTURER
CHECK VALVE SPECIFICATION MANUF'S OFFER
DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL
STANDARD : 2.0" TO 24.0" FLGD TO B-16.5 RF/125AARH
PIPING CLASS : B45A, B46A, B4A
Tag No: 53403
(For category -II MRs only )
Page 73 of 77
VALVE MATERIAL SPECIFICATION
GAIL LTD.Client :
PETROCHEM COMPLEXProject :
PATA UPLocation :
16/43Dept./Sect. :
JOB SPECIFICATION NO.
A096-6-44-0006 Rev. 0
Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1
Page 13 of 13
53446
53446
TAG NO. :
SHEET REV. NO.
DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009
2 3 4 5
NOTES
45
6789
10
TESTING SHALL BE AS PER BS EN 12266-1 & BS 6364.20% VALVE CASTINGS UPTO 16" AND 100% VALVE CASTINGS 18" AND ABOVE SHALL UNDERGORADIOGRAPHIC EXAMINATION.VENDOR SHALL CERTIFY SUITABILITY OF THE VALVE FOR INTENDED SERVICEALL CASTINGS SHALL BE SOLUTION HEAT TREATEDWELD REPAIR, IF ANY, SHALL BE CARRIED OUT BEFORE SOLUTION HEAT TREATMENT FOR VALVES.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVE TESTING AS PER BS 6755 (PART-I) & BS-6364 IS ALSO ACCEPTABLE.
BODY
COVER
DISC
BODY SEAT RING
HINGE PIN
DISC HINGE
COVER STUD BOLT
COVER NUT
COVER GASKET
BY PASSES
TYPE
REQUIREMENT OFRADIOGRAPHY
OTHERS
SPECIAL SERVICECONDITIONS
WASHER,NUT,PIN
HYDROSTATIC TESTPRESSURE
TEST PRESSUREWITH AIR
CAST
BOLTED
NON-RENEWABLE/RENEWABLE
SWING CHECK TYPE
CRYO
BODY : 1100 PSIG
ASTM A 351 GR CF8
ASTM A 351 GR.CF8
STELLITED
STELLITED
SS 304/ SS 316 (NO CASTING)
SS 304
ASTM A320 GR B8 CL 2 (IMPACT TESTED)
ASTM A194 GR B8 (IMPACT TESTED)
SP WND SS316-GRAFOIL FILLER
REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.
MIN TEMP -196 DEG. C.
SS 304 (NO CASTING)
SEAT : 800 PSIG
Sheet No. 1 of 1
300 BS-1868RATING :SIZE RANGE : ENDS :
12
3
THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.
STANDARD:MFGRS CAT/FIG:
RATING: ENDS:
SIGNATURE&
SEALOF MANUFACTURER
CHECK VALVE SPECIFICATION MANUF'S OFFER
DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL
STANDARD : 2.0" TO 24.0" FLGD TO B-16.5 RF/125AARH
PIPING CLASS : B2K
Tag No: 53446
(For category -II MRs only )
Page 74 of 77
ADDITIONAL TECHNICAL
REQUIREMENTS
DOCUMENT No.
A096-090-16-43-ATR-3425 Rev.A
Page 1 of 3
A 17/09/2013 ISSUED AS JOB SPECIFICATION SSP MMK AK
Rev. No Date Purpose Prepared
by Checked by Approved by
Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved
ADDITIONAL TECHNICAL REQUIREMENTS
(VALVES)
Page 75 of 77
ADDITIONAL TECHNICAL
REQUIREMENTS
DOCUMENT No.
A096-090-16-43-ATR-3425 Rev.A
Page 2 of 3
Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved
ADDITIONAL TECHNICAL REQUIREMENTS (FOR VALVES)
1. Vendor to note that no correspondence shall be entered into or entertained after the bid submission.
2. Vendor shall furnish quotations only for those items, for which he can supply strictly as per MR specifications including fulfillment of Qualification Criteria as per MR.
3. The submission of price by vendor shall be construed to mean that he has confirmed compliance with all technical specifications of the corresponding item(s).
4. Bidders shall categorically confirm compliance to the following specifications attached with the requisition: a) Addition technical requirements, A096-090-16-43-ATR-3425 Rev A. b) Technical notes for Valves, 6-44-0052 Rev.6. c) Inspection and test plan for valves, 6-81-0004 Rev 6. d) Standard Specification for PMI at Vendor’s Work, 6-81-0001 Rev 2. e) Specification for quality management system requirements from
bidders, 6-78-0001 Rev 0. f) Specification for documentation requirements from suppliers, 6-78-
0003 Rev 0. g) Valve Specification Sheets: A096-6-44-0006-3425 (51046, 51303,
51403, 51446, 52046, 52303, 52403, 52446, 52949, 53046, 53303, 53403, 53446)
5. GASKETS: CA Filler is not acceptable for bonnet gaskets. Grafoil filler
is only acceptable.
STEM PACKING: Stem Packing shall be of asbestos free material. It
shall be “Corrosion Inhibited die formed flexible graphite with braided
anti extrusion rings.
6. Valves specified as LO(Lock-Open) and LC(Lock-Closed) shall be
supplied with arrangement suitable for locking in open as well as in closed
position. Lock is included in vendor’s scope.
7. Stem MOC 17-4 PH SS is acceptable in place of 13% Cr Steel.
8. M/s CEIL is also included as Third Party Inspection Agency.
9. In case of order being placed on manufacturer, only final inspection shall be Carried out and stage wise inspection reports/test results shall be reviewed
Page 76 of 77
ADDITIONAL TECHNICAL
REQUIREMENTS
DOCUMENT No.
A096-090-16-43-ATR-3425 Rev.A
Page 3 of 3
Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved
by TPI. Stage wise inspection shall be the sole responsibility of manufacturer.
10. LT/CRYO valves shall be provided with Extended Bonnet.
11. The specification 6-44-0052-A3 Rev 6 (special requirements for LT/CRYO valves) stands deleted, bidder is suggested to quote as per his enlistment with EIL. He can also quote for the same size or less in same type, rating, metallurgy which he has supplied to EIL in past.
Page 77 of 77