table of contents - eiltenders.eil.co.in/newtenders/userdata/doc_repository/a096/rfq/a096... ·...

77
Click on the Document Title to go to that section of the document Table of Contents Document Number Rev. Document Title Page Number A096-090-WB-MR- 3425 A VALVE: LT/CRYO (GATE GLOB E CHECK) 2 6-44-0052 6 Technical notes for valves. 6 6-81-0004 5 ITP for valves 26 6-78-0003 0 Specification for Documentation Requirement from Suppliers 33 6-78-0001 0 Specification for Quality Mgt. System Requirements from Bidders 45 6-81-0001 2 Standard specification for Positive Material Identification (PMI) at Supplier's Works 54 A096-6-44-0006- 3425 0 SPECS FOR MR OR PACKAGE INPUT 62 A096-090-16-43- ATR-3425 A ADDITIONAL TECHNICAL REQUIREMENTS 75 Page 1 of 77

Upload: doandat

Post on 17-Mar-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Click on the Document Title to go to that section of the document

Table of ContentsDocument Number Rev. Document Title Page

NumberA096-090-WB-MR-3425

A VALVE: LT/CRYO (GATE GLOB E CHECK) 2

6-44-0052 6 Technical notes for valves. 66-81-0004 5 ITP for valves 266-78-0003 0 Specification for Documentation Requirement from Suppliers 336-78-0001 0 Specification for Quality Mgt. System Requirements from Bidders 456-81-0001 2 Standard specification for Positive Material Identification (PMI) at

Supplier's Works54

A096-6-44-0006-3425

0 SPECS FOR MR OR PACKAGE INPUT 62

A096-090-16-43-ATR-3425

A ADDITIONAL TECHNICAL REQUIREMENTS 75

Page 1 of 77

Page 2: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Thi

s dr

awin

g an

d de

sign

it c

over

s ar

e pr

oper

ty o

f E

NG

INE

ER

S IN

DIA

LIM

ITE

D. T

hey

are

mer

ely

loan

ed o

n th

e bo

rrow

er's

exp

ress

agr

eem

ent t

hat i

t will

not

be

repr

oduc

ed, c

opie

d, e

xhib

ited

nor

used

exce

pt in

the

limite

d w

ay a

nd p

riva

te u

se p

erm

itted

by

wri

tten

cons

ent g

iven

by

the

lend

er to

the

borr

ower

for

the

inte

nded

use

. EIL

-164

1-51

5 R

ev.0

A4-

210x

297

EIL

- 5

88 A

- 2

16 x

279

ENGINEERS INDIA LIMITED

NEW DELHI

Project:

Client:

PETROCHEM COMPLEX

GAIL LTD.

Requisition No. Rev

A096-090-WB-MR-3425 A

Page 1 of 4

MATERIAL REQUISITION (TOP SHEET)

ITEM: VALVE: LT/CRYO(GATE GLOBE CHECK)

Issue Status 1. -> Entire Requisition Issued

2. -> Only Revised Pages are Issued

(Fill 1 or 2 from below in this bracket)

DOCUMENT NUMBER(Always quote this document number given below as reference)

A096 090 WB 3425MR 17/09/2013 16/43A

JOB NO. UNIT/AREA

COST CENTRE

DOCCODE

SR.NO. REV DATE ORIGINATINGDIVN./DEPT

VENDOR NAME VENDOR CODE

Material to be delivered at (job site) GAIL LTD., PATA UP within the delivery period specified in the "Request For

Quotation" (RFQ).

Notes :This page is a record of all the Revisions of this Requisition.

The nature of the Revision is briefly stated in the "Details" column below, the Requisition in its entirety shall beconsidered for contractual purposes.

When a Requisition is revised, only the revised pages may be issued.

When revised pages only are issued, the revised pages shall form part of the original Requisition. The original requisition alongwith the revised pages shall be considered in its entirety for contractual purposes.

REV. DATE BY CHK. APPD.

A 17/09/2013 ISSUED FOR BIDS

DETAILS

[ ]

Vendors are required to quote strictly as per technical specifications / notes stipulated in the material requisition. Theoffers with deviations are likely to be summarily rejected.

1.

2.

3.

4.

5.

MR Category :I

SSP MMK AK

This is a system generated approved document and does not require signature

Page 2 of 77

Page 3: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Thi

s dr

awin

g an

d de

sign

it c

over

s ar

e pr

oper

ty o

f E

NG

INE

ER

S IN

DIA

LIM

ITE

D. T

hey

are

mer

ely

loan

ed o

n th

e bo

rrow

er's

exp

ress

agr

eem

ent t

hat i

t will

not

be

repr

oduc

ed, c

opie

d, e

xhib

ited

nor

used

exce

pt in

the

limite

d w

ay a

nd p

riva

te u

se p

erm

itted

by

wri

tten

cons

ent g

iven

by

the

lend

er to

the

borr

ower

for

the

inte

nded

use

. EIL

-164

1-51

5 R

ev.0

A4-

210x

297

EIL

- 5

88 A

- 2

16 x

279

ENGINEERS INDIA LIMITED

NEW DELHI

Project:

Client:

PETROCHEM COMPLEX

GAIL LTD.

Requisition No. Rev

A096-090-WB-MR-3425 A

Page 2 of 4

LIST OF ATTACHMENT

DOCUMENT TITLESR. NO DOCUMENT NO.REVISION

NO. DATE 1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

TECHNICAL NOTES FOR VALVES

INSPECTION AND TEST PLAN FORVALVES

STANDARD SPECIFICATION FORPOSITIVE MATERIALIDENTIFICATION (PMI) ATSUPPLIER'S WORK

SPECIFICATION FOR QUALITYMANAGEMENT SYSTEM REQUIREMENTSFROM BIDDERS

SPECIFICATION FOR DOCUMENTATIONREQUIREMENTS FROM SUPPLIERS

ADDITIONAL TECHNICALREQUIREMENTS

VALVE MATERIAL SPECIFICATION

VALVESHEET NO.51046

VALVESHEET NO.51303

VALVESHEET NO.51403

VALVESHEET NO.51446

VALVESHEET NO.52046

VALVESHEET NO.52303

VALVESHEET NO.52403

VALVESHEET NO.52446

VALVESHEET NO.52949

VALVESHEET NO.53046

VALVESHEET NO.53303

VALVESHEET NO.53403

VALVESHEET NO.53446

6-44-0052

6-81-0004

6-81-0001

6-78-0001

6-78-0003

A096-090-16-43-ATR-3425

A096-6-44-0006-3425

A096-6-44-06-51046

A096-6-44-06-51303

A096-6-44-06-51403

A096-6-44-06-51446

A096-6-44-06-52046

A096-6-44-06-52303

A096-6-44-06-52403

A096-6-44-06-52446

A096-6-44-06-52949

A096-6-44-06-53046

A096-6-44-06-53303

A096-6-44-06-53403

A096-6-44-06-53446

6

5

2

0

0

A

0

5

5

5

5

5

5

5

5

0

5

5

5

5

04/08/2010

17/06/2013

20/10/2011

04/06/2009

04/06/2009

17/09/2013

17/09/2013

30/06/2009

30/06/2009

30/06/2009

30/06/2009

30/06/2009

30/06/2009

30/06/2009

30/06/2009

22/03/2012

30/06/2009

30/06/2009

30/06/2009

30/06/2009

Page 3 of 77

Page 4: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Thi

s dr

awin

g an

d de

sign

it c

over

s ar

e pr

oper

ty o

f E

NG

INE

ER

S IN

DIA

LIM

ITE

D. T

hey

are

mer

ely

loan

ed o

n th

e bo

rrow

er's

exp

ress

agr

eem

ent t

hat i

t will

not

be

repr

oduc

ed, c

opie

d, e

xhib

ited

nor

used

exce

pt in

the

limite

d w

ay a

nd p

riva

te u

se p

erm

itted

by

wri

tten

cons

ent g

iven

by

the

lend

er to

the

borr

ower

for

the

inte

nded

use

. EIL

-164

1-51

5 R

ev.0

A4-

210x

297

EIL

- 5

88 A

- 2

16 x

279

ENGINEERS INDIA LIMITED

NEW DELHI

Project:

Client:

PETROCHEM COMPLEX

GAIL LTD.

Requisition No. Rev

A096-090-WB-MR-3425 A

Page 3 of 4

MR ATTACHMENTSR.NO. DETAIL DESCRIPTION QTY. U. RATE TOT.VALUE CDD

VLV.GATE, SHEET 51046, CRYO

VLV.GATE, SHEET 51303, LT

VLV.GATE, SHEET 51403, LT

VLV.GATE, SHEET 51446, CRYO

VLV.GLOBE, SHEET 52046, CRYO

VLV.GLOBE, SHEET 52303, LT

VLV.GLOBE, SHEET 52403, LT

VLV.GLOBE, SHEET 52446, CRYO

VLV.GLOBE, SHEET 52949, CRYO

VLV.CHECK, SHEET 53046, CRYO

Item Description:

Item Description:

Item Description:

Item Description:

Item Description:

Item Description:

Item Description:

Item Description:

Item Description:

Item Description:

51046ZZZ4081ZZZZZ(CC:4879161623)

51303ZZZ509ZZZZZZ(CC:4877261713)

51303ZZZ515ZZZZZZ(CC:4877262913)

51403ZZZ511ZZZZZZ(CC:4877262123)

51403ZZZ5151ZZZZZ(CC:4877292923)

51403ZZZ515ZZZZZZ(CC:4877262923)

51403ZZZ5181ZZZZZ

51446ZZZ409ZZZZZZ(CC:4879471723)

51446ZZZ4152ZZZZZ(CC:4879492923)

51446ZZZ415ZZZZZZ(CC:4879472923)

52046ZZZ408ZZZZZZ(CC:4889141623)

52303ZZZ509ZZZZZZ(CC:4887891713)

52403ZZZ515ZZZZZZ(CC:4887892923)

52446ZZZ415ZZZZZZ(CC:4889202923)

52949ZZZ404ZZZZZZ

53046ZZZ405ZZZZZZ(CC:4829270943)

1.5 INCH, LOCK OPEN

2.0 INCH

6.0 INCH

3.0 INCH

6.0 INCH, LOCK OPEN

6.0 INCH

12.0 INCH, LOCK OPEN

2.0 INCH

6.0 INCH, LOCK CLOSED

6.0 INCH

1.5 INCH

2.0 INCH

6.0 INCH

6.0 INCH

0.5 INCH

0.75 INCH

6 NOS

3 NOS

3 NOS

2 NOS

1 NOS

1 NOS

1 NOS

4 NOS

1 NOS

2 NOS

6 NOS

1 NOS

1 NOS

1 NOS

16 NOS

12 NOS

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

ITEMCODE/CLIENT CODE(CC)

Page 4 of 77

Page 5: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Thi

s dr

awin

g an

d de

sign

it c

over

s ar

e pr

oper

ty o

f E

NG

INE

ER

S IN

DIA

LIM

ITE

D. T

hey

are

mer

ely

loan

ed o

n th

e bo

rrow

er's

exp

ress

agr

eem

ent t

hat i

t will

not

be

repr

oduc

ed, c

opie

d, e

xhib

ited

nor

used

exce

pt in

the

limite

d w

ay a

nd p

riva

te u

se p

erm

itted

by

wri

tten

cons

ent g

iven

by

the

lend

er to

the

borr

ower

for

the

inte

nded

use

. EIL

-164

1-51

5 R

ev.0

A4-

210x

297

EIL

- 5

88 A

- 2

16 x

279

ENGINEERS INDIA LIMITED

NEW DELHI

Project:

Client:

PETROCHEM COMPLEX

GAIL LTD.

Requisition No. Rev

A096-090-WB-MR-3425 A

Page 4 of 4

MR ATTACHMENTSR.NO. DETAIL DESCRIPTION QTY. U. RATE TOT.VALUE CDD

VLV.CHECK, SHEET 53303, LT

VLV.CHECK, SHEET 53403, LT

VLV.CHECK, SHEET 53446, CRYO

Item Description:

Item Description:

Item Description:

53046ZZZ406ZZZZZZ(CC:4829241143)

53303ZZZ515ZZZZZZ(CC:4834142913)

53403ZZZ509ZZZZZZ(CC:4834141723)

53446ZZZ415ZZZZZZ(CC:4835232923)

1.0 INCH

6.0 INCH

2.0 INCH

6.0 INCH

16 NOS

1 NOS

2 NOS

1 NOS

17

18

19

20

ITEMCODE/CLIENT CODE(CC)

Page 5 of 77

Page 6: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 6 of 77

Page 7: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 7 of 77

Page 8: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 8 of 77

Page 9: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 9 of 77

Page 10: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 10 of 77

Page 11: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 11 of 77

Page 12: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 12 of 77

Page 13: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 13 of 77

Page 14: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 14 of 77

Page 15: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 15 of 77

Page 16: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 16 of 77

Page 17: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 17 of 77

Page 18: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 18 of 77

Page 19: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 19 of 77

Page 20: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 20 of 77

Page 21: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 21 of 77

Page 22: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 22 of 77

Page 23: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 23 of 77

Page 24: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 24 of 77

Page 25: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 25 of 77

Page 26: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

■_71 I for.fvfn.1)

ENGINEERS INDIA LIMITED (A Govt of India Undertaking}

INSPECTION AND TEST PLAN FOR

VALVES

STANDARD SPECIFICATION NO.

6-81-0004 Rev. 5

Page 1 of 7

fktorr a -crteTur

INSPECTION AND TEST PLAN FOR

VALVES

5. 17.06,2013 REVISED AND RE-ISSUED TKK RKS SCG DM

4 15.07.2011 REVISED AND RE-ISSUED TKK SCG AKC DM

3 30.06.2010 REVISED AND RE-ISSUED RKB VKJ SKP ND

2 31.01.2008 REVISED AND RE-ISSUED CS SS MVKK VC

1 05.10.2005 QUANTUM OF CHECK & SCOPE OF INSPECTION REVISED SS MVKK SY VJN

Rev. No. Date Purpose

Prepared by

Checked by

Standards Committee Convenor

Standards Bureau Chairman

Approved by

Format No. 8-00-0001-F7 Rev. 0 Copyright EIL — All rights reserved

Page 26 of 77

Page 27: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

fg-zrr iffaeg eieM1,751,275141

STANDARD SPECIFICATION NO.

6-81-0004 Rev. 5

Page 2 of 7

ei ENGINEERS INDIA LIMITED IA Govt of India Undertaking)

INSPECTION AND TEST PLAN FOR

VALVES

Abbreviations:

CEIL Certification Engineers International Limited MRT Mechanical Run Test

CIMFR Central Institute of Mining & Fuel Research NDT Non Destructive Testing

CE Carbon Equivalent NPSH Net Positive Suction Head

DFT Dry Film Thickness PO Purchase Order

DPT Dye Penetrant Testing PESO Petroleum Explosive Safety Organization

DHT De-hydrogen Heat Treatment PQR Procedure Qualification Record

ERTL Electronics Regional Test Laboratory PR Purchase Requisition

FCRI Fluid Control Research Institute PMI Positive Material Identification

HT Heat Treatment RT Radiography Testing

HIC Hydrogen Induced Cracking SSCC Sulphide Stress Corrosion Cracking

ITP Inspection and Test Plan TC Test Certificate

IP Ingress Protection TPI or TPIA Third Party Inspection Agency

IHT Intermediate Heat Treatment UT Ultrasonic Testing

IC Inspection Certificate VDR Vendor Data Requirement

IGC Inter Granular Corrosion WPS Welding Procedure Specification

MPT/MT Magnetic Particle Testing WPQ Welders Performance Qualification

MTC Material Test Certificate

Inspection Standards Committee

Convenor : Mr. S C Gupta

Members:

Mr. R.K. Singh

Mr. Rajeev Kumar Mr. Himangshu Pal Mr. Neeraj Mathur

Mr. T Kamalakannan Mr. Deepak Gupta (Project) Mr. Mayank Jain

Format No. 8-00-0001-F7 Rev.O Copyright EIL — All rights reserved

Page 27 of 77

Page 28: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

k31 eJ ENGINEERS fg- zrr la154tg INDIA LIMITED

(A Govt of India Undertaking)

INSPECTION AND TEST PLAN FOR

VALVES

STANDARD SPECIFICATION NO.

6-81-0004 Rev. 5

Page 3 of 7

1.0 SCOPE

This Inspection and Test Plan covers the minimum testing requirements of Valves.

2.0 REFERENCE DOCUMENTS

PO/PR/Standards referred therein/ Job specifications /Approved documents.

3.0 INSPECTION AND TEST REQUIREMENTS

SL NO

STAGE/ ACTIVITY CHARACTERISTICS QUANTUM OF

CHECK RECORD

SCOPE OF INSPECTION

SUB SUPPLIER

SUPPLIER EIL/TPIA

1.0 Procedure

1.1

Hydrostatic Test, Heat Treatment, NDT,

Helium Leak Test And

Other Procedures

Documented Procedures 100% Procedure Documents

- H R

1.2 WPS,PQR & WPQ Welding Parameters & Qualification Record

100% WPS,PQR

&WPQ - H

W- New R- Existing

1.3 Pre-Qualification Tests Fire safe,

Cryogenic & Other Test as applicable

As per PR / Purchase Specification

Acceptance Report

- H H

(If new)

Format No. 8-00-0001-F7 Rev.O Copyright EIL — All rights reserved

Page 28 of 77

Page 29: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

17177R FRIVU ‘7,1.3,195 +1)

STANDARD SPECIFICATION NO.

6-81-0004 Rev. 5

Page 4 of 7

k31 elei ENGINEERS

la 5V--ar faireg INDIA LIMITED IA Govt Al India Undertaking)

INSPECTION AND TEST PLAN FOR

VALVES

SL NO

STAGE/ ACTIVITY CHARACTERISTICS QUANTUM OF

CHECK RECORD

SCOPE OF INSPECTION

SUB SUPPLIER

SUPPLIER EIL/TPIA

2.0 Material Inspection

2.1. Castings & Forgings

(Body, Bonnet, Disc, Stem, Body ring)

Chemical ,Mechanical , Heat Treatment,

NDT,IGC & Other Properties as applicable

100% Test

Certificates H R R

2.2 Castings & Forgings

(Body, Bonnet, Disc, Stem, Body ring) Visual & Dimension 100%

Inspection Report

H H -

2.3. Body and Bonnet Castings Radiography Examination

As per PR / Purchase Specification

Films and report

H R R

2.4 Bars for Trim material Chemical Analysis Each Heat Test

Certificates& Lab Report

H R -

2.5 Gaskets, Gear units, Fasteners, Gland,

Packings, etc. Physical / Chemical

Properties 100%

Test Certificates& Lab Report

H R -

2.6 Actuators as applicable Performance ,

Statutory Certificates as 100% nspection

Test Certificates , Inspection

report

H H R

Format No. 8-00-0001-F7 Rev.O Copyright EIL — All rights reserved

Page 29 of 77

Page 30: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

,511faJt.-1' IHIF kora,' MI ,10, H )

ENGINEERS INDIA LIMITED (A Goer of India Undertaking)

INSPECTION AND TEST PLAN FOR

VALVES

STANDARD SPECIFICATION NO.

6-81-0004 Rev. 5

Page 5 of 7

SL NO

STAGE/ ACTIVITY CHARACTERISTICS QUANTUM OF

CHECK RECORD

SCOPE OF INSPECTION

SUB SUPPLIER

SUPPLIER EIL/TPIA

3.0 In Process Inspection

3.1 Welding Welding Parameters as

per WPS / PQR 100%

Inspection Reports

- H -

3.2 Machining of components Visual / Dimension 100% Inspection

Reports - H -

4.0 Final Inspection

4.1 Hydrostatic / Pneumatic Test and

Helium Leak test as applicable Leak Check

As per PR / Purchase Specification

Test Report - (Note 1) H

RW

4.2 Visual / Dimension Surface & Dimension Check

100% Test Report - H RW

(Note 1)

4.3 Functional Test for Actuator Operated

Valves Satisfactory Performance

100% Test Report - H RW

Format No. 8-00-0001-F7 Rev.O

Copyright EL — All rights reserved

Page 30 of 77

Page 31: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

14-7,eWOwmt JxRIM

STANDARD SPECIFICATION NO.

6-81-0004 Rev. 5

Page 6 of 7

ENGINEERS 5fgziT 254-"d5 INDIA LIMITED

(A Govt of India Undertaking(

INSPECTION AND TEST PLAN FOR

VALVES

SL NO

STAGE/ ACTIVITY CHARACTERISTICS QUANTUM OF

CHECK RECORD

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER EIL/TPIA

4.4 PMI Check Chemical

As per EIL Spec. 6-81-0001

Inspection Report

- H RW

4.5 Strip Check(As applicable) Verify Components & Differential hardness if

applicable

As per PR / Purchase Specification

Inspection Report

- H RW

(Note 1)

4.6 Final Stamping Stamping Of Accepted

Valves

Stamping of Valves which are witnessed

by EIL/TPIA.

Inspection rt Report

- H H

(Note-1)

5.0 Painting

5.1 Painting and Color coding as applicable Visual / DFT Check 100% Inspection

Report - H -

6.0 Documentation & IC

6.1 Documentation & Inspection

Certificate(IC)

Review of Stage Inspection Reports /

Test Reports & Issue of IC

100% Supplier TC

& IC - H H

Format No. 8-00-0001-F7 Rev.O

Copyright EIL — All rights reserved

Page 31 of 77

Page 32: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

eleage ,711,5R17,17

STANDARD SPECIFICATION NO.

6-81-0004 Rev. 5

Page 7 of 7

k3t ei ENGINEERS $'fgar 254-eg INDIA LIMITED

IA Govt of India UndettakIng)

INSPECTION AND TEST PLAN FOR

VALVES

Legend: H- Hold (Do not proceed without approval), P-Perform, RW - Random Witness (As specified or 10% ( min.1 no. of each size and type of Bulk item)), R-Review, W-Witness (Give due notice, work may proceed after scheduled date).

NOTES (As applicable): 1. For Non NACE &Non Hydrogen service Carbon Steel Valves up to size 12" will be accepted on review of Supplier Test Certificates. Supplier Test

Certificate to be reviewed by EIL/TPIA. 2. This document describes the generic test requirements. Any additional test or Inspection scope if specified in contract documents shall also be

applicable.(Unless otherwise agreed upon) 3. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred there in /Job Specification /Approved Documents.

Format No. 8-00-0001-F7 Rev.O

Copyright EIL — All rights reserved

Page 32 of 77

Page 33: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 33 of 77

Page 34: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 34 of 77

Page 35: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 35 of 77

Page 36: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 36 of 77

Page 37: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 37 of 77

Page 38: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 38 of 77

Page 39: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 39 of 77

Page 40: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 40 of 77

Page 41: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 41 of 77

Page 42: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 42 of 77

Page 43: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 43 of 77

Page 44: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 44 of 77

Page 45: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 45 of 77

Page 46: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 46 of 77

Page 47: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 47 of 77

Page 48: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 48 of 77

Page 49: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 49 of 77

Page 50: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 50 of 77

Page 51: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 51 of 77

Page 52: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 52 of 77

Page 53: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

Page 53 of 77

Page 54: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

151fRiseAstigat efaleg

ENGINEERSINI NA LIMITED/A “nul Ina. Lnden.,),

STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PMI) AT

SUPPLIER'S WORKS

STANDARD SPECIFICATION No.

6 -81 -0001 Rev. 2Page I of 8

c 1T covingii 4,flcomoict) TIPTth LI 111

f'6g itta-vr

STANDARD SPECIFICATION

FORPOSITIVE MATERIAL

IDENTIFICATION(PMI)

AT SUPPLIER'S WORKS

40D., 15,

2 20.10.11 REVISED AND RE-ISSUED AKC DM

1 15.07.08 REVISED AND RE-ISSUED NKR SSL SKP VC

0 07.12.00 ISSUED AS STANDARD SPECIFICATION AKC AKB AKB MI

Standards StandardsRev.No Date Purpose Prepared

byChecked

byCommitteeConvenor

BureauChairman

Approved by

Formal No. 8-00-0001-F1 Rev. 0 Copyright EIL — All rights reserved

Page 54 of 77

Page 55: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

151M-ae? le. ' ENGINEERSimegver INDIA LIMITEDyin eRaWanJelwill Govl of India Undertakno

STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PM I) AT

SUPPLIER'S WORKS

STANDARD SPECIFICATION No.6-81-0001 Rev. 2

Page 2 of 8

Abbreviations:

API American Petroleum InstituteAS Alloy SteelLSTK Lump Sum Turn KeyPMI Positive Material IdentificationSch ScheduleSS Stainless SteelTPI or TPIA Third Party Inspection Agency

Inspection Standards Committee

Convenor: Mr.AK Chaudhary

Members: Mr. SS LotayMr. SC GuptaMr. RK SinghMr. Rajeev KumarMr. Anoop GoelMr. G SureshMr. G Poornachandra RaoMr. MP Jain (Projects)

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL — All rights reserved

Page 55 of 77

Page 56: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PMI) AT

SUPPLIER'S WORKS

151M4-e?fte ENGINEERSOgrir tfigtegW INDIA LIMITED

Gorl of India undertaking}

STANDARD SPECIFICATION No.

6-81-0001 Rev. 2Page 3 of 8

CONTENTS

1.0 SCOPE 4

2.0 REFERENCE DOCUMENTS 4

3.0 DEFINITIONS 4

4.0 PMI EXAMINATION 5

5.0 ACCEPTABLE METHODS FOR PMI 5

6.0 EXTENT OF PMI EXAMINATION 6

7.0 RECORDING AND DOCUMENTATION 7

8.0 MARKING 7

Copyright EIL —All rights reservedFormat No. 8-00-0001-F1 Rev. 0Page 56 of 77

Page 57: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PMT) AT

SUPPLIER'S WORKS

/ft ENCJNEERSbeire,altateg '-‘60- 1 INDIA LIMITED

STANDARD SPECIFICATION No.

6-81-0001 Rev. 2Page 4 of 8

1.0 SCOPE

1.1 This specification applies to the requirements for Positive Material Identification (PMI) to beperformed at the Supplier's works on Metallic Materials procured either directly by theOwner/EIL/ LSTK contractor or indirectly through the sub-Suppliers.

1.2 Any post order deviation from this specification must be approved by Owner/EIL in theDeviation/ Waiver Permit format (No. 5-0000-0180-F1) enclosed with Material Requisition.

1.3 This specification covers the procedures and methodology to be adopted to assure that thechemical composition of the material is consistent with the material specifications as specifiedin purchase documents using 'Alloy Analyzer' at the time of final inspection before dispatch.

1.4 The scope of this specification shall include but shall not be limited to Positive MaterialIdentification (PMI) to be performed on Materials listed below:

1.4.1 For alloy Steel materials as below:Alloy Steel Pipes including Clad PipesAlloy Steel Flanges & ForgingsAlloy Steel Fittings including Clad FittingsAlloy Steel FastenersAlloy Cast & Forged steel valvesAlloy Steel Instrumentation Items (Control Valves, Safety Valves etc.)Longitudinal Pipe & Fittings Welds.Gaskets (for Ring Type Joints)

1.4.2 For Carbon Steel materials as below:All Carbon Steel Piping items under NACE or HIC or H2Carbon Steel flanges and valves (Rating 900# and above)Carbon Steel Pipes & fittings for following thicknesses:Size 1"- 2" NB : Sch 160 & aboveSize 3" NB : Sch XS & aboveSize 4" - 12" NB : Sch 120 & above

Following items shall be excluded from scope of PMI examination.

Gaskets other than for Ring Type JointsInternal Components of Valves

1.5 All grades of material supplies including Stainless Steels shall be liable for PMI test at site. Incase of any defective materials being found at site, the Supplier shall be responsible to effectreplacement of such defective materials at project site without any delays to the satisfaction ofEIL site RCM (Resident Construction Manager).

2.0 REFERENCE DOCUMENTS

2.1 API Recommended Practice 578 (First Edition, May 1999) - Material Verification Program forNew and Existing Alloy Piping Systems.

3.0 DEFINITIONS

3.1 Supplier: Any Supplier or Manufacturer on whom an order is placed for the supply of referreditems. This definition shall also include any sub-Supplier or manufacturer on whom a sub-orderis placed by the Supplier.

Copyright EIL — All rights reservedFormat No. 8-00-0001-F1 Rev. 0

Page 57 of 77

Page 58: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PM I) AT

SUPPLIER'S WORKS

SaIRCIELM—; ENGINEERSPar taiReZ VW INDIA LIMITED

STANDARD SPECIFICATION No.

6-81-0001 Rev. 2Page 5 of 8

3.2 Inspection Lot: A group of items offered for inspection covered under same size, Heat andHeat treatment lot.

3.3 Alloy Material: Any metallic material (including welding filler materials) that containsalloying elements such as chromium, nickel, molybdenum or vanadium, which are intentionallyadded to enhance mechanical or physical properties and/or corrosion resistance.

4.0 PMI EXAMINATION

4.1 The Supplier shall submit a procedure of PMI to comply with the requirements of thisSpecification Approval of PMI Procedure shall be obtained from Owner/EIL/TPIA prior tocommencing manufacture/ inspection of product.

4.2 PMI examination of materials is independent of any certification, markings or colour codingthat may exist and is aimed at verifying that the alloy used are as per specified grades.

4.3 The Supplier shall identify all incoming alloy materials and maintain full traceability of all alloymaterials, including all off-cuts. Transfer of identification marks shall be undertaken prior tocutting to ensure maintenance of identification on off-cuts.

4.4 The Supplier shall ensure that all alloy materials are segregated and stored in separatelyidentified locations to prevent the mix up of materials of different alloy specifications or alloymaterial with carbon steel. Non ferro-magnetic materials shall be segregated at all times fromferro-magnetic materials.

4.5 PMI examination is subject to surveillance inspection by Owner/EIL/TPIA.

5.0 ACCEPTABLE METHODS FOR PMI

5.1 The method used for PMI examination shall provide a quantitative determination of the alloyingelements like chromium, nickel, molybdenum or vanadium in Alloy Steel items.

5.2 Instruments or methods used for PMI examination shall be able to provide quantitative,recordable, elemental composition results for positive identification of alloying elementspresent.

5.3 The acceptable instruments for alloy analyzer shall be either "Portable X-Ray fluorescence" or"Optical Emission" type each capable of verifying the percentage of alloy elements withinspecified range.

5.4 Chemical spot testing, magnets, alloy sorters and other methods using eddy current ortriboelectric testing methods are not acceptable for PMI examination.

5.5 The PMI instrument used shall have the sensitivity to detect the alloying elements in thespecified range.

5.6 All PMI instruments shall have been serviced within a 6 month period of the time of use toverify the suitability of batteries, sources etc., and the data of the last service shall be stated onthe PMI Report Form (Sample enclosed).

5.7 Each analyzer must be calibrated according to the manufacturer's specification at the beginningand end of each shift. Instrument must be checked against known standard for each alloy typeto be inspected during the shift.

Copyright EIL — All rights reservedFormat No. 8-00-0001-F1 Rev. 0

Page 58 of 77

Page 59: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PMI) AT

SUPPLIER'S WORKS

ISillaZreqe ENGINEERSs'Ig7e2eg W INDIA UMITED

Govt a Inaa Undenakingi

STANDARD SPECIFICATION No.

6-81-0001 Rev. 2Page 6 of 8

5.8 Certified samples, with full traceability, of a known alloy materials shall be available for use asa random spot check on the instrument calibration.

5.9 The surfaces to be examined shall be prepared by light grinding or abrasive paper and solventcleaner. Evidence of Arc burn resulting from examination shall be removed by light grinding orabrasive paper. No permanent marks, which are injurious to the usage of product in service, areacceptable.

5.10 Alloy Steel ring type joint Gaskets shall be inspected by using portable X-Ray fluorescenceinstrument.

5.11 Testing shall be done as per the procedures outlined by the manufactures of alloy analyzerbeing used. Modification of these procedures if any must be approved by Owner/EIL.

5.12 The persons performing PMI shall demonstrate their capabilities to the satisfaction ofOwner/EIL/TPIA visiting engineer. If the Supplier has qualified operator on their rolls, he mayperform the examination. Otherwise PMI examination shall be sub-contracted to an independenttesting agency approved by EIL.

5.13 Whenever material is identified as not meeting requirements by the visiting engineer a rejectionnote shall be issued.

6.0 EXTENT OF PMI EXAMINATION

Following sampling plans shall be applicable for PMI examination of various items.

Flanges, Fittings 100%Valves, RTJ Gaskets

Pipes 100% (for pipes procured from traders).

2 random samples drawn from eachSize/Heat/Lot (for pipes procured directly from mills)

C. Fasteners

Lot Size Sample Size

Upto 100 2% (Min 2)101 to 500 1% (Min 3)501 and above 0.5% (Min 5)

Note:

For Welded Pipes and Fittings, PMI shall be performed on Base Metal as well asweldments.

Whenever any sample drawn to PMI test on the basis of percentage selection in B & Cabove, fails to meet specification requirements, 100% of items of lot shall be tested forPMI.

Copyright EIL — All rights reservedFormat No. 8-00-0001-F1 Rev. 0Page 59 of 77

Page 60: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PMI) AT

SUPPLIER'S WORKS

i.311-aelti. ENGINEERS

ogrir EiRtegi INDIA LIMITEDIA Go' at India Undertaking)

STANDARD SPECIFICATION No.6-81-0001 Rev. 2

Page 7 of 8

7.0 RECORDING AND DOCUMENTATION

The results of PMI examination shall be recorded in a Report Format as enclosed with thisspecification.

8.0 MARKING

8.1 All alloy materials tested by PMI shall be identified using either of the following methods byindicating "PMI OK"

Bar Code/Hologram StickerA low stress stamp marking

Copyright EIL — All rights reservedFormat No. 8-00-0001-F1 Rev. 0Page 60 of 77

Page 61: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PMI) AT

SUPPLIER'S WORKS

012-ael ie ENGINEERSst",ar &Reg W INDIALIMTED

GOA Of India undertakng)

STANDARD SPECIFICATION No.6-81-0001 Rev. 2

Page 8 of 8

POSITIVE MATERIAL IDENTIFICATION REPORTBULK MATERIALS

Page of

Project: Client Job No.

PMI Report No. Supplier/Sub-Supplier

Purchase Order No. Testing Agency

PurchaseRequisition No:

PMI Location

Bulk Item Type (as per Requisition)

Material Specification/Grade

Number of items in Lot

Requisition Item No./ Description Major content, Weight Percent RemarksAccept/Reject

Element Cr Mo Ni V

Specified Range

Actual observations

Instrument Type / ID

Last Service Date Inspection Agency Witnessed By

Copyright EIL — All rights reservedFormat No. 8-00-0001-F1 Rev. 0Page 61 of 77

Page 62: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

VALVE MATERIAL SPECIFICATION

GAIL LTD.Client :

PETROCHEM COMPLEXProject :

PATA UPLocation :

16/43Dept./Sect. :

JOB SPECIFICATION NO.

A096-6-44-0006 Rev. 0

Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1

Page 1 of 13

51046

51046

TAG NO. :

SHEET REV. NO.

DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009

2 3 4 5

NOTES

45678

TESTING SHALL BE AS PER BS 6364 ALSO. VALVE SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364 (NON COLD BOX APPLICATION).VENDOR SHALL CERTIFY SUITABILITY OF THE VALVE FOR INTENDED SERVICE CONDITIONS.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVES AS PER API-602 AND TESTING AS PER API-598 & BS-6364 ARE ALSO ACCEPTABLE.

BODY

BONNET

STEM

WEDGE DISC

BODY SEAT RING

STEM PACKING

HAND WHEEL

BONNET BOLTS

BONNET NUTS

BONNET GASKET

SPECIAL SERVICECONDITIONS

BACK SEAT &SHOULDER

OTHERS

HYDROSTATIC TESTPRESSURE

TEST PRESSUREWITH AIR

FORGED

BOLTED

RISING

SOLID

RENEWABLE

RENEWABLE WITHVALVE OPEN ONSTREAM

NON RISING

CRYO

INTEGRAL

O.S & Y. (NOTE 5)

BODY : 2900 PSIG

80 PSIG

ASTM A 182 GR.F304

ASTM A 182 GR.F304

SS 304/ SS 316; (NO CASTING)

STELLITED

STELLITED

CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS

MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON

ASTM A320 GR B8 CL.2 (IMPACT TESTED)

ASTM A194 GR.8 (IMPACT TESTED)

SP WND SS316-GRAFOIL FILLER

MIN TEMP -196 DEG C.

SEAT : 2125 PSIG

Sheet No. 1 of 1

800 API 602/ ISO 15761RATING :SIZE RANGE : ENDS :

12

3

THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.

STANDARD:MFGRS CAT/FIG:

RATING: ENDS:

SIGNATURE&

SEALOF MANUFACTURER

GATE VALVE SPECIFICATION MANUF'S OFFER

DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL

STANDARD : 0.5" TO 1.5" SW 3000 TO B-16.11

PIPING CLASS : A2K, B2K, D2K

Tag No: 51046

(For category -II MRs only )

Page 62 of 77

Page 63: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

VALVE MATERIAL SPECIFICATION

GAIL LTD.Client :

PETROCHEM COMPLEXProject :

PATA UPLocation :

16/43Dept./Sect. :

JOB SPECIFICATION NO.

A096-6-44-0006 Rev. 0

Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1

Page 2 of 13

51303

51303

TAG NO. :

SHEET REV. NO.

DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009

2 3 4 5

NOTES

45678

TESTING SHALL BE AS PER BS-6364 ALSO. VALVES SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364(FOR NONCOLD BOX APPLICATION). 20 % VALVE CASTINGS SHALL UNDERGO RADIOGRAPHIC EXAMINATION.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVES AS PER API-600 AND TESTING AS PER API-598 & BS-6364 ARE ALSO ACCEPTABLE.

BODY

BONNET

STEM

WEDGE DISC

BODY SEAT RING

STEM PACKING

HAND WHEEL

BONNET BOLTS

BONNET NUTS

BONNET GASKET

REQUIREMENT OFGEAR OPERATOR

REQUIREMENT OFRADIOGRAPHY

SPECIAL SERVICECONDITIONS

BACK SEAT &SHOULDER

OTHERS

HYDROSTATIC TESTPRESSURE

TEST PRESSUREWITH AIR

CAST

BOLTED

RISING

FLEXIBLE

NON-RENEWABLE/RENEWABLE

RENEWABLE WITHVALVE OPEN ONSTREAM

NON RISING

LT

O.S & Y.

BODY : 400 PSIG

80 PSIG

ASTM A 352 GR.LCB

ASTM A 352 GR.LCB

SS 304 / SS316; (NO CASTING)

STELLITED

STELLITED

CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS

MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON

ASTM A320 GR L7

ASTM A194 GR.4/GR 7

SP WND SS316-GRAFOIL FILLER/CORRUGATEDSS316

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

MIN. TEMP. -45 DEG.C.

SS304 / SS316

SEAT : 300 PSIG

Sheet No. 1 of 1

150 API 600/ ISO 10434RATING :SIZE RANGE : ENDS :

12

3

THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.

STANDARD:MFGRS CAT/FIG:

RATING: ENDS:

SIGNATURE&

SEALOF MANUFACTURER

GATE VALVE SPECIFICATION MANUF'S OFFER

DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL

STANDARD : 2.0" TO 24.0" FLGD TO B-16.5 RF/125AARH

PIPING CLASS : A45A, A46A, A4A

Tag No: 51303

(For category -II MRs only )

Page 63 of 77

Page 64: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

VALVE MATERIAL SPECIFICATION

GAIL LTD.Client :

PETROCHEM COMPLEXProject :

PATA UPLocation :

16/43Dept./Sect. :

JOB SPECIFICATION NO.

A096-6-44-0006 Rev. 0

Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1

Page 3 of 13

51403

51403

TAG NO. :

SHEET REV. NO.

DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009

2 3 4 5

NOTES

456

78

TESTING SHALL BE AS PER BS-6364 ALSO. VALVES SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364 (NON COLD BOX APPLICATION)20% VALVE CASTINGS UPTO 16" AND 100% VALVE CASTINGS 18" AND ABOVE SHALL UNDERGORADIOGRAPHIC EXAMINATION.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVES AS PER API-600 AND TESTING AS PER API-598 & BS-6364 ARE ALSO ACCEPTABLE.

BODY

BONNET

STEM

WEDGE DISC

BODY SEAT RING

STEM PACKING

HAND WHEEL

BONNET BOLTS

BONNET NUTS

BONNET GASKET

REQUIREMENT OFGEAR OPERATOR

REQUIREMENT OFRADIOGRAPHY

SPECIAL SERVICECONDITIONS

BACK SEAT &SHOULDER

OTHERS

HYDROSTATIC TESTPRESSURE

TEST PRESSUREWITH AIR

CAST

BOLTED

RISING

FLEXIBLE

RENEWABLE/NON-RENEWABLE

RENEWABLE WITHVALVE OPEN ONSTREAM

NON RISING

LT

O.S & Y.

BODY : 1050 PSIG

80 PSIG

ASTM A 352 GR.LCB

ASTM A 352 GR.LCB

SS 304 / SS316; (NO CASTING)

STELLITED

STELLITED

CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS

MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON

ASTM A320 GR L7

ASTM A194 GR 4/GR 7

SP WND SS316-GRAFOIL FILLER

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

MIN TEMP -45 DEG.C.

SS 304 / SS316

SEAT : 775 PSIG

Sheet No. 1 of 1

300 API 600/ ISO 10434RATING :SIZE RANGE : ENDS :

12

3

THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.

STANDARD:MFGRS CAT/FIG:

RATING: ENDS:

SIGNATURE&

SEALOF MANUFACTURER

GATE VALVE SPECIFICATION MANUF'S OFFER

DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL

STANDARD : 2.0" TO 24.0" FLGD TO B-16.5 RF/125AARH

PIPING CLASS : B45A, B46A, B4A

Tag No: 51403

(For category -II MRs only )

Page 64 of 77

Page 65: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

VALVE MATERIAL SPECIFICATION

GAIL LTD.Client :

PETROCHEM COMPLEXProject :

PATA UPLocation :

16/43Dept./Sect. :

JOB SPECIFICATION NO.

A096-6-44-0006 Rev. 0

Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1

Page 4 of 13

51446

51446

TAG NO. :

SHEET REV. NO.

DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009

2 3 4 5

NOTES

456

789

1011

TESTING SHALL BE AS PER BS 6364 ALSO. VALVES SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364 (NON COLD BOX APPLICATION).20% VALVE CASTINGS UPTO 16" AND 100% VALVE CASTINGS 18" AND ABOVE SHALL UNDERGORADIOGRAPHIC EXAMINATION.VENDOR SHALL CERTIFY SUITABILITY OF THE VALVE FOR INTENDED SERVICE. ALL CASTINGS SHALL BE SOLUTION HEAT TREATED. WELD REPAIRS, IF ANY, SHALL BE CARRIED OUT BEFORE SOLUTION HEAT TREATMENT.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVES AS PER API-600 AND TESTING AS PER API-598 & BS-6364 ARE ALSO ACCEPTABLE.

BODY

BONNET

STEM

WEDGE DISC

BODY SEAT RING

STEM PACKING

HAND WHEEL

BONNET BOLTS

BONNET NUTS

BONNET GASKET

REQUIREMENT OFGEAR OPERATOR

REQUIREMENT OFRADIOGRAPHY

SPECIAL SERVICECONDITIONS

BACK SEAT &SHOULDER

OTHERS

HYDROSTATIC TESTPRESSURE

TEST PRESSUREWITH AIR

CAST

BOLTED

RISING

FLEXIBLE

NON-RENEWABLE/RENEWABLE

RENEWABLE WITHVALVE OPEN ONSTREAM

NON RISING

CRYO

O.S & Y.

BODY : 1100 PSIG

80 PSIG

ASTM A 351 GR CF8

ASTM A 351 GR.CF8

SS 304/ SS316; (NO CASTING)

STELLITED

STELLITED

CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS

MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON

ASTM A320 GR B8 CL 2 (IMPACT TESTED)

ASTM A194 GR 8 (IMPACT TESTED)

SP WND SS316-GRAFOIL FILLER

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

MIN TEMP -196 DEG.C.

SS304

SEAT : 800 PSIG

Sheet No. 1 of 1

300 API 600/ ISO 10434RATING :SIZE RANGE : ENDS :

12

3

THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.

STANDARD:MFGRS CAT/FIG:

RATING: ENDS:

SIGNATURE&

SEALOF MANUFACTURER

GATE VALVE SPECIFICATION MANUF'S OFFER

DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL

STANDARD : 2.0" TO 24.0" FLGD TO B-16.5 RF/125AARH

PIPING CLASS : B2K

Tag No: 51446

(For category -II MRs only )

Page 65 of 77

Page 66: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

VALVE MATERIAL SPECIFICATION

GAIL LTD.Client :

PETROCHEM COMPLEXProject :

PATA UPLocation :

16/43Dept./Sect. :

JOB SPECIFICATION NO.

A096-6-44-0006 Rev. 0

Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1

Page 5 of 13

52046

52046

TAG NO. :

SHEET REV. NO.

DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009

2 3 4 5

NOTES

45678

TESTING SHALL BE AS PER BS 6364 ALSO. VALVE SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364 (NON COLD BOX APPLICATION)VENDOR SHALL CERTIFY SUITABILITY OF THE VALVE FOR THE INTENDED SERVICE.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVES AS PER BS-5352 AND TESTING AS PER BS 6755(PART-I) & BS-6364 ARE ALSO ACCEPTABLE.

BODY

BONNET

STEM

DISC

BODY SEAT RING

STEM PACKING

HAND WHEEL

BONNET BOLTS

BONNET NUTS

BONNET GASKET

OTHERS

SPECIAL SERVICECONDITIONS

BACK SEAT &SHOULDER

HYDROSTATIC TESTPRESSURE

TEST PRESSUREWITH AIR

FORGED

BOLTED

RISING

LOOSE PLUG TYPE

RENEWABLE/NONRENEWABLE

RENEWABLE WITHVALVE OPEN ONSTREAM

RISING

O S & Y

CRYO

INTEGRAL

BODY : 2900 PSIG

80 PSIG

ASTM A 182 GR.F304

ASTM A 182 GR.F304

SS 304/ SS 316; (NO CASTING)

STELLITED

STELLITED

CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS

MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON

ASTM A320 GR B8 CL 2 (IMPACT TESTED)

ASTM A194 GR.8 (IMPACT TESTED)

SP WND SS316-GRAFOIL FILLER

MIN TEMP -196 DEG. C.

SEAT : 2125 PSIG

Sheet No. 1 of 1

800 BS EN ISO 15761RATING :SIZE RANGE : ENDS :

12

3

THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.

STANDARD:MFGRS CAT/FIG:

RATING: ENDS:

SIGNATURE&

SEALOF MANUFACTURER

GLOBE VALVE SPECIFICATION MANUF'S OFFER

DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL

STANDARD : 0.5" TO 1.5" SW 3000 TO B-16.11

PIPING CLASS : A2K, B2K, D2K

Tag No: 52046

(For category -II MRs only )

Page 66 of 77

Page 67: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

VALVE MATERIAL SPECIFICATION

GAIL LTD.Client :

PETROCHEM COMPLEXProject :

PATA UPLocation :

16/43Dept./Sect. :

JOB SPECIFICATION NO.

A096-6-44-0006 Rev. 0

Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1

Page 6 of 13

52303

52303

TAG NO. :

SHEET REV. NO.

DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009

2 3 4 5

NOTES

45678

TESTING SHALL BE AS PER BS EN 12266-1 & BS-6364. VALVES SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364(FOR NONCOLD BOX APPLICATION). 20% VALVE CASTING SHALL UNDERGO RADIOGRAPHIC EXAMINATION.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVE TESTING AS PER BS 6755 (PART-I) & BS-6364 IS ALSO ACCEPTABLE.

BODY

BONNET

STEM

DISC

BODY SEAT RING

STEM PACKING

HAND WHEEL

BONNET BOLTS

BONNET NUTS

BONNET GASKET

REQUIREMENT OFGEAR OPERATOR

REQUIREMENT OFRADIOGRAPHY

OTHERS

SPECIAL SERVICECONDITION

BACK SEAT &SHOULDER

HYDROSTATIC TESTPRESSURE

TEST PRESSUREWITH AIR

CAST

BOLTED

RISING

LOOSE PLUGTYPE/BALL TYP

RENEWABLE/NONRENEWABLE

RENEWABLE WITHVALVE OPEN ONSTREAM

RISING

O S & Y

LT

BODY : 400 PSIG

80 PSIG

ASTM A 352 GR.LCB

ASTM A 352 GR.LCB

SS 304 / SS316; (NO CASTING)

STELLITED

STELLITED

CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS

MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON

ASTM A320 GR.L7

ASTM A194 GR.4 / GR.7

SP WND SS316-GRAFOIL FILLER/CORRUGATEDSS316

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

MIN TEMP. -45 DEG. C.

SS 304 / SS316

SEAT : 300 PSIG

Sheet No. 1 of 1

150 BS-1873RATING :SIZE RANGE : ENDS :

12

3

THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.

STANDARD:MFGRS CAT/FIG:

RATING: ENDS:

SIGNATURE&

SEALOF MANUFACTURER

GLOBE VALVE SPECIFICATION MANUF'S OFFER

DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL

STANDARD : 2.0" TO 16.0" FLGD TO B-16.5 RF/125AARH

PIPING CLASS : A45A, A46A, A4A

Tag No: 52303

(For category -II MRs only )

Page 67 of 77

Page 68: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

VALVE MATERIAL SPECIFICATION

GAIL LTD.Client :

PETROCHEM COMPLEXProject :

PATA UPLocation :

16/43Dept./Sect. :

JOB SPECIFICATION NO.

A096-6-44-0006 Rev. 0

Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1

Page 7 of 13

52403

52403

TAG NO. :

SHEET REV. NO.

DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009

2 3 4 5

NOTES

45678

TESTING SHALL BE AS PER BS EN 12266-1 & BS-6364 VALVES SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364 (NON COLD BOX APPLICATION). 20% VALVE CASTINGS SHALL UNDERGO RADIOGRAPHIC EXAMINATION.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVE TESTING AS PER BS 6755 (PART-I) & BS-6364 IS ALSO ACCEPTABLE.

BODY

BONNET

STEM

DISC

BODY SEAT RING

STEM PACKING

HAND WHEEL

BONNET BOLTS

BONNET NUTS

BONNET GASKET

REQUIREMENT OFGEAR OPERATOR

REQUIREMENT OFRADIOGRAPHY

OTHERS

SPECIAL SERVICECONDITION

BACK SEAT &SHOULDER

HYDROSTATIC TESTPRESSURE

TEST PRESSUREWITH AIR

CAST

BOLTED

RISING

LOOSE PLUGTYPE/BALL TYP

RENEWABLE/NONRENEWABLE

RENEWABLE WITHVALVE OPEN ONSTREAM

RISING

O S & Y

LT

BODY : 1050 PSIG

80 PSIG

ASTM A 352 GR.LCB

ASTM A 352 GR.LCB

SS 304 / SS316; (NO CASTING)

STELLITED

STELLITED

CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS

MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON

ASTM A320 GR L7

ASTM A194 GR 4 / GR.7

SP WND SS316-GRAFOIL FILLER

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

MIN TEMP -45 DEG. C.

SS 304 / SS316

SEAT : 775 PSIG

Sheet No. 1 of 1

300 BS-1873RATING :SIZE RANGE : ENDS :

12

3

THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.

STANDARD:MFGRS CAT/FIG:

RATING: ENDS:

SIGNATURE&

SEALOF MANUFACTURER

GLOBE VALVE SPECIFICATION MANUF'S OFFER

DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL

STANDARD : 2.0" TO 12.0" FLGD TO B-16.5 RF/125AARH

PIPING CLASS : B45A, B46A, B4A

Tag No: 52403

(For category -II MRs only )

Page 68 of 77

Page 69: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

VALVE MATERIAL SPECIFICATION

GAIL LTD.Client :

PETROCHEM COMPLEXProject :

PATA UPLocation :

16/43Dept./Sect. :

JOB SPECIFICATION NO.

A096-6-44-0006 Rev. 0

Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1

Page 8 of 13

52446

52446

TAG NO. :

SHEET REV. NO.

DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009

2 3 4 5

NOTES

456789

1011

TESTING SHALL BE AS PER BS EN 12266-1 & BS 6364. VALVES SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364 (NON COLD BOX APPLICATION). 20% VALVE CASTINGS SHALL UNDERGO RADIOGRAPHIC EXAMINATION.VENDOR SHALL CERTIFY SUITABILITY OF THE VALVE FOR THE INTENDED SERVICE. ALL CASTINGS SHALL BE SOLUTION HEAT TREATED. WELD REPAIR, IF ANY, SHALL BE CARRIED OUT BEFORE SOLUTION HEAT TREATMENT.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVE TESTING AS PER BS 6755 (PART-I) & BS-6364 IS ALSO ACCEPTABLE.

BODY

BONNET

STEM

DISC

BODY SEAT RING

STEM PACKING

HAND WHEEL

BONNET BOLTS

BONNET NUTS

BONNET GASKET

REQUIREMENT OFGEAR OPERATOR

REQUIREMENT OFRADIOGRAPHY

OTHERS

SPECIAL SERVICECONDITIONS

BACK SEAT &SHOULDER

HYDROSTATIC TESTPRESSURE

TEST PRESSUREWITH AIR

CAST

BOLTED

RISING

LOOSE PLUGTYPE/BALL TYP

RENEWABLE/NONRENEWABLE

RENEWABLE WITHVALVE OPEN ONSTREAM

RISING

O S & Y

CRYO

BODY : 1100 PSIG

80 PSIG

ASTM A 351 GR CF8

ASTM A 351 GR.CF8

SS 304/ SS 316; (NO CASTING)

STELLITED

STELLITED

CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS

MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON

ASTM A320 GR B8 CL 2 (IMPACT TESTED)

ASTM A194 GR.8 (IMPACT TESTED)

SP WND SS316-GRAFOIL FILLER

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

MIN TEMP -196 DEG. C.

SS304

SEAT : 800 PSIG

Sheet No. 1 of 1

300 BS-1873RATING :SIZE RANGE : ENDS :

12

3

THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.

STANDARD:MFGRS CAT/FIG:

RATING: ENDS:

SIGNATURE&

SEALOF MANUFACTURER

GLOBE VALVE SPECIFICATION MANUF'S OFFER

DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL

STANDARD : 2.0" TO 12.0" FLGD TO B-16.5 RF/125AARH

PIPING CLASS : B2K

Tag No: 52446

(For category -II MRs only )

Page 69 of 77

Page 70: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

VALVE MATERIAL SPECIFICATION

GAIL LTD.Client :

PETROCHEM COMPLEXProject :

PATA UPLocation :

16/43Dept./Sect. :

JOB SPECIFICATION NO.

A096-6-44-0006 Rev. 0

Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1

Page 9 of 13

52949

52949

TAG NO. :

SHEET REV. NO.

DATE 22/03/2012

0

NOTES

456789

10

TESTING SHALL BE AS PER API-598 & BS-6364.20% VALVE CASTING SHALL UNDERGO RADIOGRAPHIC EXAMINATION. ALL CASTINGS SHALL BE SOLUTION HEAT TREATED. WELD REPAIRS, IF ANY, SHALL BE CARRIED OUT BEFORE SOLUTION HEAT TREATMENT.VALVES SHALL BE PROVIDED WITH EXTENDED BONNET AS PER BS 6364(FOR NONCOLD BOX APPLICATION).VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSOVENDOR SHALL CERTIFY SUITABILITY OF THE VALVE FOR THE INTENDED SERVICE.

BODY

BONNET

STEM

DISC

BODY SEAT RING

STEM PACKING

HAND WHEEL

BONNET BOLTS

BONNET NUTS

BONNET GASKET

REQUIREMENT OFGEAR OPERATOR

REQUIREMENT OFRADIOGRAPHY

OTHERS

SPECIAL SERVICECONDITION

BACK SEAT &SHOULDER

HYDROSTATIC TESTPRESSURE

TEST PRESSUREWITH AIR

CAST

BOLTED

RISING

LOOSE PLUGTYPE/BALL TYP

RENEWABLE/NONRENEWABLE

RENEWABLE WITHVALVE OPEN ONSTREAM

RISING

O S & Y

BODY : 1100 PSIG

80 PSIG

ASTM A 351 GR.CF8M

ASTM A 351 GR.CF8M

SS 316

SS 316

SS 316

CORROSION INHIBITED DIE FORMED FLEXIBLEGRAPHITE WITH BRAIDED ANTI EXTRUSIONRINGS

MALLEABLE IRON/CAST ST/FAB.ST/DUCT. IRON

ASTM A193 GR B8M CL. 2 (IMPACT TESTED)

ASTM A194 GR 8M (IMPACT TESTED)

SP WND SS316-GRAFOIL FILLER

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

MIN. TEMP -110 DEG.C. & MAX. TEMP. 343 DEG.C

SS316

SEAT : 800 PSIG

Sheet No. 1 of 1

300 ANSI-B-16.34RATING :SIZE RANGE : ENDS :

12

3

THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.

STANDARD:MFGRS CAT/FIG:

RATING: ENDS:

SIGNATURE&

SEALOF MANUFACTURER

GLOBE VALVE SPECIFICATION MANUF'S OFFER

DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL

STANDARD : 0.5" TO 12.0" FLGD TO B-16.5 RF/125AARH

PIPING CLASS : B92K

Tag No: 52949

(For category -II MRs only )

Page 70 of 77

Page 71: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

VALVE MATERIAL SPECIFICATION

GAIL LTD.Client :

PETROCHEM COMPLEXProject :

PATA UPLocation :

16/43Dept./Sect. :

JOB SPECIFICATION NO.

A096-6-44-0006 Rev. 0

Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1

Page 10 of 13

53046

53046

TAG NO. :

SHEET REV. NO.

DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009

2 3 4 5

NOTES

45678

TESTING SHALL BE AS PER BS 6364 ALSO.VENDOR SHALL CERTIFY SUITABILITY OF THE VALVE FOR INTENDED SERVICE.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVES SHALL BE OF STANDARD BORE DESIGN.VALVES AS PER BS-5352 AND TESTING AS PER BS 6755(PART-I) & BS-6364 IS ALSO ACCEPTABLE .

BODY

COVER

DISC/PISTON

BODY SEAT RING

DISC HINGE/HINGEPIN

COVER STUD BOLT

COVER NUT

COVER GASKET

TYPE

OTHERS

SPECIAL SERVICECONDITIONS

WASHER,NUT,PIN

HYDROSTATIC TESTPRESSURE

TEST PRESSUREWITH AIR

FORGED

BOLTED

RENEWABLE/NON-RENEWABLE

LIFT CHECK TYPE

CRYO

BODY : 2900 PSIG

ASTM A 182 GR.F304

ASTM A 182 GR.F304

STELLITED

STELLITED

ASTM A320 GR B8 CL 2 (IMPACT TESTED)

ASTM A194 GR 8 (IMPACT TESTED)

SP WND SS316-GRAFOIL FILLER

MIN TEMP -196 DEG. C.

SEAT : 2125 PSIG

Sheet No. 1 of 1

800 BS EN ISO 15761RATING :SIZE RANGE : ENDS :

12

3

THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.

STANDARD:MFGRS CAT/FIG:

RATING: ENDS:

SIGNATURE&

SEALOF MANUFACTURER

CHECK VALVE SPECIFICATION MANUF'S OFFER

DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL

STANDARD : 0.5" TO 1.5" SW 3000 TO B-16.11

PIPING CLASS : A2K, B2K, D2K

Tag No: 53046

(For category -II MRs only )

Page 71 of 77

Page 72: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

VALVE MATERIAL SPECIFICATION

GAIL LTD.Client :

PETROCHEM COMPLEXProject :

PATA UPLocation :

16/43Dept./Sect. :

JOB SPECIFICATION NO.

A096-6-44-0006 Rev. 0

Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1

Page 11 of 13

53303

53303

TAG NO. :

SHEET REV. NO.

DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009

2 3 4 5

NOTES

4567

TESTING SHALL BE AS PER BS EN 12266-1 & BS-6364. 20% VALVE CASTINGS SHALL UNDERGO RADIOGRAPHIC EXAMINATION.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVE TESTING AS PER BS 6755 (PART-I) & BS-6364 IS ALSO ACCEPTABLE.

BODY

COVER

DISC

BODY SEAT RING

DISC HINGE

HINGE PIN

COVER STUD BOLT

COVER NUT

COVER GASKET

BY PASSES

TYPE

REQUIREMENT OFRADIOGRAPHY

OTHERS

SPECIAL SERVICECONDITIONS

WASHER,NUT,PIN

HYDROSTATIC TESTPRESSURE

TEST PRESSUREWITH AIR

CAST

BOLTED

RENEWABLE/NON-RENEWABLE

SWING CHECK TYPE

LT

BODY : 400 PSIG

ASTM A 352 GR.LCB

ASTM A 352 GR.LCB

STELLITED

STELLITED

A352 GR LCB/SS304/SSS316

SS304 / SS316(NO CASTING)

ASTM A320 GR L7

ASTM A194 GR 4/GR 7

SP WND SS316-GRAFOIL FILLER

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

MIN TEMP. -45 DEG. C.

SS 304 / SS316 (NO CASTING)

SEAT : 300 PSIG

Sheet No. 1 of 1

150 BS-1868RATING :SIZE RANGE : ENDS :

12

3

THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.

STANDARD:MFGRS CAT/FIG:

RATING: ENDS:

SIGNATURE&

SEALOF MANUFACTURER

CHECK VALVE SPECIFICATION MANUF'S OFFER

DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL

STANDARD : 2.0" TO 24.0" FLGD TO B-16.5 RF/125AARH

PIPING CLASS : A45A, A46A, A4A

Tag No: 53303

(For category -II MRs only )

Page 72 of 77

Page 73: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

VALVE MATERIAL SPECIFICATION

GAIL LTD.Client :

PETROCHEM COMPLEXProject :

PATA UPLocation :

16/43Dept./Sect. :

JOB SPECIFICATION NO.

A096-6-44-0006 Rev. 0

Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1

Page 12 of 13

53403

53403

TAG NO. :

SHEET REV. NO.

DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009

2 3 4 5

NOTES

45

67

TESTING SHALL BE AS PER BS EN 12266-1 & BS-6364.20% VALVE CASTINGS UPTO 16" AND 100% VALVE CASTINGS 18" AND ABOVE SHALL UNDERGORADIOGRAPHIC EXAMINATION.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVE TESTING AS PER BS 6755 (PART-I) & BS-6364 IS ALSO ACCEPTABLE.

BODY

COVER

DISC

BODY SEAT RING

HINGE PIN

DISC HINGE

COVER STUD BOLT

COVER NUT

COVER GASKET

BY PASSES

TYPE

REQUIREMENT OFRADIOGRAPHY

OTHERS

SPECIAL SERVICECONDITIONS

WASHER,NUT,PIN

HYDROSTATIC TESTPRESSURE

TEST PRESSUREWITH AIR

CAST

BOLTED

RENWABLE/NON-RENEWABLE

SWING CHECK TYPE

LT

BODY : 1050 PSIG

ASTM A 352 GR.LCB

ASTM A 352 GR.LCB

STELLITED

STELLITED

SS304 / SS316(NO CASTING)

SS 304/SS 316/A352 GR LCB

ASTM A320 GR L7

ASTM A194 GR 4/GR 7

SP WND SS316-GRAFOIL FILLER

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

MIN TEMP -45 DEG. C.

SS 304 / SS316(NO CASTING)

SEAT : 775 PSIG

Sheet No. 1 of 1

300 BS-1868RATING :SIZE RANGE : ENDS :

12

3

THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.

STANDARD:MFGRS CAT/FIG:

RATING: ENDS:

SIGNATURE&

SEALOF MANUFACTURER

CHECK VALVE SPECIFICATION MANUF'S OFFER

DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL

STANDARD : 2.0" TO 24.0" FLGD TO B-16.5 RF/125AARH

PIPING CLASS : B45A, B46A, B4A

Tag No: 53403

(For category -II MRs only )

Page 73 of 77

Page 74: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

VALVE MATERIAL SPECIFICATION

GAIL LTD.Client :

PETROCHEM COMPLEXProject :

PATA UPLocation :

16/43Dept./Sect. :

JOB SPECIFICATION NO.

A096-6-44-0006 Rev. 0

Copyright EIL-All rights reservedTemplate No. 5-0000-0001-T2 Rev. 1

Page 13 of 13

53446

53446

TAG NO. :

SHEET REV. NO.

DATE 02/01/1995 14/12/2000 28/05/2001 30/06/2009

2 3 4 5

NOTES

45

6789

10

TESTING SHALL BE AS PER BS EN 12266-1 & BS 6364.20% VALVE CASTINGS UPTO 16" AND 100% VALVE CASTINGS 18" AND ABOVE SHALL UNDERGORADIOGRAPHIC EXAMINATION.VENDOR SHALL CERTIFY SUITABILITY OF THE VALVE FOR INTENDED SERVICEALL CASTINGS SHALL BE SOLUTION HEAT TREATEDWELD REPAIR, IF ANY, SHALL BE CARRIED OUT BEFORE SOLUTION HEAT TREATMENT FOR VALVES.VALVES TO COMPLY WITH DESIGN REQUIREMENTS OF BS-6364 ALSO.VALVE TESTING AS PER BS 6755 (PART-I) & BS-6364 IS ALSO ACCEPTABLE.

BODY

COVER

DISC

BODY SEAT RING

HINGE PIN

DISC HINGE

COVER STUD BOLT

COVER NUT

COVER GASKET

BY PASSES

TYPE

REQUIREMENT OFRADIOGRAPHY

OTHERS

SPECIAL SERVICECONDITIONS

WASHER,NUT,PIN

HYDROSTATIC TESTPRESSURE

TEST PRESSUREWITH AIR

CAST

BOLTED

NON-RENEWABLE/RENEWABLE

SWING CHECK TYPE

CRYO

BODY : 1100 PSIG

ASTM A 351 GR CF8

ASTM A 351 GR.CF8

STELLITED

STELLITED

SS 304/ SS 316 (NO CASTING)

SS 304

ASTM A320 GR B8 CL 2 (IMPACT TESTED)

ASTM A194 GR B8 (IMPACT TESTED)

SP WND SS316-GRAFOIL FILLER

REFER TECHNICAL NOTES FOR PURCHASE OFVALVES.

MIN TEMP -196 DEG. C.

SS 304 (NO CASTING)

SEAT : 800 PSIG

Sheet No. 1 of 1

300 BS-1868RATING :SIZE RANGE : ENDS :

12

3

THIS VALVE SPEC SHEET SHALL BE READ IN CONJUNCTION WITH TECHNICAL NOTES FOR VALVES.ONLY IN THE CASE OF CATEGORY - II MRs,BIDDER SHALL CLEARLY WRITE ALL/ ANY DEVIATION AGAINSTEACH PART/ MATERIAL OF VALVE IN THE SPACE PROVIDED FOR AND WHEREVER BIDDER AGREES WITHEIL'S SPEC BIDDER SHALL INDICATE "AGREED".NO CUTTING/ OVERWRITING BY BIDDER ON EIL'S SPEC IS ALLOWED.

STANDARD:MFGRS CAT/FIG:

RATING: ENDS:

SIGNATURE&

SEALOF MANUFACTURER

CHECK VALVE SPECIFICATION MANUF'S OFFER

DESCRIPTION CONSTRUCTION CONSTRUCTION MATERIALMATERIAL

STANDARD : 2.0" TO 24.0" FLGD TO B-16.5 RF/125AARH

PIPING CLASS : B2K

Tag No: 53446

(For category -II MRs only )

Page 74 of 77

Page 75: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

ADDITIONAL TECHNICAL

REQUIREMENTS

DOCUMENT No.

A096-090-16-43-ATR-3425 Rev.A

Page 1 of 3

A 17/09/2013 ISSUED AS JOB SPECIFICATION SSP MMK AK

Rev. No Date Purpose Prepared

by Checked by Approved by

Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved

ADDITIONAL TECHNICAL REQUIREMENTS

(VALVES)

Page 75 of 77

Page 76: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

ADDITIONAL TECHNICAL

REQUIREMENTS

DOCUMENT No.

A096-090-16-43-ATR-3425 Rev.A

Page 2 of 3

Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved

ADDITIONAL TECHNICAL REQUIREMENTS (FOR VALVES)

1. Vendor to note that no correspondence shall be entered into or entertained after the bid submission.

2. Vendor shall furnish quotations only for those items, for which he can supply strictly as per MR specifications including fulfillment of Qualification Criteria as per MR.

3. The submission of price by vendor shall be construed to mean that he has confirmed compliance with all technical specifications of the corresponding item(s).

4. Bidders shall categorically confirm compliance to the following specifications attached with the requisition: a) Addition technical requirements, A096-090-16-43-ATR-3425 Rev A. b) Technical notes for Valves, 6-44-0052 Rev.6. c) Inspection and test plan for valves, 6-81-0004 Rev 6. d) Standard Specification for PMI at Vendor’s Work, 6-81-0001 Rev 2. e) Specification for quality management system requirements from

bidders, 6-78-0001 Rev 0. f) Specification for documentation requirements from suppliers, 6-78-

0003 Rev 0. g) Valve Specification Sheets: A096-6-44-0006-3425 (51046, 51303,

51403, 51446, 52046, 52303, 52403, 52446, 52949, 53046, 53303, 53403, 53446)

5. GASKETS: CA Filler is not acceptable for bonnet gaskets. Grafoil filler

is only acceptable.

STEM PACKING: Stem Packing shall be of asbestos free material. It

shall be “Corrosion Inhibited die formed flexible graphite with braided

anti extrusion rings.

6. Valves specified as LO(Lock-Open) and LC(Lock-Closed) shall be

supplied with arrangement suitable for locking in open as well as in closed

position. Lock is included in vendor’s scope.

7. Stem MOC 17-4 PH SS is acceptable in place of 13% Cr Steel.

8. M/s CEIL is also included as Third Party Inspection Agency.

9. In case of order being placed on manufacturer, only final inspection shall be Carried out and stage wise inspection reports/test results shall be reviewed

Page 76 of 77

Page 77: Table of Contents - EILtenders.eil.co.in/newtenders/userdata/Doc_Repository/A096/RFQ/A096... · Click on the Document Title to go to that section of the document Table of Contents

ADDITIONAL TECHNICAL

REQUIREMENTS

DOCUMENT No.

A096-090-16-43-ATR-3425 Rev.A

Page 3 of 3

Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved

by TPI. Stage wise inspection shall be the sole responsibility of manufacturer.

10. LT/CRYO valves shall be provided with Extended Bonnet.

11. The specification 6-44-0052-A3 Rev 6 (special requirements for LT/CRYO valves) stands deleted, bidder is suggested to quote as per his enlistment with EIL. He can also quote for the same size or less in same type, rating, metallurgy which he has supplied to EIL in past.