prbdb.gov.inprbdb.gov.in/files/tnm/mpr sep 2017.pdf · 2019. 4. 10. · output and performance...
TRANSCRIPT
MONTHLY PROGRESS REPORT SEPTEMBER–2017
Output & Performance Based Road Contract (OPRC)
(Asset Management Contract) for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works
of Road of Sangrur - Mansa - Bathinda Contract Area.
Site Office:- PATEL INFRASTRUCTURE Pvt. Ltd.
Village –Ramnagar Sibbian P.o-Sangrur. Teh-Sangrur.
Distt- Sangrur. (Punjab) Website:www.oprc.patelinfra.com
Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Improvement, Rehabilitation, Resurfacing & Routine Maintenance works of Roads of Sangrur-Mansa-Bathinda Contract Area
MPR – SEPTEMBER 2017
INDEX
S No. DESCRIPTION PAGE NO.
1 INTRODUCTION, EXECUTIVE SUMMARY & PROJECT BRIEF
2 CASH FLOW REPORT
3 PHYSICAL PROGRESS WORK SUMMARY
4 ROAD ASSET DAMAGE REPORT
5 ROAD FURNITURE REPORTS
6 NETWORK PERFORMANCE REPORT
7 INVENTORY DATA BASE REPORT
8 QUALITY CONTROL TESTS & WEATHER REPORT
9 ESMF COMPLIANCE REPORT
10 EMERGENCY WORK REPORT
MPR
1. INTRODUCTION,
EXECUTIVE
AND PROJECT
MPR – SEPTEMBER 2017
INTRODUCTION,
EXECUTIVE SUMMARY
PROJECT BRIEF
SUMMARY
MPR
2.
ESTIMATES
MPR – SEPTEMBER 2017
CASH FLOW
ESTIMATES REPORT
REPORT
MPR
3. PHYSICAL PROGRESS
WORK SUMMARY
MPR – SEPTEMBER 2017
PHYSICAL PROGRESS
WORK SUMMARY
PHYSICAL PROGRESS
MPR
4. ROAD
MPR – SEPTEMBER 2017
ROAD ASSET DAMAGE
REPORT
DAMAGE
MPR
5. ROAD
MPR – SEPTEMBER 2017
ROAD FURNITUERE
REPORTS
FURNITUERE
MPR
6PERFORMANCE
MPR – SEPTEMBER 2017
6. NETWORK PERFORMANCE REPORT
REPORT
MPR
7. INVENTORY
MPR – SEPTEMBER 2017
INVENTORY DATA BASE
REPORT
BASE
MPR
8. QUALITY CONTROL
TES
MPR – SEPTEMBER 2017
QUALITY CONTROL
TESTS & WEATHER
REPORT
QUALITY CONTROL
& WEATHER
MPR
9. ESMF
MPR – SEPTEMBER 2017
ESMF COMPLIANCE
REPORT
COMPLIANCE
MPR
10. EMERGENCY WORK
MPR – SEPTEMBER 2017
EMERGENCY WORK
REPORT
EMERGENCY WORK
MPR – SEPTEMBER 2017
1. INTRODUCTION:
� Output- and Performance-based contract for Roads is designed to increase the
efficiency and effectiveness of road asset management and maintenance. It should
ensure that the physical condition of the roads is adequate for the road users over the
entire period of the contract. This type of contract is significantly different from the
simple execution of works to the management and conservation of road assets.
� The OPRC is a model, where contractor is paid for fixed lump-sum prices for bringing
the road to a certain specified service level i.e., the Rehabilitation, Improvement and
resurfacing of the road to pre-defined standards, and then maintaining it at that level
for a relatively long period for a lump-sum periodic remuneration to cover all physical
and non-physical services provided by the Contractor, except for unforeseen emergency
works which are remunerated separately.
� Service Levels stated in the contract are defined from a road user‘s perspective and
from a ―strength of the pavement‖ point of view and include factors such as, riding
comfort, safety features, residual strength of pavement, etc.
� OPRC contract makes it necessary for the Contractor to have a good management
capacity, which means the capability to define, optimize and carry out on a timely basis
the physical interventions which are needed in the short, medium and long term, in
order to guarantee that the roads remain above the agreed Service Levels complying
with local legislation, technical and performance specifications and environmental and
social regulations.
1.1 Objective:
� To increase the efficiency and effectiveness with which the management and
maintenance of the road network is carried out.
� To maximize the value for money being spent on the development and maintenance of
the road network.
� To improve the condition and safety of the road network for the benefit of its users.
� To proactively maintain the condition of the road network within the right of way using
planned strategies and best practices available.
MPR – SEPTEMBER 2017
2. EXECUTIVE SUMMARY:
� Construction Activities:
• Various maintenance & construction activities were carried out on all the project
roads as required by relevant RUS & CPM`s.
Meetings/ Inspections / Visits:
• Contractor’s CMU team conducted internal audit for the month of August 2017
from 01.9.2017 to 03.9.2017.
• 22nd Arbitration meeting was held at PRBDB Mohali on 6.9.2017.
• Client conducted audit on 9.9.2017 for the month of August 2017.
• 23rd Arbitration hearing held on 11.9.2017 in the office of Institution of Engineers
Chandigarh.
• Executive Director, Associate Vice President, Road Manager and Project Manager
visited site and held meeting on 19.9.2017.
• Executive Engineer visited project on 19.9.2017.
• Executive Engineer, SDE, Road Manager, Project Manager and CMU Team Leader
visited the project on 23.9.2017.
• 24th and final Arbitration meeting was held on 29.9.2017 in the office of
Institution of Engineers Chandigarh.
MPR – SEPTEMBER 2017
PROJECT BRIEF:
Road Network Area Map
Road
Section
No.
Name of Contract Road Sections Classification
Length
in
(Kms)
S1 Sangrur-Sunam MDR-21 11.30
S2 Bhawanigarh-Sunam-Bhikhi-Kotshamir SH-12A 106.13
S3 Barnala-Mansa SH-13 7.29
S4 Mansa-Talwandisabo(upto intersection with B8) ODR 24.97
S5 Dhanaula-Bhikhi MDR 25.34
B8 Bathinda-Kotshamir-Talwandi Sabo(upto intersection
with S4)
SH-17 28.65
Total Contract Road Length(km) 203.68
MPR – SEPTEMBER 2017
Road Section under Improvement
Road Treatment Sections
Road No.
Length (Km)
Av.
ROW (m)
Current Paved Width
(m)
Proposed Paved width
(m)
Indicative
Conceptual Design Section
(refer
Appendix 2)
Traffic Loading Group
(MSA)
S2 SH-12A: Bhawanigarh - Sunam - Mansa - Kot Shamir
NH64 (Bhawanigarh) to
NH71 Intersection
S2 16.06 35.2 -
38
7 10 B1, B2, B3 100
NH71 Intersection
to 24.6 Km (Sunam)
S2 6.30 35.2 - 45.43
7 10 B1, B2, B3 100
26.4 km to 28.6 km S2 1.40 35.2 -
45.43 7 10 B1, B2, B3 100
28.6 km to 45.22 km
S2 16.62 35.2 - 45.43
7 10 B1, B2, B3 100
45.22 km to SH13 Intersection
(HarisinghwalaChowk)
S2 22.62 >35.2
0 7 10 B1, B2, B3 100
SH13 Intersection (HarisinghwalaCho
wk) to km 79
S2 11.16 45.72 7 10 B1, B2, B3 100
km 79 to Kotshamir (Bathinda District)
S2 12.00 45.72 7 10 B1, B2, B3 100
km 79 to Kotshamir (Bathinda District)
S2 17.77 45.72 7 10 B1, B2, B3 100
S4 ODR-6/9 Mansa - Talwandi Sabo (upto intersection with B8)
ODR9 Mansa to Talwandi Sabo
(upto intersection with B8)
S4 24.97 25.15 5.5 10 E1,E2 50
Total (Km) 128.90
MPR – SEPTEMBER 2017
Road Section under Rehabilitation
Road
Treatment Section
Road No.
Length (Km)
Av.
ROW (m)
Current Paved Width
(m)
Proposed Paved width
(m)
Indicative
Conceptual Design Section
(refer
Appendix 2)
Traffic Loading Group
(MSA)
S1 MDR-21: Sangrur–Sunam
Sangrur to Sunam
S1 11.30 18.40 10 10 C1,C2 100
S2 SH-12A: Bhawanigarh - Sunam - Mansa - Kot Shamir
24.6 Km to
26.4 Km (less Rail
Over Bridge 400m
Approx)
S2 1.40 35.2-
45.43 14 14 D 100
27.6 Km to 28.6 Km (4
lane divided carriageway)
S2 0.80 35.2-
45.43 14 14 D 100
S3 - SH13: Barnala– Mansa
S-3
Intersection Sh-12A - Intersection
Talwandi Sabo Road
S3 7.29 30.18 10 10 C1, C2, D 100
S5 ODR-14: Dhanaula–Bhikhi
NH-64
Dhanaula to SH-12A Bhikhi
S5 3.00 10.06 - 20.13
5.5 5.5 F1,F2 50
NH-64 Dhanaula to
SH-12A Bhikhi
S5 8.00 10.06 -
20.13 5.5 5.5 F1,F2 50
NH-64 Dhanaula to
SH-12A Bhikhi
S5 8.00 10.06 -
20.13 5.5 5.5 F1,F2 50
B8 SH-17: Bathinda - Kotshamir - Talwandi Sabo (upto intersection with S4)
Bathinda to Kilometre Stone 15
B8 5.80 30.05 14.5 14.5 D 50
MPR – SEPTEMBER 2017
Kilometre Stone 15 to Talwandi Sabo
B8 15.57 30.05 10 10 C1, C2 50
Talwandi Sabo B8 2.23 30.05 14 14 D 50
Talawandi Sabo to Intersection with S4
B8
5.05
20.13
10 10 C1 50
CONTRACT INFORMATION
1 Project Name
Output & Performance Based Road Contract
for Improvement, Rehabilitation, Resurfacing
& Routine Maintenance Works of Roads of
Sangrur-Mansa-BathindaArea in the State
of Punjab. (World Bank Funded Project)
2 Contract Number PSRSP/WB/OPRC/1/ICB
3 Client Public Works Department (B&R) Punjab.
4 Contractor Patel Infrastructure Pvt. Ltd.
5 Design Consultant Feedback Infrastructure Services Pvt. Ltd.
6 Total Contract Road
Length 203.680 Kms.
7 Total Project Cost /
Contract Value (INR) 596,36,14,900
8 Date Of Bidding 26th April 2012
9 Date of Signing of
Contract 10th Dec 2012
10 Start Date of Contract 05th Dec2012
11 Expected Date of
Completion 04th Dec 2022
12 Duration of Contract 10 Years
13 Advanced Payment 10% of the sum of apportioned value for
improvement, rehabilitation works.
MPR – SEPTEMBER 2017
� Present Status (Preconstruction Activities)
Sl. Tasks Remarks
A SURVEY
1 FIELD DATA SURVEY COMPLETED
2 Pavement Design Report (for S2, S5) COMPLETED
3 Typical Cross Sections (for S2, S5) COMPLETED
4 Plan and Profile (for S2, S5) COMPLETED
5 Construction Drawings - GADS for
Structures/Highway (for All Roads)
AS PER REQUIREMENT
6 FLY LEVELLING & TRAVERSING COMPLETED
7 PROPOSED CENTRELINE MARKING UNDER PROCESS
8 OGL OF INITIAL PHASE COMPLETED
9 ENVIRONMENTAL AND SOCIAL SCREENING COMPLETED
10 ENVIRONMENTAL AND SOCIAL REPORTS COMPLETED
B PLANTS & EQUIPMENTS
1 MOBILISATION OF HOT MIX PLANT COMPLETED
2 ERECTION OF HOT MIX PLANT COMPLETED
3 PLANT & EQUIPMENT FOR NETWORK
PERFORMANCE
COMPLETED
4 OTHER PLANT & EQUIPMENT FOR
REHABILITATION AND IMPROVEMENT
AS PER REQUIREMENT
D CAMP CONSTRUCTION
1 CONSTRUCTION OF LABOUR CAMP COMPLETED
2 CONSTRUCTION OF SITE OFFICE COMPLETED
3 CONSTRUCTION OF QC LABORATORY COMPLETED
4 MANPOWER
COMPLETED
F REPORTING
1 FORWARD WORK PROGRAMME REVISED WORK PROGRAMME
SUBMITTED
2 FINAL CQAMP SUBMITTED& APPROVED
3 INITIAL INVENTORY DATABASE SUBMITTED
4 TRAFFIC MANAGEMENT PLAN SUBMITTED
MPR – SEPTEMBER 2017
� Organization Chart
Road Manager (Mukesh Kumar)
HR & Adm Manager
(Pravin Kahar)
Senior Site Engineer (Pushpraj Singh)
Site Engineer Construction
(Chinu Singla, Y.N Pandey)
Material Engineer (Sanjay Pandey)
Road Assest Manager
(Vijay Sodhi)
Road Safety Officer (Ramesh Patil)
Road Safety Supervisors Sunil Kumar and Nitin Kumar
Plant & Equipment Engineer
(R.K Singh)
Contract Financial Manager (Pravin
Kahar)
Design Engineer
(Ziauddin A Khan)
Bridge Engineer
(Mr. Rashid Najfi)
Environment Specialist
(Manoj Kumar)
Social Specialist
(Minati Sinha)
IT Manager (Gopal Khatri)
Road Safety Expert (Dhanraj Nagdev)
CMU T.L.
(Sewak Singh Sidhu)
Sr. Environmentalist
(Vardan Srivastva)
Environmentalist (Mani Sharma)
Field Engineer (Pankaj Kumar)
Jr. Engineers
1. Bhupesh Sharma, 2. Charanjit Singh, 3. Vishwas Kukker
Field Engineer ( Rakesh Kumar
1.0.1_Material_Recieved_Status_September_2017
Material Received During The Month of September - 2017
Sr. No. Description Unit Previous Qty This Month Qty Up to Date QtyConsumed In
This MonthRemarks
1 G.S.B MT 4,09,380.820 583.660 4,09,964.480 583.660
2 Aggregate 40mm MT 2,30,387.866 2,30,387.866 1,169.770
3 Aggregate 20mm MT 2,76,688.348 1,292.710 2,77,981.058 1,220.700
4 Aggregate 10mm MT 2,37,938.606 199.110 2,38,137.716 1,081.530
5 Crushed Stone Dust MT 4,37,820.781 1,456.132 4,39,276.913 1,617.253
6 Sand MT 3,582.015 3,582.015
7 Steel MT 41.410 41.410
8 Cement MT 1,317.250 3.000 1,320.250 2.400
9 Bitumen MT 24,618.601 171.141 24,789.742 103.74
10 Emulsion MT 2,574.040 14.770 2,588.810 10.990
1.0.2.1_OPRC_Highway_Progress_S-5_Rehabilitation_Upto_September_2017
Rehabilitation works (0+000 to 25+340) S-5 road upto 30/09/17
Length Length
Upto
Previous
Month
Upto
Previous
Month
1 BSUG S5 LHS 3270 0 RHS 3270 0 6540
2 DBM S5 LHS 25340 0 RHS 25340 0 50680
3 BC S5 LHS 25340 0 RHS 25340 0 50680
4 RAP Work S5 LHS 2900 0 RHS 3100 0 6000
5 WMM S5 LHS 18560 0 RHS 18560 0 37120
RemarksSr.No Description Road
NameSide Side
This
month
This
monthTotal
1.0.2.2_OPRC_Highway_Progress_S2_Improvement_Rehabilitation_Upto_September_2017
Improvement works (68+000 To 79+000) S-2 road up to 30/09/17
Length (M) Length (M)Upto
PreviousMonth
UptoPrevious
MonthTotal
1 Excavation S2 LHS 11000 0 RHS 11000 0 22000
2 Subgrade S2 LHS 11000 0 RHS 11000 0 22000
3 GSB S2 LHS 11000 0 RHS 11000 0 22000
4 WMM S2 LHS 11000 0 RHS 11000 0 22000
5 DBM (Widening) S2 LHS 11000 0 RHS 11000 0 22000
6 DBM Top S2 LHS 11000 0 RHS 11000 0 22000
7 BC Top S2 LHS 11000 0 RHS 11000 0 22000
RemarksSr.No Description RoadName Side SideThis Month This Month
1.0.2.2_OPRC_Highway_Progress_S2_Improvement_Rehabilitation_Upto_September_2017
Improvement works (2+240 To 18+150) S-2 road upto 30/09/17
Length (M) Length (M)Upto
PreviousMonth
UptoPrevious
MonthTotal
1 Excavation S2 LHS 14910 0 RHS 14910 0 29820
2 Subgrade S2 LHS 14910 0 RHS 14910 0 29820
3 GSB S2 LHS 14910 0 RHS 14910 0 29820
4 WMM S2 LHS 14910 0 RHS 14910 0 29820
5 Milling of Existing Pavement S2 LHS 14910 0 RHS 14910 0 29820
6 BM S2 LHS 14910 0 RHS 14910 0 29820
7 DBM Top S2 LHS 14910 0 RHS 14910 0 29820
8 BC Top S2 LHS 14910 0 RHS 14910 0 29820
RemarksSr.No Description RoadName Side SideThis
Month This Month
1.0.2.2_OPRC_Highway_Progress_S2_Improvement_Rehabilitation_Upto_September_2017
Improvement works (45+220 To 67+840) S-2 road up to 30/09/17
Length (M) Length (M)Upto
PreviousMonth
UptoPrevious
Month
1 Excavation S2 LHS 21100 0 RHS 21100 0 42200
2 Subgrade S2 LHS 21100 0 RHS 21100 0 42200
3 GSB S2 LHS 21100 0 RHS 21100 0 42200
4 WMM Widening Ist Layer S2 LHS 21100 0 RHS 21100 0 42200
5 Milling of Existing Pavement S2 LHS 21100 0 RHS 21100 0 42200
6 WMM Top Widening & Existing S2 LHS 21100 0 RHS 21100 0 42200
7 DBM Top S2 LHS 21100 0 RHS 21100 0 42200
8 BC S2 LHS 21100 0 RHS 21100 0 42200
RemarksSr.No Description RoadName Side Side TotalThis Month This Month
1.0.2.2_OPRC_Highway_Progress_S2_Improvement_Rehabilitation_Upto_September_2017
Improvement works (18+150 To 24+400) S-2 road up to 30/09/17
Length (M) Length (M)Upto
PreviousMonth
UptoPrevious
Month
1 Excavation S2 LHS 6250 0 RHS 6250 0 12500
2 Subgrade S2 LHS 6250 0 RHS 6250 0 12500
3 GSB S2 LHS 6250 0 RHS 6250 0 12500
4 WMM Widening Ist Layer S2 LHS 6250 0 RHS 6250 0 12500
5 Milling of Existing Pavement S2 LHS 6250 0 RHS 6250 0 12500
6 WMM Top Widening & Existing S2 LHS 6250 0 RHS 6250 0 12500
7 DBM Top S2 LHS 6250 0 RHS 6250 0 12500
8 BC S2 LHS 6250 0 RHS 6250 0 12500
RemarksSr.No Description RoadName Side Side TotalThis Month This Month
1.0.2.2_OPRC_Highway_Progress_S2_Improvement_Rehabilitation_Upto_September_2017
Improvement works (79+000 to 108+770) S-2 road up to 30/09/17
Length (M) Length (M)Upto
PreviousMonth
UptoPrevious
Month
1 Excavation S2 LHS 26520 0 RHS 25450 0 51970
2 Subgrade S2 LHS 26370 0 RHS 25050 0 51420
3 GSB S2 LHS 26350 0 RHS 25050 0 51400
4 WMM Widening Ist Layer S2 LHS 26350 0 RHS 25050 0 51400
5 Milling of Existing Pavement S2 LHS 25710 0 RHS 25730 0 51440
6 WMM Top Widening & Existing S2 LHS 25710 0 RHS 25730 0 51440
7 DBM Top S2 LHS 25710 0 RHS 25730 0 51440
8 BC S2 LHS 25680 0 RHS 25670 0 51350
RemarksSr.No Description RoadName Side Side TotalThis Month This
Month
1.0.2.2_OPRC_Highway_Progress_S2_Improvement_Rehabilitation_Upto_September_2017
Length (M) Length (M)Upto
PreviousMonth
UptoPrevious
Month
1 Excavation S2 LHS 15200 0 RHS 15200 0 30400
2 Subgrade S2 LHS 15200 0 RHS 15200 0 30400
3 GSB S2 LHS 15200 0 RHS 15200 0 30400
4 WMM Widening Ist Layer S2 LHS 15200 0 RHS 15200 0 30400
5 Milling of Existing Pavement S2 LHS 15200 0 RHS 15200 0 30400
6 WMM Top Widening & Existing S2 LHS 15200 0 RHS 15200 0 30400
7 DBM Top S2 LHS 15200 0 RHS 15200 0 30400
8 BC S2 LHS 15200 0 RHS 15200 0 30400
Improvement works (28+600 to 45+200) S-2 road up to 30/09/17
RemarksSr.No Description RoadName Side Side TotalThis Month This Month
1.0.2.2_OPRC_Highway_Progress_S2_Improvement_Rehabilitation_Upto_September_2017
Length (M) Length (M)Upto
PreviousMonth
UptoPrevious
Month
1 Excavation S2 LHS 1000 0 RHS 960 0 1960
2 Subgrade S2 LHS 1000 0 RHS 960 0 1960
3 GSB S2 LHS 1000 0 RHS 960 0 1960
4 WMM Widening Ist Layer S2 LHS 1000 0 RHS 960 0 1960
5 Milling of Existing Pavement S2 LHS 1000 0 RHS 960 0 1960
6 WMM Top Widening & Existing S2 LHS 1000 0 RHS 960 0 1960
7 DBM Top S2 LHS 1000 0 RHS 960 0 1960
8 BC S2 LHS 1000 0 RHS 960 0 1960
Improvement works (8+400 to 9+400) S-2 road up to 30/09/17
Sr.No Description RoadName Side This Month Side This Month Total Remarks
1.0.2.2_OPRC_Highway_Progress_S2_Improvement_Rehabilitation_Upto_September_2017
Length (M) Length (M)Upto
PreviousMonth
UptoPrevious
Month
1 Excavation S2 LHS 2030 0 RHS 2030 0 4060
2 Subgrade S2 LHS 2030 0 RHS 2030 0 4060
3 GSB S2 LHS 2030 0 RHS 2030 0 4060
4 WMM Widening Ist Layer S2 LHS 2030 0 RHS 2030 0 4060
5 Milling of Existing Pavement S2 LHS 2030 0 RHS 2030 0 4060
6 WMM Top Widening & Existing S2 LHS 2030 0 RHS 2030 0 4060
7 DBM Top S2 LHS 2030 0 RHS 2030 0 4060
8 BC S2 LHS 2030 0 RHS 2030 0 4060
Improvement works (84+030 to 86+060) Maur Four Lane S-2 road up to 30/09/17
Sr.No Description RoadName Side This Month Side This Month Total Remarks
1.0.2.2_OPRC_Highway_Progress_S2_Improvement_Rehabilitation_Upto_September_2017
Length (M) Length (M)Upto
PreviousMonth
UptoPrevious
Month
1 Excavation S2 LHS 1505 0 RHS 1200 0 2705
2 Embankment S2 LHS 0 0 RHS 420 0 420
3 Subgrade S2 LHS 1430 0 RHS 1620 0 3050
4 GSB S2 LHS 1430 0 RHS 1620 0 3050
5 WMM Widening Ist Layer S2 LHS 1425 0 RHS 1670 0 3095
6 Milling of Existing Pavement S2 LHS 1670 0 RHS 1620 0 3290
7 WMM Top Widening & Existing S2 LHS 1420 0 RHS 1670 0 3090
8 DBM Top S2 LHS 1420 0 RHS 1650 0 3070
9 BC S2 LHS 1420 0 RHS 1400 0 2820
Improvement works (54+030 to 55+700) Bhikhi Four Lane S-2 road up to 30/09/17
Sr.No Description RoadName Side This Month Side This Month Total Remarks
1.0.2.2_OPRC_Highway_Progress_S2_Improvement_Rehabilitation_Upto_September_2017
Length (M) Length (M)Upto
PreviousMonth
UptoPrevious
Month
1 Excavation S2 LHS 1400 0 RHS 1400 0 2800
2 Subgrade S2 LHS 1400 0 RHS 1400 0 2800
3 GSB S2 LHS 1400 0 RHS 1400 0 2800
4 WMM Widening Ist Layer S2 LHS 1400 0 RHS 1400 0 2800
5 Milling of Existing Pavement S2 LHS 1400 0 RHS 1400 0 2800
6 WMM Top Widening & Existing S2 LHS 1400 0 RHS 1400 0 2800
7 DBM Top S2 LHS 1400 0 RHS 1400 0 2800
8 BC S2 LHS 1400 0 RHS 1400 0 2800
Improvement works (39+300 to 40+700) Cheema Four Lane S-2 road up to 30/09/17
Sr.No Description RoadName Side This Month Side This Month Total Remarks
1.0.2.2_OPRC_Highway_Progress_S2_Improvement_Rehabilitation_Upto_September_2017
Rehabilitation Works (24+400 to 28+600) S-2 road up to 30/09/17
Length (M) Length (M)Upto
PreviousMonth
UptoPrevious
Month
1 Milling of Existing Pavement S2 LHS 3550 0 RHS 3550 0 7100
2 WMM Top Existing S2 LHS 3550 0 RHS 3550 0 7100
3 DBM Top S2 LHS 3550 0 RHS 3550 0 7100
4 BC S2 LHS 3550 0 RHS 3550 0 7100
RemarksSr.No Description RoadName Side Side TotalThis MonthThis Month
1.0.2.3_OPRC_Highway_Progress_S3_Improvement_Upto_September_2017
Improvement works- Four Lane (182+640 to 189+930) S-3 road up to 30/09/17
Length (M) Length (M)Upto
PreviousMonth
UptoPrevious
MonthTotal
1 Clearing & Grubing S3 LHS 6560 0 RHS 6560 0 13120
2 Excavation S3 LHS 6560 0 RHS 6560 0 13120
3 Embankment S3 LHS 570 0 RHS 1040 0 1610
4 Subgrade S3 LHS 6560 0 RHS 6560 0 13120
5 GSB S3 LHS 6560 0 RHS 6560 0 13120
6 WMM Widening Ist Layer S3 LHS 6560 0 RHS 6560 0 13120
7 Milling of Existing Pavement S3 LHS 6560 0 RHS 6560 0 13120
8 WMM Top Widening & Existing S3 LHS 6560 0 RHS 6560 0 13120
9 DBM Top S3 LHS 6785 0 RHS 6785 0 13570
10 BC S3 LHS 7310 0 RHS 7310 0 14620
RemarksSr.No Description RoadName Side SideThis Month This Month
1.0.2.4_OPRC_Highway_Progress_S1_Rehabilitation_Upto_September_2017
Rehabilitation works (0+000 to 11+300) S-1 road upto 30/09/17
Length (M) Length (M)Upto
PreviousMonth
UptoPrevious
MonthTotal
1 Milling of ExistingPavement S1 LHS 11150 0 RHS 11150 0 22300
2 WMM S1 LHS 7750 0 RHS 7750 0 15500
3 Prime Coat S1 LHS 7750 0 RHS 7750 0 15500
4 Tack Coat S1 LHS 11150 0 RHS 11150 0 22300
5 DBM S1 LHS 11150 0 RHS 11150 0 22300
6 Tack Coat S1 LHS 11150 0 RHS 11150 0 22300
7 BC S1 LHS 11150 0 RHS 11150 0 22300
RemarksSr.No Description RoadName Side SideThis Month This Month
1.0.2.5_OPRC_Highway_Progress_B-8_Rehabilitation_Resurfacing_Upto_September_2017
Rehablitation Works (5+700 to 9+200) B-8 road upto 30/09/17
UptoPrevious
MonthThis Month
UptoPrevious
Month
UptoPrevious
MonthTotal
1Milling ofExisting
PavementB8 LHS 3000 0 RHS 3000 0 6000
2 WMM Top B8 LHS 3000 0 RHS 3000 0 6000
3 DBM B8 LHS 3000 0 RHS 3000 0 6000
4 BC B8 LHS 3000 0 RHS 3000 0 6000
RemarksSr.No Description RoadName Side Side
Length (M)Length (M)
1.0.2.5_OPRC_Highway_Progress_B-8_Rehabilitation_Resurfacing_Upto_September_2017
Resurfacing Works (9+200 to 37+850) B-8 road upto 31/08/17
UptoPrevious
MonthThis Month
UptoPrevious
Month
UptoPrevious
MonthTotal
1Milling ofExisting
PavementB8 LHS 28650 0 RHS 28650 0 57300
2 Prime Coat B8 LHS 28650 0 RHS 28650 0 57300
3 Tack Coat B8 LHS 28650 0 RHS 28650 0 57300
4 BC B8 LHS 28650 0 RHS 28650 0 57300
Length (M)
RemarksSr.No Description RoadName Side
Length (M)
Side
1.0.2.6_OPRC_Highway_Progress_S-4_Improvement_Upto_September_2017
Improvement works (0+000 To24+970) S-4 road upto 30/09/17
UptoPrevious
MonthThis Month
UptoPrevious
MonthThis Month Total
1 Excavation S4 LHS 24970 0 RHS 24970 0 49940
2 Subgrade S4 LHS 24970 0 RHS 24970 0 49940
3 GSB S4 LHS 24970 0 RHS 24970 0 49940
4 WMM S4 LHS 24970 0 RHS 24970 0 49940
5 DBMWidening S4 LHS 24970 0 RHS 24970 0 49940
6 DBM Top S4 LHS 24970 0 RHS 24970 0 49940
7 BC Top S4 LHS 24970 0 RHS 24970 0 49940
RemarksSr.No Description Road Name Side Side
Length (M) Length (M)
OPRC PROJECT (SANGRUR-MANSA-BATHINDA)CONTRACT AREA 1.0.3_OPRC_Culvert_Progress_Upto_date_September_-2017
SUMMARY OF UP TO DATE PROGRESS OF PIPE CULVERTS ON S-2 (BHAWANIGARH-KOTSHAMIR) ROAD SEPTEMBER -17, UNDER- 4th Year Work PROGRAM COMPLETED FOR LHS COMPLETED FOR RHS
S. NO CHAINAGE TYPE OF CULVERT ExcavationFor Head
Wall
P.C.C ForHead Wall
1st Lift ofHead Wall
Excavationfor Pipe
P.C.C ForPipe Pipe Laying Filling of
Sand/ GSB2nd Lift ofHead Wall
3rd Lift ofHead Wall
4th Lift ofHead Wall Parapet Catchpit
ExcavationFor Head
Wall
P.C.C ForHead Wall
1st Lift ofHead Wall
Excavationfor Pipe
P.C.C ForPipe Pipe Laying Filling of
Sand/GSB2nd Lift ofHead Wall
3rd Lift ofHead Wall
4th Lift ofHead Wall Parapet Catchpit
1 8+990 PIPE CULVERT 5-Nov-16 7-Nov-16 9-Nov-16 6-Nov-16 7-Nov-16 7-Nov-16 7-Nov-16 10-Nov-16 11-Nov-16 11-Nov-16 22-Nov-16 15-Oct-16 17-Oct-16 17-Oct-16 16-Oct-16 16-Oct-16 16-Oct-16 18-Oct-16 19-Oct-16 20-Oct-16 Not required 23-Oct-16 26-Oct-16
2 9+080 PIPE CULVERT 11-Nov-16 12-Nov-16 14-Nov-16 12-Nov-16 12-Nov-16 13-Nov-16 13-Nov-16 15-Nov-16 19-Nov-16 Not required 19-Nov-16 20-Nov-16 20-Nov-16 22-Nov-16 20-Nov-16 20-Nov-16 20-Nov-16 22-Nov-16 23-Nov-16 24-Nov-16 Not required 26-Nov-16
3 18+471 PIPE CULVERT 24-Jan-16 24-Jan-16 28-Jan-16 24-Jan-16 28-Jan-16 29-Jan-16 29-Jan-16 30-Jan-16 31-Jan-16 31-Jan-16 15-Feb-16 17-Feb-16 3-Feb-16 3-Feb-16 6-Feb-16 3-Feb-16 4-Feb-16 4-Feb-16 8-Feb-16 8-Feb-16 9-Feb-16 11-Feb-16 17-Feb-16 17-Feb-16
4 31+500 PIPE CULVERT 19-Jan-15 20-Jan-15 21-Jan-15 27-Jan-15 27-Jan-15 27-Jan-15 27-Jan-15 28-Jan-15 29-Jan-15 Not required 6-Jul-16 12-Jul-16 19-Jan-15 19-Jan-15 21-Jan-15 27-Jan-15 27-Jan-15 27-Jan-15 27-Jan-15 28-Jan-15 29-Jan-15 Not required 4-Jul-16 10-Jul-16
5 32+534 PIPE CULVERT 12-Apr-16 12-Apr-16 14-Apr-16 14-Apr-16 14-Apr-16 14-Apr-16 14-Apr-16 16-Apr-16 16-Apr-16 Not required 18-Apr-16 2-May-16 2-May-16 2-May-16 3-May-16 4-May-16 4-May-16 4-May-16 6-May-16 6-May-16 Not required 8-May-16 23-May-16
6 32+990 PIPE CULVERT 21-Feb-15 21-Feb-15 21-Feb-15 22-Feb-15 22-Feb-15 22-Feb-15 22-Feb-15 22-Feb-15 25-Feb-15 25-Feb-15 27-Feb-15 14-Feb-15 14-Feb-15 15-Feb-15 15-Feb-15 15-Feb-15 16-Feb-15 16-Feb-15 16-Feb-15 19-Feb-15 20-Feb-15 25-Feb-15
7 34+000 PIPE CULVERT 9-May-16 9-May-16 10-May-16 12-May-16 12-May-16 12-May-16 12-May-16 12-May-16 13-May-16 14-May-16 31-May-16 4-Feb-15 6-Feb-15 7-Feb-15 7-Feb-15 7-Feb-15 7-Feb-15 7-Feb-15 8-Feb-15 10-Feb-15 12-Feb-15 13-Feb-15 18-Feb-15
8 34+600 PIPE CULVERT 12-May-16 14-May-16 15-May-16 16-May-16 17-May-16 17-May-16 17-May-16 17-May-16 18-May-16 19-May-16 19-May-16 1-Feb-15 1-Feb-15 6-Feb-15 6-Feb-15 7-Feb-15 7-Feb-15 7-Feb-15 8-Feb-15 10-Feb-15 Not required 10-Feb-15 18-Feb-15
9 35+210 PIPE CULVERT 23-Jan-15 24-Jan-15 27-Jan-15 30-Jan-15 30-Jan-15 30-Jan-15 30-Jan-15 30-Jan-15 31-Jan-15 31-Jan-15 13-Feb-15 8-Feb-15 23-Jan-15 24-Jan-15 24-Jan-15 27-Jan-15 27-Jan-15 27-Jan-15 27-Jan-15 29-Jan-15 30-Jan-15 1-Feb-15 9-Feb-15
10 37+100 PIPE CULVERT 16-Jan-15 16-Jan-15 16-Jan-15 16-Jan-15 16-Jan-15 16-Jan-15 16-Jan-15 17-Jan-15 18-Jan-15 18-Jan-15 25-Jan-15 25-Jan-15 RHS WIDENING NOT REQUIRED
11 38+170 PIPE CULVERT 17-Jan-15 17-Jan-15 24-Jan-15 25-Jan-15 25-Jan-15 27-Jan-15 27-Jan-15 27-Jan-15 28-Jan-15 30-Jan-15 10-Feb-15 5-Feb-15 22-Jan-15 22-Jan-15 23-Jan-15 23-Jan-15 24-Jan-15 25-Jan-15 25-Jan-15 25-Jan-15 27-Jan-15 28-Jan-15 12-Feb-15 5-Feb-15
12 38+564 PIPE CULVERT 10-Jun-16 11-Jun-16 11-Jun-16 12-Jun-16 12-Jun-16 13-Jun-16 13-Jun-16 14-Jun-16 15-Jun-16 Not required 16-Jun-16 17-Jun-16 17-Jun-16 18-Jun-16 18-Jun-16 19-Jun-16 19-Jun-16 20-Jun-16 20-Jun-16 21-Jun-16 22-Jun-16 22-Jun-16 25-Jun-16 25-Jun-16
13 39+250 PIPE CULVERT 10-Jan-15 11-Jan-15 12-Jan-15 12-Jan-15 12-Jan-15 13-Jan-15 13-Jan-15 13-Jan-15 15-Jan-15 15-Jan-15 17-Jan-15 20-Jan-15 9-Jan-15 11-Jan-15 11-Jan-15 12-Jan-15 12-Jan-15 13-Jan-15 13-Jan-15 13-Jan-15 15-Jan-15 16-Jan-15 18-Jan-15 11-Feb-15
14 39+650 PIPE CULVERT 3-Mar-17 3-Mar-17 2-Mar-17 3-Mar-17 3-Mar-17 3-Mar-17 7-Mar-17 8-Mar-17 9-Mar-17 9-Mar-17 12-Mar-17 1-Mar-17 1-Mar-17 2-Mar-17 1-Mar-17 1-Mar-17 3-Mar-17 6-Mar-17 7-Mar-17 8-Mar-17 9-Mar-17 11-Mar-17
15 40+200 PIPE CULVERT 26-Apr-17 26-Apr-17 27-Apr-17 26-Apr-17 26-Apr-17 27-Apr-17 28-Apr-17 28-Apr-17 29-Apr-17 30-Apr-17 30-Apr-17 5-Mar-17 5-Mar-17 6-Mar-17 5-Mar-17 6-Mar-17 7-Mar-17 9-Mar-17 7-Mar-17 8-Mar-17 9-Mar-17 10-Mar-17 11-Mar-17
16 42+350 PIPE CULVERT 27-Sep-16 27-Sep-16 30-Sep-16 27-Sep-16 28-Sep-16 1-Oct-16 1-Oct-16 2-Oct-16 3-Oct-16 Not required 4-Oct-16 14-Oct-16 3-Oct-16 3-Oct-16 4-Oct-16 3-Oct-16 5-Oct-16 10-Oct-16 10-Oct-16 11-Oct-16 12-Oct-16 Not required 13-Oct-16 12-Oct-16
17 51+040 PIPE CULVERT 20-Nov-14 20-Nov-14 22-Nov-14 22-Nov-14 22-Nov-14 22-Nov-14 22-Nov-14 2-Jan-15 4-Jan-15 4-Jan-15 20-Nov-14 20-Nov-14 2-Jan-15 2-Jan-15 2-Jan-15 5-Jan-15 5-Jan-15 6-Jan-15 6-Jan-15 7-Jan-15
18 51+190 PIPE CULVERT 19-Nov-14 19-Nov-14 21-Nov-14 22-Nov-14 22-Nov-14 23-Nov-14 3-Jan-15 3-Jan-15 4-Jan-15 4-Jan-15 12-Dec-15 14-Dec-15 19-Nov-14 19-Nov-14 21-Nov-14 22-Nov-14 22-Nov-14 26-Nov-14 26-Nov-14 2-Jan-15 3-Jan-15 Not required 12-Dec-15 16-Dec-15
19 52+660 PIPE CULVERT 26-Nov-15 26-Nov-15 26-Nov-15 24-Nov-15 24-Nov-15 25-Nov-15 26-Nov-15 26-Nov-15 27-Nov-15 28-Nov-15 5-Dec-15 18-Dec-15 1-Dec-15 1-Dec-15 1-Dec-15 2-Dec-15 2-Dec-15 3-Dec-15 3-Dec-15 3-Dec-15 4-Dec-15 5-Dec-15 5-Dec-15 17-Dec-15
20 53+295 PIPE CULVERT 8-Nov-14 9-Nov-14 11-Nov-14 11-Nov-14 11-Nov-14 13-Nov-14 13-Nov-14 14-Nov-14 15-Nov-14 Not required 10-Dec-15 12-Dec-15 8-Nov-14 9-Nov-14 10-Nov-14 10-Nov-14 10-Nov-14 17-Nov-14 17-Nov-14 17-Nov-14 18-Nov-14 19-Nov-14 14-Dec-15
21 56+998 PIPE CULVERT 23-Jan-15 25-Jan-15 2-Feb-15 3-Feb-15 3-Feb-15 3-Feb-15 3-Feb-15 4-Feb-15 5-Feb-15 Not required 8-Feb-15 11-Feb-15 23-Jan-15 25-Jan-15 2-Feb-15 3-Feb-15 3-Feb-15 3-Feb-15 3-Feb-15 4-Feb-15 5-Feb-15 6-Feb-15 9-Feb-15 11-Feb-15
22 57+675 PIPE CULVERT 7-Nov-14 7-Nov-14 8-Nov-14 9-Nov-14 9-Nov-14 10-Nov-14 10-Nov-14 12-Nov-14 12-Nov-14 13-Nov-14 30-Nov-14 29-Nov-14 7-Nov-14 7-Nov-14 8-Nov-14 9-Nov-14 9-Nov-14 10-Nov-14 10-Nov-14 10-Nov-14 11-Nov-14 13-Nov-14 28-Nov-14 28-Nov-14
23 59+510 PIPE CULVERT 7-Aug-15 7-Aug-15 8-Aug-15 21-Aug-15 21-Aug-15 21-Aug-15 21-Aug-15 24-Aug-15 25-Aug-15 1-Sep-15 7-Aug-15 7-Aug-15 8-Aug-15 22-Aug-15 22-Aug-15 22-Aug-15 22-Aug-15 24-Aug-15 25-Aug-15 1-Sep-15
24 58+658 PIPE CULVERT 15-Jul-15 15-Jul-15 15-Jul-15 4-Aug-15 4-Aug-15 4-Aug-15 4-Aug-15 5-Aug-15 6-Aug-15 Not required 6-Aug-15 9-Aug-15 15-Jul-15 15-Jul-15 15-Jul-15 5-Nov-15 5-Nov-15 5-Nov-15 5-Nov-15 6-Aug-15 7-Aug-15 Not required 7-Aug-15 24-Aug-15
25 59+950 PIPE CULVERT 14-Sep-14 19-Sep-14 20-Sep-14 20-Sep-14 20-Sep-14 21-Sep-14 21-Sep-14 21-Sep-14 22-Sep-14 24-Sep-14 14-Sep-14 19-Sep-14 20-Sep-14 20-Sep-14 20-Sep-14 21-Sep-14 21-Sep-14 21-Sep-14 22-Sep-14 24-Sep-14
26 61+830 PIPE CULVERT 21-Sep-14 22-Sep-14 23-Sep-14 4-Oct-14 4-Oct-14 4-Oct-14 4-Oct-14 5-Oct-14 6-Oct-14 Not required 21-Sep-14 22-Sep-14 23-Sep-14 4-Oct-14 4-Oct-14 4-Oct-14 6-Oct-14 6-Oct-14 6-Oct-14 Not required
27 63+050 PIPE CULVERT 23-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 6-Sep-14 4-Sep-14 15-Sep-14 15-Sep-14 18-Sep-14 23-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 4-Sep-14 4-Sep-14 5-Sep-14 9-Sep-14 13-Sep-14
28 63+205 PIPE CULVERT 23-Aug-14 25-Aug-14 29-Aug-14 29-Aug-14 8-Sep-14 14-Sep-14 14-Sep-14 14-Sep-14 14-Sep-14 18-Sep-14 23-Aug-14 25-Aug-14 29-Aug-14 8-Sep-14 8-Sep-14 8-Sep-14 8-Sep-14 20-Sep-14 21-Sep-14 Not required1/9
OPRC PROJECT (SANGRUR-MANSA-BATHINDA)CONTRACT AREA 1.0.3_OPRC_Culvert_Progress_Upto_date_September_-2017
SUMMARY OF UP TO DATE PROGRESS OF PIPE CULVERTS ON S-2 (BHAWANIGARH-KOTSHAMIR) ROAD SEPTEMBER -17, UNDER- 4th Year Work PROGRAM COMPLETED FOR LHS COMPLETED FOR RHS
S. NO CHAINAGE TYPE OF CULVERT ExcavationFor Head
Wall
P.C.C ForHead Wall
1st Lift ofHead Wall
Excavationfor Pipe
P.C.C ForPipe Pipe Laying Filling of
Sand/ GSB2nd Lift ofHead Wall
3rd Lift ofHead Wall
4th Lift ofHead Wall Parapet Catchpit
ExcavationFor Head
Wall
P.C.C ForHead Wall
1st Lift ofHead Wall
Excavationfor Pipe
P.C.C ForPipe Pipe Laying Filling of
Sand/GSB2nd Lift ofHead Wall
3rd Lift ofHead Wall
4th Lift ofHead Wall Parapet Catchpit
29 63+320 PIPE CULVERT 23-Aug-14 24-Aug-14 2-Sep-14 7-Sep-14 7-Sep-14 9-Sep-14 9-Sep-14 10-Sep-14 12-Sep-14 14-Sep-14 23-Aug-14 24-Aug-14 31-Aug-14 7-Sep-14 7-Sep-14 7-Sep-14 14-Sep-14 16-Sep-14 16-Sep-14 20-Sep-14
30 64+360 PIPE CULVERT Widening not required 29-Mar-15 30-Mar-15 30-Mar-15 30-Mar-15 30-Mar-15 31-Mar-15 1-Apr-15 2-Apr-15 3-Apr-15 4-Apr-15
31 65+140 PIPE CULVERT 27-Mar-14 27-Mar-14 8-Apr-14 8-Apr-14 8-Apr-14 8-Apr-14 8-Apr-14 9-Apr-14 9-Apr-14 Not required 11-Apr-14 Not required 27-Mar-14 27-Mar-14 8-Apr-14 8-Apr-14 8-Apr-14 8-Apr-14 8-Apr-14 9-Apr-14 9-Apr-14 Not required 11-Apr-14 Not required
32 65+550 PIPE CULVERT 14-Apr-14 14-Apr-14 15-Apr-14 15-Apr-14 18-Apr-14 18-Apr-14 18-Apr-14 21-Apr-14 22-Apr-14 23-Apr-14 24-Apr-14 28-Apr-14 15-Apr-14 15-Apr-14 17-Apr-14 18-Apr-14 18-Apr-14 18-Apr-14 18-Apr-14 5-May-14 10-May-14 11-May-14 12-May-14 18-May-14
33 79+755 PIPE CULVERT 9-Mar-15 9-Mar-15 10-Mar-15 12-Mar-15 12-Mar-15 12-Mar-15 12-Mar-15 12-Mar-15 13-Mar-15 14-Mar-15 31-Mar-15 Not required 9-Mar-15 9-Mar-15 10-Mar-15 13-Mar-15 13-Mar-15 13-Mar-15 14-Mar-15 16-Mar-15 17-Mar-15 18-Mar-15 31-Mar-15 Not required
34 81+475 PIPE CULVERT 13-Mar-15 14-Mar-15 17-Mar-15 20-Mar-15 20-Mar-15 22-Mar-15 22-Mar-15 22-Mar-15 29-Mar-15 Not required 30-Mar-15 28-Apr-15 13-Mar-15 13-Mar-15 17-Mar-15 13-Mar-15 19-Mar-15 19-Mar-15 20-Mar-15 20-Mar-15 29-Mar-15 Not required 30-Mar-15 30-Apr-15
35 83+200 PIPE CULVERT 27-Jun-15 28-Jun-15 28-Jun-15 3-Jul-15 3-Jul-15 3-Jul-15 3-Jul-15 4-Jul-15 4-Jul-15 5-Jul-15 7-Jul-15 9-Jul-15 27-Jun-15 28-Jun-15 28-Jun-15 29-Jun-15 29-Jun-15 29-Jun-15 29-Jun-15 3-Jul-15 4-Jul-15 4-Jul-15 6-Jul-15 11-Jul-15
36 82+368 PIPE CULVERT 3-Apr-16 3-Apr-16 5-Apr-16 7-Apr-16 7-Apr-16 7-Apr-16 7-Apr-16 11-Apr-16 12-Apr-16 Not required 13-Apr-16 7-May-16 17-Mar-16 19-Mar-16 20-Mar-16 20-Mar-16 21-Mar-16 26-Mar-16 26-Mar-16 31-Mar-16 2-Apr-16 2-Apr-16 19-Apr-16 7-May-16
37 83+459 PIPE CULVERT 4-Apr-16 4-Apr-16 7-Apr-16 7-Apr-16 7-Apr-16 7-Apr-16 7-Apr-16 9-Apr-16 10-Apr-16 Not required 11-Apr-16 6-May-16 20-Mar-16 20-Mar-16 22-Mar-16 23-Mar-16 23-Mar-16 26-Mar-16 26-Mar-16 2-Apr-16 2-Apr-16 Not required 3-May-16 7-May-16
38 85+620 PIPE CULVERT 19-Mar-15 19-Mar-15 19-Mar-15 19-Mar-15 7-Apr-15 13-Apr-15 13-Apr-15 13-Apr-15 14-Apr-15 Not required 15-Apr-15 21-Apr-15 13-Apr-15 13-Apr-15 14-Apr-15 14-Apr-15 14-Apr-15 14-Apr-15 14-Apr-15 21-Apr-15 22-Apr-15 Not required 23-Apr-15
39 85+620PIPE CULVERT
(Widening For FourLane)
29-Nov-16 29-Nov-16 30-Nov-16 29-Nov-16 29-Nov-16 30-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 Not required 7-Dec-16 7-Dec-16 2-Dec-16 2-Dec-16 3-Dec-16 3-Dec-16 3-Dec-16 3-Dec-16 3-Dec-16 5-Dec-16 5-Dec-16 Not required 6-Dec-16 7-Dec-16
40 88+090 PIPE CULVERT 5-Apr-15 5-Apr-15 6-Apr-15 7-Apr-15 7-Apr-15 8-Apr-15 8-Apr-15 8-Apr-15 14-Apr-15 15-Apr-15 16-Apr-15 23-Apr-15 5-Apr-15 5-Apr-15 6-Apr-15 7-Apr-15 7-Apr-15 8-Apr-15 8-Apr-15 10-Apr-15 11-Apr-15 12-Apr-15 16-Apr-15 23-Apr-15
41 88+435 PIPE CULVERT 8-Apr-15 19-Apr-15 21-Apr-15 24-Apr-15 24-Apr-15 24-Apr-15 24-Apr-15 24-Apr-15 25-Apr-15 Not required 2-May-15 30-May-15 8-Apr-15 8-Apr-15 12-Apr-15 13-Apr-15 13-Apr-15 24-Apr-15 24-Apr-15 24-Apr-15 25-Apr-15 2-May-15 6-May-15 30-May-15
42 89+515 PIPE CULVERT 30-May-15 30-May-15 31-May-15 1-Jun-15 1-Jun-15 1-Jun-15 1-Jun-15 1-Jun-15 2-Jun-15 Not required 16-Jun-15 30-May-15 30-May-15 31-May-15 1-Jun-15 1-Jun-15 1-Jun-15 1-Jun-15 1-Jun-15 15-Jun-15 Not required 15-Jun-15
43 92+350 PIPE CULVERT 10-May-15 10-May-15 12-May-15 12-May-15 12-May-15 12-May-15 12-May-15 13-May-15 14-May-15 Not required 15-May-15 8-May-15 10-May-15 12-May-15 12-May-15 12-May-15 12-May-15 12-May-15 13-May-15 14-May-15 Not required 15-May-15
44 95+360 PIPE CULVERT 25-Apr-15 25-Apr-15 25-Apr-15 26-Apr-15 26-Apr-15 26-Apr-15 26-Apr-15 26-Apr-15 28-Apr-15 Not required 29-Apr-15 28-May-15 25-Apr-15 25-Apr-15 25-Apr-15 28-Apr-15 28-Apr-15 28-Apr-15 28-Apr-15 28-Apr-15 1-May-15 Not required 6-May-15 27-May-15
45 95+610 PIPE CULVERT 26-Apr-15 26-Apr-15 27-Apr-15 28-Apr-15 28-Apr-15 28-Apr-15 28-Apr-15 29-Apr-15 30-Apr-15 1-May-15 2-May-15 16-May-15 26-Apr-15 27-Apr-15 27-Apr-15 28-Apr-15 28-Apr-15 28-Apr-15 28-Apr-15 29-Apr-15 30-Apr-15 Not required 2-May-15 16-May-15
46 98+020 PIPE CULVERT 4-Jun-15 6-Jun-15 6-Jun-15 6-Jun-15 6-Jun-15 14-Jun-15 14-Jun-15 9-Jul-15 10-Jul-15 Not required 17-Jul-15 1-Aug-15 4-Jun-15 6-Jun-15 6-Jun-15 6-Jun-15 6-Jun-15 14-Jun-15 14-Jun-15 10-Jul-15 17-Jul-15 18-Jul-15 19-Jul-15 1-Aug-15
47 101+220 PIPE CULVERT 1-Jun-16 1-Jun-16 1-Jun-16 2-Jun-16 2-Jun-16 3-Jun-16 3-Jun-16 4-Jun-16 5-Jun-16 Not required 7-Jun-16 29-Jun-16 5-Jun-16 5-Jun-16 6-Jun-16 6-Jun-16 7-Jun-16 7-Jun-16 7-Jun-16 8-Jun-16 9-Jun-16 Not required 29-Jun-16 30-Jun-16
48 101+460 PIPE CULVERT 2-Jun-16 3-Jun-16 4-Jun-16 4-Jun-16 4-Jun-16 19-Jun-16 19-Jun-16 21-Jun-16 22-Jun-16 Not required 28-Jun-16 25-Jun-16 2-Jul-16 2-Jul-16 4-Jul-16 5-Jul-16 5-Jul-16 5-Jul-16 5-Jul-16 6-Jul-16 7-Jul-16 8-Jul-16 9-Jul-16 12-Jul-16
49 101+850 PIPE CULVERT 7-Jun-15 20-Jul-15 22-Jul-15 28-Jul-15 28-Jul-15 28-Jul-15 28-Jul-15 29-Jul-15 30-Jul-15 31-Jul-15 1-Aug-15 9-Aug-15 7-Jun-15 20-Jul-15 22-Jul-15 27-Jul-15 27-Jul-15 27-Jul-15 27-Jul-15 28-Jul-15 29-Jul-15 30-Jul-15 1-Aug-15 13-Aug-15
50 103+805 PIPE CULVERT 8-Jul-15 8-Jul-15 6-Dec-15 6-Dec-15 6-Dec-15 6-Dec-15 6-Dec-15 26-Jun-16 27-Jun-16 28-Jun-16 30-Jun-16 14-Jul-16 8-Jul-15 8-Jul-15 10-Jun-16 10-Jun-16 11-Jun-16 11-Jun-16 11-Jun-16 12-Jun-16 12-Jun-16 13-Jun-16 21-Jun-16 16-Jul-16
51 107+137 PIPE CULVERT 3-Aug-15 2-Jun-16 2-Jun-16 3-Jun-16 3-Jun-16 4-Jun-16 4-Jun-16 4-Jun-16 5-Jun-16 6-Jun-16 19-Jun-16 3-Aug-15 2-Jun-16 3-Jun-16 3-Jun-16 4-Jun-16 4-Jun-16 4-Jun-16 6-Jun-16 7-Jun-16 8-Jun-16 12-Jun-16 15-Jun-16
52 108+050 PIPE CULVERT 3-Aug-15 2-Jun-16 2-Jun-16 3-Jun-16 3-Jun-16 4-Jun-16 4-Jun-16 4-Jun-16 5-Jun-16 6-Jun-16 19-Jun-16 3-Aug-15 2-Jun-16 3-Jun-16 3-Jun-16 4-Jun-16 4-Jun-16 4-Jun-16 6-Jun-16 7-Jun-16 8-Jun-16 12-Jun-16 15-Jun-16
51 51 51 51 51 51 49 51 51 29 43 33 51 51 51 51 51 51 50 51 51 31 41 36
2/9
OPRC PROJECT (SANGRUR-MANSA-BATHINDA)CONTRACT AREA 1.0.3_OPRC_Culvert_Progress_Upto_date_September_-2017
SUMMARY OF UP TO DATE PROGRESS OF SLAB CULVERTS ON S-2 (BHAWANIGARH-KOTSHAMIR) ROAD SEPTEMBER -17, 4th Year Work Program COMPLETED FOR LHS COMPLETED FOR RHS
S. NO CHAINAGE TYPE OF CULVERTExcavation P.C.C Abutment Bed Block Dirt Wall Slab Parapet Catchpit Excavation P.C.C Abutment Bed Block Dirt Wall Slab Parapet Catchpit
1 8+385 SLAB CULVERT 26-Mar-16 26-Mar-16 1-Apr-16 9-Apr-16 9-Apr-16 9-Apr-16 12-Apr-16 11-Apr-16 14-Apr-16 15-Apr-16 19-Apr-16 20-Apr-16 20-Apr-16 21-Apr-16 3-May-16
2 9+165 SLAB CULVERT 27-Mar-16 4-Apr-16 4-Apr-16 5-Apr-16 5-Apr-16 5-Apr-16 12-Apr-16 8-Apr-16 15-Apr-16 16-Apr-16 19-Apr-16 20-Apr-16 21-Apr-16 21-Apr-16 27-Apr-16
3 19+016 SLAB CULVERT 26-Feb-16 26-Feb-16 29-Feb-16 29-Feb-16 29-Feb-16 8-Mar-16 10-Mar-16 Not Required 11-Mar-16 11-Mar-16 13-Mar-16 16-Mar-16 19-Mar-16 21-Mar-16 23-Mar-16 Not Required
4 21+040 SLAB CULVERT 10-Feb-16 11-Feb-16 18-Feb-16 18-Feb-16 18-Feb-16 18-Feb-16 2-Mar-16 Not Required 23-Feb-16 23-Feb-16 25-Feb-16 26-Feb-16 26-Feb-16 1-Mar-16 2-Mar-16 Not Required
5 21+376 SLAB CULVERT 30-Jan-16 1-Feb-16 9-Feb-16 11-Feb-16 15-Feb-16 13-Feb-16 16-Feb-16 Not Required 18-Feb-16 18-Feb-16 20-Feb-16 21-Feb-16 22-Feb-16 22-Feb-16 29-Feb-16 Not Required
6 22+437 SLAB CULVERT 24-Jan-16 30-Jan-16 31-Jan-16 6-Feb-16 3-Feb-16 12-Feb-16 16-Feb-16 Not Required 19-Feb-16 21-Feb-16 23-Feb-16 24-Feb-16 24-Feb-16 28-Feb-16 29-Feb-16 Not Required
7 22+850 SLAB CULVERT 31-Jan-16 31-Jan-16 5-Feb-16 8-Feb-16 12-Feb-16 12-Feb-16 28-Feb-16 Not Required 16-Feb-16 16-Feb-16 18-Feb-16 19-Feb-16 18-Feb-16 18-Feb-16 28-Feb-16 Not Required
8 26+150 SLAB CULVERT 27-Aug-16
9 29+555 SLAB CULVERT 18-Apr-16 25-Jun-16 26-Jun-16 26-Jun-16 27-Jun-16 27-Jun-16 29-Jun-16 30-Jun-16 15-May-16 15-May-16 16-May-16 16-May-16 17-May-16 25-May-16 27-May-16
10 29+480 SLAB CULVERT 4-Feb-15 5-Feb-15 6-Feb-15 6-Feb-15 6-Feb-15 7-Feb-15 14-Feb-15
11 29+850 SLAB CULVERT 20-Jan-15 21-Jan-15 24-Jan-15 27-Jan-15 27-Jan-15 29-Jan-15 21-Jan-15 21-Jan-15 28-Jan-15 28-Jan-15 28-Jan-15 29-Jan-15 6-Feb-15
12 29+944 SLAB CULVERT 9-May-16 9-May-16 11-May-16 11-May-16 12-May-16 12-May-16 13-May-16 16-May-16 17-May-16 18-May-16 18-May-16 19-May-16 20-May-16 23-May-16
13 30+650 SLAB CULVERT 18-Jan-15 19-Jan-15 22-Jan-15 23-Jan-15 23-Jan-15 24-Jan-15 2-Feb-15 18-Jan-15 18-Jan-15 20-Jan-15 23-Jan-15 23-Jan-15 24-Jan-15 1-Feb-15
14 32+100 SLAB CULVERT 18-Jan-15 18-Jan-15 22-Jan-15 24-Jan-15 24-Jan-15 29-Jan-15 18-Jan-15 18-Jan-15 22-Jan-15 24-Jan-15 24-Jan-15 29-Jan-15
15 32+300 SLAB CULVERT 18-Jan-15 18-Jan-15 18-Jan-15 19-Jan-15 19-Jan-15 20-Jan-15 12-May-16 3-Mar-15 18-Jan-15 19-Jan-15 19-Jan-15 19-Jan-15 19-Jan-15 20-Jan-15 3-Mar-15
16 33+725 SLAB CULVERT 13-Apr-16 13-Apr-16 14-Apr-16 14-May-16 15-May-16 18-May-16 20-May-16 1-Jul-16 31-Jan-15 31-Jan-15 1-Feb-15 3-Feb-15 3-Feb-15 6-Feb-15
17 34+730 SLAB CULVERT 16-Jan-15 17-Jan-15 17-Jan-15 20-Jan-15 20-Jan-15 22-Jan-15 9-Feb-15 17-Jan-15 18-Jan-15 18-Jan-15 20-Jan-15 20-Jan-15 22-Jan-15 9-Feb-15
18 35+770 SLAB CULVERT 29-Jan-15 30-Jan-15 30-Jan-15 30-Jan-15 30-Jan-15 31-Jan-15 9-Feb-15 29-Jan-15 30-Jan-15 30-Jan-15 30-Jan-15 30-Jan-15 31-Jan-15
19 35+810 SLAB CULVERT 14-May-16 18-May-16 21-May-16 25-May-16 25-May-16 25-May-16 26-Jun-16 27-Jun-16 27-May-16 27-May-16 29-May-16 29-May-16 29-May-16 30-May-16 31-May-16 27-Jun-16
20 36+130 SLAB CULVERT 5-Oct-16 5-Oct-16 10-Oct-16 10-Oct-16 10-Oct-16 12-Oct-16 15-Oct-16 Not Required 11-Oct-16 12-Oct-16 14-Oct-16 16-Oct-16 18-Oct-16 20-Oct-16 23-Oct-16
21 36+484 SLAB CULVERT 20-Jul-16 21-Jul-16 21-Jul-16 22-Jul-16 23-Jul-16 24-Jul-16 25-Jul-16 Not Required 22-Jul-16 23-Jul-16 23-Jul-16 23-Jul-16 23-Jul-16 24-Jul-16 27-Jul-16
22 40+660 SLAB CULVERT 28-Feb-17 28-Feb-17 1-Mar-17 2-Mar-17 2-Mar-17 4-Mar-17 5-Mar-17 4-Mar-17 26-Feb-17 26-Feb-17 28-Feb-17 1-Mar-17 1-Mar-17 4-Mar-17 3-Mar-17 4-Mar-17
3/9
OPRC PROJECT (SANGRUR-MANSA-BATHINDA)CONTRACT AREA 1.0.3_OPRC_Culvert_Progress_Upto_date_September_-2017
SUMMARY OF UP TO DATE PROGRESS OF SLAB CULVERTS ON S-2 (BHAWANIGARH-KOTSHAMIR) ROAD SEPTEMBER -17, 4th Year Work Program COMPLETED FOR LHS COMPLETED FOR RHS
S. NO CHAINAGE TYPE OF CULVERTExcavation P.C.C Abutment Bed Block Dirt Wall Slab Parapet Catchpit Excavation P.C.C Abutment Bed Block Dirt Wall Slab Parapet Catchpit
23 44+520 SLAB CULVERT 10-Jan-15 10-Jan-15 13-Jan-15 13-Jan-15 13-Jan-15 15-Jan-15 Not required Not Required 10-Jan-15 10-Jan-15 13-Jan-15 13-Jan-15 13-Jan-15 15-Jan-15
24 45+105 SLAB CULVERT 14-Feb-15 15-Feb-15 19-Feb-15 24-Feb-15 24-Feb-15 27-Feb-15 9-Mar-15 Not Required 18-Feb-15 18-Feb-15 18-Feb-15 19-Feb-15 19-Feb-15 24-Feb-15 8-Mar-15
25 45+690 SLAB CULVERT 15-Feb-15 15-Feb-15 15-Feb-15 15-Feb-15 15-Feb-15 18-Feb-15 8-Mar-15 5-Mar-15 15-Feb-15 15-Feb-15 16-Feb-15 18-Feb-15 18-Feb-15 19-Feb-15 7-Mar-15 7-Mar-15
26 45+750 SLAB CULVERT 2-Nov-15 2-Nov-15 2-Nov-15 3-Nov-15 3-Nov-15 5-Nov-15 21-Nov-15 7-Nov-15 8-Nov-15 8-Nov-15 9-Nov-15 17-Nov-15 19-Nov-15 21-Nov-15
27 46+545 SLAB CULVERT 2-May-15 2-May-15 2-May-15 4-May-15 8-May-15 9-May-15 Not required 6-May-15 6-May-15 6-May-15 6-May-15 7-May-15 9-May-15 10-May-15
28 47+050 SLAB CULVERT 10-May-15 10-May-15 12-May-15 19-May-15 20-May-15 20-May-15 30-May-15 11-May-15 11-May-15 12-May-15 19-May-15 20-May-15 20-May-15 4-Jun-15
29 48+117 SLAB CULVERT 10-May-15 10-May-15 15-May-15 18-May-15 18-May-15 22-May-15 Not required 6-Jun-15 10-May-15 10-May-15 16-May-15 16-May-15 16-May-15 22-May-15 6-Jun-15
30 49+408 SLAB CULVERT 16-Oct-15 16-Oct-15 16-Oct-15 17-Oct-15 17-Oct-15 17-Oct-15 21-Nov-15 1-Nov-15 1-Nov-15 1-Nov-15 2-Nov-15 3-Nov-15 4-Nov-15 21-Nov-15
31 49+575 SLAB CULVERT 25-Nov-14 25-Nov-14 8-Dec-14 8-Dec-14 8-Dec-14 8-Feb-15 Not required 25-Nov-14 25-Nov-14 7-Dec-14 7-Dec-14 7-Dec-14 8-Feb-15
32 50+050 SLAB CULVERT 20-Nov-14 20-Nov-14 24-Nov-14 24-Nov-14 24-Nov-14 27-Nov-14 2-Dec-14 20-Nov-14 20-Nov-14 21-Nov-14 24-Nov-14 24-Nov-14 26-Nov-14 3-Dec-14
33 51+234 SLAB CULVERT 5-Jan-15 6-Jan-15 8-Jan-15 10-Jan-15 10-Jan-15 11-Jan-15 Not required 8-Jan-15 8-Jan-15 10-Jan-15 10-Jan-15 10-Jan-15 12-Jan-15
34 51+360 SLAB CULVERT 19-Nov-14 19-Nov-14 20-Nov-14 22-Nov-14 22-Nov-14 23-Nov-14 Not required 10-Dec-14 19-Nov-14 19-Nov-14 21-Nov-14 22-Nov-14 22-Nov-14 23-Nov-14 10-Dec-14
35 51+868 SLAB CULVERT 17-Nov-15 18-Nov-15 18-Nov-15 19-Nov-15 20-Nov-15 21-Nov-15 28-Nov-15 18-Oct-15 18-Oct-15 18-Oct-15 18-Oct-15 18-Oct-15 1-Nov-15 28-Nov-15
36 52+037 SLAB CULVERT 9-Nov-14 9-Nov-14 14-Nov-14 15-Nov-14 15-Nov-14 11-Feb-15 Not required 9-Nov-14 9-Nov-14 13-Nov-14 15-Nov-14 15-Nov-14 11-Feb-15
37 53+948 SLAB CULVERT 7-Nov-14 7-Nov-14 17-Nov-14 17-Nov-14 17-Nov-14 18-Nov-14 20-Nov-14 12-Feb-17 12-Feb-17 14-Feb-17 15-Feb-17 15-Feb-17 16-Feb-17 17--2-16 17-Feb-17
38 54+535 SLAB CULVERT 24-Dec-16 25-Dec-16 26-Dec-16 27-Dec-16 27-Dec-16 27-Dec-16 27-Dec-16 24-Dec-16 25-Dec-16 26-Dec-16 27-Dec-16 27-Dec-16 27-Dec-16
39 54+720 SLAB CULVERT 15-Dec-16 16-Dec-16 18-Dec-16 19-Dec-16 19-Dec-16 19-Dec-16 22-Dec-16 23-Dec-16 10-Dec-16 12-Dec-16 15-Dec-16 16-Dec-16 16-Dec-16 19-Dec-16 20-Dec-16 22-Dec-16
40 55+625 SLAB CULVERT 27-Dec-16 27-Dec-16 28-Dec-16 28-Dec-16 28-Dec-16 30-Dec-16 2-Jan-17 31-Dec-16 28-Dec-16 28-Dec-16 29-Dec-16 30-Dec-16 30-Dec-16 30-Dec-16 3-Jan-17 31-Dec-16
41 55+715 SLAB CULVERT 8-Nov-14 10-Nov-14 10-Nov-14 12-Nov-14 12-Nov-14 13-Nov-14 9-Dec-14 8-Nov-14 10-Nov-14 11-Nov-14 12-Nov-14 12-Nov-14 13-Nov-14 9-Dec-14
42 56+020 SLAB CULVERT 22-Nov-14 27-Nov-14 28-Nov-14 29-Nov-14 29-Nov-14 30-Nov-14 6-Dec-14 4-Dec-14 22-Nov-14 27-Nov-14 28-Nov-14 29-Nov-14 29-Nov-14 30-Nov-14 6-Dec-14 4-Dec-14
43 56+470 SLAB CULVERT 29-Oct-14 29-Oct-14 30-Oct-14 4-Nov-14 4-Nov-14 5-Nov-14 12-Nov-14 14-Feb-15 29-Oct-14 29-Oct-14 30-Oct-14 4-Nov-14 4-Nov-14 5-Nov-14 14-Nov-14 14-Feb-15
44 57+075 SLAB CULVERT 5-Nov-14 5-Nov-14 9-Nov-14 9-Nov-14 9-Nov-14 10-Nov-14 26-Dec-14 5-Nov-14 5-Nov-14 9-Nov-14 9-Nov-14 9-Nov-14 10-Nov-14 12-Nov-14 29-Dec-15
4/9
OPRC PROJECT (SANGRUR-MANSA-BATHINDA)CONTRACT AREA 1.0.3_OPRC_Culvert_Progress_Upto_date_September_-2017
SUMMARY OF UP TO DATE PROGRESS OF SLAB CULVERTS ON S-2 (BHAWANIGARH-KOTSHAMIR) ROAD SEPTEMBER -17, 4th Year Work Program COMPLETED FOR LHS COMPLETED FOR RHS
S. NO CHAINAGE TYPE OF CULVERTExcavation P.C.C Abutment Bed Block Dirt Wall Slab Parapet Catchpit Excavation P.C.C Abutment Bed Block Dirt Wall Slab Parapet Catchpit
45 57+490 SLAB CULVERT 24-Sep-14 27-Sep-14 27-Oct-14 28-Oct-14 6-Nov-14 6-Nov-14 16-Nov-14 12-Feb-15 5-Nov-14 5-Nov-14 9-Nov-14 9-Nov-14 9-Nov-14 10-Nov-14 12-Nov-14 24-Dec-15
46 57+687 SLAB CULVERT 13-Oct-14 26-Oct-14 26-Oct-14 28-Oct-14 6-Nov-14 7-Nov-14 1-Dec-14 2-Dec-14 26-Sep-14 26-Sep-14 13-Oct-14 26-Oct-14 6-Nov-14 8-Nov-14 3-Dec-14 4-Dec-14
47 57+945 SLAB CULVERT 25-Sep-14 29-Sep-14 9-Oct-14 12-Oct-14 12-Oct-14 14-Oct-14 21-Oct-14 11-Dec-14 25-Sep-14 29-Sep-14 9-Oct-14 12-Oct-14 12-Oct-14 14-Oct-14 21-Oct-14 11-Dec-14
48 58+182 SLAB CULVERT 25-Sep-14 29-Sep-14 1-Oct-14 1-Oct-14 1-Oct-14 9-Oct-14 19-Oct-14 20-Oct-14 25-Sep-14 29-Sep-14 8-Oct-14 8-Oct-14 8-Oct-14 9-Oct-14 19-Oct-14 22-Oct-14
49 59+650 SLAB CULVERT 26-Sep-14 26-Sep-14 29-Sep-14 30-Sep-14 30-Sep-14 2-Oct-14 17-Oct-14 20-Oct-14 26-Sep-14 26-Sep-14 28-Sep-14 30-Sep-14 30-Sep-14 2-Oct-14 17-Oct-14 18-Oct-14
50 59+745 SLAB CULVERT 10-Dec-14 12-Dec-14 13-Dec-14 15-Dec-14 16-Dec-14 18-Dec-14 2-Jan-15 Not Required 10-Dec-14 11-Dec-14 12-Dec-14 14-Dec-14 14-Dec-14 16-Dec-14 31-Dec-14 Not Required
51 63+480 SLAB CULVERT 25-Mar-14 25-Mar-14 4-Apr-14 4-Apr-14 4-Apr-14 9-May-14 Not Required 25-Mar-14 25-Mar-14 4-Apr-14 4-Apr-14 4-Apr-14 9-May-14
52 63+580 SLAB CULVERT
53 73+400 SLAB CULVERT(Widening)
5-Aug-16 6-Aug-16 10-Aug-16 16-Aug-16 16-Aug-16 17-Aug-16 17-Aug-16 Not Required 18-Mar-17 19-Mar-17 19-Mar-17 19-Mar-17 20-Mar-17 20-Mar-17 21-Mar-17 Not Required
54 74+085 SLAB CULVERT(Widening)
1-Sep-16 1-Sep-16 2-Sep-16 2-Sep-16 11-Sep-16 11-Sep-16 12-Sep-16
55 75+310 SLAB CULVERT(Widening)
17-Aug-16 17-Aug-16 23-Aug-16 26-Aug-16 1-Sep-16 1-Sep-16 3-Sep-16 10-Sep-16 17-Aug-16 17-Aug-16 24-Aug-16 31-Aug-16 1-Sep-16 1-Sep-16 5-Sep-16 10-Sep-16
56 80+273 SLAB CULVERT(Widening)
9-Mar-15 9-Mar-15 10-Mar-15 13-Mar-15 13-Mar-15 19-Mar-15 29-Nov-15 22-Jul-16 9-Mar-15 9-Mar-15 12-Mar-15 14-Mar-15 20-Mar-15 21-Mar-15 29-Nov-15 22-Jul-16
57 80+273 SLAB CULVERT(Existing)
25-Mar-16 26-Mar-16 28-Mar-16 30-Mar-16 30-Mar-16 31-Mar-16 9-Mar-16 10-Mar-16 11-Mar-16 14-Mar-16 19-Mar-16 20-Mar-16
58 80+560 SLAB CULVERT 9-Mar-15 9-Mar-15 11-Mar-15 11-Mar-15 11-Mar-15 14-Mar-15 15-May-15 13-May-15 9-Mar-15 9-Mar-15 10-Mar-15 10-Mar-15 10-Mar-15 14-Mar-15 14-May-15 13-May-15
59 80+784 SLAB CULVERT(Widening)
10-Mar-15 10-Mar-15 13-Mar-15 16-Mar-15 19-Mar-15 19-Mar-15 2-May-15 11-May-15 11-Mar-15 11-Mar-15 14-Mar-15 16-Mar-15 21-Mar-15 21-Mar-15 6-May-15 11-May-15
60 80+784 SLAB CULVERT(Existing)
27-Mar-16 27-Mar-16 28-Mar-16 30-Mar-16 6-Apr-16 8-Apr-16 10-Mar-16 11-Mar-16 13-Mar-16 14-Mar-16 19-Mar-16 19-Mar-16
61 81+675 SLAB CULVERT(Existing+widening)
25-Mar-16 26-Mar-16 27-Mar-16 30-Mar-16 6-Apr-16 8-Apr-16 9-Apr-16 24-Jul-16 12-Mar-16 13-Mar-16 14-Mar-16 15-Mar-16 20-Mar-16 20-Mar-16 21-Mar-16 25-Jul-16
62 82+025 SLAB CULVERT 15-Mar-15 15-Mar-15 17-Mar-15 18-Mar-15 31-Mar-15 31-Mar-15 25-Apr-15 21-Apr-15 15-Mar-15 15-Mar-15 18-Mar-15 18-Mar-15 31-Mar-15 31-Mar-15 25-Apr-15 21-Apr-15
63 82+400 SLAB CULVERT 15-Mar-15 15-Mar-15 17-Mar-15 22-Mar-15 23-Mar-15 2-Apr-15 7-Apr-15 7-Apr-15 15-Mar-15 15-Mar-15 18-Mar-15 22-Mar-15 23-Mar-15 2-Apr-15 9-Apr-15 8-Apr-15
64 83+270 SLAB CULVERT 18-Mar-15 18-Mar-15 19-Mar-15 20-Mar-15 22-Mar-15 22-Mar-15 3-Apr-15 31-Mar-15 17-Mar-15 17-Mar-15 18-Mar-15 20-Mar-15 22-Mar-15 22-Mar-15 3-Apr-15 31-Mar-15
65 84+200 SLAB CULVERT 11-Dec-16 11-Dec-16 14-Dec-16 14-Dec-16 15-Dec-16 16-Dec-16 20-Dec-16 18-Dec-16 2-Dec-16 3-Dec-16 4-Dec-16 6-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16
66 84+925 SLAB CULVERT(Widening for Four Lane)
1-Dec-16 1-Dec-16 1-Dec-16 2-Dec-16 3-Dec-16 8-Dec-16 9-Dec-16 9-Dec-16 21-Nov-16 21-Nov-16 24-Nov-16 28-Nov-16 30-Nov-16 30-Nov-16 4-Dec-16 21-Dec-16
5/9
OPRC PROJECT (SANGRUR-MANSA-BATHINDA)CONTRACT AREA 1.0.3_OPRC_Culvert_Progress_Upto_date_September_-2017
SUMMARY OF UP TO DATE PROGRESS OF SLAB CULVERTS ON S-2 (BHAWANIGARH-KOTSHAMIR) ROAD SEPTEMBER -17, 4th Year Work Program COMPLETED FOR LHS COMPLETED FOR RHS
S. NO CHAINAGE TYPE OF CULVERTExcavation P.C.C Abutment Bed Block Dirt Wall Slab Parapet Catchpit Excavation P.C.C Abutment Bed Block Dirt Wall Slab Parapet Catchpit
67 84+925 SLAB CULVERT(Widening)
18-Mar-15 18-Mar-15 21-Mar-15 3-Apr-15 7-Apr-15 7-Apr-15 2-Nov-15 18-Mar-15 18-Mar-15 30-Mar-15 3-Apr-15 6-Apr-15 6-Apr-15 2-Nov-15
68 84+925 SLAB CULVERT(Existing)
28-Mar-16 29-Mar-16 31-Mar-16 2-Apr-16 7-Apr-16 9-Apr-16 10-Apr-16 24-Jul-16 20-May-15 20-May-15 21-May-15 21-May-15 22-May-15 23-May-15 20-Jul-16 24-Jul-16
69 86+055 SLAB CULVERT 20-Mar-15 20-Mar-15 5-Apr-15 9-Apr-15 15-Apr-15 15-Apr-15 21-Apr-15 20-Apr-15 28-Mar-16 29-Mar-16 30-Mar-16 22-Apr-16 21-Apr-16 22-Apr-16 25-Apr-16 28-Apr-16
70 86+515 SLAB CULVERT(Widening)
31-Mar-15 31-Mar-15 2-Apr-15 8-Apr-15 11-Apr-15 11-Apr-15 2-May-15 7-May-15 2-Apr-15 2-Apr-15 4-Apr-15 8-Apr-15 9-Apr-15 9-Apr-15 6-May-15 22-May-15
71 86+515 SLAB CULVERT(Existing)
1-Apr-16 2-Apr-16 3-Apr-16 7-Apr-16 7-Apr-16 7-Apr-16 11-Apr-16 8-May-16 18-Apr-16 18-Apr-16 20-Apr-16 20-Apr-16 20-Apr-16 21-Apr-16 22-Apr-16 23-Apr-16
72 86+573 SLAB CULVERT 15-May-16 15-May-16 17-May-16 18-May-16 17-May-16 20-May-16 22-May-16 10-May-16 11-May-16 12-May-16 12-May-16 13-May-16 15-May-16 19-May-16
73 87+230 SLAB CULVERT 23-Mar-15 23-Mar-15 30-Mar-15 5-Apr-15 8-Apr-15 8-Apr-15 12-Apr-15 13-Apr-15 22-Mar-15 22-Mar-15 29-Mar-15 5-Apr-15 8-Apr-15 9-Apr-15 13-Apr-15 12-Apr-15
74 88+673 SLAB CULVERT 8-Apr-15 8-Apr-15 9-Apr-15 11-Apr-15 19-Apr-15 19-Apr-15 27-Apr-15 16-May-15 8-Apr-15 8-Apr-15 10-Apr-15 11-Apr-15 10-Apr-15 20-Apr-15 27-Apr-15 16-May-15
75 89+130 SLAB CULVERT 9-Apr-15 9-Apr-15 10-Apr-15 15-Apr-15 10-Apr-15 16-Apr-15 23-Apr-15 21-Apr-15 8-Apr-15 8-Apr-15 11-Apr-15 15-Apr-15 11-Apr-15 16-Apr-15 24-Apr-15 21-Apr-15
76 91+755 SLAB CULVERT 12-Apr-15 12-Apr-15 12-Apr-15 21-Apr-15 13-Apr-15 28-Apr-15 1-Dec-15 4-Dec-15 12-Apr-15 13-Apr-15 14-Apr-15 22-Apr-15 14-Apr-15 28-Apr-15 3-Dec-15 4-Dec-15
77 90+200 SLAB CULVERT 17-May-16 18-May-16 20-May-16 22-May-16 21-May-16 24-May-16 26-May-16 25-May-16 28-Apr-16 28-Apr-16 2-May-16 3-May-16 3-May-16 4-May-16 14-May-16 4-May-16
78 93+075 SLAB CULVERT 30-May-16 30-May-16 31-May-16 3-Jun-16 3-Jun-16 4-Jun-16 15-Jun-16 Not Required 30-May-16 30-May-16 31-May-16 3-Jun-16 3-Jun-16 4-Jun-16 15-Jun-16 Not Required
79 94+185 SLAB CULVERT 6-May-15 6-May-15 6-May-15 12-May-15 14-May-15 14-May-15 22-May-15 4-Dec-15 15-May-15 15-May-15 19-May-15 20-May-15 20-May-15 22-May-15 5-Jun-15 5-Jun-15
80 94+310 SLAB CULVERT 16-Apr-15 16-Apr-15 19-Apr-15 26-Apr-15 26-Apr-15 27-Apr-15 4-May-15 4-May-15 16-Apr-15 16-Apr-15 20-Apr-15 26-Apr-15 26-Apr-15 27-Apr-15 6-May-15 4-May-15
81 95+540 SLAB CULVERT 26-Apr-15 27-Apr-15 1-May-15 1-May-15 1-May-15 1-May-15 16-May-15 11-Jun-15 1-May-15 1-May-15 1-May-15 10-May-15 14-May-15 14-May-15 16-May-15
82 96+485 SLAB CULVERT 22-May-15 22-May-15 30-May-15 3-Jun-15 3-Jun-15 10-Jun-15 12-Jun-15 21-Jun-15 3-Jun-15 3-Jun-15 4-Jun-15 5-Jun-15 4-Jun-15 10-Jun-15 12-Jun-15 21-Jun-15
83 96+790 SLAB CULVERT 17-Mar-16 18-Mar-16 12-Apr-16 15-Apr-16 8-Jun-15 9-Jun-15 7-Jul-16 17-Mar-16 18-Mar-16 23-Mar-16 15-Apr-16 8-Jun-15 10-Jun-15 8-Jul-16
84 97+770 SLAB CULVERT 4-Jun-15 4-Jun-15 6-Jun-15 11-Jun-15 12-Jun-15 12-Jun-15 17-Jun-15 4-Jun-15 4-Jun-15 7-Jun-15 11-Jun-15 12-Jun-15 12-Jun-15 15-Jun-15
6/9
OPRC PROJECT (SANGRUR-MANSA-BATHINDA)CONTRACT AREA 1.0.3_OPRC_Culvert_Progress_Upto_date_September_-2017
SUMMARY OF UP TO DATE PROGRESS OF SLAB CULVERTS ON S-2 (BHAWANIGARH-KOTSHAMIR) ROAD SEPTEMBER -17, 4th Year Work Program COMPLETED FOR LHS COMPLETED FOR RHS
S. NO CHAINAGE TYPE OF CULVERTExcavation P.C.C Abutment Bed Block Dirt Wall Slab Parapet Catchpit Excavation P.C.C Abutment Bed Block Dirt Wall Slab Parapet Catchpit
85 97+895 SLAB CULVERT 30-May-16 30-May-16 31-May-16 1-Jun-16 2-Jun-16 2-Jun-16 5-Jul-16 10-Jul-16 30-May-16 30-May-16 31-May-16 1-Jun-16 2-Jun-16 4-Jun-16 10-Jul-16 12-Jul-16
86 98+140 SLAB CULVERT 5-Jun-15 5-Jun-15 9-Jun-15 11-Jun-15 11-Jun-15 14-Jun-15 17-Jun-15 19-Jun-15
87 98+380 SLAB CULVERT 29-Jun-16 29-Jun-16 30-Jun-16 1-Jul-16 2-Jul-16 2-Jul-16 4-Jul-16 8-Jul-16 17-Jun-16 17-Jun-16 20-Jun-16 20-Jun-16 23-Jun-16 23-Jun-16 27-Jun-16 27-Jun-16
88 98+845 SLAB CULVERT 8-Jun-15 19-Jun-15 22-Jun-15 23-Jun-15 23-Jun-15 6-Jul-15 22-Jul-15 21-Jul-15 10-Apr-16 10-Apr-16 12-Apr-16 23-Apr-16 30-Jun-16 30-Jun-16 10-Jul-16
89 99+430 SLAB CULVERT 29-Jun-15 10-Apr-16 13-Apr-16 15-Apr-16 2-May-16 3-May-16 11-Jul-16 18-Jul-16 10-Apr-16 10-Apr-16 13-Apr-16 15-Apr-16 2-May-16 3-May-16 12-Jul-16 19-Jul-16
90 100+082 SLAB CULVERT 8-May-16 9-May-16 10-May-16 12-May-16 13-May-16 14-May-16 14-May-16 14-May-16 22-Apr-16 22-Apr-16 25-Apr-16 25-Apr-16 13-May-16 14-May-16 23-Jul-16 24-Jul-16
91 101+000 SLAB CULVERT 18-Jun-15 18-Jun-15 26-Jun-15 26-Jun-15 26-Jun-15 18-Jul-15 17-Jul-15 25-Jul-15 18-Jun-15 18-Jun-15 26-Jun-15 26-Jun-15 26-Jun-15 18-Jul-15 17-Jul-15 25-Jul-15
92 102+045 SLAB CULVERT 8-Jul-15 9-Jul-15 10-Jul-15 11-Jul-15 12-Jul-15 14-Jul-15 15-Jul-15 16-Jul-15 8-Jul-15 19-Jul-15 21-Jul-15 22-Jul-15 21-Jul-15 2-Aug-15 5-Feb-17
93 102+730 SLAB CULVERT 22-Jun-15 22-Jun-15 1-Jul-15 9-Jul-15 1-Jul-15 18-Jul-15 26-Jul-15 19-Jul-16 22-Jun-15 22-Jun-15 3-Jul-15 10-Jul-15 3-Jul-15 18-Jul-15 27-Jul-15 19-Jul-16
94 103+245 SLAB CULVERT 27-Jul-15 27-Jul-15 7-Aug-15 18-Aug-15 7-Aug-15 9-Aug-15 16-Jul-16 15-Jul-16 27-Jul-15 27-Jul-15 17-Aug-15 18-Aug-15 17-Aug-15 19-Aug-15 16-Jul-16 15-Jul-16
95 103+330 SLAB CULVERT
96 103+630 SLAB CULVERT 8-Jun-16 10-Jun-16 13-Jun-16 14-Jun-16 27-Jun-16 28-Jun-16 4-Jul-16 11-Jul-16 10-Jun-16 10-Jun-16 13-Jun-16 14-Jun-16 27-Jun-16 29-Jun-16 4-Jul-16 16-Jul-16
97 103+665 SLAB CULVERT 1-Jul-16 1-Jul-16 1-Jul-16 1-Jul-16 2-Jul-16 2-Jul-16 8-Jul-16 Not Required 1-Jul-16 1-Jul-16 1-Jul-16 1-Jul-16 2-Jul-16 2-Jul-16 8-Jul-16 Not Required
98 104+280 SLAB CULVERT 25-Apr-16 25-Apr-16 28-Apr-16 3-Jun-16 4-Jun-16 6-Jun-16 8-Jul-16 20-Jul-16 25-Apr-16 25-Apr-16 28-Apr-16 3-Jun-16 4-Jun-16 6-Jun-16 8-Jul-16 15-Jul-16
99 104+635 SLAB CULVERT 22-May-16 22-May-16 23-May-16 25-May-16 23-May-16 25-May-16 28-Jun-16 28-May-16 15-May-16 15-May-16 17-May-16 18-May-16 20-May-16 20-May-16 21-May-16 24-May-16
100 105+060 SLAB CULVERT 26-Apr-16 26-Apr-16 27-Apr-16 2-Jun-16 2-Jun-16 4-Jun-16 28-Jun-16 27-Apr-16 27-Apr-16 28-Apr-16 2-Jun-16 2-Jun-16 4-Jun-16 28-Jun-16
101 105+262 SLAB CULVERT 3-Jul-15 17-Aug-15 18-Aug-15 18-Aug-15 18-Aug-15 4-Jun-16 26-Jun-16 25-Jun-16 24-Apr-16 24-Apr-16 25-Apr-16 2-Jun-16 2-Jun-16 4-Jun-16 26-Jun-16 25-Jun-16
102 105+415 SLAB CULVERT 3-Aug-15 3-Aug-15 20-Aug-15 20-Aug-15 20-Aug-15 14-Jun-16 17-Jun-16 23-Jun-16 29-May-16 29-May-16 31-May-16 2-Jun-16 5-Jun-16 6-Jun-16 26-Jun-16 25-Jun-16
103 106+075 SLAB CULVERT 3-Aug-15 1-Jun-16 2-Jun-16 16-Jun-16 16-Jun-16 18-Jun-16 19-Jun-16 20-Jul-16 2-Jun-16 4-Jun-16 4-Jun-16 16-Jun-16 16-Jun-16 18-Jun-16 19-Jun-16 24-Jun-16
104 108+050 SLAB CULVERT 8-Jun-16 8-Jun-16 13-Jun-16 27-Jun-16 27-Jun-16 27-Jun-16 13-Jul-16 8-Jun-16 13-Jun-16 27-Jun-16 27-Jun-16 1-Jul-16 3-Jul-16 14-Jul-16
105 108+350 SLAB CULVERT 4-Jun-16 4-Jun-16 7-Jun-16 7-Jun-16 12-Jun-16 12-Jun-16 15-Jun-16
102 102 102 102 102 102 86 62 99 98 98 98 98 98 77 58Total
Not required
Hinderance due to Canal Closer Hinderance due to Canal Closer
7/9
OPRC PROJECT (SANGRUR-MANSA-BATHINDA)CONTRACT AREA 1.0.3_OPRC_Culvert_Progress_Upto_date_September_-2017
SUMMARY OF UP TO DATE PROGRESS OF PIPE CULVERTS ON S-3 (BARNALA-MANSA) ROAD SEPTEMBER-17, UNDER- 4th Year Work PROGRAM COMPLETED FOR LHS COMPLETED FOR RHS
S. NO CHAINAGE TYPE OF CULVERT ExcavationFor Head
Wall
P.C.C ForHead Wall
1st Lift ofHead Wall
Excavationfor Pipe
P.C.C ForPipe Pipe Laying Filling of
Sand/ GSB2nd Lift ofHead Wall
3rd Lift ofHead Wall
4th Lift ofHead Wall Parapet Catchpit
ExcavationFor Head
Wall
P.C.C ForHead Wall
1st Lift ofHead Wall
Excavationfor Pipe
P.C.C ForPipe Pipe Laying Filling of
Sand/GSB2nd Lift ofHead Wall
3rd Lift ofHead Wall
4th Lift ofHead Wall Parapet Catchpit
1 183+160 PIPE CULVERT 11-Jan-17 11-Jan-17 12-Jan-17 11-Jan-17 11-Jan-17 13-Jan-17 16-Jan-17 15-Jan-17 16-Jan-17 17-Jan-17 20-Jan-17 20-Jan-17 11-Jan-17 11-Jan-17 12-Jan-17 11-Jan-17 11-Jan-17 13-Jan-17 16-Jan-17 15-Jan-17 16-Jan-17 17-Jan-17 11-Feb-17 13-Feb-17
2 183+830 PIPE CULVERT 22-Jan-17 23-Jan-17 23-Jan-17 22-Jan-17 23-Jan-17 24-Jan-17 19-Feb-17 25-Jan-17 27-Jan-17 28-Jan-17 9-Feb-17 30-Jan-17 12-Jan-17 13-Jan-17 21-Jan-17 12-Jan-17 13-Jan-17 21-Jan-17 19-Feb-17 22-Jan-17 23-Jan-17 24-Jan-17 10-Feb-17 29-Jan-17
3 189+784 PIPE CULVERT 16-Feb-17 16-Feb-17 19-Feb-17 16-Feb-17 17-Feb-17 18-Feb-17 26-Feb-17 20-Feb-17 21-Feb-17 21-Feb-17 22-Feb-17 24-Feb-17 25-Jan-17 27-Jan-17 28-Jan-17 25-Jan-17 31-Jan-17 1-Feb-17 2-Feb-17 1-Feb-17 2-Feb-17 3-Feb-17 3-Feb-17 6-Feb-17
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
8/9
OPRC PROJECT (SANGRUR-MANSA-BATHINDA)CONTRACT AREA 1.0.3_OPRC_Culvert_Progress_Upto_date_September_-2017
SUMMARY OF UP TO DATE PROGRESS OF SLAB CULVERTS ON S-3 (BARNAL-MANSA) ROAD SEPTEMBER -17, 4th Year Work Program COMPLETED FOR LHS COMPLETED FOR RHS
S. NO CHAINAGE TYPE OF CULVERTExcavation P.C.C Abutment Bed Block Dirt Wall Slab Parapet Catchpit Excavation P.C.C Abutment Bed Block Dirt Wall Slab Parapet Catchpit
1 182+660 SLAB CULVERT 23-Apr-17 23-Apr-17 24-Apr-17 25-Apr-17 28-Apr-17 28-Apr-17 29-Apr-17 3-May-17 2-May-17 3-May-17 6-May-17 6-May-17 8-May-17 8-May-17 9-May-17 Not required
2 187+870 SLAB CULVERT 10-Jan-17 10-Jan-17 15-Jan-17 15-Jan-17 15-Jan-17 21-Jan-17 15-Feb-17 22-Jan-17 10-Jan-17 10-Jan-17 16-Jan-17 17-Jan-17 17-Jan-17 21-Jan-17 15-Feb-17 20-Jan-17
3 188+700 SLAB CULVERT 8-Jan-17 15-Jan-17 16-Jan-17 17-Jan-17 17-Jan-17 21-Jan-17 28-Jan-17 20-Jan-17 12-Jan-17 13-Jan-17 13-Jan-17 13-Jan-17 13-Jan-17 21-Jan-17 23-Jan-17 Not required
4 189+540 SLAB CULVERT 2-Jan-17 2-Jan-17 5-Jan-17 6-Jan-17 6-Jan-17 21-Jan-17 12-Feb-17 9-Jan-17 2-Jan-17 2-Jan-17 3-Jan-17 4-Jan-17 4-Jan-17 21-Jan-17 12-Feb-17 7-Jan-17
5 189+900 SLAB CULVERT 5-Jan-17 5-Jan-17 6-Jan-17 6-Jan-17 6-Jan-17 21-Jan-17 10-Feb-17 8-Jan-17 5-Jan-17 5-Jan-17 7-Jan-17 7-Jan-17 7-Jan-17 21-Jan-17 10-Feb-17 9-Jan-17
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 3Total
9/9
Hindrance Due to Utilities September 2017Road Name S2 Bhawanigarh to Kotshamir Road No : SH-12A
LHS RHS
1 28+800 LHS SEP 5.80
2 28+830 LHS SEP 5.40
3 28+880 LHS SEP 6.90
4 29+550 LHS SEP 8.00
Note: SEP-Street Electric Pole, EP-Electric Pole, PF- Pole Foundation, TP- Telephone Pole
RemarksS.NoExisting
Chaninage(Km)Side
Type ofStructure(Pipe
/Slab/Box/Arch) or EP
Distance From C/L ofLHS carriage way in
(m)
1 Bus stop shelter 184+926 LHS 2.80 Removed
2 College Boundary wall 184+926 LHS 2.80
3 BSNL UG Box 185+511 LHS 0.80 UG-Underground
4Sewage Vent Pipe &
Sewer Line185+538 LHS 6.80
5 Sewer Line 186+456 LHS 0.206 BSNL LINE 185+961 RHS 2.807 Sewer Line Vent Pipe 185+763 RHS 7.008 Sewer Line Vent Pipe 184+935 RHS 5.309 Sewer Line Vent Pipe 188+781 LHS 7.7010 SEP 182+640 Center 3.00 Roundabout11 Man holes 182+910 LHS 10.20 From CL12 Man holes 183+405 LHS 10.40 From CL13 Man holes 183+465 LHS 10.10 From CL14 Man holes 183+530 LHS 9.60 From CL15 Man holes 183+590 LHS 9.40 From CL16 Man holes 185+475 LHS 7.20 From CL17 BSNL Chamber 183+735 RHS 7.50 From CL18 BSNL Chamber 184+200 LHS 10.30 From CL19 BSNL Chamber 184+694 RHS 6.30 From CL20 BSNL Chamber 184+700 LHS 5.40 From CL21 BSNL Chamber 184+880 LHS 5.00 From CL22 BSNL Chamber 185+240 LHS 10.70 From CL23 BSNL Chamber 185+435 LHS 6.65 From CL24 BSNL Chamber 185+810 LHS 7.40 From CL25 BSNL Chamber 185+915 RHS 9.00 From CL26 BSNL Chamber 186+390 LHS 7.50 From CL27 Sewer Line Vent Pipe 185+475 LHS 10.70 From CL28 Sewer Line Vent Pipe 184+900 RHS 9.30 From CL29 Manhole 184+860 RHS 3.10 From CL30 Manhole 184+901 RHS 2.50 From CL31 Vent shaft 184+901 RHS 9.40 From CL32 Manhole 184+947 RHS 2.50 From CL33 Manhole 184+995 RHS 3.00 From CL34 Manhole 185+046 RHS 3.50 From CL35 Manhole 185+104 RHS 4.50 From CL36 Manhole 285+158 RHS 2.50 From CL37 Manhole 185+209 RHS 2.00 From CL38 Manhole 185+260 RHS 1.00 From CL39 Manhole 185+475 LHS 9.50 From CL40 Manhole 185+650 RHS 3.00 From CL41 Manhole 185+705 RHS 4.00 From CL42 Manhole 185+705 RHS 12.20 From CL43 Manhole 185+769 RHS 3.00 From CL44 Manhole 185+872 RHS 3.00 From CL45 Manhole 185+930 RHS 3.50 From CL46 Manhole 186+003 RHS 3.50 From CL47 Manhole 186+075 RHS 3.00 From CL48 Manhole 186+176 RHS 4.50 From CL49 Manhole 186+262 RHS 4.50 From CL50 Manhole 186+327 RHS 3.50 From CL51 Manhole 186+385 RHS 3.50 From CL52 Manhole 186+458 RHS 3.50 From CL53 Manhole 186+573 RHS 3.50 From CL54 Manhole 186+604 RHS 3.50 From CL
Hindrance Due to Utilities September 2017 of S3 (Barnala-Mansa) Road
S.No. Item Description Chainage SideDistance from BTEdge/ CL in (mtrs)
Remarks
S.No. Item Description Chainage SideDistance from BTEdge/ CL in (mtrs)
Remarks
55 Manhole 186+666 RHS 5.50 From CL56 Manhole 186+695 LHS 7.50 From CL57 Manhole 186+756 LHS 8.00 From CL58 Manhole 186+756 LHS 13.00 From CL59 Manhole 186+810 RHS 8.50 From CL60 Manhole 187+643 RHS 9.00 From CL61 Manhole 187+737 RHS 8.00 From CL62 Manhole 187+815 RHS 8.00 From CL63 Manhole 187+889 RHS 7.50 From CL64 Manhole 187+986 RHS 7.50 From CL65 Manhole 188+040 RHS 8.05 From CL66 Manhole 188+057 RHS 8.50 From CL67 Manhole 188+106 RHS 8.00 From CL68 Manhole 188+155 LHS 6.00 From CL69 Manhole 188+185 RHS 11.00 From CL70 Manhole 188+202 RHS 9.00 From CL71 Manhole 188+236 RHS 10.50 From CL72 Manhole 188+305 RHS 11.00 From CL73 Manhole 188+370 RHS 9.30 From CL74 Manhole 188+405 LHS 9.50 From CL75 Manhole 188+468 LHS 10.00 From CL76 Manhole 188+521 RHS 11.00 From CL77 Manhole 188+572 RHS 4.50 From CL78 Manhole 188+625 RHS 5.00 From CL79 Manhole 188+625 LHS 10.00 From CL80 Manhole 188+676 LHS 10.50 From CL81 Manhole 188+676 RHS 5.00 From CL82 Manhole 188+724 LHS 10.00 From CL83 Manhole 188+776 LHS 5.00 From CL84 Manhole 188+782 LHS 11.00 From CL85 Manhole 188+844 LHS 5.00 From CL86 Manhole 188+905 LHS 4.00 From CL87 Manhole 188+954 LHS 5.00 From CL88 Manhole 189+021 LHS 5.00 From CL89 Manhole 189+073 LHS 5.50 From CL90 Manhole 189+125 LHS 5.50 From CL91 Manhole 189+187 LHS 5.50 From CL92 Manhole 189+240 LHS 4.20 From CL93 Manhole 189+297 LHS 4.00 From CL94 Manhole 189+352 LHS 3.50 From CL95 Manhole 189+408 LHS 3.50 From CL96 Manhole 189+454 LHS 4.00 From CL97 Manhole 189+493 LHS 4.00 From CL
1.0.4_List_of_Hindrances_September_2017
Obstructions Due to Trees Between Ch. 0+000 to 24+970 onRamdittewala chowk to Jaga Ramtirth (S4) September 2017
Chainage TreeFrom To LHS (No.) RHS (No.)
1 14+500 1.00
2 15+000 15+020 2.00
Sr.No. Remarks
1.0.4_List_of_Hindrances_September_2017
Mansa - Talwandi Sabo Electrics Lines at Low Height S-4Sr. No. Chainage Hieght (m) Side
1 0+010 6.2 B/S2 0+095 6.5 B/S3 0+270 6.4 B/S4 0+330 6.9 B/S5 0+600 7.3 B/S6 0+750 6.6 B/S7 1+125 5.4 B/S8 1+325 6.9 B/S9 1+360 9.1 B/S
10 1+495 6.8 B/S11 1+505 6.8 B/S12 1+670 6.5 B/S13 1+920 7.8 B/S14 1+975 7.4 B/S15 2+040 7.5 B/S16 2+340 6.7 B/S17 2+940 6.6 B/S18 3+330 6.0 B/S19 3+400 5.4 B/S20 3+690 6.8 B/S21 3+750 6.7 B/S22 3+870 6.3 B/S23 4+060 5.2 B/S24 4+130 5.0 B/S25 4+195 5.5 B/S26 4+395 7.3 B/S27 4+440 6.4 B/S28 4+485 5.4 B/S29 4+610 6.6 B/S30 4+635 5.4 B/S31 6+590 5.3 B/S32 6+885 6.2 B/S33 6+960 7.4 B/S34 7+060 8.7 B/S35 7+260 7.2 B/S36 7+270 7.7 B/S37 7+900 4.6 B/S38 10+950 5.1 B/S39 11+725 5.2 B/S40 11+790 5.4 B/S
Obstructions Due to Low height of Electric Poles &Wires Between Ch.0+000 to 24+970 on (S4)road
September 2017Annexure-I
1.1 Staff & Equipment details of September 2017
List of Local Employees for the Month of September-2017S No Equipment Type Min Capacity Nos. Remarks
1 Falling Weight Deflectometer (FWD) 250 KN 1
2 Hot Mix Plant (Batch Type Apollo) 128 TPH 1
3 Hot Mix Plant (Batch Type Linnhoff) 200 TPH 1
4 WMM Mixing Plant (Mackmax) 250 TPH 1
5 Sensor Paver (Bituminous Works) 600 TPH 1
6 Hydraulic Excavators 0.9-1.0 cum. 1
7 Motor Grader 120 cum/hr. 3
8 Wheel Loader 1.6-1.7 & 2.4 cum. 3
9 JCB Backhoe Loader 0.3 & 1.2 cum 1
10 Paver Mechanical 200 TPH 1
11 Tandem Rollers 4
12 Vibratory Rollers, Soil Compactor 8-10 T 3
13 Pneumatic Tyre Roller 15 MT 1
14 Tipper / trucks 14-24 cum. 18
15 Water Tanker 12000 L 5
16 DG Set 100 KVA 1
17 DG Set 40KVA 1
18 DG Set 125KVA 1
19 DG Set 500 KVA 1
20 DG Set 82.5 KVA 1
21 Tractor/Trolley 3
22 Trailor 1
23 Tempo 1
24 Tower Light 9 M 4
25 Diesel Tanker 4000L,8000L 3
26 Baby Tandem Roller 2 Ton 1
1.1 Staff & Equipment details of September 2017
List of Local Employees for the Month of September 2017S No Position Numbers Name of Person
1 Road Manager 1 Mukesh Kumar2 Road Asset Manager/Risk Manager 1 Vijay Sodhi3 Senior Site Engineer 1 Pushpraj Singh4 Site Engineer (Construction) 1 Chinu Singla
Pankaj KumarRakesh Kumar
6 Material Engineer 1 Sanjay Pandey7 Contract Financial Manager 1 Praveen Kahar8 Plant & Equipment Engineer 1 R K Singh9 Store Manager 1 Bhagwan Jha
10 Technical Staff 1511 Non Technical Staff 2512 Conformance Management Unit
Team Leader 1 S.S. SidhuField Engineer- Section I 1 Pankaj KumarField Engineer- Section II 1 Rakesh KumarJr. Engineer 1 Bhupesh SharmaJr. Engineer 1 Vishwas KukkerJr. Engineer 1 Charanjit SinghSenior Environmentalist 1 Vardan SrivastavJunior Environmentalist 1 Mani SharmaSafety Officer 1 Ramesh Patil
25 Site Engineers (Maintenance)
1.1 Staff & Equipment details of September 2017
List of Local Employees for the Month of September-2017
Sr. No. Name of Employee Designation
1 Sewak Singh Sidhu Manager2 Vijay Sodhi Engineer3 Bhupesh Sharma Junior Engineer4 Charanjit Singh Junior Engineer5 Vishwas Kukker Junior Engineer6 Gurjit Singh Lab. Technician7 Jasvir Singh Operator (Excavator)8 Sandeep Singh Driver (L)9 Jagdev Singh Driver (L)10 Jasvir Singh Driver (L)11 Sheru Singh Driver (L)12 Jagseer Singh Driver (L)13 Sukhjinder Singh Driver (L)14 Gurpreet Kumar Lab Labour15 Naveen Sharma Lab Labour16 Gurpreet Singh Office boy17 Gurjit Singh Sweeper18 Amarjeet Singh Sweeper19 Mukhtiar Singh Gardener20 Bhola Khan Weigh bridge (O.P)21 Gurbinder Singh Labour22 Nachhtar Singh Gardenar23 Nirmal Singh Weigh bridge (N.P)24 Gurjant Singh (M) Mason25 Gurjant Singh (M) Mason26 Teja Singh Labour27 Leela Singh Labour28 Kewal Singh Labour29 Mithu Singh Labour30 Kaka Singh Labour31 Kaila Singh Labour32 Jagsir Singh Labour33 Amrik Singh labour34 Buta Singh Labour35 Gurdas singh Labour36 Baghel singh Labour37 Surjeet Singh Labour38 Ramesh singh Labour39 Balor Singh Labour40 Avtar Singh Labour41 Jagjit Singh Labour42 Bhola Singh Labour43 Buta Singh Labour44 Leela singh Labour45 Balvir Singh Labour46 Yodha Singh Mason47 Joginder Singh Labour48 Avtar Singh Labour49 Mandar Singh Labour50 Harjit Singh Labour51 Amar Ram Labour52 Satnam Singh Labour53 Pritam Singh Labour
1.1 Staff & Equipment details of September 2017
Sr. No. Name of Employee Designation
54 Balwinder Singh Labour55 karanvir Singh Labour56 Najar Khan Labour57 Jagsir ram Labour58 Pal Singh Labour59 Gora singh Labour60 Tilu Singh Labour61 Darshan Singh Labour62 Chaina ram Singh Labour63 Kulwinder Singh Labour64 Satpal Singh Labour65 Soma Singh Labour66 Jaswant Singh Labour67 Gurjant Singh Labour68 Gurpreet Singh Labour69 Gurcharan Singh Labour70 Manpreet Singh Labour71 Hari Ram Labour72 Dilwara Singh Labour73 Jagsir singh Labour74 Jagraj Singh Labour75 Harbans Singh Labour76 Binder Pal Singh Labour77 Resham Singh Labour78 Kuldeep Singh sr.Labour79 Amritpal Singh sr.Labour80 Gurcharan Singh Labour81 Kuldeep Khan Labour82 Singara Singh Labour83 Pal Singh Labour84 Takdeer Singh Labour85 Mahesh Kumar Labour86 Bhupinder Singh Labour87 Harphool Singh Labour88 Sandeep Singh Labour89 Gurmeet Singh Labour90 Amandeep Singh labour91 Bahadur Singh labour92 Harmesh Singh labour93 Makhan Singh labour94 Love Preet Singh labour95 Jagraj Singh labour96 Sohna Singh labour97 Nirmal Singh labour
INTERIM PAYMENT CERTIFICATES DETAILS 1.2_Interim_Payment_Certificates_Detail_Up_to_September_2017
IPC No. Month
Date of
Reciept
from
Contractor
Work done Certified
(`)
Price Adjustment
(`)
Gross Work done
(`)
Retention Money
6% (`)
Recovery of
Advance payment
10% from IPC (`)
Income Tax TDS
2% (`)
Sale Tax 6% (`)
(5% upto IPC 01),
(4% from IPC 17)
Labour Cess 1%
(`)
Culture Cess
1% (`) (from
IPC 02)
Cancer & Drug
Addiction Cess 1%
(`) (from IPC 02)
Withheld Amount
5% & 10% from
IPC-23
Withheald
ReleasedTotal Deductions Net Payable Amount
0105-Dec-12 To 04-Mar-
1315.03.13 2,32,47,000 34,99,705 2,67,46,705 - - 5,34,934 13,37,335 2,67,467 - - - 21,39,736 2,46,06,969
Advance
Payment-Mar-13 21.03.13 15,00,00,000 - 15,00,00,000 - - 30,00,000 - - - - - 30,00,000 14,70,00,000
Advance
Payment-
02
Apr-13 29.04.13 9,91,16,000 - 9,91,16,000 - - 19,82,320 - - - - - 19,82,320 9,71,33,680
2 05-Mar-12 To 04-Jun-13 15.06.13 5,38,05,954 26,08,863 5,64,14,817 - - 11,28,296 33,84,889 5,64,148 5,64,148 5,64,148 - 62,05,629 5,02,09,188
Advance
Payment-
03
10,67,64,000 - 10,67,64,000 - - 21,35,280 - - - - - 21,35,280 10,46,28,720
0305-Jun-13 To 04-Sep-
1307.10.13 3,82,65,079 48,85,051 4,31,50,130 - 3,55,88,000 1,51,243 25,89,008 4,31,501 4,31,501 4,31,501 - 3,96,22,754 35,27,376
04 05-Jun-13 To 09-Oct-13 17.10.13 10,13,21,208 1,03,96,731 11,17,17,939 67,03,076 - 22,34,359 67,03,076 11,17,179 11,17,179 11,17,179 55,85,897 2,45,77,945 8,71,39,994
05 10-Oct-13 To 15-Nov-13 15.11.13 25,51,53,800 4,06,11,552 29,57,65,352 1,77,35,237 - 59,15,307 1,77,45,921 29,57,654 29,57,654 29,57,654 1,47,79,364 6,50,48,791 23,07,16,561
0616 Nov-13 To 01 Dec-
1301.12.13 9,79,43,834 1,56,10,975 11,35,54,809 68,13,289 - 22,71,096 68,13,289 11,35,548 11,35,548 11,35,548 56,77,740 2,49,82,058 8,49,84,751
0701 Dec-13 To 04 Dec-
1315.12.13 9,21,81,774 91,65,107 10,13,46,881 33,96,270 3,55,88,000 13,15,178 60,80,813 10,13,469 - - 28,30,225 5,02,23,955 8,67,10,926
0805 Dec-13 To 04 Mar-
1405.03.14 14,56,18,548 1,57,14,334 16,13,32,882 70,83,636 3,55,88,000 25,14,898 96,79,973 16,13,329 - - 59,03,030 6,23,82,866 9,89,50,016
09 05 Mar-14 To 28 Mar-14 28.03.14 5,91,71,354 34,67,600 6,26,38,954 37,57,454 3,55,88,000 5,41,019 37,58,337 6,26,390 - - 31,31,211 4,74,02,411 1,52,36,543
10 29- Mar-14 To14 -April-
14 28.04.14 10,95,45,387 1,64,31,497 12,59,76,884 75,58,613 - 25,19,538 75,58,613 12,59,769 - - 62,98,844 2,51,95,377 10,07,81,507
1115 -April-14 To 30-April-
14 05.05.14 10,59,82,935 1,55,09,033 12,14,91,968 72,89,518 - 24,29,839 72,89,518 12,14,920 - - 60,74,598 2,42,98,394 9,71,93,575
1205 -Mar-14 To 04-June-
14 06.06.14 13,67,45,426 1,60,51,836 15,27,97,262 65,33,324 3,55,88,000 23,44,185 91,67,836 15,27,973 - - 54,46,904 6,06,08,222 9,21,89,040
1305 -June-14 To 24-June-
14 24.06.14 13,87,57,490 2,16,07,438 16,03,64,928 96,27,463 - 32,07,299 96,21,896 16,03,649 - - 80,65,266 3,21,25,573 12,82,39,355
1425 -June-14 To 31-July-
14 01.08.14 10,72,69,769 (64,999) 10,72,04,770 64,36,186 - 21,44,095 64,32,286 10,72,048 - - 53,63,488 2,14,48,104 8,57,56,667
1501 -August -14 To 31-
August-14 02.09.14 10,54,48,567 1,13,39,995 11,67,88,562 70,07,314 3,55,88,000 16,24,011 70,07,314 11,67,886 - - 58,39,428 5,82,33,953 5,85,54,609
1605 -June -14 To 07-
September-14 30.10.14 6,35,41,588 1,12,23,307 7,47,64,895 17,10,612 14,95,298 44,85,894 7,47,649 - - 14,25,510 98,64,963 6,48,99,932
Hand
Recipt2,45,31,420 2,45,31,420
17 5 Sep-14 To 4 Dec-14 15.12.14 8,52,44,415 68,82,319 9,21,26,734 28,20,376 3,55,88,000 11,30,775 36,85,069 9,21,267 - - 23,50,313 4,64,95,801 4,56,30,934
18 5 Dec-14 to 5- Mar-15 04.04.15 2,63,73,680 1,62,42,085 4,26,15,765 - - 8,52,315 17,04,631 4,26,158 - - - 29,83,104 3,96,32,661
19 5 Mar-15 to 4 Jun -15 07.07.15 3,84,66,036 62,58,052 4,47,24,088 - 3,55,88,000 1,82,722 17,88,964 4,47,241 - - - 3,80,06,927 67,17,161
20 5 Jun-15 to 4 Sep -15 04.09.15 30,41,80,451 18,59,862 30,60,40,313 1,83,62,419 3,55,88,000 54,09,046 1,22,41,613 30,60,403 - - 1,53,02,016 8,99,63,497 21,60,76,816
21 5 Sep -15 to 31 Oct -15 02.11.15 11,22,17,225 10,32,493 11,32,49,718 67,94,983 3,55,88,000 15,53,234 45,29,989 11,32,497 56,62,486 5,52,61,189 5,79,88,529
22 5 June -15 to 4 Dec-15 21.12.15 25,06,14,064 2,68,43,184 27,74,57,248 1,12,65,778 - 55,49,145 1,10,98,290 27,74,572 1,66,50,156 4,73,37,941 23,01,19,306
23 5 Dec -15 to 28 Mar-16 28.03.16 14,56,18,548 (6,10,476) 14,50,08,072 60,47,256 - 29,00,161 58,00,323 14,50,081 1,00,78,760 2,62,76,581 11,87,31,491
24 28 Mar-16 to 04 May-16 16.05.16 5,87,66,301 (31,52,776) 5,56,13,525 32,94,767 - 11,12,270 22,24,541 5,56,135 54,91,278 1,26,78,991 4,29,34,534
25 05 May-16 to 04 Jun-16 04.06.16 14,01,82,470 19,98,806 14,21,81,276 85,30,877 28,43,626 56,87,251 14,21,813 1,42,18,128 3,27,01,695 10,94,79,581
26 05 May-16 to 04 Jun-16 30.06.16 14,32,11,303 92,05,792 15,24,17,095 64,58,150 30,48,342 60,96,684 15,24,171 53,81,791 2,25,09,138 12,99,07,957
27 01 Jul-16 to 16 Aug-16 16.08.16 10,33,11,096 1,93,205 10,35,04,301 62,10,258 20,70,086 41,40,172 10,35,043 51,75,215 1,86,30,774 8,48,73,527
Hand
Recipt23.09.16 6,75,54,513
INTERIM PAYMENT CERTIFICATES DETAILS 1.2_Interim_Payment_Certificates_Detail_Up_to_September_2017
IPC No. Month
Date of
Reciept
from
Contractor
Work done Certified
(`)
Price Adjustment
(`)
Gross Work done
(`)
Retention Money
6% (`)
Recovery of
Advance payment
10% from IPC (`)
Income Tax TDS
2% (`)
Sale Tax 6% (`)
(5% upto IPC 01),
(4% from IPC 17)
Labour Cess 1%
(`)
Culture Cess
1% (`) (from
IPC 02)
Cancer & Drug
Addiction Cess 1%
(`) (from IPC 02)
Withheld Amount
5% & 10% from
IPC-23
Withheald
ReleasedTotal Deductions Net Payable Amount
28 5 Jun-16 to 4 Sept -16 13.09.16 8,94,88,238 88,40,682 9,83,28,920 30,17,748 19,66,578 39,33,157 9,83,289 25,14,790 1,24,15,562 8,59,13,358
29 5 Sept -16 to 5 Oct-16 06.10.16 14,64,16,761 11,54,426 14,75,71,187 88,54,271 29,51,424 59,02,847 14,75,712 73,78,559 2,65,62,813 12,10,08,373
30 06 Oct-16 to 28 Nov-16 28.11.16 15,01,57,335 1,10,81,549 16,12,38,884 96,74,333 32,24,778 64,49,555 16,12,389 80,61,944 2,90,22,999 13,22,15,885
Hand
Recipt12.12.16 4,21,26,541 4,21,26,541
31 5 Sept-16 to 25 Dec -16 26.12.16 4,11,93,596 61,50,456 4,73,44,052 9,46,881 18,93,762 4,73,441 33,14,084 4,40,29,968
32 5 Oct-16 to 18 Nov -16 26.12.16 49,49,365 - 49,49,365 2,96,962 98,987 1,97,975 49,494 6,43,418 43,05,947
Hand
Recipt3,99,22,061
33 19 Nov-16 to 15 Feb-17 20.02.17 1,69,43,875 7,00,707 1,76,44,582 10,64,853 3,52,892 7,05,783 1,76,446 22,99,974 1,53,44,608
34 05 Dec -16 to 04 Feb -17 14.03.17 4,38,83,330 95,28,864 5,34,12,194 3,24,739 10,68,244 21,36,488 5,34,122 40,63,593 4,93,48,602
35 05 Feb -16 to 28 Mar -17 28.03.17 10,64,06,572 31,73,088 10,95,79,660 65,76,696 21,91,593 43,83,186 10,95,797 54,80,580 1,97,27,852 8,98,51,808
36 29 Mar-17 to 05 May-17 05.05.17 13,96,26,915 48,469 13,96,75,384 83,58,791 27,93,508 55,87,015 13,96,754 69,66,979 1,67,44,256 11,45,72,337
37 06 May- 17 to 26 May'-17 26.05.17 15,43,13,578 (32,61,298) 15,10,52,280 90,69,074 30,21,046 60,42,091 15,10,523 59,04,268 1,64,77,928 12,55,05,278
38 26.06.2017 to 30.05.2017 30.05.2017 10,96,30,432 (80,70,105) 10,15,60,327 60,84,758 20,31,207 40,62,413 10,15,603 34,32,719 1,66,26,700 8,49,33,627
3930.05.2017 to 05.06.2017
(In Process)08.06.2017 5,48,50,936 83,91,641 6,32,42,577 9,03,471 12,64,852 25,29,703 6,32,426 2,99,890 56,30,341 5,76,12,236
4,45,59,26,236 30,25,49,049 4,75,84,75,285 21,56,62,552 35,58,80,000 8,80,51,906 21,24,77,499 4,40,25,954 62,06,030 62,06,030 19,67,71,377 6,66,57,961 1,10,78,53,489 3,83,93,28,468 Total
1.3_Excise_Duty_Exemption_Up_to_September_2017
Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Improvement, Rehabilitation,
Resurfacing & Routine Maintenance works of Roads of Sangrur-Mansa-Bathinda Contract Area
Statement Showing the Excise Duty Excemption Certificate
Up to 30.09.17
Sr. No. DescriptionExcise Exemption Certificate
No.Dated Expiry Date Unit
Quantity
Approved
Quantity
Up to Date
Quantity Up
to Last
Month
Quantity in
This MonthRemarks
1JCB 3 DX (Excavator
Loader)PSRSP/WB/OPRC/ICB/11 24.05.15 No. 2 2.00 2.00 0.00 Quantity Used
2 JCB 210 Tracked Excavator PSRSP/WB/OPRC/ICB/2 24.05.15 No. 1 1.00 1.00 0.00 Quantity Used
3JCB 430 ZX Wheeled
Loading ShovelPSRSP/WB/OPRC/ICB/3 24.05.15 No. 1 1.00 1.00 0.00 Quantity Used
4 Tipper (AMW) PSRSP/WB/OPRC/ICB/4 24.05.15 No. 5 5.00 5.00 0.00 Quantity Used
5 Bitumen (VG-30) IOCL PSRSP/WB/OPRC/ICB/12 17.06.13 04.12.15 MT 6000 5978.98 5978.98 0.00 Quantity Used
6 Emulsion (RS1-BULK) PSRSP/WB/OPRC/ICB/6 24.05.13 MT 190 173.86 173.86 0.00 Quantity Used
7 Emulsion (SS1-BULK) PSRSP/WB/OPRC/ICB/7 24.05.13 MT 65 58.03 58.03 0.00 Quantity Used
8 Cement - OPC Grade-43 PSRSP/WB/OPRC/ICB/8 24.05.15 MT 300 150.00 150.00 0.00 Quantity Used
9 Diesel (IOCL) PSRSP/WB/OPRC/ICB/10 17.06.13 04.12.15 KL 6000 428.00 428.00 0.00 Certificate Expired
10Bitumen (VG-30) GULF
PETROCHEMPSRSP/WB/OPRC/ICB/15 21.04.13 31.03.15 KL 2500 1197.69 1197.69 0.00 Quantity Used
11 Emulsion (RS1-BULK) PSRSP/WB/OPRC/ICB/16 12.06.14 31.03.15 KL 450 146.40 146.40 0.00 Quantity Used
12 Bitumen (VG-30) IOCL PSRSP/WB/OPRC/ICB/17 18.06.14 31.03.15 KL 6500 1615.53 1615.53 0.00 Quantity Used
13 Emulsion (SS1-BULK) PSRSP/WB/OPRC/ICB/18 12.06.14 31.03.15 KL 200 116.51 116.51 0.00 Quantity Used
14 Bitumen (VG-30) IOCL PSRSP/WB/OPRC/ICB/20 25.04.15 31.03.2016 MT 6000 4098.71 4098.71 0.00 Certificate Expired
15 Emulsion (RS1-BULK) PSRSP/WB/OPRC/ICB/21 25.04.15 31.03.2016 MT 200 198.22 198.22 0.00 Quantity Used
16 Emulsion (SS1-BULK) PSRSP/WB/OPRC/ICB/22 25.04.15 31.03.2016 MT 275 261.75 261.75 0.00 Certificate Expired
17Caterpillar 120 K2 Motor
GraderPSRSP/WB/OPRC/ICB/23 21.08.15 31.03.2016 Nos 2 2.00 2.00 0.00 Quantity Used
18Electronic Sensor Paver -
VoggllePSRSP/WB/OPRC/ICB/24 21.08.15 31.03.2016 Nos 2 2.00 2.00 0.00 Quantity Used
19Soil Compactor HAMM
Model No. 31 1PSRSP/WB/OPRC/ICB/25 21.08.15 31.03.2016 Nos 4 4.00 4.00 0.00 Quantity Used
20 JCB 3DX Excavator loader PSRSP/WB/OPRC/ICB/26 21.08.15 31.03.2016 Nos 2 2.00 2.00 0.00 Quantity Used
21JCB JS 205 LC tracked
ExcavatorPSRSP/WB/OPRC/ICB/27 21.08.15 31.03.2016 Nos 1 1.00 1.00 0.00 Quantity Used
22 Bhart Benz Hywa PSRSP/WB/OPRC/ICB/28 21.08.15 31.03.2016 Nos 25 25.00 25.00 0.00 Quantity Used
23 JCB 455 ZX loading shovel PSRSP/WB/OPRC/ICB/29 21.08.15 31.03.2016 Nos 3 3.00 3.00 0.00 Quantity Used
24 Emulsion (RS1-BULK) PSRSP/WB/OPRC/ICB/30 26.10.15 31.03.2017 MT 250 234.56 234.56 0.00 Certificate Expired
25 Diesel (IOCL) PSRSP/WB/OPRC/ICB/31 24.11.15 31.03.2016 KL 400 76.00 76.00 0.00 Certificate Expired
26 Diesel (IOCL) PSRSP/WB/OPRC/ICB/32 03.02.16 31.03.2017 KL 3000 975.44 975.44 0.00 Certificate Expired
27 Bitumen (VG-30) IOCL PSRSP/WB/OPRC/ICB/33 26.02.16 31.03.2017 MT 8500 4735.69 4735.69 0.00 Certificate Expired
28 Emulsion (SS1-BULK) PSRSP/WB/OPRC/ICB/34 26.02.16 31.03.2017 MT 650 336.25 336.25 0.00 Certificate Expired
29 Emulsion (RS1-BULK) PSRSP/WB/OPRC/ICB/37 02.06.16 31.03.2017 MT 350 295.33 295.33 0.00 Certificate Expired
30 Emulsion (RS1-BULK) PSRSP/WB/OPRC/ICB/38 17.04.17 31.03.18 MT 171 0.00 0.00 0.00
31 Emulsion (SS1-BULK) PSRSP/WB/OPRC/ICB/39 17.04.17 31.03.18 MT 259 0.00 0.00 0.00
32 Bitumen (VG-30) IOCL PSRSP/WB/OPRC/ICB/40 17.04.17 31.03.18 MT 3500 0.00 0.00 0.00
33 Diesel (IOCL) PSRSP/WB/OPRC/ICB/41 17.04.17 31.03.18 KL 3000 415.90 315.90 100.00
2.0_Cash_Flow_Estimates_Reports_September_2017
Year Wise Proposed Cash Outlay (2012-2022)
Apportioned YEARS
Description of Works Amount in
INR
1 2 3 4 5 6 7 8 9 10
Revised Financial 46.15 43.53 38.53 82.18 15.69 226.08
Physical (Km) 25.91 24.44 21.63 45.43 8.81 - - - - - 126.22
Revised Financial 42.79 18.79 5.99 12.70 48.38 128.65
Physical (Km) 25.34 - 11.13 3.55 7.53 - - - 28.65 - 76.19
Revised Financial 8.88 26.74 13.89 13.57 63.08
Physical (Km) - 28.65 - - - - 86 45.06 43.78 203.49
Revised Financial 15.50 15.50 15.50 15.50 15.50 15.50 15.50 15.50 15.50 15.50 154.98
Physical (Km) 203.68 203.68 203.68 203.68 203.68 203.68 203.68 203.68 203.68 203.68 203.68
Financial 28.54
Physical (Km) 11.57
Financial 9.69
Physical (Nos.) 7.00
Revised Financial 104.44 67.91 72.82 103.67 82.12 15.50 42.24 29.39 77.77 15.50 611.35
Physical (Kms)
Improvement and
Rehabilitation
51.25 24.44 32.76 48.98 16.34 15.50 86.00 45.06 72.43 0.00 392.75
Physical (Nos.) for
Bridges7.00 0.00 0.00 0.00 0.00 7.00
TotalProposal/ Planned
Improvement 229.60
Rehabilitation 126.28
Resurfacing 63.14
Network Performance 154.98
Variation (Four Lane) 28.54
Variation (Bridges) 9.69
Grand Total 612.23
Note:- 1. Against the Contract Length of Improvement of 128.9 Kms, Actual length of improvement is (128.9-.19-1.08-1.35-.06)=126.22 Kms.
2. Against the Contract Length of Rehabilitation of 74.78 Kms, Actual Length of Rehabilitation is (74.78+1.35+.06)= 76.19 Kms.
3. Against the Contract Length of Resurfacing of 203.68 Kms, Actual Length of Resurfacing is (203.68-0.19)= 203.49 Kms.
4. Length of ROB Mansa is 850 mtr. and the same has been deducted from the S3 four lane length.
2.0_Cash_Flow_Estimates_Reports_September_2017
7.8
60
70
80
90
100
Cummulative Percentage
Revised S-CURVE For 1st Year OPRC Project
0
10
20
30
40
50
60
Cummulative Percentage
Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14
Cummulative Planned % 1.21 2.42 3.63 4.84 6.05 7.26 29.03 52.26 57.64 67.19 73.40 79.61 82.95 82.95 87.96 94.63 100.00
Cummulative Achieved % 1.21 2.42 3.63 4.84 6.05 7.26 13.17 17.02 23.34 42.33 58.14 71.01 73.18 73.18 78.02 88.56 100.00
2.0_Cash_Flow_Estimates_Reports_September_2017
7.8
60
70
80
90
100
Cu
mm
ula
tiv
e P
erc
en
tag
e
Revised S-CURVE For 2nd Year OPRC Project
0
10
20
30
40
50
60
Cu
mm
ula
tiv
e P
erc
en
tag
e
Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14
Cummulative Planned % 0.85 1.69 2.54 9.22 18.23 31.72 45.58 60.12 76.10 88.03 99.15 100.00
Cummulative Achieved % 0.81 1.62 2.42 5.46 10.17 20.31 31.57 37.31 41.46 42.46 44.63 48.12
Target not achieved for want of forest clearance by MOEF
2.0_Cash_Flow_Estimates_Reports_September_2017
7.8
60
70
80
90
100
Cu
mm
ula
tiv
e P
erc
en
tag
e
Revised S-CURVE For 3rd Year OPRC Project
0
10
20
30
40
50
60
Cu
mm
ula
tiv
e P
erc
en
tag
e
Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15
Cummulative Planned % 1.70 3.41 5.11 6.81 8.52 10.22 32.34 52.89 66.34 82.14 98.30 100.00 100.00
Cummulative Achieved % 1.70 3.41 5.11 6.81 8.50 10.21 24.47 39.78 55.83 66.93 78.03 91.48 100.00
2.0_Cash_Flow_Estimates_Reports_September_2017
7.8
60
70
80
90
100
Cu
mm
ula
tiv
e P
erc
en
tag
e
Revised S-CURVE For 4th Year OPRC Project on dated 06.12.2016
0
10
20
30
40
50
60
Cu
mm
ula
tiv
e P
erc
en
tag
e
Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16
Cummulative Planned % 1.04 2.09 3.13 19.09 30.21 41.33 52.45 61.41 70.37 82.93 95.49 100.00
Cummulative Achieved % 1.04 2.09 6.37 14.83 23.59 34.71 44.25 53.64 63.03 71.27 79.51 82.76
Note:- For Details please refer our letter no. PIPL/OPRC/1062/2016 dated 06.12.2016
2.0_Cash_Flow_Estimates_Reports_September_2017
7.8
60
70
80
90
100
Cu
mm
ula
tiv
e P
erc
en
tag
e
Revised S-CURVE For 5th Year OPRC Project
0
10
20
30
40
50
60
Cu
mm
ula
tiv
e P
erc
en
tag
e
Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17
Series2 3.62 13.69 30.22 49.58 82.63 96.38 100.00 100.00 100.00 100.00
Series1 3.62 8.50 11.73 41.80 64.66 95.20 98.16 98.96 98.99 98.99
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Daily Progress Report of September -2017
Name Of Project:- Output and Performance Based Road Contract (OPRC) (Asset Management Contract) For Improvement, Rehabilitation, Resurfacing & Routine Maintenance
Works of Roads of Sangrur-Mansa-Bathinda Contract Area
PUNJAB ROADS AND BRIDGES DEVELOPMENT BOARD
Road Name : Sangrur to Sunam (S-1)
Chainage
From To
1 01-09-17 0+000 0+800 Dewatering BHS Sqm 300.00
2 01-09-17 3+400 3+420 Shoulder tree branches removal RHS Rmt 20.00
3 01-09-17 11+300 Dewatering from junction RHS Sqm 50.00
4 02-09-17 3+000 5+000 Shrubs removal along the shoulder BHS Rmt 2000.00
5 02-09-17 3+000 5+000 Shoulder vegetation removal LHS Sqm 1000.00
6 02-09-17 3+000 5+000 KM stone cleaning LHS Nos 3.00
7 02-09-17 3+000 5+000 HM stone cleaning LHS Nos 8.00
8 02-09-17 1+000 3+000 Shrubs removal along the shoulder BHS Rmt 4000.00
9 02-09-17 1+000 5+000 Culvert cleaning BHS Nos 5.00
10 02-09-17 1+000 5+000 Signposts cleaning BHS Nos 10.00
11 02-09-17 1+000 5+000 KM stone cleaning LHS Nos 2.00
12 02-09-17 1+000 5+000 HM stone cleaning LHS Nos 8.00
13 02-09-17 1+000 5+000 Rope type safety barrier cleaning LHS Sqm 1000.00
14 04-09-17 3+350 Obstruction removal from shoulder RHS Sqm 5.00
15 04-09-17 0+000 2+200 Shoulder rectification BHS Sqm 800.00
16 04-09-17 0+800 1+500 Vegetation removal BHS Sqm 500.00
17 04-09-17 0+000 0+800 Pavement surface cleaning BHS Sqm 1200.00
18 04-09-17 0+000 Island cleaning BHS Sqm 30.00
19 04-09-17 0+100 0+800 Drain & catchpit cleaning along the kerb LHS Nos 32.00
20 04-09-17 0+800 4+500 Embankment slope rectification LHS Sqm 7.50
21 07-09-17 0+050 0+150 Cateyes fixing LHS Nos 4.00
22 07-09-17 0+050 0+150 Cateyes fixing Center Nos 5.00
23 07-09-17 0+050 0+150 Cateyes fixing RHS Nos 4.00
24 07-09-17 2+450 2+600 Cateyes fixing LHS Nos 2.00
25 07-09-17 2+450 2+600 Cateyes fixing Center Nos 4.00
26 07-09-17 2+450 2+600 Cateyes fixing RHS Nos 2.00
27 07-09-17 6+700 6+950 Cateyes fixing LHS Nos 1.00
28 07-09-17 6+700 6+950 Cateyes fixing Center Nos 1.00
29 07-09-17 6+700 6+950 Cateyes fixing RHS Nos 2.00
30 07-09-17 9+100 9+350 Cateyes fixing LHS Nos 2.00
31 07-09-17 9+100 9+350 Cateyes fixing Center Nos 2.00
32 07-09-17 9+100 9+350 Cateyes fixing RHS Nos 1.00
33 07-09-17 9+550 9+900 Cateyes fixing LHS Nos 1.00
34 07-09-17 9+550 9+900 Cateyes fixing RHS Nos 2.00
35 07-09-17 10+350 10+500 Cateyes fixing LHS Nos 1.00
36 07-09-17 10+350 10+500 Cateyes fixing RHS Nos 1.00
37 19-09-17 10+195 11+240 Thermoplastic road marking (Edge Line) LHS Sqm 156.75
38 19-09-17 10+195 11+240 Thermoplastic road marking (Edge Line) RHS Sqm 156.75
39 19-09-17 10+379 10+490 Thermoplastic road marking (Center line continues) Center Sqm 11.10
S. No. Description of Work Side RemarksUnit QuantityDate
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Sangrur to Sunam (S-1)
Chainage
From ToS. No. Description of Work Side RemarksUnit QuantityDate
40 19-09-17 10+195 11+270 Thermoplastic road marking (Center line) Center Sqm 36.90
41 20-09-17 9+580 9+850 Thermoplastic road marking (Center line continues) Center Sqm 27.00
42 20-09-17 9+300 9+380 Thermoplastic road marking (Center line continues) Center Sqm 8.00
43 20-09-17 9+380 9+580 Thermoplastic road marking (Center line) Center Sqm 6.30
44 20-09-17 10+110 10+195 Thermoplastic road marking (Edge Line) RHS Sqm 12.75
45 20-09-17 10+080 10+195 Thermoplastic road marking (Center line) Center Sqm 4.80
46 20-09-17 9+440 10+195 Thermoplastic road marking (Edge Line) LHS Sqm 113.25
47 20-09-17 10+005 10+025 Thermoplastic road marking (Edge Line) RHS Sqm 3.00
48 20-09-17 9+640 9+670 Thermoplastic road marking (Edge Line) RHS Sqm 4.50
49 20-09-17 9+675 9+690 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
50 20-09-17 9+695 9+730 Thermoplastic road marking (Edge Line) RHS Sqm 5.25
51 20-09-17 9+740 9+830 Thermoplastic road marking (Edge Line) RHS Sqm 13.50
52 20-09-17 9+290 9+620 Thermoplastic road marking (Edge Line) RHS Sqm 49.50
53 20-09-17 9+070 9+090 Thermoplastic road marking (Edge Line) RHS Sqm 3.00
54 20-09-17 8+980 9+000 Thermoplastic road marking (Edge Line) LHS Sqm 3.00
55 20-09-17 9+185 9+200 Thermoplastic road marking (Edge Line) LHS Sqm 2.25
56 20-09-17 9+130 9+160 Thermoplastic road marking (Edge Line) LHS Sqm 4.50
57 20-09-17 9+300 9+330 Thermoplastic road marking (Edge Line) LHS Sqm 4.50
58 21-09-17 2+155 2+450 Thermoplastic road marking (Edge Line) LHS Sqm 44.25
59 21-09-17 0+000 2+125 Thermoplastic road marking (Edge Line) LHS Sqm 318.75
60 21-09-17 0+000 0+570 Thermoplastic road marking (Edge Line) RHS Sqm 85.50
61 21-09-17 0+600 0+680 Thermoplastic road marking (Edge Line) RHS Sqm 12.00
62 21-09-17 0+710 0+900 Thermoplastic road marking (Edge Line) RHS Sqm 28.50
63 21-09-17 0+050 0+150 Thermoplastic road marking (Center line continues) Center Sqm 15.00
64 21-09-17 5+000 11+000 Shoulder vegetation removal RHS Sqm 9000.00
65 21-09-17 5+000 6+000 Shoulder vegetation removal LHS Sqm 1500.00
66 22-09-17 4+010 4+150 Thermoplastic road marking (Edge Line) RHS Sqm 21.00
67 22-09-17 4+170 4+370 Thermoplastic road marking (Edge Line) RHS Sqm 30.00
68 22-09-17 3+200 4+030 Thermoplastic road marking (Edge Line) LHS Sqm 124.50
69 22-09-17 2+155 2+450 Thermoplastic road marking (Edge Line) RHS Sqm 44.25
70 22-09-17 1+370 2+125 Thermoplastic road marking (Edge Line) RHS Sqm 113.25
71 22-09-17 0+900 1+335 Thermoplastic road marking (Edge Line) RHS Sqm 65.25
72 22-09-17 0+000 2+450 Thermoplastic road marking (Center line continues) Center Sqm 88.20
73 22-09-17 5+000 6+000 Shrubs removal along the shoulder BHS Rmt 1500.00
74 22-09-17 6+000 11+300 Shoulder vegetation removal LHS Sqm 7500.00
75 23-09-17 6+000 10+000 Shrubs removal along the shoulder BHS Rmt 3000.00
76 23-09-17 5+000 9+000 Shoulder vegetation removal BHS Sqm 3500.00
77 23-09-17 5+000 9+000 Culvert cleaning RHS Nos 7.00
78 23-09-17 5+000 9+000 KM stone cleaning LHS Nos 4.00
79 23-09-17 5+000 9+000 HM stone cleaning LHS Nos 12.00
80 23-09-17 5+000 9+000 Signpost cleaning BHS Nos 14.00
81 25-09-17 5+300 9+200 Embankment slope rectification LHS Sqm 25.00
82 25-09-17 10+000 11+300 Shrubs removal along the shoulder BHS Rmt 200.00
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Sangrur to Sunam (S-1)
Chainage
From ToS. No. Description of Work Side RemarksUnit QuantityDate
83 27-09-17 9+000 11+000 Culvert cleaning BHS Nos 5.00
84 27-09-17 9+000 11+000 Shrubs removal along the shoulder BHS Rmt 300.00
85 27-09-17 11+300 Junction cleaning BHS Sqm 75.00
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Daily Progress Report of September- 2017
Name Of Project:- Output and Performance Based Road Contract (OPRC) (Asset Management Contract) For Improvement, Rehabilitation, Resurfacing & Routine Maintenance
Works of Roads of Sangrur-Mansa-Bathinda Contract Area
PUNJAB ROADS AND BRIDGES DEVELOPMENT BOARD
Road Name : Bhwanigarh-Sunam-Bhikhi-Kotshmir (S-2)
Chainage
From To
1 01-09-17 10+000 64+000 Dewatering Sqm Sqm 1500.00
2 01-09-17 53+000 54+000 Raincut rectification Sqm Sqm 200.00
3 01-09-17 63+000 63+200 Raincut rectification Sqm Sqm 25.00
4 01-09-17 70+000 80+000 Dewatering Sqm Sqm 400.00
5 01-09-17 67+800 Patch work on Round about Sqm Sqm 6.00
6 01-09-17 108+700 108+715 Coping of Median kerb Cum Cum 0.17
7 02-09-17 100+580 100+735 Fdd checking embankment of 4th layer RHS Cum 329.38
8 02-09-17 100+580 100+735 Fdd checking embankment of 5th layer RHS Cum 310.00
9 02-09-17 100+580 100+735 Fdd checking embankment of 6th layer RHS Cum 290.63
10 02-09-17 100+795 100+950 Fdd checking embankment of 4th layer RHS Cum 329.38
11 02-09-17 100+795 100+950 Fdd checking embankment of 5th layer RHS Cum 310.00
12 02-09-17 100+795 100+950 Fdd checking embankment of 6th layer RHS Cum 290.63
13 02-09-17 10+000 17+000 Shoulder vegetation removal Sqm Sqm 1200.00
14 02-09-17 30+000 30+010 Tree branches removal from shoulder Rmt Rmt 10.00
15 02-09-17 55+200 55+600 Raincut rectification Sqm Sqm 25.00
16 02-09-17 17+000 24+000 Shoulder vegetation removal Sqm Sqm 1200.00
17 02-09-17 84+000 85+000 Road cleaning along the kerb Sqm Sqm 800.00
18 02-09-17 81+600 85+000 Shoulder rectification Sqm Sqm 4000.00
19 02-09-17 82+000 83+600 Shoulder tree branches removal Rmt Rmt 1000.00
20 02-09-17 108+400 Brickwork for school washroom Sqm Sqm 3.11
21 04-09-17 100+580 100+735 Fdd checking embankment of 7th layer RHS Cum 271.25
22 04-09-17 100+580 100+735 Fdd checking embankment of 8th layer RHS Cum 271.25
23 04-09-17 100+795 100+950 Fdd checking embankment of 7th layer RHS Cum 271.25
24 04-09-17 100+795 100+950 Fdd checking embankment of 8th layer RHS Cum 271.25
25 04-09-17 100+580 100+735 Level & Fdd checking of embankment top RHS Cum 251.88
26 04-09-17 100+935 100+950 Level & Fdd checking of embankment top RHS Cum 24.38
27 04-09-17 100+400 100+580 Level & Fdd checking of subgrade top RHS Cum 136.80
28 04-09-17 100+950 101+050 Level & Fdd checking of subgrade top RHS Cum 76.00
29 04-09-17 100+580 100+735 Fdd checking of subgrade 1st RHS Cum 251.88
30 04-09-17 100+580 100+735 Level & Fdd checking of subgrade top RHS Cum 251.88
31 04-09-17 100+400 100+580 Level & Fdd checking of GSB top RHS Cum 122.40
32 04-09-17 100+580 100+735 Level & Fdd checking of GSB top RHS Cum 201.50
33 04-09-17 75+800 81+000 Shoulder rectification Sqm Sqm 4000.00
34 04-09-17 69+350 69+800 Shoulder rectification Sqm Sqm 450.00
35 04-09-17 67+700 67+900 Island cleaning Sqm Sqm 120.00
36 04-09-17 67+600 67+900 Pavement surface cleaning Sqm Sqm 1200.00
37 04-09-17 65+000 67+000 KM stone cleaning Nos Nos 2.00
38 04-09-17 65+000 67+000 HM stone cleaning Nos Nos 8.00
39 04-09-17 69+350 69+450 Reverse slope rectification Sqm Sqm 23.00
40 04-09-17 75+200 75+600 Tree branches removal from shoulder Rmt Rmt 400.00
41 04-09-17 69+300 69+350 Pavement surface cleaning Sqm Sqm 100.00
42 04-09-17 68+000 69+000 Tree branches removal from shoulder Rmt Rmt 200.00
43 04-09-17 65+400 65+420 Water based marking (Edge line) Sqm Sqm 3.00
44 04-09-17 65+415 65+460 Water based marking (Edge line) Sqm Sqm 6.75
45 04-09-17 65+480 65+507 Water based marking (Edge line) Sqm Sqm 4.05
46 04-09-17 65+510 65+517 Water based marking (Edge line) Sqm Sqm 1.05
RemarksS. No Date Description of Work Side Unit Quantity
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Bhwanigarh-Sunam-Bhikhi-Kotshmir (S-2)
Chainage
From To
RemarksS. No Date Description of Work Side Unit Quantity
47 04-09-17 65+620 65+632 Water based marking (Edge line) Sqm Sqm 1.80
48 04-09-17 65+640 65+695 Water based marking (Edge line) Sqm Sqm 8.25
49 04-09-17 65+705 65+787 Water based marking (Edge line) Sqm Sqm 12.30
50 04-09-17 65+805 65+830 Water based marking (Edge line) Sqm Sqm 3.75
51 04-09-17 65+840 65+841 Water based marking (Edge line) Sqm Sqm 0.15
52 04-09-17 65+850 65+856 Water based marking (Edge line) Sqm Sqm 0.90
53 04-09-17 65+860 65+887 Water based marking (Edge line) Sqm Sqm 4.05
54 04-09-17 65+890 65+916 Water based marking (Edge line) Sqm Sqm 3.90
55 04-09-17 66+310 66+322 Water based marking (Edge line) Sqm Sqm 1.80
56 04-09-17 66+350 66+358 Water based marking (Edge line) Sqm Sqm 1.20
57 04-09-17 66+360 66+365 Water based marking (Edge line) Sqm Sqm 0.75
58 04-09-17 66+367 66+379 Water based marking (Edge line) Sqm Sqm 1.80
59 04-09-17 66+382 66+392 Water based marking (Edge line) Sqm Sqm 1.50
60 04-09-17 66+610 66+618 Water based marking (Edge line) Sqm Sqm 1.20
61 04-09-17 66+620 66+622 Water based marking (Edge line) Sqm Sqm 0.30
62 04-09-17 66+625 66+631 Water based marking (Edge line) Sqm Sqm 0.90
63 04-09-17 66+750 66+772 Water based marking (Edge line) Sqm Sqm 3.30
64 04-09-17 66+775 66+791 Water based marking (Edge line) Sqm Sqm 2.40
65 04-09-17 66+795 66+811 Water based marking (Edge line) Sqm Sqm 2.40
66 04-09-17 66+812 66+820 Water based marking (Edge line) Sqm Sqm 1.20
67 04-09-17 66+822 66+840 Water based marking (Edge line) Sqm Sqm 2.70
68 04-09-17 66+860 66+875 Water based marking (Edge line) Sqm Sqm 2.25
69 04-09-17 66+880 66+891 Water based marking (Edge line) Sqm Sqm 1.65
70 05-09-17 100+795 100+900 Laying of GSB mixed with Milling Material RHS Cum 109.20
71 05-09-17 100+900 101+050 Laying of GSB mixed with Milling Material RHS Cum 129.00
72 05-09-17 100+400 100+580 Laying of WMM 1st RHS Cum 103.95
73 05-09-17 100+580 100+680 Laying of WMM 1st RHS Cum 101.25
74 05-09-17 100+680 100+735 Laying of WMM 1st RHS Cum 103.95
75 05-09-17 67+850 Thermoplastic road marking (Round About) - Sqm 39.30
76 05-09-17 55+695 Thermoplastic road marking (Junction) LHS Sqm 10.50
77 05-09-17 55+530 55+686 Thermoplastic road marking (Edge line) LHS Sqm 23.40
78 05-09-17 55+716 56+400 Thermoplastic road marking (Edge Line) LHS Sqm 102.60
79 05-09-17 67+400 67+900 Low Shoulder Rectification Sqm Sqm 500.00
80 05-09-17 67+200 67+900 Low Shoulder Rectification Sqm Sqm 700.00
81 05-09-17 76+250 76+400 Low Shoulder Rectification Sqm Sqm 150.00
82 05-09-17 76+250 76+450 Low Shoulder Rectification Sqm Sqm 200.00
83 05-09-17 77+350 77+400 Low Shoulder Rectification Sqm Sqm 50.00
84 05-09-17 83+900 84+070 Pavement surface cleaning Sqm Sqm 680.00
85 05-09-17 67+200 67+600 Pavement surface cleaning Sqm Sqm 800.00
86 05-09-17 67+400 67+600 Pavement surface cleaning Sqm Sqm 400.00
87 05-09-17 108+400 - Plaster for Bathroom Wall Sqm Sqm 27.00
88 05-09-17 - Plaster for Bathroom Wall Sqm Sqm 2.16
89 05-09-17 10+000 15+000 Shoulder Water Stagnation Removal Sqm Sqm 1300.00
90 05-09-17 10+000 15+000 Culvert Cleaning Nos Nos 2.00
91 05-09-17 10+000 15+000 Tree Branches Removal Rmt Rmt 600.00
92 05-09-17 10+000 15+000 KM Stone Cleaning Nos Nos 6.00
93 05-09-17 10+000 15+000 Hectometer Stone Cleaning Nos Nos 20.00
94 05-09-17 10+000 15+000 Sign Post Cleaning Nos Nos 18.00
95 05-09-17 12+000 13+000 Embankment & Raincut Rectification Sqm Sqm 7.50
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Bhwanigarh-Sunam-Bhikhi-Kotshmir (S-2)
Chainage
From To
RemarksS. No Date Description of Work Side Unit Quantity
96 05-09-17 11+000 15+000 Shoulder Cleaning Sqm Sqm 2200.00
97 05-09-17 28+190 28+227 Water based marking (Edge line) Sqm Sqm 5.55
98 05-09-17 28+250 28+285 Water based marking (Edge line) Sqm Sqm 5.25
99 05-09-17 28+060 28+099 Water based marking (Edge line) Sqm Sqm 5.85
100 05-09-17 28+020 28+031 Water based marking (Edge line) Sqm Sqm 1.65
101 05-09-17 27+900 27+914 Water based marking (Edge line) Sqm Sqm 2.10
102 05-09-17 27+530 27+551 Water based marking (Edge line) Sqm Sqm 3.15
103 05-09-17 27+360 27+409 Water based marking (Edge line) Sqm Sqm 7.35
104 05-09-17 27+250 27+292 Water based marking (Edge line) Sqm Sqm 6.30
105 05-09-17 26+300 26+350 Water based marking (Center line) Sqm Sqm 3.60
106 05-09-17 26+300 26+350 Water based marking (Center line) Sqm Sqm 3.15
107 05-09-17 26+270 26+328 Water based marking (Edge line) Sqm Sqm 8.70
108 05-09-17 26+200 26+273 Water based marking (Edge line) Sqm Sqm 10.95
109 05-09-17 26+040 26+065 Water based marking (Edge line) Sqm Sqm 3.75
110 05-09-17 26+010 26+022 Water based marking (Edge line) Sqm Sqm 1.80
111 05-09-17 25+990 26+001 Water based marking (Edge line) Sqm Sqm 1.65
112 05-09-17 26+930 - Water based marking (Edge line) Sqm Sqm 8.10
113 05-09-17 25+900 25+908 Water based marking (Edge line) Sqm Sqm 1.20
114 05-09-17 25+800 25+900 Water based marking (Center line) Sqm Sqm 1.35
115 05-09-17 25+900 25+950 Water based marking (Center line) Sqm Sqm 1.35
116 05-09-17 25+910 25+935 Water based marking (Edge line) Sqm Sqm 3.75
117 05-09-17 24+580 - Water based marking (Edge line) Sqm Sqm 3.00
118 05-09-17 24+560 24+566 Water based marking (Edge line) Sqm Sqm 0.90
119 05-09-17 24+470 24+500 Water based marking (Edge line) Sqm Sqm 4.50
120 05-09-17 24+500 24+521 Water based marking (Center line) Sqm Sqm 3.15
121 05-09-17 24+030 24+058 Water based marking (Edge line) Sqm Sqm 4.20
122 05-09-17 67+460 67+602 Water based marking (Edge line) Sqm Sqm 21.30
123 05-09-17 67+750 67+756 Water based marking (Edge line) Sqm Sqm 0.90
124 05-09-17 67+800 67+813 Water based marking (Edge line) Sqm Sqm 1.95
125 05-09-17 68+030 68+034 Water based marking (Edge line) Sqm Sqm 0.60
126 05-09-17 68+410 68+423 Water based marking (Edge line) Sqm Sqm 1.95
127 05-09-17 68+450 68+468 Water based marking (Edge line) Sqm Sqm 2.70
128 05-09-17 68+430 68+440 Water based marking (Edge line) Sqm Sqm 1.50
129 05-09-17 68+620 68+632 Water based marking (Edge line) Sqm Sqm 1.80
130 05-09-17 68+630 68+640 Water based marking (Edge line) Sqm Sqm 1.50
131 05-09-17 68+970 68+986 Water based marking (Edge line) Sqm Sqm 2.40
132 05-09-17 69+000 69+011 Water based marking (Edge line) Sqm Sqm 1.65
133 05-09-17 69+030 69+046 Water based marking (Edge line) Sqm Sqm 2.40
134 05-09-17 69+050 69+060 Water based marking (Edge line) Sqm Sqm 1.50
135 05-09-17 69+070 69+072 Water based marking (Edge line) Sqm Sqm 0.30
136 05-09-17 69+075 69+077 Water based marking (Edge line) Sqm Sqm 0.30
137 05-09-17 69+080 69+094 Water based marking (Edge line) Sqm Sqm 2.10
138 05-09-17 69+300 69+306 Water based marking (Edge line) Sqm Sqm 0.90
139 05-09-17 69+350 69+369 Water based marking (Edge line) Sqm Sqm 2.85
140 05-09-17 69+400 69+415 Water based marking (Edge line) Sqm Sqm 2.25
141 05-09-17 69+450 69+456 Water based marking (Edge line) Sqm Sqm 0.90
142 05-09-17 69+570 69+574 Water based marking (Edge line) Sqm Sqm 0.60
143 05-09-17 69+590 69+602 Water based marking (Edge line) Sqm Sqm 1.80
144 05-09-17 69+620 69+626 Water based marking (Edge line) Sqm Sqm 0.90
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Bhwanigarh-Sunam-Bhikhi-Kotshmir (S-2)
Chainage
From To
RemarksS. No Date Description of Work Side Unit Quantity
145 05-09-17 69+640 69+654 Water based marking (Edge line) Sqm Sqm 2.10
146 05-09-17 69+670 69+678 Water based marking (Edge line) Sqm Sqm 1.20
147 05-09-17 69+680 69+691 Water based marking (Edge line) Sqm Sqm 1.65
148 05-09-17 69+700 69+704 Water based marking (Edge line) Sqm Sqm 0.60
149 05-09-17 69+710 69+713 Water based marking (Edge line) Sqm Sqm 0.45
150 05-09-17 69+768 69+800 Water based marking (Edge line) Sqm Sqm 4.80
151 05-09-17 69+802 69+814 Water based marking (Edge line) Sqm Sqm 1.80
152 05-09-17 69+825 69+873 Water based marking (Edge line) Sqm Sqm 7.20
153 05-09-17 69+875 69+887 Water based marking (Edge line) Sqm Sqm 1.80
154 05-09-17 69+890 69+895 Water based marking (Edge line) Sqm Sqm 0.75
155 05-09-17 69+910 69+912 Water based marking (Edge line) Sqm Sqm 0.30
156 05-09-17 69+920 69+952 Water based marking (Edge line) Sqm Sqm 4.80
157 05-09-17 69+970 69+989 Water based marking (Edge line) Sqm Sqm 2.85
158 05-09-17 69+900 69+912 Water based marking (Edge line) Sqm Sqm 1.80
159 05-09-17 69+890 69+896 Water based marking (Edge line) Sqm Sqm 0.90
160 05-09-17 69+888 69+890 Water based marking (Edge line) Sqm Sqm 0.30
161 05-09-17 69+840 69+857 Water based marking (Edge line) Sqm Sqm 2.55
162 05-09-17 69+830 69+834 Water based marking (Edge line) Sqm Sqm 0.60
163 05-09-17 69+750 69+810 Water based marking (Edge line) Sqm Sqm 9.00
164 05-09-17 69+735 69+745 Water based marking (Edge line) Sqm Sqm 1.50
165 05-09-17 69+720 69+727 Water based marking (Edge line) Sqm Sqm 1.05
166 05-09-17 69+700 69+702 Water based marking (Edge line) Sqm Sqm 0.30
167 05-09-17 69+595 69+601 Water based marking (Edge line) Sqm Sqm 0.90
168 05-09-17 69+570 69+575 Water based marking (Edge line) Sqm Sqm 0.75
169 05-09-17 69+565 69+567 Water based marking (Edge line) Sqm Sqm 0.30
170 05-09-17 69+555 69+559 Water based marking (Edge line) Sqm Sqm 0.60
171 05-09-17 69+580 - Water based marking (Zebra) Sqm Sqm 13.50
172 05-09-17 69+580 - Water based marking (Stop line) Sqm Sqm 1.50
173 05-09-17 67+493 67+600 Water based marking (Edge line) Sqm Sqm 16.05
174 06-09-17 100+400 100+530 Excavation upto Subgrade top for widening bridge approaches LHS Cum 247.00
175 06-09-17 100+950 101+030 Level & Fdd checking of WMM 1st RHS Cum 46.20
176 06-09-17 100+795 100+850 Level & Fdd checking of WMM 1st RHS Cum 107.80
177 06-09-17 100+850 100+950 Level & Fdd checking of WMM 1st RHS Cum 108.75
178 06-09-17 15+000 20+000 Shrubs removal along the shoulder Rmt Rmt 2000.00
179 06-09-17 15+000 18+000 Shoulder vegetation removal Sqm Sqm 1000.00
180 06-09-17 15+000 18+000 KM stone cleaning Nos Nos 4.00
181 06-09-17 15+000 18+000 HM stone cleaning Nos Nos 12.00
182 06-09-17 17+400 17+500 Rope wire type safety barrier cleaning Sqm Sqm 100.00
183 06-09-17 15+000 20+000 Culvert Cleaning Nos Nos 5.00
184 06-09-17 18+300 18+500 Median cleaning Sqm Sqm 120.00
185 06-09-17 15+000 20+000 Signpost cleaning Nos Nos 20.00
186 06-09-17 15+000 20+000 Shoulder rectification Sqm Sqm 1600.00
187 06-09-17 15+000 20+000 Pavement surface cleaning Sqm Sqm 2400.00
188 06-09-17 15+000 20+000 Raincut rectification Sqm Sqm 25.00
189 06-09-17 59+250 59+400 Cateyes fixing Nos Nos 1.00
190 06-09-17 59+250 59+400 Cateyes fixing Nos Nos 2.00
191 06-09-17 15+035 15+039 Water based marking (Edge line) Sqm Sqm 0.60
192 06-09-17 15+350 15+354 Water based marking (Edge line) Sqm Sqm 0.60
193 06-09-17 15+345 15+347 Water based marking (Edge line) Sqm Sqm 0.30
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Bhwanigarh-Sunam-Bhikhi-Kotshmir (S-2)
Chainage
From To
RemarksS. No Date Description of Work Side Unit Quantity
194 06-09-17 15+430 15+436 Water based marking (Edge line) Sqm Sqm 0.90
195 06-09-17 15+500 15+509 Water based marking (Edge line) Sqm Sqm 1.35
196 06-09-17 15+550 15+577 Water based marking (Edge line) Sqm Sqm 4.05
197 06-09-17 15+585 15+589 Water based marking (Edge line) Sqm Sqm 0.60
198 06-09-17 15+800 15+808 Water based marking (Edge line) Sqm Sqm 1.20
199 06-09-17 15+870 15+876 Water based marking (Edge line) Sqm Sqm 0.90
200 06-09-17 15+880 15+886 Water based marking (Edge line) Sqm Sqm 0.90
201 06-09-17 15+890 15+900 Water based marking (Edge line) Sqm Sqm 1.50
202 06-09-17 15+880 15+890 Water based marking (Edge line) Sqm Sqm 1.50
203 06-09-17 15+940 15+949 Water based marking (Edge line) Sqm Sqm 1.35
204 06-09-17 15+940 15+947 Water based marking (Edge line) Sqm Sqm 1.05
205 06-09-17 15+995 16+013 Water based marking (Edge line) Sqm Sqm 2.70
206 06-09-17 16+050 16+059 Water based marking (Edge line) Sqm Sqm 1.35
207 06-09-17 16+220 16+235 Water based marking (Edge line) Sqm Sqm 2.25
208 06-09-17 16+250 16+260 Water based marking (Edge line) Sqm Sqm 1.50
209 06-09-17 16+320 16+326 Water based marking (Edge line) Sqm Sqm 0.90
210 06-09-17 16+310 16+321 Water based marking (Edge line) Sqm Sqm 1.65
211 06-09-17 16+350 16+353 Water based marking (Edge line) Sqm Sqm 0.45
212 06-09-17 16+380 16+384 Water based marking (Edge line) Sqm Sqm 0.60
213 06-09-17 16+500 16+511 Water based marking (Edge line) Sqm Sqm 1.65
214 06-09-17 16+600 16+609 Water based marking (Edge line) Sqm Sqm 1.35
215 06-09-17 16+840 16+847 Water based marking (Edge line) Sqm Sqm 1.05
216 06-09-17 16+850 16+858 Water based marking (Edge line) Sqm Sqm 1.20
217 06-09-17 16+940 16+963 Water based marking (Edge line) Sqm Sqm 3.45
218 06-09-17 16+980 16+985 Water based marking (Edge line) Sqm Sqm 0.75
219 06-09-17 17+010 17+033 Water based marking (Edge line) Sqm Sqm 3.45
220 06-09-17 17+170 17+190 Water based marking (Edge line) Sqm Sqm 3.00
221 06-09-17 17+192 17+199 Water based marking (Edge line) Sqm Sqm 1.05
222 06-09-17 17+200 17+203 Water based marking (Edge line) Sqm Sqm 0.45
223 06-09-17 17+205 17+220 Water based marking (Edge line) Sqm Sqm 2.25
224 06-09-17 17+225 17+229 Water based marking (Edge line) Sqm Sqm 0.60
225 06-09-17 17+270 17+286 Water based marking (Edge line) Sqm Sqm 2.40
226 06-09-17 17+290 17+315 Water based marking (Edge line) Sqm Sqm 3.75
227 06-09-17 17+330 17+334 Water based marking (Edge line) Sqm Sqm 0.60
228 06-09-17 17+350 17+361 Water based marking (Edge line) Sqm Sqm 1.65
229 06-09-17 17+380 17+403 Water based marking (Edge line) Sqm Sqm 3.45
230 06-09-17 17+410 17+412 Water based marking (Edge line) Sqm Sqm 0.30
231 06-09-17 17+420 17+450 Water based marking (Edge line) Sqm Sqm 4.50
232 06-09-17 17+520 17+539 Water based marking (Edge line) Sqm Sqm 2.85
233 06-09-17 17+560 17+587 Water based marking (Edge line) Sqm Sqm 4.05
234 06-09-17 17+590 17+592 Water based marking (Edge line) Sqm Sqm 0.30
235 06-09-17 17+600 17+640 Water based marking (Edge line) Sqm Sqm 6.00
236 06-09-17 17+650 17+654 Water based marking (Edge line) Sqm Sqm 0.60
237 06-09-17 17+680 17+687 Water based marking (Edge line) Sqm Sqm 1.05
238 06-09-17 17+720 17+730 Water based marking (Edge line) Sqm Sqm 1.50
239 06-09-17 17+700 17+723 Water based marking (Edge line) Sqm Sqm 3.45
240 06-09-17 17+730 17+748 Water based marking (Edge line) Sqm Sqm 2.70
241 06-09-17 17+740 17+753 Water based marking (Edge line) Sqm Sqm 1.95
242 06-09-17 17+760 17+770 Water based marking (Edge line) Sqm Sqm 1.50
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Bhwanigarh-Sunam-Bhikhi-Kotshmir (S-2)
Chainage
From To
RemarksS. No Date Description of Work Side Unit Quantity
243 06-09-17 17+770 17+780 Water based marking (Edge line) Sqm Sqm 1.50
244 06-09-17 17+810 17+824 Water based marking (Edge line) Sqm Sqm 2.10
245 06-09-17 17+830 17+845 Water based marking (Edge line) Sqm Sqm 2.25
246 06-09-17 17+860 17+871 Water based marking (Edge line) Sqm Sqm 1.65
247 06-09-17 17+874 17+895 Water based marking (Edge line) Sqm Sqm 3.15
248 06-09-17 17+910 17+924 Water based marking (Edge line) Sqm Sqm 2.10
249 06-09-17 17+940 17+950 Water based marking (Edge line) Sqm Sqm 1.50
250 06-09-17 17+960 17+964 Water based marking (Edge line) Sqm Sqm 0.60
251 06-09-17 17+970 17+984 Water based marking (Edge line) Sqm Sqm 2.10
252 06-09-17 17+990 17+995 Water based marking (Edge line) Sqm Sqm 0.75
253 06-09-17 18+000 18+125 Water based marking (Edge line) Sqm Sqm 18.75
254 06-09-17 18+120 18+126 Water based marking (Edge line) Sqm Sqm 0.90
255 06-09-17 18+090 18+112 Water based marking (Edge line) Sqm Sqm 3.30
256 06-09-17 18+400 18+465 Water based marking (Edge line) Sqm Sqm 9.75
257 06-09-17 80+000 85+000 Shoulder vegetation removal Sqm Sqm 9600.00
258 06-09-17 108+400 PCC for bath room wall Cum Cum 0.81
259 06-09-17 108+730 Brickwork for pedestrian crossing Cum Cum 0.06
260 06-09-17 108+730 Plasterwork for pedestrian crossing (Inner & top) Sqm Sqm 0.94
261 06-09-17 108+730 Concerting for pedestrian crossing Cum Cum 0.27
262 06-09-17 68+520 69+010 Cateyes fixing Nos Nos 2.00
263 06-09-17 68+520 69+010 Cateyes fixing Nos Nos 2.00
264 06-09-17 68+520 69+010 Cateyes fixing Nos Nos 8.00
265 06-09-17 13+550 13+600 Cateyes fixing Nos Nos 6.00
266 07-09-17 100+530 100+590 Excavation upto Subgrade top for widening of bridge approaches LHS Cum 120.00
267 07-09-17 100+400 100+580 Level & Fdd checking of Subgrade widening portion RHS Cum 136.80
268 07-09-17 18+320 18+360 Plasterwork for repair of median kerb Sqm Sqm 3.00
269 07-09-17 18+420 18+450 Plasterwork for repair of median kerb Sqm Sqm 1.80
270 07-09-17 20+000 25+000 Shoulder rectification Sqm Sqm 1800.00
271 07-09-17 20+000 25+000 Pavement surface cleaning Sqm Sqm 1800.00
272 07-09-17 24+500 24+600 Junction cleaning Sqm Sqm 200.00
273 07-09-17 20+000 25+000 Shrubs removal along the shoulder Rmt Rmt 1500.00
274 07-09-17 20+000 25+000 KM stone cleaning Nos Nos 5.00
275 07-09-17 20+000 25+000 HM stone cleaning Nos Nos 16.00
276 07-09-17 20+000 25+000 Culvert cleaning Nos Nos 5.00
277 07-09-17 20+000 25+000 Embankment slope rectification Sqm Sqm 10.00
278 07-09-17 20+000 25+000 Signpost cleaning Nos Nos 32.00
279 07-09-17 12+630 12+900 Cateyes fixing Nos Nos 4.00
280 07-09-17 12+630 12+900 Cateyes fixing Nos Nos 4.00
281 07-09-17 12+630 12+900 Cateyes fixing Nos Nos 2.00
282 07-09-17 13+750 13+900 Cateyes fixing Nos Nos 1.00
283 07-09-17 13+750 13+900 Cateyes fixing Nos Nos 3.00
284 07-09-17 13+750 13+900 Cateyes fixing Nos Nos 1.00
285 07-09-17 16+750 17+000 Cateyes fixing Nos Nos 2.00
286 07-09-17 16+750 17+000 Cateyes fixing Nos Nos 5.00
287 07-09-17 16+750 17+000 Cateyes fixing Nos Nos 2.00
288 07-09-17 17+400 17+600 Cateyes fixing Nos Nos 1.00
289 07-09-17 17+400 17+600 Cateyes fixing Nos Nos 2.00
290 07-09-17 17+400 17+600 Cateyes fixing Nos Nos 2.00
291 07-09-17 20+650 20+800 Cateyes fixing Nos Nos 2.00
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Bhwanigarh-Sunam-Bhikhi-Kotshmir (S-2)
Chainage
From To
RemarksS. No Date Description of Work Side Unit Quantity
292 07-09-17 16+220 16+235 Cateyes fixing Nos Nos 4.00
293 07-09-17 16+250 16+260 Cateyes fixing Nos Nos 2.00
294 07-09-17 28+000 28+150 Cateyes fixing (RHS) Nos Nos 1.00
295 07-09-17 28+000 28+150 Cateyes fixing (RHS) Nos Nos 2.00
296 07-09-17 28+000 28+150 Cateyes fixing (LHS) Nos Nos 1.00
297 07-09-17 28+000 28+150 Cateyes fixing (LHS) Nos Nos 2.00
298 07-09-17 28+000 28+150 Cateyes fixing (LHS) Nos Nos 2.00
299 07-09-17 28+700 28+950 Cateyes fixing Nos Nos 1.00
300 07-09-17 28+700 28+950 Cateyes fixing Nos Nos 3.00
301 07-09-17 28+700 28+950 Cateyes fixing Nos Nos 1.00
302 07-09-17 29+700 29+850 Cateyes fixing Nos Nos 2.00
303 07-09-17 29+700 29+850 Cateyes fixing Nos Nos 1.00
304 07-09-17 29+700 29+850 Cateyes fixing Nos Nos 2.00
305 07-09-17 35+810 36+080 Cateyes fixing Nos Nos 2.00
306 07-09-17 35+810 36+080 Cateyes fixing Nos Nos 1.00
307 07-09-17 36+150 36+430 Cateyes fixing Nos Nos 2.00
308 07-09-17 36+600 36+900 Cateyes fixing Nos Nos 2.00
309 07-09-17 36+600 36+900 Cateyes fixing Nos Nos 2.00
310 07-09-17 18+250 Cateyes fixing on Chevron Nos Nos 12.00
311 07-09-17 18+380 Cateyes fixing on Chevron Nos Nos 12.00
312 07-09-17 39+400 Cateyes fixing on Chevron Nos Nos 12.00
313 07-09-17 40+600 Cateyes fixing on Chevron Nos Nos 12.00
314 07-09-17 95+400 Pipe encasing & jointing Sqm Sqm 0.18
315 08-09-17 108+720 Thermoplastic road marking (Zebra Marking) BHS Sqm 16.20
316 08-09-17 108+720 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
317 08-09-17 18+420 18+450 Plasterwork for repair of median kerb Sqm Sqm 1.50
318 08-09-17 26+100 26+108 Footpath tiles rectification Sqm Sqm 12.00
319 08-09-17 25+000 25+400 Shoulder rectification Sqm Sqm 400.00
320 08-09-17 25+000 25+400 Pavement surface cleaning Sqm Sqm 400.00
321 08-09-17 27+200 29+000 Shoulder rectification Sqm Sqm 1500.00
322 08-09-17 27+200 29+000 Pavement surface cleaning Sqm Sqm 1200.00
323 08-09-17 25+000 26+400 Road cleaning along the kerb Sqm Sqm 800.00
324 08-09-17 26+400 27+200 ROB cleaning Sqm Sqm 500.00
325 08-09-17 27+300 29+000 Shrubs removal along the shoulder Rmt Rmt 100.00
326 08-09-17 25+000 29+000 KM stone cleaning Nos Nos 2.00
327 08-09-17 25+000 29+000 HM stone cleaning Nos Nos 4.00
328 09-09-17 100+735 100+800 Application of Tack Coat RHS Sqm 305.50
329 09-09-17 100+735 100+800 DBM laying RHS Cum 9.78
330 09-09-17 100+735 100+800 Application of Tack Coat RHS Sqm 305.50
331 09-09-17 100+735 100+800 BC laying RHS Cum 15.28
332 09-09-17 63+800 68+000 Thermoplastic road marking (Center Line) Center Sqm 130.20
333 09-09-17 67+764 68+000 Thermoplastic road marking (Edge Line) LHS Sqm 35.40
334 09-09-17 67+596 67+675 Thermoplastic road marking (Edge Line) LHS Sqm 11.85
335 09-09-17 66+574 67+458 Thermoplastic road marking (Edge Line) LHS Sqm 132.60
336 09-09-17 25+880 26+100 Footpath tiles rectification Sqm Sqm 12.00
337 09-09-17 27+950 Repair work of Median Nose Sqm Sqm 4.00
338 09-09-17 29+000 30+000 Shoulder rectification Sqm Sqm 700.00
339 09-09-17 29+000 30+000 Shrubs removal along the shoulder Rmt Rmt 20.00
340 09-09-17 29+000 30+000 Culvert cleaning Nos Nos 2.00
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Bhwanigarh-Sunam-Bhikhi-Kotshmir (S-2)
Chainage
From To
RemarksS. No Date Description of Work Side Unit Quantity
341 09-09-17 55+000 55+600 Main carriageway cleaning Sqm Sqm 400.00
342 09-09-17 55+000 55+600 Pavement surface cleaning Sqm Sqm 750.00
343 09-09-17 55+500 Junction cleaning Sqm Sqm 40.00
344 09-09-17 55+000 65+000 Shoulder rectification Sqm Sqm 1200.00
345 10-09-17 65+546 66+574 Thermoplastic road marking (Edge Line) LHS Sqm 154.20
346 10-09-17 65+420 65+523 Thermoplastic road marking (Edge Line) LHS Sqm 15.45
347 10-09-17 64+800 65+400 Thermoplastic road marking (Edge Line) LHS Sqm 90.00
348 10-09-17 64+761 64+795 Thermoplastic road marking (Edge Line) LHS Sqm 5.10
349 10-09-17 64+731 64+756 Thermoplastic road marking (Edge Line) LHS Sqm 3.75
350 10-09-17 64+676 64+726 Thermoplastic road marking (Edge Line) LHS Sqm 7.50
351 10-09-17 64+584 64+634 Thermoplastic road marking (Edge Line) LHS Sqm 7.50
352 10-09-17 64+549 64+579 Thermoplastic road marking (Edge Line) LHS Sqm 4.50
353 10-09-17 64+504 64+544 Thermoplastic road marking (Edge Line) LHS Sqm 6.00
354 10-09-17 64+147 64+474 Thermoplastic road marking (Edge Line) LHS Sqm 49.05
355 10-09-17 63+842 64+116 Thermoplastic road marking (Edge Line) LHS Sqm 41.10
356 10-09-17 63+800 64+005 Thermoplastic road marking (Edge Line) RHS Sqm 30.75
357 11-09-17 33+000 36+000 Shrubs removal along the shoulder Rmt Rmt 1500.00
358 11-09-17 97+000 108+000 Dewatering Sqm Sqm 1250.00
359 12-09-17 100+580 100+735 Excavation upto subgrade top LHS Cum 294.50
360 12-09-17 95+300 95+400 Excavation upto subgrade top LHS Cum 190.00
361 12-09-17 67+650 BC laying for Patch work at Round about portion RHS Cum 1.32
362 12-09-17 67+650 BC laying for Patch work at Round about portion LHS Cum 1.56
363 12-09-17 67+650 BC laying for Patch work at Round about portion LHS Cum 0.64
364 12-09-17 67+650 BC laying for Patch work at Round about portion LHS Cum 0.22
365 12-09-17 88+620 88+700 Thermoplastic road marking (Rumbles) BHS Sqm 37.80
366 12-09-17 88+760 88+840 Thermoplastic road marking (Rumbles) BHS Sqm 37.80
367 12-09-17 30+000 33+000 Shrubs removal along the shoulder Rmt Rmt 2000.00
368 12-09-17 30+000 33+000 Culvert cleaning Nos Nos 5.00
369 12-09-17 30+000 33+000 KM Stone Cleaning Nos Nos 3.00
370 12-09-17 30+000 33+000 HM Stone Cleaning Nos Nos 12.00
371 13-09-17 100+850 101+060 Excavation upto subgrade top LHS Cum 399.00
372 13-09-17 100+400 100+735 Milling of existing surface LHS Sqm 1373.50
373 13-09-17 100+400 100+735 Level & Fdd checking of Subgrade top LHS Cum 254.60
374 13-09-17 13+760 13+880 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
375 13-09-17 14+020 14+140 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
376 13-09-17 14+100 14+140 Thermoplastic road marking (Rumbles) BHS Sqm 12.60
377 13-09-17 13+900 14+015 Thermoplastic road marking (Zigzag marking) Center Sqm 11.40
378 13-09-17 20+810 20+940 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
379 13-09-17 20+535 20+665 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
380 13-09-17 20+710 20+810 Thermoplastic road marking (Zigzag marking) Center Sqm 10.00
381 13-09-17 69+610 69+740 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
382 13-09-17 69+440 69+570 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
383 13-09-17 69+570 69+610 Thermoplastic road marking (Zigzag marking) Center Sqm 4.00
384 13-09-17 72+980 72+850 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
385 13-09-17 72+800 72+850 Thermoplastic road marking (Zigzag marking) Center Sqm 5.00
386 13-09-17 72+670 72+800 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
387 13-09-17 88+620 88+700 Thermoplastic road marking (Center Line continue) Center Sqm 7.00
388 13-09-17 88+760 88+840 Thermoplastic road marking (Center Line continue) Center Sqm 7.00
389 13-09-17 88+700 88+760 Thermoplastic road marking (Zigzag marking) Center Sqm 6.00
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Bhwanigarh-Sunam-Bhikhi-Kotshmir (S-2)
Chainage
From To
RemarksS. No Date Description of Work Side Unit Quantity
390 13-09-17 30+000 33+000 Shrubs removal along the shoulder Rmt Rmt 2000.00
391 13-09-17 46+600 64+500 Removal of edge line with emulsion Sqm Sqm 135.00
392 14-09-17 100+850 101+060 Level & Fdd checking of Subgrade top LHS Cum 159.60
393 14-09-17 100+400 100+735 Milling of existing surface RHS Sqm 971.50
394 14-09-17 100+790 101+060 Milling of existing surface LHS Sqm 1620.00
395 14-09-17 6+087 6+100 BC laying for Median gap filling Center Cum 1.43
396 14-09-17 6+302 6+310 BC laying for Median gap filling Center Cum 0.88
397 14-09-17 6+560 6+572 BC laying for Median gap filling Center Cum 1.32
398 14-09-17 6+708 6+722 BC laying for Median gap filling Center Cum 1.54
399 14-09-17 7+088 7+108 BC laying for Median gap filling Center Cum 2.20
400 14-09-17 7+250 7+265 BC laying for Median gap filling Center Cum 1.65
401 14-09-17 8+946 8+970 BC laying for Median gap filling Center Cum 2.64
402 14-09-17 6+206 6+220 BC laying for Median gap filling Center Cum 1.54
403 14-09-17 54+200 Bc laying for junction improvement (link road) RHS Cum 4.80
404 14-09-17 54+200 Bc laying for junction improvement (Flare portions) RHS Cum 1.34
405 14-09-17 54+250 Bc laying for junction improvement (link road) RHS Cum 4.80
406 14-09-17 54+250 Bc laying for junction improvement (Flare portions) RHS Cum 1.57
407 14-09-17 72+980 72+850 Thermoplastic road marking (Chevron) Center Sqm 18.00
408 14-09-17 9+180 9+324 Thermoplastic road marking (Center Line) LHS Sqm 7.20
409 14-09-17 9+180 9+324 Thermoplastic road marking (Center Line) RHS Sqm 7.20
410 14-09-17 40+324 40+330 BC laying for Median gap filling Cum Cum 0.54
411 14-09-17 45+050 Patch work Sqm Sqm 0.50
412 14-09-17 46+500 46+600 Application of emulsion on old road marking Sqm Sqm 10.00
413 14-09-17 44+200 46+000 Shrubs removal along the shoulder Rmt Rmt 1500.00
414 15-09-17 100+400 100+735 Laying of GSB (Widening) LHS Cum 227.80
415 15-09-17 100+850 101+060 Laying of GSB (Widening) LHS Cum 142.80
416 15-09-17 64+730 64+755 Thermoplastic road marking (Edge Line) RHS Sqm 3.75
417 15-09-17 64+760 64+764 Thermoplastic road marking (Edge Line) RHS Sqm 0.60
418 15-09-17 64+790 64+795 Thermoplastic road marking (Edge Line) RHS Sqm 0.75
419 15-09-17 64+800 65+415 Thermoplastic road marking (Edge Line) RHS Sqm 92.25
420 15-09-17 65+590 65+620 Thermoplastic road marking (Edge Line) RHS Sqm 4.50
421 15-09-17 65+632 65+640 Thermoplastic road marking (Edge Line) RHS Sqm 1.20
422 15-09-17 65+695 65+703 Thermoplastic road marking (Edge Line) RHS Sqm 1.20
423 15-09-17 65+460 65+480 Thermoplastic road marking (Edge Line) RHS Sqm 3.00
424 15-09-17 65+507 65+510 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
425 15-09-17 64+005 64+120 Thermoplastic road marking (Edge Line) RHS Sqm 17.25
426 15-09-17 64+149 64+332 Thermoplastic road marking (Edge Line) RHS Sqm 27.45
427 15-09-17 64+358 64+496 Thermoplastic road marking (Edge Line) RHS Sqm 20.70
428 15-09-17 64+531 64+537 Thermoplastic road marking (Edge Line) RHS Sqm 0.90
429 15-09-17 64+542 64+567 Thermoplastic road marking (Edge Line) RHS Sqm 3.75
430 15-09-17 64+572 64+637 Thermoplastic road marking (Edge Line) RHS Sqm 9.75
431 15-09-17 64+692 64+725 Thermoplastic road marking (Edge Line) RHS Sqm 4.95
432 15-09-17 47+000 53+000 Shoulder Vegetation Removal Sqm Sqm 3000.00
433 15-09-17 50+000 53+000 Shoulder rectification Cum Cum 90.00
434 15-09-17 50+000 53+000 Pavement surface cleaning Sqm Sqm 2700.00
435 15-09-17 50+000 53+000 Shrubs removal along the shoulder Rmt Rmt 750.00
436 15-09-17 52+000 54+000 Culvert Cleaning Nos Nos 4.00
437 16-09-17 96+500 96+700 Excavation upto subgrade top RHS Cum 400.00
438 16-09-17 96+500 96+700 Level & Fdd checking of subgrade Top RHS Cum 15.20
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Bhwanigarh-Sunam-Bhikhi-Kotshmir (S-2)
Chainage
From To
RemarksS. No Date Description of Work Side Unit Quantity
439 16-09-17 100+400 100+735 Laying & Fdd checking of WMM 1st (Widening) LHS Cum 165.83
440 16-09-17 100+850 100+900 Laying & Fdd checking of WMM 1st (Widening) LHS Cum 24.75
441 16-09-17 ############## 65+590 Thermoplastic road marking (Edge Line) RHS Sqm 2.10
442 16-09-17 65+805 65+810 Thermoplastic road marking (Edge Line) RHS Sqm 0.75
443 16-09-17 65+830 65+837 Thermoplastic road marking (Edge Line) RHS Sqm 1.05
444 16-09-17 65+841 65+850 Thermoplastic road marking (Edge Line) RHS Sqm 1.35
445 16-09-17 65+860 65+862 Thermoplastic road marking (Edge Line) RHS Sqm 0.30
446 16-09-17 65+887 65+890 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
447 16-09-17 65+916 66+310 Thermoplastic road marking (Edge Line) RHS Sqm 59.10
448 16-09-17 66+322 66+350 Thermoplastic road marking (Edge Line) RHS Sqm 4.20
449 16-09-17 66+358 66+360 Thermoplastic road marking (Edge Line) RHS Sqm 0.30
450 16-09-17 66+365 66+367 Thermoplastic road marking (Edge Line) RHS Sqm 0.30
451 16-09-17 66+379 66+382 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
452 16-09-17 66+392 66+610 Thermoplastic road marking (Edge Line) RHS Sqm 32.70
453 16-09-17 66+618 66+620 Thermoplastic road marking (Edge Line) RHS Sqm 0.30
454 16-09-17 66+622 66+625 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
455 16-09-17 66+631 66+750 Thermoplastic road marking (Edge Line) RHS Sqm 17.85
456 16-09-17 66+772 66+775 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
457 16-09-17 66+791 66+795 Thermoplastic road marking (Edge Line) RHS Sqm 0.60
458 16-09-17 66+811 66+812 Thermoplastic road marking (Edge Line) RHS Sqm 0.15
459 16-09-17 66+820 66+822 Thermoplastic road marking (Edge Line) RHS Sqm 0.30
460 16-09-17 66+840 66+860 Thermoplastic road marking (Edge Line) RHS Sqm 3.00
461 16-09-17 66+875 66+880 Thermoplastic road marking (Edge Line) RHS Sqm 0.75
462 16-09-17 66+891 67+460 Thermoplastic road marking (Edge Line) RHS Sqm 85.35
463 16-09-17 67+602 67+682 Thermoplastic road marking (Edge Line) RHS Sqm 12.00
464 16-09-17 67+850 Thermoplastic road marking (Round about Marking) BHS Sqm 5.40
465 16-09-17 67+720 67+757 Thermoplastic road marking (Edge Line) RHS Sqm 5.55
466 16-09-17 67+800 67+830 Thermoplastic road marking (Edge Line) RHS Sqm 4.50
467 16-09-17 67+865 68+000 Thermoplastic road marking (Edge Line) RHS Sqm 20.25
468 16-09-17 63+000 63+795 Thermoplastic road marking (Edge Line) LHS Sqm 119.25
469 16-09-17 62+716 62+918 Thermoplastic road marking (Edge Line) LHS Sqm 30.30
470 16-09-17 50+000 54+000 Shoulder Vegetation Removal Sqm Sqm 2500.00
471 16-09-17 50+000 54+000 Culvert cleaning Nos Nos 6.00
472 16-09-17 50+000 54+000 Signboard cleaning Nos Nos 7.00
473 16-09-17 50+000 54+000 Shrubs removal along the shoulder Rmt Rmt 600.00
474 16-09-17 50+000 54+000 KM stone Cleaning Nos Nos 5.00
475 16-09-17 50+000 54+000 HM stone Cleaning Nos Nos 16.00
476 16-09-17 35+100 LHS, 35+210 RHS 2 Name Informatory Signboard installed Nos Nos 2.00
477 16-09-1739+700 RHS, 40+650 LHS, 40+750 RHS, 42+310 LHS, 40+380 RHS 51+480 RHS, 51+370 RHSFlag type Direction Signboard installed Nos Nos 7.00
478 18-09-17 100+900 101+060 Level & Fdd checking of WMM 1st (Widening) LHS Cum 79.20
479 18-09-17 100+795 101+060 Level & Fdd checking of WMM Top RHS Cum 198.75
480 18-09-17 100+670 100+735 Level & Fdd checking of WMM Top RHS Cum 52.00
481 18-09-17 54+229 54+255 Thermoplastic road marking (Edge Line) RHS Sqm 3.90
482 18-09-17 62+100 62+716 Thermoplastic road marking (Edge Line) LHS Sqm 92.40
483 18-09-17 61+745 62+000 Thermoplastic road marking (Edge Line) RHS Sqm 38.25
484 18-09-17 60+630 60+800 Thermoplastic road marking (Edge Line) RHS Sqm 25.50
485 18-09-17 62+200 62+250 Thermoplastic road marking (Edge Line) RHS Sqm 7.50
486 18-09-17 62+955 63+000 Thermoplastic road marking (Edge Line) RHS Sqm 6.75
487 18-09-17 63+060 63+800 Thermoplastic road marking (Edge Line) RHS Sqm 111.00
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Bhwanigarh-Sunam-Bhikhi-Kotshmir (S-2)
Chainage
From To
RemarksS. No Date Description of Work Side Unit Quantity
488 18-09-17 56+400 56+490 Thermoplastic road marking (Edge Line) LHS Sqm 13.50
489 18-09-17 54+200 Thermoplastic road marking (Junction) RHS Sqm 11.25
490 18-09-17 54+265 Thermoplastic road marking (Junction) RHS Sqm 9.15
491 18-09-17 61+300 61+380 Thermoplastic road marking (Edge Line) LHS Sqm 12.00
492 18-09-17 61+585 61+800 Thermoplastic road marking (Edge Line) LHS Sqm 32.25
493 18-09-17 54+040 54+070 Thermoplastic road marking (Edge Line) RHS Sqm 4.50
494 18-09-17 54+241 54+265 Thermoplastic road marking (Edge Line) RHS Sqm 3.60
495 18-09-17 45+000 50+000 Culvert cleaning Nos Nos 8.00
496 18-09-17 45+000 50+000 Signboard cleaning Nos Nos 10.00
497 18-09-17 45+000 50+000 Shoulder cleaning Sqm Sqm 2000.00
498 18-09-17 45+000 50+000 Shrubs removal along the shoulder Rmt Rmt 700.00
499 18-09-17 45+000 50+000 KM stone Cleaning Nos Nos 5.00
500 18-09-17 45+000 50+000 HM stone Cleaning Nos Nos 20.00
501 18-09-17 35+100 LHS, 35+210 RHS Keep left 300mm sheet installed for jumbo bollard signboard Nos Nos 2.00
502 18-09-17 39+410 Keep left 400mm sheet installed for jumbo bollard signboard Nos Nos 1.00
503 18-09-17 11+240 No overtaking signboard ACM Sheet installed Nos Nos 1.00
504 18-09-17 45+000 50+000 Shoulder vegetation removal Sqm Sqm 2000.00
505 19-09-17 100+400 100+670 Level & Fdd checking of WMM Top RHS Cum 135.00
506 19-09-17 100+400 100+740 Level & Fdd checking of WMM Top LHS Cum 170.00
507 19-09-17 100+790 101+060 Level & Fdd checking of WMM Top LHS Cum 135.00
508 19-09-17 100+400 100+735 Application of Prime coat RHS Sqm 1708.50
509 19-09-17 100+795 101+060 Application of Prime coat RHS Sqm 1351.50
510 19-09-17 46+600 50+000 Shoulder rectification Sqm Sqm 1600.00
511 19-09-17 46+600 50+000 Pavement surface cleaning Sqm Sqm 1600.00
512 19-09-17 40+000 42+000 Culvert cleaning Nos Nos 2.00
513 19-09-17 40+000 42+000 Signboard cleaning Nos Nos 6.00
514 19-09-17 40+000 42+000 Raincut rectification Sqm Sqm 35.00
515 19-09-17 40+000 42+000 Shrubs removal along the shoulder Rmt Rmt 200.00
516 19-09-17 40+000 LHS, 40+260 RHS 3 Name informatory signboard installed Nos Nos 2.00
517 20-09-17 100+400 100+730 Application of Tack coat RHS Sqm 1650.00
518 20-09-17 100+400 100+730 DBM laying RHS Cum 82.50
519 20-09-17 100+795 101+060 Application of Tack coat RHS Sqm 1325.00
520 20-09-17 100+795 101+060 DBM laying RHS Cum 66.25
521 20-09-17 101+060 101+100 Application of Tack coat LHS Sqm 200.00
522 20-09-17 101+060 101+100 DBM laying LHS Cum 10.00
523 20-09-17 42+000 45+000 Raincut rectification Sqm Sqm 75.00
524 20-09-17 42+000 45+000 Shrubs removal along the shoulder Rmt Rmt 600.00
525 20-09-17 42+000 45+000 Culvert cleaning Nos Nos 1.00
526 20-09-17 42+000 45+000 Signboard cleaning Nos Nos 6.00
527 20-09-17 44+970 44+975 Obstruction removal along the shoulder Sqm Sqm 5.00
528 20-09-17 37+000 40+000 Culvert cleaning Nos Nos 4.00
529 20-09-17 37+000 40+000 Shrubs removal along the shoulder Rmt Rmt 500.00
530 20-09-17 37+000 40+000 Signboard cleaning Nos Nos 7.00
531 20-09-17 38+800 38+810 Obstruction removal along the shoulder Sqm Sqm 10.00
532 20-09-17 107+500 Installation of direction sign board (flag type) Nos Nos 1.00
533 21-09-17 100+400 100+735 Application of Tack coat LHS Sqm 1675.00
534 21-09-17 100+400 100+735 DBM laying LHS Cum 83.75
535 21-09-17 100+790 101+000 Application of Tack coat LHS Sqm 1050.00
536 21-09-17 100+790 101+000 DBM laying LHS Cum 52.50
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Bhwanigarh-Sunam-Bhikhi-Kotshmir (S-2)
Chainage
From To
RemarksS. No Date Description of Work Side Unit Quantity
537 21-09-17 35+000 37+000 Shrubs removal along the shoulder Rmt Rmt 1500.00
538 21-09-17 35+000 37+000 KM stone cleaning Nos Nos 3.00
539 21-09-17 35+000 37+000 HM stone cleaning Nos Nos 8.00
540 21-09-17 35+000 37+000 Signpost cleaning Nos Nos 13.00
541 21-09-17 35+800 36+000 Embankment slope rectification Sqm Sqm 50.00
542 21-09-17 35+000 37+000 Culvert cleaning Nos Nos 6.00
543 21-09-17 67+800 Providing rumble strips at round about portion Cum Cum 0.41
544 22-09-17 96+500 96+700 Excavation upto subgrade top LHS Cum 400.00
545 22-09-17 96+500 96+700 Level & Fdd checking of subgrade top LHS Sqm 760.00
546 22-09-17 96+500 96+700 Level & Fdd checking of GSB top LHS Cum 136.00
547 22-09-17 96+500 96+700 Fdd checking of WMM 1st RHS Cum 102.00
548 22-09-17 95+400 Excavation for pipe culvert RHS Cum 0.81
549 22-09-17 95+400 PCC for pipe bed of pipe culvert RHS Cum 9.60
550 22-09-17 5+000 10+000 Shoulder vegetation removal Sqm Sqm 4500.00
551 22-09-17 30+000 35+000 Culvert cleaning Nos Nos 8.00
552 22-09-17 30+000 35+000 Shrubs removal along the shoulder Rmt Rmt 1600.00
553 22-09-17 30+000 35+000 Signpost cleaning Nos Nos 13.00
554 22-09-17 30+000 35+000 KM stone cleaning Nos Nos 4.00
555 22-09-17 30+000 35+000 HM stone cleaning Nos Nos 15.00
556 22-09-17 33+500 34+000 Embankment slope rectification Sqm Sqm 10.00
557 23-09-17 100+400 101+060 Application of Tack coat LHS Sqm 3300.00
558 23-09-17 100+400 101+060 BC laying LHS Cum 165.00
559 23-09-17 36+350 Thermoplastic road marking (Stop Line) BHS Sqm 1.50
560 23-09-17 35+800 35+900 Thermoplastic road marking (Edge Line) RHS Sqm 15.00
561 23-09-17 35+750 35+920 Thermoplastic road marking (Edge Line) LHS Sqm 25.50
562 23-09-17 35+830 Thermoplastic road marking (Triangle) BHS Sqm 2.76
563 23-09-17 35+830 Thermoplastic road marking (Rectangle) BHS Sqm 8.25
564 23-09-17 35+800 Thermoplastic road marking (Stop Line) BHS Sqm 1.50
565 23-09-17 35+830 Thermoplastic road marking (Stop Line) BHS Sqm 3.00
566 23-09-17 36+050 36+210 Thermoplastic road marking (Edge Line) RHS Sqm 24.00
567 23-09-17 36+120 36+180 Thermoplastic road marking (Edge Line) LHS Sqm 9.00
568 23-09-17 36+080 36+090 Thermoplastic road marking (Edge Line) LHS Sqm 1.50
569 23-09-17 36+170 Thermoplastic road marking (Stop Line) BHS Sqm 3.00
570 23-09-17 36+170 Thermoplastic road marking (Triangle) BHS Sqm 2.76
571 23-09-17 36+170 Thermoplastic road marking (Rectangle) BHS Sqm 5.50
572 23-09-17 36+350 36+450 Thermoplastic road marking (Edge Line) BHS Sqm 30.00
573 23-09-17 36+400 Thermoplastic road marking (Stop Line) BHS Sqm 3.00
574 23-09-17 36+350 Thermoplastic road marking (Rumbles) BHS Sqm 9.60
575 23-09-17 36+400 Thermoplastic road marking (Rectangle) BHS Sqm 5.50
576 23-09-17 36+400 Thermoplastic road marking (Triangle) BHS Sqm 2.76
577 23-09-17 36+840 36+940 Thermoplastic road marking (Edge Line) RHS Sqm 15.00
578 23-09-17 36+860 36+945 Thermoplastic road marking (Edge Line) LHS Sqm 12.75
579 23-09-17 36+870 Thermoplastic road marking (Stop Line) BHS Sqm 3.00
580 23-09-17 36+870 Thermoplastic road marking (H Block) BHS Sqm 5.50
581 23-09-17 36+870 Thermoplastic road marking (Triangle) BHS Sqm 2.76
582 23-09-17 29+850 29+920 Thermoplastic road marking (Edge Line) RHS Sqm 10.50
583 23-09-17 2+800 5+000 Shoulder vegetation removal Sqm Sqm 3300.00
584 23-09-17 2+800 10+000 Shoulder vegetation removal Sqm Sqm 6750.00
585 23-09-17 25+000 26+350 Painting of median kerb Sqm Sqm 2000.00
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Bhwanigarh-Sunam-Bhikhi-Kotshmir (S-2)
Chainage
From To
RemarksS. No Date Description of Work Side Unit Quantity
586 24-09-17 8+020 8+030 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
587 24-09-17 9+900 Thermoplastic road marking (Zebra) BHS Sqm 12.60
588 24-09-17 9+945 10+005 Thermoplastic road marking (Edge Line) RHS Sqm 9.00
589 24-09-17 9+900 9+935 Thermoplastic road marking (Edge Line) RHS Sqm 5.25
590 24-09-17 9+870 9+890 Thermoplastic road marking (Edge Line) RHS Sqm 3.00
591 24-09-17 9+900 Thermoplastic road marking (Stop Line) BHS Sqm 1.50
592 24-09-17 9+500 Thermoplastic road marking (Zebra) RHS Sqm 1.80
593 24-09-17 9+500 36+210 Thermoplastic road marking (Stop Line) BHS Sqm 1.50
594 24-09-17 9+520 9+550 Thermoplastic road marking (Continues) Center Sqm 2.50
595 24-09-17 8+330 8+335 Thermoplastic road marking (Edge Line) RHS Sqm 0.75
596 24-09-17 8+327 8+330 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
597 24-09-17 8+305 8+320 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
598 24-09-17 8+285 8+300 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
599 24-09-17 6+550 Thermoplastic road marking (Zebra) BHS Sqm 3.60
600 24-09-17 8+255 8+270 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
601 24-09-17 8+247 8+250 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
602 24-09-17 8+190 8+215 Thermoplastic road marking (Edge Line) RHS Sqm 3.75
603 24-09-17 8+170 8+180 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
604 24-09-17 8+135 8+145 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
605 24-09-17 8+040 8+090 Thermoplastic road marking (Edge Line) RHS Sqm 7.50
606 24-09-17 7+990 8+005 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
607 24-09-17 7+745 7+755 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
608 24-09-17 7+480 7+580 Thermoplastic road marking (Edge Line) RHS Sqm 15.00
609 24-09-17 7+450 7+460 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
610 24-09-17 7+370 7+380 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
611 24-09-17 7+435 7+440 Thermoplastic road marking (Edge Line) RHS Sqm 0.75
612 24-09-17 6+595 6+605 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
613 24-09-17 6+180 6+190 Thermoplastic road marking (Edge Line) LHS Sqm 1.50
614 24-09-17 6+145 6+170 Thermoplastic road marking (Edge Line) LHS Sqm 3.75
615 24-09-17 2+420 2+540 Thermoplastic road marking (Edge Line) RHS Sqm 16.50
616 24-09-17 64+000 Thermoplastic road marking (Junction) RHS Sqm 9.75
617 24-09-17 67+850 Thermoplastic road marking (Round about) Center Sqm 15.00
618 24-09-17 6+550 Thermoplastic road marking (Stop Line) BHS Sqm 1.05
619 25-09-17 100+795 101+060 Application of Tack coat RHS Sqm 1325.00
620 25-09-17 100+795 101+060 BC laying RHS Cum 66.25
621 25-09-17 100+400 100+730 Application of Tack coat RHS Sqm 1650.00
622 25-09-17 100+400 100+730 BC laying RHS Cum 82.50
623 25-09-17 108+715 108+740 Thermoplastic road marking (Kerb Line) BHS Sqm 7.50
624 25-09-17 70+000 75+000 Shoulder rectification Sqm Sqm 5000.00
625 25-09-17 70+000 75+000 KM stone cleaning Nos Nos 5.00
626 25-09-17 70+000 75+000 HM stone cleaning Nos Nos 20.00
627 25-09-17 67+850 Patchwork Cum Cum 0.25
628 26-09-17 100+680 100+800 BC laying for central gap of bridge RHS Sqm 7.20
629 26-09-17 100+410 101+080 Thermoplastic road marking (Center Line) Center Sqm 18.60
630 26-09-17 100+500 100+667 Thermoplastic road marking (Center Line) Center Sqm 16.70
631 26-09-17 100+400 100+953 Thermoplastic road marking (Edge Line) RHS Sqm 82.95
632 26-09-17 70+000 72+000 Tree branches removal along the shoulder Rmt Rmt 1500.00
633 27-09-17 96+540 96+700 Level & Fdd checking of GSB top LHS Sqm 108.80
634 27-09-17 100+953 101+100 Thermoplastic road marking (Edge Line) RHS Sqm 22.05
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Road Name : Bhwanigarh-Sunam-Bhikhi-Kotshmir (S-2)
Chainage
From To
RemarksS. No Date Description of Work Side Unit Quantity
635 27-09-17 100+400 101+100 Thermoplastic road marking (Edge Line) LHS Sqm 105.00
636 27-09-17 86+990 87+020 Thermoplastic road marking (Rumbles) BHS Sqm 25.20
637 27-09-17 87+020 87+120 Thermoplastic road marking (Zigzag Marking) Center Sqm 10.00
638 27-09-17 87+120 87+150 Thermoplastic road marking (Rumbles) BHS Sqm 25.20
639 27-09-17 86+990 87+020 Thermoplastic road marking (Continue Center Line) Center Sqm 3.00
640 27-09-17 87+120 87+150 Thermoplastic road marking (Continue Center Line) Center Sqm 3.00
641 27-09-17 97+000 108+000 Shoulder vegetation removal Sqm Sqm 1200.00
642 28-09-17 96+540 96+700 Level & Fdd checking of WMM 1st (widening) LHS Cum 95.20
643 28-09-17 2+240 10+000 Culvert cleaning Nos Nos 12.00
644 28-09-17 108+400 108+500 Road Marking Rectification(Application of emulsion on old marking) Sqm Sqm 30.00
645 28-09-17 108+650 108+670 Road Marking Rectification(Application of emulsion on old marking) Sqm Sqm 3.00
646 29-09-17 96+470 96+540 GSB dumped on site RHS Trips 3.00
647 29-09-17 95+400 95+500 GSB dumped on site RHS Trips 4.00
648 29-09-17 2+600 10+000 KM stone cleaning Nos Nos 8.00
649 29-09-17 2+600 10+000 HM stone cleaning Nos Nos 28.00
650 29-09-17 2+600 10+000 Signpost cleaning Nos Nos 30.00
651 29-09-17 45+000 48+200 Shoulder rectification Sqm Sqm 1500.00
652 29-09-17 45+000 48+200 Pavement Surface Cleaning Sqm Sqm 1500.00
653 29-09-17 45+000 55+000 Application of Emulsion on old Road Marking Sqm Sqm 9.00
654 30-09-17 95+500 GSB dumped on site RHS Trips 2.00
655 30-09-17 35+000 40+000 Shoulder rectification Sqm Sqm 1700.00
656 30-09-17 36+000 37+000 Shrubs removal along the shoulder Rmt Rmt 300.00
657 30-09-17 35+000 40+000 Pavement surface cleaning Sqm Sqm 1700.00
658 30-09-17 35+000 40+000 Culvert cleaning Nos Nos 4.00
659 30-09-17 35+000 40+000 Application of emulsion on old road marking at junctions Sqm Sqm 18.00
660 30-09-17 39+400 40+000 Road cleaning along the kerb Sqm Sqm 600.00
661 30-09-17 105+000 108+700 Shoulder rectification Sqm Sqm 3000.00
662 30-09-17 105+400 107+000 Shoulder rectification Sqm Sqm 1000.00
663 30-09-17 101+600 101+650 Application of Emulsion on old Road Marking Sqm Sqm 15.00
Daily Progress Report of September -2017
Chainage
From To
1 01-09-17 183+000 185+000 Raincut rectification BHS Sqm 2.00
2 01-09-17 188+000 190+000 Raincut rectification BHS Sqm 1.50
3 01-09-17 183+000 192+000 Dewatering BHS Sqm 200.00
4 02-09-17 185+810 185+820 Thermoplastic road marking (Edge line) RHS Sqm 1.50
5 02-09-17 185+845 185+857 Thermoplastic road marking (Edge line) RHS Sqm 1.80
6 02-09-17 185+835 Thermoplastic road marking (Junction) RHS Sqm 8.70
7 02-09-17 185+760 Thermoplastic road marking (Stop line) BHS Sqm 2.10
8 02-09-17 185+735 185+769 Thermoplastic road marking (Edge line) LHS Sqm 5.10
9 02-09-17 185+745 Thermoplastic road marking (Junction) RHS Sqm 8.70
10 02-09-17 185+603 185+640 Thermoplastic road marking (Edge line) RHS Sqm 5.55
11 02-09-17 185+430 Thermoplastic road marking (Stop line) BHS Sqm 2.10
12 02-09-17 185+100 Thermoplastic road marking (Stop line) BHS Sqm 2.10
13 02-09-17 184+874 184+908 Thermoplastic road marking (Edge line) LHS Sqm 5.10
14 02-09-17 184+850 Thermoplastic road marking (Junction) LHS Sqm 11.10
15 02-09-17 184+828 184+841 Thermoplastic road marking (Edge line) LHS Sqm 1.95
16 02-09-17 184+840 Thermoplastic road marking (Stop line) BHS Sqm 2.10
17 02-09-17 183+000 Thermoplastic road marking (Junction) RHS Sqm 6.15
18 02-09-17 184+880 Thermoplastic road marking (Stop line) BHS Sqm 2.10
19 02-09-17 184+800 Thermoplastic road marking (Junction) RHS Sqm 12.00
20 02-09-17 184+431 184+470 Thermoplastic road marking (Edge line) RHS Sqm 5.85
21 02-09-17 184+445 184+467 Thermoplastic road marking (Kerb line) LHS Sqm 3.30
22 02-09-17 184+610 Thermoplastic road marking (Junction) LHS Sqm 9.75
23 02-09-17 184+590 Thermoplastic road marking (Junction) LHS Sqm 7.50
24 02-09-17 184+010 Thermoplastic road marking (Junction) RHS Sqm 6.90
25 02-09-17 183+820 Thermoplastic road marking (Junction) RHS Sqm 8.70
26 02-09-17 183+835 Thermoplastic road marking (Stop line) BHS Sqm 2.10
27 02-09-17 183+670 183+693 Thermoplastic road marking (Kerb line) LHS Sqm 3.45
28 02-09-17 183+230 183+260 Thermoplastic road marking (Kerb line) LHS Sqm 4.50
29 02-09-17 183+230 183+260 Thermoplastic road marking (Kerb line) RHS Sqm 4.50
30 02-09-17 183+200 Thermoplastic road marking (Junction) RHS Sqm 9.00
31 02-09-17 183+090 Thermoplastic road marking (Junction) RHS Sqm 6.30
32 02-09-17 189+835 Thermoplastic road marking (Junction) LHS Sqm 6.60
33 02-09-17 189+870 Thermoplastic road marking (Junction) LHS Sqm 8.10
34 02-09-17 189+779 189+817 Thermoplastic road marking (Edge line) LHS Sqm 5.70
35 02-09-17 189+970 Thermoplastic road marking (Stop line) BHS Sqm 2.10
36 02-09-17 189+617 189+639 Thermoplastic road marking (Edge line) LHS Sqm 3.30
37 02-09-17 189+590 Thermoplastic road marking (Junction) LHS Sqm 8.55
38 02-09-17 189+557 189+570 Thermoplastic road marking (Edge line) LHS Sqm 1.95
39 02-09-17 189+505 189+530 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
40 02-09-17 189+505 189+530 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
41 02-09-17 189+490 189+518 Thermoplastic road marking (Edge line) LHS Sqm 4.20
42 02-09-17 189+470 Thermoplastic road marking (Junction) LHS Sqm 7.20
Remarks
Name Of Project:- Output and Performance Based Road Contract (OPRC) (Asset Management Contract) For Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of
Roads of Sangrur-Mansa-Bathinda Contract Area
PUNJAB ROADS AND BRIDGES DEVELOPMENT BOARD
Road Name : Barnala-Mansa (Mansa Kainchian to Ram Ditte Wala Chowk (S-3)
S.
No.Date Description of Work Side Unit Quantity
Chainage
From To
Remarks
Road Name : Barnala-Mansa (Mansa Kainchian to Ram Ditte Wala Chowk (S-3)
S.
No.Date Description of Work Side Unit Quantity
43 02-09-17 189+439 189+462 Thermoplastic road marking (Edge line) LHS Sqm 3.45
44 02-09-17 189+190 Thermoplastic road marking (Stop line) BHS Sqm 2.10
45 02-09-17 188+990 189+003 Thermoplastic road marking (Edge line) LHS Sqm 1.95
46 02-09-17 189+010 Thermoplastic road marking (Junction) LHS Sqm 9.00
47 02-09-17 189+026 189+090 Thermoplastic road marking (Edge line) LHS Sqm 9.60
48 02-09-17 189+095 Thermoplastic road marking (Junction) LHS Sqm 6.75
49 02-09-17 189+110 189+128 Thermoplastic road marking (Edge line) LHS Sqm 2.70
50 02-09-17 189+085 189+110 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
51 02-09-17 189+085 189+110 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
52 02-09-17 189+124 189+143 Thermoplastic road marking (Edge line) RHS Sqm 2.85
53 02-09-17 189+150 Thermoplastic road marking (Junction) RHS Sqm 5.10
54 02-09-17 189+165 189+189 Thermoplastic road marking (Edge line) RHS Sqm 3.60
55 02-09-17 189+040 Thermoplastic road marking (Junction) RHS Sqm 6.00
56 02-09-17 189+090 Thermoplastic road marking (Stop line) BHS Sqm 2.10
57 02-09-17 188+813 188+837 Thermoplastic road marking (Edge line) LHS Sqm 3.60
58 02-09-17 188+800 Thermoplastic road marking (Junction) LHS Sqm 10.65
59 02-09-17 188+733 188+778 Thermoplastic road marking (Edge line) LHS Sqm 6.75
60 02-09-17 188+730 Thermoplastic road marking (Junction) LHS Sqm 6.00
61 02-09-17 188+719 188+746 Thermoplastic road marking (Edge line) LHS Sqm 4.05
62 02-09-17 188+772 188+797 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
63 02-09-17 188+772 188+797 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
64 02-09-17 188+540 188+565 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
65 02-09-17 188+540 188+565 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
66 02-09-17 188+428 188+495 Thermoplastic road marking (Edge line) RHS Sqm 10.05
67 02-09-17 188+330 188+355 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
68 02-09-17 188+330 188+355 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
69 02-09-17 188+290 Thermoplastic road marking (Junction) RHS Sqm 9.15
70 02-09-17 188+309 188+328 Thermoplastic road marking (Edge line) RHS Sqm 2.85
71 02-09-17 188+200 Thermoplastic road marking (Junction) RHS Sqm 5.55
72 02-09-17 188+184 188+193 Thermoplastic road marking (Edge line) RHS Sqm 1.35
73 02-09-17 188+211 188+216 Thermoplastic road marking (Edge line) RHS Sqm 0.75
74 02-09-17 188+180 Thermoplastic road marking (Stop line) RHS Sqm 2.10
75 04-09-17 187+702 187+732 Thermoplastic road marking (Edge line) RHS Sqm 4.50
76 04-09-17 187+640 187+675 Thermoplastic road marking (Kerb line) RHS Sqm 5.25
77 04-09-17 187+640 187+720 Thermoplastic road marking (Kerb line) LHS Sqm 12.00
78 04-09-17 187+666 187+720 Thermoplastic road marking (Center line) Center Sqm 2.70
79 04-09-17 187+666 187+720 Thermoplastic road marking (Center line) Center Sqm 3.15
80 04-09-17 187+660 187+740 Thermoplastic road marking (Edge line) LHS Sqm 12.00
81 04-09-17 189+090 Thermoplastic road marking (Zebra) BHS Sqm 21.60
82 04-09-17 188+180 Thermoplastic road marking (Stop line) LHS Sqm 1.05
83 04-09-17 188+170 188+180 Thermoplastic road marking (Edge line) LHS Sqm 1.50
84 04-09-17 188+160 Thermoplastic road marking (Junction) LHS Sqm 7.05
85 04-09-17 188+105 188+136 Thermoplastic road marking (Edge line) LHS Sqm 4.65
86 04-09-17 187+983 187+990 Thermoplastic road marking (Edge line) LHS Sqm 1.05
Chainage
From To
Remarks
Road Name : Barnala-Mansa (Mansa Kainchian to Ram Ditte Wala Chowk (S-3)
S.
No.Date Description of Work Side Unit Quantity
87 04-09-17 187+980 Thermoplastic road marking (Junction) LHS Sqm 4.50
88 04-09-17 187+959 187+972 Thermoplastic road marking (Edge line) LHS Sqm 1.95
89 04-09-17 188+000 Thermoplastic road marking (Stop line) BHS Sqm 2.10
90 04-09-17 187+900 Thermoplastic road marking (Junction) RHS Sqm 10.35
91 04-09-17 187+817 187+842 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
92 04-09-17 187+817 187+842 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
93 04-09-17 187+830 Thermoplastic road marking (Junction) LHS Sqm 6.75
94 04-09-17 187+780 Thermoplastic road marking (Junction) LHS Sqm 7.50
95 04-09-17 187+725 Thermoplastic road marking (Junction) RHS Sqm 7.50
96 05-09-17 183+090 - Thermoplastic road marking (Zebra line) BHS Sqm 21.60
97 05-09-17 183+090 - Thermoplastic road marking (Stop line) BHS Sqm 2.10
98 05-09-17 182+790 - Thermoplastic road marking (Zebra line) BHS Sqm 18.00
99 05-09-17 182+790 - Thermoplastic road marking (Stop line) RHS Sqm 1.05
100 05-09-17 182+790 182+800 Thermoplastic road marking (Edge line) RHS Sqm 1.50
101 05-09-17 182+910 182+935 Thermoplastic road marking (Kerb Edge line) BHS Sqm 7.50
102 08-09-17 187+592 187+635 Damaged MBCB removed and stocked at camp LHS Rmt 43.00
103 08-09-17 187+592 187+621 Damaged MBCB removed and stocked at camp RHS Rmt 29.00
104 11-09-17 189+940 189+984 Thermoplastic road marking (Edge Line) RHS Sqm 6.60
105 11-09-17 189+990 Thermoplastic road marking (Junction) LHS Sqm 8.70
106 11-09-17 189+990 Thermoplastic road marking (Chevron) Center Sqm 4.20
107 11-09-17 189+960 189+990 Thermoplastic road marking (Center Line) Center Sqm 1.80
108 12-09-17 182+800 BC laying for junction improvement (Link road) LHS Cum 2.00
109 12-09-17 182+800 BC laying for junction improvement (flare portion) LHS Cum 4.55
110 12-09-17 190+000 Bc laying for speed table BHS Cum 4.40
111 12-09-17 190+000 BC laying for ramp of speed table BHS Cum 8.80
112 12-09-17 190+015 Rumble Strips BHS Cum 0.50
113 12-09-17 189+900 Rumble Strips BHS Cum 0.39
114 15-09-17 189+940 - Thermoplastic road marking (Rumble) RHS Sqm 23.22
115 15-09-17 190+000 - Thermoplastic road marking (Rumble) RHS Sqm 23.22
116 15-09-17 189+990 - Thermoplastic road marking (Triangle) BHS Sqm 4.14
117 15-09-17 189+990 - Thermoplastic road marking (H) BHS Sqm 11.00
118 15-09-17 189+940 - Thermoplastic road marking (Zig Zag) LHS Sqm 1.20
119 15-09-17 190+000 - Thermoplastic road marking (Zig Zag) BHS Sqm 1.35
120 16-09-17 186+800 187+600 ROB cleaning work LHS Sqm 320.00
121 16-09-17 182+900 182+910 Median Tiles Fixing-Rectification Center Sqm 8.00
122 16-09-17 186+700 186+710 Median Tiles Fixing-Rectification Center Sqm 8.00
123 18-09-17 183+600 184+000 Shoulder rectification LHS Sqm 400.00
124 18-09-17 186+800 187+600 ROB cleaning RHS Sqm 400.00
125 18-09-17 Speed breaker signboard installed Nos 3.00
126 19-09-17 189+500 190+000 Road cleaning along the kerb BHS Sqm 500.00
127 19-09-17 184+000 186+500 Shoulder rectification LHS Sqm 1500.00
128 19-09-17 4 Name informatory signboard installed Nos 2.00
129 20-09-17 184+000 186+200 Embankment slope rectification RHS Sqm 1000.00
130 20-09-17 187+600 188+000 Road cleaning along the kerb LHS Sqm 400.00
189+950 Median, 190+030 LHS,
190+050 RHS
186+550 LHS, 186+750 RHS
Chainage
From To
Remarks
Road Name : Barnala-Mansa (Mansa Kainchian to Ram Ditte Wala Chowk (S-3)
S.
No.Date Description of Work Side Unit Quantity
131 21-09-17 187+600 188+400 Shoulder rectification LHS Sqm 800.00
132 21-09-17 188+000 188+200 Road cleaning along the kerb LHS Sqm 100.00
133 21-09-17 189+900 BC laying for speed table LHS Cum 3.28
134 21-09-17 189+900 BC laying for speed table LHS Cum 2.45
135 21-09-17 182+800 Patch work LHS Cum 0.45
136 22-09-17 188+200 189+600 Road cleaning along the kerb LHS Sqm 700.00
137 22-09-17 188+600 189+600 Road cleaning along the kerb RHS Sqm 500.00
138 22-09-17 189+000 190+000 Shoulder rectification BHS Sqm 2000.00
139 23-09-17 189+000 190+000 Shoulder rectification BHS Cum 100.00
140 23-09-17 188+350 188+650 Road cleaning along the kerb RHS Sqm 150.00
141 26-09-17 189+960 Thermoplastic road marking (Triangle) LHS Sqm 2.78
142 26-09-17 189+960 Thermoplastic road marking (Block) LHS Sqm 5.50
143 27-09-17 184+000 185+000 Soil dumping on shoulder BHS Trips 14.00
144 28-09-17 184+000 185+000 Shoulder Slope Soil Dumping BHS Trips 7.00
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Daily Progress Report of September -2017
Name Of Project:- Output and Performance Based Road Contract (OPRC) (Asset Management Contract) For Improvement, Rehabilitation, Resurfacing & Routine
Maintenance Works of Roads of Sangrur-Mansa-Bathinda Contract Area
PUNJAB ROADS AND BRIDGES DEVELOPMENT BOARD
Mansa-Talwandi Sabo upto Ramtirath Jaga (S-4)
Chainage
From To
1 01-09-17 3+650 Raincut rectification BHS Sqm 9.00
2 01-09-17 2+400 Raincut rectification BHS Sqm 1.00
3 01-09-17 0+400 Raincut rectification BHS Sqm 1.00
4 01-09-17 17+420 Raincut rectification BHS Sqm 4.00000
5 01-09-17 4+200 Raincut rectification BHS Sqm 1.00
6 01-09-17 0+000 24+970 Dewatering BHS Sqm 4000.00
7 06-09-17 20+000 24+970 Shoulder rectification BHS Sqm 4000.00
8 06-09-17 20+000 21+600 Culvert cleaning BHS Nos 6.00
9 06-09-17 20+000 21+600 KM stone cleaning LHS Nos 1.00
10 06-09-17 20+000 21+600 HM stone cleaning LHS Nos 8.00
11 06-09-17 20+000 21+600 Tree branches removal along the shoulder BHS Rmt 400.00
12 06-09-17 21+000 21+070 Rope wire type safety barrier cleaning BHS Sqm 266.00
13 06-09-17 24+500 24+570 Rope wire type safety barrier cleaning BHS Sqm 266.00
14 07-09-17 15+000 20+000 Shoulder rectification RHS Sqm 1500.00
15 07-09-17 15+000 18+400 Shoulder rectification LHS Sqm 1400.00
16 07-09-17 21+600 23+000 Culvert cleaning BHS Nos 9.00
17 07-09-17 21+600 23+000 KM stone cleaning LHS Nos 2.00
18 07-09-17 21+600 23+000 HM stone cleaning LHS Nos 9.00
19 07-09-17 21+600 23+000 Tree branches removal along the shoulder BHS Rmt 500.00
20 08-09-17 18+400 20+000 Shoulder rectification RHS Sqm 750.00
21 08-09-17 23+000 24+970 Culvert cleaning BHS Nos 8.00
22 08-09-17 15+000 18+000 Culvert cleaning BHS Nos 8.00
23 08-09-17 15+000 18+000 KM stone cleaning LHS Nos 3.00
24 08-09-17 15+000 18+000 HM stone cleaning LHS Nos 12.00
25 08-09-17 15+000 18+000 Tree branches removal along the shoulder BHS Rmt 500.00
26 08-09-17 23+000 24+970 Tree branches removal along the shoulder BHS Rmt 200.00
27 08-09-17 18+000 20+000 Shoulder vegetation removal RHS Sqm 2400.00
28 09-09-17 18+000 20+000 Culvert cleaning BHS Nos 8.00
29 09-09-17 18+000 20+000 Tree branches removal along the shoulder BHS Rmt 800.00
30 09-09-17 15+000 15+200 Pavement surface cleaning BHS Sqm 1000.00
31 09-09-17 15+600 15+620 Pavement surface cleaning RHS Sqm 50.00
32 09-09-17 24+970 Junction cleaning BHS Sqm 20.00
33 11-09-17 0+000 Thermoplastic road marking (Give way marking) RHS Sqm 1.80
34 11-09-17 1+750 1+840 Thermoplastic road marking (Rumbles) BHS Sqm 37.80
35 11-09-17 1+970 2+060 Thermoplastic road marking (Rumbles) BHS Sqm 37.80
36 11-09-17 1+890 1+930 Thermoplastic road marking (Zigzag marking) Center Sqm 4.00
37 11-09-17 1+750 1+880 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
38 11-09-17 1+820 2+050 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
39 15-09-17 0+000 5+000 Culvert Cleaning BHS Nos 4.00
RemarksSr. No. Date Description of Work Side Unit Quantity
3.0_Physical_Progress_Work_Summary_DPR_September_2017
Mansa-Talwandi Sabo upto Ramtirath Jaga (S-4)
Chainage
From ToRemarksSr. No. Date Description of Work Side Unit Quantity
40 15-09-17 5+000 7+500 Culvert Cleaning BHS Nos 10.00
41 15-09-17 5+000 7+500 KM Stone Cleaning LHS Nos 2.00
42 15-09-17 5+000 7+500 HM Stone Cleaning LHS Nos 10.00
43 15-09-17 5+000 7+500 Shoulder Vegetation Removal BHS Sqm 800.00
44 15-09-17 5+000 7+500 Delineator Cleaning BHS Nos 20.00
45 15-09-17 5+500 5+600 Vegetation removal along crash barrier BHS Sqm 150.00
46 15-09-17 5+620 5+670 Vegetation removal along crash barrier RHS Sqm 75.00
47 15-09-17 6+140 6+200 Vegetation removal along crash barrier LHS Sqm 90.00
48 15-09-17 6+120 6+200 Vegetation removal along crash barrier RHS Sqm 120.00
49 15-09-17 6+220 6+260 Vegetation removal along crash barrier RHS Sqm 60.00
50 26-09-17 0+000 3+000 Shoulder rectification BHS Sqm 200.00
51 27-09-17 3+000 5+000 Shoulder rectification BHS Sqm 6000.00
52 27-09-17 0+000 5+000 KM stone cleaning LHS Nos 5.00
53 27-09-17 0+000 5+000 HM stone cleaning LHS Nos 20.00
54 28-09-17 10+000 15+000 Shoulder rectification BHS Sqm 1500.00
55 28-09-17 10+000 11+400 Culvert cleaning BHS Nos 8.00
56 28-09-17 10+000 11+400 KM stone cleaning BHS Nos 1.00
57 28-09-17 10+000 11+400 HM stone cleaning BHS Nos 6.00
58 29-09-17 11+400 15+000 Culvert cleaning BHS Nos 7.00
59 29-09-17 11+400 15+000 KM stone cleaning BHS Nos 4.00
60 29-09-17 11+400 15+000 HM stone cleaning BHS Nos 14.00
61 29-09-17 11+550 11+600 Rope type crash barrier cleaning BHS Sqm 150.00
62 30-09-17 2+900 2+950 Along Rope type crash barrier- Vegetation cleaning BHS Sqm 150.00
63 30-09-17 11+000 15+000 Shoulder vegetation removal BHS Sqm 9600.00
64 30-09-17 9+000 11+000 Shoulder vegetation removal RHS Sqm 2400.00
Daily Progress Report of September -2017
Name Of Project:- Output and Performance Based Road Contract (OPRC) (Asset Management Contract) For Improvement, Rehabilitation,
Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bathinda Contract Area
PUNJAB ROADS AND BRIDGES DEVELOPMENT BOARD
Road Name : Dhanaula-Bhikhi (S-5)
Chainage
From To
1 01-09-17 10+000 23+000 Dewatering BHS Sqm 1800.00
2 02-09-17 20+200 20+208 Water based marking (Edge line) RHS Sqm 0.80
3 02-09-17 20+240 20+241 Water based marking (Edge line) RHS Sqm 0.10
4 02-09-17 20+245 20+247 Water based marking (Edge line) RHS Sqm 0.20
5 02-09-17 20+250 20+253 Water based marking (Edge line) RHS Sqm 0.30
6 02-09-17 20+430 20+433 Water based marking (Edge line) RHS Sqm 0.30
7 02-09-17 20+450 20+452 Water based marking (Edge line) RHS Sqm 0.20
8 02-09-17 20+460 20+476 Water based marking (Edge line) RHS Sqm 1.60
9 02-09-17 20+630 20+635 Water based marking (Edge line) RHS Sqm 0.50
10 02-09-17 20+970 20+973 Water based marking (Edge line) RHS Sqm 0.30
11 02-09-17 20+975 20+978 Water based marking (Edge line) RHS Sqm 0.30
12 02-09-17 20+980 20+986 Water based marking (Edge line) RHS Sqm 0.60
13 02-09-17 20+988 21+000 Water based marking (Edge line) RHS Sqm 1.20
14 02-09-17 21+160 21+177 Water based marking (Edge line) RHS Sqm 1.70
15 02-09-17 21+179 21+180 Water based marking (Edge line) RHS Sqm 0.10
16 02-09-17 21+182 21+184 Water based marking (Edge line) RHS Sqm 0.20
17 02-09-17 21+185 21+187 Water based marking (Edge line) RHS Sqm 0.20
18 02-09-17 21+190 21+199 Water based marking (Edge line) RHS Sqm 0.90
19 02-09-17 21+200 21+209 Water based marking (Edge line) RHS Sqm 0.90
20 02-09-17 21+260 21+272 Water based marking (Edge line) RHS Sqm 1.20
21 02-09-17 21+280 21+285 Water based marking (Edge line) RHS Sqm 0.50
22 02-09-17 21+290 21+292 Water based marking (Edge line) RHS Sqm 0.20
23 02-09-17 21+295 21+298 Water based marking (Edge line) RHS Sqm 0.30
24 02-09-17 21+305 21+308 Water based marking (Edge line) RHS Sqm 0.30
25 02-09-17 21+315 21+319 Water based marking (Edge line) RHS Sqm 0.40
26 02-09-17 21+325 21+329 Water based marking (Edge line) RHS Sqm 0.40
27 02-09-17 21+960 21+962 Water based marking (Edge line) RHS Sqm 0.20
28 02-09-17 22+410 22+412 Water based marking (Edge line) RHS Sqm 0.20
29 02-09-17 22+415 22+417 Water based marking (Edge line) RHS Sqm 0.20
30 02-09-17 22+460 22+466 Water based marking (Edge line) RHS Sqm 0.60
31 02-09-17 22+540 22+543 Water based marking (Edge line) RHS Sqm 0.30
32 02-09-17 22+560 22+565 Water based marking (Edge line) RHS Sqm 0.50
33 02-09-17 22+700 22+705 Water based marking (Edge line) RHS Sqm 0.50
34 02-09-17 22+710 22+712 Water based marking (Edge line) RHS Sqm 0.20
RemarksSr.
No.Date Description of Work Side Unit Quantity
Road Name : Dhanaula-Bhikhi (S-5)
Chainage
From To
RemarksSr.
No.Date Description of Work Side Unit Quantity
35 02-09-17 22+715 22+720 Water based marking (Edge line) RHS Sqm 0.50
36 02-09-17 22+730 22+732 Water based marking (Edge line) RHS Sqm 0.20
37 02-09-17 22+900 22+905 Water based marking (Edge line) RHS Sqm 0.50
38 02-09-17 22+920 22+925 Water based marking (Edge line) RHS Sqm 0.50
39 02-09-17 22+940 22+950 Water based marking (Edge line) RHS Sqm 1.00
40 02-09-17 22+980 22+998 Water based marking (Edge line) RHS Sqm 1.80
41 02-09-17 23+010 23+014 Water based marking (Edge line) RHS Sqm 0.40
42 02-09-17 23+030 23+037 Water based marking (Edge line) RHS Sqm 0.70
43 02-09-17 23+020 23+026 Water based marking (Edge line) RHS Sqm 0.60
44 02-09-17 23+040 23+042 Water based marking (Edge line) RHS Sqm 0.20
45 02-09-17 23+050 23+059 Water based marking (Edge line) RHS Sqm 0.90
46 02-09-17 23+060 23+067 Water based marking (Edge line) RHS Sqm 0.70
47 02-09-17 23+075 23+078 Water based marking (Edge line) RHS Sqm 0.30
48 02-09-17 23+080 23+082 Water based marking (Edge line) RHS Sqm 0.20
49 02-09-17 23+085 23+090 Water based marking (Edge line) RHS Sqm 0.50
50 02-09-17 23+120 23+133 Water based marking (Edge line) RHS Sqm 1.30
51 02-09-17 23+140 23+157 Water based marking (Edge line) RHS Sqm 1.70
52 02-09-17 23+160 23+167 Water based marking (Edge line) RHS Sqm 0.70
53 02-09-17 23+170 23+182 Water based marking (Edge line) RHS Sqm 1.20
54 02-09-17 23+185 23+196 Water based marking (Edge line) RHS Sqm 1.10
55 02-09-17 23+198 23+207 Water based marking (Edge line) RHS Sqm 0.90
56 02-09-17 23+210 23+218 Water based marking (Edge line) RHS Sqm 0.80
57 02-09-17 23+220 23+235 Water based marking (Edge line) RHS Sqm 1.50
58 02-09-17 23+240 23+250 Water based marking (Edge line) RHS Sqm 1.00
59 02-09-17 23+255 23+257 Water based marking (Edge line) RHS Sqm 0.20
60 02-09-17 23+260 23+264 Water based marking (Edge line) RHS Sqm 0.40
61 02-09-17 23+270 23+274 Water based marking (Edge line) RHS Sqm 0.40
62 02-09-17 23+280 23+284 Water based marking (Edge line) RHS Sqm 0.40
63 02-09-17 23+290 23+296 Water based marking (Edge line) RHS Sqm 0.60
64 02-09-17 23+305 23+308 Water based marking (Edge line) RHS Sqm 0.30
65 02-09-17 23+340 23+355 Water based marking (Edge line) RHS Sqm 1.50
66 02-09-17 23+360 23+363 Water based marking (Edge line) RHS Sqm 0.30
67 02-09-17 23+365 23+367 Water based marking (Edge line) RHS Sqm 0.20
68 02-09-17 23+370 23+395 Water based marking (Edge line) RHS Sqm 2.50
69 02-09-17 23+405 23+410 Water based marking (Edge line) RHS Sqm 0.50
70 02-09-17 23+420 23+423 Water based marking (Edge line) RHS Sqm 0.30
71 02-09-17 23+425 23+428 Water based marking (Edge line) RHS Sqm 0.30
Road Name : Dhanaula-Bhikhi (S-5)
Chainage
From To
RemarksSr.
No.Date Description of Work Side Unit Quantity
72 02-09-17 23+440 23+446 Water based marking (Edge line) RHS Sqm 0.60
73 02-09-17 23+460 23+465 Water based marking (Edge line) RHS Sqm 0.50
74 02-09-17 23+500 23+506 Water based marking (Edge line) RHS Sqm 0.60
75 02-09-17 23+508 23+509 Water based marking (Edge line) RHS Sqm 0.10
76 02-09-17 23+512 23+519 Water based marking (Edge line) RHS Sqm 0.70
77 02-09-17 23+530 23+540 Water based marking (Edge line) RHS Sqm 1.00
78 02-09-17 23+550 23+556 Water based marking (Edge line) RHS Sqm 0.60
79 02-09-17 23+560 23+563 Water based marking (Edge line) RHS Sqm 0.30
80 02-09-17 23+570 23+573 Water based marking (Edge line) RHS Sqm 0.30
81 02-09-17 23+587 23+590 Water based marking (Edge line) RHS Sqm 0.30
82 02-09-17 23+620 23+626 Water based marking (Edge line) RHS Sqm 0.60
83 02-09-17 23+630 23+638 Water based marking (Edge line) RHS Sqm 0.80
84 02-09-17 23+640 23+646 Water based marking (Edge line) RHS Sqm 0.60
85 02-09-17 23+700 23+701 Water based marking (Edge line) RHS Sqm 0.10
86 02-09-17 23+710 23+713 Water based marking (Edge line) RHS Sqm 0.30
87 02-09-17 23+750 23+751 Water based marking (Edge line) RHS Sqm 0.10
88 02-09-17 23+760 23+763 Water based marking (Edge line) RHS Sqm 0.30
89 02-09-17 23+850 23+852 Water based marking (Edge line) RHS Sqm 0.20
90 02-09-17 23+880 23+882 Water based marking (Edge line) RHS Sqm 0.20
91 02-09-17 23+900 23+904 Water based marking (Edge line) RHS Sqm 0.40
92 02-09-17 24+180 24+205 Water based marking (center line) RHS Sqm 1.80
93 02-09-17 24+220 24+250 Water based marking (Edge line) RHS Sqm 3.00
94 02-09-17 24+260 24+267 Water based marking (Edge line) RHS Sqm 0.70
95 02-09-17 24+280 24+286 Water based marking (Edge line) RHS Sqm 0.60
96 02-09-17 24+320 24+335 Water based marking (Edge line) RHS Sqm 1.50
97 02-09-17 24+340 24+390 Water based marking (Center line) Center Sqm 0.90
98 02-09-17 24+400 24+450 Water based marking (Center line) Center Sqm 3.50
99 02-09-17 24+440 24+441 Water based marking (Edge line) RHS Sqm 0.10
100 02-09-17 24+443 24+445 Water based marking (Edge line) RHS Sqm 0.20
101 02-09-17 24+447 24+449 Water based marking (Edge line) RHS Sqm 0.20
102 02-09-17 24+450 24+458 Water based marking (Edge line) RHS Sqm 0.80
103 02-09-17 24+460 24+465 Water based marking (Edge line) RHS Sqm 0.50
104 02-09-17 24+480 24+491 Water based marking (Edge line) RHS Sqm 1.10
105 02-09-17 24+520 24+528 Water based marking (Edge line) RHS Sqm 0.80
106 02-09-17 24+580 24+584 Water based marking (Edge line) RHS Sqm 0.40
107 02-09-17 24+610 24+612 Water based marking (Edge line) RHS Sqm 0.20
108 02-09-17 24+620 24+622 Water based marking (Edge line) RHS Sqm 0.20
Road Name : Dhanaula-Bhikhi (S-5)
Chainage
From To
RemarksSr.
No.Date Description of Work Side Unit Quantity
109 02-09-17 24+630 24+700 Water based marking (Center line) Center Sqm 1.80
110 02-09-17 24+220 Water based marking (Zebra) LHS Sqm 3.00
111 02-09-17 24+560 24+564 Water based marking (Edge line) LHS Sqm 0.40
112 02-09-17 24+500 24+503 Water based marking (Edge line) LHS Sqm 0.30
113 02-09-17 24+480 24+487 Water based marking (Edge line) LHS Sqm 0.70
114 02-09-17 24+430 24+477 Water based marking (Edge line) LHS Sqm 4.70
115 02-09-17 24+380 24+415 Water based marking (Edge line) LHS Sqm 3.50
116 02-09-17 24+235 24+241 Water based marking (Edge line) LHS Sqm 0.60
117 02-09-17 24+120 24+131 Water based marking (Edge line) LHS Sqm 1.10
118 02-09-17 23+900 23+908 Water based marking (Edge line) LHS Sqm 0.80
119 02-09-17 23+670 23+672 Water based marking (Edge line) LHS Sqm 0.20
120 02-09-17 23+673 23+674 Water based marking (Edge line) LHS Sqm 0.10
121 02-09-17 23+450 23+455 Water based marking (Edge line) LHS Sqm 0.50
122 02-09-17 23+400 23+404 Water based marking (Edge line) LHS Sqm 0.40
123 02-09-17 23+392 23+396 Water based marking (Edge line) LHS Sqm 0.40
124 02-09-17 23+370 23+372 Water based marking (Edge line) LHS Sqm 0.20
125 02-09-17 22+900 22+911 Water based marking (Edge line) LHS Sqm 1.10
126 02-09-17 22+890 22+892 Water based marking (Edge line) LHS Sqm 0.20
127 02-09-17 22+760 22+761 Water based marking (Edge line) LHS Sqm 0.10
128 02-09-17 22+750 22+751 Water based marking (Edge line) LHS Sqm 0.10
129 02-09-17 22+740 22+743 Water based marking (Edge line) LHS Sqm 0.30
130 02-09-17 22+735 22+736 Water based marking (Edge line) LHS Sqm 0.10
131 02-09-17 22+720 22+723 Water based marking (Edge line) LHS Sqm 0.30
132 02-09-17 22+380 22+395 Water based marking (Edge line) LHS Sqm 1.50
133 02-09-17 22+080 22+090 Water based marking (Edge line) LHS Sqm 1.00
134 02-09-17 22+030 22+047 Water based marking (Edge line) LHS Sqm 1.70
135 02-09-17 21+900 21+905 Water based marking (Edge line) LHS Sqm 0.50
136 02-09-17 21+810 21+820 Water based marking (Edge line) LHS Sqm 1.00
137 02-09-17 21+580 21+600 Water based marking (Edge line) LHS Sqm 2.00
138 02-09-17 21+460 21+485 Water based marking (Edge line) LHS Sqm 2.50
139 02-09-17 21+405 21+423 Water based marking (Edge line) LHS Sqm 1.80
140 02-09-17 21+330 21+335 Water based marking (Edge line) LHS Sqm 0.50
141 02-09-17 20+470 20+476 Water based marking (Edge line) LHS Sqm 0.60
142 02-09-17 20+360 20+370 Water based marking (Edge line) LHS Sqm 1.00
143 02-09-17 20+200 20+207 Water based marking (Edge line) LHS Sqm 0.70
144 02-09-17 24+700 24+719 Water based marking (Edge line) LHS Sqm 1.90
145 02-09-17 24+670 24+693 Water based marking (Edge line) LHS Sqm 2.30
Road Name : Dhanaula-Bhikhi (S-5)
Chainage
From To
RemarksSr.
No.Date Description of Work Side Unit Quantity
146 02-09-17 24+575 24+601 Water based marking (Edge line) LHS Sqm 2.60
147 04-09-17 0+000 5+000 Shoulder vegetation removal BHS Sqm 10000.00
148 04-09-17 4+990 5+000 Water based marking (Edge line) RHS Sqm 1.00
149 04-09-17 4+950 4+954 Water based marking (Edge line) RHS Sqm 0.40
150 04-09-17 4+956 4+960 Water based marking (Edge line) RHS Sqm 0.40
151 04-09-17 4+750 4+752 Water based marking (Edge line) RHS Sqm 0.20
152 04-09-17 4+700 4+702 Water based marking (Edge line) RHS Sqm 0.20
153 04-09-17 4+705 4+706 Water based marking (Edge line) RHS Sqm 0.10
154 04-09-17 4+610 4+615 Water based marking (Edge line) RHS Sqm 0.50
155 04-09-17 4+620 4+623 Water based marking (Edge line) RHS Sqm 0.30
156 04-09-17 4+495 4+500 Water based marking (Edge line) RHS Sqm 0.50
157 04-09-17 4+502 4+504 Water based marking (Edge line) RHS Sqm 0.20
158 04-09-17 4+450 4+456 Water based marking (Edge line) RHS Sqm 0.60
159 04-09-17 4+400 4+402 Water based marking (Edge line) RHS Sqm 0.20
160 04-09-17 4+230 4+234 Water based marking (Edge line) RHS Sqm 0.40
161 04-09-17 4+170 4+172 Water based marking (Edge line) RHS Sqm 0.20
162 04-09-17 4+140 4+142 Water based marking (Edge line) RHS Sqm 0.20
163 04-09-17 4+143 4+160 Water based marking (Edge line) RHS Sqm 1.70
164 04-09-17 3+890 3+891 Water based marking (Edge line) RHS Sqm 0.10
165 04-09-17 3+800 3+813 Water based marking (Edge line) RHS Sqm 1.30
166 04-09-17 3+740 3+749 Water based marking (Edge line) RHS Sqm 0.90
167 04-09-17 3+605 3+607 Water based marking (Edge line) RHS Sqm 0.20
168 04-09-17 3+580 3+582 Water based marking (Edge line) RHS Sqm 0.20
169 04-09-17 3+584 3+587 Water based marking (Edge line) RHS Sqm 0.30
170 04-09-17 3+590 3+597 Water based marking (Edge line) RHS Sqm 0.70
171 04-09-17 3+600 3+603 Water based marking (Edge line) RHS Sqm 0.30
172 04-09-17 2+350 2+355 Water based marking (Edge line) RHS Sqm 0.50
173 04-09-17 2+354 2+361 Water based marking (Edge line) RHS Sqm 0.70
174 04-09-17 2+080 2+091 Water based marking (Edge line) RHS Sqm 1.10
175 04-09-17 2+000 2+008 Water based marking (Edge line) RHS Sqm 0.80
176 04-09-17 1+790 1+796 Water based marking (Edge line) RHS Sqm 0.60
177 04-09-17 1+750 Water based marking (Zebra) RHS Sqm 3.00
178 04-09-17 1+700 Water based marking (Center line) Center Sqm 0.30
179 04-09-17 1+590 1+596 Water based marking (Edge line) RHS Sqm 0.60
180 04-09-17 1+600 1+614 Water based marking (Edge line) RHS Sqm 1.40
181 04-09-17 1+620 1+626 Water based marking (Edge line) RHS Sqm 0.60
182 04-09-17 1+615 1+616 Water based marking (Edge line) RHS Sqm 0.10
Road Name : Dhanaula-Bhikhi (S-5)
Chainage
From To
RemarksSr.
No.Date Description of Work Side Unit Quantity
183 04-09-17 1+470 1+474 Water based marking (Edge line) RHS Sqm 0.40
184 04-09-17 1+475 1+481 Water based marking (Edge line) RHS Sqm 0.60
185 04-09-17 0+920 0+921 Water based marking (Edge line) RHS Sqm 0.10
186 04-09-17 0+900 0+906 Water based marking (Edge line) RHS Sqm 0.60
187 04-09-17 0+770 0+779 Water based marking (Edge line) RHS Sqm 0.90
188 04-09-17 0+750 0+765 Water based marking (Edge line) RHS Sqm 1.50
189 04-09-17 0+040 0+080 Water based marking (Edge line) RHS Sqm 4.00
190 04-09-17 0+090 0+094 Water based marking (Edge line) RHS Sqm 0.40
191 04-09-17 0+100 0+115 Water based marking (Edge line) RHS Sqm 1.50
192 04-09-17 0+140 0+144 Water based marking (Edge line) RHS Sqm 0.40
193 04-09-17 0+010 0+130 Water based marking (Edge line) Center Sqm 3.60
194 04-09-17 4+985 4+986 Water based marking (Edge line) LHS Sqm 0.10
195 04-09-17 4+970 4+976 Water based marking (Edge line) LHS Sqm 0.60
196 04-09-17 4+940 4+947 Water based marking (Edge line) LHS Sqm 0.70
197 04-09-17 4+930 4+934 Water based marking (Edge line) LHS Sqm 0.40
198 04-09-17 4+780 4+781 Water based marking (Edge line) LHS Sqm 0.10
199 04-09-17 4+700 4+707 Water based marking (Edge line) LHS Sqm 0.70
200 04-09-17 4+620 4+622 Water based marking (Edge line) LHS Sqm 0.20
201 04-09-17 4+625 4+628 Water based marking (Edge line) LHS Sqm 0.30
202 04-09-17 4+560 4+579 Water based marking (Edge line) LHS Sqm 1.90
203 04-09-17 4+500 4+503 Water based marking (Edge line) LHS Sqm 0.30
204 04-09-17 4+450 4+453 Water based marking (Edge line) LHS Sqm 0.30
205 04-09-17 4+380 4+383 Water based marking (Edge line) LHS Sqm 0.30
206 04-09-17 4+360 4+365 Water based marking (Edge line) LHS Sqm 0.50
207 04-09-17 4+355 4+357 Water based marking (Edge line) LHS Sqm 0.20
208 04-09-17 4+150 4+165 Water based marking (Edge line) LHS Sqm 1.50
209 04-09-17 4+130 4+135 Water based marking (Edge line) LHS Sqm 0.50
210 04-09-17 4+100 4+114 Water based marking (Edge line) LHS Sqm 1.40
211 04-09-17 4+090 4+093 Water based marking (Edge line) LHS Sqm 0.30
212 04-09-17 4+085 4+088 Water based marking (Edge line) LHS Sqm 0.30
213 04-09-17 4+070 4+076 Water based marking (Edge line) LHS Sqm 0.60
214 04-09-17 4+040 4+046 Water based marking (Edge line) LHS Sqm 0.60
215 04-09-17 4+010 4+016 Water based marking (Edge line) LHS Sqm 0.60
216 04-09-17 3+995 4+000 Water based marking (Edge line) LHS Sqm 0.50
217 04-09-17 3+985 3+991 Water based marking (Edge line) LHS Sqm 0.60
218 04-09-17 3+940 3+943 Water based marking (Edge line) LHS Sqm 0.30
219 04-09-17 3+930 3+933 Water based marking (Edge line) LHS Sqm 0.30
Road Name : Dhanaula-Bhikhi (S-5)
Chainage
From To
RemarksSr.
No.Date Description of Work Side Unit Quantity
220 04-09-17 3+920 3+923 Water based marking (Edge line) LHS Sqm 0.30
221 04-09-17 3+900 3+906 Water based marking (Edge line) LHS Sqm 0.60
222 04-09-17 3+890 3+895 Water based marking (Edge line) LHS Sqm 0.50
223 04-09-17 3+880 3+885 Water based marking (Edge line) LHS Sqm 0.50
224 04-09-17 3+870 3+874 Water based marking (Edge line) LHS Sqm 0.40
225 04-09-17 3+860 3+864 Water based marking (Edge line) LHS Sqm 0.40
226 04-09-17 3+760 3+763 Water based marking (Edge line) LHS Sqm 0.30
227 04-09-17 3+358 3+359 Water based marking (Edge line) LHS Sqm 0.10
228 04-09-17 3+440 3+444 Water based marking (Edge line) LHS Sqm 0.40
229 04-09-17 3+195 3+200 Water based marking (Edge line) LHS Sqm 0.50
230 04-09-17 3+150 3+164 Water based marking (Edge line) LHS Sqm 1.40
231 04-09-17 3+140 3+146 Water based marking (Edge line) LHS Sqm 0.60
232 04-09-17 3+120 3+124 Water based marking (Edge line) LHS Sqm 0.40
233 04-09-17 3+110 3+119 Water based marking (Edge line) LHS Sqm 0.90
234 04-09-17 3+005 3+010 Water based marking (Edge line) LHS Sqm 0.50
235 04-09-17 3+000 3+002 Water based marking (Edge line) LHS Sqm 0.20
236 04-09-17 2+990 2+996 Water based marking (Edge line) LHS Sqm 0.60
237 04-09-17 2+920 2+924 Water based marking (Edge line) LHS Sqm 0.40
238 04-09-17 2+900 2+903 Water based marking (Edge line) LHS Sqm 0.30
239 04-09-17 2+720 2+722 Water based marking (Edge line) LHS Sqm 0.20
240 04-09-17 2+725 2+727 Water based marking (Edge line) LHS Sqm 0.20
241 04-09-17 2+730 2+733 Water based marking (Edge line) LHS Sqm 0.30
242 04-09-17 2+704 2+705 Water based marking (Edge line) LHS Sqm 0.10
243 04-09-17 2+710 2+715 Water based marking (Edge line) LHS Sqm 0.50
244 04-09-17 2+716 2+719 Water based marking (Edge line) LHS Sqm 0.30
245 04-09-17 2+580 2+583 Water based marking (Edge line) LHS Sqm 0.30
246 04-09-17 2+540 2+544 Water based marking (Edge line) LHS Sqm 0.40
247 04-09-17 2+520 2+526 Water based marking (Edge line) LHS Sqm 0.60
248 04-09-17 2+405 2+406 Water based marking (Edge line) LHS Sqm 0.10
249 04-09-17 2+450 2+530 Water based marking (Center line) LHS Sqm 1.50
250 04-09-17 2+385 2+390 Water based marking (Edge line) LHS Sqm 0.50
251 04-09-17 2+040 2+051 Water based marking (Edge line) LHS Sqm 1.10
252 04-09-17 2+052 2+064 Water based marking (Edge line) LHS Sqm 1.20
253 04-09-17 1+980 1+988 Water based marking (Edge line) LHS Sqm 0.80
254 04-09-17 1+920 1+922 Water based marking (Edge line) LHS Sqm 0.20
255 04-09-17 1+850 1+863 Water based marking (Edge line) LHS Sqm 1.30
256 04-09-17 1+840 1+846 Water based marking (Edge line) LHS Sqm 0.60
Road Name : Dhanaula-Bhikhi (S-5)
Chainage
From To
RemarksSr.
No.Date Description of Work Side Unit Quantity
257 04-09-17 1+835 1+840 Water based marking (Edge line) LHS Sqm 0.50
258 04-09-17 1+825 1+830 Water based marking (Edge line) LHS Sqm 0.50
259 04-09-17 1+820 1+824 Water based marking (Edge line) LHS Sqm 0.40
260 04-09-17 1+620 1+630 Water based marking (Edge line) LHS Sqm 1.00
261 04-09-17 1+530 1+533 Water based marking (Edge line) LHS Sqm 0.30
262 04-09-17 1+480 1+486 Water based marking (Edge line) LHS Sqm 0.60
263 04-09-17 1+470 1+474 Water based marking (Edge line) LHS Sqm 0.40
264 04-09-17 1+380 1+387 Water based marking (Edge line) LHS Sqm 0.70
265 04-09-17 1+250 1+252 Water based marking (Edge line) LHS Sqm 0.20
266 04-09-17 1+240 1+246 Water based marking (Edge line) LHS Sqm 0.60
267 04-09-17 1+200 1+217 Water based marking (Edge line) LHS Sqm 1.70
268 04-09-17 1+192 1+193 Water based marking (Edge line) LHS Sqm 0.10
269 04-09-17 1+180 1+183 Water based marking (Edge line) LHS Sqm 0.30
270 04-09-17 1+160 1+170 Water based marking (Edge line) LHS Sqm 1.00
271 04-09-17 1+155 1+159 Water based marking (Edge line) LHS Sqm 0.40
272 04-09-17 1+150 1+151 Water based marking (Edge line) LHS Sqm 0.10
273 04-09-17 1+050 1+055 Water based marking (Edge line) LHS Sqm 0.50
274 04-09-17 0+990 0+998 Water based marking (Edge line) LHS Sqm 0.80
275 04-09-17 0+900 0+905 Water based marking (Edge line) LHS Sqm 0.50
276 04-09-17 0+640 0+644 Water based marking (Edge line) LHS Sqm 0.40
277 04-09-17 0+570 0+576 Water based marking (Edge line) LHS Sqm 0.60
278 04-09-17 0+320 0+330 Water based marking (Edge line) LHS Sqm 1.00
279 04-09-17 0+300 0+310 Water based marking (Edge line) LHS Sqm 1.00
280 04-09-17 0+220 0+230 Water based marking (Edge line) LHS Sqm 1.00
281 04-09-17 0+200 0+210 Water based marking (Edge line) LHS Sqm 1.00
282 04-09-17 0+170 0+184 Water based marking (Edge line) LHS Sqm 1.40
283 04-09-17 0+150 0+151 Water based marking (Edge line) LHS Sqm 0.10
284 04-09-17 0+010 0+136 Water based marking (Edge line) LHS Sqm 12.60
285 05-09-17 20+000 23+600 Shoulder Vegetation Removal BHS Sqm 4000.00
286 06-09-17 6+450 6+570 Cateyes fixing LHS Nos 2.00
287 06-09-17 6+450 6+570 Cateyes fixing Center Nos 1.00
288 06-09-17 1+230 1+350 Cateyes fixing LHS Nos 1.00
289 06-09-17 1+230 1+350 Cateyes fixing RHS Nos 1.00
290 06-09-17 0+650 0+900 Cateyes fixing LHS Nos 2.00
291 06-09-17 0+650 0+900 Cateyes fixing RHS Nos 1.00
292 11-09-17 0+000 0+040 Junction cleaning BHS Sqm 60.00
293 11-09-17 0+000 4+000 Culvert cleaning BHS Nos 9.00
Road Name : Dhanaula-Bhikhi (S-5)
Chainage
From To
RemarksSr.
No.Date Description of Work Side Unit Quantity
294 11-09-17 0+200 3+500 Shrubs removal along the shoulder BHS Rmt 1000.00
295 11-09-17 0+000 4+000 KM stone cleaning LHS Nos 4.00
296 11-09-17 0+000 4+000 HM stone cleaning LHS Nos 16.00
297 11-09-17 0+000 4+000 Signpost cleaning BHS Nos 10.00
298 11-09-17 0+000 4+000 Delineator cleaning BHS Nos 20.00
299 11-09-17 24+850 Brickwork for repair of culvert parapet wall RHS Cum 0.21
300 11-09-17 24+850 Plasterwork for repair of culvert parapet wall RHS Sqm 1.40
301 11-09-17 4+000 Km stone foundation repaired LHS Sqm 0.30
302 11-09-17 3+950 Plasterwork for repair of culvert parapet wall LHS Sqm 0.10
303 12-09-17 4+000 5+000 Shrubs removal along the shoulder BHS Rmt 2000.00
304 12-09-17 4+000 5+000 Culvert cleaning BHS Nos 4.00
305 12-09-17 20+000 21+000 Culvert cleaning BHS Nos 4.00
306 12-09-17 20+000 23+000 Vegetation Removal Shrubs Side BHS Rmt 1500.00
307 13-09-17 20+000 23+600 Shoulder rectification RHS Sqm 3600.00
308 13-09-17 20+000 22+000 Shoulder rectification LHS Sqm 2000.00
309 13-09-17 20+000 23+600 Pavement surface cleaning BHS Sqm 1800.00
310 13-09-17 21+000 24+000 Culvert cleaning BHS Nos 6.00
311 13-09-17 21+000 24+000 Signpost cleaning BHS Nos 11.00
312 14-09-17 22+000 24+000 Shoulder rectification LHS Sqm 1200.00
313 14-09-17 23+600 24+000 Shoulder rectification RHS Sqm 400.00
314 14-09-17 20+000 24+000 Pavement surface cleaning LHS Sqm 750.00
315 19-09-17 15+000 20+000 Shoulder vegetation removal BHS Sqm 8000.00
316 20-09-17 10+000 15+000 Shoulder vegetation removal BHS Sqm 8000.00
317 25-09-17 5+000 7+000 Shrubs removal along the shoulder BHS Rmt 1400.00
318 25-09-17 5+000 7+000 Culvert cleaning RHS Nos 4.00
319 25-09-17 5+000 7+000 Signpost cleaning BHS Nos 15.00
320 25-09-17 5+000 7+000 KM stone cleaning LHS Nos 3.00
321 25-09-17 5+000 7+000 HM stone cleaning LHS Nos 8.00
322 26-09-17 7+000 12+000 Shrubs removal along the shoulder BHS Rmt 2000.00
323 26-09-17 7+000 12+000 Culvert cleaning RHS Nos 11.00
324 26-09-17 7+000 12+000 KM stone cleaning LHS Nos 5.00
325 26-09-17 7+000 12+000 HM stone cleaning LHS Nos 16.00
326 26-09-17 7+000 12+000 Signpost cleaning BHS Nos 18.00
327 26-09-17 7+200 Raincut rectification along the parapet RHS Sqm 0.75
328 27-09-17 13+000 16+000 KM stone cleaning LHS Nos 3.00
329 27-09-17 13+000 16+000 HM stone cleaning LHS Nos 8.00
330 27-09-17 7+000 12+000 Shrubs removal along the shoulder BHS Rmt 2000.00
Road Name : Dhanaula-Bhikhi (S-5)
Chainage
From To
RemarksSr.
No.Date Description of Work Side Unit Quantity
331 27-09-17 7+000 12+000 Culvert cleaning BHS Nos 13.00
332 27-09-17 13+000 14+000 Shoulder rectification RHS Sqm 1000.00
333 28-09-17 10+000 13+000 Shoulder rectification RHS Sqm 3000.00
334 28-09-17 10+000 12+000 Shoulder rectification LHS Sqm 2000.00
335 28-09-17 10+000 12+000 Pavement Surface Cleaning BHS Sqm 1500.00
336 28-09-17 5+600 11+500 Application of emulsion on old road marking BHS Sqm 7.00
337 28-09-17 10+000 14+000 Bund Removal along Culvert Parapet RHS Nos 7.00
338 29-09-17 12+000 15+000 Shoulder rectification LHS Sqm 2000.00
339 29-09-17 12+000 15+000 Pavement Surface Cleaning LHS Sqm 2000.00
340 29-09-17 6+250 Stop signboard installed due to damage on link road LHS Nos 1.00
341 29-09-17 6+650 Hazard Marker Signboard installed due to theft RHS Nos 2.00
Daily Progress Report of September 2017
Name Of Project:- Output and Performance Based Road Contract (OPRC) (Asset Management Contract) For Improvement, Rehabilitation, Resurfacing
& Routine Maintenance Works of Roads of Sangrur-Mansa-Bathinda Contract Area
PUNJAB ROADS AND BRIDGES DEVELOPMENT BOARD
Chainage
From To
1 01-09-17 9+200 15+000 Dewatering LHS Sqm 1000.00
2 02-09-17 8+650 9+000 Road cleaning along the kerb BHS Sqm 280.00
3 02-09-17 15+490 15+498 Water based marking (Edge line) LHS Sqm 1.20
4 02-09-17 15+530 15+533 Water based marking (Edge line) LHS Sqm 0.45
5 02-09-17 15+535 15+552 Water based marking (Edge line) LHS Sqm 2.55
6 02-09-17 15+560 15+584 Water based marking (Edge line) LHS Sqm 3.60
7 02-09-17 15+600 15+607 Water based marking (Edge line) LHS Sqm 1.05
8 02-09-17 15+640 15+676 Water based marking (Edge line) LHS Sqm 5.40
9 02-09-17 15+700 15+795 Water based marking (Edge line) LHS Sqm 14.25
10 02-09-17 15+800 15+830 Water based marking (Edge line) LHS Sqm 4.50
11 02-09-17 15+850 15+890 Water based marking (Edge line) LHS Sqm 6.00
12 02-09-17 15+950 15+987 Water based marking (Edge line) LHS Sqm 5.55
13 02-09-17 16+045 16+050 Water based marking (center line) LHS Sqm 0.50
14 02-09-17 16+040 16+043 Water based marking (center line) LHS Sqm 0.30
15 02-09-17 16+000 16+014 Water based marking (center line) LHS Sqm 1.40
16 02-09-17 15+930 15+976 Water based marking (center line) LHS Sqm 4.60
17 02-09-17 15+925 15+928 Water based marking (center line) LHS Sqm 0.30
18 02-09-17 16+000 16+018 Water based marking (Edge line) LHS Sqm 2.70
19 02-09-17 16+030 16+051 Water based marking (Edge line) LHS Sqm 3.15
20 02-09-17 16+160 16+168 Water based marking (Edge line) LHS Sqm 1.20
21 02-09-17 16+300 16+306 Water based marking (Edge line) LHS Sqm 0.90
22 02-09-17 16+310 16+326 Water based marking (Edge line) LHS Sqm 2.40
23 02-09-17 16+576 16+600 Water based marking (Edge line) LHS Sqm 3.60
24 02-09-17 16+620 16+666 Water based marking (Edge line) LHS Sqm 6.90
25 02-09-17 16+670 16+675 Water based marking (Edge line) LHS Sqm 0.75
26 02-09-17 16+720 16+730 Water based marking (Edge line) LHS Sqm 1.50
27 02-09-17 16+750 16+762 Water based marking (Edge line) LHS Sqm 1.80
28 02-09-17 16+870 16+893 Water based marking (Edge line) LHS Sqm 3.45
29 02-09-17 16+780 16+795 Water based marking (Edge line) LHS Sqm 2.25
30 02-09-17 17+000 17+015 Water based marking (Edge line) LHS Sqm 2.25
31 02-09-17 15+005 15+037 Water based marking (Edge line) RHS Sqm 4.80
Road Name : Bathinda- Talwandi Sabo (B-8)
S.
No.Date Description of Work Side RemarksUnit Quantity
Chainage
From To
Road Name : Bathinda- Talwandi Sabo (B-8)
S.
No.Date Description of Work Side RemarksUnit Quantity
32 02-09-17 15+040 15+066 Water based marking (Edge line) RHS Sqm 3.90
33 02-09-17 15+080 15+099 Water based marking (Edge line) RHS Sqm 2.85
34 02-09-17 15+105 15+110 Water based marking (Edge line) RHS Sqm 0.75
35 02-09-17 15+160 15+187 Water based marking (Edge line) RHS Sqm 4.05
36 02-09-17 15+220 15+229 Water based marking (Edge line) RHS Sqm 1.35
37 02-09-17 15+430 15+438 Water based marking (Edge line) RHS Sqm 1.20
38 02-09-17 15+445 15+475 Water based marking (Edge line) RHS Sqm 4.50
39 02-09-17 15+540 15+580 Water based marking (Edge line) RHS Sqm 6.00
40 02-09-17 15+700 15+726 Water based marking (Edge line) RHS Sqm 3.90
41 02-09-17 15+740 15+751 Water based marking (Edge line) RHS Sqm 1.65
42 02-09-17 15+770 15+775 Water based marking (Edge line) RHS Sqm 0.75
43 02-09-17 15+780 15+790 Water based marking (Edge line) RHS Sqm 1.50
44 02-09-17 15+800 15+832 Water based marking (Edge line) RHS Sqm 4.80
45 02-09-17 15+850 15+928 Water based marking (Edge line) RHS Sqm 11.70
46 02-09-17 16+180 16+196 Water based marking (Edge line) RHS Sqm 2.40
47 02-09-17 16+210 16+312 Water based marking (Edge line) RHS Sqm 15.30
48 02-09-17 16+410 16+418 Water based marking (Edge line) RHS Sqm 1.20
49 02-09-17 16+480 16+483 Water based marking (Edge line) RHS Sqm 0.45
50 02-09-17 16+750 16+761 Water based marking (Edge line) RHS Sqm 1.65
51 02-09-17 16+840 16+852 Water based marking (Edge line) RHS Sqm 1.80
52 02-09-17 16+860 16+867 Water based marking (Edge line) RHS Sqm 1.05
53 02-09-17 17+010 17+016 Water based marking (Edge line) RHS Sqm 0.90
54 02-09-17 10+760 10+774 Water based marking (Edge line) RHS Sqm 2.10
55 02-09-17 10+790 10+819 Water based marking (Edge line) RHS Sqm 4.35
56 02-09-17 10+840 10+848 Water based marking (Edge line) RHS Sqm 1.20
57 02-09-17 11+195 11+218 Water based marking (Edge line) LHS Sqm 3.45
58 02-09-17 11+190 11+193 Water based marking (Edge line) LHS Sqm 0.45
59 02-09-17 9+420 9+430 Water based marking (Kerb line) BHS Sqm 3.00
60 02-09-17 10+376 10+400 Water based marking (Edge line) LHS Sqm 3.60
61 05-09-17 10+000 11+000 Road Cleaning along the Kerb BHS Sqm 400.00
62 05-09-17 15+000 20+000 Delineator Reinstalled for Curve Portion Nos 25.00
63 06-09-17 5+750 Thermoplastic road marking (Zebra Marking) BHS Sqm 19.80
64 06-09-17 6+095 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
65 06-09-17 6+115 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
Chainage
From To
Road Name : Bathinda- Talwandi Sabo (B-8)
S.
No.Date Description of Work Side RemarksUnit Quantity
66 06-09-17 6+405 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
67 06-09-17 6+425 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
68 06-09-17 6+935 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
69 06-09-17 6+955 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
70 06-09-17 7+430 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
71 06-09-17 7+450 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
72 06-09-17 8+175 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
73 06-09-17 8+040 8+650 Median kerb painting BHS Sqm 244.00
74 06-09-17 13+350 13+600 Cateyes fixing LHS Nos 1.00
75 06-09-17 13+350 13+600 Cateyes fixing Center Nos 7.00
76 06-09-17 13+550 13+600 Cateyes fixing LHS Nos 1.00
77 06-09-17 12+440 12+600 Cateyes fixing (LHS) LHS Nos 1.00
78 06-09-17 12+440 12+600 Cateyes fixing (LHS) Center Nos 6.00
79 06-09-17 12+440 12+600 Cateyes fixing (RHS) LHS Nos 1.00
80 06-09-17 12+440 12+600 Cateyes fixing (RHS) Center Nos 7.00
81 06-09-17 6+750 6+860 Cateyes fixing (LHS) LHS Nos 6.00
82 06-09-17 6+750 6+860 Cateyes fixing (LHS) Center Nos 6.00
83 06-09-17 6+750 6+860 Cateyes fixing (LHS) RHS Nos 6.00
84 06-09-17 6+750 6+860 Cateyes fixing (RHS) LHS Nos 6.00
85 06-09-17 6+750 6+860 Cateyes fixing (RHS) Center Nos 6.00
86 06-09-17 6+750 6+860 Cateyes fixing (RHS) RHS Nos 6.00
87 07-09-17 6+910 6+935 Thermoplastic road marking (Kerb Line) RHS Sqm 3.75
88 07-09-17 6+910 6+935 Thermoplastic road marking (Kerb Line) LHS Sqm 3.75
89 07-09-17 8+645 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
90 07-09-17 8+670 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
91 07-09-17 8+195 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
92 07-09-17 7+427 7+540 Thermoplastic road marking (Kerb Line) LHS Sqm 16.95
93 07-09-17 7+427 7+540 Thermoplastic road marking (Kerb Line) RHS Sqm 16.95
94 07-09-17 7+427 7+540 Thermoplastic road marking (Edge Line) LHS Sqm 16.95
95 07-09-17 7+427 7+540 Thermoplastic road marking (Edge Line) RHS Sqm 16.95
96 07-09-17 8+645 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
97 07-09-17 8+670 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
98 07-09-17 8+195 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
99 07-09-17 8+175 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
100 07-09-17 7+430 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
Chainage
From To
Road Name : Bathinda- Talwandi Sabo (B-8)
S.
No.Date Description of Work Side RemarksUnit Quantity
101 07-09-17 7+450 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
102 07-09-17 6+935 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
103 07-09-17 6+955 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
104 07-09-17 7+400 7+540 Road cleaning along the kerb BHS Sqm 112.00
105 07-09-17 8+040 8+200 Application of primer on Median BHS Sqm 128.00
106 07-09-17 14+950 Brickwork for pedestrian crossing BHS Sqm 0.12
107 07-09-17 14+950 Plasterwork for pedestrian crossing (Inner & top) LHS Sqm 0.49
108 07-09-17 14+950 Concerting for pedestrian crossing Center Cum 0.20
109 08-09-17 10+230 Brickwork for Parapet wall LHS Cum 0.21
110 08-09-17 10+230 Plaster work for parapet wall (Inner) LHS Sqm 1.20
111 08-09-17 10+230 Plaster work for parapet wall (Top) LHS Sqm 0.72
112 08-09-17 10+230 Plaster work for parapet wall (Sides) LHS Sqm 0.43
113 08-09-17 10+230 Plaster work for parapet wall (Outer) LHS Sqm 1.20
114 08-09-17 15+010 Brickwork for pedestrian crossing Center Cum 0.12
115 08-09-17 15+010 Plaster work for pedestrian crossing Center Sqm 0.70
116 08-09-17 15+010 Concreting for pedestrian crossing RHS Cum 0.20
117 08-09-17 5+875 5+920 Thermoplastic road marking (Center Line) BHS Sqm 2.25
118 08-09-17 5+880 5+920 Thermoplastic road marking (Center Line) BHS Sqm 1.80
119 08-09-17 5+833 5+970 Thermoplastic road marking (Edge Line) BHS Sqm 20.55
120 08-09-17 5+897 5+920 Thermoplastic road marking (Edge Line) LHS Sqm 3.45
121 08-09-17 5+837 5+897 Thermoplastic road marking (Edge Line) RHS Sqm 9.00
122 08-09-17 5+880 Thermoplastic road marking (Chevron) LHS Sqm 5.25
123 08-09-17 5+855 5+897 Thermoplastic road marking (Edge Line) RHS Sqm 6.30
124 08-09-17 5+830 Thermoplastic road marking (Junction) BHS Sqm 6.45
125 08-09-17 5+897 5+864 Thermoplastic road marking (Edge Line) BHS Sqm 4.95
126 08-09-17 5+870 Thermoplastic road marking (Junction) BHS Sqm 9.60
127 08-09-17 5+750 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
128 08-09-17 6+095 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
129 08-09-17 6+115 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
130 08-09-17 6+405 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
131 08-09-17 6+425 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
132 08-09-17 6+253 6+309 Thermoplastic road marking (Kerb Line) RHS Sqm 8.40
133 08-09-17 6+206 6+243 Thermoplastic road marking (Kerb Line) RHS Sqm 5.55
134 08-09-17 5+887 6+197 Thermoplastic road marking (Kerb Line) RHS Sqm 46.50
Chainage
From To
Road Name : Bathinda- Talwandi Sabo (B-8)
S.
No.Date Description of Work Side RemarksUnit Quantity
135 08-09-17 5+887 6+116 Thermoplastic road marking (Kerb Line) LHS Sqm 34.35
136 08-09-17 6+405 6+425 Thermoplastic road marking (Kerb Line) LHS Sqm 3.00
137 08-09-17 6+405 6+425 Thermoplastic road marking (Kerb Line) RHS Sqm 3.00
138 08-09-17 7+000 7+400 Road cleaning along the kerb BHS Sqm 160.00
139 08-09-17 17+000 20+000 Shoulder vegetation removal BHS Sqm 7200.00
140 09-09-17 Brickwork for Median kerb Center Cum 1.77
141 09-09-17 Plasterwork for Median kerb Center Sqm 13.82
142 09-09-17 Coping for Median kerb Center Cum 0.46
143 09-09-17 9+200 10+000 Shoulder rectification BHS Sqm 1600.00
144 09-09-17 6+500 7+000 Road cleaning along the kerb BHS Sqm 1000.00
145 09-09-17 8+040 9+200 Application of final coat of Median Paint BHS Sqm 464.00
146 11-09-17 Brickwork for Median kerb Center Cum 1.10
147 11-09-17 Plasterwork for Median kerb Center Sqm 8.64
148 11-09-17 Coping for Median kerb Center Cum 0.29
149 11-09-17 9+200 15+000 Dewatering BHS Sqm 800.00
150 11-09-17 5+900 6+500 Road cleaning along the kerb BHS Sqm 1200.00
151 11-09-17 7+500 8+000 Road cleaning along the kerb BHS Sqm 1000.00
152 11-09-17 10+000 15+000 Culvert cleaning BHS Nos 6.00
153 11-09-17 10+000 15+000 KM stone cleaning LHS Nos 5.00
154 11-09-17 10+000 15+000 HM stone cleaning LHS Nos 20.00
155 11-09-17 10+000 12+000 Shoulder rectification BHS Sqm 1000.00
156 12-09-177+260, 7+245, 7+110, 8+170, 8+185 Brickwork for Median kerb Center Cum 1.10
157 12-09-177+260, 7+245, 7+110, 8+170, 8+185 Plasterwork for Median kerb Center Sqm 8.64
158 12-09-177+260, 7+245, 7+110, 8+170, 8+185 Coping for Median kerb Center Cum 0.29
159 12-09-17 30+290 30+370 Thermoplastic road marking (Rumbles) BHS Sqm 37.80
160 12-09-17 30+110 30+190 Thermoplastic road marking (Rumbles) BHS Sqm 37.80
161 12-09-17 30+220 30+280 Thermoplastic road marking (Zigzag marking) Center Sqm 6.00
162 12-09-17 30+290 30+370 Thermoplastic road marking (Center Line continue) Center Sqm 7.00
163 12-09-17 30+110 30+215 Thermoplastic road marking (Center Line continue) Center Sqm 9.00
164 12-09-17 26+655 26+785 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
165 12-09-17 26+830 26+960 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
166 12-09-17 27+320 27+450 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
167 12-09-17 27+510 27+640 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
168 12-09-17 26+785 26+830 Thermoplastic road marking (Zigzag marking) Center Sqm 4.40
6+620, 6+635, 6+710, 6+725,
7+088
6+620, 6+635, 6+710, 6+725,
7+088
6+620, 6+635, 6+710, 6+725,
7+088
6+190, 6+200, 6+245, 6+236,
6+300, 6+306, 6+560, 6+575
6+190, 6+200, 6+245, 6+236,
6+300, 6+306, 6+560, 6+575
6+190, 6+200, 6+245, 6+236,
6+300, 6+306, 6+560, 6+575
Chainage
From To
Road Name : Bathinda- Talwandi Sabo (B-8)
S.
No.Date Description of Work Side RemarksUnit Quantity
169 12-09-17 27+440 27+490 Thermoplastic road marking (Zigzag marking) Center Sqm 5.00
170 12-09-17 7+540 8+040 Road cleaning along the kerb RHS Sqm 500.00
171 13-09-17 8+800 9+200 Road cleaning along the kerb BHS Sqm 320.00
172 13-09-17 8+800 9+200 Median Center soil dressing Center Sqm 160.00
173 13-09-17 7+540 7+700 RUB cleaning RHS Sqm 240.00
174 13-09-17 7+800 8+040 Footpath cleaning LHS Sqm 360.00
175 13-09-17 7+540 7+700 Footpath cleaning RHS Sqm 240.00
176 13-09-17 7+800 8+040 Footpath cleaning LHS Sqm 360.00
177 14-09-17 9+180 Thermoplastic road marking (Junction) LHS Sqm 4.65
178 14-09-17 9+172 9+278 Thermoplastic road marking (Edge Line) LHS Sqm 15.90
179 14-09-17 9+160 Thermoplastic road marking (Junction) RHS Sqm 6.75
180 14-09-17 9+097 9+163 Thermoplastic road marking (Edge Line) LHS Sqm 9.90
181 14-09-17 9+100 9+155 Thermoplastic road marking (Center Line) LHS Sqm 2.70
182 14-09-17 9+100 9+155 Thermoplastic road marking (Center Line) RHS Sqm 2.70
183 14-09-17 9+206 9+296 Thermoplastic road marking (Center Line continue) Center Sqm 13.50
184 14-09-17 9+139 9+150 Thermoplastic road marking (Kerb Line) BHS Sqm 4.35
185 14-09-17 9+170 69+740 Thermoplastic road marking (Round about marking) BHS Sqm 26.55
186 14-09-17 9+180 9+191 Thermoplastic road marking (Kerb Line) BHS Sqm 4.35
187 14-09-17 7+700 8+040 RUB cleaning RHS Sqm 510.00
188 14-09-17 7+800 8+040 RUB cleaning Center Sqm 480.00
189 14-09-17 9+200 10+500 Median cleaning Center Sqm 800.00
190 14-09-17 9+100 9+300 Junction cleaning BHS Sqm 160.00
191 14-09-17 9+100 9+300 Round about cleaning RHS Sqm 70.80
192 14-09-17 9+100 9+300 Island cleaning BHS Sqm 200.00
193 15-09-17 9+600 10+500 Median vegetation cleaning Center Sqm 560.00
194 16-09-17 11+000 12+000 Road cleaning along the kerb BHS Sqm 400.00
195 18-09-17 Camp 27+400 Paver block shifting BHS Nos 2000.00
196 18-09-17 16+550 Road from left side signboard installed RHS Nos 1.00
197 18-09-17 27+500 Road from right side signboard installed RHS Nos 1.00
198 18-09-17 22+080 Cross Road ahead signboard installed LHS Nos 1.00
199 18-09-17 8+080, 13+430 Gap in median Signboard installed Median Nos 2.00
200 18-09-17 7+600 LHS, 7+950 RHS Speed breaker signboard installed Nos 2.00
201 18-09-17 17+150 Chevron sheets installed due to damage RHS Nos 2.00
202 18-09-17 17+230 Chevron sheets installed due to damage RHS Nos 1.00
Chainage
From To
Road Name : Bathinda- Talwandi Sabo (B-8)
S.
No.Date Description of Work Side RemarksUnit Quantity
203 19-09-17 26+750 Pavement scarification for speed table BHS Sqm 35.00
204 19-09-17 2+682 Pavement scarification for speed table BHS Sqm 35.00
205 19-09-17 27+450 Pavement scarification for speed table BHS Sqm 35.00
206 19-09-17 27+500 Pavement scarification for speed table BHS Sqm 35.00
207 19-09-17 9+100 PCC laying for rectification of median kerb BHS Cum 0.60
208 20-09-17 30+600 31+000 Road cleaning along the kerb BHS Sqm 400.00
209 20-09-17 27+450 BC laying for speed table BHS Cum 3.46
210 20-09-17 27+500 BC laying for speed table BHS Cum 3.46
211 20-09-17 27+450 Paver Block laying for speed table BHS Sqm 42.00
212 20-09-17 27+500 Paver Block laying for speed table BHS Sqm 42.00
213 20-09-17 9+210 RHS, 9+110 LHS Installation of informatory signboard Nos 2.00
214 20-09-17 9+150 LHS, 9+150 RHS Installation of 3 Name informatory signboard Nos 2.00
215 20-09-17 27+450 LHS, 27+500 RHS Installation of Speed breaker signboard Nos 2.00
216 20-09-17 9+150 Triple chevron sign board installed on Round about portion Nos 4.00
217 21-09-17 31+000 32+000 Road cleaning along the kerb BHS Sqm 200.00
218 22-09-17 31+200 31+400 Road cleaning along the kerb BHS Sqm 200.00
219 23-09-17 31+400 31+600 Road cleaning along the kerb BHS Sqm 200.00
220 25-09-17 27+445 27+495 Thermoplastic road marking (Zigzag Marking) BHS Sqm 15.00
221 25-09-17 27+445 Thermoplastic road marking (Triangle) BHS Sqm 4.16
222 25-09-17 27+445 Thermoplastic road marking (Block) BHS Sqm 11.00
223 25-09-17 27+495 Thermoplastic road marking (Triangle) BHS Sqm 4.16
224 25-09-17 27+495 Thermoplastic road marking (Block) BHS Sqm 11.00
225 25-09-17 6+191 6+200 Thermoplastic road marking (Kerb Line) BHS Sqm 2.70
226 25-09-17 6+235 6+245 Thermoplastic road marking (Kerb Line) BHS Sqm 3.00
227 25-09-17 6+300 6+305 Thermoplastic road marking (Kerb Line) BHS Sqm 1.50
228 25-09-17 6+560 6+570 Thermoplastic road marking (Kerb Line) BHS Sqm 3.00
229 25-09-17 6+623 6+630 Thermoplastic road marking (Kerb Line) BHS Sqm 2.10
230 25-09-17 6+708 6+715 Thermoplastic road marking (Kerb Line) BHS Sqm 2.10
231 25-09-17 7+090 7+110 Thermoplastic road marking (Kerb Line) BHS Sqm 6.00
232 25-09-17 7+255 7+266 Thermoplastic road marking (Kerb Line) BHS Sqm 3.30
233 25-09-17 8+170 8+200 Thermoplastic road marking (Kerb Line) BHS Sqm 9.00
234 25-09-17 8+645 8+670 Thermoplastic road marking (Kerb Line) BHS Sqm 7.50
235 25-09-17 8+927 8+947 Thermoplastic road marking (Kerb Line) BHS Sqm 6.00
236 25-09-17 14+900 15+000 Thermoplastic road marking (Edge Line) RHS Sqm 15.00
Chainage
From To
Road Name : Bathinda- Talwandi Sabo (B-8)
S.
No.Date Description of Work Side RemarksUnit Quantity
237 25-09-17 14+900 14+950 Thermoplastic road marking (Kerb Line) BHS Sqm 15.00
238 25-09-17 14+950 Thermoplastic road marking (Chevron) Center Sqm 8.70
239 25-09-17 31+600 31+800 Road cleaning along the kerb BHS Sqm 80.00
240 26-09-17 36+150 36+290 Thermoplastic road marking (Edge Line) LHS Sqm 21.00
241 26-09-17 36+150 36+290 Thermoplastic road marking (Edge Line) RHS Sqm 21.00
242 26-09-17 36+390 36+500 Thermoplastic road marking (Edge Line) LHS Sqm 16.50
243 26-09-17 36+390 36+500 Thermoplastic road marking (Edge Line) RHS Sqm 16.50
244 26-09-17 14+930 Thermoplastic road marking (Zebra Marking) RHS Sqm 12.60
245 26-09-17 14+860 14+950 Thermoplastic road marking (Center Line) RHS Sqm 3.00
246 26-09-17 14+930 15+010 Thermoplastic road marking (Edge Line) LHS Sqm 12.00
247 26-09-17 14+900 14+965 Thermoplastic road marking (Center Line) LHS Sqm 2.10
248 26-09-17 30+800 30+950 Road cleaning along the kerb BHS Sqm 120.00
249 26-09-17 7+540 8+040 Patchwork at RUB portion BHS Cum 0.13
250 26-09-17 7+540 8+040 Patchwork at RUB portion BHS Cum 0.08
251 26-09-17 7+540 8+040 Patchwork at RUB portion BHS Cum 0.08
252 26-09-17 7+540 8+040 Patchwork at RUB portion BHS Cum 0.10
253 26-09-17 7+540 8+040 Patchwork at RUB portion BHS Cum 0.01
254 26-09-17 7+540 8+040 Patchwork at RUB portion BHS Cum 0.05
255 26-09-17 7+540 8+040 Patchwork at RUB portion BHS Cum 0.11
256 26-09-17 7+540 8+040 Patchwork at RUB portion BHS Cum 0.14
257 26-09-17 7+540 8+040 Patchwork at RUB portion BHS Cum 0.05
258 26-09-17 7+540 8+040 Patchwork at RUB portion BHS Cum 0.05
259 27-09-17 20+000 25+000 Shoulder vegetation removal LHS Sqm 4800.00
260 27-09-17 32+000 32+700 Road cleaning along the kerb BHS Sqm 560.00
261 28-09-17 20+000 25+000 Shoulder vegetation removal RHS Sqm 6000.00
262 28-09-17 25+000 30+000 Shoulder vegetation removal BHS Sqm 8400.00
263 28-09-17 32+700 32+830 Road cleaning along the kerb BHS Sqm 104.00
264 28-09-17 32+780 - Round About Cleaning BHS Sqm 15.20
265 28-09-17 14+900 15+000Road Marking Rectification(Application of emulsion on old
marking)BHS Sqm 30.00
266 29-09-17 20+000 22+000 KM stone cleaning BHS Nos 2.00
267 29-09-17 20+000 22+000 HM stone cleaning BHS Nos 8.00
268 29-09-17 20+000 22+000 Delineator cleaning BHS Nos 20.00
269 29-09-17 33+000 38+000 Shoulder vegetation removal BHS Sqm 10000.00
270 29-09-17 15+150 15+300 Application of Emulsion on old Road Marking BHS Sqm 45.00
4.0_Road_Asset_Damage_Report_September_2017
APPENDIX - K
ROAD ASSET DAMAGE REPORT SEPTEMBER-2017
S.No DATE Side Damage Details Damage Caused By Action Taken
Name of Road : Bhawanigarh-Bhikhi-Kotshamir (S-2)
1 18+320 18+360 07-09-17 BHS Median kerb damaged Unknown vehicle Repaired
2 18+420 18+450 08-09-17 BHS Median kerb damaged Unknown vehicle Repaired
3 27+950 09-09-17 Center Median Nose damaged Unknown vehicle Repaired
Name of Road :Barnala-Mansa (S3)
1 182+900 182+910 16-09-17 Center Median Tiles damged Unknown vehicle Repaired
2 186+700 186+710 16-09-17 Center Median Tiles damged Unknown vehicle Repaired
Name of Road :Dhanaula-Bhikhi (S5)
1 24+850 11-09-17 RHS Culvert parapet wall damaged Unknown vehicle Repaired
2 4+000 11-09-17 LHS KM stone damaged Unknown vehicle Reinstalled
3 3+950 11-09-17 LHS Culvert parapet wall damaged Unknown vehicle Repaired
Chainage
From To
5.0_Road_Furniture_Repair_New_Installation_Summary_Report_September_2017
APPENDIX-J
ROAD SIGN MAINTENANCE REPORT (September-2017)
From To
1 Bhawanigarh-Kotshamir S2 2 Name Informatory Signboard installed 2 16-09-17
2 Bhawanigarh-Kotshamir S2 Flag type Direction Signboard installed 7 16-09-17
3 Bhawanigarh-Kotshamir S2Keep left 300mm sheet installed for jumbo
bollard signboard2 18-09-17
4 Bhawanigarh-Kotshamir S2 39+410Keep left 400mm sheet installed for jumbo
bollard signboardMedian 1 18-09-17
5 Bhawanigarh-Kotshamir S2 11+240 No overtaking signboard ACM Sheet installed LHS 1 18-09-17
6 Bathinda-Talwandi Sabo B8 16+550 Road from left side signboard installed RHS 1 18-09-17
7 Bathinda-Talwandi Sabo B8 27+500 Road from right side signboard installed RHS 1 18-09-17
8 Bathinda-Talwandi Sabo B8 22+080 Cross Road ahead signboard installed LHS 1 18-09-17
9 Bathinda-Talwandi Sabo B8 8+080, 13+430 Gap in median Signboard installed Median 2 18-09-17
10 Bathinda-Talwandi Sabo B8 7+600 LHS, 7+950 RHS Speed breaker signboard installed 2 18-09-17
11 Barnala-Mansa S3 Speed breaker signboard installed 3 18-09-17
12 Bathinda-Talwandi Sabo B8 17+150 Chevron sheets installed due to damage RHS 2 18-09-17
13 Bathinda-Talwandi Sabo B8 17+230 Chevron sheets installed due to damage RHS 1 18-09-17
14 Bhawanigarh-Kotshamir S2 40+000 LHS, 40+260 RHS 3 Name informatory signboard installed 2 19-09-17
15 Barnala-Mansa S3 186+550 LHS, 186+750 RHS 4 Name informatory signboard installed 2 19-09-17
16 Bhawanigarh-Kotshamir S2 107+500 Installation of direction sign board (flag type) LHS 1 20-09-17
17 Bathinda-Talwandi Sabo B8 9+210 RHS, 9+110 LHS Installation of informatory signboard 2 20-09-17
18 Bathinda-Talwandi Sabo B8 9+150 LHS, 9+150 RHS Installation of 3 Name informatory signboard 2 20-09-17
19 Bathinda-Talwandi Sabo B8 27+450 LHS, 27+500 RHS Installation of Speed breaker signboard 2 20-09-17
20 Bathinda-Talwandi Sabo B8 9+150Triple chevron sign board installed on Round
about portion4 20-09-17
21 Dhanaula-Bhikhi S5 6+250Stop signboard installed due to damage on link
roadLHS 1 29-09-17
22 Dhanaula-Bhikhi S5 6+650 Hazard Marker Signboard installed due to theft RHS 2 29-09-17
35+100 LHS, 35+210 RHS
189+950 Median, 190+030 LHS, 190+050
RHS
Date
InstalledRemarks
35+100 LHS, 35+210 RHS
39+700 RHS, 40+650 LHS, 40+750 RHS,
42+310 LHS, 40+380 RHS 51+480 RHS,
51+370 RHS
S. No Road Name Sign Type SideNos./
Rmt
Location
APPENDIX-J
From To
1 Sangrur-Sunam S1 10+195 11+240 Thermoplastic road marking (Edge Line) LHS Sqm 156.75
2 Sangrur-Sunam S1 10+195 11+240 Thermoplastic road marking (Edge Line) RHS Sqm 156.75
3 Sangrur-Sunam S1 10+379 10+490Thermoplastic road marking (Center line
continues)Center Sqm 11.1
4 Sangrur-Sunam S1 10+195 11+270 Thermoplastic road marking (Center line) Center Sqm 36.9
5 Sangrur-Sunam S1 9+580 9+850Thermoplastic road marking (Center line
continues)Center Sqm 27
6 Sangrur-Sunam S1 9+300 9+380Thermoplastic road marking (Center line
continues)Center Sqm 8
7 Sangrur-Sunam S1 9+380 9+580 Thermoplastic road marking (Center line) Center Sqm 6.3
8 Sangrur-Sunam S1 10+110 10+195 Thermoplastic road marking (Edge Line) RHS Sqm 12.75
9 Sangrur-Sunam S1 10+080 10+195 Thermoplastic road marking (Center line) Center Sqm 4.8
10 Sangrur-Sunam S1 9+440 10+195 Thermoplastic road marking (Edge Line) LHS Sqm 113.25
11 Sangrur-Sunam S1 10+005 10+025 Thermoplastic road marking (Edge Line) RHS Sqm 3
12 Sangrur-Sunam S1 9+640 9+670 Thermoplastic road marking (Edge Line) RHS Sqm 4.5
13 Sangrur-Sunam S1 9+675 9+690 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
14 Sangrur-Sunam S1 9+695 9+730 Thermoplastic road marking (Edge Line) RHS Sqm 5.25
15 Sangrur-Sunam S1 9+740 9+830 Thermoplastic road marking (Edge Line) RHS Sqm 13.5
16 Sangrur-Sunam S1 9+290 9+620 Thermoplastic road marking (Edge Line) RHS Sqm 49.5
17 Sangrur-Sunam S1 9+070 9+090 Thermoplastic road marking (Edge Line) RHS Sqm 3
18 Sangrur-Sunam S1 8+980 9+000 Thermoplastic road marking (Edge Line) LHS Sqm 3
19 Sangrur-Sunam S1 9+185 9+200 Thermoplastic road marking (Edge Line) LHS Sqm 2.25
20 Sangrur-Sunam S1 9+130 9+160 Thermoplastic road marking (Edge Line) LHS Sqm 4.5
21 Sangrur-Sunam S1 9+300 9+330 Thermoplastic road marking (Edge Line) LHS Sqm 4.5
22 Sangrur-Sunam S1 2+155 2+450 Thermoplastic road marking (Edge Line) LHS Sqm 44.25
23 Sangrur-Sunam S1 0+000 2+125 Thermoplastic road marking (Edge Line) LHS Sqm 318.75
24 Sangrur-Sunam S1 0+000 0+570 Thermoplastic road marking (Edge Line) RHS Sqm 85.5
ROAD MARKING MAINTENANCE (September-2017)
Qty. in Sqm RemarksS. No Road Name
Location
Description of Work Side Unit
25 Sangrur-Sunam S1 0+600 0+680 Thermoplastic road marking (Edge Line) RHS Sqm 12
26 Sangrur-Sunam S1 0+710 0+900 Thermoplastic road marking (Edge Line) RHS Sqm 28.5
27 Sangrur-Sunam S1 0+050 0+150Thermoplastic road marking (Center line
continues)Center Sqm 15
28 Sangrur-Sunam S1 4+010 4+150 Thermoplastic road marking (Edge Line) RHS Sqm 21
29 Sangrur-Sunam S1 4+170 4+370 Thermoplastic road marking (Edge Line) RHS Sqm 30
30 Sangrur-Sunam S1 3+200 4+030 Thermoplastic road marking (Edge Line) LHS Sqm 124.5
31 Sangrur-Sunam S1 2+155 2+450 Thermoplastic road marking (Edge Line) RHS Sqm 44.25
32 Sangrur-Sunam S1 1+370 2+125 Thermoplastic road marking (Edge Line) RHS Sqm 113.25
33 Sangrur-Sunam S1 0+900 1+335 Thermoplastic road marking (Edge Line) RHS Sqm 65.25
34 Sangrur-Sunam S1 0+000 2+450Thermoplastic road marking (Center line
continues)Center Sqm 88.2
APPENDIX-J
ROAD MARKING MAINTENANCE (September-2017)
From To
1 Bhawanigarh-Kotshamir S2 67+850 Thermoplastic road marking (Round About) - Sqm 39.30
2 Bhawanigarh-Kotshamir S2 55+695 Thermoplastic road marking (Junction) LHS Sqm 10.50
3 Bhawanigarh-Kotshamir S2 55+530 55+686 Thermoplastic road marking (Edge line) LHS Sqm 23.40
4 Bhawanigarh-Kotshamir S2 55+716 56+400 Thermoplastic road marking (Edge Line) LHS Sqm 102.60
5 Bhawanigarh-Kotshamir S2 108+720 Thermoplastic road marking (Zebra Marking) BHS Cum 16.20
6 Bhawanigarh-Kotshamir S2 108+720 Thermoplastic road marking (Stop Line) BHS Cum 2.10
7 Bhawanigarh-Kotshamir S2 63+800 68+000 Thermoplastic road marking (Center Line) Center Cum 130.20
8 Bhawanigarh-Kotshamir S2 67+764 68+000 Thermoplastic road marking (Edge Line) LHS Cum 35.40
9 Bhawanigarh-Kotshamir S2 67+596 67+675 Thermoplastic road marking (Edge Line) LHS Sqm 11.85
10 Bhawanigarh-Kotshamir S2 66+574 67+458 Thermoplastic road marking (Edge Line) LHS Sqm 132.60
11 Bhawanigarh-Kotshamir S2 65+546 66+574 Thermoplastic road marking (Edge Line) LHS Sqm 154.20
12 Bhawanigarh-Kotshamir S2 65+420 65+523 Thermoplastic road marking (Edge Line) LHS Sqm 15.45
13 Bhawanigarh-Kotshamir S2 64+800 65+400 Thermoplastic road marking (Edge Line) LHS Sqm 90.00
14 Bhawanigarh-Kotshamir S2 64+761 64+795 Thermoplastic road marking (Edge Line) LHS Sqm 5.10
15 Bhawanigarh-Kotshamir S2 64+731 64+756 Thermoplastic road marking (Edge Line) LHS Sqm 3.75
16 Bhawanigarh-Kotshamir S2 64+676 64+726 Thermoplastic road marking (Edge Line) LHS Sqm 7.50
17 Bhawanigarh-Kotshamir S2 64+584 64+634 Thermoplastic road marking (Edge Line) LHS Sqm 7.50
18 Bhawanigarh-Kotshamir S2 64+549 64+579 Thermoplastic road marking (Edge Line) LHS Sqm 4.50
19 Bhawanigarh-Kotshamir S2 64+504 64+544 Thermoplastic road marking (Edge Line) LHS Cum 6.00
20 Bhawanigarh-Kotshamir S2 64+147 64+474 Thermoplastic road marking (Edge Line) LHS Cum 49.05
21 Bhawanigarh-Kotshamir S2 63+842 64+116 Thermoplastic road marking (Edge Line) LHS Sqm 41.10
22 Bhawanigarh-Kotshamir S2 63+800 64+005 Thermoplastic road marking (Edge Line) RHS Sqm 30.75
23 Bhawanigarh-Kotshamir S2 88+620 88+700 Thermoplastic road marking (Rumbles) BHS Sqm 37.80
24 Bhawanigarh-Kotshamir S2 88+760 88+840 Thermoplastic road marking (Rumbles) BHS Sqm 37.80
25 Bhawanigarh-Kotshamir S2 13+760 13+880 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
26 Bhawanigarh-Kotshamir S2 14+020 14+140 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
27 Bhawanigarh-Kotshamir S2 14+100 14+140 Thermoplastic road marking (Rumbles) BHS Sqm 12.60
28 Bhawanigarh-Kotshamir S2 13+900 14+015 Thermoplastic road marking (Zigzag marking) Center Sqm 11.40
29 Bhawanigarh-Kotshamir S2 20+810 20+940 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
Qty. in Sqm RemarksS. No Road NameLocation
Description of Work Side Unit
30 Bhawanigarh-Kotshamir S2 20+535 20+665 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
31 Bhawanigarh-Kotshamir S2 20+710 20+810 Thermoplastic road marking (Zigzag marking) Center Sqm 10.00
32 Bhawanigarh-Kotshamir S2 69+610 69+740 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
33 Bhawanigarh-Kotshamir S2 69+440 69+570 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
34 Bhawanigarh-Kotshamir S2 69+570 69+610 Thermoplastic road marking (Zigzag marking) Center Sqm 4.00
35 Bhawanigarh-Kotshamir S2 72+980 72+850 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
36 Bhawanigarh-Kotshamir S2 72+800 72+850 Thermoplastic road marking (Zigzag marking) Center Sqm 5.00
37 Bhawanigarh-Kotshamir S2 72+670 72+800 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
38 Bhawanigarh-Kotshamir S2 88+620 88+700 Thermoplastic road marking (Center Line continue) Center Cum 7.00
39 Bhawanigarh-Kotshamir S2 88+760 88+840 Thermoplastic road marking (Center Line continue) Center Sqm 7.00
40 Bhawanigarh-Kotshamir S2 88+700 88+760 Thermoplastic road marking (Zigzag marking) Center Sqm 6.00
41 Bhawanigarh-Kotshamir S2 72+980 72+850 Thermoplastic road marking (Chevron) Center Sqm 18.00
42 Bhawanigarh-Kotshamir S2 9+180 9+324 Thermoplastic road marking (Center Line) LHS Sqm 7.20
43 Bhawanigarh-Kotshamir S2 9+180 9+324 Thermoplastic road marking (Center Line) RHS Cum 7.20
44 Bhawanigarh-Kotshamir S2 64+730 64+755 Thermoplastic road marking (Edge Line) RHS Sqm 3.75
45 Bhawanigarh-Kotshamir S2 64+760 64+764 Thermoplastic road marking (Edge Line) RHS Cum 0.60
46 Bhawanigarh-Kotshamir S2 64+790 64+795 Thermoplastic road marking (Edge Line) RHS Sqm 0.75
47 Bhawanigarh-Kotshamir S2 64+800 65+415 Thermoplastic road marking (Edge Line) RHS Sqm 92.25
48 Bhawanigarh-Kotshamir S2 65+590 65+620 Thermoplastic road marking (Edge Line) RHS Sqm 4.50
49 Bhawanigarh-Kotshamir S2 65+632 65+640 Thermoplastic road marking (Edge Line) RHS Sqm 1.20
50 Bhawanigarh-Kotshamir S2 65+695 65+703 Thermoplastic road marking (Edge Line) RHS Sqm 1.20
51 Bhawanigarh-Kotshamir S2 65+460 65+480 Thermoplastic road marking (Edge Line) RHS Sqm 3.00
52 Bhawanigarh-Kotshamir S2 65+507 65+510 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
53 Bhawanigarh-Kotshamir S2 64+005 64+120 Thermoplastic road marking (Edge Line) RHS Sqm 17.25
54 Bhawanigarh-Kotshamir S2 64+149 64+332 Thermoplastic road marking (Edge Line) RHS Sqm 27.45
55 Bhawanigarh-Kotshamir S2 64+358 64+496 Thermoplastic road marking (Edge Line) RHS Sqm 20.70
56 Bhawanigarh-Kotshamir S2 64+531 64+537 Thermoplastic road marking (Edge Line) RHS Sqm 0.90
57 Bhawanigarh-Kotshamir S2 64+542 64+567 Thermoplastic road marking (Edge Line) RHS Sqm 3.75
58 Bhawanigarh-Kotshamir S2 64+572 64+637 Thermoplastic road marking (Edge Line) RHS Sqm 9.75
59 Bhawanigarh-Kotshamir S2 64+692 64+725 Thermoplastic road marking (Edge Line) RHS Sqm 4.95
60 Bhawanigarh-Kotshamir S2 65+576 65+590 Thermoplastic road marking (Edge Line) RHS Sqm 2.10
61 Bhawanigarh-Kotshamir S2 65+805 65+810 Thermoplastic road marking (Edge Line) RHS Sqm 0.75
62 Bhawanigarh-Kotshamir S2 65+830 65+837 Thermoplastic road marking (Edge Line) RHS Sqm 1.05
63 Bhawanigarh-Kotshamir S2 65+841 65+850 Thermoplastic road marking (Edge Line) RHS Sqm 1.35
64 Bhawanigarh-Kotshamir S2 65+860 65+862 Thermoplastic road marking (Edge Line) RHS Sqm 0.30
65 Bhawanigarh-Kotshamir S2 65+887 65+890 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
66 Bhawanigarh-Kotshamir S2 65+916 66+310 Thermoplastic road marking (Edge Line) RHS Sqm 59.10
67 Bhawanigarh-Kotshamir S2 66+322 66+350 Thermoplastic road marking (Edge Line) RHS Sqm 4.20
68 Bhawanigarh-Kotshamir S2 66+358 66+360 Thermoplastic road marking (Edge Line) RHS Sqm 0.30
69 Bhawanigarh-Kotshamir S2 66+365 66+367 Thermoplastic road marking (Edge Line) RHS Sqm 0.30
70 Bhawanigarh-Kotshamir S2 66+379 66+382 Thermoplastic road marking (Edge Line) RHS Cum 0.45
71 Bhawanigarh-Kotshamir S2 66+392 66+610 Thermoplastic road marking (Edge Line) RHS Sqm 32.70
72 Bhawanigarh-Kotshamir S2 66+618 66+620 Thermoplastic road marking (Edge Line) RHS Cum 0.30
73 Bhawanigarh-Kotshamir S2 66+622 66+625 Thermoplastic road marking (Edge Line) RHS Cum 0.45
74 Bhawanigarh-Kotshamir S2 66+631 66+750 Thermoplastic road marking (Edge Line) RHS Sqm 17.85
75 Bhawanigarh-Kotshamir S2 66+772 66+775 Thermoplastic road marking (Edge Line) RHS Cum 0.45
76 Bhawanigarh-Kotshamir S2 66+791 66+795 Thermoplastic road marking (Edge Line) RHS Sqm 0.60
77 Bhawanigarh-Kotshamir S2 66+811 66+812 Thermoplastic road marking (Edge Line) RHS Sqm 0.15
78 Bhawanigarh-Kotshamir S2 66+820 66+822 Thermoplastic road marking (Edge Line) RHS Sqm 0.30
79 Bhawanigarh-Kotshamir S2 66+840 66+860 Thermoplastic road marking (Edge Line) RHS Sqm 3.00
80 Bhawanigarh-Kotshamir S2 66+875 66+880 Thermoplastic road marking (Edge Line) RHS Sqm 0.75
81 Bhawanigarh-Kotshamir S2 66+891 67+460 Thermoplastic road marking (Edge Line) RHS Sqm 85.35
82 Bhawanigarh-Kotshamir S2 67+602 67+682 Thermoplastic road marking (Edge Line) RHS Sqm 12.00
83 Bhawanigarh-Kotshamir S2 67+850 Thermoplastic road marking (Round about Marking) BHS Sqm 5.40
84 Bhawanigarh-Kotshamir S2 67+720 67+757 Thermoplastic road marking (Edge Line) RHS Sqm 5.55
85 Bhawanigarh-Kotshamir S2 67+800 67+830 Thermoplastic road marking (Edge Line) RHS Sqm 4.50
86 Bhawanigarh-Kotshamir S2 67+865 68+000 Thermoplastic road marking (Edge Line) RHS Sqm 20.25
87 Bhawanigarh-Kotshamir S2 63+000 63+795 Thermoplastic road marking (Edge Line) LHS Sqm 119.25
88 Bhawanigarh-Kotshamir S2 62+716 62+918 Thermoplastic road marking (Edge Line) LHS Sqm 30.30
89 Bhawanigarh-Kotshamir S2 54+229 54+255 Thermoplastic road marking (Edge Line) RHS Sqm 3.90
90 Bhawanigarh-Kotshamir S2 62+100 62+716 Thermoplastic road marking (Edge Line) LHS Sqm 92.40
91 Bhawanigarh-Kotshamir S2 61+745 62+000 Thermoplastic road marking (Edge Line) RHS Sqm 38.25
92 Bhawanigarh-Kotshamir S2 60+630 60+800 Thermoplastic road marking (Edge Line) RHS Cum 25.50
93 Bhawanigarh-Kotshamir S2 62+200 62+250 Thermoplastic road marking (Edge Line) RHS Sqm 7.50
94 Bhawanigarh-Kotshamir S2 62+955 63+000 Thermoplastic road marking (Edge Line) RHS Cum 6.75
95 Bhawanigarh-Kotshamir S2 63+060 63+800 Thermoplastic road marking (Edge Line) RHS Sqm 111.00
96 Bhawanigarh-Kotshamir S2 56+400 56+490 Thermoplastic road marking (Edge Line) LHS Sqm 13.50
97 Bhawanigarh-Kotshamir S2 54+200 Thermoplastic road marking (Junction) RHS Sqm 11.25
98 Bhawanigarh-Kotshamir S2 54+265 Thermoplastic road marking (Junction) RHS Sqm 9.15
99 Bhawanigarh-Kotshamir S2 61+300 61+380 Thermoplastic road marking (Edge Line) LHS Sqm 12.00
100 Bhawanigarh-Kotshamir S2 61+585 61+800 Thermoplastic road marking (Edge Line) LHS Sqm 32.25
101 Bhawanigarh-Kotshamir S2 54+040 54+070 Thermoplastic road marking (Edge Line) RHS Sqm 4.50
102 Bhawanigarh-Kotshamir S2 54+241 54+265 Thermoplastic road marking (Edge Line) RHS Sqm 3.60
103 Bhawanigarh-Kotshamir S2 36+350 Thermoplastic road marking (Stop Line) BHS Sqm 1.50
104 Bhawanigarh-Kotshamir S2 35+800 35+900 Thermoplastic road marking (Edge Line) RHS Sqm 15.00
105 Bhawanigarh-Kotshamir S2 35+750 35+920 Thermoplastic road marking (Edge Line) LHS Cum 25.50
106 Bhawanigarh-Kotshamir S2 35+830 Thermoplastic road marking (Triangle) BHS Cum 2.76
107 Bhawanigarh-Kotshamir S2 35+830 Thermoplastic road marking (Rectangle) BHS Cum 8.25
108 Bhawanigarh-Kotshamir S2 35+800 Thermoplastic road marking (Stop Line) BHS Cum 1.50
109 Bhawanigarh-Kotshamir S2 35+830 Thermoplastic road marking (Stop Line) BHS Cum 3.00
110 Bhawanigarh-Kotshamir S2 36+050 36+210 Thermoplastic road marking (Edge Line) RHS Cum 24.00
111 Bhawanigarh-Kotshamir S2 36+120 36+180 Thermoplastic road marking (Edge Line) LHS Cum 9.00
112 Bhawanigarh-Kotshamir S2 36+080 36+090 Thermoplastic road marking (Edge Line) LHS Cum 1.50
113 Bhawanigarh-Kotshamir S2 36+170 Thermoplastic road marking (Stop Line) BHS Cum 3.00
114 Bhawanigarh-Kotshamir S2 36+170 Thermoplastic road marking (Triangle) BHS Sqm 2.76
115 Bhawanigarh-Kotshamir S2 36+170 Thermoplastic road marking (Rectangle) BHS Cum 5.50
116 Bhawanigarh-Kotshamir S2 36+350 36+450 Thermoplastic road marking (Edge Line) BHS Sqm 30.00
117 Bhawanigarh-Kotshamir S2 36+400 Thermoplastic road marking (Stop Line) BHS Sqm 3.00
118 Bhawanigarh-Kotshamir S2 36+350 Thermoplastic road marking (Rumbles) BHS Sqm 9.60
119 Bhawanigarh-Kotshamir S2 36+400 Thermoplastic road marking (Rectangle) BHS Sqm 5.50
120 Bhawanigarh-Kotshamir S2 36+400 Thermoplastic road marking (Triangle) BHS Sqm 2.76
121 Bhawanigarh-Kotshamir S2 36+840 36+940 Thermoplastic road marking (Edge Line) RHS Sqm 15.00
122 Bhawanigarh-Kotshamir S2 36+860 36+945 Thermoplastic road marking (Edge Line) LHS Sqm 12.75
123 Bhawanigarh-Kotshamir S2 36+870 Thermoplastic road marking (Stop Line) BHS Sqm 3.00
124 Bhawanigarh-Kotshamir S2 36+870 Thermoplastic road marking (H Block) BHS Sqm 5.50
125 Bhawanigarh-Kotshamir S2 36+870 Thermoplastic road marking (Triangle) BHS Sqm 2.76
126 Bhawanigarh-Kotshamir S2 29+850 29+920 Thermoplastic road marking (Edge Line) RHS Sqm 10.50
127 Bhawanigarh-Kotshamir S2 8+020 8+030 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
128 Bhawanigarh-Kotshamir S2 9+900 Thermoplastic road marking (Zebra) BHS Sqm 12.60
129 Bhawanigarh-Kotshamir S2 9+945 10+005 Thermoplastic road marking (Edge Line) RHS Cum 9.00
130 Bhawanigarh-Kotshamir S2 9+900 9+935 Thermoplastic road marking (Edge Line) RHS Sqm 5.25
131 Bhawanigarh-Kotshamir S2 9+870 9+890 Thermoplastic road marking (Edge Line) RHS Cum 3.00
132 Bhawanigarh-Kotshamir S2 9+900 Thermoplastic road marking (Stop Line) BHS Sqm 1.50
133 Bhawanigarh-Kotshamir S2 9+500 Thermoplastic road marking (Zebra) RHS Sqm 1.80
134 Bhawanigarh-Kotshamir S2 9+500 36+210 Thermoplastic road marking (Stop Line) BHS Sqm 1.50
135 Bhawanigarh-Kotshamir S2 9+520 9+550 Thermoplastic road marking (Continues) Center Sqm 2.50
136 Bhawanigarh-Kotshamir S2 8+330 8+335 Thermoplastic road marking (Edge Line) RHS Sqm 0.75
137 Bhawanigarh-Kotshamir S2 8+327 8+330 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
138 Bhawanigarh-Kotshamir S2 8+305 8+320 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
139 Bhawanigarh-Kotshamir S2 8+285 8+300 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
140 Bhawanigarh-Kotshamir S2 6+550 Thermoplastic road marking (Zebra) BHS Sqm 3.60
141 Bhawanigarh-Kotshamir S2 8+255 8+270 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
142 Bhawanigarh-Kotshamir S2 8+247 8+250 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
143 Bhawanigarh-Kotshamir S2 8+190 8+215 Thermoplastic road marking (Edge Line) RHS Sqm 3.75
144 Bhawanigarh-Kotshamir S2 8+170 8+180 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
145 Bhawanigarh-Kotshamir S2 8+135 8+145 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
146 Bhawanigarh-Kotshamir S2 8+040 8+090 Thermoplastic road marking (Edge Line) RHS Sqm 7.50
147 Bhawanigarh-Kotshamir S2 7+990 8+005 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
148 Bhawanigarh-Kotshamir S2 7+745 7+755 Thermoplastic road marking (Edge Line) RHS Cum 1.50
149 Bhawanigarh-Kotshamir S2 7+480 7+580 Thermoplastic road marking (Edge Line) RHS Sqm 15.00
150 Bhawanigarh-Kotshamir S2 7+450 7+460 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
151 Bhawanigarh-Kotshamir S2 7+370 7+380 Thermoplastic road marking (Edge Line) RHS Cum 1.50
152 Bhawanigarh-Kotshamir S2 7+435 7+440 Thermoplastic road marking (Edge Line) RHS Cum 0.75
153 Bhawanigarh-Kotshamir S2 6+595 6+605 Thermoplastic road marking (Edge Line) RHS Cum 1.50
154 Bhawanigarh-Kotshamir S2 6+180 6+190 Thermoplastic road marking (Edge Line) LHS Cum 1.50
155 Bhawanigarh-Kotshamir S2 6+145 6+170 Thermoplastic road marking (Edge Line) LHS Cum 3.75
156 Bhawanigarh-Kotshamir S2 2+420 2+540 Thermoplastic road marking (Edge Line) RHS Cum 16.50
157 Bhawanigarh-Kotshamir S2 64+000 Thermoplastic road marking (Junction) RHS Cum 9.75
158 Bhawanigarh-Kotshamir S2 67+850 Thermoplastic road marking (Round about) Center Cum 15.00
159 Bhawanigarh-Kotshamir S2 6+550 Thermoplastic road marking (Stop Line) BHS Cum 1.05
160 Bhawanigarh-Kotshamir S2 108+715 108+740 Thermoplastic road marking (Kerb Line) BHS Cum 7.50
161 Bhawanigarh-Kotshamir S2 100+410 101+080 Thermoplastic road marking (Center Line) Center Cum 18.60
162 Bhawanigarh-Kotshamir S2 100+500 100+667 Thermoplastic road marking (Center Line) Center Cum 16.70
163 Bhawanigarh-Kotshamir S2 100+400 100+953 Thermoplastic road marking (Edge Line) RHS Sqm 82.95
164 Bhawanigarh-Kotshamir S2 100+953 101+100 Thermoplastic road marking (Edge Line) RHS Sqm 22.05
165 Bhawanigarh-Kotshamir S2 100+400 101+100 Thermoplastic road marking (Edge Line) LHS Sqm 105.00
166 Bhawanigarh-Kotshamir S2 86+990 87+020 Thermoplastic road marking (Rumbles) BHS Sqm 25.20
167 Bhawanigarh-Kotshamir S2 87+020 87+120 Thermoplastic road marking (Zigzag Marking) Center Sqm 10.00
168 Bhawanigarh-Kotshamir S2 87+120 87+150 Thermoplastic road marking (Rumbles) BHS Sqm 25.20
169 Bhawanigarh-Kotshamir S2 86+990 87+020 Thermoplastic road marking (Continue Center Line) Center Sqm 3.00
170 Bhawanigarh-Kotshamir S2 87+120 87+150 Thermoplastic road marking (Continue Center Line) Center Sqm 3.00
171 Bhawanigarh-Kotshamir S2 65+400 65+420 Water based marking (Edge line) LHS Sqm
172 Bhawanigarh-Kotshamir S2 65+415 65+460 Water based marking (Edge line) RHS Sqm
173 Bhawanigarh-Kotshamir S2 65+480 65+507 Water based marking (Edge line) RHS Sqm
174 Bhawanigarh-Kotshamir S2 65+510 65+517 Water based marking (Edge line) RHS Sqm
175 Bhawanigarh-Kotshamir S2 65+620 65+632 Water based marking (Edge line) RHS Sqm
176 Bhawanigarh-Kotshamir S2 65+640 65+695 Water based marking (Edge line) RHS Cum
177 Bhawanigarh-Kotshamir S2 65+705 65+787 Water based marking (Edge line) RHS Cum
178 Bhawanigarh-Kotshamir S2 65+805 65+830 Water based marking (Edge line) RHS Sqm
179 Bhawanigarh-Kotshamir S2 65+840 65+841 Water based marking (Edge line) RHS Sqm
180 Bhawanigarh-Kotshamir S2 65+850 65+856 Water based marking (Edge line) RHS Sqm
181 Bhawanigarh-Kotshamir S2 65+860 65+887 Water based marking (Edge line) RHS Sqm
182 Bhawanigarh-Kotshamir S2 65+890 65+916 Water based marking (Edge line) RHS Sqm
183 Bhawanigarh-Kotshamir S2 66+310 66+322 Water based marking (Edge line) RHS Sqm
184 Bhawanigarh-Kotshamir S2 66+350 66+358 Water based marking (Edge line) RHS Sqm
185 Bhawanigarh-Kotshamir S2 66+360 66+365 Water based marking (Edge line) RHS Sqm
186 Bhawanigarh-Kotshamir S2 66+367 66+379 Water based marking (Edge line) RHS Sqm
187 Bhawanigarh-Kotshamir S2 66+382 66+392 Water based marking (Edge line) RHS Sqm
188 Bhawanigarh-Kotshamir S2 66+610 66+618 Water based marking (Edge line) RHS Sqm
189 Bhawanigarh-Kotshamir S2 66+620 66+622 Water based marking (Edge line) RHS Sqm
190 Bhawanigarh-Kotshamir S2 66+625 66+631 Water based marking (Edge line) RHS Sqm
191 Bhawanigarh-Kotshamir S2 66+750 66+772 Water based marking (Edge line) RHS Sqm
192 Bhawanigarh-Kotshamir S2 66+775 66+791 Water based marking (Edge line) RHS Sqm
193 Bhawanigarh-Kotshamir S2 66+795 66+811 Water based marking (Edge line) RHS Sqm
194 Bhawanigarh-Kotshamir S2 66+812 66+820 Water based marking (Edge line) RHS Sqm
195 Bhawanigarh-Kotshamir S2 66+822 66+840 Water based marking (Edge line) RHS Sqm
196 Bhawanigarh-Kotshamir S2 66+860 66+875 Water based marking (Edge line) RHS Sqm
197 Bhawanigarh-Kotshamir S2 66+880 66+891 Water based marking (Edge line) RHS Sqm
198 Bhawanigarh-Kotshamir S2 28+190 28+227 Water based marking (Edge line) RHS Sqm
199 Bhawanigarh-Kotshamir S2 28+250 28+285 Water based marking (Edge line) LHS Sqm
200 Bhawanigarh-Kotshamir S2 28+060 28+099 Water based marking (Edge line) LHS Cum
201 Bhawanigarh-Kotshamir S2 28+020 28+031 Water based marking (Edge line) LHS Cum
202 Bhawanigarh-Kotshamir S2 27+900 27+914 Water based marking (Edge line) LHS Cum
203 Bhawanigarh-Kotshamir S2 27+530 27+551 Water based marking (Edge line) RHS Cum
204 Bhawanigarh-Kotshamir S2 27+360 27+409 Water based marking (Edge line) RHS Sqm
205 Bhawanigarh-Kotshamir S2 27+250 27+292 Water based marking (Edge line) LHS Sqm
206 Bhawanigarh-Kotshamir S2 26+300 26+350 Water based marking (Center line) RHS Sqm
207 Bhawanigarh-Kotshamir S2 26+300 26+350 Water based marking (Center line) LHS Sqm
208 Bhawanigarh-Kotshamir S2 26+270 26+328 Water based marking (Edge line) RHS Sqm
209 Bhawanigarh-Kotshamir S2 26+200 26+273 Water based marking (Edge line) LHS Sqm
210 Bhawanigarh-Kotshamir S2 26+040 26+065 Water based marking (Edge line) LHS Sqm
211 Bhawanigarh-Kotshamir S2 26+010 26+022 Water based marking (Edge line) LHS Sqm
212 Bhawanigarh-Kotshamir S2 25+990 26+001 Water based marking (Edge line) LHS Sqm
213 Bhawanigarh-Kotshamir S2 26+930 - Water based marking (Edge line) LHS Sqm
214 Bhawanigarh-Kotshamir S2 25+900 25+908 Water based marking (Edge line) LHS Sqm
215 Bhawanigarh-Kotshamir S2 25+800 25+900 Water based marking (Center line) LHS Sqm
216 Bhawanigarh-Kotshamir S2 25+900 25+950 Water based marking (Center line) RHS Sqm
217 Bhawanigarh-Kotshamir S2 25+910 25+935 Water based marking (Edge line) RHS Sqm
218 Bhawanigarh-Kotshamir S2 24+580 - Water based marking (Edge line) LHS Sqm
219 Bhawanigarh-Kotshamir S2 24+560 24+566 Water based marking (Edge line) LHS Sqm
220 Bhawanigarh-Kotshamir S2 24+470 24+500 Water based marking (Edge line) RHS Sqm
221 Bhawanigarh-Kotshamir S2 24+500 24+521 Water based marking (Center line) RHS Sqm
222 Bhawanigarh-Kotshamir S2 24+030 24+058 Water based marking (Edge line) RHS Sqm
223 Bhawanigarh-Kotshamir S2 67+460 67+602 Water based marking (Edge line) RHS Sqm
224 Bhawanigarh-Kotshamir S2 67+750 67+756 Water based marking (Edge line) LHS Sqm
225 Bhawanigarh-Kotshamir S2 67+800 67+813 Water based marking (Edge line) RHS Sqm
226 Bhawanigarh-Kotshamir S2 68+030 68+034 Water based marking (Edge line) RHS Sqm
227 Bhawanigarh-Kotshamir S2 68+410 68+423 Water based marking (Edge line) LHS Sqm
228 Bhawanigarh-Kotshamir S2 68+450 68+468 Water based marking (Edge line) RHS Sqm
229 Bhawanigarh-Kotshamir S2 68+430 68+440 Water based marking (Edge line) LHS Sqm
230 Bhawanigarh-Kotshamir S2 68+620 68+632 Water based marking (Edge line) RHS Sqm
231 Bhawanigarh-Kotshamir S2 68+630 68+640 Water based marking (Edge line) LHS Sqm
232 Bhawanigarh-Kotshamir S2 68+970 68+986 Water based marking (Edge line) LHS Sqm
233 Bhawanigarh-Kotshamir S2 69+000 69+011 Water based marking (Edge line) LHS Cum
234 Bhawanigarh-Kotshamir S2 69+030 69+046 Water based marking (Edge line) LHS Cum
235 Bhawanigarh-Kotshamir S2 69+050 69+060 Water based marking (Edge line) RHS Cum
236 Bhawanigarh-Kotshamir S2 69+070 69+072 Water based marking (Edge line) RHS Sqm
237 Bhawanigarh-Kotshamir S2 69+075 69+077 Water based marking (Edge line) RHS Sqm
238 Bhawanigarh-Kotshamir S2 69+080 69+094 Water based marking (Edge line) RHS Sqm
239 Bhawanigarh-Kotshamir S2 69+300 69+306 Water based marking (Edge line) LHS Sqm
240 Bhawanigarh-Kotshamir S2 69+350 69+369 Water based marking (Edge line) LHS Sqm
241 Bhawanigarh-Kotshamir S2 69+400 69+415 Water based marking (Edge line) LHS Sqm
242 Bhawanigarh-Kotshamir S2 69+450 69+456 Water based marking (Edge line) LHS Sqm
243 Bhawanigarh-Kotshamir S2 69+570 69+574 Water based marking (Edge line) LHS Sqm
244 Bhawanigarh-Kotshamir S2 69+590 69+602 Water based marking (Edge line) LHS Sqm
245 Bhawanigarh-Kotshamir S2 69+620 69+626 Water based marking (Edge line) LHS Sqm
246 Bhawanigarh-Kotshamir S2 69+640 69+654 Water based marking (Edge line) LHS Sqm
247 Bhawanigarh-Kotshamir S2 69+670 69+678 Water based marking (Edge line) LHS Sqm
248 Bhawanigarh-Kotshamir S2 69+680 69+691 Water based marking (Edge line) LHS Sqm
249 Bhawanigarh-Kotshamir S2 69+700 69+704 Water based marking (Edge line) LHS Sqm
250 Bhawanigarh-Kotshamir S2 69+710 69+713 Water based marking (Edge line) LHS Cum
251 Bhawanigarh-Kotshamir S2 69+768 69+800 Water based marking (Edge line) LHS Cum
252 Bhawanigarh-Kotshamir S2 69+802 69+814 Water based marking (Edge line) LHS Cum
253 Bhawanigarh-Kotshamir S2 69+825 69+873 Water based marking (Edge line) LHS Sqm
254 Bhawanigarh-Kotshamir S2 69+875 69+887 Water based marking (Edge line) LHS Sqm
255 Bhawanigarh-Kotshamir S2 69+890 69+895 Water based marking (Edge line) LHS Sqm
256 Bhawanigarh-Kotshamir S2 69+910 69+912 Water based marking (Edge line) LHS Sqm
257 Bhawanigarh-Kotshamir S2 69+920 69+952 Water based marking (Edge line) LHS Sqm
258 Bhawanigarh-Kotshamir S2 69+970 69+989 Water based marking (Edge line) LHS Sqm
259 Bhawanigarh-Kotshamir S2 69+900 69+912 Water based marking (Edge line) RHS Sqm
260 Bhawanigarh-Kotshamir S2 69+890 69+896 Water based marking (Edge line) RHS Cum
261 Bhawanigarh-Kotshamir S2 69+888 69+890 Water based marking (Edge line) RHS Sqm
262 Bhawanigarh-Kotshamir S2 69+840 69+857 Water based marking (Edge line) RHS Cum
263 Bhawanigarh-Kotshamir S2 69+830 69+834 Water based marking (Edge line) RHS Sqm
264 Bhawanigarh-Kotshamir S2 69+750 69+810 Water based marking (Edge line) RHS Cum
265 Bhawanigarh-Kotshamir S2 69+735 69+745 Water based marking (Edge line) RHS Sqm
266 Bhawanigarh-Kotshamir S2 69+720 69+727 Water based marking (Edge line) RHS Sqm
267 Bhawanigarh-Kotshamir S2 69+700 69+702 Water based marking (Edge line) RHS Sqm
268 Bhawanigarh-Kotshamir S2 69+595 69+601 Water based marking (Edge line) RHS Sqm
269 Bhawanigarh-Kotshamir S2 69+570 69+575 Water based marking (Edge line) RHS Sqm
270 Bhawanigarh-Kotshamir S2 69+565 69+567 Water based marking (Edge line) RHS Sqm
271 Bhawanigarh-Kotshamir S2 69+555 69+559 Water based marking (Edge line) RHS Sqm
272 Bhawanigarh-Kotshamir S2 69+580 - Water based marking (Zebra) BHS Sqm
273 Bhawanigarh-Kotshamir S2 69+580 - Water based marking (Stop line) LHS Sqm
274 Bhawanigarh-Kotshamir S2 67+493 67+600 Water based marking (Edge line) RHS Sqm
275 Bhawanigarh-Kotshamir S2 15+035 15+039 Water based marking (Edge line) LHS Sqm
276 Bhawanigarh-Kotshamir S2 15+350 15+354 Water based marking (Edge line) LHS Sqm
277 Bhawanigarh-Kotshamir S2 15+345 15+347 Water based marking (Edge line) LHS Sqm
278 Bhawanigarh-Kotshamir S2 15+430 15+436 Water based marking (Edge line) RHS Sqm
279 Bhawanigarh-Kotshamir S2 15+500 15+509 Water based marking (Edge line) LHS Sqm
280 Bhawanigarh-Kotshamir S2 15+550 15+577 Water based marking (Edge line) RHS Sqm
281 Bhawanigarh-Kotshamir S2 15+585 15+589 Water based marking (Edge line) RHS Sqm
282 Bhawanigarh-Kotshamir S2 15+800 15+808 Water based marking (Edge line) LHS Sqm
283 Bhawanigarh-Kotshamir S2 15+870 15+876 Water based marking (Edge line) RHS Cum
284 Bhawanigarh-Kotshamir S2 15+880 15+886 Water based marking (Edge line) RHS Sqm
285 Bhawanigarh-Kotshamir S2 15+890 15+900 Water based marking (Edge line) RHS Cum
286 Bhawanigarh-Kotshamir S2 15+880 15+890 Water based marking (Edge line) LHS Sqm
287 Bhawanigarh-Kotshamir S2 15+940 15+949 Water based marking (Edge line) LHS Sqm
288 Bhawanigarh-Kotshamir S2 15+940 15+947 Water based marking (Edge line) RHS Sqm
289 Bhawanigarh-Kotshamir S2 15+995 16+013 Water based marking (Edge line) RHS Sqm
290 Bhawanigarh-Kotshamir S2 16+050 16+059 Water based marking (Edge line) LHS Sqm
291 Bhawanigarh-Kotshamir S2 16+220 16+235 Water based marking (Edge line) LHS Sqm
292 Bhawanigarh-Kotshamir S2 16+250 16+260 Water based marking (Edge line) LHS Cum
293 Bhawanigarh-Kotshamir S2 16+320 16+326 Water based marking (Edge line) LHS Sqm
294 Bhawanigarh-Kotshamir S2 16+310 16+321 Water based marking (Edge line) RHS Cum
295 Bhawanigarh-Kotshamir S2 16+350 16+353 Water based marking (Edge line) RHS Cum
296 Bhawanigarh-Kotshamir S2 16+380 16+384 Water based marking (Edge line) RHS Cum
297 Bhawanigarh-Kotshamir S2 16+500 16+511 Water based marking (Edge line) RHS Cum
298 Bhawanigarh-Kotshamir S2 16+600 16+609 Water based marking (Edge line) RHS Sqm
299 Bhawanigarh-Kotshamir S2 16+840 16+847 Water based marking (Edge line) RHS Sqm
300 Bhawanigarh-Kotshamir S2 16+850 16+858 Water based marking (Edge line) RHS Sqm
301 Bhawanigarh-Kotshamir S2 16+940 16+963 Water based marking (Edge line) RHS Sqm
302 Bhawanigarh-Kotshamir S2 16+980 16+985 Water based marking (Edge line) RHS Sqm
303 Bhawanigarh-Kotshamir S2 17+010 17+033 Water based marking (Edge line) LHS Sqm
304 Bhawanigarh-Kotshamir S2 17+170 17+190 Water based marking (Edge line) RHS Sqm
305 Bhawanigarh-Kotshamir S2 17+192 17+199 Water based marking (Edge line) RHS Sqm
306 Bhawanigarh-Kotshamir S2 17+200 17+203 Water based marking (Edge line) LHS Cum
307 Bhawanigarh-Kotshamir S2 17+205 17+220 Water based marking (Edge line) LHS Sqm
308 Bhawanigarh-Kotshamir S2 17+225 17+229 Water based marking (Edge line) LHS Sqm
309 Bhawanigarh-Kotshamir S2 17+270 17+286 Water based marking (Edge line) RHS Sqm
310 Bhawanigarh-Kotshamir S2 17+290 17+315 Water based marking (Edge line) RHS Sqm
311 Bhawanigarh-Kotshamir S2 17+330 17+334 Water based marking (Edge line) RHS Sqm
312 Bhawanigarh-Kotshamir S2 17+350 17+361 Water based marking (Edge line) RHS Sqm
313 Bhawanigarh-Kotshamir S2 17+380 17+403 Water based marking (Edge line) RHS Sqm
314 Bhawanigarh-Kotshamir S2 17+410 17+412 Water based marking (Edge line) RHS Sqm
315 Bhawanigarh-Kotshamir S2 17+420 17+450 Water based marking (Edge line) RHS Sqm
316 Bhawanigarh-Kotshamir S2 17+520 17+539 Water based marking (Edge line) RHS Sqm
317 Bhawanigarh-Kotshamir S2 17+560 17+587 Water based marking (Edge line) RHS Sqm
318 Bhawanigarh-Kotshamir S2 17+590 17+592 Water based marking (Edge line) RHS Sqm
319 Bhawanigarh-Kotshamir S2 17+600 17+640 Water based marking (Edge line) LHS Sqm
320 Bhawanigarh-Kotshamir S2 17+650 17+654 Water based marking (Edge line) RHS Sqm
321 Bhawanigarh-Kotshamir S2 17+680 17+687 Water based marking (Edge line) RHS Sqm
322 Bhawanigarh-Kotshamir S2 17+720 17+730 Water based marking (Edge line) RHS Sqm
323 Bhawanigarh-Kotshamir S2 17+700 17+723 Water based marking (Edge line) LHS Sqm
324 Bhawanigarh-Kotshamir S2 17+730 17+748 Water based marking (Edge line) LHS Sqm
325 Bhawanigarh-Kotshamir S2 17+740 17+753 Water based marking (Edge line) RHS Sqm
326 Bhawanigarh-Kotshamir S2 17+760 17+770 Water based marking (Edge line) RHS Sqm
327 Bhawanigarh-Kotshamir S2 17+770 17+780 Water based marking (Edge line) LHS Sqm
328 Bhawanigarh-Kotshamir S2 17+810 17+824 Water based marking (Edge line) RHS Sqm
329 Bhawanigarh-Kotshamir S2 17+830 17+845 Water based marking (Edge line) RHS Sqm
330 Bhawanigarh-Kotshamir S2 17+860 17+871 Water based marking (Edge line) RHS Sqm
331 Bhawanigarh-Kotshamir S2 17+874 17+895 Water based marking (Edge line) RHS Sqm
332 Bhawanigarh-Kotshamir S2 17+910 17+924 Water based marking (Edge line) RHS Sqm
333 Bhawanigarh-Kotshamir S2 17+940 17+950 Water based marking (Edge line) RHS Sqm
334 Bhawanigarh-Kotshamir S2 17+960 17+964 Water based marking (Edge line) RHS Sqm
335 Bhawanigarh-Kotshamir S2 17+970 17+984 Water based marking (Edge line) RHS Sqm
336 Bhawanigarh-Kotshamir S2 17+990 17+995 Water based marking (Edge line) RHS Sqm
337 Bhawanigarh-Kotshamir S2 18+000 18+125 Water based marking (Edge line) RHS Sqm
338 Bhawanigarh-Kotshamir S2 18+120 18+126 Water based marking (Edge line) LHS Sqm
339 Bhawanigarh-Kotshamir S2 18+090 18+112 Water based marking (Edge line) LHS Sqm
340 Bhawanigarh-Kotshamir S2 18+400 18+465 Water based marking (Edge line) RHS Sqm
APPENDIX-J
From To
1 Barnala-Mansa S3 185+810 185+820 Thermoplastic road marking (Edge line) RHS Sqm 1.50
2 Barnala-Mansa S3 185+845 185+857 Thermoplastic road marking (Edge line) RHS Sqm 1.80
3 Barnala-Mansa S3 185+835 Thermoplastic road marking (Junction) RHS Sqm 8.70
4 Barnala-Mansa S3 185+760 Thermoplastic road marking (Stop line) BHS Sqm 2.10
5 Barnala-Mansa S3 185+735 185+769 Thermoplastic road marking (Edge line) LHS Sqm 5.10
6 Barnala-Mansa S3 185+745 Thermoplastic road marking (Junction) RHS Sqm 8.70
7 Barnala-Mansa S3 185+603 185+640 Thermoplastic road marking (Edge line) RHS Sqm 5.55
8 Barnala-Mansa S3 185+430 Thermoplastic road marking (Stop line) BHS Sqm 2.10
9 Barnala-Mansa S3 185+100 Thermoplastic road marking (Stop line) BHS Sqm 2.10
10 Barnala-Mansa S3 184+874 184+908 Thermoplastic road marking (Edge line) LHS Sqm 5.10
11 Barnala-Mansa S3 184+850 Thermoplastic road marking (Junction) LHS Sqm 11.10
12 Barnala-Mansa S3 184+828 184+841 Thermoplastic road marking (Edge line) LHS Sqm 1.95
13 Barnala-Mansa S3 184+840 Thermoplastic road marking (Stop line) BHS Sqm 2.10
14 Barnala-Mansa S3 183+000 Thermoplastic road marking (Junction) RHS Sqm 6.15
15 Barnala-Mansa S3 184+880 Thermoplastic road marking (Stop line) BHS Sqm 2.10
16 Barnala-Mansa S3 184+800 Thermoplastic road marking (Junction) RHS Sqm 12.00
17 Barnala-Mansa S3 184+431 184+470 Thermoplastic road marking (Edge line) RHS Sqm 5.85
18 Barnala-Mansa S3 184+445 184+467 Thermoplastic road marking (Kerb line) LHS Sqm 3.30
19 Barnala-Mansa S3 184+610 Thermoplastic road marking (Junction) LHS Sqm 9.75
20 Barnala-Mansa S3 184+590 Thermoplastic road marking (Junction) LHS Sqm 7.50
21 Barnala-Mansa S3 184+010 Thermoplastic road marking (Junction) RHS Sqm 6.90
22 Barnala-Mansa S3 183+820 Thermoplastic road marking (Junction) RHS Sqm 8.70
23 Barnala-Mansa S3 183+835 Thermoplastic road marking (Stop line) BHS Sqm 2.10
24 Barnala-Mansa S3 183+670 183+693 Thermoplastic road marking (Kerb line) LHS Sqm 3.45
ROAD MARKING MAINTENANCE (September-2017)
S. No Road Name
Location
Description of Work Side Unit Qty. in Sqm Remarks
25 Barnala-Mansa S3 183+230 183+260 Thermoplastic road marking (Kerb line) LHS Sqm 4.50
26 Barnala-Mansa S3 183+230 183+260 Thermoplastic road marking (Kerb line) RHS Sqm 4.50
27 Barnala-Mansa S3 183+200 Thermoplastic road marking (Junction) RHS Sqm 9.00
28 Barnala-Mansa S3 183+090 Thermoplastic road marking (Junction) RHS Sqm 6.30
29 Barnala-Mansa S3 189+835 Thermoplastic road marking (Junction) LHS Sqm 6.60
30 Barnala-Mansa S3 189+870 Thermoplastic road marking (Junction) LHS Sqm 8.10
31 Barnala-Mansa S3 189+779 189+817 Thermoplastic road marking (Edge line) LHS Sqm 5.70
32 Barnala-Mansa S3 189+970 Thermoplastic road marking (Stop line) BHS Sqm 2.10
33 Barnala-Mansa S3 189+617 189+639 Thermoplastic road marking (Edge line) LHS Sqm 3.30
34 Barnala-Mansa S3 189+590 Thermoplastic road marking (Junction) LHS Sqm 8.55
35 Barnala-Mansa S3 189+557 189+570 Thermoplastic road marking (Edge line) LHS Sqm 1.95
36 Barnala-Mansa S3 189+505 189+530 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
37 Barnala-Mansa S3 189+505 189+530 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
38 Barnala-Mansa S3 189+490 189+518 Thermoplastic road marking (Edge line) LHS Sqm 4.20
39 Barnala-Mansa S3 189+470 Thermoplastic road marking (Junction) LHS Sqm 7.20
40 Barnala-Mansa S3 189+439 189+462 Thermoplastic road marking (Edge line) LHS Sqm 3.45
41 Barnala-Mansa S3 189+190 Thermoplastic road marking (Stop line) BHS Sqm 2.10
42 Barnala-Mansa S3 188+990 189+003 Thermoplastic road marking (Edge line) LHS Sqm 1.95
43 Barnala-Mansa S3 189+010 Thermoplastic road marking (Junction) LHS Sqm 9.00
44 Barnala-Mansa S3 189+026 189+090 Thermoplastic road marking (Edge line) LHS Sqm 9.60
45 Barnala-Mansa S3 189+095 Thermoplastic road marking (Junction) LHS Sqm 6.75
46 Barnala-Mansa S3 189+110 189+128 Thermoplastic road marking (Edge line) LHS Sqm 2.70
47 Barnala-Mansa S3 189+085 189+110 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
48 Barnala-Mansa S3 189+085 189+110 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
49 Barnala-Mansa S3 189+124 189+143 Thermoplastic road marking (Edge line) RHS Sqm 2.85
50 Barnala-Mansa S3 189+150 Thermoplastic road marking (Junction) RHS Sqm 5.10
51 Barnala-Mansa S3 189+165 189+189 Thermoplastic road marking (Edge line) RHS Sqm 3.60
52 Barnala-Mansa S3 189+040 Thermoplastic road marking (Junction) RHS Sqm 6.00
53 Barnala-Mansa S3 189+090 Thermoplastic road marking (Stop line) BHS Sqm 2.10
54 Barnala-Mansa S3 188+813 188+837 Thermoplastic road marking (Edge line) LHS Sqm 3.60
55 Barnala-Mansa S3 188+800 Thermoplastic road marking (Junction) LHS Sqm 10.65
56 Barnala-Mansa S3 188+733 188+778 Thermoplastic road marking (Edge line) LHS Sqm 6.75
57 Barnala-Mansa S3 188+730 Thermoplastic road marking (Junction) LHS Sqm 6.00
58 Barnala-Mansa S3 188+719 188+746 Thermoplastic road marking (Edge line) LHS Sqm 4.05
59 Barnala-Mansa S3 188+772 188+797 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
60 Barnala-Mansa S3 188+772 188+797 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
61 Barnala-Mansa S3 188+540 188+565 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
62 Barnala-Mansa S3 188+540 188+565 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
63 Barnala-Mansa S3 188+428 188+495 Thermoplastic road marking (Edge line) RHS Sqm 10.05
64 Barnala-Mansa S3 188+330 188+355 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
65 Barnala-Mansa S3 188+330 188+355 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
66 Barnala-Mansa S3 188+290 Thermoplastic road marking (Junction) RHS Sqm 9.15
67 Barnala-Mansa S3 188+309 188+328 Thermoplastic road marking (Edge line) RHS Sqm 2.85
68 Barnala-Mansa S3 188+200 Thermoplastic road marking (Junction) RHS Sqm 5.55
69 Barnala-Mansa S3 188+184 188+193 Thermoplastic road marking (Edge line) RHS Sqm 1.35
70 Barnala-Mansa S3 188+211 188+216 Thermoplastic road marking (Edge line) RHS Sqm 0.75
71 Barnala-Mansa S3 188+180 Thermoplastic road marking (Stop line) RHS Sqm 2.10
72 Barnala-Mansa S3 187+702 187+732 Thermoplastic road marking (Edge line) RHS Sqm 4.50
73 Barnala-Mansa S3 187+640 187+675 Thermoplastic road marking (Kerb line) RHS Sqm 5.25
74 Barnala-Mansa S3 187+640 187+720 Thermoplastic road marking (Kerb line) LHS Sqm 12.00
75 Barnala-Mansa S3 187+666 187+720 Thermoplastic road marking (Center line) Center Sqm 2.70
76 Barnala-Mansa S3 187+666 187+720 Thermoplastic road marking (Center line) Center Sqm 3.15
77 Barnala-Mansa S3 187+660 187+740 Thermoplastic road marking (Edge line) LHS Sqm 12.00
78 Barnala-Mansa S3 189+090 Thermoplastic road marking (Zebra) BHS Sqm 21.60
79 Barnala-Mansa S3 188+180 Thermoplastic road marking (Stop line) LHS Sqm 1.05
80 Barnala-Mansa S3 188+170 188+180 Thermoplastic road marking (Edge line) LHS Sqm 1.50
81 Barnala-Mansa S3 188+160 Thermoplastic road marking (Junction) LHS Sqm 7.05
82 Barnala-Mansa S3 188+105 188+136 Thermoplastic road marking (Edge line) LHS Sqm 4.65
83 Barnala-Mansa S3 187+983 187+990 Thermoplastic road marking (Edge line) LHS Sqm 1.05
84 Barnala-Mansa S3 187+980 Thermoplastic road marking (Junction) LHS Sqm 4.50
85 Barnala-Mansa S3 187+959 187+972 Thermoplastic road marking (Edge line) LHS Sqm 1.95
86 Barnala-Mansa S3 188+000 Thermoplastic road marking (Stop line) BHS Sqm 2.10
87 Barnala-Mansa S3 187+900 Thermoplastic road marking (Junction) RHS Sqm 10.35
88 Barnala-Mansa S3 187+817 187+842 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
89 Barnala-Mansa S3 187+817 187+842 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
90 Barnala-Mansa S3 187+830 Thermoplastic road marking (Junction) LHS Sqm 6.75
91 Barnala-Mansa S3 187+780 Thermoplastic road marking (Junction) LHS Sqm 7.50
92 Barnala-Mansa S3 187+725 Thermoplastic road marking (Junction) RHS Sqm 7.50
93 Barnala-Mansa S3 183+090 - Thermoplastic road marking (Zebra line) BHS Sqm 21.60
94 Barnala-Mansa S3 183+090 - Thermoplastic road marking (Stop line) BHS Sqm 2.10
95 Barnala-Mansa S3 182+790 - Thermoplastic road marking (Zebra line) BHS Sqm 18.00
96 Barnala-Mansa S3 182+790 - Thermoplastic road marking (Stop line) RHS Sqm 1.05
97 Barnala-Mansa S3 182+790 182+800 Thermoplastic road marking (Edge line) RHS Sqm 1.50
98 Barnala-Mansa S3 182+910 182+935 Thermoplastic road marking (Kerb Edge line) BHS Sqm 7.50
99 Barnala-Mansa S3 189+940 189+984 Thermoplastic road marking (Edge Line) RHS Sqm 6.60
100 Barnala-Mansa S3 189+990 Thermoplastic road marking (Junction) LHS Sqm 8.70
101 Barnala-Mansa S3 189+990 Thermoplastic road marking (Chevron) Center Sqm 4.20
102 Barnala-Mansa S3 189+960 189+990 Thermoplastic road marking (Center Line) Center Sqm 1.80
103 Barnala-Mansa S3 189+940 - Thermoplastic road marking (Rumble) RHS Sqm 23.22
104 Barnala-Mansa S3 190+000 - Thermoplastic road marking (Rumble) RHS Sqm 23.22
105 Barnala-Mansa S3 189+990 - Thermoplastic road marking (Triangle) BHS Sqm 4.14
106 Barnala-Mansa S3 189+990 - Thermoplastic road marking (H) BHS Sqm 11.00
107 Barnala-Mansa S3 189+940 - Thermoplastic road marking (Zig Zag) LHS Sqm 1.20
108 Barnala-Mansa S3 190+000 - Thermoplastic road marking (Zig Zag) BHS Sqm 1.35
109 Barnala-Mansa S3 189+960 Thermoplastic road marking (Triangle) LHS Sqm 2.78
110 Barnala-Mansa S3 189+960 Thermoplastic road marking (Block) LHS Sqm 5.50
APPENDIX-J
ROAD MARKING MAINTENANCE (September-2017)
From To
1 Mansa-Talwandi Sabo S4 0+000 Water based marking (Triangle) RHS Sqm 1.80
2 Mansa-Talwandi Sabo S4 1+750 1+840 Water based marking (Block) BHS Sqm 37.80
3 Mansa-Talwandi Sabo S4 1+970 2+060 Water based marking (Edge line) BHS Sqm 37.80
4 Mansa-Talwandi Sabo S4 1+890 1+930 Water based marking (Edge line) Center Sqm 4.00
5 Mansa-Talwandi Sabo S4 1+750 1+880 Water based marking (Edge line) Center Sqm 12.00
6 Mansa-Talwandi Sabo S4 1+820 2+050 Water based marking (Edge line) Center Sqm 12.00
Qty. in Sqm RemarksS. No Road NameLocation
Description of Work Side Unit
APPENDIX-J
ROAD MARKING MAINTENANCE (September-2017)
From To
1 Dhanaula - Bhikhi S5 20+200 20+208 Water based marking (Edge line) RHS Sqm 0.8
2 Dhanaula - Bhikhi S5 20+240 20+241 Water based marking (Edge line) RHS Sqm 0.1
3 Dhanaula - Bhikhi S5 20+245 20+247 Water based marking (Edge line) RHS Sqm 0.2
4 Dhanaula - Bhikhi S5 20+250 20+253 Water based marking (Edge line) RHS Sqm 0.3
5 Dhanaula - Bhikhi S5 20+430 20+433 Water based marking (Edge line) RHS Sqm 0.3
6 Dhanaula - Bhikhi S5 20+450 20+452 Water based marking (Edge line) RHS Sqm 0.2
7 Dhanaula - Bhikhi S5 20+460 20+476 Water based marking (Edge line) RHS Sqm 1.6
8 Dhanaula - Bhikhi S5 20+630 20+635 Water based marking (Edge line) RHS Sqm 0.5
9 Dhanaula - Bhikhi S5 20+970 20+973 Water based marking (Edge line) RHS Sqm 0.3
10 Dhanaula - Bhikhi S5 20+975 20+978 Water based marking (Edge line) RHS Sqm 0.3
11 Dhanaula - Bhikhi S5 20+980 20+986 Water based marking (Edge line) RHS Sqm 0.6
12 Dhanaula - Bhikhi S5 20+988 21+000 Water based marking (Edge line) RHS Sqm 1.2
13 Dhanaula - Bhikhi S5 21+160 21+177 Water based marking (Edge line) RHS Sqm 1.7
14 Dhanaula - Bhikhi S5 21+179 21+180 Water based marking (Edge line) RHS Sqm 0.1
15 Dhanaula - Bhikhi S5 21+182 21+184 Water based marking (Edge line) RHS Sqm 0.2
16 Dhanaula - Bhikhi S5 21+185 21+187 Water based marking (Edge line) RHS Sqm 0.2
17 Dhanaula - Bhikhi S5 21+190 21+199 Water based marking (Edge line) RHS Sqm 0.9
18 Dhanaula - Bhikhi S5 21+200 21+209 Water based marking (Edge line) RHS Sqm 0.9
19 Dhanaula - Bhikhi S5 21+260 21+272 Water based marking (Edge line) RHS Sqm 1.2
20 Dhanaula - Bhikhi S5 21+280 21+285 Water based marking (Edge line) RHS Sqm 0.5
21 Dhanaula - Bhikhi S5 21+290 21+292 Water based marking (Edge line) RHS Sqm 0.2
22 Dhanaula - Bhikhi S5 21+295 21+298 Water based marking (Edge line) RHS Sqm 0.3
23 Dhanaula - Bhikhi S5 21+305 21+308 Water based marking (Edge line) RHS Sqm 0.3
24 Dhanaula - Bhikhi S5 21+315 21+319 Water based marking (Edge line) RHS Sqm 0.4
25 Dhanaula - Bhikhi S5 21+325 21+329 Water based marking (Edge line) RHS Sqm 0.4
Qty. in Sqm RemarksS.
NoRoad Name
LocationDescription of Work Side Unit
26 Dhanaula - Bhikhi S5 21+960 21+962 Water based marking (Edge line) RHS Sqm 0.2
27 Dhanaula - Bhikhi S5 22+410 22+412 Water based marking (Edge line) RHS Sqm 0.2
28 Dhanaula - Bhikhi S5 22+415 22+417 Water based marking (Edge line) RHS Sqm 0.2
29 Dhanaula - Bhikhi S5 22+460 22+466 Water based marking (Edge line) RHS Sqm 0.6
30 Dhanaula - Bhikhi S5 22+540 22+543 Water based marking (Edge line) RHS Sqm 0.3
31 Dhanaula - Bhikhi S5 22+560 22+565 Water based marking (Edge line) RHS Sqm 0.5
32 Dhanaula - Bhikhi S5 22+700 22+705 Water based marking (Edge line) RHS Sqm 0.5
33 Dhanaula - Bhikhi S5 22+710 22+712 Water based marking (Edge line) RHS Sqm 0.2
34 Dhanaula - Bhikhi S5 22+715 22+720 Water based marking (Edge line) RHS Sqm 0.5
35 Dhanaula - Bhikhi S5 22+730 22+732 Water based marking (Edge line) RHS Sqm 0.2
36 Dhanaula - Bhikhi S5 22+900 22+905 Water based marking (Edge line) RHS Sqm 0.5
37 Dhanaula - Bhikhi S5 22+920 22+925 Water based marking (Edge line) RHS Sqm 0.5
38 Dhanaula - Bhikhi S5 22+940 22+950 Water based marking (Edge line) RHS Sqm 1
39 Dhanaula - Bhikhi S5 22+980 22+998 Water based marking (Edge line) RHS Sqm 1.8
40 Dhanaula - Bhikhi S5 23+010 23+014 Water based marking (Edge line) RHS Sqm 0.4
41 Dhanaula - Bhikhi S5 23+030 23+037 Water based marking (Edge line) RHS Sqm 0.7
42 Dhanaula - Bhikhi S5 23+020 23+026 Water based marking (Edge line) RHS Sqm 0.6
43 Dhanaula - Bhikhi S5 23+040 23+042 Water based marking (Edge line) RHS Sqm 0.2
44 Dhanaula - Bhikhi S5 23+050 23+059 Water based marking (Edge line) RHS Sqm 0.9
45 Dhanaula - Bhikhi S5 23+060 23+067 Water based marking (Edge line) RHS Sqm 0.7
46 Dhanaula - Bhikhi S5 23+075 23+078 Water based marking (Edge line) RHS Sqm 0.3
47 Dhanaula - Bhikhi S5 23+080 23+082 Water based marking (Edge line) RHS Sqm 0.2
48 Dhanaula - Bhikhi S5 23+085 23+090 Water based marking (Edge line) RHS Sqm 0.5
49 Dhanaula - Bhikhi S5 23+120 23+133 Water based marking (Edge line) RHS Sqm 1.3
50 Dhanaula - Bhikhi S5 23+140 23+157 Water based marking (Edge line) RHS Sqm 1.7
51 Dhanaula - Bhikhi S5 23+160 23+167 Water based marking (Edge line) RHS Sqm 0.7
52 Dhanaula - Bhikhi S5 23+170 23+182 Water based marking (Edge line) RHS Sqm 1.2
53 Dhanaula - Bhikhi S5 23+185 23+196 Water based marking (Edge line) RHS Sqm 1.1
54 Dhanaula - Bhikhi S5 23+198 23+207 Water based marking (Edge line) RHS Sqm 0.9
55 Dhanaula - Bhikhi S5 23+210 23+218 Water based marking (Edge line) RHS Sqm 0.8
56 Dhanaula - Bhikhi S5 23+220 23+235 Water based marking (Edge line) RHS Sqm 1.5
57 Dhanaula - Bhikhi S5 23+240 23+250 Water based marking (Edge line) RHS Sqm 1
58 Dhanaula - Bhikhi S5 23+255 23+257 Water based marking (Edge line) RHS Sqm 0.2
59 Dhanaula - Bhikhi S5 23+260 23+264 Water based marking (Edge line) RHS Sqm 0.4
60 Dhanaula - Bhikhi S5 23+270 23+274 Water based marking (Edge line) RHS Sqm 0.4
61 Dhanaula - Bhikhi S5 23+280 23+284 Water based marking (Edge line) RHS Sqm 0.4
62 Dhanaula - Bhikhi S5 23+290 23+296 Water based marking (Edge line) RHS Sqm 0.6
63 Dhanaula - Bhikhi S5 23+305 23+308 Water based marking (Edge line) RHS Sqm 0.3
64 Dhanaula - Bhikhi S5 23+340 23+355 Water based marking (Edge line) RHS Sqm 1.5
65 Dhanaula - Bhikhi S5 23+360 23+363 Water based marking (Edge line) RHS Sqm 0.3
66 Dhanaula - Bhikhi S5 23+365 23+367 Water based marking (Edge line) RHS Sqm 0.2
67 Dhanaula - Bhikhi S5 23+370 23+395 Water based marking (Edge line) RHS Sqm 2.5
68 Dhanaula - Bhikhi S5 23+405 23+410 Water based marking (Edge line) RHS Sqm 0.5
69 Dhanaula - Bhikhi S5 23+420 23+423 Water based marking (Edge line) RHS Sqm 0.3
70 Dhanaula - Bhikhi S5 23+425 23+428 Water based marking (Edge line) RHS Sqm 0.3
71 Dhanaula - Bhikhi S5 23+440 23+446 Water based marking (Edge line) RHS Sqm 0.6
72 Dhanaula - Bhikhi S5 23+460 23+465 Water based marking (Edge line) RHS Sqm 0.5
73 Dhanaula - Bhikhi S5 23+500 23+506 Water based marking (Edge line) RHS Sqm 0.6
74 Dhanaula - Bhikhi S5 23+508 23+509 Water based marking (Edge line) RHS Sqm 0.1
75 Dhanaula - Bhikhi S5 23+512 23+519 Water based marking (Edge line) RHS Sqm 0.7
76 Dhanaula - Bhikhi S5 23+530 23+540 Water based marking (Edge line) RHS Sqm 1
77 Dhanaula - Bhikhi S5 23+550 23+556 Water based marking (Edge line) RHS Sqm 0.6
78 Dhanaula - Bhikhi S5 23+560 23+563 Water based marking (Edge line) RHS Sqm 0.3
79 Dhanaula - Bhikhi S5 23+570 23+573 Water based marking (Edge line) RHS Sqm 0.3
80 Dhanaula - Bhikhi S5 23+587 23+590 Water based marking (Edge line) RHS Sqm 0.3
81 Dhanaula - Bhikhi S5 23+620 23+626 Water based marking (Edge line) RHS Sqm 0.6
82 Dhanaula - Bhikhi S5 23+630 23+638 Water based marking (Edge line) RHS Sqm 0.8
83 Dhanaula - Bhikhi S5 23+640 23+646 Water based marking (Edge line) RHS Sqm 0.6
84 Dhanaula - Bhikhi S5 23+700 23+701 Water based marking (Edge line) RHS Sqm 0.1
85 Dhanaula - Bhikhi S5 23+710 23+713 Water based marking (Edge line) RHS Sqm 0.3
86 Dhanaula - Bhikhi S5 23+750 23+751 Water based marking (Edge line) RHS Sqm 0.1
87 Dhanaula - Bhikhi S5 23+760 23+763 Water based marking (Edge line) RHS Sqm 0.3
88 Dhanaula - Bhikhi S5 23+850 23+852 Water based marking (Edge line) RHS Sqm 0.2
89 Dhanaula - Bhikhi S5 23+880 23+882 Water based marking (Edge line) RHS Sqm 0.2
90 Dhanaula - Bhikhi S5 23+900 23+904 Water based marking (Edge line) RHS Sqm 0.4
91 Dhanaula - Bhikhi S5 24+180 24+205 Water based marking (center line) RHS Sqm 1.8
92 Dhanaula - Bhikhi S5 24+220 24+250 Water based marking (Edge line) RHS Sqm 3
93 Dhanaula - Bhikhi S5 24+260 24+267 Water based marking (Edge line) RHS Sqm 0.7
94 Dhanaula - Bhikhi S5 24+280 24+286 Water based marking (Edge line) RHS Sqm 0.6
95 Dhanaula - Bhikhi S5 24+320 24+335 Water based marking (Edge line) RHS Sqm 1.5
96 Dhanaula - Bhikhi S5 24+340 24+390 Water based marking (Center line) Center Sqm 0.9
97 Dhanaula - Bhikhi S5 24+400 24+450 Water based marking (Center line) Center Sqm 3.5
98 Dhanaula - Bhikhi S5 24+440 24+441 Water based marking (Edge line) RHS Sqm 0.1
99 Dhanaula - Bhikhi S5 24+443 24+445 Water based marking (Edge line) RHS Sqm 0.2
100 Dhanaula - Bhikhi S5 24+447 24+449 Water based marking (Edge line) RHS Sqm 0.2
101 Dhanaula - Bhikhi S5 24+450 24+458 Water based marking (Edge line) RHS Sqm 0.8
102 Dhanaula - Bhikhi S5 24+460 24+465 Water based marking (Edge line) RHS Sqm 0.5
103 Dhanaula - Bhikhi S5 24+480 24+491 Water based marking (Edge line) RHS Sqm 1.1
104 Dhanaula - Bhikhi S5 24+520 24+528 Water based marking (Edge line) RHS Sqm 0.8
105 Dhanaula - Bhikhi S5 24+580 24+584 Water based marking (Edge line) RHS Sqm 0.4
106 Dhanaula - Bhikhi S5 24+610 24+612 Water based marking (Edge line) RHS Sqm 0.2
107 Dhanaula - Bhikhi S5 24+620 24+622 Water based marking (Edge line) RHS Sqm 0.2
108 Dhanaula - Bhikhi S5 24+630 24+700 Water based marking (Center line) Center Sqm 1.8
109 Dhanaula - Bhikhi S5 24+220 Water based marking (Zebra) LHS Sqm 3
110 Dhanaula - Bhikhi S5 24+560 24+564 Water based marking (Edge line) LHS Sqm 0.4
111 Dhanaula - Bhikhi S5 24+500 24+503 Water based marking (Edge line) LHS Sqm 0.3
112 Dhanaula - Bhikhi S5 24+480 24+487 Water based marking (Edge line) LHS Sqm 0.7
113 Dhanaula - Bhikhi S5 24+430 24+477 Water based marking (Edge line) LHS Sqm 4.7
114 Dhanaula - Bhikhi S5 24+380 24+415 Water based marking (Edge line) LHS Sqm 3.5
115 Dhanaula - Bhikhi S5 24+235 24+241 Water based marking (Edge line) LHS Sqm 0.6
116 Dhanaula - Bhikhi S5 24+120 24+131 Water based marking (Edge line) LHS Sqm 1.1
117 Dhanaula - Bhikhi S5 23+900 23+908 Water based marking (Edge line) LHS Sqm 0.8
118 Dhanaula - Bhikhi S5 23+670 23+672 Water based marking (Edge line) LHS Sqm 0.2
119 Dhanaula - Bhikhi S5 23+673 23+674 Water based marking (Edge line) LHS Sqm 0.1
120 Dhanaula - Bhikhi S5 23+450 23+455 Water based marking (Edge line) LHS Sqm 0.5
121 Dhanaula - Bhikhi S5 23+400 23+404 Water based marking (Edge line) LHS Sqm 0.4
122 Dhanaula - Bhikhi S5 23+392 23+396 Water based marking (Edge line) LHS Sqm 0.4
123 Dhanaula - Bhikhi S5 23+370 23+372 Water based marking (Edge line) LHS Sqm 0.2
124 Dhanaula - Bhikhi S5 22+900 22+911 Water based marking (Edge line) LHS Sqm 1.1
125 Dhanaula - Bhikhi S5 22+890 22+892 Water based marking (Edge line) LHS Sqm 0.2
126 Dhanaula - Bhikhi S5 22+760 22+761 Water based marking (Edge line) LHS Sqm 0.1
127 Dhanaula - Bhikhi S5 22+750 22+751 Water based marking (Edge line) LHS Sqm 0.1
128 Dhanaula - Bhikhi S5 22+740 22+743 Water based marking (Edge line) LHS Sqm 0.3
129 Dhanaula - Bhikhi S5 22+735 22+736 Water based marking (Edge line) LHS Sqm 0.1
130 Dhanaula - Bhikhi S5 22+720 22+723 Water based marking (Edge line) LHS Sqm 0.3
131 Dhanaula - Bhikhi S5 22+380 22+395 Water based marking (Edge line) LHS Sqm 1.5
132 Dhanaula - Bhikhi S5 22+080 22+090 Water based marking (Edge line) LHS Sqm 1
133 Dhanaula - Bhikhi S5 22+030 22+047 Water based marking (Edge line) LHS Sqm 1.7
134 Dhanaula - Bhikhi S5 21+900 21+905 Water based marking (Edge line) LHS Sqm 0.5
135 Dhanaula - Bhikhi S5 21+810 21+820 Water based marking (Edge line) LHS Sqm 1
136 Dhanaula - Bhikhi S5 21+580 21+600 Water based marking (Edge line) LHS Sqm 2
137 Dhanaula - Bhikhi S5 21+460 21+485 Water based marking (Edge line) LHS Sqm 2.5
138 Dhanaula - Bhikhi S5 21+405 21+423 Water based marking (Edge line) LHS Sqm 1.8
139 Dhanaula - Bhikhi S5 21+330 21+335 Water based marking (Edge line) LHS Sqm 0.5
140 Dhanaula - Bhikhi S5 20+470 20+476 Water based marking (Edge line) LHS Sqm 0.6
141 Dhanaula - Bhikhi S5 20+360 20+370 Water based marking (Edge line) LHS Sqm 1
142 Dhanaula - Bhikhi S5 20+200 20+207 Water based marking (Edge line) LHS Sqm 0.7
143 Dhanaula - Bhikhi S5 24+700 24+719 Water based marking (Edge line) LHS Sqm 1.9
144 Dhanaula - Bhikhi S5 24+670 24+693 Water based marking (Edge line) LHS Sqm 2.3
145 Dhanaula - Bhikhi S5 24+575 24+601 Water based marking (Edge line) LHS Sqm 2.6
146 Dhanaula - Bhikhi S5 4+990 5+000 Water based marking (Edge line) RHS Sqm 1
147 Dhanaula - Bhikhi S5 4+950 4+954 Water based marking (Edge line) RHS Sqm 0.4
148 Dhanaula - Bhikhi S5 4+956 4+960 Water based marking (Edge line) RHS Sqm 0.4
149 Dhanaula - Bhikhi S5 4+750 4+752 Water based marking (Edge line) RHS Sqm 0.2
150 Dhanaula - Bhikhi S5 4+700 4+702 Water based marking (Edge line) RHS Sqm 0.2
151 Dhanaula - Bhikhi S5 4+705 4+706 Water based marking (Edge line) RHS Sqm 0.1
152 Dhanaula - Bhikhi S5 4+610 4+615 Water based marking (Edge line) RHS Sqm 0.5
153 Dhanaula - Bhikhi S5 4+620 4+623 Water based marking (Edge line) RHS Sqm 0.3
154 Dhanaula - Bhikhi S5 4+495 4+500 Water based marking (Edge line) RHS Sqm 0.5
155 Dhanaula - Bhikhi S5 4+502 4+504 Water based marking (Edge line) RHS Sqm 0.2
156 Dhanaula - Bhikhi S5 4+450 4+456 Water based marking (Edge line) RHS Sqm 0.6
157 Dhanaula - Bhikhi S5 4+400 4+402 Water based marking (Edge line) RHS Sqm 0.2
158 Dhanaula - Bhikhi S5 4+230 4+234 Water based marking (Edge line) RHS Sqm 0.4
159 Dhanaula - Bhikhi S5 4+170 4+172 Water based marking (Edge line) RHS Sqm 0.2
160 Dhanaula - Bhikhi S5 4+140 4+142 Water based marking (Edge line) RHS Sqm 0.2
161 Dhanaula - Bhikhi S5 4+143 4+160 Water based marking (Edge line) RHS Sqm 1.7
162 Dhanaula - Bhikhi S5 3+890 3+891 Water based marking (Edge line) RHS Sqm 0.1
163 Dhanaula - Bhikhi S5 3+800 3+813 Water based marking (Edge line) RHS Sqm 1.3
164 Dhanaula - Bhikhi S5 3+740 3+749 Water based marking (Edge line) RHS Sqm 0.9
165 Dhanaula - Bhikhi S5 3+605 3+607 Water based marking (Edge line) RHS Sqm 0.2
166 Dhanaula - Bhikhi S5 3+580 3+582 Water based marking (Edge line) RHS Sqm 0.2
167 Dhanaula - Bhikhi S5 3+584 3+587 Water based marking (Edge line) RHS Sqm 0.3
168 Dhanaula - Bhikhi S5 3+590 3+597 Water based marking (Edge line) RHS Sqm 0.7
169 Dhanaula - Bhikhi S5 3+600 3+603 Water based marking (Edge line) RHS Sqm 0.3
170 Dhanaula - Bhikhi S5 2+350 2+355 Water based marking (Edge line) RHS Sqm 0.5
171 Dhanaula - Bhikhi S5 2+354 2+361 Water based marking (Edge line) RHS Sqm 0.7
172 Dhanaula - Bhikhi S5 2+080 2+091 Water based marking (Edge line) RHS Sqm 1.1
173 Dhanaula - Bhikhi S5 2+000 2+008 Water based marking (Edge line) RHS Sqm 0.8
174 Dhanaula - Bhikhi S5 1+790 1+796 Water based marking (Edge line) RHS Sqm 0.6
175 Dhanaula - Bhikhi S5 1+750 Water based marking (Zebra) RHS Sqm 3
176 Dhanaula - Bhikhi S5 1+700 Water based marking (Center line) Center Sqm 0.3
177 Dhanaula - Bhikhi S5 1+590 1+596 Water based marking (Edge line) RHS Sqm 0.6
178 Dhanaula - Bhikhi S5 1+600 1+614 Water based marking (Edge line) RHS Sqm 1.4
179 Dhanaula - Bhikhi S5 1+620 1+626 Water based marking (Edge line) RHS Sqm 0.6
180 Dhanaula - Bhikhi S5 1+615 1+616 Water based marking (Edge line) RHS Sqm 0.1
181 Dhanaula - Bhikhi S5 1+470 1+474 Water based marking (Edge line) RHS Sqm 0.4
182 Dhanaula - Bhikhi S5 1+475 1+481 Water based marking (Edge line) RHS Sqm 0.6
183 Dhanaula - Bhikhi S5 0+920 0+921 Water based marking (Edge line) RHS Sqm 0.1
184 Dhanaula - Bhikhi S5 0+900 0+906 Water based marking (Edge line) RHS Sqm 0.6
185 Dhanaula - Bhikhi S5 0+770 0+779 Water based marking (Edge line) RHS Sqm 0.9
186 Dhanaula - Bhikhi S5 0+750 0+765 Water based marking (Edge line) RHS Sqm 1.5
187 Dhanaula - Bhikhi S5 0+040 0+080 Water based marking (Edge line) RHS Sqm 4
188 Dhanaula - Bhikhi S5 0+090 0+094 Water based marking (Edge line) RHS Sqm 0.4
189 Dhanaula - Bhikhi S5 0+100 0+115 Water based marking (Edge line) RHS Sqm 1.5
190 Dhanaula - Bhikhi S5 0+140 0+144 Water based marking (Edge line) RHS Sqm 0.4
191 Dhanaula - Bhikhi S5 0+010 0+130 Water based marking (Edge line) Center Sqm 3.6
192 Dhanaula - Bhikhi S5 4+985 4+986 Water based marking (Edge line) LHS Sqm 0.1
193 Dhanaula - Bhikhi S5 4+970 4+976 Water based marking (Edge line) LHS Sqm 0.6
194 Dhanaula - Bhikhi S5 4+940 4+947 Water based marking (Edge line) LHS Sqm 0.7
195 Dhanaula - Bhikhi S5 4+930 4+934 Water based marking (Edge line) LHS Sqm 0.4
196 Dhanaula - Bhikhi S5 4+780 4+781 Water based marking (Edge line) LHS Sqm 0.1
197 Dhanaula - Bhikhi S5 4+700 4+707 Water based marking (Edge line) LHS Sqm 0.7
198 Dhanaula - Bhikhi S5 4+620 4+622 Water based marking (Edge line) LHS Sqm 0.2
199 Dhanaula - Bhikhi S5 4+625 4+628 Water based marking (Edge line) LHS Sqm 0.3
200 Dhanaula - Bhikhi S5 4+560 4+579 Water based marking (Edge line) LHS Sqm 1.9
201 Dhanaula - Bhikhi S5 4+500 4+503 Water based marking (Edge line) LHS Sqm 0.3
202 Dhanaula - Bhikhi S5 4+450 4+453 Water based marking (Edge line) LHS Sqm 0.3
203 Dhanaula - Bhikhi S5 4+380 4+383 Water based marking (Edge line) LHS Sqm 0.3
204 Dhanaula - Bhikhi S5 4+360 4+365 Water based marking (Edge line) LHS Sqm 0.5
205 Dhanaula - Bhikhi S5 4+355 4+357 Water based marking (Edge line) LHS Sqm 0.2
206 Dhanaula - Bhikhi S5 4+150 4+165 Water based marking (Edge line) LHS Sqm 1.5
207 Dhanaula - Bhikhi S5 4+130 4+135 Water based marking (Edge line) LHS Sqm 0.5
208 Dhanaula - Bhikhi S5 4+100 4+114 Water based marking (Edge line) LHS Sqm 1.4
209 Dhanaula - Bhikhi S5 4+090 4+093 Water based marking (Edge line) LHS Sqm 0.3
210 Dhanaula - Bhikhi S5 4+085 4+088 Water based marking (Edge line) LHS Sqm 0.3
211 Dhanaula - Bhikhi S5 4+070 4+076 Water based marking (Edge line) LHS Sqm 0.6
212 Dhanaula - Bhikhi S5 4+040 4+046 Water based marking (Edge line) LHS Sqm 0.6
213 Dhanaula - Bhikhi S5 4+010 4+016 Water based marking (Edge line) LHS Sqm 0.6
214 Dhanaula - Bhikhi S5 3+995 4+000 Water based marking (Edge line) LHS Sqm 0.5
215 Dhanaula - Bhikhi S5 3+985 3+991 Water based marking (Edge line) LHS Sqm 0.6
216 Dhanaula - Bhikhi S5 3+940 3+943 Water based marking (Edge line) LHS Sqm 0.3
217 Dhanaula - Bhikhi S5 3+930 3+933 Water based marking (Edge line) LHS Sqm 0.3
218 Dhanaula - Bhikhi S5 3+920 3+923 Water based marking (Edge line) LHS Sqm 0.3
219 Dhanaula - Bhikhi S5 3+900 3+906 Water based marking (Edge line) LHS Sqm 0.6
220 Dhanaula - Bhikhi S5 3+890 3+895 Water based marking (Edge line) LHS Sqm 0.5
221 Dhanaula - Bhikhi S5 3+880 3+885 Water based marking (Edge line) LHS Sqm 0.5
222 Dhanaula - Bhikhi S5 3+870 3+874 Water based marking (Edge line) LHS Sqm 0.4
223 Dhanaula - Bhikhi S5 3+860 3+864 Water based marking (Edge line) LHS Sqm 0.4
224 Dhanaula - Bhikhi S5 3+760 3+763 Water based marking (Edge line) LHS Sqm 0.3
225 Dhanaula - Bhikhi S5 3+358 3+359 Water based marking (Edge line) LHS Sqm 0.1
226 Dhanaula - Bhikhi S5 3+440 3+444 Water based marking (Edge line) LHS Sqm 0.4
227 Dhanaula - Bhikhi S5 3+195 3+200 Water based marking (Edge line) LHS Sqm 0.5
228 Dhanaula - Bhikhi S5 3+150 3+164 Water based marking (Edge line) LHS Sqm 1.4
229 Dhanaula - Bhikhi S5 3+140 3+146 Water based marking (Edge line) LHS Sqm 0.6
230 Dhanaula - Bhikhi S5 3+120 3+124 Water based marking (Edge line) LHS Sqm 0.4
231 Dhanaula - Bhikhi S5 3+110 3+119 Water based marking (Edge line) LHS Sqm 0.9
232 Dhanaula - Bhikhi S5 3+005 3+010 Water based marking (Edge line) LHS Sqm 0.5
233 Dhanaula - Bhikhi S5 3+000 3+002 Water based marking (Edge line) LHS Sqm 0.2
234 Dhanaula - Bhikhi S5 2+990 2+996 Water based marking (Edge line) LHS Sqm 0.6
235 Dhanaula - Bhikhi S5 2+920 2+924 Water based marking (Edge line) LHS Sqm 0.4
236 Dhanaula - Bhikhi S5 2+900 2+903 Water based marking (Edge line) LHS Sqm 0.3
237 Dhanaula - Bhikhi S5 2+720 2+722 Water based marking (Edge line) LHS Sqm 0.2
238 Dhanaula - Bhikhi S5 2+725 2+727 Water based marking (Edge line) LHS Sqm 0.2
239 Dhanaula - Bhikhi S5 2+730 2+733 Water based marking (Edge line) LHS Sqm 0.3
240 Dhanaula - Bhikhi S5 2+704 2+705 Water based marking (Edge line) LHS Sqm 0.1
241 Dhanaula - Bhikhi S5 2+710 2+715 Water based marking (Edge line) LHS Sqm 0.5
242 Dhanaula - Bhikhi S5 2+716 2+719 Water based marking (Edge line) LHS Sqm 0.3
243 Dhanaula - Bhikhi S5 2+580 2+583 Water based marking (Edge line) LHS Sqm 0.3
244 Dhanaula - Bhikhi S5 2+540 2+544 Water based marking (Edge line) LHS Sqm 0.4
245 Dhanaula - Bhikhi S5 2+520 2+526 Water based marking (Edge line) LHS Sqm 0.6
246 Dhanaula - Bhikhi S5 2+405 2+406 Water based marking (Edge line) LHS Sqm 0.1
247 Dhanaula - Bhikhi S5 2+450 2+530 Water based marking (Center line) LHS Sqm 1.5
248 Dhanaula - Bhikhi S5 2+385 2+390 Water based marking (Edge line) LHS Sqm 0.5
249 Dhanaula - Bhikhi S5 2+040 2+051 Water based marking (Edge line) LHS Sqm 1.1
250 Dhanaula - Bhikhi S5 2+052 2+064 Water based marking (Edge line) LHS Sqm 1.2
251 Dhanaula - Bhikhi S5 1+980 1+988 Water based marking (Edge line) LHS Sqm 0.8
252 Dhanaula - Bhikhi S5 1+920 1+922 Water based marking (Edge line) LHS Sqm 0.2
253 Dhanaula - Bhikhi S5 1+850 1+863 Water based marking (Edge line) LHS Sqm 1.3
254 Dhanaula - Bhikhi S5 1+840 1+846 Water based marking (Edge line) LHS Sqm 0.6
255 Dhanaula - Bhikhi S5 1+835 1+840 Water based marking (Edge line) LHS Sqm 0.5
256 Dhanaula - Bhikhi S5 1+825 1+830 Water based marking (Edge line) LHS Sqm 0.5
257 Dhanaula - Bhikhi S5 1+820 1+824 Water based marking (Edge line) LHS Sqm 0.4
258 Dhanaula - Bhikhi S5 1+620 1+630 Water based marking (Edge line) LHS Sqm 1
259 Dhanaula - Bhikhi S5 1+530 1+533 Water based marking (Edge line) LHS Sqm 0.3
260 Dhanaula - Bhikhi S5 1+480 1+486 Water based marking (Edge line) LHS Sqm 0.6
261 Dhanaula - Bhikhi S5 1+470 1+474 Water based marking (Edge line) LHS Sqm 0.4
262 Dhanaula - Bhikhi S5 1+380 1+387 Water based marking (Edge line) LHS Sqm 0.7
263 Dhanaula - Bhikhi S5 1+250 1+252 Water based marking (Edge line) LHS Sqm 0.2
264 Dhanaula - Bhikhi S5 1+240 1+246 Water based marking (Edge line) LHS Sqm 0.6
265 Dhanaula - Bhikhi S5 1+200 1+217 Water based marking (Edge line) LHS Sqm 1.7
266 Dhanaula - Bhikhi S5 1+192 1+193 Water based marking (Edge line) LHS Sqm 0.1
267 Dhanaula - Bhikhi S5 1+180 1+183 Water based marking (Edge line) LHS Sqm 0.3
268 Dhanaula - Bhikhi S5 1+160 1+170 Water based marking (Edge line) LHS Sqm 1
269 Dhanaula - Bhikhi S5 1+155 1+159 Water based marking (Edge line) LHS Sqm 0.4
270 Dhanaula - Bhikhi S5 1+150 1+151 Water based marking (Edge line) LHS Sqm 0.1
271 Dhanaula - Bhikhi S5 1+050 1+055 Water based marking (Edge line) LHS Sqm 0.5
272 Dhanaula - Bhikhi S5 0+990 0+998 Water based marking (Edge line) LHS Sqm 0.8
273 Dhanaula - Bhikhi S5 0+900 0+905 Water based marking (Edge line) LHS Sqm 0.5
274 Dhanaula - Bhikhi S5 0+640 0+644 Water based marking (Edge line) LHS Sqm 0.4
275 Dhanaula - Bhikhi S5 0+570 0+576 Water based marking (Edge line) LHS Sqm 0.6
276 Dhanaula - Bhikhi S5 0+320 0+330 Water based marking (Edge line) LHS Sqm 1
277 Dhanaula - Bhikhi S5 0+300 0+310 Water based marking (Edge line) LHS Sqm 1
278 Dhanaula - Bhikhi S5 0+220 0+230 Water based marking (Edge line) LHS Sqm 1
279 Dhanaula - Bhikhi S5 0+200 0+210 Water based marking (Edge line) LHS Sqm 1
280 Dhanaula - Bhikhi S5 0+170 0+184 Water based marking (Edge line) LHS Sqm 1.4
281 Dhanaula - Bhikhi S5 0+150 0+151 Water based marking (Edge line) LHS Sqm 0.1
282 Dhanaula - Bhikhi S5 0+010 0+136 Water based marking (Edge line) LHS Sqm 12.6
APPENDIX-J
ROAD MARKING MAINTENANCE (September-2017)
From To
1 Bathinda-Talwandi Sabo B8 5+750 Thermoplastic road marking (Zebra Marking) BHS Sqm 19.80
2 Bathinda-Talwandi Sabo B8 6+095 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
3 Bathinda-Talwandi Sabo B8 6+115 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
4 Bathinda-Talwandi Sabo B8 6+405 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
5 Bathinda-Talwandi Sabo B8 6+425 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
6 Bathinda-Talwandi Sabo B8 6+935 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
7 Bathinda-Talwandi Sabo B8 6+955 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
8 Bathinda-Talwandi Sabo B8 7+430 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
9 Bathinda-Talwandi Sabo B8 7+450 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
10 Bathinda-Talwandi Sabo B8 8+175 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
11 Bathinda-Talwandi Sabo B8 6+910 6+935 Thermoplastic road marking (Kerb Line) RHS Sqm 3.75
12 Bathinda-Talwandi Sabo B8 6+910 6+935 Thermoplastic road marking (Kerb Line) LHS Sqm 3.75
13 Bathinda-Talwandi Sabo B8 8+645 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
14 Bathinda-Talwandi Sabo B8 8+670 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
15 Bathinda-Talwandi Sabo B8 8+195 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
16 Bathinda-Talwandi Sabo B8 7+427 7+540 Thermoplastic road marking (Kerb Line) LHS Sqm 16.95
17 Bathinda-Talwandi Sabo B8 7+427 7+540 Thermoplastic road marking (Kerb Line) RHS Sqm 16.95
18 Bathinda-Talwandi Sabo B8 7+427 7+540 Thermoplastic road marking (Edge Line) LHS Sqm 16.95
19 Bathinda-Talwandi Sabo B8 7+427 7+540 Thermoplastic road marking (Edge Line) RHS Sqm 16.95
20 Bathinda-Talwandi Sabo B8 8+645 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
21 Bathinda-Talwandi Sabo B8 8+670 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
22 Bathinda-Talwandi Sabo B8 8+195 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
23 Bathinda-Talwandi Sabo B8 8+175 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
24 Bathinda-Talwandi Sabo B8 7+430 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
25 Bathinda-Talwandi Sabo B8 7+450 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
Qty. in Sqm RemarksS.
NoRoad Name
LocationDescription of Work Side Unit
26 Bathinda-Talwandi Sabo B8 6+935 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
27 Bathinda-Talwandi Sabo B8 6+955 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
28 Bathinda-Talwandi Sabo B8 5+875 5+920 Thermoplastic road marking (Center Line) BHS Sqm 2.25
29 Bathinda-Talwandi Sabo B8 5+880 5+920 Thermoplastic road marking (Center Line) BHS Sqm 1.80
30 Bathinda-Talwandi Sabo B8 5+833 5+970 Thermoplastic road marking (Edge Line) BHS Sqm 20.55
31 Bathinda-Talwandi Sabo B8 5+897 5+920 Thermoplastic road marking (Edge Line) LHS Sqm 3.45
32 Bathinda-Talwandi Sabo B8 5+837 5+897 Thermoplastic road marking (Edge Line) RHS Sqm 9.00
33 Bathinda-Talwandi Sabo B8 5+880 Thermoplastic road marking (Chevron) LHS Sqm 5.25
34 Bathinda-Talwandi Sabo B8 5+855 5+897 Thermoplastic road marking (Edge Line) RHS Sqm 6.30
35 Bathinda-Talwandi Sabo B8 5+830 Thermoplastic road marking (Junction) BHS Sqm 6.45
36 Bathinda-Talwandi Sabo B8 5+897 5+864 Thermoplastic road marking (Edge Line) BHS Sqm 4.95
37 Bathinda-Talwandi Sabo B8 5+870 Thermoplastic road marking (Junction) BHS Sqm 9.60
38 Bathinda-Talwandi Sabo B8 5+750 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
39 Bathinda-Talwandi Sabo B8 6+095 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
40 Bathinda-Talwandi Sabo B8 6+115 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
41 Bathinda-Talwandi Sabo B8 6+405 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
42 Bathinda-Talwandi Sabo B8 6+425 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
43 Bathinda-Talwandi Sabo B8 6+253 6+309 Thermoplastic road marking (Kerb Line) RHS Sqm 8.40
44 Bathinda-Talwandi Sabo B8 6+206 6+243 Thermoplastic road marking (Kerb Line) RHS Sqm 5.55
45 Bathinda-Talwandi Sabo B8 5+887 6+197 Thermoplastic road marking (Kerb Line) RHS Sqm 46.50
46 Bathinda-Talwandi Sabo B8 5+887 6+116 Thermoplastic road marking (Kerb Line) LHS Sqm 34.35
47 Bathinda-Talwandi Sabo B8 6+405 6+425 Thermoplastic road marking (Kerb Line) LHS Sqm 3.00
48 Bathinda-Talwandi Sabo B8 6+405 6+425 Thermoplastic road marking (Kerb Line) RHS Sqm 3.00
49 Bathinda-Talwandi Sabo B8 30+290 30+370 Thermoplastic road marking (Rumbles) BHS Sqm 37.80
50 Bathinda-Talwandi Sabo B8 30+110 30+190 Thermoplastic road marking (Rumbles) BHS Sqm 37.80
51 Bathinda-Talwandi Sabo B8 30+220 30+280 Thermoplastic road marking (Zigzag marking) Center Sqm 6.00
52 Bathinda-Talwandi Sabo B8 30+290 30+370 Thermoplastic road marking (Center Line continue) Center Sqm 7.00
53 Bathinda-Talwandi Sabo B8 30+110 30+215 Thermoplastic road marking (Center Line continue) Center Sqm 9.00
54 Bathinda-Talwandi Sabo B8 26+655 26+785 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
55 Bathinda-Talwandi Sabo B8 26+830 26+960 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
56 Bathinda-Talwandi Sabo B8 27+320 27+450 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
57 Bathinda-Talwandi Sabo B8 27+510 27+640 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
58 Bathinda-Talwandi Sabo B8 26+785 26+830 Thermoplastic road marking (Zigzag marking) Center Sqm 4.40
59 Bathinda-Talwandi Sabo B8 27+440 27+490 Thermoplastic road marking (Zigzag marking) Center Sqm 5.00
60 Bathinda-Talwandi Sabo B8 9+180 Thermoplastic road marking (Junction) LHS Sqm 4.65
61 Bathinda-Talwandi Sabo B8 9+172 9+278 Thermoplastic road marking (Edge Line) LHS Sqm 15.90
62 Bathinda-Talwandi Sabo B8 9+160 Thermoplastic road marking (Junction) RHS Sqm 6.75
63 Bathinda-Talwandi Sabo B8 9+097 9+163 Thermoplastic road marking (Edge Line) LHS Sqm 9.90
64 Bathinda-Talwandi Sabo B8 9+100 9+155 Thermoplastic road marking (Center Line) LHS Sqm 2.70
65 Bathinda-Talwandi Sabo B8 9+100 9+155 Thermoplastic road marking (Center Line) RHS Sqm 2.70
66 Bathinda-Talwandi Sabo B8 9+206 9+296 Thermoplastic road marking (Center Line continue) Center Sqm 13.50
67 Bathinda-Talwandi Sabo B8 9+139 9+150 Thermoplastic road marking (Kerb Line) BHS Sqm 4.35
68 Bathinda-Talwandi Sabo B8 9+170 69+740 Thermoplastic road marking (Round about marking) BHS Sqm 26.55
69 Bathinda-Talwandi Sabo B8 9+180 9+191 Thermoplastic road marking (Kerb Line) BHS Sqm 4.35
70 Bathinda-Talwandi Sabo B8 27+445 27+495 Thermoplastic road marking (Zigzag Marking) BHS Sqm 15.00
71 Bathinda-Talwandi Sabo B8 27+445 Thermoplastic road marking (Triangle) BHS Sqm 4.16
72 Bathinda-Talwandi Sabo B8 27+445 Thermoplastic road marking (Block) BHS Sqm 11.00
73 Bathinda-Talwandi Sabo B8 27+495 Thermoplastic road marking (Triangle) BHS Sqm 4.16
74 Bathinda-Talwandi Sabo B8 27+495 Thermoplastic road marking (Block) BHS Sqm 11.00
75 Bathinda-Talwandi Sabo B8 6+191 6+200 Thermoplastic road marking (Kerb Line) BHS Sqm 2.70
76 Bathinda-Talwandi Sabo B8 6+235 6+245 Thermoplastic road marking (Kerb Line) BHS Sqm 3.00
77 Bathinda-Talwandi Sabo B8 6+300 6+305 Thermoplastic road marking (Kerb Line) BHS Sqm 1.50
78 Bathinda-Talwandi Sabo B8 6+560 6+570 Thermoplastic road marking (Kerb Line) BHS Sqm 3.00
79 Bathinda-Talwandi Sabo B8 6+623 6+630 Thermoplastic road marking (Kerb Line) BHS Sqm 2.10
80 Bathinda-Talwandi Sabo B8 6+708 6+715 Thermoplastic road marking (Kerb Line) BHS Sqm 2.10
81 Bathinda-Talwandi Sabo B8 7+090 7+110 Thermoplastic road marking (Kerb Line) BHS Sqm 6.00
82 Bathinda-Talwandi Sabo B8 7+255 7+266 Thermoplastic road marking (Kerb Line) BHS Sqm 3.30
83 Bathinda-Talwandi Sabo B8 8+170 8+200 Thermoplastic road marking (Kerb Line) BHS Sqm 9.00
84 Bathinda-Talwandi Sabo B8 8+645 8+670 Thermoplastic road marking (Kerb Line) BHS Sqm 7.50
85 Bathinda-Talwandi Sabo B8 8+927 8+947 Thermoplastic road marking (Kerb Line) BHS Sqm 6.00
86 Bathinda-Talwandi Sabo B8 14+900 15+000 Thermoplastic road marking (Edge Line) RHS Sqm 15.00
87 Bathinda-Talwandi Sabo B8 14+900 14+950 Thermoplastic road marking (Kerb Line) BHS Sqm 15.00
88 Bathinda-Talwandi Sabo B8 14+950 Thermoplastic road marking (Chevron) Center Sqm 8.70
89 Bathinda-Talwandi Sabo B8 36+150 36+290 Thermoplastic road marking (Edge Line) LHS Sqm 21.00
90 Bathinda-Talwandi Sabo B8 36+150 36+290 Thermoplastic road marking (Edge Line) RHS Sqm 21.00
91 Bathinda-Talwandi Sabo B8 36+390 36+500 Thermoplastic road marking (Edge Line) LHS Sqm 16.50
92 Bathinda-Talwandi Sabo B8 36+390 36+500 Thermoplastic road marking (Edge Line) RHS Sqm 16.50
93 Bathinda-Talwandi Sabo B8 14+930 Thermoplastic road marking (Zebra Marking) RHS Sqm 12.60
94 Bathinda-Talwandi Sabo B8 14+860 14+950 Thermoplastic road marking (Center Line) RHS Sqm 3.00
95 Bathinda-Talwandi Sabo B8 14+930 15+010 Thermoplastic road marking (Edge Line) LHS Sqm 12.00
96 Bathinda-Talwandi Sabo B8 14+900 14+965 Thermoplastic road marking (Center Line) LHS Sqm 2.10
97 Bathinda-Talwandi Sabo B8 15+490 15+498 Water based marking (Edge line) LHS Sqm 1.20
98 Bathinda-Talwandi Sabo B8 15+530 15+533 Water based marking (Edge line) LHS Sqm 0.45
99 Bathinda-Talwandi Sabo B8 15+535 15+552 Water based marking (Edge line) LHS Sqm 2.55
100 Bathinda-Talwandi Sabo B8 15+560 15+584 Water based marking (Edge line) LHS Sqm 3.60
101 Bathinda-Talwandi Sabo B8 15+600 15+607 Water based marking (Edge line) LHS Sqm 1.05
102 Bathinda-Talwandi Sabo B8 15+640 15+676 Water based marking (Edge line) LHS Sqm 5.40
103 Bathinda-Talwandi Sabo B8 15+700 15+795 Water based marking (Edge line) LHS Sqm 14.25
104 Bathinda-Talwandi Sabo B8 15+800 15+830 Water based marking (Edge line) LHS Sqm 4.50
105 Bathinda-Talwandi Sabo B8 15+850 15+890 Water based marking (Edge line) LHS Sqm 6.00
106 Bathinda-Talwandi Sabo B8 15+950 15+987 Water based marking (Edge line) LHS Sqm 5.55
107 Bathinda-Talwandi Sabo B8 16+045 16+050 Water based marking (center line) LHS Sqm 0.50
108 Bathinda-Talwandi Sabo B8 16+040 16+043 Water based marking (center line) LHS Sqm 0.30
109 Bathinda-Talwandi Sabo B8 16+000 16+014 Water based marking (center line) LHS Sqm 1.40
110 Bathinda-Talwandi Sabo B8 15+930 15+976 Water based marking (center line) LHS Sqm 4.60
111 Bathinda-Talwandi Sabo B8 15+925 15+928 Water based marking (center line) LHS Sqm 0.30
112 Bathinda-Talwandi Sabo B8 16+000 16+018 Water based marking (Edge line) LHS Sqm 2.70
113 Bathinda-Talwandi Sabo B8 16+030 16+051 Water based marking (Edge line) LHS Sqm 3.15
114 Bathinda-Talwandi Sabo B8 16+160 16+168 Water based marking (Edge line) LHS Sqm 1.20
115 Bathinda-Talwandi Sabo B8 16+300 16+306 Water based marking (Edge line) LHS Sqm 0.90
116 Bathinda-Talwandi Sabo B8 16+310 16+326 Water based marking (Edge line) LHS Sqm 2.40
117 Bathinda-Talwandi Sabo B8 16+576 16+600 Water based marking (Edge line) LHS Sqm 3.60
118 Bathinda-Talwandi Sabo B8 16+620 16+666 Water based marking (Edge line) LHS Sqm 6.90
119 Bathinda-Talwandi Sabo B8 16+670 16+675 Water based marking (Edge line) LHS Sqm 0.75
120 Bathinda-Talwandi Sabo B8 16+720 16+730 Water based marking (Edge line) LHS Sqm 1.50
121 Bathinda-Talwandi Sabo B8 16+750 16+762 Water based marking (Edge line) LHS Sqm 1.80
122 Bathinda-Talwandi Sabo B8 16+870 16+893 Water based marking (Edge line) LHS Sqm 3.45
123 Bathinda-Talwandi Sabo B8 16+780 16+795 Water based marking (Edge line) LHS Sqm 2.25
124 Bathinda-Talwandi Sabo B8 17+000 17+015 Water based marking (Edge line) LHS Sqm 2.25
125 Bathinda-Talwandi Sabo B8 15+005 15+037 Water based marking (Edge line) RHS Sqm 4.80
126 Bathinda-Talwandi Sabo B8 15+040 15+066 Water based marking (Edge line) RHS Sqm 3.90
127 Bathinda-Talwandi Sabo B8 15+080 15+099 Water based marking (Edge line) RHS Sqm 2.85
128 Bathinda-Talwandi Sabo B8 15+105 15+110 Water based marking (Edge line) RHS Sqm 0.75
129 Bathinda-Talwandi Sabo B8 15+160 15+187 Water based marking (Edge line) RHS Sqm 4.05
130 Bathinda-Talwandi Sabo B8 15+220 15+229 Water based marking (Edge line) RHS Sqm 1.35
131 Bathinda-Talwandi Sabo B8 15+430 15+438 Water based marking (Edge line) RHS Sqm 1.20
132 Bathinda-Talwandi Sabo B8 15+445 15+475 Water based marking (Edge line) RHS Sqm 4.50
133 Bathinda-Talwandi Sabo B8 15+540 15+580 Water based marking (Edge line) RHS Sqm 6.00
134 Bathinda-Talwandi Sabo B8 15+700 15+726 Water based marking (Edge line) RHS Sqm 3.90
135 Bathinda-Talwandi Sabo B8 15+740 15+751 Water based marking (Edge line) RHS Sqm 1.65
136 Bathinda-Talwandi Sabo B8 15+770 15+775 Water based marking (Edge line) RHS Sqm 0.75
137 Bathinda-Talwandi Sabo B8 15+780 15+790 Water based marking (Edge line) RHS Sqm 1.50
138 Bathinda-Talwandi Sabo B8 15+800 15+832 Water based marking (Edge line) RHS Sqm 4.80
139 Bathinda-Talwandi Sabo B8 15+850 15+928 Water based marking (Edge line) RHS Sqm 11.70
140 Bathinda-Talwandi Sabo B8 16+180 16+196 Water based marking (Edge line) RHS Sqm 2.40
141 Bathinda-Talwandi Sabo B8 16+210 16+312 Water based marking (Edge line) RHS Sqm 15.30
142 Bathinda-Talwandi Sabo B8 16+410 16+418 Water based marking (Edge line) RHS Sqm 1.20
143 Bathinda-Talwandi Sabo B8 16+480 16+483 Water based marking (Edge line) RHS Sqm 0.45
144 Bathinda-Talwandi Sabo B8 16+750 16+761 Water based marking (Edge line) RHS Sqm 1.65
145 Bathinda-Talwandi Sabo B8 16+840 16+852 Water based marking (Edge line) RHS Sqm 1.80
146 Bathinda-Talwandi Sabo B8 16+860 16+867 Water based marking (Edge line) RHS Sqm 1.05
147 Bathinda-Talwandi Sabo B8 17+010 17+016 Water based marking (Edge line) RHS Sqm 0.90
148 Bathinda-Talwandi Sabo B8 10+760 10+774 Water based marking (Edge line) RHS Sqm 2.10
149 Bathinda-Talwandi Sabo B8 10+790 10+819 Water based marking (Edge line) RHS Sqm 4.35
150 Bathinda-Talwandi Sabo B8 10+840 10+848 Water based marking (Edge line) RHS Sqm 1.20
151 Bathinda-Talwandi Sabo B8 11+195 11+218 Water based marking (Edge line) LHS Sqm 3.45
152 Bathinda-Talwandi Sabo B8 11+190 11+193 Water based marking (Edge line) LHS Sqm 0.45
153 Bathinda-Talwandi Sabo B8 9+420 9+430 Water based marking (Kerb line) BHS Sqm 3.00
154 Bathinda-Talwandi Sabo B8 10+376 10+400 Water based marking (Edge line) LHS Sqm 3.60
7.0_Inventory_Data_Base_September_2017
APPENDIX-J
ROAD SIGN MAINTENANCE REPORT (September-2017)
From To
1 Bhawanigarh-Kotshamir S2 2 Name Informatory Signboard installed 2 16-09-17
2 Bhawanigarh-Kotshamir S2 Flag type Direction Signboard installed 7 16-09-17
3 Bhawanigarh-Kotshamir S2Keep left 300mm sheet installed for jumbo
bollard signboard2 18-09-17
4 Bhawanigarh-Kotshamir S2 39+410Keep left 400mm sheet installed for jumbo
bollard signboardMedian 1 18-09-17
5 Bhawanigarh-Kotshamir S2 11+240 No overtaking signboard ACM Sheet installed LHS 1 18-09-17
6 Bathinda-Talwandi Sabo B8 16+550 Road from left side signboard installed RHS 1 18-09-17
7 Bathinda-Talwandi Sabo B8 27+500 Road from right side signboard installed RHS 1 18-09-17
8 Bathinda-Talwandi Sabo B8 22+080 Cross Road ahead signboard installed LHS 1 18-09-17
9 Bathinda-Talwandi Sabo B8 8+080, 13+430 Gap in median Signboard installed Median 2 18-09-17
10 Bathinda-Talwandi Sabo B8 7+600 LHS, 7+950 RHS Speed breaker signboard installed 2 18-09-17
11 Barnala-Mansa S3 Speed breaker signboard installed 3 18-09-17
12 Bathinda-Talwandi Sabo B8 17+150 Chevron sheets installed due to damage RHS 2 18-09-17
13 Bathinda-Talwandi Sabo B8 17+230 Chevron sheets installed due to damage RHS 1 18-09-17
14 Bhawanigarh-Kotshamir S2 40+000 LHS, 40+260 RHS 3 Name informatory signboard installed 2 19-09-17
15 Barnala-Mansa S3 186+550 LHS, 186+750 RHS 4 Name informatory signboard installed 2 19-09-17
16 Bhawanigarh-Kotshamir S2 107+500 Installation of direction sign board (flag type) LHS 1 20-09-17
17 Bathinda-Talwandi Sabo B8 9+210 RHS, 9+110 LHS Installation of informatory signboard 2 20-09-17
18 Bathinda-Talwandi Sabo B8 9+150 LHS, 9+150 RHS Installation of 3 Name informatory signboard 2 20-09-17
19 Bathinda-Talwandi Sabo B8 27+450 LHS, 27+500 RHS Installation of Speed breaker signboard 2 20-09-17
20 Bathinda-Talwandi Sabo B8 9+150Triple chevron sign board installed on Round
about portion4 20-09-17
21 Dhanaula-Bhikhi S5 6+250Stop signboard installed due to damage on link
roadLHS 1 29-09-17
22 Dhanaula-Bhikhi S5 6+650 Hazard Marker Signboard installed due to theft RHS 2 29-09-17
35+100 LHS, 35+210 RHS
189+950 Median, 190+030 LHS, 190+050
RHS
Date
InstalledRemarks
35+100 LHS, 35+210 RHS
39+700 RHS, 40+650 LHS, 40+750 RHS,
42+310 LHS, 40+380 RHS 51+480 RHS,
51+370 RHS
S. No Road Name Sign Type SideNos./
Rmt
Location
APPENDIX-J
From To
1 Sangrur-Sunam S1 10+195 11+240 Thermoplastic road marking (Edge Line) LHS Sqm 156.75
2 Sangrur-Sunam S1 10+195 11+240 Thermoplastic road marking (Edge Line) RHS Sqm 156.75
3 Sangrur-Sunam S1 10+379 10+490Thermoplastic road marking (Center line
continues)Center Sqm 11.1
4 Sangrur-Sunam S1 10+195 11+270 Thermoplastic road marking (Center line) Center Sqm 36.9
5 Sangrur-Sunam S1 9+580 9+850Thermoplastic road marking (Center line
continues)Center Sqm 27
6 Sangrur-Sunam S1 9+300 9+380Thermoplastic road marking (Center line
continues)Center Sqm 8
7 Sangrur-Sunam S1 9+380 9+580 Thermoplastic road marking (Center line) Center Sqm 6.3
8 Sangrur-Sunam S1 10+110 10+195 Thermoplastic road marking (Edge Line) RHS Sqm 12.75
9 Sangrur-Sunam S1 10+080 10+195 Thermoplastic road marking (Center line) Center Sqm 4.8
10 Sangrur-Sunam S1 9+440 10+195 Thermoplastic road marking (Edge Line) LHS Sqm 113.25
11 Sangrur-Sunam S1 10+005 10+025 Thermoplastic road marking (Edge Line) RHS Sqm 3
12 Sangrur-Sunam S1 9+640 9+670 Thermoplastic road marking (Edge Line) RHS Sqm 4.5
13 Sangrur-Sunam S1 9+675 9+690 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
14 Sangrur-Sunam S1 9+695 9+730 Thermoplastic road marking (Edge Line) RHS Sqm 5.25
15 Sangrur-Sunam S1 9+740 9+830 Thermoplastic road marking (Edge Line) RHS Sqm 13.5
16 Sangrur-Sunam S1 9+290 9+620 Thermoplastic road marking (Edge Line) RHS Sqm 49.5
17 Sangrur-Sunam S1 9+070 9+090 Thermoplastic road marking (Edge Line) RHS Sqm 3
18 Sangrur-Sunam S1 8+980 9+000 Thermoplastic road marking (Edge Line) LHS Sqm 3
19 Sangrur-Sunam S1 9+185 9+200 Thermoplastic road marking (Edge Line) LHS Sqm 2.25
20 Sangrur-Sunam S1 9+130 9+160 Thermoplastic road marking (Edge Line) LHS Sqm 4.5
21 Sangrur-Sunam S1 9+300 9+330 Thermoplastic road marking (Edge Line) LHS Sqm 4.5
22 Sangrur-Sunam S1 2+155 2+450 Thermoplastic road marking (Edge Line) LHS Sqm 44.25
23 Sangrur-Sunam S1 0+000 2+125 Thermoplastic road marking (Edge Line) LHS Sqm 318.75
24 Sangrur-Sunam S1 0+000 0+570 Thermoplastic road marking (Edge Line) RHS Sqm 85.5
ROAD MARKING MAINTENANCE (September-2017)
Qty. in Sqm RemarksS. No Road Name
Location
Description of Work Side Unit
25 Sangrur-Sunam S1 0+600 0+680 Thermoplastic road marking (Edge Line) RHS Sqm 12
26 Sangrur-Sunam S1 0+710 0+900 Thermoplastic road marking (Edge Line) RHS Sqm 28.5
27 Sangrur-Sunam S1 0+050 0+150Thermoplastic road marking (Center line
continues)Center Sqm 15
28 Sangrur-Sunam S1 4+010 4+150 Thermoplastic road marking (Edge Line) RHS Sqm 21
29 Sangrur-Sunam S1 4+170 4+370 Thermoplastic road marking (Edge Line) RHS Sqm 30
30 Sangrur-Sunam S1 3+200 4+030 Thermoplastic road marking (Edge Line) LHS Sqm 124.5
31 Sangrur-Sunam S1 2+155 2+450 Thermoplastic road marking (Edge Line) RHS Sqm 44.25
32 Sangrur-Sunam S1 1+370 2+125 Thermoplastic road marking (Edge Line) RHS Sqm 113.25
33 Sangrur-Sunam S1 0+900 1+335 Thermoplastic road marking (Edge Line) RHS Sqm 65.25
34 Sangrur-Sunam S1 0+000 2+450Thermoplastic road marking (Center line
continues)Center Sqm 88.2
APPENDIX-J
ROAD MARKING MAINTENANCE (September-2017)
From To
1 Bhawanigarh-Kotshamir S2 67+850 Thermoplastic road marking (Round About) - Sqm 39.30
2 Bhawanigarh-Kotshamir S2 55+695 Thermoplastic road marking (Junction) LHS Sqm 10.50
3 Bhawanigarh-Kotshamir S2 55+530 55+686 Thermoplastic road marking (Edge line) LHS Sqm 23.40
4 Bhawanigarh-Kotshamir S2 55+716 56+400 Thermoplastic road marking (Edge Line) LHS Sqm 102.60
5 Bhawanigarh-Kotshamir S2 108+720 Thermoplastic road marking (Zebra Marking) BHS Cum 16.20
6 Bhawanigarh-Kotshamir S2 108+720 Thermoplastic road marking (Stop Line) BHS Cum 2.10
7 Bhawanigarh-Kotshamir S2 63+800 68+000 Thermoplastic road marking (Center Line) Center Cum 130.20
8 Bhawanigarh-Kotshamir S2 67+764 68+000 Thermoplastic road marking (Edge Line) LHS Cum 35.40
9 Bhawanigarh-Kotshamir S2 67+596 67+675 Thermoplastic road marking (Edge Line) LHS Sqm 11.85
10 Bhawanigarh-Kotshamir S2 66+574 67+458 Thermoplastic road marking (Edge Line) LHS Sqm 132.60
11 Bhawanigarh-Kotshamir S2 65+546 66+574 Thermoplastic road marking (Edge Line) LHS Sqm 154.20
12 Bhawanigarh-Kotshamir S2 65+420 65+523 Thermoplastic road marking (Edge Line) LHS Sqm 15.45
13 Bhawanigarh-Kotshamir S2 64+800 65+400 Thermoplastic road marking (Edge Line) LHS Sqm 90.00
14 Bhawanigarh-Kotshamir S2 64+761 64+795 Thermoplastic road marking (Edge Line) LHS Sqm 5.10
15 Bhawanigarh-Kotshamir S2 64+731 64+756 Thermoplastic road marking (Edge Line) LHS Sqm 3.75
16 Bhawanigarh-Kotshamir S2 64+676 64+726 Thermoplastic road marking (Edge Line) LHS Sqm 7.50
17 Bhawanigarh-Kotshamir S2 64+584 64+634 Thermoplastic road marking (Edge Line) LHS Sqm 7.50
18 Bhawanigarh-Kotshamir S2 64+549 64+579 Thermoplastic road marking (Edge Line) LHS Sqm 4.50
19 Bhawanigarh-Kotshamir S2 64+504 64+544 Thermoplastic road marking (Edge Line) LHS Cum 6.00
20 Bhawanigarh-Kotshamir S2 64+147 64+474 Thermoplastic road marking (Edge Line) LHS Cum 49.05
21 Bhawanigarh-Kotshamir S2 63+842 64+116 Thermoplastic road marking (Edge Line) LHS Sqm 41.10
22 Bhawanigarh-Kotshamir S2 63+800 64+005 Thermoplastic road marking (Edge Line) RHS Sqm 30.75
23 Bhawanigarh-Kotshamir S2 88+620 88+700 Thermoplastic road marking (Rumbles) BHS Sqm 37.80
24 Bhawanigarh-Kotshamir S2 88+760 88+840 Thermoplastic road marking (Rumbles) BHS Sqm 37.80
25 Bhawanigarh-Kotshamir S2 13+760 13+880 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
26 Bhawanigarh-Kotshamir S2 14+020 14+140 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
27 Bhawanigarh-Kotshamir S2 14+100 14+140 Thermoplastic road marking (Rumbles) BHS Sqm 12.60
28 Bhawanigarh-Kotshamir S2 13+900 14+015 Thermoplastic road marking (Zigzag marking) Center Sqm 11.40
29 Bhawanigarh-Kotshamir S2 20+810 20+940 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
Qty. in Sqm RemarksS. No Road NameLocation
Description of Work Side Unit
30 Bhawanigarh-Kotshamir S2 20+535 20+665 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
31 Bhawanigarh-Kotshamir S2 20+710 20+810 Thermoplastic road marking (Zigzag marking) Center Sqm 10.00
32 Bhawanigarh-Kotshamir S2 69+610 69+740 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
33 Bhawanigarh-Kotshamir S2 69+440 69+570 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
34 Bhawanigarh-Kotshamir S2 69+570 69+610 Thermoplastic road marking (Zigzag marking) Center Sqm 4.00
35 Bhawanigarh-Kotshamir S2 72+980 72+850 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
36 Bhawanigarh-Kotshamir S2 72+800 72+850 Thermoplastic road marking (Zigzag marking) Center Sqm 5.00
37 Bhawanigarh-Kotshamir S2 72+670 72+800 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
38 Bhawanigarh-Kotshamir S2 88+620 88+700 Thermoplastic road marking (Center Line continue) Center Cum 7.00
39 Bhawanigarh-Kotshamir S2 88+760 88+840 Thermoplastic road marking (Center Line continue) Center Sqm 7.00
40 Bhawanigarh-Kotshamir S2 88+700 88+760 Thermoplastic road marking (Zigzag marking) Center Sqm 6.00
41 Bhawanigarh-Kotshamir S2 72+980 72+850 Thermoplastic road marking (Chevron) Center Sqm 18.00
42 Bhawanigarh-Kotshamir S2 9+180 9+324 Thermoplastic road marking (Center Line) LHS Sqm 7.20
43 Bhawanigarh-Kotshamir S2 9+180 9+324 Thermoplastic road marking (Center Line) RHS Cum 7.20
44 Bhawanigarh-Kotshamir S2 64+730 64+755 Thermoplastic road marking (Edge Line) RHS Sqm 3.75
45 Bhawanigarh-Kotshamir S2 64+760 64+764 Thermoplastic road marking (Edge Line) RHS Cum 0.60
46 Bhawanigarh-Kotshamir S2 64+790 64+795 Thermoplastic road marking (Edge Line) RHS Sqm 0.75
47 Bhawanigarh-Kotshamir S2 64+800 65+415 Thermoplastic road marking (Edge Line) RHS Sqm 92.25
48 Bhawanigarh-Kotshamir S2 65+590 65+620 Thermoplastic road marking (Edge Line) RHS Sqm 4.50
49 Bhawanigarh-Kotshamir S2 65+632 65+640 Thermoplastic road marking (Edge Line) RHS Sqm 1.20
50 Bhawanigarh-Kotshamir S2 65+695 65+703 Thermoplastic road marking (Edge Line) RHS Sqm 1.20
51 Bhawanigarh-Kotshamir S2 65+460 65+480 Thermoplastic road marking (Edge Line) RHS Sqm 3.00
52 Bhawanigarh-Kotshamir S2 65+507 65+510 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
53 Bhawanigarh-Kotshamir S2 64+005 64+120 Thermoplastic road marking (Edge Line) RHS Sqm 17.25
54 Bhawanigarh-Kotshamir S2 64+149 64+332 Thermoplastic road marking (Edge Line) RHS Sqm 27.45
55 Bhawanigarh-Kotshamir S2 64+358 64+496 Thermoplastic road marking (Edge Line) RHS Sqm 20.70
56 Bhawanigarh-Kotshamir S2 64+531 64+537 Thermoplastic road marking (Edge Line) RHS Sqm 0.90
57 Bhawanigarh-Kotshamir S2 64+542 64+567 Thermoplastic road marking (Edge Line) RHS Sqm 3.75
58 Bhawanigarh-Kotshamir S2 64+572 64+637 Thermoplastic road marking (Edge Line) RHS Sqm 9.75
59 Bhawanigarh-Kotshamir S2 64+692 64+725 Thermoplastic road marking (Edge Line) RHS Sqm 4.95
60 Bhawanigarh-Kotshamir S2 65+576 65+590 Thermoplastic road marking (Edge Line) RHS Sqm 2.10
61 Bhawanigarh-Kotshamir S2 65+805 65+810 Thermoplastic road marking (Edge Line) RHS Sqm 0.75
62 Bhawanigarh-Kotshamir S2 65+830 65+837 Thermoplastic road marking (Edge Line) RHS Sqm 1.05
63 Bhawanigarh-Kotshamir S2 65+841 65+850 Thermoplastic road marking (Edge Line) RHS Sqm 1.35
64 Bhawanigarh-Kotshamir S2 65+860 65+862 Thermoplastic road marking (Edge Line) RHS Sqm 0.30
65 Bhawanigarh-Kotshamir S2 65+887 65+890 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
66 Bhawanigarh-Kotshamir S2 65+916 66+310 Thermoplastic road marking (Edge Line) RHS Sqm 59.10
67 Bhawanigarh-Kotshamir S2 66+322 66+350 Thermoplastic road marking (Edge Line) RHS Sqm 4.20
68 Bhawanigarh-Kotshamir S2 66+358 66+360 Thermoplastic road marking (Edge Line) RHS Sqm 0.30
69 Bhawanigarh-Kotshamir S2 66+365 66+367 Thermoplastic road marking (Edge Line) RHS Sqm 0.30
70 Bhawanigarh-Kotshamir S2 66+379 66+382 Thermoplastic road marking (Edge Line) RHS Cum 0.45
71 Bhawanigarh-Kotshamir S2 66+392 66+610 Thermoplastic road marking (Edge Line) RHS Sqm 32.70
72 Bhawanigarh-Kotshamir S2 66+618 66+620 Thermoplastic road marking (Edge Line) RHS Cum 0.30
73 Bhawanigarh-Kotshamir S2 66+622 66+625 Thermoplastic road marking (Edge Line) RHS Cum 0.45
74 Bhawanigarh-Kotshamir S2 66+631 66+750 Thermoplastic road marking (Edge Line) RHS Sqm 17.85
75 Bhawanigarh-Kotshamir S2 66+772 66+775 Thermoplastic road marking (Edge Line) RHS Cum 0.45
76 Bhawanigarh-Kotshamir S2 66+791 66+795 Thermoplastic road marking (Edge Line) RHS Sqm 0.60
77 Bhawanigarh-Kotshamir S2 66+811 66+812 Thermoplastic road marking (Edge Line) RHS Sqm 0.15
78 Bhawanigarh-Kotshamir S2 66+820 66+822 Thermoplastic road marking (Edge Line) RHS Sqm 0.30
79 Bhawanigarh-Kotshamir S2 66+840 66+860 Thermoplastic road marking (Edge Line) RHS Sqm 3.00
80 Bhawanigarh-Kotshamir S2 66+875 66+880 Thermoplastic road marking (Edge Line) RHS Sqm 0.75
81 Bhawanigarh-Kotshamir S2 66+891 67+460 Thermoplastic road marking (Edge Line) RHS Sqm 85.35
82 Bhawanigarh-Kotshamir S2 67+602 67+682 Thermoplastic road marking (Edge Line) RHS Sqm 12.00
83 Bhawanigarh-Kotshamir S2 67+850 Thermoplastic road marking (Round about Marking) BHS Sqm 5.40
84 Bhawanigarh-Kotshamir S2 67+720 67+757 Thermoplastic road marking (Edge Line) RHS Sqm 5.55
85 Bhawanigarh-Kotshamir S2 67+800 67+830 Thermoplastic road marking (Edge Line) RHS Sqm 4.50
86 Bhawanigarh-Kotshamir S2 67+865 68+000 Thermoplastic road marking (Edge Line) RHS Sqm 20.25
87 Bhawanigarh-Kotshamir S2 63+000 63+795 Thermoplastic road marking (Edge Line) LHS Sqm 119.25
88 Bhawanigarh-Kotshamir S2 62+716 62+918 Thermoplastic road marking (Edge Line) LHS Sqm 30.30
89 Bhawanigarh-Kotshamir S2 54+229 54+255 Thermoplastic road marking (Edge Line) RHS Sqm 3.90
90 Bhawanigarh-Kotshamir S2 62+100 62+716 Thermoplastic road marking (Edge Line) LHS Sqm 92.40
91 Bhawanigarh-Kotshamir S2 61+745 62+000 Thermoplastic road marking (Edge Line) RHS Sqm 38.25
92 Bhawanigarh-Kotshamir S2 60+630 60+800 Thermoplastic road marking (Edge Line) RHS Cum 25.50
93 Bhawanigarh-Kotshamir S2 62+200 62+250 Thermoplastic road marking (Edge Line) RHS Sqm 7.50
94 Bhawanigarh-Kotshamir S2 62+955 63+000 Thermoplastic road marking (Edge Line) RHS Cum 6.75
95 Bhawanigarh-Kotshamir S2 63+060 63+800 Thermoplastic road marking (Edge Line) RHS Sqm 111.00
96 Bhawanigarh-Kotshamir S2 56+400 56+490 Thermoplastic road marking (Edge Line) LHS Sqm 13.50
97 Bhawanigarh-Kotshamir S2 54+200 Thermoplastic road marking (Junction) RHS Sqm 11.25
98 Bhawanigarh-Kotshamir S2 54+265 Thermoplastic road marking (Junction) RHS Sqm 9.15
99 Bhawanigarh-Kotshamir S2 61+300 61+380 Thermoplastic road marking (Edge Line) LHS Sqm 12.00
100 Bhawanigarh-Kotshamir S2 61+585 61+800 Thermoplastic road marking (Edge Line) LHS Sqm 32.25
101 Bhawanigarh-Kotshamir S2 54+040 54+070 Thermoplastic road marking (Edge Line) RHS Sqm 4.50
102 Bhawanigarh-Kotshamir S2 54+241 54+265 Thermoplastic road marking (Edge Line) RHS Sqm 3.60
103 Bhawanigarh-Kotshamir S2 36+350 Thermoplastic road marking (Stop Line) BHS Sqm 1.50
104 Bhawanigarh-Kotshamir S2 35+800 35+900 Thermoplastic road marking (Edge Line) RHS Sqm 15.00
105 Bhawanigarh-Kotshamir S2 35+750 35+920 Thermoplastic road marking (Edge Line) LHS Cum 25.50
106 Bhawanigarh-Kotshamir S2 35+830 Thermoplastic road marking (Triangle) BHS Cum 2.76
107 Bhawanigarh-Kotshamir S2 35+830 Thermoplastic road marking (Rectangle) BHS Cum 8.25
108 Bhawanigarh-Kotshamir S2 35+800 Thermoplastic road marking (Stop Line) BHS Cum 1.50
109 Bhawanigarh-Kotshamir S2 35+830 Thermoplastic road marking (Stop Line) BHS Cum 3.00
110 Bhawanigarh-Kotshamir S2 36+050 36+210 Thermoplastic road marking (Edge Line) RHS Cum 24.00
111 Bhawanigarh-Kotshamir S2 36+120 36+180 Thermoplastic road marking (Edge Line) LHS Cum 9.00
112 Bhawanigarh-Kotshamir S2 36+080 36+090 Thermoplastic road marking (Edge Line) LHS Cum 1.50
113 Bhawanigarh-Kotshamir S2 36+170 Thermoplastic road marking (Stop Line) BHS Cum 3.00
114 Bhawanigarh-Kotshamir S2 36+170 Thermoplastic road marking (Triangle) BHS Sqm 2.76
115 Bhawanigarh-Kotshamir S2 36+170 Thermoplastic road marking (Rectangle) BHS Cum 5.50
116 Bhawanigarh-Kotshamir S2 36+350 36+450 Thermoplastic road marking (Edge Line) BHS Sqm 30.00
117 Bhawanigarh-Kotshamir S2 36+400 Thermoplastic road marking (Stop Line) BHS Sqm 3.00
118 Bhawanigarh-Kotshamir S2 36+350 Thermoplastic road marking (Rumbles) BHS Sqm 9.60
119 Bhawanigarh-Kotshamir S2 36+400 Thermoplastic road marking (Rectangle) BHS Sqm 5.50
120 Bhawanigarh-Kotshamir S2 36+400 Thermoplastic road marking (Triangle) BHS Sqm 2.76
121 Bhawanigarh-Kotshamir S2 36+840 36+940 Thermoplastic road marking (Edge Line) RHS Sqm 15.00
122 Bhawanigarh-Kotshamir S2 36+860 36+945 Thermoplastic road marking (Edge Line) LHS Sqm 12.75
123 Bhawanigarh-Kotshamir S2 36+870 Thermoplastic road marking (Stop Line) BHS Sqm 3.00
124 Bhawanigarh-Kotshamir S2 36+870 Thermoplastic road marking (H Block) BHS Sqm 5.50
125 Bhawanigarh-Kotshamir S2 36+870 Thermoplastic road marking (Triangle) BHS Sqm 2.76
126 Bhawanigarh-Kotshamir S2 29+850 29+920 Thermoplastic road marking (Edge Line) RHS Sqm 10.50
127 Bhawanigarh-Kotshamir S2 8+020 8+030 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
128 Bhawanigarh-Kotshamir S2 9+900 Thermoplastic road marking (Zebra) BHS Sqm 12.60
129 Bhawanigarh-Kotshamir S2 9+945 10+005 Thermoplastic road marking (Edge Line) RHS Cum 9.00
130 Bhawanigarh-Kotshamir S2 9+900 9+935 Thermoplastic road marking (Edge Line) RHS Sqm 5.25
131 Bhawanigarh-Kotshamir S2 9+870 9+890 Thermoplastic road marking (Edge Line) RHS Cum 3.00
132 Bhawanigarh-Kotshamir S2 9+900 Thermoplastic road marking (Stop Line) BHS Sqm 1.50
133 Bhawanigarh-Kotshamir S2 9+500 Thermoplastic road marking (Zebra) RHS Sqm 1.80
134 Bhawanigarh-Kotshamir S2 9+500 36+210 Thermoplastic road marking (Stop Line) BHS Sqm 1.50
135 Bhawanigarh-Kotshamir S2 9+520 9+550 Thermoplastic road marking (Continues) Center Sqm 2.50
136 Bhawanigarh-Kotshamir S2 8+330 8+335 Thermoplastic road marking (Edge Line) RHS Sqm 0.75
137 Bhawanigarh-Kotshamir S2 8+327 8+330 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
138 Bhawanigarh-Kotshamir S2 8+305 8+320 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
139 Bhawanigarh-Kotshamir S2 8+285 8+300 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
140 Bhawanigarh-Kotshamir S2 6+550 Thermoplastic road marking (Zebra) BHS Sqm 3.60
141 Bhawanigarh-Kotshamir S2 8+255 8+270 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
142 Bhawanigarh-Kotshamir S2 8+247 8+250 Thermoplastic road marking (Edge Line) RHS Sqm 0.45
143 Bhawanigarh-Kotshamir S2 8+190 8+215 Thermoplastic road marking (Edge Line) RHS Sqm 3.75
144 Bhawanigarh-Kotshamir S2 8+170 8+180 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
145 Bhawanigarh-Kotshamir S2 8+135 8+145 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
146 Bhawanigarh-Kotshamir S2 8+040 8+090 Thermoplastic road marking (Edge Line) RHS Sqm 7.50
147 Bhawanigarh-Kotshamir S2 7+990 8+005 Thermoplastic road marking (Edge Line) RHS Sqm 2.25
148 Bhawanigarh-Kotshamir S2 7+745 7+755 Thermoplastic road marking (Edge Line) RHS Cum 1.50
149 Bhawanigarh-Kotshamir S2 7+480 7+580 Thermoplastic road marking (Edge Line) RHS Sqm 15.00
150 Bhawanigarh-Kotshamir S2 7+450 7+460 Thermoplastic road marking (Edge Line) RHS Sqm 1.50
151 Bhawanigarh-Kotshamir S2 7+370 7+380 Thermoplastic road marking (Edge Line) RHS Cum 1.50
152 Bhawanigarh-Kotshamir S2 7+435 7+440 Thermoplastic road marking (Edge Line) RHS Cum 0.75
153 Bhawanigarh-Kotshamir S2 6+595 6+605 Thermoplastic road marking (Edge Line) RHS Cum 1.50
154 Bhawanigarh-Kotshamir S2 6+180 6+190 Thermoplastic road marking (Edge Line) LHS Cum 1.50
155 Bhawanigarh-Kotshamir S2 6+145 6+170 Thermoplastic road marking (Edge Line) LHS Cum 3.75
156 Bhawanigarh-Kotshamir S2 2+420 2+540 Thermoplastic road marking (Edge Line) RHS Cum 16.50
157 Bhawanigarh-Kotshamir S2 64+000 Thermoplastic road marking (Junction) RHS Cum 9.75
158 Bhawanigarh-Kotshamir S2 67+850 Thermoplastic road marking (Round about) Center Cum 15.00
159 Bhawanigarh-Kotshamir S2 6+550 Thermoplastic road marking (Stop Line) BHS Cum 1.05
160 Bhawanigarh-Kotshamir S2 108+715 108+740 Thermoplastic road marking (Kerb Line) BHS Cum 7.50
161 Bhawanigarh-Kotshamir S2 100+410 101+080 Thermoplastic road marking (Center Line) Center Cum 18.60
162 Bhawanigarh-Kotshamir S2 100+500 100+667 Thermoplastic road marking (Center Line) Center Cum 16.70
163 Bhawanigarh-Kotshamir S2 100+400 100+953 Thermoplastic road marking (Edge Line) RHS Sqm 82.95
164 Bhawanigarh-Kotshamir S2 100+953 101+100 Thermoplastic road marking (Edge Line) RHS Sqm 22.05
165 Bhawanigarh-Kotshamir S2 100+400 101+100 Thermoplastic road marking (Edge Line) LHS Sqm 105.00
166 Bhawanigarh-Kotshamir S2 86+990 87+020 Thermoplastic road marking (Rumbles) BHS Sqm 25.20
167 Bhawanigarh-Kotshamir S2 87+020 87+120 Thermoplastic road marking (Zigzag Marking) Center Sqm 10.00
168 Bhawanigarh-Kotshamir S2 87+120 87+150 Thermoplastic road marking (Rumbles) BHS Sqm 25.20
169 Bhawanigarh-Kotshamir S2 86+990 87+020 Thermoplastic road marking (Continue Center Line) Center Sqm 3.00
170 Bhawanigarh-Kotshamir S2 87+120 87+150 Thermoplastic road marking (Continue Center Line) Center Sqm 3.00
171 Bhawanigarh-Kotshamir S2 65+400 65+420 Water based marking (Edge line) LHS Sqm
172 Bhawanigarh-Kotshamir S2 65+415 65+460 Water based marking (Edge line) RHS Sqm
173 Bhawanigarh-Kotshamir S2 65+480 65+507 Water based marking (Edge line) RHS Sqm
174 Bhawanigarh-Kotshamir S2 65+510 65+517 Water based marking (Edge line) RHS Sqm
175 Bhawanigarh-Kotshamir S2 65+620 65+632 Water based marking (Edge line) RHS Sqm
176 Bhawanigarh-Kotshamir S2 65+640 65+695 Water based marking (Edge line) RHS Cum
177 Bhawanigarh-Kotshamir S2 65+705 65+787 Water based marking (Edge line) RHS Cum
178 Bhawanigarh-Kotshamir S2 65+805 65+830 Water based marking (Edge line) RHS Sqm
179 Bhawanigarh-Kotshamir S2 65+840 65+841 Water based marking (Edge line) RHS Sqm
180 Bhawanigarh-Kotshamir S2 65+850 65+856 Water based marking (Edge line) RHS Sqm
181 Bhawanigarh-Kotshamir S2 65+860 65+887 Water based marking (Edge line) RHS Sqm
182 Bhawanigarh-Kotshamir S2 65+890 65+916 Water based marking (Edge line) RHS Sqm
183 Bhawanigarh-Kotshamir S2 66+310 66+322 Water based marking (Edge line) RHS Sqm
184 Bhawanigarh-Kotshamir S2 66+350 66+358 Water based marking (Edge line) RHS Sqm
185 Bhawanigarh-Kotshamir S2 66+360 66+365 Water based marking (Edge line) RHS Sqm
186 Bhawanigarh-Kotshamir S2 66+367 66+379 Water based marking (Edge line) RHS Sqm
187 Bhawanigarh-Kotshamir S2 66+382 66+392 Water based marking (Edge line) RHS Sqm
188 Bhawanigarh-Kotshamir S2 66+610 66+618 Water based marking (Edge line) RHS Sqm
189 Bhawanigarh-Kotshamir S2 66+620 66+622 Water based marking (Edge line) RHS Sqm
190 Bhawanigarh-Kotshamir S2 66+625 66+631 Water based marking (Edge line) RHS Sqm
191 Bhawanigarh-Kotshamir S2 66+750 66+772 Water based marking (Edge line) RHS Sqm
192 Bhawanigarh-Kotshamir S2 66+775 66+791 Water based marking (Edge line) RHS Sqm
193 Bhawanigarh-Kotshamir S2 66+795 66+811 Water based marking (Edge line) RHS Sqm
194 Bhawanigarh-Kotshamir S2 66+812 66+820 Water based marking (Edge line) RHS Sqm
195 Bhawanigarh-Kotshamir S2 66+822 66+840 Water based marking (Edge line) RHS Sqm
196 Bhawanigarh-Kotshamir S2 66+860 66+875 Water based marking (Edge line) RHS Sqm
197 Bhawanigarh-Kotshamir S2 66+880 66+891 Water based marking (Edge line) RHS Sqm
198 Bhawanigarh-Kotshamir S2 28+190 28+227 Water based marking (Edge line) RHS Sqm
199 Bhawanigarh-Kotshamir S2 28+250 28+285 Water based marking (Edge line) LHS Sqm
200 Bhawanigarh-Kotshamir S2 28+060 28+099 Water based marking (Edge line) LHS Cum
201 Bhawanigarh-Kotshamir S2 28+020 28+031 Water based marking (Edge line) LHS Cum
202 Bhawanigarh-Kotshamir S2 27+900 27+914 Water based marking (Edge line) LHS Cum
203 Bhawanigarh-Kotshamir S2 27+530 27+551 Water based marking (Edge line) RHS Cum
204 Bhawanigarh-Kotshamir S2 27+360 27+409 Water based marking (Edge line) RHS Sqm
205 Bhawanigarh-Kotshamir S2 27+250 27+292 Water based marking (Edge line) LHS Sqm
206 Bhawanigarh-Kotshamir S2 26+300 26+350 Water based marking (Center line) RHS Sqm
207 Bhawanigarh-Kotshamir S2 26+300 26+350 Water based marking (Center line) LHS Sqm
208 Bhawanigarh-Kotshamir S2 26+270 26+328 Water based marking (Edge line) RHS Sqm
209 Bhawanigarh-Kotshamir S2 26+200 26+273 Water based marking (Edge line) LHS Sqm
210 Bhawanigarh-Kotshamir S2 26+040 26+065 Water based marking (Edge line) LHS Sqm
211 Bhawanigarh-Kotshamir S2 26+010 26+022 Water based marking (Edge line) LHS Sqm
212 Bhawanigarh-Kotshamir S2 25+990 26+001 Water based marking (Edge line) LHS Sqm
213 Bhawanigarh-Kotshamir S2 26+930 - Water based marking (Edge line) LHS Sqm
214 Bhawanigarh-Kotshamir S2 25+900 25+908 Water based marking (Edge line) LHS Sqm
215 Bhawanigarh-Kotshamir S2 25+800 25+900 Water based marking (Center line) LHS Sqm
216 Bhawanigarh-Kotshamir S2 25+900 25+950 Water based marking (Center line) RHS Sqm
217 Bhawanigarh-Kotshamir S2 25+910 25+935 Water based marking (Edge line) RHS Sqm
218 Bhawanigarh-Kotshamir S2 24+580 - Water based marking (Edge line) LHS Sqm
219 Bhawanigarh-Kotshamir S2 24+560 24+566 Water based marking (Edge line) LHS Sqm
220 Bhawanigarh-Kotshamir S2 24+470 24+500 Water based marking (Edge line) RHS Sqm
221 Bhawanigarh-Kotshamir S2 24+500 24+521 Water based marking (Center line) RHS Sqm
222 Bhawanigarh-Kotshamir S2 24+030 24+058 Water based marking (Edge line) RHS Sqm
223 Bhawanigarh-Kotshamir S2 67+460 67+602 Water based marking (Edge line) RHS Sqm
224 Bhawanigarh-Kotshamir S2 67+750 67+756 Water based marking (Edge line) LHS Sqm
225 Bhawanigarh-Kotshamir S2 67+800 67+813 Water based marking (Edge line) RHS Sqm
226 Bhawanigarh-Kotshamir S2 68+030 68+034 Water based marking (Edge line) RHS Sqm
227 Bhawanigarh-Kotshamir S2 68+410 68+423 Water based marking (Edge line) LHS Sqm
228 Bhawanigarh-Kotshamir S2 68+450 68+468 Water based marking (Edge line) RHS Sqm
229 Bhawanigarh-Kotshamir S2 68+430 68+440 Water based marking (Edge line) LHS Sqm
230 Bhawanigarh-Kotshamir S2 68+620 68+632 Water based marking (Edge line) RHS Sqm
231 Bhawanigarh-Kotshamir S2 68+630 68+640 Water based marking (Edge line) LHS Sqm
232 Bhawanigarh-Kotshamir S2 68+970 68+986 Water based marking (Edge line) LHS Sqm
233 Bhawanigarh-Kotshamir S2 69+000 69+011 Water based marking (Edge line) LHS Cum
234 Bhawanigarh-Kotshamir S2 69+030 69+046 Water based marking (Edge line) LHS Cum
235 Bhawanigarh-Kotshamir S2 69+050 69+060 Water based marking (Edge line) RHS Cum
236 Bhawanigarh-Kotshamir S2 69+070 69+072 Water based marking (Edge line) RHS Sqm
237 Bhawanigarh-Kotshamir S2 69+075 69+077 Water based marking (Edge line) RHS Sqm
238 Bhawanigarh-Kotshamir S2 69+080 69+094 Water based marking (Edge line) RHS Sqm
239 Bhawanigarh-Kotshamir S2 69+300 69+306 Water based marking (Edge line) LHS Sqm
240 Bhawanigarh-Kotshamir S2 69+350 69+369 Water based marking (Edge line) LHS Sqm
241 Bhawanigarh-Kotshamir S2 69+400 69+415 Water based marking (Edge line) LHS Sqm
242 Bhawanigarh-Kotshamir S2 69+450 69+456 Water based marking (Edge line) LHS Sqm
243 Bhawanigarh-Kotshamir S2 69+570 69+574 Water based marking (Edge line) LHS Sqm
244 Bhawanigarh-Kotshamir S2 69+590 69+602 Water based marking (Edge line) LHS Sqm
245 Bhawanigarh-Kotshamir S2 69+620 69+626 Water based marking (Edge line) LHS Sqm
246 Bhawanigarh-Kotshamir S2 69+640 69+654 Water based marking (Edge line) LHS Sqm
247 Bhawanigarh-Kotshamir S2 69+670 69+678 Water based marking (Edge line) LHS Sqm
248 Bhawanigarh-Kotshamir S2 69+680 69+691 Water based marking (Edge line) LHS Sqm
249 Bhawanigarh-Kotshamir S2 69+700 69+704 Water based marking (Edge line) LHS Sqm
250 Bhawanigarh-Kotshamir S2 69+710 69+713 Water based marking (Edge line) LHS Cum
251 Bhawanigarh-Kotshamir S2 69+768 69+800 Water based marking (Edge line) LHS Cum
252 Bhawanigarh-Kotshamir S2 69+802 69+814 Water based marking (Edge line) LHS Cum
253 Bhawanigarh-Kotshamir S2 69+825 69+873 Water based marking (Edge line) LHS Sqm
254 Bhawanigarh-Kotshamir S2 69+875 69+887 Water based marking (Edge line) LHS Sqm
255 Bhawanigarh-Kotshamir S2 69+890 69+895 Water based marking (Edge line) LHS Sqm
256 Bhawanigarh-Kotshamir S2 69+910 69+912 Water based marking (Edge line) LHS Sqm
257 Bhawanigarh-Kotshamir S2 69+920 69+952 Water based marking (Edge line) LHS Sqm
258 Bhawanigarh-Kotshamir S2 69+970 69+989 Water based marking (Edge line) LHS Sqm
259 Bhawanigarh-Kotshamir S2 69+900 69+912 Water based marking (Edge line) RHS Sqm
260 Bhawanigarh-Kotshamir S2 69+890 69+896 Water based marking (Edge line) RHS Cum
261 Bhawanigarh-Kotshamir S2 69+888 69+890 Water based marking (Edge line) RHS Sqm
262 Bhawanigarh-Kotshamir S2 69+840 69+857 Water based marking (Edge line) RHS Cum
263 Bhawanigarh-Kotshamir S2 69+830 69+834 Water based marking (Edge line) RHS Sqm
264 Bhawanigarh-Kotshamir S2 69+750 69+810 Water based marking (Edge line) RHS Cum
265 Bhawanigarh-Kotshamir S2 69+735 69+745 Water based marking (Edge line) RHS Sqm
266 Bhawanigarh-Kotshamir S2 69+720 69+727 Water based marking (Edge line) RHS Sqm
267 Bhawanigarh-Kotshamir S2 69+700 69+702 Water based marking (Edge line) RHS Sqm
268 Bhawanigarh-Kotshamir S2 69+595 69+601 Water based marking (Edge line) RHS Sqm
269 Bhawanigarh-Kotshamir S2 69+570 69+575 Water based marking (Edge line) RHS Sqm
270 Bhawanigarh-Kotshamir S2 69+565 69+567 Water based marking (Edge line) RHS Sqm
271 Bhawanigarh-Kotshamir S2 69+555 69+559 Water based marking (Edge line) RHS Sqm
272 Bhawanigarh-Kotshamir S2 69+580 - Water based marking (Zebra) BHS Sqm
273 Bhawanigarh-Kotshamir S2 69+580 - Water based marking (Stop line) LHS Sqm
274 Bhawanigarh-Kotshamir S2 67+493 67+600 Water based marking (Edge line) RHS Sqm
275 Bhawanigarh-Kotshamir S2 15+035 15+039 Water based marking (Edge line) LHS Sqm
276 Bhawanigarh-Kotshamir S2 15+350 15+354 Water based marking (Edge line) LHS Sqm
277 Bhawanigarh-Kotshamir S2 15+345 15+347 Water based marking (Edge line) LHS Sqm
278 Bhawanigarh-Kotshamir S2 15+430 15+436 Water based marking (Edge line) RHS Sqm
279 Bhawanigarh-Kotshamir S2 15+500 15+509 Water based marking (Edge line) LHS Sqm
280 Bhawanigarh-Kotshamir S2 15+550 15+577 Water based marking (Edge line) RHS Sqm
281 Bhawanigarh-Kotshamir S2 15+585 15+589 Water based marking (Edge line) RHS Sqm
282 Bhawanigarh-Kotshamir S2 15+800 15+808 Water based marking (Edge line) LHS Sqm
283 Bhawanigarh-Kotshamir S2 15+870 15+876 Water based marking (Edge line) RHS Cum
284 Bhawanigarh-Kotshamir S2 15+880 15+886 Water based marking (Edge line) RHS Sqm
285 Bhawanigarh-Kotshamir S2 15+890 15+900 Water based marking (Edge line) RHS Cum
286 Bhawanigarh-Kotshamir S2 15+880 15+890 Water based marking (Edge line) LHS Sqm
287 Bhawanigarh-Kotshamir S2 15+940 15+949 Water based marking (Edge line) LHS Sqm
288 Bhawanigarh-Kotshamir S2 15+940 15+947 Water based marking (Edge line) RHS Sqm
289 Bhawanigarh-Kotshamir S2 15+995 16+013 Water based marking (Edge line) RHS Sqm
290 Bhawanigarh-Kotshamir S2 16+050 16+059 Water based marking (Edge line) LHS Sqm
291 Bhawanigarh-Kotshamir S2 16+220 16+235 Water based marking (Edge line) LHS Sqm
292 Bhawanigarh-Kotshamir S2 16+250 16+260 Water based marking (Edge line) LHS Cum
293 Bhawanigarh-Kotshamir S2 16+320 16+326 Water based marking (Edge line) LHS Sqm
294 Bhawanigarh-Kotshamir S2 16+310 16+321 Water based marking (Edge line) RHS Cum
295 Bhawanigarh-Kotshamir S2 16+350 16+353 Water based marking (Edge line) RHS Cum
296 Bhawanigarh-Kotshamir S2 16+380 16+384 Water based marking (Edge line) RHS Cum
297 Bhawanigarh-Kotshamir S2 16+500 16+511 Water based marking (Edge line) RHS Cum
298 Bhawanigarh-Kotshamir S2 16+600 16+609 Water based marking (Edge line) RHS Sqm
299 Bhawanigarh-Kotshamir S2 16+840 16+847 Water based marking (Edge line) RHS Sqm
300 Bhawanigarh-Kotshamir S2 16+850 16+858 Water based marking (Edge line) RHS Sqm
301 Bhawanigarh-Kotshamir S2 16+940 16+963 Water based marking (Edge line) RHS Sqm
302 Bhawanigarh-Kotshamir S2 16+980 16+985 Water based marking (Edge line) RHS Sqm
303 Bhawanigarh-Kotshamir S2 17+010 17+033 Water based marking (Edge line) LHS Sqm
304 Bhawanigarh-Kotshamir S2 17+170 17+190 Water based marking (Edge line) RHS Sqm
305 Bhawanigarh-Kotshamir S2 17+192 17+199 Water based marking (Edge line) RHS Sqm
306 Bhawanigarh-Kotshamir S2 17+200 17+203 Water based marking (Edge line) LHS Cum
307 Bhawanigarh-Kotshamir S2 17+205 17+220 Water based marking (Edge line) LHS Sqm
308 Bhawanigarh-Kotshamir S2 17+225 17+229 Water based marking (Edge line) LHS Sqm
309 Bhawanigarh-Kotshamir S2 17+270 17+286 Water based marking (Edge line) RHS Sqm
310 Bhawanigarh-Kotshamir S2 17+290 17+315 Water based marking (Edge line) RHS Sqm
311 Bhawanigarh-Kotshamir S2 17+330 17+334 Water based marking (Edge line) RHS Sqm
312 Bhawanigarh-Kotshamir S2 17+350 17+361 Water based marking (Edge line) RHS Sqm
313 Bhawanigarh-Kotshamir S2 17+380 17+403 Water based marking (Edge line) RHS Sqm
314 Bhawanigarh-Kotshamir S2 17+410 17+412 Water based marking (Edge line) RHS Sqm
315 Bhawanigarh-Kotshamir S2 17+420 17+450 Water based marking (Edge line) RHS Sqm
316 Bhawanigarh-Kotshamir S2 17+520 17+539 Water based marking (Edge line) RHS Sqm
317 Bhawanigarh-Kotshamir S2 17+560 17+587 Water based marking (Edge line) RHS Sqm
318 Bhawanigarh-Kotshamir S2 17+590 17+592 Water based marking (Edge line) RHS Sqm
319 Bhawanigarh-Kotshamir S2 17+600 17+640 Water based marking (Edge line) LHS Sqm
320 Bhawanigarh-Kotshamir S2 17+650 17+654 Water based marking (Edge line) RHS Sqm
321 Bhawanigarh-Kotshamir S2 17+680 17+687 Water based marking (Edge line) RHS Sqm
322 Bhawanigarh-Kotshamir S2 17+720 17+730 Water based marking (Edge line) RHS Sqm
323 Bhawanigarh-Kotshamir S2 17+700 17+723 Water based marking (Edge line) LHS Sqm
324 Bhawanigarh-Kotshamir S2 17+730 17+748 Water based marking (Edge line) LHS Sqm
325 Bhawanigarh-Kotshamir S2 17+740 17+753 Water based marking (Edge line) RHS Sqm
326 Bhawanigarh-Kotshamir S2 17+760 17+770 Water based marking (Edge line) RHS Sqm
327 Bhawanigarh-Kotshamir S2 17+770 17+780 Water based marking (Edge line) LHS Sqm
328 Bhawanigarh-Kotshamir S2 17+810 17+824 Water based marking (Edge line) RHS Sqm
329 Bhawanigarh-Kotshamir S2 17+830 17+845 Water based marking (Edge line) RHS Sqm
330 Bhawanigarh-Kotshamir S2 17+860 17+871 Water based marking (Edge line) RHS Sqm
331 Bhawanigarh-Kotshamir S2 17+874 17+895 Water based marking (Edge line) RHS Sqm
332 Bhawanigarh-Kotshamir S2 17+910 17+924 Water based marking (Edge line) RHS Sqm
333 Bhawanigarh-Kotshamir S2 17+940 17+950 Water based marking (Edge line) RHS Sqm
334 Bhawanigarh-Kotshamir S2 17+960 17+964 Water based marking (Edge line) RHS Sqm
335 Bhawanigarh-Kotshamir S2 17+970 17+984 Water based marking (Edge line) RHS Sqm
336 Bhawanigarh-Kotshamir S2 17+990 17+995 Water based marking (Edge line) RHS Sqm
337 Bhawanigarh-Kotshamir S2 18+000 18+125 Water based marking (Edge line) RHS Sqm
338 Bhawanigarh-Kotshamir S2 18+120 18+126 Water based marking (Edge line) LHS Sqm
339 Bhawanigarh-Kotshamir S2 18+090 18+112 Water based marking (Edge line) LHS Sqm
340 Bhawanigarh-Kotshamir S2 18+400 18+465 Water based marking (Edge line) RHS Sqm
APPENDIX-J
From To
1 Barnala-Mansa S3 185+810 185+820 Thermoplastic road marking (Edge line) RHS Sqm 1.50
2 Barnala-Mansa S3 185+845 185+857 Thermoplastic road marking (Edge line) RHS Sqm 1.80
3 Barnala-Mansa S3 185+835 Thermoplastic road marking (Junction) RHS Sqm 8.70
4 Barnala-Mansa S3 185+760 Thermoplastic road marking (Stop line) BHS Sqm 2.10
5 Barnala-Mansa S3 185+735 185+769 Thermoplastic road marking (Edge line) LHS Sqm 5.10
6 Barnala-Mansa S3 185+745 Thermoplastic road marking (Junction) RHS Sqm 8.70
7 Barnala-Mansa S3 185+603 185+640 Thermoplastic road marking (Edge line) RHS Sqm 5.55
8 Barnala-Mansa S3 185+430 Thermoplastic road marking (Stop line) BHS Sqm 2.10
9 Barnala-Mansa S3 185+100 Thermoplastic road marking (Stop line) BHS Sqm 2.10
10 Barnala-Mansa S3 184+874 184+908 Thermoplastic road marking (Edge line) LHS Sqm 5.10
11 Barnala-Mansa S3 184+850 Thermoplastic road marking (Junction) LHS Sqm 11.10
12 Barnala-Mansa S3 184+828 184+841 Thermoplastic road marking (Edge line) LHS Sqm 1.95
13 Barnala-Mansa S3 184+840 Thermoplastic road marking (Stop line) BHS Sqm 2.10
14 Barnala-Mansa S3 183+000 Thermoplastic road marking (Junction) RHS Sqm 6.15
15 Barnala-Mansa S3 184+880 Thermoplastic road marking (Stop line) BHS Sqm 2.10
16 Barnala-Mansa S3 184+800 Thermoplastic road marking (Junction) RHS Sqm 12.00
17 Barnala-Mansa S3 184+431 184+470 Thermoplastic road marking (Edge line) RHS Sqm 5.85
18 Barnala-Mansa S3 184+445 184+467 Thermoplastic road marking (Kerb line) LHS Sqm 3.30
19 Barnala-Mansa S3 184+610 Thermoplastic road marking (Junction) LHS Sqm 9.75
20 Barnala-Mansa S3 184+590 Thermoplastic road marking (Junction) LHS Sqm 7.50
21 Barnala-Mansa S3 184+010 Thermoplastic road marking (Junction) RHS Sqm 6.90
22 Barnala-Mansa S3 183+820 Thermoplastic road marking (Junction) RHS Sqm 8.70
23 Barnala-Mansa S3 183+835 Thermoplastic road marking (Stop line) BHS Sqm 2.10
24 Barnala-Mansa S3 183+670 183+693 Thermoplastic road marking (Kerb line) LHS Sqm 3.45
ROAD MARKING MAINTENANCE (September-2017)
S. No Road Name
Location
Description of Work Side Unit Qty. in Sqm Remarks
25 Barnala-Mansa S3 183+230 183+260 Thermoplastic road marking (Kerb line) LHS Sqm 4.50
26 Barnala-Mansa S3 183+230 183+260 Thermoplastic road marking (Kerb line) RHS Sqm 4.50
27 Barnala-Mansa S3 183+200 Thermoplastic road marking (Junction) RHS Sqm 9.00
28 Barnala-Mansa S3 183+090 Thermoplastic road marking (Junction) RHS Sqm 6.30
29 Barnala-Mansa S3 189+835 Thermoplastic road marking (Junction) LHS Sqm 6.60
30 Barnala-Mansa S3 189+870 Thermoplastic road marking (Junction) LHS Sqm 8.10
31 Barnala-Mansa S3 189+779 189+817 Thermoplastic road marking (Edge line) LHS Sqm 5.70
32 Barnala-Mansa S3 189+970 Thermoplastic road marking (Stop line) BHS Sqm 2.10
33 Barnala-Mansa S3 189+617 189+639 Thermoplastic road marking (Edge line) LHS Sqm 3.30
34 Barnala-Mansa S3 189+590 Thermoplastic road marking (Junction) LHS Sqm 8.55
35 Barnala-Mansa S3 189+557 189+570 Thermoplastic road marking (Edge line) LHS Sqm 1.95
36 Barnala-Mansa S3 189+505 189+530 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
37 Barnala-Mansa S3 189+505 189+530 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
38 Barnala-Mansa S3 189+490 189+518 Thermoplastic road marking (Edge line) LHS Sqm 4.20
39 Barnala-Mansa S3 189+470 Thermoplastic road marking (Junction) LHS Sqm 7.20
40 Barnala-Mansa S3 189+439 189+462 Thermoplastic road marking (Edge line) LHS Sqm 3.45
41 Barnala-Mansa S3 189+190 Thermoplastic road marking (Stop line) BHS Sqm 2.10
42 Barnala-Mansa S3 188+990 189+003 Thermoplastic road marking (Edge line) LHS Sqm 1.95
43 Barnala-Mansa S3 189+010 Thermoplastic road marking (Junction) LHS Sqm 9.00
44 Barnala-Mansa S3 189+026 189+090 Thermoplastic road marking (Edge line) LHS Sqm 9.60
45 Barnala-Mansa S3 189+095 Thermoplastic road marking (Junction) LHS Sqm 6.75
46 Barnala-Mansa S3 189+110 189+128 Thermoplastic road marking (Edge line) LHS Sqm 2.70
47 Barnala-Mansa S3 189+085 189+110 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
48 Barnala-Mansa S3 189+085 189+110 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
49 Barnala-Mansa S3 189+124 189+143 Thermoplastic road marking (Edge line) RHS Sqm 2.85
50 Barnala-Mansa S3 189+150 Thermoplastic road marking (Junction) RHS Sqm 5.10
51 Barnala-Mansa S3 189+165 189+189 Thermoplastic road marking (Edge line) RHS Sqm 3.60
52 Barnala-Mansa S3 189+040 Thermoplastic road marking (Junction) RHS Sqm 6.00
53 Barnala-Mansa S3 189+090 Thermoplastic road marking (Stop line) BHS Sqm 2.10
54 Barnala-Mansa S3 188+813 188+837 Thermoplastic road marking (Edge line) LHS Sqm 3.60
55 Barnala-Mansa S3 188+800 Thermoplastic road marking (Junction) LHS Sqm 10.65
56 Barnala-Mansa S3 188+733 188+778 Thermoplastic road marking (Edge line) LHS Sqm 6.75
57 Barnala-Mansa S3 188+730 Thermoplastic road marking (Junction) LHS Sqm 6.00
58 Barnala-Mansa S3 188+719 188+746 Thermoplastic road marking (Edge line) LHS Sqm 4.05
59 Barnala-Mansa S3 188+772 188+797 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
60 Barnala-Mansa S3 188+772 188+797 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
61 Barnala-Mansa S3 188+540 188+565 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
62 Barnala-Mansa S3 188+540 188+565 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
63 Barnala-Mansa S3 188+428 188+495 Thermoplastic road marking (Edge line) RHS Sqm 10.05
64 Barnala-Mansa S3 188+330 188+355 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
65 Barnala-Mansa S3 188+330 188+355 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
66 Barnala-Mansa S3 188+290 Thermoplastic road marking (Junction) RHS Sqm 9.15
67 Barnala-Mansa S3 188+309 188+328 Thermoplastic road marking (Edge line) RHS Sqm 2.85
68 Barnala-Mansa S3 188+200 Thermoplastic road marking (Junction) RHS Sqm 5.55
69 Barnala-Mansa S3 188+184 188+193 Thermoplastic road marking (Edge line) RHS Sqm 1.35
70 Barnala-Mansa S3 188+211 188+216 Thermoplastic road marking (Edge line) RHS Sqm 0.75
71 Barnala-Mansa S3 188+180 Thermoplastic road marking (Stop line) RHS Sqm 2.10
72 Barnala-Mansa S3 187+702 187+732 Thermoplastic road marking (Edge line) RHS Sqm 4.50
73 Barnala-Mansa S3 187+640 187+675 Thermoplastic road marking (Kerb line) RHS Sqm 5.25
74 Barnala-Mansa S3 187+640 187+720 Thermoplastic road marking (Kerb line) LHS Sqm 12.00
75 Barnala-Mansa S3 187+666 187+720 Thermoplastic road marking (Center line) Center Sqm 2.70
76 Barnala-Mansa S3 187+666 187+720 Thermoplastic road marking (Center line) Center Sqm 3.15
77 Barnala-Mansa S3 187+660 187+740 Thermoplastic road marking (Edge line) LHS Sqm 12.00
78 Barnala-Mansa S3 189+090 Thermoplastic road marking (Zebra) BHS Sqm 21.60
79 Barnala-Mansa S3 188+180 Thermoplastic road marking (Stop line) LHS Sqm 1.05
80 Barnala-Mansa S3 188+170 188+180 Thermoplastic road marking (Edge line) LHS Sqm 1.50
81 Barnala-Mansa S3 188+160 Thermoplastic road marking (Junction) LHS Sqm 7.05
82 Barnala-Mansa S3 188+105 188+136 Thermoplastic road marking (Edge line) LHS Sqm 4.65
83 Barnala-Mansa S3 187+983 187+990 Thermoplastic road marking (Edge line) LHS Sqm 1.05
84 Barnala-Mansa S3 187+980 Thermoplastic road marking (Junction) LHS Sqm 4.50
85 Barnala-Mansa S3 187+959 187+972 Thermoplastic road marking (Edge line) LHS Sqm 1.95
86 Barnala-Mansa S3 188+000 Thermoplastic road marking (Stop line) BHS Sqm 2.10
87 Barnala-Mansa S3 187+900 Thermoplastic road marking (Junction) RHS Sqm 10.35
88 Barnala-Mansa S3 187+817 187+842 Thermoplastic road marking (Kerb line) LHS Sqm 3.75
89 Barnala-Mansa S3 187+817 187+842 Thermoplastic road marking (Kerb line) RHS Sqm 3.75
90 Barnala-Mansa S3 187+830 Thermoplastic road marking (Junction) LHS Sqm 6.75
91 Barnala-Mansa S3 187+780 Thermoplastic road marking (Junction) LHS Sqm 7.50
92 Barnala-Mansa S3 187+725 Thermoplastic road marking (Junction) RHS Sqm 7.50
93 Barnala-Mansa S3 183+090 - Thermoplastic road marking (Zebra line) BHS Sqm 21.60
94 Barnala-Mansa S3 183+090 - Thermoplastic road marking (Stop line) BHS Sqm 2.10
95 Barnala-Mansa S3 182+790 - Thermoplastic road marking (Zebra line) BHS Sqm 18.00
96 Barnala-Mansa S3 182+790 - Thermoplastic road marking (Stop line) RHS Sqm 1.05
97 Barnala-Mansa S3 182+790 182+800 Thermoplastic road marking (Edge line) RHS Sqm 1.50
98 Barnala-Mansa S3 182+910 182+935 Thermoplastic road marking (Kerb Edge line) BHS Sqm 7.50
99 Barnala-Mansa S3 189+940 189+984 Thermoplastic road marking (Edge Line) RHS Sqm 6.60
100 Barnala-Mansa S3 189+990 Thermoplastic road marking (Junction) LHS Sqm 8.70
101 Barnala-Mansa S3 189+990 Thermoplastic road marking (Chevron) Center Sqm 4.20
102 Barnala-Mansa S3 189+960 189+990 Thermoplastic road marking (Center Line) Center Sqm 1.80
103 Barnala-Mansa S3 189+940 - Thermoplastic road marking (Rumble) RHS Sqm 23.22
104 Barnala-Mansa S3 190+000 - Thermoplastic road marking (Rumble) RHS Sqm 23.22
105 Barnala-Mansa S3 189+990 - Thermoplastic road marking (Triangle) BHS Sqm 4.14
106 Barnala-Mansa S3 189+990 - Thermoplastic road marking (H) BHS Sqm 11.00
107 Barnala-Mansa S3 189+940 - Thermoplastic road marking (Zig Zag) LHS Sqm 1.20
108 Barnala-Mansa S3 190+000 - Thermoplastic road marking (Zig Zag) BHS Sqm 1.35
109 Barnala-Mansa S3 189+960 Thermoplastic road marking (Triangle) LHS Sqm 2.78
110 Barnala-Mansa S3 189+960 Thermoplastic road marking (Block) LHS Sqm 5.50
APPENDIX-J
ROAD MARKING MAINTENANCE (September-2017)
From To
1 Mansa-Talwandi Sabo S4 0+000 Water based marking (Triangle) RHS Sqm 1.80
2 Mansa-Talwandi Sabo S4 1+750 1+840 Water based marking (Block) BHS Sqm 37.80
3 Mansa-Talwandi Sabo S4 1+970 2+060 Water based marking (Edge line) BHS Sqm 37.80
4 Mansa-Talwandi Sabo S4 1+890 1+930 Water based marking (Edge line) Center Sqm 4.00
5 Mansa-Talwandi Sabo S4 1+750 1+880 Water based marking (Edge line) Center Sqm 12.00
6 Mansa-Talwandi Sabo S4 1+820 2+050 Water based marking (Edge line) Center Sqm 12.00
Qty. in Sqm RemarksS. No Road NameLocation
Description of Work Side Unit
APPENDIX-J
ROAD MARKING MAINTENANCE (September-2017)
From To
1 Dhanaula - Bhikhi S5 20+200 20+208 Water based marking (Edge line) RHS Sqm 0.8
2 Dhanaula - Bhikhi S5 20+240 20+241 Water based marking (Edge line) RHS Sqm 0.1
3 Dhanaula - Bhikhi S5 20+245 20+247 Water based marking (Edge line) RHS Sqm 0.2
4 Dhanaula - Bhikhi S5 20+250 20+253 Water based marking (Edge line) RHS Sqm 0.3
5 Dhanaula - Bhikhi S5 20+430 20+433 Water based marking (Edge line) RHS Sqm 0.3
6 Dhanaula - Bhikhi S5 20+450 20+452 Water based marking (Edge line) RHS Sqm 0.2
7 Dhanaula - Bhikhi S5 20+460 20+476 Water based marking (Edge line) RHS Sqm 1.6
8 Dhanaula - Bhikhi S5 20+630 20+635 Water based marking (Edge line) RHS Sqm 0.5
9 Dhanaula - Bhikhi S5 20+970 20+973 Water based marking (Edge line) RHS Sqm 0.3
10 Dhanaula - Bhikhi S5 20+975 20+978 Water based marking (Edge line) RHS Sqm 0.3
11 Dhanaula - Bhikhi S5 20+980 20+986 Water based marking (Edge line) RHS Sqm 0.6
12 Dhanaula - Bhikhi S5 20+988 21+000 Water based marking (Edge line) RHS Sqm 1.2
13 Dhanaula - Bhikhi S5 21+160 21+177 Water based marking (Edge line) RHS Sqm 1.7
14 Dhanaula - Bhikhi S5 21+179 21+180 Water based marking (Edge line) RHS Sqm 0.1
15 Dhanaula - Bhikhi S5 21+182 21+184 Water based marking (Edge line) RHS Sqm 0.2
16 Dhanaula - Bhikhi S5 21+185 21+187 Water based marking (Edge line) RHS Sqm 0.2
17 Dhanaula - Bhikhi S5 21+190 21+199 Water based marking (Edge line) RHS Sqm 0.9
18 Dhanaula - Bhikhi S5 21+200 21+209 Water based marking (Edge line) RHS Sqm 0.9
19 Dhanaula - Bhikhi S5 21+260 21+272 Water based marking (Edge line) RHS Sqm 1.2
20 Dhanaula - Bhikhi S5 21+280 21+285 Water based marking (Edge line) RHS Sqm 0.5
21 Dhanaula - Bhikhi S5 21+290 21+292 Water based marking (Edge line) RHS Sqm 0.2
22 Dhanaula - Bhikhi S5 21+295 21+298 Water based marking (Edge line) RHS Sqm 0.3
23 Dhanaula - Bhikhi S5 21+305 21+308 Water based marking (Edge line) RHS Sqm 0.3
24 Dhanaula - Bhikhi S5 21+315 21+319 Water based marking (Edge line) RHS Sqm 0.4
25 Dhanaula - Bhikhi S5 21+325 21+329 Water based marking (Edge line) RHS Sqm 0.4
Qty. in Sqm RemarksS.
NoRoad Name
LocationDescription of Work Side Unit
26 Dhanaula - Bhikhi S5 21+960 21+962 Water based marking (Edge line) RHS Sqm 0.2
27 Dhanaula - Bhikhi S5 22+410 22+412 Water based marking (Edge line) RHS Sqm 0.2
28 Dhanaula - Bhikhi S5 22+415 22+417 Water based marking (Edge line) RHS Sqm 0.2
29 Dhanaula - Bhikhi S5 22+460 22+466 Water based marking (Edge line) RHS Sqm 0.6
30 Dhanaula - Bhikhi S5 22+540 22+543 Water based marking (Edge line) RHS Sqm 0.3
31 Dhanaula - Bhikhi S5 22+560 22+565 Water based marking (Edge line) RHS Sqm 0.5
32 Dhanaula - Bhikhi S5 22+700 22+705 Water based marking (Edge line) RHS Sqm 0.5
33 Dhanaula - Bhikhi S5 22+710 22+712 Water based marking (Edge line) RHS Sqm 0.2
34 Dhanaula - Bhikhi S5 22+715 22+720 Water based marking (Edge line) RHS Sqm 0.5
35 Dhanaula - Bhikhi S5 22+730 22+732 Water based marking (Edge line) RHS Sqm 0.2
36 Dhanaula - Bhikhi S5 22+900 22+905 Water based marking (Edge line) RHS Sqm 0.5
37 Dhanaula - Bhikhi S5 22+920 22+925 Water based marking (Edge line) RHS Sqm 0.5
38 Dhanaula - Bhikhi S5 22+940 22+950 Water based marking (Edge line) RHS Sqm 1
39 Dhanaula - Bhikhi S5 22+980 22+998 Water based marking (Edge line) RHS Sqm 1.8
40 Dhanaula - Bhikhi S5 23+010 23+014 Water based marking (Edge line) RHS Sqm 0.4
41 Dhanaula - Bhikhi S5 23+030 23+037 Water based marking (Edge line) RHS Sqm 0.7
42 Dhanaula - Bhikhi S5 23+020 23+026 Water based marking (Edge line) RHS Sqm 0.6
43 Dhanaula - Bhikhi S5 23+040 23+042 Water based marking (Edge line) RHS Sqm 0.2
44 Dhanaula - Bhikhi S5 23+050 23+059 Water based marking (Edge line) RHS Sqm 0.9
45 Dhanaula - Bhikhi S5 23+060 23+067 Water based marking (Edge line) RHS Sqm 0.7
46 Dhanaula - Bhikhi S5 23+075 23+078 Water based marking (Edge line) RHS Sqm 0.3
47 Dhanaula - Bhikhi S5 23+080 23+082 Water based marking (Edge line) RHS Sqm 0.2
48 Dhanaula - Bhikhi S5 23+085 23+090 Water based marking (Edge line) RHS Sqm 0.5
49 Dhanaula - Bhikhi S5 23+120 23+133 Water based marking (Edge line) RHS Sqm 1.3
50 Dhanaula - Bhikhi S5 23+140 23+157 Water based marking (Edge line) RHS Sqm 1.7
51 Dhanaula - Bhikhi S5 23+160 23+167 Water based marking (Edge line) RHS Sqm 0.7
52 Dhanaula - Bhikhi S5 23+170 23+182 Water based marking (Edge line) RHS Sqm 1.2
53 Dhanaula - Bhikhi S5 23+185 23+196 Water based marking (Edge line) RHS Sqm 1.1
54 Dhanaula - Bhikhi S5 23+198 23+207 Water based marking (Edge line) RHS Sqm 0.9
55 Dhanaula - Bhikhi S5 23+210 23+218 Water based marking (Edge line) RHS Sqm 0.8
56 Dhanaula - Bhikhi S5 23+220 23+235 Water based marking (Edge line) RHS Sqm 1.5
57 Dhanaula - Bhikhi S5 23+240 23+250 Water based marking (Edge line) RHS Sqm 1
58 Dhanaula - Bhikhi S5 23+255 23+257 Water based marking (Edge line) RHS Sqm 0.2
59 Dhanaula - Bhikhi S5 23+260 23+264 Water based marking (Edge line) RHS Sqm 0.4
60 Dhanaula - Bhikhi S5 23+270 23+274 Water based marking (Edge line) RHS Sqm 0.4
61 Dhanaula - Bhikhi S5 23+280 23+284 Water based marking (Edge line) RHS Sqm 0.4
62 Dhanaula - Bhikhi S5 23+290 23+296 Water based marking (Edge line) RHS Sqm 0.6
63 Dhanaula - Bhikhi S5 23+305 23+308 Water based marking (Edge line) RHS Sqm 0.3
64 Dhanaula - Bhikhi S5 23+340 23+355 Water based marking (Edge line) RHS Sqm 1.5
65 Dhanaula - Bhikhi S5 23+360 23+363 Water based marking (Edge line) RHS Sqm 0.3
66 Dhanaula - Bhikhi S5 23+365 23+367 Water based marking (Edge line) RHS Sqm 0.2
67 Dhanaula - Bhikhi S5 23+370 23+395 Water based marking (Edge line) RHS Sqm 2.5
68 Dhanaula - Bhikhi S5 23+405 23+410 Water based marking (Edge line) RHS Sqm 0.5
69 Dhanaula - Bhikhi S5 23+420 23+423 Water based marking (Edge line) RHS Sqm 0.3
70 Dhanaula - Bhikhi S5 23+425 23+428 Water based marking (Edge line) RHS Sqm 0.3
71 Dhanaula - Bhikhi S5 23+440 23+446 Water based marking (Edge line) RHS Sqm 0.6
72 Dhanaula - Bhikhi S5 23+460 23+465 Water based marking (Edge line) RHS Sqm 0.5
73 Dhanaula - Bhikhi S5 23+500 23+506 Water based marking (Edge line) RHS Sqm 0.6
74 Dhanaula - Bhikhi S5 23+508 23+509 Water based marking (Edge line) RHS Sqm 0.1
75 Dhanaula - Bhikhi S5 23+512 23+519 Water based marking (Edge line) RHS Sqm 0.7
76 Dhanaula - Bhikhi S5 23+530 23+540 Water based marking (Edge line) RHS Sqm 1
77 Dhanaula - Bhikhi S5 23+550 23+556 Water based marking (Edge line) RHS Sqm 0.6
78 Dhanaula - Bhikhi S5 23+560 23+563 Water based marking (Edge line) RHS Sqm 0.3
79 Dhanaula - Bhikhi S5 23+570 23+573 Water based marking (Edge line) RHS Sqm 0.3
80 Dhanaula - Bhikhi S5 23+587 23+590 Water based marking (Edge line) RHS Sqm 0.3
81 Dhanaula - Bhikhi S5 23+620 23+626 Water based marking (Edge line) RHS Sqm 0.6
82 Dhanaula - Bhikhi S5 23+630 23+638 Water based marking (Edge line) RHS Sqm 0.8
83 Dhanaula - Bhikhi S5 23+640 23+646 Water based marking (Edge line) RHS Sqm 0.6
84 Dhanaula - Bhikhi S5 23+700 23+701 Water based marking (Edge line) RHS Sqm 0.1
85 Dhanaula - Bhikhi S5 23+710 23+713 Water based marking (Edge line) RHS Sqm 0.3
86 Dhanaula - Bhikhi S5 23+750 23+751 Water based marking (Edge line) RHS Sqm 0.1
87 Dhanaula - Bhikhi S5 23+760 23+763 Water based marking (Edge line) RHS Sqm 0.3
88 Dhanaula - Bhikhi S5 23+850 23+852 Water based marking (Edge line) RHS Sqm 0.2
89 Dhanaula - Bhikhi S5 23+880 23+882 Water based marking (Edge line) RHS Sqm 0.2
90 Dhanaula - Bhikhi S5 23+900 23+904 Water based marking (Edge line) RHS Sqm 0.4
91 Dhanaula - Bhikhi S5 24+180 24+205 Water based marking (center line) RHS Sqm 1.8
92 Dhanaula - Bhikhi S5 24+220 24+250 Water based marking (Edge line) RHS Sqm 3
93 Dhanaula - Bhikhi S5 24+260 24+267 Water based marking (Edge line) RHS Sqm 0.7
94 Dhanaula - Bhikhi S5 24+280 24+286 Water based marking (Edge line) RHS Sqm 0.6
95 Dhanaula - Bhikhi S5 24+320 24+335 Water based marking (Edge line) RHS Sqm 1.5
96 Dhanaula - Bhikhi S5 24+340 24+390 Water based marking (Center line) Center Sqm 0.9
97 Dhanaula - Bhikhi S5 24+400 24+450 Water based marking (Center line) Center Sqm 3.5
98 Dhanaula - Bhikhi S5 24+440 24+441 Water based marking (Edge line) RHS Sqm 0.1
99 Dhanaula - Bhikhi S5 24+443 24+445 Water based marking (Edge line) RHS Sqm 0.2
100 Dhanaula - Bhikhi S5 24+447 24+449 Water based marking (Edge line) RHS Sqm 0.2
101 Dhanaula - Bhikhi S5 24+450 24+458 Water based marking (Edge line) RHS Sqm 0.8
102 Dhanaula - Bhikhi S5 24+460 24+465 Water based marking (Edge line) RHS Sqm 0.5
103 Dhanaula - Bhikhi S5 24+480 24+491 Water based marking (Edge line) RHS Sqm 1.1
104 Dhanaula - Bhikhi S5 24+520 24+528 Water based marking (Edge line) RHS Sqm 0.8
105 Dhanaula - Bhikhi S5 24+580 24+584 Water based marking (Edge line) RHS Sqm 0.4
106 Dhanaula - Bhikhi S5 24+610 24+612 Water based marking (Edge line) RHS Sqm 0.2
107 Dhanaula - Bhikhi S5 24+620 24+622 Water based marking (Edge line) RHS Sqm 0.2
108 Dhanaula - Bhikhi S5 24+630 24+700 Water based marking (Center line) Center Sqm 1.8
109 Dhanaula - Bhikhi S5 24+220 Water based marking (Zebra) LHS Sqm 3
110 Dhanaula - Bhikhi S5 24+560 24+564 Water based marking (Edge line) LHS Sqm 0.4
111 Dhanaula - Bhikhi S5 24+500 24+503 Water based marking (Edge line) LHS Sqm 0.3
112 Dhanaula - Bhikhi S5 24+480 24+487 Water based marking (Edge line) LHS Sqm 0.7
113 Dhanaula - Bhikhi S5 24+430 24+477 Water based marking (Edge line) LHS Sqm 4.7
114 Dhanaula - Bhikhi S5 24+380 24+415 Water based marking (Edge line) LHS Sqm 3.5
115 Dhanaula - Bhikhi S5 24+235 24+241 Water based marking (Edge line) LHS Sqm 0.6
116 Dhanaula - Bhikhi S5 24+120 24+131 Water based marking (Edge line) LHS Sqm 1.1
117 Dhanaula - Bhikhi S5 23+900 23+908 Water based marking (Edge line) LHS Sqm 0.8
118 Dhanaula - Bhikhi S5 23+670 23+672 Water based marking (Edge line) LHS Sqm 0.2
119 Dhanaula - Bhikhi S5 23+673 23+674 Water based marking (Edge line) LHS Sqm 0.1
120 Dhanaula - Bhikhi S5 23+450 23+455 Water based marking (Edge line) LHS Sqm 0.5
121 Dhanaula - Bhikhi S5 23+400 23+404 Water based marking (Edge line) LHS Sqm 0.4
122 Dhanaula - Bhikhi S5 23+392 23+396 Water based marking (Edge line) LHS Sqm 0.4
123 Dhanaula - Bhikhi S5 23+370 23+372 Water based marking (Edge line) LHS Sqm 0.2
124 Dhanaula - Bhikhi S5 22+900 22+911 Water based marking (Edge line) LHS Sqm 1.1
125 Dhanaula - Bhikhi S5 22+890 22+892 Water based marking (Edge line) LHS Sqm 0.2
126 Dhanaula - Bhikhi S5 22+760 22+761 Water based marking (Edge line) LHS Sqm 0.1
127 Dhanaula - Bhikhi S5 22+750 22+751 Water based marking (Edge line) LHS Sqm 0.1
128 Dhanaula - Bhikhi S5 22+740 22+743 Water based marking (Edge line) LHS Sqm 0.3
129 Dhanaula - Bhikhi S5 22+735 22+736 Water based marking (Edge line) LHS Sqm 0.1
130 Dhanaula - Bhikhi S5 22+720 22+723 Water based marking (Edge line) LHS Sqm 0.3
131 Dhanaula - Bhikhi S5 22+380 22+395 Water based marking (Edge line) LHS Sqm 1.5
132 Dhanaula - Bhikhi S5 22+080 22+090 Water based marking (Edge line) LHS Sqm 1
133 Dhanaula - Bhikhi S5 22+030 22+047 Water based marking (Edge line) LHS Sqm 1.7
134 Dhanaula - Bhikhi S5 21+900 21+905 Water based marking (Edge line) LHS Sqm 0.5
135 Dhanaula - Bhikhi S5 21+810 21+820 Water based marking (Edge line) LHS Sqm 1
136 Dhanaula - Bhikhi S5 21+580 21+600 Water based marking (Edge line) LHS Sqm 2
137 Dhanaula - Bhikhi S5 21+460 21+485 Water based marking (Edge line) LHS Sqm 2.5
138 Dhanaula - Bhikhi S5 21+405 21+423 Water based marking (Edge line) LHS Sqm 1.8
139 Dhanaula - Bhikhi S5 21+330 21+335 Water based marking (Edge line) LHS Sqm 0.5
140 Dhanaula - Bhikhi S5 20+470 20+476 Water based marking (Edge line) LHS Sqm 0.6
141 Dhanaula - Bhikhi S5 20+360 20+370 Water based marking (Edge line) LHS Sqm 1
142 Dhanaula - Bhikhi S5 20+200 20+207 Water based marking (Edge line) LHS Sqm 0.7
143 Dhanaula - Bhikhi S5 24+700 24+719 Water based marking (Edge line) LHS Sqm 1.9
144 Dhanaula - Bhikhi S5 24+670 24+693 Water based marking (Edge line) LHS Sqm 2.3
145 Dhanaula - Bhikhi S5 24+575 24+601 Water based marking (Edge line) LHS Sqm 2.6
146 Dhanaula - Bhikhi S5 4+990 5+000 Water based marking (Edge line) RHS Sqm 1
147 Dhanaula - Bhikhi S5 4+950 4+954 Water based marking (Edge line) RHS Sqm 0.4
148 Dhanaula - Bhikhi S5 4+956 4+960 Water based marking (Edge line) RHS Sqm 0.4
149 Dhanaula - Bhikhi S5 4+750 4+752 Water based marking (Edge line) RHS Sqm 0.2
150 Dhanaula - Bhikhi S5 4+700 4+702 Water based marking (Edge line) RHS Sqm 0.2
151 Dhanaula - Bhikhi S5 4+705 4+706 Water based marking (Edge line) RHS Sqm 0.1
152 Dhanaula - Bhikhi S5 4+610 4+615 Water based marking (Edge line) RHS Sqm 0.5
153 Dhanaula - Bhikhi S5 4+620 4+623 Water based marking (Edge line) RHS Sqm 0.3
154 Dhanaula - Bhikhi S5 4+495 4+500 Water based marking (Edge line) RHS Sqm 0.5
155 Dhanaula - Bhikhi S5 4+502 4+504 Water based marking (Edge line) RHS Sqm 0.2
156 Dhanaula - Bhikhi S5 4+450 4+456 Water based marking (Edge line) RHS Sqm 0.6
157 Dhanaula - Bhikhi S5 4+400 4+402 Water based marking (Edge line) RHS Sqm 0.2
158 Dhanaula - Bhikhi S5 4+230 4+234 Water based marking (Edge line) RHS Sqm 0.4
159 Dhanaula - Bhikhi S5 4+170 4+172 Water based marking (Edge line) RHS Sqm 0.2
160 Dhanaula - Bhikhi S5 4+140 4+142 Water based marking (Edge line) RHS Sqm 0.2
161 Dhanaula - Bhikhi S5 4+143 4+160 Water based marking (Edge line) RHS Sqm 1.7
162 Dhanaula - Bhikhi S5 3+890 3+891 Water based marking (Edge line) RHS Sqm 0.1
163 Dhanaula - Bhikhi S5 3+800 3+813 Water based marking (Edge line) RHS Sqm 1.3
164 Dhanaula - Bhikhi S5 3+740 3+749 Water based marking (Edge line) RHS Sqm 0.9
165 Dhanaula - Bhikhi S5 3+605 3+607 Water based marking (Edge line) RHS Sqm 0.2
166 Dhanaula - Bhikhi S5 3+580 3+582 Water based marking (Edge line) RHS Sqm 0.2
167 Dhanaula - Bhikhi S5 3+584 3+587 Water based marking (Edge line) RHS Sqm 0.3
168 Dhanaula - Bhikhi S5 3+590 3+597 Water based marking (Edge line) RHS Sqm 0.7
169 Dhanaula - Bhikhi S5 3+600 3+603 Water based marking (Edge line) RHS Sqm 0.3
170 Dhanaula - Bhikhi S5 2+350 2+355 Water based marking (Edge line) RHS Sqm 0.5
171 Dhanaula - Bhikhi S5 2+354 2+361 Water based marking (Edge line) RHS Sqm 0.7
172 Dhanaula - Bhikhi S5 2+080 2+091 Water based marking (Edge line) RHS Sqm 1.1
173 Dhanaula - Bhikhi S5 2+000 2+008 Water based marking (Edge line) RHS Sqm 0.8
174 Dhanaula - Bhikhi S5 1+790 1+796 Water based marking (Edge line) RHS Sqm 0.6
175 Dhanaula - Bhikhi S5 1+750 Water based marking (Zebra) RHS Sqm 3
176 Dhanaula - Bhikhi S5 1+700 Water based marking (Center line) Center Sqm 0.3
177 Dhanaula - Bhikhi S5 1+590 1+596 Water based marking (Edge line) RHS Sqm 0.6
178 Dhanaula - Bhikhi S5 1+600 1+614 Water based marking (Edge line) RHS Sqm 1.4
179 Dhanaula - Bhikhi S5 1+620 1+626 Water based marking (Edge line) RHS Sqm 0.6
180 Dhanaula - Bhikhi S5 1+615 1+616 Water based marking (Edge line) RHS Sqm 0.1
181 Dhanaula - Bhikhi S5 1+470 1+474 Water based marking (Edge line) RHS Sqm 0.4
182 Dhanaula - Bhikhi S5 1+475 1+481 Water based marking (Edge line) RHS Sqm 0.6
183 Dhanaula - Bhikhi S5 0+920 0+921 Water based marking (Edge line) RHS Sqm 0.1
184 Dhanaula - Bhikhi S5 0+900 0+906 Water based marking (Edge line) RHS Sqm 0.6
185 Dhanaula - Bhikhi S5 0+770 0+779 Water based marking (Edge line) RHS Sqm 0.9
186 Dhanaula - Bhikhi S5 0+750 0+765 Water based marking (Edge line) RHS Sqm 1.5
187 Dhanaula - Bhikhi S5 0+040 0+080 Water based marking (Edge line) RHS Sqm 4
188 Dhanaula - Bhikhi S5 0+090 0+094 Water based marking (Edge line) RHS Sqm 0.4
189 Dhanaula - Bhikhi S5 0+100 0+115 Water based marking (Edge line) RHS Sqm 1.5
190 Dhanaula - Bhikhi S5 0+140 0+144 Water based marking (Edge line) RHS Sqm 0.4
191 Dhanaula - Bhikhi S5 0+010 0+130 Water based marking (Edge line) Center Sqm 3.6
192 Dhanaula - Bhikhi S5 4+985 4+986 Water based marking (Edge line) LHS Sqm 0.1
193 Dhanaula - Bhikhi S5 4+970 4+976 Water based marking (Edge line) LHS Sqm 0.6
194 Dhanaula - Bhikhi S5 4+940 4+947 Water based marking (Edge line) LHS Sqm 0.7
195 Dhanaula - Bhikhi S5 4+930 4+934 Water based marking (Edge line) LHS Sqm 0.4
196 Dhanaula - Bhikhi S5 4+780 4+781 Water based marking (Edge line) LHS Sqm 0.1
197 Dhanaula - Bhikhi S5 4+700 4+707 Water based marking (Edge line) LHS Sqm 0.7
198 Dhanaula - Bhikhi S5 4+620 4+622 Water based marking (Edge line) LHS Sqm 0.2
199 Dhanaula - Bhikhi S5 4+625 4+628 Water based marking (Edge line) LHS Sqm 0.3
200 Dhanaula - Bhikhi S5 4+560 4+579 Water based marking (Edge line) LHS Sqm 1.9
201 Dhanaula - Bhikhi S5 4+500 4+503 Water based marking (Edge line) LHS Sqm 0.3
202 Dhanaula - Bhikhi S5 4+450 4+453 Water based marking (Edge line) LHS Sqm 0.3
203 Dhanaula - Bhikhi S5 4+380 4+383 Water based marking (Edge line) LHS Sqm 0.3
204 Dhanaula - Bhikhi S5 4+360 4+365 Water based marking (Edge line) LHS Sqm 0.5
205 Dhanaula - Bhikhi S5 4+355 4+357 Water based marking (Edge line) LHS Sqm 0.2
206 Dhanaula - Bhikhi S5 4+150 4+165 Water based marking (Edge line) LHS Sqm 1.5
207 Dhanaula - Bhikhi S5 4+130 4+135 Water based marking (Edge line) LHS Sqm 0.5
208 Dhanaula - Bhikhi S5 4+100 4+114 Water based marking (Edge line) LHS Sqm 1.4
209 Dhanaula - Bhikhi S5 4+090 4+093 Water based marking (Edge line) LHS Sqm 0.3
210 Dhanaula - Bhikhi S5 4+085 4+088 Water based marking (Edge line) LHS Sqm 0.3
211 Dhanaula - Bhikhi S5 4+070 4+076 Water based marking (Edge line) LHS Sqm 0.6
212 Dhanaula - Bhikhi S5 4+040 4+046 Water based marking (Edge line) LHS Sqm 0.6
213 Dhanaula - Bhikhi S5 4+010 4+016 Water based marking (Edge line) LHS Sqm 0.6
214 Dhanaula - Bhikhi S5 3+995 4+000 Water based marking (Edge line) LHS Sqm 0.5
215 Dhanaula - Bhikhi S5 3+985 3+991 Water based marking (Edge line) LHS Sqm 0.6
216 Dhanaula - Bhikhi S5 3+940 3+943 Water based marking (Edge line) LHS Sqm 0.3
217 Dhanaula - Bhikhi S5 3+930 3+933 Water based marking (Edge line) LHS Sqm 0.3
218 Dhanaula - Bhikhi S5 3+920 3+923 Water based marking (Edge line) LHS Sqm 0.3
219 Dhanaula - Bhikhi S5 3+900 3+906 Water based marking (Edge line) LHS Sqm 0.6
220 Dhanaula - Bhikhi S5 3+890 3+895 Water based marking (Edge line) LHS Sqm 0.5
221 Dhanaula - Bhikhi S5 3+880 3+885 Water based marking (Edge line) LHS Sqm 0.5
222 Dhanaula - Bhikhi S5 3+870 3+874 Water based marking (Edge line) LHS Sqm 0.4
223 Dhanaula - Bhikhi S5 3+860 3+864 Water based marking (Edge line) LHS Sqm 0.4
224 Dhanaula - Bhikhi S5 3+760 3+763 Water based marking (Edge line) LHS Sqm 0.3
225 Dhanaula - Bhikhi S5 3+358 3+359 Water based marking (Edge line) LHS Sqm 0.1
226 Dhanaula - Bhikhi S5 3+440 3+444 Water based marking (Edge line) LHS Sqm 0.4
227 Dhanaula - Bhikhi S5 3+195 3+200 Water based marking (Edge line) LHS Sqm 0.5
228 Dhanaula - Bhikhi S5 3+150 3+164 Water based marking (Edge line) LHS Sqm 1.4
229 Dhanaula - Bhikhi S5 3+140 3+146 Water based marking (Edge line) LHS Sqm 0.6
230 Dhanaula - Bhikhi S5 3+120 3+124 Water based marking (Edge line) LHS Sqm 0.4
231 Dhanaula - Bhikhi S5 3+110 3+119 Water based marking (Edge line) LHS Sqm 0.9
232 Dhanaula - Bhikhi S5 3+005 3+010 Water based marking (Edge line) LHS Sqm 0.5
233 Dhanaula - Bhikhi S5 3+000 3+002 Water based marking (Edge line) LHS Sqm 0.2
234 Dhanaula - Bhikhi S5 2+990 2+996 Water based marking (Edge line) LHS Sqm 0.6
235 Dhanaula - Bhikhi S5 2+920 2+924 Water based marking (Edge line) LHS Sqm 0.4
236 Dhanaula - Bhikhi S5 2+900 2+903 Water based marking (Edge line) LHS Sqm 0.3
237 Dhanaula - Bhikhi S5 2+720 2+722 Water based marking (Edge line) LHS Sqm 0.2
238 Dhanaula - Bhikhi S5 2+725 2+727 Water based marking (Edge line) LHS Sqm 0.2
239 Dhanaula - Bhikhi S5 2+730 2+733 Water based marking (Edge line) LHS Sqm 0.3
240 Dhanaula - Bhikhi S5 2+704 2+705 Water based marking (Edge line) LHS Sqm 0.1
241 Dhanaula - Bhikhi S5 2+710 2+715 Water based marking (Edge line) LHS Sqm 0.5
242 Dhanaula - Bhikhi S5 2+716 2+719 Water based marking (Edge line) LHS Sqm 0.3
243 Dhanaula - Bhikhi S5 2+580 2+583 Water based marking (Edge line) LHS Sqm 0.3
244 Dhanaula - Bhikhi S5 2+540 2+544 Water based marking (Edge line) LHS Sqm 0.4
245 Dhanaula - Bhikhi S5 2+520 2+526 Water based marking (Edge line) LHS Sqm 0.6
246 Dhanaula - Bhikhi S5 2+405 2+406 Water based marking (Edge line) LHS Sqm 0.1
247 Dhanaula - Bhikhi S5 2+450 2+530 Water based marking (Center line) LHS Sqm 1.5
248 Dhanaula - Bhikhi S5 2+385 2+390 Water based marking (Edge line) LHS Sqm 0.5
249 Dhanaula - Bhikhi S5 2+040 2+051 Water based marking (Edge line) LHS Sqm 1.1
250 Dhanaula - Bhikhi S5 2+052 2+064 Water based marking (Edge line) LHS Sqm 1.2
251 Dhanaula - Bhikhi S5 1+980 1+988 Water based marking (Edge line) LHS Sqm 0.8
252 Dhanaula - Bhikhi S5 1+920 1+922 Water based marking (Edge line) LHS Sqm 0.2
253 Dhanaula - Bhikhi S5 1+850 1+863 Water based marking (Edge line) LHS Sqm 1.3
254 Dhanaula - Bhikhi S5 1+840 1+846 Water based marking (Edge line) LHS Sqm 0.6
255 Dhanaula - Bhikhi S5 1+835 1+840 Water based marking (Edge line) LHS Sqm 0.5
256 Dhanaula - Bhikhi S5 1+825 1+830 Water based marking (Edge line) LHS Sqm 0.5
257 Dhanaula - Bhikhi S5 1+820 1+824 Water based marking (Edge line) LHS Sqm 0.4
258 Dhanaula - Bhikhi S5 1+620 1+630 Water based marking (Edge line) LHS Sqm 1
259 Dhanaula - Bhikhi S5 1+530 1+533 Water based marking (Edge line) LHS Sqm 0.3
260 Dhanaula - Bhikhi S5 1+480 1+486 Water based marking (Edge line) LHS Sqm 0.6
261 Dhanaula - Bhikhi S5 1+470 1+474 Water based marking (Edge line) LHS Sqm 0.4
262 Dhanaula - Bhikhi S5 1+380 1+387 Water based marking (Edge line) LHS Sqm 0.7
263 Dhanaula - Bhikhi S5 1+250 1+252 Water based marking (Edge line) LHS Sqm 0.2
264 Dhanaula - Bhikhi S5 1+240 1+246 Water based marking (Edge line) LHS Sqm 0.6
265 Dhanaula - Bhikhi S5 1+200 1+217 Water based marking (Edge line) LHS Sqm 1.7
266 Dhanaula - Bhikhi S5 1+192 1+193 Water based marking (Edge line) LHS Sqm 0.1
267 Dhanaula - Bhikhi S5 1+180 1+183 Water based marking (Edge line) LHS Sqm 0.3
268 Dhanaula - Bhikhi S5 1+160 1+170 Water based marking (Edge line) LHS Sqm 1
269 Dhanaula - Bhikhi S5 1+155 1+159 Water based marking (Edge line) LHS Sqm 0.4
270 Dhanaula - Bhikhi S5 1+150 1+151 Water based marking (Edge line) LHS Sqm 0.1
271 Dhanaula - Bhikhi S5 1+050 1+055 Water based marking (Edge line) LHS Sqm 0.5
272 Dhanaula - Bhikhi S5 0+990 0+998 Water based marking (Edge line) LHS Sqm 0.8
273 Dhanaula - Bhikhi S5 0+900 0+905 Water based marking (Edge line) LHS Sqm 0.5
274 Dhanaula - Bhikhi S5 0+640 0+644 Water based marking (Edge line) LHS Sqm 0.4
275 Dhanaula - Bhikhi S5 0+570 0+576 Water based marking (Edge line) LHS Sqm 0.6
276 Dhanaula - Bhikhi S5 0+320 0+330 Water based marking (Edge line) LHS Sqm 1
277 Dhanaula - Bhikhi S5 0+300 0+310 Water based marking (Edge line) LHS Sqm 1
278 Dhanaula - Bhikhi S5 0+220 0+230 Water based marking (Edge line) LHS Sqm 1
279 Dhanaula - Bhikhi S5 0+200 0+210 Water based marking (Edge line) LHS Sqm 1
280 Dhanaula - Bhikhi S5 0+170 0+184 Water based marking (Edge line) LHS Sqm 1.4
281 Dhanaula - Bhikhi S5 0+150 0+151 Water based marking (Edge line) LHS Sqm 0.1
282 Dhanaula - Bhikhi S5 0+010 0+136 Water based marking (Edge line) LHS Sqm 12.6
APPENDIX-J
ROAD MARKING MAINTENANCE (September-2017)
From To
1 Bathinda-Talwandi Sabo B8 5+750 Thermoplastic road marking (Zebra Marking) BHS Sqm 19.80
2 Bathinda-Talwandi Sabo B8 6+095 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
3 Bathinda-Talwandi Sabo B8 6+115 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
4 Bathinda-Talwandi Sabo B8 6+405 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
5 Bathinda-Talwandi Sabo B8 6+425 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
6 Bathinda-Talwandi Sabo B8 6+935 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
7 Bathinda-Talwandi Sabo B8 6+955 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
8 Bathinda-Talwandi Sabo B8 7+430 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
9 Bathinda-Talwandi Sabo B8 7+450 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
10 Bathinda-Talwandi Sabo B8 8+175 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
11 Bathinda-Talwandi Sabo B8 6+910 6+935 Thermoplastic road marking (Kerb Line) RHS Sqm 3.75
12 Bathinda-Talwandi Sabo B8 6+910 6+935 Thermoplastic road marking (Kerb Line) LHS Sqm 3.75
13 Bathinda-Talwandi Sabo B8 8+645 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
14 Bathinda-Talwandi Sabo B8 8+670 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
15 Bathinda-Talwandi Sabo B8 8+195 Thermoplastic road marking (Zebra Marking) BHS Sqm 21.60
16 Bathinda-Talwandi Sabo B8 7+427 7+540 Thermoplastic road marking (Kerb Line) LHS Sqm 16.95
17 Bathinda-Talwandi Sabo B8 7+427 7+540 Thermoplastic road marking (Kerb Line) RHS Sqm 16.95
18 Bathinda-Talwandi Sabo B8 7+427 7+540 Thermoplastic road marking (Edge Line) LHS Sqm 16.95
19 Bathinda-Talwandi Sabo B8 7+427 7+540 Thermoplastic road marking (Edge Line) RHS Sqm 16.95
20 Bathinda-Talwandi Sabo B8 8+645 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
21 Bathinda-Talwandi Sabo B8 8+670 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
22 Bathinda-Talwandi Sabo B8 8+195 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
23 Bathinda-Talwandi Sabo B8 8+175 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
24 Bathinda-Talwandi Sabo B8 7+430 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
25 Bathinda-Talwandi Sabo B8 7+450 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
Qty. in Sqm RemarksS.
NoRoad Name
LocationDescription of Work Side Unit
26 Bathinda-Talwandi Sabo B8 6+935 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
27 Bathinda-Talwandi Sabo B8 6+955 Thermoplastic road marking (Stop Line) BHS Sqm 4.20
28 Bathinda-Talwandi Sabo B8 5+875 5+920 Thermoplastic road marking (Center Line) BHS Sqm 2.25
29 Bathinda-Talwandi Sabo B8 5+880 5+920 Thermoplastic road marking (Center Line) BHS Sqm 1.80
30 Bathinda-Talwandi Sabo B8 5+833 5+970 Thermoplastic road marking (Edge Line) BHS Sqm 20.55
31 Bathinda-Talwandi Sabo B8 5+897 5+920 Thermoplastic road marking (Edge Line) LHS Sqm 3.45
32 Bathinda-Talwandi Sabo B8 5+837 5+897 Thermoplastic road marking (Edge Line) RHS Sqm 9.00
33 Bathinda-Talwandi Sabo B8 5+880 Thermoplastic road marking (Chevron) LHS Sqm 5.25
34 Bathinda-Talwandi Sabo B8 5+855 5+897 Thermoplastic road marking (Edge Line) RHS Sqm 6.30
35 Bathinda-Talwandi Sabo B8 5+830 Thermoplastic road marking (Junction) BHS Sqm 6.45
36 Bathinda-Talwandi Sabo B8 5+897 5+864 Thermoplastic road marking (Edge Line) BHS Sqm 4.95
37 Bathinda-Talwandi Sabo B8 5+870 Thermoplastic road marking (Junction) BHS Sqm 9.60
38 Bathinda-Talwandi Sabo B8 5+750 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
39 Bathinda-Talwandi Sabo B8 6+095 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
40 Bathinda-Talwandi Sabo B8 6+115 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
41 Bathinda-Talwandi Sabo B8 6+405 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
42 Bathinda-Talwandi Sabo B8 6+425 Thermoplastic road marking (Stop Line) BHS Sqm 2.10
43 Bathinda-Talwandi Sabo B8 6+253 6+309 Thermoplastic road marking (Kerb Line) RHS Sqm 8.40
44 Bathinda-Talwandi Sabo B8 6+206 6+243 Thermoplastic road marking (Kerb Line) RHS Sqm 5.55
45 Bathinda-Talwandi Sabo B8 5+887 6+197 Thermoplastic road marking (Kerb Line) RHS Sqm 46.50
46 Bathinda-Talwandi Sabo B8 5+887 6+116 Thermoplastic road marking (Kerb Line) LHS Sqm 34.35
47 Bathinda-Talwandi Sabo B8 6+405 6+425 Thermoplastic road marking (Kerb Line) LHS Sqm 3.00
48 Bathinda-Talwandi Sabo B8 6+405 6+425 Thermoplastic road marking (Kerb Line) RHS Sqm 3.00
49 Bathinda-Talwandi Sabo B8 30+290 30+370 Thermoplastic road marking (Rumbles) BHS Sqm 37.80
50 Bathinda-Talwandi Sabo B8 30+110 30+190 Thermoplastic road marking (Rumbles) BHS Sqm 37.80
51 Bathinda-Talwandi Sabo B8 30+220 30+280 Thermoplastic road marking (Zigzag marking) Center Sqm 6.00
52 Bathinda-Talwandi Sabo B8 30+290 30+370 Thermoplastic road marking (Center Line continue) Center Sqm 7.00
53 Bathinda-Talwandi Sabo B8 30+110 30+215 Thermoplastic road marking (Center Line continue) Center Sqm 9.00
54 Bathinda-Talwandi Sabo B8 26+655 26+785 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
55 Bathinda-Talwandi Sabo B8 26+830 26+960 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
56 Bathinda-Talwandi Sabo B8 27+320 27+450 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
57 Bathinda-Talwandi Sabo B8 27+510 27+640 Thermoplastic road marking (Center Line continue) Center Sqm 12.00
58 Bathinda-Talwandi Sabo B8 26+785 26+830 Thermoplastic road marking (Zigzag marking) Center Sqm 4.40
59 Bathinda-Talwandi Sabo B8 27+440 27+490 Thermoplastic road marking (Zigzag marking) Center Sqm 5.00
60 Bathinda-Talwandi Sabo B8 9+180 Thermoplastic road marking (Junction) LHS Sqm 4.65
61 Bathinda-Talwandi Sabo B8 9+172 9+278 Thermoplastic road marking (Edge Line) LHS Sqm 15.90
62 Bathinda-Talwandi Sabo B8 9+160 Thermoplastic road marking (Junction) RHS Sqm 6.75
63 Bathinda-Talwandi Sabo B8 9+097 9+163 Thermoplastic road marking (Edge Line) LHS Sqm 9.90
64 Bathinda-Talwandi Sabo B8 9+100 9+155 Thermoplastic road marking (Center Line) LHS Sqm 2.70
65 Bathinda-Talwandi Sabo B8 9+100 9+155 Thermoplastic road marking (Center Line) RHS Sqm 2.70
66 Bathinda-Talwandi Sabo B8 9+206 9+296 Thermoplastic road marking (Center Line continue) Center Sqm 13.50
67 Bathinda-Talwandi Sabo B8 9+139 9+150 Thermoplastic road marking (Kerb Line) BHS Sqm 4.35
68 Bathinda-Talwandi Sabo B8 9+170 69+740 Thermoplastic road marking (Round about marking) BHS Sqm 26.55
69 Bathinda-Talwandi Sabo B8 9+180 9+191 Thermoplastic road marking (Kerb Line) BHS Sqm 4.35
70 Bathinda-Talwandi Sabo B8 27+445 27+495 Thermoplastic road marking (Zigzag Marking) BHS Sqm 15.00
71 Bathinda-Talwandi Sabo B8 27+445 Thermoplastic road marking (Triangle) BHS Sqm 4.16
72 Bathinda-Talwandi Sabo B8 27+445 Thermoplastic road marking (Block) BHS Sqm 11.00
73 Bathinda-Talwandi Sabo B8 27+495 Thermoplastic road marking (Triangle) BHS Sqm 4.16
74 Bathinda-Talwandi Sabo B8 27+495 Thermoplastic road marking (Block) BHS Sqm 11.00
75 Bathinda-Talwandi Sabo B8 6+191 6+200 Thermoplastic road marking (Kerb Line) BHS Sqm 2.70
76 Bathinda-Talwandi Sabo B8 6+235 6+245 Thermoplastic road marking (Kerb Line) BHS Sqm 3.00
77 Bathinda-Talwandi Sabo B8 6+300 6+305 Thermoplastic road marking (Kerb Line) BHS Sqm 1.50
78 Bathinda-Talwandi Sabo B8 6+560 6+570 Thermoplastic road marking (Kerb Line) BHS Sqm 3.00
79 Bathinda-Talwandi Sabo B8 6+623 6+630 Thermoplastic road marking (Kerb Line) BHS Sqm 2.10
80 Bathinda-Talwandi Sabo B8 6+708 6+715 Thermoplastic road marking (Kerb Line) BHS Sqm 2.10
81 Bathinda-Talwandi Sabo B8 7+090 7+110 Thermoplastic road marking (Kerb Line) BHS Sqm 6.00
82 Bathinda-Talwandi Sabo B8 7+255 7+266 Thermoplastic road marking (Kerb Line) BHS Sqm 3.30
83 Bathinda-Talwandi Sabo B8 8+170 8+200 Thermoplastic road marking (Kerb Line) BHS Sqm 9.00
84 Bathinda-Talwandi Sabo B8 8+645 8+670 Thermoplastic road marking (Kerb Line) BHS Sqm 7.50
85 Bathinda-Talwandi Sabo B8 8+927 8+947 Thermoplastic road marking (Kerb Line) BHS Sqm 6.00
86 Bathinda-Talwandi Sabo B8 14+900 15+000 Thermoplastic road marking (Edge Line) RHS Sqm 15.00
87 Bathinda-Talwandi Sabo B8 14+900 14+950 Thermoplastic road marking (Kerb Line) BHS Sqm 15.00
88 Bathinda-Talwandi Sabo B8 14+950 Thermoplastic road marking (Chevron) Center Sqm 8.70
89 Bathinda-Talwandi Sabo B8 36+150 36+290 Thermoplastic road marking (Edge Line) LHS Sqm 21.00
90 Bathinda-Talwandi Sabo B8 36+150 36+290 Thermoplastic road marking (Edge Line) RHS Sqm 21.00
91 Bathinda-Talwandi Sabo B8 36+390 36+500 Thermoplastic road marking (Edge Line) LHS Sqm 16.50
92 Bathinda-Talwandi Sabo B8 36+390 36+500 Thermoplastic road marking (Edge Line) RHS Sqm 16.50
93 Bathinda-Talwandi Sabo B8 14+930 Thermoplastic road marking (Zebra Marking) RHS Sqm 12.60
94 Bathinda-Talwandi Sabo B8 14+860 14+950 Thermoplastic road marking (Center Line) RHS Sqm 3.00
95 Bathinda-Talwandi Sabo B8 14+930 15+010 Thermoplastic road marking (Edge Line) LHS Sqm 12.00
96 Bathinda-Talwandi Sabo B8 14+900 14+965 Thermoplastic road marking (Center Line) LHS Sqm 2.10
97 Bathinda-Talwandi Sabo B8 15+490 15+498 Water based marking (Edge line) LHS Sqm 1.20
98 Bathinda-Talwandi Sabo B8 15+530 15+533 Water based marking (Edge line) LHS Sqm 0.45
99 Bathinda-Talwandi Sabo B8 15+535 15+552 Water based marking (Edge line) LHS Sqm 2.55
100 Bathinda-Talwandi Sabo B8 15+560 15+584 Water based marking (Edge line) LHS Sqm 3.60
101 Bathinda-Talwandi Sabo B8 15+600 15+607 Water based marking (Edge line) LHS Sqm 1.05
102 Bathinda-Talwandi Sabo B8 15+640 15+676 Water based marking (Edge line) LHS Sqm 5.40
103 Bathinda-Talwandi Sabo B8 15+700 15+795 Water based marking (Edge line) LHS Sqm 14.25
104 Bathinda-Talwandi Sabo B8 15+800 15+830 Water based marking (Edge line) LHS Sqm 4.50
105 Bathinda-Talwandi Sabo B8 15+850 15+890 Water based marking (Edge line) LHS Sqm 6.00
106 Bathinda-Talwandi Sabo B8 15+950 15+987 Water based marking (Edge line) LHS Sqm 5.55
107 Bathinda-Talwandi Sabo B8 16+045 16+050 Water based marking (center line) LHS Sqm 0.50
108 Bathinda-Talwandi Sabo B8 16+040 16+043 Water based marking (center line) LHS Sqm 0.30
109 Bathinda-Talwandi Sabo B8 16+000 16+014 Water based marking (center line) LHS Sqm 1.40
110 Bathinda-Talwandi Sabo B8 15+930 15+976 Water based marking (center line) LHS Sqm 4.60
111 Bathinda-Talwandi Sabo B8 15+925 15+928 Water based marking (center line) LHS Sqm 0.30
112 Bathinda-Talwandi Sabo B8 16+000 16+018 Water based marking (Edge line) LHS Sqm 2.70
113 Bathinda-Talwandi Sabo B8 16+030 16+051 Water based marking (Edge line) LHS Sqm 3.15
114 Bathinda-Talwandi Sabo B8 16+160 16+168 Water based marking (Edge line) LHS Sqm 1.20
115 Bathinda-Talwandi Sabo B8 16+300 16+306 Water based marking (Edge line) LHS Sqm 0.90
116 Bathinda-Talwandi Sabo B8 16+310 16+326 Water based marking (Edge line) LHS Sqm 2.40
117 Bathinda-Talwandi Sabo B8 16+576 16+600 Water based marking (Edge line) LHS Sqm 3.60
118 Bathinda-Talwandi Sabo B8 16+620 16+666 Water based marking (Edge line) LHS Sqm 6.90
119 Bathinda-Talwandi Sabo B8 16+670 16+675 Water based marking (Edge line) LHS Sqm 0.75
120 Bathinda-Talwandi Sabo B8 16+720 16+730 Water based marking (Edge line) LHS Sqm 1.50
121 Bathinda-Talwandi Sabo B8 16+750 16+762 Water based marking (Edge line) LHS Sqm 1.80
122 Bathinda-Talwandi Sabo B8 16+870 16+893 Water based marking (Edge line) LHS Sqm 3.45
123 Bathinda-Talwandi Sabo B8 16+780 16+795 Water based marking (Edge line) LHS Sqm 2.25
124 Bathinda-Talwandi Sabo B8 17+000 17+015 Water based marking (Edge line) LHS Sqm 2.25
125 Bathinda-Talwandi Sabo B8 15+005 15+037 Water based marking (Edge line) RHS Sqm 4.80
126 Bathinda-Talwandi Sabo B8 15+040 15+066 Water based marking (Edge line) RHS Sqm 3.90
127 Bathinda-Talwandi Sabo B8 15+080 15+099 Water based marking (Edge line) RHS Sqm 2.85
128 Bathinda-Talwandi Sabo B8 15+105 15+110 Water based marking (Edge line) RHS Sqm 0.75
129 Bathinda-Talwandi Sabo B8 15+160 15+187 Water based marking (Edge line) RHS Sqm 4.05
130 Bathinda-Talwandi Sabo B8 15+220 15+229 Water based marking (Edge line) RHS Sqm 1.35
131 Bathinda-Talwandi Sabo B8 15+430 15+438 Water based marking (Edge line) RHS Sqm 1.20
132 Bathinda-Talwandi Sabo B8 15+445 15+475 Water based marking (Edge line) RHS Sqm 4.50
133 Bathinda-Talwandi Sabo B8 15+540 15+580 Water based marking (Edge line) RHS Sqm 6.00
134 Bathinda-Talwandi Sabo B8 15+700 15+726 Water based marking (Edge line) RHS Sqm 3.90
135 Bathinda-Talwandi Sabo B8 15+740 15+751 Water based marking (Edge line) RHS Sqm 1.65
136 Bathinda-Talwandi Sabo B8 15+770 15+775 Water based marking (Edge line) RHS Sqm 0.75
137 Bathinda-Talwandi Sabo B8 15+780 15+790 Water based marking (Edge line) RHS Sqm 1.50
138 Bathinda-Talwandi Sabo B8 15+800 15+832 Water based marking (Edge line) RHS Sqm 4.80
139 Bathinda-Talwandi Sabo B8 15+850 15+928 Water based marking (Edge line) RHS Sqm 11.70
140 Bathinda-Talwandi Sabo B8 16+180 16+196 Water based marking (Edge line) RHS Sqm 2.40
141 Bathinda-Talwandi Sabo B8 16+210 16+312 Water based marking (Edge line) RHS Sqm 15.30
142 Bathinda-Talwandi Sabo B8 16+410 16+418 Water based marking (Edge line) RHS Sqm 1.20
143 Bathinda-Talwandi Sabo B8 16+480 16+483 Water based marking (Edge line) RHS Sqm 0.45
144 Bathinda-Talwandi Sabo B8 16+750 16+761 Water based marking (Edge line) RHS Sqm 1.65
145 Bathinda-Talwandi Sabo B8 16+840 16+852 Water based marking (Edge line) RHS Sqm 1.80
146 Bathinda-Talwandi Sabo B8 16+860 16+867 Water based marking (Edge line) RHS Sqm 1.05
147 Bathinda-Talwandi Sabo B8 17+010 17+016 Water based marking (Edge line) RHS Sqm 0.90
148 Bathinda-Talwandi Sabo B8 10+760 10+774 Water based marking (Edge line) RHS Sqm 2.10
149 Bathinda-Talwandi Sabo B8 10+790 10+819 Water based marking (Edge line) RHS Sqm 4.35
150 Bathinda-Talwandi Sabo B8 10+840 10+848 Water based marking (Edge line) RHS Sqm 1.20
151 Bathinda-Talwandi Sabo B8 11+195 11+218 Water based marking (Edge line) LHS Sqm 3.45
152 Bathinda-Talwandi Sabo B8 11+190 11+193 Water based marking (Edge line) LHS Sqm 0.45
153 Bathinda-Talwandi Sabo B8 9+420 9+430 Water based marking (Kerb line) BHS Sqm 3.00
154 Bathinda-Talwandi Sabo B8 10+376 10+400 Water based marking (Edge line) LHS Sqm 3.60
Contract No.ClientMonitoring ConsultantContractor
No. of TestConducted
No. ofTestPass
No. ofTestFail
No. of TestConducted
No. ofTestPass
No. ofTestFail
No. of TestConducted
No. ofTestPass
No. ofTestFail
Earth work ( OGL, Existing& Shoulder
MORT&H 305/903.2
Gradation/Sand Content IS:2720 Part-04 1722 1722 0 0 0 0 1722 1722 0Atterberg Limit IS:2720 Part-05 1732 1732 0 0 0 0 1732 1732 0Proctor Density Test IS:2720 Part-08 1732 1732 0 0 0 0 1732 1732 0Free Swell Index IS:2720 Part-40 1721 1721 0 0 0 0 1721 1721 0CBR IS:2720 Part-16 1605 1603 2 0 0 0 1605 1603 2Field Density (No.of Set ) IS:2720 Part-28 2247 2077 170 23 20 3 2270 2097 173Earth work (Embankment &Subgrade) MORT&H 305/903.2
Field Density (No.of Set ) IS:2720 Part-28 1766 1610 156 28 25 3 1794 1635 159Borrow Area MORT&H 305/903.2
Upto DateUpto Last Month
Project:- Output and Performance Based Road Contract for Improvement, Rehabilitation ,Resurfacing & Routine Maintenance (Contract No. PSRSP/WB/OPRC/1/ICB) of Sangrur-Mansa-
Bathinda Road Contract.
Monthly Progress Report (Sep..- 2017)Sep.- 2017
Patel Infrastructure Pvt. Ltd
Name of the Test
PSRSP/WB/OPRC/1/ICBP.W.D. (B&R)
Indian andForeign Standards
reffered
TNM ( Technology & Management )
Contractor,s Rep. CMU,s Rep. Client,s Rep./MC,s Rep.
Borrow Area MORT&H 305/903.2Gradation/Sand Content IS:2720 Part-04 89 89 0 0 0 0 89 89 0Atterberg Limit IS:2720 Part-05 89 89 0 0 0 0 89 89 0Proctor Density Test IS:2720 Part-08 89 89 0 0 0 0 89 89 0Free Swell Index IS:2720 Part-40 89 89 0 0 0 0 89 89 0CBR IS:2720 Part-16 50 50 0 0 0 0 50 50 0Granular Sub Base (GSB) MORT&H 401/900.3.1Gradation MORT&H-Table-400-1 1240 1240 0 10 10 0 1250 1250 0Atterberg Limit IS:2720 Part-05 1223 1223 0 10 10 0 1233 1233 0Water Absorption IS:2386 Part-03 5 5 0 0 0 0 5 5 0Proctor Density Test IS:2720 Part-08 5 5 0 0 0 0 5 5 0CBR IS:2720 Part-16 5 5 0 0 0 0 5 5 010% Fines Value BS:812 Part-111 2 2 0 0 0 0 2 2 0Field Density (No. of Pit) IS:2720 Part-28 2309 2294 15 18 18 0 2327 2312 15Base (WMM) MORT&H 406/900.3.4Gradation MORT&H-Table-400-13 2177 2177 0 40 0 40 2217 2177 40Atterberg Limit IS:2720 Part-05 2154 2154 0 40 0 40 2194 2154 40Aggregate Impact Value IS:2386 Part-04 1184 1184 0 25 0 25 1209 1184 25Flakiness & Elongation Index IS:2386 Part-01 1359 1359 0 25 0 25 1384 1359 25Proctor Density Test IS:2720 Part-08 2 2 0 0 0 0 2 2 0Water Absorption IS:2386 Part-03 5 5 0 0 0 0 5 5 0Field Density (No. of Set) IS:2720 Part-28 2962 2958 4 18 0 18 2980 2958 22Prime/ Tack Coat MORT&H 502/503/900.4.1Rate of Spread Test IS:217/8887 3961 3961 0 20 20 0 3981 3981 0Bituminous Macadam MORT&H 504/900.4.4
GradationMORT&H504/Table- 500-7 109 109 0 0 0 0 109 109 0GradationMORT&H504/Table- 500-7 109 109 0 0 0 0 109 109 0
Aggregate Impact Value IS:2386 Part-04 43 43 0 0 0 0 43 43 0
Contractor,s Rep. CMU,s Rep. Client,s Rep./MC,s Rep.
Contract No.ClientMonitoring ConsultantContractor
No. of TestConducted
No. ofTestPass
No. ofTestFail
No. of TestConducted
No. ofTestPass
No. ofTestFail
No. of TestConducted
No. ofTestPass
No. ofTestFail
Upto DateUpto Last Month
Project:- Output and Performance Based Road Contract for Improvement, Rehabilitation ,Resurfacing & Routine Maintenance (Contract No. PSRSP/WB/OPRC/1/ICB) of Sangrur-Mansa-
Bathinda Road Contract.
Monthly Progress Report (Sep..- 2017)Sep.- 2017
Patel Infrastructure Pvt. Ltd
Name of the Test
PSRSP/WB/OPRC/1/ICBP.W.D. (B&R)
Indian andForeign Standards
reffered
TNM ( Technology & Management )
Flakiness & Elongation Index IS:2386 Part-01 65 65 0 0 0 0 65 65 0Binder Content ASTM-D 2172 62 62 0 0 0 0 62 62 0Coating/ Stripping Value IS:6241 5 5 0 0 0 0 5 5 0Unit Bulk Density 96 96 0 0 0 0 96 96 0Field Density (No. of Core) ASTM- D- 2726 173 173 0 0 0 0 173 173 0Dense BituminousMacadam MORT&H 505/900.4.5
GradationMORT&H505/Table- 500-10 1071 1071 0 6 6 0 1077 1077 0
Coating/ Stripping Value IS:6241 6 6 0 0 0 0 6 6 0Marshall Stability STM D 1559 1084 1084 0 6 6 0 1090 1090 0Binder Content ASTM-D 2172 1044 1044 0 6 6 0 1050 1050 0
Contractor,s Rep. CMU,s Rep. Client,s Rep./MC,s Rep.
Binder Content ASTM-D 2172 1044 1044 0 6 6 0 1050 1050 0Aggregate Impact Value IS:2386 Psrt-04 593 593 0 4 4 0 597 597 0Flakiness & Elongation Index IS:2386 Part-01 610 610 0 4 4 0 614 614 0Sand Equivalent Value IS:2386 Part-37 5 5 0 0 0 0 5 5 0Field Density (No. of Core) ASTM- D- 2726 3431 3431 0 15 15 0 3446 3446 0Bituminous Concrete MORT&H 507/900.4.5
GradationMORT&H507/Table- 500-17 922 922 0 15 15 0 937 937 0
Coating/ Stripping Value IS:6241 3 3 0 0 0 0 3 3 0Marshall Stability STM D 1559 997 997 0 15 15 0 1012 1012 0Aggregate Impact Value IS:2386 Part-04 561 561 0 10 10 0 571 571 0Binder Content ASTM-D 2172 976 976 0 15 15 0 991 991 0Flakiness & Elongation Index IS:2386 Part-01 571 571 0 10 10 0 581 581 0Field Density (No. of Core) ASTM- D- 2726 3706 3706 0 16 16 0 3722 3722 0Built Up Spray Grout MORT&H 506
Gradation MORT&H506/Table- 500-7 31 31 0 0 0 0 31 31 0
Aggregate Impact Value IS:2386 Part-04 14 14 0 0 0 0 14 14 0Flakiness & Elongation Index IS:2386 Part-01 22 22 0 0 0 0 22 22 0Binder Content ASTM-D 2172 20 20 0 0 0 0 20 20 0Coating/ Stripping Value IS:6241 1 1 0 0 0 0 1 1 0 Marshal Density 24 24 0 0 0 0 24 24 0Recycling AsphaltPavement MORT&H 519/900.4.10
Gradation IRC-37-2012 16 16 0 0 0 0 16 16 0Indirect Tensile Strength - ITS(Kpa)
IRC-37-2012 32 32 0 0 0 0 32 32 0Expansion Ratio and Half Life IRC-37-2012 16 16 0 0 0 0 16 16 0Cement Spray Test IRC-37-2012 16 16 0 0 0 0 16 16 0Cement Spray Test IRC-37-2012 16 16 0 0 0 0 16 16 0Field Density/ Compaction IRC-37-2012 49 49 0 0 0 0 49 49 0
Contractor,s Rep. CMU,s Rep. Client,s Rep./MC,s Rep.
Contract No.ClientMonitoring ConsultantContractor
No. of TestConducted
No. ofTestPass
No. ofTestFail
No. of TestConducted
No. ofTestPass
No. ofTestFail
No. of TestConducted
No. ofTestPass
No. ofTestFail
Upto DateUpto Last Month
Project:- Output and Performance Based Road Contract for Improvement, Rehabilitation ,Resurfacing & Routine Maintenance (Contract No. PSRSP/WB/OPRC/1/ICB) of Sangrur-Mansa-
Bathinda Road Contract.
Monthly Progress Report (Sep..- 2017)Sep.- 2017
Patel Infrastructure Pvt. Ltd
Name of the Test
PSRSP/WB/OPRC/1/ICBP.W.D. (B&R)
Indian andForeign Standards
reffered
TNM ( Technology & Management )
Cement MORT&H 1006Fineness by Dry Sieving IS:4031 78 78 0 0 0 0 78 78 0Normal Consistency IS:4031 78 78 0 0 0 0 78 78 0Initial & Final Setting Time IS:4031 78 78 0 0 0 0 78 78 0Compressive Strength IS:4031 0 0 0
3 days IS:4031 78 78 0 0 0 0 78 78 07 days IS:4031 78 78 0 0 0 0 78 78 0
28 Days IS:4031 77 77 0 0 0 0 77 77 0Coarse/ Fine Aggregate MORT&H 1007/1008Gradation/Sand Content IS:383 3414 3299 115 15 15 0 3429 3314 115Water Absorption IS:2386 Part-3 18 18 0 0 0 0 18 18 0Bulk Density IS:2386 Part-3 12 12 0 0 0 0 12 12 0Sp. Gravity IS:2386 Part-3 34 34 0 0 0 0 34 34 0Flakiness & Elongation Index IS:2386 Part-1 1720 1720 0 15 15 0 1735 1735 0
Contractor,s Rep. CMU,s Rep. Client,s Rep./MC,s Rep.
Flakiness & Elongation Index IS:2386 Part-1 1720 1720 0 15 15 0 1735 1735 0Aggregate Impact Value IS:2386 Part-4 1433 1433 0 15 15 0 1448 1448 0Cube Compressive Strength
( No. of Set) MORT&H 1700
M-10 IS:516/1199
07 days 8 8 0 0 0 0 8 8 0
28 days 11 11 0 0 0 0 11 11 0M-15 IS:516/1199
07 days 848 848 0 0 0 0 848 848 028 days 916 916 0 0 0 0 916 916 0
M-20 07 days 45 45 0 0 0 0 45 45 0
28 days 98 98 0 0 0 0 98 98 0M-25
07 days 157 157 0 0 0 0 157 157 028 days 160 160 0 0 0 0 160 160 0
M-30 07 days 194 194 0 0 0 0 194 194 0
28 days 202 202 0 0 0 0 202 202 0M-35
07 days 16 16 0 0 0 0 16 16 028 days 27 27 0 0 0 0 27 27 0
M-40 07 days 26 26 0 0 0 0 26 26 0
28 days 29 29 0 0 0 0 29 29 0M-45M-45
07 days 5 5 0 0 0 0 5 5 028 days 7 7 0 0 0 0 7 7 0
Brick Masonry MORT&H 1400Mortar Cubes (Grade 1:3) IS:2250Contractor,s Rep. CMU,s Rep. Client,s Rep./MC,s Rep.
Contract No.ClientMonitoring ConsultantContractor
No. of TestConducted
No. ofTestPass
No. ofTestFail
No. of TestConducted
No. ofTestPass
No. ofTestFail
No. of TestConducted
No. ofTestPass
No. ofTestFail
Upto DateUpto Last Month
Project:- Output and Performance Based Road Contract for Improvement, Rehabilitation ,Resurfacing & Routine Maintenance (Contract No. PSRSP/WB/OPRC/1/ICB) of Sangrur-Mansa-
Bathinda Road Contract.
Monthly Progress Report (Sep..- 2017)Sep.- 2017
Patel Infrastructure Pvt. Ltd
Name of the Test
PSRSP/WB/OPRC/1/ICBP.W.D. (B&R)
Indian andForeign Standards
reffered
TNM ( Technology & Management )
07 days 682 682 0 0 0 0 682 682 028 days 689 689 0 0 0 0 689 689 0
Emulsion TestViscosity Test IS:217/8887 264 264 0 3 3 0 267 267 0Residue by Evaporation IS:217/8887 264 264 0 3 3 0 267 267 0Bitumen (VG-30) IS- 73- 2013Penetration Test IS:1203-1978 1440 1440 0 15 15 0 1455 1455 0Ductility ( VG- 30) IS:1208-1978 1437 1437 0 15 15 0 1452 1452 0Absolute Viscosity IS:1206-1978 0 0 0 0 0 0 0 0 0Kinematic Viscosity IS:1206-1978 0 0 0 0 0 0 0 0 0Softening Point IS:1205-1978 1540 1540 0 15 15 0 1555 1555 0Bitumen (VG-10) IS- 73- 2013Penetration Test IS:1203-1978 5 5 0 0 0 0 5 5 0
Contractor,s Rep. CMU,s Rep. Client,s Rep./MC,s Rep.
Bitumen (VG-10) IS- 73- 2013Penetration Test IS:1203-1978 5 5 0 0 0 0 5 5 0Ductility ( VG- 10) IS:1208-1978 5 5 0 0 0 0 5 5 0Absolute Viscosity IS:1206-1978 0 0 0 0 0 0 0 0 0Kinematic Viscosity IS:1206-1978 0 0 0 0 0 0 0 0 0Softning Point IS:1205-1978 5 5 0 0 0 0 5 5 0Bricks TestDimension Test IS:1077 , 3495 78 78 0 0 0 0 78 78 0Water Absorption IS:1077 , 3495 78 78 0 0 0 0 78 78 0Compressive Strength IS:1077 , 3495 78 78 0 0 0 0 78 78 0Hume PipeThree Edge Bearing Test IS:458/3597 90 90 0 0 0 0 90 90 0Hydroststic Test IS:458/3597 51 51 0 0 0 0 51 51 0Dimension Test IS:458/3597 288 288 0 0 0 0 288 288 0Third Party TestAggregate Test IS- 2386Deleterious Contant IS- 2386- Part - 2 4 4 0 0 0 0 4 4 0Soundness IS- 2386- Part - 5 2 2 0 0 0 0 2 2 0Stone Polishing Value BS- 812- Part - 114 1 1 0 0 0 0 1 1 0Alkali Aggregate Reactivity IS- 2386- Part -7 4 4 0 0 0 0 4 4 0Cement test IS- 8112 2 2 0 0 0 0 2 2 0Lime test IS- 1514 3 3 0 0 0 0 3 3 0Emulsion Test IS- 8887- 2004 1 1 0 0 0 0 1 1 0Bitumen Test IS- 73- 2013 1 1 0 0 0 0 1 1 0
Steel IS- 432/1786/1030/2004 1 1 0 0 0 0 1 1 0
Water IS- 3025 6 6 0 0 0 0 6 6 0Concrete Admixture IS- 1199/6925/8103 1 1 0 0 0 0 1 1 0Concrete Admixture IS- 1199/6925/8103 1 1 0 0 0 0 1 1 0Thermoplastic Paint MORTH&H 803.4.1.1 3 3 0 0 0 0 3 3 0Glass Beads MORTH&H 803.4.2.3 1 1 0 0 0 0 1 1 0
Contractor,s Rep. CMU,s Rep. Client,s Rep./MC,s Rep.
Contract No.
ClientMonitoringConsultantContractor
Month Sep. 17
Minimum Maximum
01-09-17 26.4 37.4 56.0 82.0 - - -
02-09-17 27.1 38.9 57.0 84.0 - - -
03-09-17 27.6 37.5 54.0 83.0 - - -
04-09-17 26.1 38.3 55.0 88.0 - - -
05-09-17 28.1 37.9 56.0 82.0 - - -
06-09-17 27.9 37.0 56.0 82.0 - - -
07-09-17 27.0 37.8 54.0 83.0 - - -
08-09-17 26.5 38.0 56.0 82.0 - - -
09-09-17 26.8 39.0 57.0 81.0 - - -
10-09-17 27.0 39.2 54.0 80.0 - - -
11-09-17 26.7 40.3 46.0 79.0 - - -
DateMinimum
Temperature(ºC)
MaximumTemperature
(ºC)
Rainfall(mm)
Reason ofDisrupted
Remarks
Project:- Output and Performance Based Road Contract for Improvement, Rehabilitation , Resurfacing &Routine Maintenance (Contract No. PSRSP/WB/OPRC/1/ICB) of Sangrur-Mansa-Bathinda Road Contract.
PSRSP/WB/OPRC/1/ICB
P.W.D. (B&R)
Patel Infrastructure Pvt. Ltd
WEATHER RECORD
Humidity
TNM ( Technology & Management )
11-09-17 26.7 40.3 46.0 79.0 - - -
12-09-17 27.8 39.8 56.0 81.0 - - -
13-09-17 28.2 38.4 58.0 82.0 - - -
14-09-17 26.9 39.2 49.0 79.0 - - -
15-09-17 27.4 40.1 50.0 78.0 - - -
16-09-17 28.3 38.7 52.0 82.0 - - -
17-09-17 27.3 39.9 55.0 84.0 - - -
18-09-17 26.1 39.2 54.0 80.0 - - -
19-09-17 27.4 39.6 53.0 81.0 - - -
20-09-17 28.0 38.9 54.0 85.0 - - -
21-09-17 27.6 40.1 52.0 83.0 - - -
22-09-17 26.8 37.8 54.0 86.0 - - -
23-09-17 27.2 39.5 50.0 80.0 - - -
24-09-17 26.7 38.2 53.0 82.0 - - -
25-09-17 25.3 36.8 57.0 82.0 - - -
26-09-17 25.8 33.9 58.0 83.0 - - -
27-09-17 25.6 32.9 54.0 86.0 - - -
28-09-17 24.8 33.2 55.0 84.0 - - -
29-09-17 25.9 33.7 53.0 81.0 - - -
30-09-17 25.2 33.6 57.0 82.0 - - -
Contractor's Rep CMU's Rep. Client's Rep./M.C. Rep.Contractor's Rep CMU's Rep. Client's Rep./M.C. Rep.
Monthly ESMF ReportPeriod – September 2017
CONTENTS
S.No. Description Page No.
1. Executive Summary
2. Status of Statutory Clearances
3. Details of Earthwork
4. Details of Water Consumption
5. Work Done During the Month
6. Environmental Enhancement
7. Waste Generation and Disposal
8. Details of PUC
9. Details of Machineries in Operation
10. Road Accident Report
11. HSE Objectives and Measures
12. Grievance Management
13. Observation on EMP Implementation and Compliance
14. Conclusions
LIST OF ANNEXURE
I. Photographs – Good Environmental Practices
II. Photographs – Safety Tool Box Talks
III. Details of the ESMF Performance Indicator
Monthly ESMF ReportPeriod – September 2017
1. EXECUTIVE SUMMARYThis report summarizes the achievements and accomplishments in health, environment, safety and socialforay. HSE accomplishments of the month: The OPRC Sangrur - Mansa - Bathinda project has achievedapproximately3074784 safe cumulative man-hours worked up to 30th–September-2017.
Table 1:- HSE Initiative and Achievements
S. No. Activity Measures Remarks
1 ESMF performance indicator Attached in Annexure III
2 Statutory clearance All required statuary clearances have beenobtained except permission for extractionof ground water.
Ref: Table 4, Not requiredas per CWGA guidelinesas extracted quantity ofwater per day is less than 1Lac liter.
3 Earth work During this month 2051 Cum earthworkwas produced and 2051Cum was reused.
Ref: Table 8
4 Water consumption 414 KLD water used in gardening andsprinkling for settling of dust on haul roadand base camps.
Ref: Table 9
5 Waste generation and disposal 443 Cum milling material was generated,while 676 Cum used as per design.Surplus quantity is stored at camp site.
Ref: Table 13
6 Pollution under controlcertificates
Various dates. Ref: Table 14
7 Cleaning of culverts 216 Nos. cleaned. Ref: Table 10
8 Environmental monitoring All Environmental Monitoring of OPRCproject has been done as per scheduled.
Construction period hasbeen completed.
Monthly ESMF ReportPeriod – September 2017
Table 2: Good HSE Practices
S. No. Activity Number Remarks
1. Package Skid MountedSewage Treatment plant ofcapacity 20 KLD is inoperation in base camp 2.
Sewage collection tank (2 No.) has beencovered and facilitated with exhaust pipe(PVC).
Capacity has beenincreased to 20KLD.
2. Plants and landscaping is beingmaintained in both the campsites, to develop a green belt.
Landscaping is being improved and plantsare being maintained in both camps.
3. Composting Pit Operational at one camp site .
4. Collection, Segregation andStorage area for solid waste.
Operational at both camp site
Table 3: Details of the Project HSE Team
S. No. Name Designation
1. Sewak Singh Sidhu CMU Team Leader
2. VardanSrivastava Sr. Environmental Officer.
3. Mani Kumar Jr. Environmental Officer.
4. Ramesh Patil Sr. Safety Officer
5. Nitin Sharma Safety Supervisor
2. STATUS OF STATUTORY CLEARANCESThe need to comply and adhere to HSE laws, regulations and social policies and the requirement to
obtain permissions before undertaking any work is adequately understood. All the concerned
authorities as per applicability have been approached to get clearances as per contract provisions.
2.1. CONSTRUCTION CAMPS
Table 4:- Status of the Statutory Clearances of the Camp 1 (KhialaKhurd) and Camp 2 (KhialaKalan)
Activities Statutory Authority When Required Status Expiry Date Remarks
Applied Obtained/Approved
Camp-1:KhialaKhurd Camp at Km. 64+050; 3KM LHSCamp Layout Plan PWD, Sangrur Before
ConstructionApplied with revised camplayout plan with seweragesystem vide letter no.PIPL/OPRC/186/2013dated 31.07.2013
NA
Consent toEstablishment (CTE)for Hot Mix Plant(Apollo)
Punjab StatePollution ControlBoard
BeforeConstruction
Applied vide letter no.PIPL/OPRC/PWD/2013-14/010 dated
23. 09.2013
Obtained vide NOC No.ZO/BTI/2013/NOC -110 dated04.10.2013
03.10.2014 Renewal is not requiredas plant has beenestablished
Consent to Operation(CTO) for Hot MixPlant (Apollo)
Punjab StatePollution ControlBoard
BeforeConstruction
Applied vide letter no.PIPL/OPRC/PWD/2013-14/027 dated 24.10.2013
Obtained vide NOC No.ZO/BTI/WPC/2013 /F-164 dated19.12.2013 & ZO/BTI/APC/2013/ F- 148 dated19.12.2013
30.06.2016 Not in use; to bedemobilized
NOC for Change ofLand Use
District TownPlanner, Bathinda
BeforeConstruction
Applied dated 16.04.2013 Obtained vide letter no.997DTP(B)/55 dated 17.04.2013
NA
Permission forWithdrawal of GroundWater for Construction
Central GroundWater Board
BeforeExtraction
Applied vide PIPL/OPRC/PWD/201/2013-14/007 Receiving No.9083at DC office Mansa.
In process gentle reminder (letterno. PIPL/OPRC/618/2015)has been given to DC officeMansa (receiving no. 16341)dated on 30.07.2015
NA Permission from CWGAis not applicable as thequantity of waterextraction is less than 1Lac liter per day.
Installation ofGenerators
Punjab ElectricityBoard
BeforeInstallation
AppliedPIPL/ADMIN/2014-15/078 dated 23.04.2015
Obtained vide memo 000353dated 11.04.2016
Adequate stack heighthas been provided to DGset in Base Camps.
Activities Statutory Authority When Required Status Expiry Date Remarks
Applied Obtained/Approved
Explosive License forStoring Fuel Oil,Lubricants, Diesel, etc.at Construction Camp
Chief Cont. ofExplosives
BeforeInstallation
AppliedPIPL/ADMIN/2014-15/018 dated 22.04.2015
Obtained vide no.P/NC/PB/14/4153 (P317010)dated 22.04.2015
31.12.2017
Camp-2: KhialaKalan Camp at KM. 61+600; 0.3KM RHS
Camp Layout Plan PWD, Sangrur BeforeConstruction
Applied, revised camplayout plan with seweragesystem vide letter no.PIPL/OPRC/408/2014dated 09.09.2014.Revision 2 also submittedvide letter no.OPRC/PIPL/999/2016,13.09.2016.
NA
Consent toEstablishment (CTE)for Hot Mix Plant(Linhoff)
Punjab StatePollution ControlBoard
BeforeConstruction
Applied ID Nos. 1083096dated 29.03.1014
Obtained vide NOC No.ZO/BTI/2014/ NOC -123 dated17.04.2014
16.04.2015 Renewal is not requiredas plant has beenestablished.
Consent to Operation(CTO) for Hot MixPlant (Linhoff)
Punjab StatePollution ControlBoard
BeforeConstruction
Applied ID Nos. 1308253and 1308188 dated16.05.1014
Obtained vide NOC No.ZO/BTI/WPC/ 2014/F-180 &ZO/ BTI/APC/2014/F-163 dated21.05.2014
30.06.2019 Industry IDR14MNS1083075
Storage, Handling, andTransport of HazardousMaterials
Punjab StatePollution ControlBoard (PSPCB)
BeforeConstruction
Applied application ID no.1421038 dated 11.06.2014
Obtained vide letter no.HWM/MNS-2016/3743658dated 25.01.2016
24.04.2021
Installation ofGenerators
Punjab ElectricityBoard
Beforeinstallation
Applied PIPL/ADMIN/2014-15/078 dated23.04.2015
Obtained vide memo 000354dated 11.04.2016
Permission forWithdrawal of GroundWater for Construction
Central GroundWater Board
BeforeExtraction
Applied vide PIPL/OPRC/PWD/201/2013-14/007 Receiving No.9084at DC office Mansa.
In processGentle reminder (letter no.PIPL/OPRC/618/2015)has been given to DC officeMansa (receiving no. 16341)dated on 30.07.2015
NA Permission from CWGAis not applicable as theQuantity of waterextraction is less than 1Lac liter per day.
Activities Statutory Authority When Required Status Expiry Date Remarks
Applied Obtained/Approved
Other ClearancesRegistration of Vehicles& Road Equipment’s
Motor VehicleDepartment
Beforeconstruction
Applied various date Obtained Various dates Engaged for OPRCproject
PUC of all Vehicles/Machinery
Motor VehicleDepartment
Beforeoperational
Applied various date Ref. Table 13 Ref. Table 14 Engaged for OPRCproject
Labour License LabourCommissioner,Sangrur
- Applied for renewal videletter no.PIPL/ADMIN/2014-15/39dated 15.12.2014
Obtained vide License no.-L-563 dated 17.11.2016 for 100labours
31.12.2017
Labour License LabourCommissioner,Bathinda
- Applied for renewed videletter no.PIPL/ADMIN/2014-15/40dated 15.12.2014
Applied with vide License no. -L-20/2013 dated 21.03.2017 for50 labours
31.12.2017
Sand Mining Dept of Geo. andMining,
Beforeoperational
- - NA Not Applicable asprocured from existingsand quarry.
Quarry for Aggregates Dept of Geo. andMining,
BeforeOperational
- - NA Not Applicable; asprocured from existingaggregates quarry
Debris Disposal Sites Gram Panchayat BeforeOperational
Applied vide letter no.PIPL/OPRC/101/2013dated 02.05.2015
- NA Ch. 6+300 R/S on S-2road.
Canal Water Permission Irrigation Department - Applied for renewal videour letter on dated24.06.2016
Renewed vide serial no. Z,receipt no.111211 dated23.08.2016
30.06.2017 Construction phase isover. So there is norequirement of extractionof canal water.
Forest Clearance Forest Department BeforeOperational
- Ref. Table 6 NA Application for forestclearance had beensubmitted by PWDSangrur.
2.2. FOREST CLEARANCE
Table 5: Forest Clearance Status of the S2, S3 and S4 Roads
RoadName
StatutoryAuthority
When Required Stretch Obtained/Approved Remarks
S2
Forest Dept.,Sangrur
Before Construction 2+240 to 18+300 Obtained (diversion of forest land)vide letter no. F. No: 9-PBC536/2012-CHA dated25.04.2015
Cutting completed.
Forest Dept.Sangrur
Before Construction 18+300 to 45+700 Obtained (diversion of forest land)vide letter no. 220 dated13.04.2015
Final approval obtained andtree cutting completed.
Forest Dept.,Mansa
Before Construction 45+700 to 67+800 Obtained (diversion of forest land)vide letter no. 220 dated13.04.2015
Final approval obtained andtree cutting has beencompleted.
Forest Dept.,Mansa
Before Construction 67+800 to 79+000 Obtained (diversion of forest land)vide letter no. F.No: 9-PBC536/2012-CHA dated25.04.2015
Cutting completed
Forest Dept.,Mansa
Before Construction 79+000 to 82+000 Obtained (diversion of forest land)vide letter no. 220 dated13.04.2015
Final approval obtained andtree cutting has beencompleted.
Forest Dept.,Bathinda
Before Construction 82+000 to 108+770 Obtained (diversion of forest land)vide letter no.220 dated13.04.2015.
Final approval obtained andtree cutting has beencompleted.
S3 Forest Dept.,Mansa
Before Construction 119+640 to 126+930 Obtained (diversion of forest land)vide letter no. 4047-48 dated16.09.2014
Final approval obtained andtree cutting has beencompleted.
S4 Forest Dept.Mansa &Bathinda
Before Construction 0+000 to 24+970 Obtained (diversion of forest land)vide letter no. F.No: 9-PBC255/2013-CHA dated13.11.2015.
Cutting completed
2.3. DETAILS OF TREE CUTTING
Table 6: Tree Cutting Progress Status on S2 & S3 Roads
Chainage (Km) District &Division
Forest area to bediverted (ha)
No. of trees tobe cut
No. of trees cut up toprevious month
No. of trees cut in thismonth
Total trees cutFrom To
S2 road
2.240 18.300 Sangrur 4.48 1456 1456 NA 1456
18.300 45.220 Sangrur 14.61 2672 Data not available Data not available Data not available
45.220 67.800 Mansa17.0211
3593
Data not available Data not available Data not available
79.000 82.500 Mansa Data not available Data not available Data not available
67.800 79.000 Mansa 6.43 Data not available Data not available Data not available
82.500 108.770 Bathinda 13.3710 4697 Data not available Data not available Data not available
Total 55.91 12418 Data not available Data not available Data not available
S3 road
119.640 126.930 Mansa 11.53 1352 Data not available Data not available Data not available
Total 11.53 1352 Data not available Data not available Data not available
Note: Tree cutting is being done by forest deportment on S2 and S3 road. The communication has been done with forest department
several times to know the information regarding tree cutting, but the same was not provided.
2.4. DETAILS OF CAMP/PLANT SITE
The base camp has been established at village KhialaKhurdwhich includes the office, laboratory,
store, workshop, diesel dispensing unit, staff quarters, dining mess and labour camp. Office,
laboratory, weigh Bridge, stores, staff quarters, labour camps and workshop are operational and
approval of fuel dispensing units from concerned authority has been obtained.
Camp 2 is fully functional with hot mix plant, WMM plant, residential quarters, dining mess and
material storage. The wind barrier around HMP has been constructed and fast growing plants have
been planted along the boundary which prevent dust nuisance in the nearby locations.
Table 7:- Location and Area Details of the Base Camps
Sl.No
Camp Site/Plant Site
ProjectRoad Chainage
Area ofCamp
PredominantWind Direction Remarks
1 Base Camp @KhialaKhurd
S2 Km.64+050
LHS
4.3Acres
NW
2 Base Camp @KhialaKalan
S2 Km.61+600
RHS
9.3Acres
NW
Monthly ESMF ReportPeriod – September 2017
3. DETAILS OF EARTHWORK
Table 8: Quantity of the Earth Work Produced and Reused up to September-2017
Sr.No.
Name ofRoad
Description ofLocation
Quantity of Earth Produced (Cum) Quantity of Earth Reused (Cum) Remarks
Up toPreviousMonth
This Month Total Up to PreviousMonth
This Month Total
1. S1 Existing Road 137 0 137 4128 0 4128
2 S2 Existing Road 321082 2051 323133 268906 2051 270957
3 S3 Existing Road 33145 0 33145 49701 0 49701
4 S4 Existing Road 92399 0 92399 95216 0 95216
5 S5 Borrow Area 8890 0 8890 32283 0 32283 Recycled.
6 B8 Existing Road 0 0 0 4118 0 4118
7 - Khiala Camp 1 - - - 500 0 500
Total Quantity of EarthProduced
457704 Total Quantity of EarthReused
456903
Surplus earth is available and stored at work site and used in preparation of shoulders on all project roads.
Monthly ESMF Report
Period – September 2017
4. DETAILS OF WATER CONSUMPTION
Table 9: Water Consumption during the Month of September-2017.
Date
Water Consumption (KLD)Total
Quantity(KLD)House hold
(average) Gardening Sprinkling ConstructionCamp 1 Camp 2
01/09/2017 0.90 6.18 2.80 11.00 0.00 20.8802/09/2017 0.90 7.44 2.80 11.00 10.00 32.1403/09/2017 0.00 7.35 2.80 11.00 0.00 21.1504/09/2017 0.90 8.07 2.80 11.00 0.00 22.7705/09/2017 0.90 8.07 2.80 11.00 10.00 32.7706/09/2017 0.90 8.39 2.80 11.00 20.00 43.0907/09/2017 0.90 8.39 2.80 11.00 30.00 53.0908/09/2017 0.90 7.86 2.80 11.00 0.00 22.5609/09/2017 0.90 7.76 2.80 11.00 0.00 22.4610/09/2017 0.00 7.35 2.80 11.00 0.00 21.1511/09/2017 0.90 7.97 2.80 11.00 0.00 22.6712/09/2017 0.90 8.18 2.80 11.00 10.00 32.8813/09/2017 0.90 8.28 2.80 11.00 60.00 82.9814/09/2017 0.90 8.49 2.80 11.00 60.00 83.1915/09/2017 0.90 8.28 2.80 11.00 40.00 62.9816/09/2017 0.90 8.91 2.80 11.00 30.00 53.6117/09/2017 0.00 7.35 2.80 11.00 0.00 21.1518/09/2017 0.90 8.91 2.80 11.00 20.00 43.6119/09/2017 0.90 9.44 2.80 11.00 40.00 64.1420/09/2017 0.90 8.81 2.80 11.00 30.00 53.5121/09/2017 0.90 8.91 2.80 11.00 20.00 43.6122/09/2017 0.90 8.49 2.80 11.00 20.00 43.1923/09/2017 0.90 8.28 2.80 11.00 0.00 22.9824/09/2017 0.00 7.35 2.80 11.00 0.00 21.1525/09/2017 0.90 8.70 2.80 11.00 10.00 33.4026/09/2017 0.90 8.81 2.80 11.00 20.00 43.5127/09/2017 0.90 9.12 2.80 11.00 30.00 53.8228/09/2017 0.90 7.76 2.80 11.00 10.00 32.4629/09/2017 0.90 9.12 2.80 11.00 30.00 53.8230/09/2017 0.90 8.70 2.80 11.00 50.00 73.40
23.40 246.68 84.00 330.00 550.00 1234.08Sources of water for construction have been identified and details have been given in OPRC-EMP-12-Rev00
Monthly ESMF Report
Period – September 2017
5. WORK DONE DURING THE MONTHFor the month of September-2017, road raise pavement markers, low shoulder rectification, roadcleaning along the kerb, low shoulder rectification and cleaning, hazard and sign boardsmaintenance, delineator cleaning and fixing, main carriageway cleaning, R.O.B cleaning, culvertcleaning, bund removal from the shoulder, kilometer and hectometer stone cleaning, white washingon trees, new installation and reinstallation of sign boards and brick work for headwall, catch pitwall, median kerb, parapet wall, roundabout and safety wall, road marking and improvement workactivities were the major activities apart from the following activities which ensured comfort andconvenience to road commuters.
Table 10: Details of Work Done During the Month of September-2017.S.No Road Name Chainage Side Quantity
From ToCateyes Fixing (RRPM’s) in Nos.
1 S1 0+050 0+150 LHS 4.002 S1 0+050 0+150 Center 5.003 S1 0+050 0+150 RHS 4.004 S1 2+450 2+600 LHS 2.005 S1 2+450 2+600 Center 4.006 S1 2+450 2+600 RHS 2.007 S1 6+700 6+950 LHS 1.008 S1 6+700 6+950 Center 1.009 S1 6+700 6+950 RHS 2.0010 S1 9+100 9+350 LHS 2.0011 S1 9+100 9+350 Center 2.0012 S1 9+100 9+350 RHS 1.0013 S1 9+550 9+900 LHS 1.0014 S1 9+550 9+900 RHS 2.0015 S1 10+350 10+500 LHS 1.0016 S1 10+350 10+500 RHS 1.0017 S2 59+250 59+400 Center 1.0018 S2 59+250 59+400 RHS 2.0019 S2 68+520 69+010 LHS 2.0020 S2 68+520 69+010 Center 2.0021 S2 68+520 69+010 RHS 8.0022 S2 13+550 13+600 Center 6.0023 S2 12+630 12+900 LHS 4.0024 S2 12+630 12+900 Center 4.0025 S2 12+630 12+900 RHS 2.0026 S2 13+750 13+900 LHS 1.0027 S2 13+750 13+900 Center 3.0028 S2 13+750 13+900 RHS 1.0029 S2 16+750 17+000 LHS 2.0030 S2 16+750 17+000 Center 5.00
Monthly ESMF Report
Period – September 2017
31S2 16+750 17+000 RHS 2.00
32 S2 17+400 17+600 LHS 1.0033 S2 17+400 17+600 Center 2.0034 S2 17+400 17+600 RHS 2.0035 S2 20+650 20+800 LHS 2.0036 S2 16+220 16+235 Center 4.0037 S2 16+250 16+260 RHS 2.0038 S2 28+000 28+150 LHS 1.0039 S2 28+000 28+150 Center 2.0040 S2 28+000 28+150 LHS 1.0041 S2 28+000 28+150 Center 2.0042 S2 28+000 28+150 RHS 2.0043 S2 28+700 28+950 LHS 1.0044 S2 28+700 28+950 Center 3.0045 S2 28+700 28+950 RHS 1.0046 S2 29+700 29+850 LHS 2.0047 S2 29+700 29+850 Center 1.0048 S2 29+700 29+850 RHS 2.0049 S2 35+810 36+080 Center 2.0050 S2 35+810 36+080 RHS 1.0051 S2 36+150 36+430 Center 2.0052 S2 36+600 36+900 Center 2.0053 S2 36+600 36+900 RHS 2.0054 S2 18+250 RHS 12.0055 S2 18+380 RHS 12.0056 S2 39+400 RHS 12.0057 S2 40+600 RHS 12.0058 S5 6+450 6+570 LHS 2.0059 S5 6+450 6+570 Center 1.0060 S5 1+230 1+350 LHS 1.0061 S5 1+230 1+350 RHS 1.0062 S5 0+650 0+900 LHS 2.0063 S5 0+650 0+900 RHS 1.0064 B8 13+350 13+600 LHS 1.0065 B8 13+350 13+600 Center 7.0066 B8 13+550 13+600 LHS 1.0067 B8 12+440 12+600 LHS 1.0068 B8 12+440 12+600 Center 6.0069 B8 12+440 12+600 LHS 1.0070 B8 12+440 12+600 Center 7.0071 B8 6+750 6+860 LHS 6.0072 B8 6+750 6+860 Center 6.00
Monthly ESMF Report
Period – September 2017
73 B8 6+750 6+860 RHS 6.00
74 B8 6+750 6+860 LHS 6.00
75 B8 6+750 6+860 Center 6.0076 B8 6+750 6+860 RHS 6.00
Shoulder rectification (Sqm)77 S1 0+000 2+200 BHS 800.0078 S2 81+600 85+000 RHS 4000.0079 S2 75+800 81+000 RHS 4000.0080 S2 69+350 69+800 LHS 450.0081 S2 67+400 67+900 LHS 500.0082 S2 67+200 67+900 RHS 700.0083 S2 76+250 76+400 LHS 150.0084 S2 76+250 76+450 RHS 200.0085 S2 77+350 77+400 LHS 50.0086 S2 15+000 20+000 BHS 1600.0087 S2 20+000 25+000 BHS 1800.0088 S2 25+000 25+400 BHS 400.0089 S2 27+200 29+000 BHS 1500.0090 S2 29+000 30+000 BHS 700.0091 S2 55+000 65+000 BHS 1200.0092 S2 50+000 53+000 RHS 180093 S2 46+600 50+000 RHS 160094 S2 70+000 75+000 BHS 500095 S2 45+000 48+200 BHS 1500.0096 S2 35+000 40+000 BHS 1700.0097 S2 105+000 108+700 RHS 3000.0098 S2 105+400 107+000 LHS 1000.0099 S3 183+600 184+000 LHS 400100 S3 184+000 186+500 LHS 1500101 S3 187+600 188+400 LHS 800102 S3 189+000 190+000 BHS 2000103 S3 189+000 190+000 BHS 2000104 S4 20+000 24+970 BHS 4000.00105 S4 15+000 20+000 RHS 1500.00106 S4 15+000 18+400 LHS 1400.00107 S4 18+400 20+000 RHS 750.00108 S4 0+000 3+000 BHS 4000109 S4 3+000 5+000 BHS 6000110 S4 10+000 15+000 BHS 1500.00111 S5 20+000 23+600 RHS 3600112 S5 20+000 22+000 LHS 2000113 S5 22+000 24+000 LHS 1200
Monthly ESMF Report
Period – September 2017
114S5 23+600 24+000 RHS 400
115 S5 13+000 14+000 RHS 1000.00116 S5 10+000 13+000 RHS 3000.00117 S5 10+000 12+000 LHS 2000.00118 S5 12+000 15+000 LHS 2000.00119 B8 9+200 10+000 BHS 1600.00120 B8 10+000 12+000 BHS 1000.00
Reverse slope rectification (Sqm)121 S2 69+350 69+450 RHS 23.00
Rain cut rectification (Sqm)122 S2 53+000 54+000 BHS 200.00123 S2 63+000 63+200 LHS 25.00124 S2 55+200 55+600 RHS 25.00125 S2 15+000 20+000 BHS 25.00126 S2 40+000 42+000 BHS 35.00127 S2 42+000 45+000 BHS 75.00128 S3 183+000 185+000 BHS 2.00129 S3 188+000 190+000 BHS 1.50130 S4 3+650 BHS 9.00131 S4 2+400 BHS 1.00132 S4 0+400 BHS 1.00133 S4 17+420 BHS 4.00134 S4 4+200 BHS 1.00135 S5 7+200 RHS 0.75
Embankment rectification (Sqm)136 S1 0+800 4+500 LHS 7.50137 S1 5+300 9+200 LHS 25.00138 S2 12+000 13+000 BHS 7.50139 S2 20+000 25+000 BHS 10.00140 S2 35+800 36+000 BHS 50.00141 S2 33+500 34+000 BHS 10.00142 S3 184+000 186+200 RHS 1000.00
Culvert cleaning (Nos.)143 S1 1+000 5+000 BHS 5.00144 S1 5+000 9+000 RHS 7.00145 S1 9+000 11+000 BHS 5.00146 S2 10+000 15+000 BHS 2.00147 S2 15+000 20+000 BHS 5.00148 S2 20+000 25+000 LHS 5.00149 S2 29+000 30+000 BHS 2.00150 S2 30+000 33+000 BHS 5.00151 S2 52+000 54+000 BHS 4.00
Monthly ESMF Report
Period – September 2017
152 S2 50+000 54+000 LHS 6.00
153 S2 45+000 50+000 BHS 8.00154 S2 40+000 42+000 BHS 2.00155 S2 42+000 45+000 BHS 1.00156 S2 37+000 40+000 BHS 4.00157 S2 35+000 37+000 BHS 6.00158 S2 30+000 35+000 BHS 8.00159 S2 2+240 10+000 BHS 12.00160 S2 35+000 40+000 BHS 4.00161 S4 20+000 21+600 BHS 6.00162 S4 21+600 23+000 BHS 9.00163 S4 23+000 24+970 BHS 8.00164 S4 15+000 18+000 BHS 8.00165 S4 18+000 20+000 BHS 8.00166 S4 0+000 5+000 BHS 4.00167 S4 5+000 7+500 BHS 10.00168 S4 10+000 11+400 BHS 8.00169 S4 11+400 15+000 BHS 7.00170 S5 0+000 4+000 BHS 9.00171 S5 4+000 5+000 BHS 4.00172 S5 20+000 21+000 BHS 4.00173 S5 21+000 24+000 BHS 6.00174 S5 5+000 7+000 RHS 4.00175 S5 7+000 12+000 RHS 11.00176 S5 7+000 12+000 BHS 13.00177 B8 10+000 15+000 BHS 6.00
Chevron sheets installed due to damage (Nos.)178 B8 17+150 RHS 2.00179 B8 17+230 RHS 1.00
Triple chevron sing board installed on Round about portion (Nos.)180 B8 9+150 4.00
Cross Road ahead signboard installed (Nos.)181 B8 22+080 LHS 1.00
No overtaking signboard ACM Sheet installed(Nos.)182 S2 11+240 LHS 1.00
Keep left 300mm sheet installed for jumbo bollard signboard(Nos.)183 S2 35+100 LHS, 35+210 RHS Median 2.00
Keep left 400mm sheet installed for jumbo bollard signboard (Nos.)184 S2 39+410 Median 1.00
Gap in median signboard installed (Nos.)185 B8 8+080, 13+430 Median 2.00
Speed breaker signboardinstallation (Nos.)
Monthly ESMF Report
Period – September 2017
186 S3 189+950 Median, 190+030 LHS, 190+050 RHS 3.00
187 B8 27+450 LHS, 27+500 RHS 2.00188 B8 7+600 LHS, 7+950 RHS 2.00Flag type direction signboard installed (Nos.)189 S2 39+700 RHS, 40+650 LHS, 40+750 RHS, 42+310 LHS,
40+380 RHS 51+480 RHS, 51+370 RHS7.00
190 S2 107+500 LHS 1.00Informatory signboard Installation (Nos.)191 B8 9+210 RHS, 9+110 LHS 2.00
Informatory signboard installed (4 Name) in Nos.192 S3 186+550 LHS, 186+750 RHS 2.00
Informatory signboard installed (3 Name) in Nos.193 S2 40+000 LHS, 40+260 RHS 2.00194 B8 9+150 LHS, 9+150 RHS 2.00
Informatory signboard installed ( 2 Name) in Nos.195 S2 35+100 LHS, 35+210 RHS 2.00
Removal of shoulder water stagnation (Sqm)196 S2 10+000 15+000 RHS 1300.00
Road from left side signboard installed (Nos.)197 B8 16+550 RHS 1.00
Road from right side signboard installed (Nos.)198 B8 27+500 RHS 1.00
Delineator reinstalled for Curve Portion (Nos.)199 B8 15+000 20+000 BHS 25.00
Delineator Cleaning (Nos.)200 S4 5+000 7+500 BHS 20.00
Stop signboard installed due to damage on link road(Nos.)201 S5 6+250 LHS 1.00
Signpost cleaning (Nos.)202 S1 1+000 5+000 BHS 10.00203 S1 5+000 9+000 BHS 14.00204 S2 10+000 15+000 BHS 18.00205 S2 15+000 20+000 BHS 20.00206 S2 20+000 25+000 BHS 32.00207 S2 35+000 37+000 BHS 13.00208 S2 30+000 35+000 BHS 13.00209 S2 2+600 10+000 BHS 30.00210 S5 0+000 4+000 BHS 10.00211 S5 21+000 24+000 BHS 11.00212 S5 5+000 7+000 BHS 15.00213 S5 7+000 12+000 BHS 18.00
Signboard cleaning (Nos.)
Monthly ESMF Report
Period – September 2017
214 S2 50+000 54+000 LHS 7.00
215 S2 45+000 50+000 BHS 10.00216 S2 40+000 42+000 BHS 6.00217 S2 42+000 45+000 BHS 6.00218 S2 37+000 40+000 BHS 7.00
Hazard Marker Signboard installed due to theft(Nos.)219 S5 6+650 RHS 2.00
Road cleaning along the kerb (Sqm)220 S2 84+000 85+000 BHS 800.00221 S2 25+000 26+400 BHS 800.00222 S2 39+400 40+000 BHS 600.00223 S3 189+500 190+000 BHS 500.00224 S3 187+600 188+000 LHS 400.00225 S3 188+000 188+200 LHS 100.00226 S3 188+200 189+600 LHS 700.00227 S3 188+600 189+600 RHS 500.00228 S3 188+350 188+650 RHS 150.00229 B8 8+650 9+000 BHS 280.00230 B8 10+000 11+000 BHS 400.00
231 B8 7+400 7+540 BHS 112.00232 B8 7+000 7+400 BHS 160.00234 B8 6+500 7+000 BHS 1000.00235 B8 5+900 6+500 BHS 1200.00236 B8 7+500 8+000 BHS 1000.00
237 B8 7+540 8+040 BHS 500.00
238 B8 8+800 9+200 RHS 320.00
239 B8 11+000 12+000 BHS 400.00
240 B8 30+600 31+000 BHS 400.00
241 B8 31+000 32+000 BHS 200.00
242 B8 31+200 31+400 BHS 200.00
243 B8 31+400 31+600 BHS 200.00
244 B8 31+600 31+800 BHS 80.00
245 B8 30+800 30+950 BHS 120.00
246 B8 32+000 32+700 BHS 560.00
247 B8 32+700 32+830 BHS 104.00ROB Cleaning (Sqm)248 S2 26+400 27+200 BHS 500.00249 S3 186+800 187+600 LHS 320.00250 S3 186+800 187+600 RHS 400.00
Main carriageway cleaning (Sqm)251 S2 55+000 55+600 RHS 400.00
Monthly ESMF Report
Period – September 2017
HM stone cleaning (Nos.)
252 S1 3+000 5+000 LHS 8.00253 S1 1+000 5+000 LHS 8.00
254 S1 5+000 9+000 LHS 12.00255 S2 10+000 15+000 LHS 20.00256 S2 65+000 67+000 LHS 8.00257 S2 15+000 18+000 LHS 12.00258 S2 20+000 25+000 LHS 16.00259 S2 25+000 29+000 LHS 4.00260 S2 30+000 33+000 BHS 12.00261 S2 50+000 54+000 LHS 16.00262 S2 45+000 50+000 LHS 20.00263 S2 35+000 37+000 LHS 8.00264 S2 30+000 35+000 LHS 15.00265 S2 70+000 75+000 BHS 20.00266 S2 2+600 10+000 LHS 28.00267 S4 20+000 21+600 LHS 8.00268 S4 21+600 23+000 LHS 9.00269 S4 15+000 18+000 LHS 12.00270 S4 5+000 7+500 LHS 10.00271 S4 0+000 5+000 LHS 20.00272 S4 10+000 11+400 BHS 6.00273 S4 11+400 15+000 BHS 14.00274 S5 0+000 4+000 LHS 16.00275 S5 5+000 7+000 LHS 8.00276 S5 7+000 12+000 LHS 16.00277 S5 13+000 16+000 LHS 8.00278 B8 10+000 15+000 LHS 20.00279 B8 20+000 22+000 BHS 8.00280 B8 28+000 30+000 BHS 8.00
Junction cleaning (Sqm)281 S1 11+300 BHS 75.00282 S2 24+500 24+600 BHS 200.00283 S2 55+500 LHS 40.00284 S4 24+970 BHS 20.00285 S5 0+000 0+040 BHS 60.00286 B8 9+100 9+300 BHS 160.00
Island cleaning (Sqm)287 S1 0+000 BHS 30.00288 S2 67+700 67+900 BHS 120.00289 B8 9+100 9+300 BHS 200.00
Km stone foundation repaired (Sqm)
Monthly ESMF Report
Period – September 2017
290 S5 4+000 LHS 0.30
KM stone cleaning (Nos.)
291 S1 3+000 5+000 LHS 3.00292 S1 1+000 5+000 LHS 3.00293 S1 5+000 9+000 LHS 4.00294 S2 65+000 67+000 LHS 2.00295 S2 10+000 15+000 LHS 6.00296 S2 15+000 18+000 LHS 4.00297 S2 20+000 25+000 LHS 5.00298 S2 25+000 29+000 LHS 2.00299 S2 30+000 33+000 BHS 3.00300 S2 50+000 54+000 LHS 5.00301 S2 45+000 50+000 LHS 5.00302 S2 35+000 37+000 LHS 3.00303 S2 30+000 35+000 LHS 4.00304 S2 70+000 75+000 BHS 5.00305 S2 2+600 10+000 LHS 8.00306 S4 20+000 21+600 LHS 1.00307 S4 21+600 23+000 LHS 2.00308 S4 15+000 18+000 LHS 3.00309 S4 5+000 7+500 LHS 2.00310 S4 0+000 5+000 LHS 5.00311 S4 10+000 11+400 BHS 1.00312 S4 11+400 15+000 BHS 4.00313 S5 0+000 4+000 LHS 4.00314 S5 5+000 7+000 LHS 3.00315 S5 7+000 12+000 LHS 5.00316 S5 13+000 16+000 LHS 3.00317 B8 10+000 15+000 LHS 5.00318 B8 20+000 22+000 BHS 2.00319 B8 28+000 30+000 BHS 2.00
Median cleaning (Sqm)320 S2 18+300 18+500 Center 120.00321 B8 9+200 10+500 Center 800.00
Median kerb painting (Sqm)322 B8 8+040 8+650 BHS 244.00323 S2 25+000 26+350 BHS 2000.00
Patch work (Sqm)324 S2 67+800 LHS 6.00
325 S2 45+050 RHS 0.50326 S2 67+850 LHS 5.00
327 S3 182+800 LHS 4.50
Monthly ESMF Report
Period – September 2017
Patchwork at RUB portion (Sqm)
328 B8 7+540 8+040 BHS 2.500329 B8 7+540 8+040 BHS 1.500330 B8 7+540 8+040 BHS 1.500
331 B8 7+540 8+040 BHS 2.000
332 B8 7+540 8+040 BHS 0.250
333 B8 7+540 8+040 BHS 1.000
334 B8 7+540 8+040 BHS 2.250
335 B8 7+540 8+040 BHS 2.850
336 B8 7+540 8+040 BHS 1.000
337 B8 7+540 8+040 BHS 1.000
RUB cleaning work (Sqm)
338 B8 7+540 7+700 RHS 240.00339 B8 7+700 8+040 RHS 510.00340 B8 7+800 8+040 Center 480.00
Drain & catchpit cleaning along the kerb(Nos.)341 S1 0+100 0+800 LHS 32.00
Footpath cleaning (Sqm)342 B8 7+800 8+040 LHS 360.00343 B8 7+540 7+700 RHS 240.00344 B8 7+800 8+040 LHS 360.00
Rope wire type safety barrier cleaning (Sqm)345 S1 1+000 5+000 LHS 1000.00346 S2 17+400 17+500 LHS 100.00347 S4 21+000 21+070 BHS 266.00348 S4 24+500 24+570 BHS 266.00349 S4 11+550 11+600 BHS 150.00
Dewatering (Sqm)350 S1 0+000 0+800 BHS 300.00351 S1 11+300 RHS 50.00352 S2 10+000 64+000 BHS 1500.00353 S2 70+000 80+000 LHS 400.00354 S2 97+000 108+000 BHS 1250.00355 S3 183+000 192+000 BHS 200.00356 S4 0+000 24+970 BHS 4000.00357 S5 10+000 23+000 BHS 1800.00358 B8 9+200 15+000 LHS 1000.00359 B8 9+200 15+000 BHS 800.00
Pavement surface cleaning (Sqm)360 S1 0+000 0+800 BHS 1200.00361 S2 67+600 67+900 BHS 1200.00
Monthly ESMF Report
Period – September 2017
362 S2 69+300 69+350 RHS 100.00
363 S2 83+900 84+070 BHS 680.00364 S2 67+200 67+600 RHS 800.00365 S2 67+400 67+600 LHS 400.00366 S2 15+000 20+000 BHS 2400.00367 S2 20+000 25+000 BHS 1800.00368 S2 25+000 25+400 BHS 400.00369 S2 27+200 29+000 BHS 1200.00370 S2 55+000 55+600 LHS 750.00371 S2 50+000 53+000 RHS 2700372 S2 46+600 50+000 RHS 1600373 S2 45+000 48+200 BHS 1500.00374 S2 35+000 40+000 BHS 1700.00375 S4 15+000 15+200 BHS 1000.00376 S4 15+600 15+620 RHS 50.00377 S5 20+000 23+600 BHS 1800.00378 S5 20+000 24+000 LHS 750.00379 S5 10+000 12+000 BHS 1500.00380 S5 12+000 15+000 LHS 2000.00
Pavement scarification for speed table (Sqm)381 B8 26+750 BHS 35.00382 B8 2+682 BHS 35.00383 B8 27+450 BHS 35.00384 B8 27+500 BHS 35.00
Shoulder Cleaning (Sqm)385 S2 11+000 15+000 BHS 2200.00386 S2 45+000 50+000 BHS 2000.00
Obstruction removal from the shoulder (Sqm)387 S1 3+350 RHS 5.00388 S2 44+970 44+975 LHS 5.00389 S2 38+800 38+810 LHS 10.00
Shrubs removal along the shoulder (Rmt)390 S1 3+000 5+000 BHS 2000.00391 S1 1+000 3+000 BHS 4000.00392 S1 5+000 6+000 BHS 1500.00393 S1 6+000 10+000 BHS 3000.00394 S1 10+000 11+300 BHS 200.00395 S1 9+000 11+000 BHS 300.00396 S2 15+000 20+000 BHS 2000.00397 S2 20+000 25+000 RHS 1500.00398 S2 27+300 29+000 BHS 100.00399 S2 29+000 30+000 BHS 20.00
Monthly ESMF Report
Period – September 2017
400 S2 30+000 33+000 BHS 2000.00
401 S2 44+200 46+000 BHS 1500.00402 S2 50+000 53+000 BHS 750.00403 S2 50+000 54+000 BHS 600.00404 S2 45+000 50+000 BHS 700.00405 S2 40+000 42+000 BHS 200.00406 S2 42+000 45+000 BHS 600.00407 S2 37+000 40+000 BHS 500.00408 S2 35+000 37+000 BHS 1500.00409 S2 30+000 35+000 BHS 1600.00410 S2 36+000 37+000 BHS 300.00411 S2 33+000 36+000 BHS 1500.00412 S5 0+200 3+500 BHS 1000.00413 S5 4+000 5+000 BHS 2000.00414 S5 5+000 7+000 BHS 1400.00415 S5 7+000 12+000 BHS 2000.00416 S5 7+000 12+000 BHS 2000.00
Tree branches removal along the shoulder (Rmt)417 S1 3+400 3+420 RHS 20.00418 S2 30+000 30+010 RHS 3000.00419 S2 82+000 83+600 RHS 2000.00420 S2 75+200 75+600 RHS 1000.00421 S2 68+000 69+000 BHS 500.00422 S2 10+000 15+000 BHS 250.00423 S2 70+000 72+000 BHS 1000.00424 S2 20+000 21+600 BHS 400.00425 S2 21+600 23+000 BHS 500.00426 S2 15+000 18+000 BHS 500.00427 S2 23+000 24+970 BHS 200.00428 S4 18+000 20+000 BHS 800.00
Vegetation removal (Sqm)429 S1 3+000 5+000 LHS 1000.00430 S1 0+800 1+500 BHS 500.00431 S1 5+000 11+000 RHS 9000.00432 S1 5+000 6+000 LHS 1500.00433 S1 6+000 11+300 LHS 7500.00434 S1 5+000 9+000 BHS 3500.00435 S2 10+000 17+000 BHS 1200.00436 S2 17+000 24+000 BHS 1200.00437 S2 15+000 18+000 BHS 1000.00438 S2 80+000 85+000 BHS 9600.00439 S2 47+000 53+000 BHS 3000.00
Monthly ESMF Report
Period – September 2017
440 S2 50+000 54+000 LHS 2500.00
441 S2 5+000 10+000 RHS 4500.00442 S2 2+800 5+000 RHS 3300.00443 S2 2+800 10+000 LHS 6750.00444 S2 97+000 108+000 RHS 1200.00445 S2 45+000 50+000 BHS 2000.00446 S4 24+000 30+000 BHS 3000.00447 S4 18+000 20+000 RHS 2400.00448 S4 5+000 7+500 BHS 800.00449 S4 5+500 5+600 BHS 150.00450 S4 5+620 5+670 RHS 75.00451 S4 6+140 6+200 LHS 90.00452 S4 6+120 6+200 RHS 120.00453 S4 6+220 6+260 RHS 60.00454 S4 2+900 2+950 BHS 150.00455 S4 11+000 15+000 BHS 9600.00456 S5 0+000 5+000 BHS 10000.00457 S5 20+000 23+600 BHS 4000.00458 S5 15+000 20+000 BHS 8000.00459 S5 10+000 15+000 BHS 8000.00460 B8 17+000 20+000 BHS 7200.00461 B8 9+600 10+500 Center 560.00462 B8 20+000 25+000 LHS 4800.00463 B8 20+000 25+000 RHS 6000.00464 B8 25+000 30+000 BHS 8400.00465 B8 33+000 38+000 BHS 10000.00
Monthly ESMF ReportPeriod – September 2017
Table 11:- Work Program for the month ofOctober- 2017
S. No. Item Description Road Name Location of Work EMP activities HSE activities
From To Side
1. Structure work &Approach roadwork of bridge inprogress.
S2 100+700 BHS Water sprinkling for dust suppression.All vehicle and machinery to be checkedfor PUC.
Barricading of excavated area with safetycones, delineators and sand bags, safetymeasures with sign board and flagmen.Monthly construction site “HSE” audit.
2. Structure work &Approach roadwork of bridge inprogress.
S2 69+800 BHS Water sprinkling for dust suppression.All vehicle and machinery to be checkedfor PUC.
Barricading of excavated area with safetycones, delineators and sand bags, safetymeasures with sign board and flagmen.Monthly construction site “HSE” audit.
3. Structure work &Approach roadwork of bridge inprogress.
S2 73+450 BHS Water sprinkling for dust suppression.All vehicle and machinery to be checkedfor PUC.
Barricading of excavated area with safetycones, delineators and sand bags, safetymeasures with sign board and flagmen.Monthly construction site “HSE” audit.
4. Routinemaintenance ofwhole road length
S1,S2,S3,S4,S5& B8
Water sprinkling for dust suppression.All vehicle and machinery to be checkedfor PUC.
Barricading of excavated area with safetycones, delineators and sand bags, safetymeasures with sign board and flagmen.Monthly construction site “HSE” audit.
Monthly ESMF ReportPeriod – September 2017
6. ENVIRONMENTAL ENHANCEMENT
Table 12: Details of Environmental Enhancement Works
S.No. RoadName
Chainage/ Km Enhancement Details
Total Numbers
Current status Remarks
Ch: In EMP Ch: ActualStatus In EMP Actual
Status1 S1 1+400 1+460 Cultural Properties-
Temple
1 1 Yet not finalized by client as avariation.
Ref: Table 5-1 inEMP of S1 road
2 S2 From8+956
to 9+097
From8+430 to 9+700
Water Body/ Ponds 2 2 Yet not finalized by client as avariation. Since the roadalignment has been shiftedtowards RHS the existing parapetwall /protection wall has beenrepaired where required, whitewashed periodically. In additionto this rope wire safety barrieralso has been fixed.
Ref:Table 5-1 inEMP of S2 road
3 S2 From17+410 to
17+500
From17+410
to17+500
Water Body/ Ponds 1 1 Metal Beam Crash Barrierinstalled as per engineeringdrawing.
Ref: Table 5-1 inEMP of S2 road
4 S2 8+540 8+560 Boundary wall ofCultural Properties
1 1 Realignment has been done, fromKm. 8+400 to 9+400
Ref: Table 5-3 inEMP of S2 road
5 S2 40+080 40+200 School (NoiseSensitive Receptors)
1 1 Plantation has been done on dated20.03.2017, thusenhancementcompleted.
Ref: Table 5-4 inEMP of S2 road
Monthly ESMF ReportPeriod – September 2017
6 S2 50+940 50+940 College (NoiseSensitive Receptors)
1 1 Already Sufficient plantationsavailable which is acting as noisebarrier.
Ref: Table 5-4 inEMP of S2 road
7 S2 64+100 64+850 School(NoiseSensitive Receptors)
1 1 Plantation has been done on dated29.09.2016, thus enhancementcompleted.
Ref: Table 5-4 inEMP of S2 road
8 S2 81+530 81+530 School (NoiseSensitive Receptors)
1 1 Plantation has been done on dated20.03.2017, thus enhancementcompleted.
Ref: Table 5-4 inEMP of S2 road
9 S2 88+800 88+800 School (NoiseSensitive Receptors)
1 1 Plantation has been done on dated20.03.2017, thus enhancementcompleted.
Ref: Table 5-4 inEMP of S2 road
10 S2 40+070 40+212 Hospital (NoiseSensitive Receptors)
1 1 Plantation has beendoneon dated20.03.2017, thus enhancementcompleted.
Ref: Table 5-4 inEMP of S2 road
11 S2 55+100 55+100 Hospital (NoiseSensitive Receptors)
1 1 Plantation has been done on dated20.03.2017, thus enhancementcompleted.
Ref: Table 5-4 inEMP of S2 road
12 S4 11+880 NIL Water Body/ Ponds 1 Nil Yet not finalized by client as avariation. Actually all the wastewater from the near villages isgetting discharged into this pond,this water is not suitable fordrinking purpose of cattle or clothwashing.
Ref: Table 5-1 inEMP of S4 road
13 S5 11+560 11+560 Enhancement of roadside pond
1 1 Yet not finalized by client as avariation.
Ref: Table 5-1 inEMP of S5 road
Monthly ESMF ReportPeriod – September 2017
14 S5 23+950 23+950 Enhancement of roadside pond
1 1 Proposal with client for approvalas a variation.
Ref: Table 5-1 inEMP of S5 road
15 S5 24+500 24+070 Enhancement of roadside pond
1 1 Proposal with client for approvalas a variation.
16 B8 15+730 15+730 Enhancement of roadside pond
1 1 Yet not finalized by client as avariation.
Ref: Table 5-1 inEMP of B8 road
7. WASTE GENERATION & DISPOSAL
Work was carried out on all roads during this month, milling material from the existing bituminous layers stored at camp site for further use, delineator
cleaning; shoulder resurfacing, Km/Hectometer stone, culvert and bridge cleaning and other required activities for network performance and
improvement. These works lead to minimal waste generation. Surplus spoil/earth from existing road obtained during month was utilized at other locations
for maintenance of shoulder. This earth is temporarily stored at site. Debris is not generated from any other activity. Whole debris is recycled and thus
disposal sites are not required. A detail of waste generation and disposal has been furnished in EMP format OPRC-EMP-14-Rev00 which is attached with
report.
Monthly ESMF ReportPeriod – September 2017
Table 13: Details of Waste Generation
S. No. Type of Waste Characteristics ofWaste
Quantity of Waste Generation Quantity of Waste Reused/Disposed Remarks
Up to PreviousMonth
This Month Total Up toPreviousMonth
ThisMonth
Total
1Bituminous milled
materialHazardous 100514 Cum 443 Cum 100957 Cum 83812 Cum 676 Cum 84488 Cum Reusable
2 Waste oil Hazardous 6185L 40L 6225 L 3705L 250 L 3955 LReusable &
Sold
3 Cement Bags Non-Hazardous 25004 Nos. 48 Nos. 25052Nos. 24545Nos. 68 Nos. 24613 Nos. Reusable
4 Drums- Steel Non-Hazardous 292 Nos. 135 Nos. 427Nos. 106 Nos. Nil 106 Nos. Reusable
5 Drums- Plastic Non-Hazardous 38 Nos. Nil 38 Nos. Nil Nil Nil Reusable
6 Tyres Non-Hazardous 581Nos. 4 Nos. 585Nos. 490 Nos. Nil. 490 Nos. Sold
Monthly ESMF ReportPeriod – September 2017
8. DETAILS OF PUCTable 14: Vehicle PUC certificate details.
Sr.No.
Vehicle No. Type of Vehicle PUC Due Date SITE
1 PB13AR8378 Bharatbenz Tipper 07-Dec.-2017 OPRC
2 PB13AR8078 Bharatbenz Tipper 07-Dec.-2017 OPRC
3 PB13AW8578 TATA Tipper 07-Dec.-2017 OPRC4 PB13AR7278 Bharatbenz Tipper 07-Dec.-2017 OPRC5 PB13AW2504 TATA Truck2518 07-Dec.-2017 OPRC
6 PB31AW3133 TATA Truck2518 07-Dec.-2017 OPRC7 GJ3CR6697 Mahindra Camper 10-Dec.-2017 OPRC
8 PB31L2503 AMW Tipper 07-Dec.-2017 OPRC
9 PB31L2504 AMW Tipper 07-Dec.-2017 OPRC
10 PB03AJ7143 Bharatbenz Tipper 07-Dec.-2017 OPRC11 GJ3AT2174 TATA Tanker 20-Nov.-2017 OPRC12 PB13AR9978 Bharatbenz Tipper 07-Dec.-2017 OPRC13 PB13AR8978 Bharatbenz Tipper 07-Dec.-2017 OPRC14 PB13AW8578 Bharatbenz Tipper 07-Dec.-2017 OPRC15 PB13AR8778 Bharatbenz Tipper 07-Dec.-2017 OPRC
16 PB03 AJ6992 Maruti Ritz 03-Jan.-2018 OPRC
17 PB31L5878 Mahindra Camper 09-Jan.-2018 OPRC18 GJAV8601 Mahindra Pickup 07- Dec.-2017 OPRC
Monthly ESMF ReportPeriod – September 2017
9. Details of Machinery in operation are given in the attached EMP format OPRC-EMP-13-Rev0
List of Construction Equipment ofSeptember- 2017S
NoEquipment Type Min Capacity Nos. Remarks
1 Falling Weight Deflectometer (FWD) 250 KN 12 Hot Mix Plant (Batch Type Apollo) 128 TPH 13 Hot Mix Plant (Batch Type Linnhoff) 200 TPH 14 WMM Mixing Plant (Mackmax) 250 TPH 15 Sensor Paver (Bituminous Works) 600 TPH 16 Hydraulic Excavators 0.9-1.0 cum. 17 Motor Grader 120 cum/hr. 38 Wheel Loader 1.6-1.7 & 2.4 cum. 39 JCB Backhoe Loader 0.3 & 1.2 cum 110 Paver Mechanical 200 TPH 111 Tandem Rollers 412 Vibratory Rollers, Soil Compactor 8-10 T 313 Pneumatic Tyre Roller 15 MT 114 Tipper / trucks 14-24 cum. 1815 Water Tanker 12000 L 5
16 DG Set 100 KVA 117 DG Set 40KVA 118 DG Set 125KVA 119 DG Set 500 KVA 120 DG Set 82.5 KVA 121 Tractor/Trolley 322 Trailor 123 Tempo 124 Tower Light 9 M 425 Diesel Tanker 4000L,8000L 326 Baby Tandem Roller 2 Ton 1
Monthly ESMF ReportPeriod – September 2017
10: Road Accident Report
Table 16: ACCIDENT DATA FOR THE MONTH OF SEPTEMBER2017OPRC Project Punjab (Sangrur-Mansa- Bathinda) Contract Area
S.No. Road Name Date ChainageTime ofAccident(am/pm)
Sex
of
affe
cted
peo
ple
or d
iver
Mal
e / F
emal
e A B C D E F G H I J KNo of
AffectedPersons
Co-ordinates
What Happened
Acc
iden
tL
ocat
ion
Nat
ure
ofA
ccid
ent
Cla
ssif
icat
ion
ofA
ccid
ent
Cau
ses
Loa
d C
ondi
tion
of V
ehic
le
Roa
d C
ondi
tion
Inte
rsec
tion
type
of C
ontr
ol
Wea
ther
Con
diti
on
Age
of
Vic
tim
Typ
e of
Vic
tim
Typ
e of
Veh
icle
Fat
al
Maj
or
Min
or
Eas
ting
(X)
Nor
thin
g (Y
)
1Dhanaula -Bhikhi (S5)
9/8/2017 3+300 M 2 9 4 6 4 2 NA 1 3
Car was burnt due to gas cylinderleakage &Noone was injured.Registration no. of car was notvisible due to car burnt.( As perLocal people statement)
2Bhawanigarh -Kotshamir (S2)
9/12/2017 3+150 10:30PM M 2 1 4 3 2 1 NA 1NA
NA 7
Loaded tractor trolly carryinganimal fodder was going towardsBhawanigarh side. Tractor trollydriver took sudden turn, Resultingtrolly got unbalanced& felled onits side. No persons was injured.
3 Bhawanigarh -Kotshamir (S2)
18/9/2017 37+700 8:30PM M 2 7 3 2 1 1 NA 1 3 1 6 1
PB-13 AR 3297 Truck was goingtowards Mansa. Driver of thevehicle was driving rashly, vehiclewent out of control & hit the treeon the shoulder side. driver of thetruck was suffered major injuries.
4 Bhawanigarh -Kotshamir (S2)
20/9/2017 57+300 7:45AM M 2 1 2 7 1 1 NA 1 3 1 5 1
PB-13 HR 6265 Truck was goingtowards Kotshamir; vehicle wentout of control & hit the tree on theshoulder. One person sufferedminor injuries. Accident occurreddue to vehicle front right side tyreburst
Monthly ESMF ReportPeriod – September 2017
5Bhawanigarh -Kotshamir (S2)
24/9/2017 30+350 6:40AM M 2 1 4 7 2 1 NA 1NA
NA 7
Loaded tractor trolly carryinganimal fodder was going towardsBhawanigarh side & felled on itsside. Accident occurred due totractor trolly rear left side wheelbearing failure. No persons wasinjured.
6Bhawanigarh -Kotshamir (S2)
29/9/2017 74+850 1:00AM M 2 7 3 6 1 1 NA 1 3 1 & 2 5 2
PB-03 AP 8257 Loaded truckcarrying tiles was going towardsKotshamir. Diver of the truck wasdriving rashly, vehicle went out ofcontrol, hit the culvert parapetwall & felled on the shoulder side.Driver & passenger of the vehiclewas suffered minor injuries.
7Bathinda -
Kotshamir(B8)30/9/2017 25+800 1:30AM M 2 5 3 1 1 1 NA 1
2&3
1 & 23&5
2
PB-05 Z 3077 Car was goingtowards Talwandi saabo. Driver ofthe car was Driving rashly, vehiclewent out of control & hit the PB-03 AP 1110. Accident occurreddue to Driver of the car was drunk& Drive. Two persons wassuffered Minor injuries.
Monthly ESMF ReportPeriod – September 2017
Notations:
(A) 1. Urban 2. Rural
(B) 1. Overturned 2. Head on Collision 3. Hit from Back 4. Hit to Fix Object 5. Right turn Collision 6. Left turn Collision 7. Veered Out Off The Road 8. Hit Pedestrian 9. Unknown /Hit & Ran Away
(C) 1. Fatal 2. Major injury 3. Minor injury 4.None
(D) 1. Drunken 2. Over Speeding 3. Vehicle out of Control 4. Driving on wrong side 5. Mechanical Problem 6. Drowsiness / Not Applicable 7. Fault of Driver
(E) 1. Normally Loaded 2. Overloaded / Hanging 3. Empty 4. Unknown
(F) 1. Straight road 2. Slight Curve 3. Sharp Curve 4. Hump 5. Dip.
(G) 1. T-Junction 2. Y-Junction 3. Four arm Junction 4. Staggered Junction 5. Junction with more than two 6. Round about Junction
(H) 1. Fine/Clear 2. Mist/Fog 3. Cloudy 4. Light Rain 5.Heavy Rain 6. Strong Wind 7. Dust Strom 8. Cold 9. Hot
(I) 1. 0-18 Years 2. 18-25 Years 3. 25-40 Years 4. 40-60 Years 5. 60-80 Years
(J) 1. Driver 2. Passenger 3. Pedestrian 4. Cyclist 5. Others
(K) 1. Two Wheeler 2. Auto Rickshaw 3. Car / Jeep 4. Bus 5. Light Truck 6. Heavy Truck 7. Tractor Trolley 8. Bicycle 9. Cycle Rickshaw 10. Hand Drawn Cart 11. Animal Drawn Cart
Monthly ESMF ReportPeriod – September 2017
Table 17: Monthly Road Accident Injury Details of 2017
Year 2017
Fatal Severe Minor Cumulative
S1 S2 S3 S4 S5 B8 S1 S2 S3 S4 S5 B8 S1 S2 S3 S4 S5 B8 Fatal Severe Minor
January 2 2 3 2 4 5
February 2 3 2 2 5
March 1 1 3 5
April 1 2 3 1 2 1 3 4 3
May 1 1 3 3 1 2 3 4
June 6 3 1 6 3 1
July 1 3 2 3 1 2 1 8 3
August 1 2 6 1 1 2 7
September 1 3 2 1 5
Monthly ESMF ReportPeriod – September 2017
Table 17: Monthly Road Accident Injury Details of 2017
Year 2017
Fatal Severe Minor Cumulative
S1 S2 S3 S4 S5 B8 S1 S2 S3 S4 S5 B8 S1 S2 S3 S4 S5 B8 Fatal Severe Minor
January 2 2 3 2 4 5
February 2 3 2 2 5
March 1 1 3 5
April 1 2 3 1 2 1 3 4 3
May 1 1 3 3 1 2 3 4
June 6 3 1 6 3 1
July 1 3 2 3 1 2 1 8 3
August 1 2 6 1 1 2 7
September 1 3 2 1 5
Monthly ESMF ReportPeriod – September 2017
Table 17: Monthly Road Accident Injury Details of 2017
Year 2017
Fatal Severe Minor Cumulative
S1 S2 S3 S4 S5 B8 S1 S2 S3 S4 S5 B8 S1 S2 S3 S4 S5 B8 Fatal Severe Minor
January 2 2 3 2 4 5
February 2 3 2 2 5
March 1 1 3 5
April 1 2 3 1 2 1 3 4 3
May 1 1 3 3 1 2 3 4
June 6 3 1 6 3 1
July 1 3 2 3 1 2 1 8 3
August 1 2 6 1 1 2 7
September 1 3 2 1 5
Monthly ESMF ReportPeriod – September 2017
Table 18: Monthly Road Accidental Injuries Details of 2016
Chart -1: Monthly graphical representations of road accidents injuries occurred during the year 2016
10
1 2 2 2 2 23
64
2
6
2 2 24
1 22 3
7
4 3
7
22 22
8
1
5 4 4
11
8
1 1
4
02468
1012
S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Fatal
Severe
Minor
Year 2016Fatal Severe Minor Cumulative
S1 S2 S3 S4 S5 B8 S1 S2 S3 S4 S5 B8 S1 S2 S3 S4 S5 B8 Fatal Severe MinorJanuary - - - - - - - - - - - - - 2 - - - - - - 2February - 10 - - - - - 3 - - - - 3 7 - - - - 10 3 10March - 1 - - - - - 6 - - - - - 4 - - - - 1 6 4April - 2 - - - - - 4 - - - - - 3 - - - - 2 4 3May - - 2 - - - - - - - - - 7 2 2 - 2 2 - 13June - - - - - - - 2 - - - - 2 8 - - - - - 2 10July - 2 - - - - - 6 - - - - - 1 - - - - 2 6 1August - - - - - - - 2 - - - - - 5 - - - - - 2 5September - - - - - - - 2 - - - - - 4 - - - - - 2 4October - 2 - - - - - 2 - - - - - 4 - 1 1 - 2 2 6November - 2 - - - - - 4 - - 1 - - 8 - - 1 - 2 5 9December - - - - - - - 2 - - - - 1 4 - - - - - 2 5Total - 19 2 - - - - 33 - 1 - 6 57 2 3 2 2 21 34 72
Monthly ESMF ReportPeriod – September 2017
Table 19: Monthly Road Accidental Injuries Details of 2015Year 2015 Fatal Severe Minor Cumulative
S1 S2 S3 S4 S5 B8 S1 S2 S3 S4 S5 B8 S1 S2 S3 S4 S5 B8 Fatal Severe
Minor
January - 1 - - - - - - - 1 - - 1 5 - - - 2 1 1 8
February 1 - - - - - - - 1 - - 2 11 1 - - - 1 1 14
March - 1 - - - - - 1 1 - - - - 4 3 1 - - 1 2 8
April - - - - - - - 1 - - - - - 5 1 1 1 - 1 8
May - - - - - - - - - - - - - 3 - - 1 - - - 4
June - - - - - - - - - - - - - 5 - - - - - - 5
July - 1 - - - - - 1 - - - - - 3 1 - - - 1 1 4
August - 1 - - - - - - - - - - 1 3 1 - - 1 1 - 6
September - 1 - - - - - - - - - - - 5 - - - - 1 - 5
October - 2 - - - - - - - - - - 1 1 1 - - - 2 - 3
November - - - - - - - - - - - - 1 3 - - - - - - 4
December - - - - - - - - - - - - - 3 - - - - - - 3
Total 1 7 - - - - - 3 1 2 - - 6 51 8 2 1 4 8 6 72
Chart 2: Monthly graphical representations of road accidental injuries occurred during the year 2015
1 1 1 1 1 1 21 1 1 1 1 11
52 2
11
14 3
1
5
1 1 13
1
53
1 13
1 1
5
1 1 1 13 3
02468
1012
S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Fatal Severe Miner
Monthly ESMF ReportPeriod – September 2017
Table 20: Monthly Road Accidental Injury Details of 2014
Year 2014 Fatal Severe Minor CumulativeS1 S2 S3 S4 S5 B8 S1 S2 S3 S4 S5 B8 S1 S2 S3 S4 S5 B8 Fatal Severe Minor
January - - - - - - - 1 - - - - - 11 - - - - - 1 11February - - - - - - - - - - - - - 7 1 - - - - 8March - - - - - - - - - - - - - 2 1 - - 1 - - 4April - - - - - - - - - - - - - 7 - - - - - - 7May - - - - - - - - - - - - - 3 - 1 - - - - 4June - - - - - - - - - - - - - 3 - 1 - - - - 4July - - - 1 - - - 1 - 1 - - - 2 - - - - 1 2 2August - 3 - - - - - 1 - - - - - 3 1 - - - 3 1 4September - 1 - - - - - 1 - - - - - 3 - - - - 1 1 3October - - - - - - - - - - - - - 7 - - - - - - 7November - - - - - - - - - - - - - 8 - - - - - - 8December - 4 - - - 2 - - - - - - - 7 - - - - 6 - 7Total - 8 - 1 - 2 - 4 - 1 - - - 63 3 2 - 1 11 5 69
Chart 3: Monthly graphical representations of roads accidents injuries occur during the year 2014.
13
1
4
1 1 1 1 1 2
11
7
1 2 1 1
7
31
31 2 3
13
7 8 7
02468
1012
S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5 S1 S3 S5
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Fatal Severe Miner
Monthly ESMF ReportPeriod – September 2017
11. HSE OBJECTIVES AND MEASURES
Objectives Measures Remarks
Health & Safety:1 Eliminate Personal Damage (PD) Class
1 incidentPD Class-1:- Damage whichpermanently alters the future of theindividual.
PD1 Fatality - 0PD1 LTI – 0
2 Reducing personal damage Class 2 andClass 3 incident systematically.PD Class-2:- Damage which temporarilyalters a person’s future e.g. broken armor muscle strain etc.PD Class-3:- Damage whichinconveniences a person e.g. first aidtreatment for a cut hand, dust in eyesetc.
The project has achieved3074784 LTI free man-hoursworked since last LTI up to 30/09/2017.PD2 (LTI) - 0PD3 - 0LTI - 0
Attached monthly safetystatistics and learningincident reports in AnnexureVI.
3 To maximize sub-contractor andsupplier involvement in improvingSafety and health performance.
1. Construction site HSE audit-12. Electrical Safety Audit-13. Housekeeping Report-14. Traffic Safety Check-15. Observation Report-16. Plant and equipment check-17. Inspection of fire extinguishers-18. Learning Incident-19. Site HSE inspection-110. Tool Box talk-1
Reports attached in safetydata Annexure IV
4 Labour welfare facility. Setting-up construction camp and storage area-1 Attached in safety reportAnnexure III
Monthly ESMF ReportPeriod – September 2017
5 To record and investigate accident. 1.Road accident-2.i.Fatal-03.ii. Serious injury-14.iii. Minor injury-5
Ref: Table 16 to 20
Environment:7 Environmental monitoring All Environmental Monitoring of
OPRC project has been done as perschedule.
AAQ and ANL, soil and water monitoringdone as prescheduled.
8 Green belt development near hot mixplant.
Landscaping work has been maintainedin camp1 and camp2. Plants are beingmaintained in both camps.
.
9 Environmental Pollution control. I. Particulate Matter- sprinkling ofwater and dust barrier has erected alongwith green belt.
II. Waste material management
i. Solid waste material(a) Kitchenwaste(b)Milled bituminous materialstacking and utilization as constructionmaterial.(c) Empty drums-steel/plastic(d) Cement bags(e)Types(f)Earthen material(g) Other waste(plastic, paper, glasses)ii. Liquid waste.Waste water (domestic sewage)b.Waste oil
I. Ref: Table 9II. Details of i. b, c, d, e, ii. bgiven in Table 13i) a- (food waste collectedand handed over piggery industry and otherbiodegradable kitchen waste disposed incomposting pit in base camps.i (g) Otherwaste is collected, segregated stored andregularly sold to vendors. For i (f) Ref:Table 8 and ii.(a) waste water collected,treated in STP and used in watering to plantin Camps.ii b waste oil collected and storedin waste oil storage room and regularly soldto authorized vendor.
Monthly ESMF ReportPeriod – September 2017
12. GRIEVANCE MANAGEMENT
A grievance redress mechanism has been established with the aim to maintain channel of communication and address as many issues as possible
through immediate and active management. Toll free no. 18001804040 has been displayed on all the roads at every 5 km. A dedicated person is
engaged to receive calls from commuters and public to identify their concerns and initiate quick action to resolve any issue. All the communication
is logged in a register along with action taken, the list of which is given in tabular form as below.
Table 21: Monthly Grievance Management Report for the Month September-2017
S. No. Mobile No. Date Time ReceiverName
Action TakenBy
Location&Description of
Grievance
Remarks Solving Time
1. 7009027199 15.09.2017 06:55PM KuldeepSingh
Ramesh Patil Village Ghrachon onBhawanigarh toKotshamir Road
The Cow was died onroad due to the road
Accident.
--
2. 9814902222 15.09.2017 11:04AM KuldeepSingh
Ramesh Patil Village Ghrachon onBhawanigarh toKotshamir Road
The Cow was died onroad due to the roadAccident. Dead cow
buried.
11:30AM
3. 7888709599 28.09.2017 07:47AM KuldeepSingh
Ramesh Patil Near Sunam onBhawanigarh toKotshamir Road
Tractor Trolleyaccident due to
overloading
Safety measure taken andguided the traffic till
clearance of road.
Monthly ESMF ReportPeriod – September 2017
13. Observation on EMP Implementation and Compliance1. Site observations of new plant on 21/01/2017S.No Observation Action Required Action By Photographs Compliance Status
1. Washing of trucks nearwater recharging point.
Washing should beprohibited near therecharging point.The filter media wasremoved andreplaced with newmaterial.
Mr.S.K.Singh
2. Spillage of Bituminousfound at few places in newplant site.
Kindly takeimmediate action toavoid such kind ofEnvironmental NonCompliances in thecamp. Remove thehazardous waste andstore the same inhazardous storagearea.
Mr.S.K.Singh
Hazardous waste yard
Monthly ESMF ReportPeriod – September 2017
3. Damaged Windrows foundat 4 places.
Replace damagedgreen net with newones.
Mr.KanhiyaJha.
4. Damaged tree branch foundat camp site.
Cut damaged treebranch to avoidaccidents.
Mr.KanhiyaJha
Monthly ESMF ReportPeriod – September 2017
5. Plant is being covered byaggregate andcausingadverse effect at growth
Proper stock pilemanagement shouldbe in practice.
Mr.BhagwanJha
Monthly ESMF ReportPeriod – September 2017
2. Site Observations on dated 22.12.2016 & 28.12.2016S.No Observation Action Required Action By Photographs Compliance Status
Observations as on 22/12/2016
1. Huge water stagnantnear WMM plant borewell.
Proper Solid platformshould be constructedwith drainage.
Mr.S.K. Singh
Complied2. Plant is being covered
by aggregate causingadverse effect ongrowth.
Proper stock pilemanagement shouldbe in practice
Mr.S.K.Singh/Mr.KanhiyaJha
Complied
Monthly ESMF ReportPeriod – September 2017
3. Wood used in campfor cooking the food.
Make ensure theworkers should useLPG cylinder forcooking.
Mr.KanhiyaJha
Complied4. After So many verbal
instruction given by usthe remaining foodwaste is directlydrained out inbathrooms causingdrainage system gotchocked.
Instruct to campsupervisor to takeimmediate action tostop such kind ofactivities.
Mr.KanhiyaJha/LabourIncharge.
Complied
Monthly ESMF ReportPeriod – September 2017
5. Spillage of Bitumenfound at many places innew plant site causingserious environmentalhazard.
Kindly take Immediateaction to avoid suchkind of EnvironmentalNon Compliances inthe camp.
Mr.S.K.Singh
Complied
Monthly ESMF ReportPeriod – September 2017
3. Site observation on dated 17.10.2016
S.No Observation Action Required Action By Photographs Compliance Status
Reminder for non-compliances of previous observations on 22/09/2016
1
Camp 2 (NewPlant)
Milled materialdirectly dumpedinto plantationarea.
Proper bund &barricading should berequired.
Mr.KanhiyaJha
Complied.
2.Waste watergenerated duringwashing of tippersis being directlydischarged in to theplantation area.
Proper Drainageshould bemaintained.
Mr. S.K.Singh
Complied.
Monthly ESMF ReportPeriod – September 2017
3. Water tanker outletpipe leakage wasfound duringcollection of waterfrom bore well.Huge wastage ofwater is occurring
Proper welding ofwater tanker isrequired to stop theleakage.Truck No. GJ 6V8080Truck No. GJ 7U7602
Mr. R K Singh/Mr. S.K. Singh
Rectification has been donebut still it needs moreimprovement.Partiallycomplied.
Monthly ESMF ReportPeriod – September 2017
4. Empty plasticbottles found nearplants.
Proper disposal ofwaste is required.
Mr. KanhiyaJha Complied.
Observations on dated 17.10.20165. Due to leakage,
huge wastage offresh wateroccurred.
Immediaterectification of theleakage problem isrequired.
Mr. Kanhiya
Complied
Monthly ESMF ReportPeriod – September 2017
6. Soil heaps found indifferent locationsin site.
Proper Re-use ofExcavated soil as perthe ESMF.
Mr.Pushpraj Singh.
Complied
Monthly ESMF ReportPeriod – September 2017
4. Site Observations as on 22/09/2016
S.No Observation Action Required Action By Photographs Compliance Status
Observations as on 22/09/2016
1.
2.
Camp 2 (New Plant)
Milled material directlydumped into plantation area.
Waste water generated duringwashing of tippers is beingdirectly discharged in to theplantation area.
Proper bund &barricading should berequired.
Proper Drainage should bemaintained for WMMplant.
Mr.kanhiya Jha
Mr. S.K.Singh
Complied
Monthly ESMF ReportPeriod – September 2017
3. Water tanker outlet pipeleakage was found duringcollection of water from borewell. Huge wastage of water isoccurring.
Proper welding of watertanker is required to stopthe leakage.Truck No. GJ 6V 8080Truck No. GJ 7U 7602
Mr. R. K. Singh/Mr. S.K. Singh
PartiallyComplied
.
Monthly ESMF ReportPeriod – September 2017
3. Water tanker outlet pipeleakage was found duringcollection of water from borewell. Huge wastage of water isoccurring.
Proper welding of watertanker is required to stopthe leakage.Truck No. GJ 6V 8080Truck No. GJ 7U 7602
Mr. R. K. Singh/Mr. S.K. Singh
PartiallyComplied
.
Monthly ESMF ReportPeriod – September 2017
3. Water tanker outlet pipeleakage was found duringcollection of water from borewell. Huge wastage of water isoccurring.
Proper welding of watertanker is required to stopthe leakage.Truck No. GJ 6V 8080Truck No. GJ 7U 7602
Mr. R. K. Singh/Mr. S.K. Singh
PartiallyComplied
.
Monthly ESMF ReportPeriod – September 2017
4.
5.
Empty plastic bottles foundnear plants.
Openly sleeping at night in thecamp.
Proper disposal of waste isrequired.
These days Chikunguniyafever getting viral in mostof the cities. Soprevention has to be takenfrom mosquito byproviding mosquito net.
Mr. KanhiyaJha
Mr. KanhiyaJha
Monthly ESMF ReportPeriod – September 2017
6. Proper ventilation for workercamp should be done.
Provide steel net forwindows & ventilators forprevention of mosquito inrooms to avoid diseases.
Mr. KanhiyaJha Complied
Monthly ESMF ReportPeriod – September 2017
5. Compliances for the TNM Letter Regarding Non Compliance of Environmental Issues Letter Ref: TNM/OPRC/519/2016 ON DATED 06-August-2016.Visit reference: 1 MC Environmental Experts on dated:-04.08.2016 2 World Bank Visit on 11.08.2016
S.No Comments Compliances status
1. Revised Site Layout Plan: The arrangements on thecamp site were not as per the layout plan submittedearlier. Contractor should submit the revised layoutplan including the following:
a) Entry Exit Pointsb) Traffic Circulation with designated loading
unloading areas and parking of vehicles.c) Drainage Plan of the camp site.d) Green Belt Development Plan.e) Location of Sewage treatment plan along with
plumbing networkf) Location of Organic waste compost pit,
Segregation yard, Bins, Hand Wash points,Toilets, Cloth washing area.
g) Kitchen and dining area.
The compliances of MC Environmental & Social Experts aregiven below as per the sequence :-
Entry Exit point, Traffic Circulation, Drainage PlanSewage treatment plan, Location of Organic wastecompost pit, Segregation yard & Hand wash Toilets,Cloth washing, Kitchen and dining areas are Shown inrevised layout plan, Attached herewith.
Green Belt Development Plan is attached herewith.
2. Social Impact Assessment reports for all Sections. Done
3. Environmental budget with expenditure details. Done.
4. CSR Budget with expenditure details Done.
Monthly ESMF ReportPeriod – September 2017
5. Details and records of Tool Box talk and Mock drillrelated to Road and Occupation health & safety andEmergency preparedness.
Done.
6. The STP installed at camp site in neither operationalnor functional. Froth and foam was observed on theSTP tanks and the water was overflowing. Themicrobial culture in the STP plant does not exist andno treatment is being carried for the wastewater
STP has become operational with increase in capacity up to 20KLD.
7. Water Meter for measurement of ground waterextraction from bore well.
Water meters have been installed.
8. Steel net provided for ventilation & protection formosquito born disease.
Done.
9. RO plant discharge being mixed with recharging pit. The outlet of RO discharge has been connected to the STP.
Monthly ESMF ReportPeriod – September 2017
6. Compliance’s of MC, Environmental Observation 04.08.2016& 05.08.20161. Observation:The STP installed at camp site in neither operationalnor functional. Froth and foam was observed on the STP tanks andthe water was overflowing. The microbial culture in the STP plantdoes not exist and no treatment is being carried for the wastewater.
Status :- Complied
Before After
2. Observation:-High volumes of fugitive emissions were observedfrom Hot Mix Plant and Bag filters were not operating properly.Leakage was also observed in the Hot mix plant and filler materialwas emitting out
Status :- Complied
Monthly ESMF ReportPeriod – September 2017
Before After
3. Observation: -Green belt in the plant was not maintained. Smallplants covered under the dust were observed. A two tear green belt isrequired to prevent the pollution emission to the nearby agriculturefields.
Status :- complied
Before After
4. Observation:-Dust barriers were not installed at many points on the Status :- Complied
Monthly ESMF ReportPeriod – September 2017
boundary of camp site. Where ever installed also, were not maintained.
Before After
5. Observation : -Drains (garland) around the DG set platforms areto be provided to control the seepage or flow of oil duringmaintenance or accidents
Status :- complied
Before After
Monthly ESMF ReportPeriod – September 2017
6.Observation:The labour at camp site (Plant labour and otheroutsourced labour) were not using PPEs during the operations
Status :- Complied
Before After
7. Observation:Untreated waste water from the STP was beingused/dumped in the filler pond and a stinking smell could easily befelt around the area. This has direct and indirect impacts on soil
Status :- Complied
Monthly ESMF ReportPeriod – September 2017
quality and ground water quality of the area.Before After
8. Observation: Organic waste composting pit is being used as awaste dumping site. It was all filled up with plastic / polythene bagsbut was cleaned during the visit itself. It is requested that the sameshould be maintained properly and shall be used only for organicwaste.
Status :- Complied
9. Observation:New bore well has been made functional near theWMM plant in new camp site without any approval from the
N/A
Monthly ESMF ReportPeriod – September 2017
quality and ground water quality of the area.Before After
8. Observation: Organic waste composting pit is being used as awaste dumping site. It was all filled up with plastic / polythene bagsbut was cleaned during the visit itself. It is requested that the sameshould be maintained properly and shall be used only for organicwaste.
Status :- Complied
9. Observation:New bore well has been made functional near theWMM plant in new camp site without any approval from the
N/A
Monthly ESMF ReportPeriod – September 2017
quality and ground water quality of the area.Before After
8. Observation: Organic waste composting pit is being used as awaste dumping site. It was all filled up with plastic / polythene bagsbut was cleaned during the visit itself. It is requested that the sameshould be maintained properly and shall be used only for organicwaste.
Status :- Complied
9. Observation:New bore well has been made functional near theWMM plant in new camp site without any approval from the
N/A
Monthly ESMF ReportPeriod – September 2017
concerned authorities. The new bore well should be closed withimmediate effects and the application to CGWA should be made fornew bore as well as the existing one at the earliest
Guidelines/Criteria for Evaluation of Proposals/Requests for groundwater abstraction (w.e.f 15.11.2012)
10. Observation: Several of the firefighting equipment’s was notinspected/refilled on the due date in July / July months. Allfirefighting equipment’s shall be immediately inspected and refilled.Also all fire buckets should be filled with the sand adequately.
Status :- Complied
11. Observation: Bitumen spillages were observed at several placesin the camp. The spilled bitumen have contaminated the green beltarea and July have contributed to green belt degradation
Status :- Complied
Before After
Monthly ESMF ReportPeriod – September 2017
Monthly ESMF ReportPeriod – September 2017
12. Observation. First Aid Box Should be Updated. Status :- Complied
Monthly ESMF ReportPeriod – September 2017
7. Site Visit on 18.01.2016
Project Manager (Environmental) and Project Manager (Social) PRBDB, Mohali visited the OPRC project along with Associate EnvironmentalExpert of MC and representative of PIPL on dated 18.01.2016.
S. No. Description Current Status Remarks
1. School Ahead Cautionary sign boardinstalled near school (Near Ch:11+100) atS2 link, it required necessary speedcalming measures and zebra crossingmarking for safety of school children.
For reducing speed caution has beenprovided in advance by fixing schoolsign board. The zebra crossing shallbe marked soon.
2. Dust barrier at new camp site was absent;previously it was installed during worldbank visit. It is required to put dust alongthe boundary of camp site.
Dust barrier with adequate height hasbeen installed along all the boundaryof the camp 2.
Monthly ESMF ReportPeriod – September 2017
S. No. Description Current Status Remarks
1. STP is installed but not functional. Thedetergent foam was floating on openwhen STP was turned on. The followingaction are required for the STP:
2.Increased the capacity of STP accordingthe waste generation for both camp sitesas detail given in MPR. The waste watergenerated from both camp is being treatedby the STP.
3.Flow meter and electric meter are needsto be installed and log book should bemaintained for the same.
4.Operation manual should be availablenear STP for reference.
STP is functional.
I. Capacity of STP is adequate. Thedetails given in the MPR is total butfor STP it is not applicable.
II. Log book has been maintained torecord the running of STP.
III. Operation manual has been madeavailable near the STP.
Capacity of STPhas beenincreased to20KLD. Meteralso has beenfixed.
Social Component:
5. The MPR submitted by the M/s PIPLcontain inadequate information about theimplementation of Social component. Thestructure (with formats) of MPR to befollowed for Social Component hasalready been provided to M/s PIPL byPRBDB. The filled up formats wereshown by Contractor during the visit andfound unsatisfactory.
The filled formats which were shownduring the site visit were provided bythe social expert of PRBDB. Theforms were filled by social expert ofFIPL as per the applicability. It isrequested to guide us to remove thediscrepancies as per yourobservation.
Monthly ESMF ReportPeriod – September 2017
S. No. Description Current Status Remarks
6. The MPR on social component shallconsist of write up on activates during themonth, details of grievances received andtheir proceeding etc.
Details of grievances with measurestaken are given in table no. 18 ofmonthly ESMF compliance report forevery month MPR.
7. As per the TOR incorporated in the 2Bspecifications of the contract theGrievance Redress Mechanism needs tobe established in the project area with theaim to settle disputes as possible throughconsultation which is pending. The GRCrequired to be constituted as specified inthe R & R policy PSRSP.
Para No. 28 of R & R policy PSRSPclearly says that GRC will beconstituted under the PSRSP.
There is no dispute betweencontractor and stakeholders.
8. Renewal of labour license applied on29.03.2016 by M/s PIPL. The previouslicense has expired on 19.03.2016. It hasbeen advised that renewal must beapplied well in advanced before theexpiry of the current validity. The MCmust be updated about the all requiredstatuary clearance / renewal to the clientand contractor well in advance beforeexpiry.
License was obtained from AssistantLabour Commissioner, Sangrur vide.License no. L-563 dated 19.02.2013which has been renewed for till 31-12-2016
Another license was obtained fromAssistant. Labour Commissioner,Bathinda vide letter no L-20/2013/Dated 6/05/2013 andrenewal is under process.
9. Authorization for operation of a facility Authorization was obtained from Part of MC.
Monthly ESMF ReportPeriod – September 2017
S. No. Description Current Status Remarks
for Collection, Storage, Disposal ofHazardous wastes generated under Rule 5of the Hazardous Waste (Management,Handling and Trans –boundaryMovement) Rules, 2008.
Punjab Pollution Control Board,Patiala Vide letter no.HWM/MNS/2016/3743658 ondated25/04/2016 and valid up to24/04/2021.
HIV/ AIDS Component
10. Competency of NGO (Green Earth)engaged for HIV/AIDS program foundinadequate, as per clause 19.2 (h) of GCof the contract, the activity required to becarried out by the approved servicedprovider or specialized NGO whereas theengaged NGO is specialized in the fieldof Environment, Health and Safety.Further it has been agreed with M/s PIPLthat documentary proof shall be producedto PRBDB for verification/ approval.
Green Earth is specialized NGO andfully competent to conduct theawareness activities about theHIV/AIDS as per clause 19.2 (h) ofGC of the contract.
Green Earth is a nonprofit – NGOduly registered under the SocietiesRegistration Act, 1860 on 04thJuly,2006 (copy enclosed). The NGO isworking especially in the field ofenvironment protection &conservation, health (STD/STI),safety (industrial & road andworkplace) and sanitation & hygienesince 2006. Since its inception, NGOhas conducted numbers of variouskinds of IEC & HRD/ CapacityBuilding activities for creating
Green Earth hasconducted no. ofHSE awarenesscamps for health,safety andenvironment withgreat emphasis onHIV/AIDS.Client’s (PWD, B& R, and Sangrur)and MC’srepresentativesare very happywith the servicesprovided by theNGO. GreenEarth NGO hasbeen associatedsince October 13,
Monthly ESMF ReportPeriod – September 2017
S. No. Description Current Status Remarks
awareness among the people aboutthe environment, health, safety,sanitation & hygiene. Please noteHIV/AIDS is a part of health.
The documentary proof has beenprovided with this compliance report.Registration certificate of the GreenEarth also has been provided.
2014 with OPRCproject. It issurprisingobservation after16 months that thecompetency ofGreen Earth isinadequate.
11. It was pointed out that the task ofHIV/AIDS prevention is being carried outthrough only public meeting condomdistribution by the NGO whereas as perthe contract the HIV/AIDs preventionprogram include campaign through IEC,provide screening, diagnosis, counselingand referrals in respect of STD, STI andHIV/AIDS. Inventory of IEC, counseling,diagnosis and referrals have not beenproduced by the M/s PIPL.
IEC activities through Power pointpresentations, video clips,discussions, demonstration of usageof condoms, condom distribution,pamphlets distribution and person-toperson interactions/ counseling aboutHIV/AIDS/STD/STI prevention isbeing done by the NGO’s team ofexperts.
In the terms of clause 19.2 (h) of GCof the contract, STI and HIV/AIDSscreening, diagnosis, counseling andreferrals of all Site staff and labor isbeing done, on dated 02.07.2016.
12. The program is being conducted for only All programs have been conducted It is again a
Monthly ESMF ReportPeriod – September 2017
S. No. Description Current Status Remarks
PIPL’s staff and labors whereas as per thecontract the target population includesemployee of monitoring consultant, andimmediate local communities also.
into the middle of the localcommunity for the assurance ofmaximum participation from thelocal community.
Attendance sheet of HSE activityclearly shows that the participation isfrom each group.
surprisingobservation forus.
13. As per the contract the contractor has toestimate a detailed cost with supportingdocument for preparation andimplementation of HIV/AIDS program.The estimated cost of program shall notexceed the provisional sum dedicated forHIV/AIDS purpose. The estimated cost isrequired to be approved by the Projectmanager, OPRC contract.
As staff and labour are also beingincluded in the HIV/AIDS awarenesscamps. As per clause 19.2(i), thispart will form the part of variation ifwe are asked to conduct the separatecamps. Confirmation is required sothat the detailed estimate shall besubmitted for variation approval.
14. The details provided in the MPR underthe HIV/AIDS component areunsatisfactory. Only consultation datevenue and no. of participants are beingprovided whereas it should contain all theinformation as per clause 19.2 (h) of GCof the contact.
Separate HSE awareness campactivity report has already beensubmitted to MC’s office in the formof hard copies (02 Nos.) after theeach camp. This detailed activityreport contains all the information asper clause 19.2(h) of GC of contract.
This is againsurprisingobservation forus.
Monthly ESMF ReportPeriod – September 2017
S. No. Description Current Status Remarks
Technical Component
15. On road S2: There was presence ofCracks at RD 2+240 to 18+300.Contractor has treated these cracks withpatches without informing MonitoringConsultant and Executive Engineer,Sangrur.
The treatment has been as anemergency measure. For furthertreatment information shall be givento MC’s office.
Pavement Expertsof MAPCTEL hasvisited the site ondated, 01.04.2016the investigationreport andrecommendationsfor treatment areawaited. Reporton causes andremedialmeasures hasbeen submitted inOctober 2016.
16. On Road S2: there was presence ofRutting at RD 5+700 on right hand wheelpart
It is in our notice and therectifications shall be carried out inthe month of July 2016.
The requiredrectifications havebeen done.
17. On Road S2: It was observed RoadPavement Markers do not conform to IRCStandard. It was bought to notice ofcontractor in presence of representative ofMonitoring Consultant.
The installed RRPM on the entirenetworks conforms to IRC standardand reputed 3M brand is being usedfor the purpose. The dysfunctionalRRPMs shall be replaced after theapproval of variation from client’s
DysfunctionalRRPMs havebeen reinstalled.
Monthly ESMF ReportPeriod – September 2017
S. No. Description Current Status Remarks
office.
18. As per report of monitoring consultantthere is delay on part of contactor insubmission of junction improvementdesign.
1. Detailed drawing of Maur Junctionat Km 84+230 submitted vide letterno. PIPL/OPRC/793/2016 dated02.03.2016.
2. Request to provide the detaileddrawing of junctions i.e. 2+24(PhaguwalKanchiya) and18+300(MehlanChowk) which arepart of NH 64 & NH 71 respectivelyvide our office letter no.PIPL/OPRC/697/2015 dated30.10.2015.
3. Detailed drawing of MansaKanchiya (67+840) has beensubmitted vide our letterno.PIPL/OPRC/415/2014 dated18.09.2014.
4. Detailed drawing of Maur Junctionat Km 85+860, Kotshamir Junction at108+770, Sangrur Sunam Junction atKm 24+450 drawings will besubmitted time to time as per work
Monthly ESMF ReportPeriod – September 2017
S. No. Description Current Status Remarks
program. Drawing of developmentof S4-B8 intersection will besubmitted on 1st week of July 2016.
19. As per report of monitoring consultant,presence of Feedback Infra is not visible.The OPRC contractor advised to involvethe associated consultant.
Feedback Infra is associated with ustill date, but now the proposal forreplacement of Feedback Infra hasbeen submitted to MC vide our letterno. PIPL/OPRC/760/2016 dated01.02.2016 andPIPL/OPRC/775/2016 dated13.02.2016.
20. On Road S2: there was presence ofsegregation at RD 50+690 on left handwheel part.
The segregation rectification shall becarried out in the month of July 2016.
21. On Road S2: Some of parapets are notpainted from Km 45 to 54 km sectionvisited by PRBDB.
The parapets have been painted.
22. On Road S1: Contractor representativewas advised to provide rumbling strip asper standard.
On S1 road growlers at four locationshave been provided in consultationwith MC.
23. On Road S2: throughout the stretch, therewere no sign boards to demarcate thespeed limits. It was brought in notice of
For speed zoning, it has been decidedduring the MEC meeting that speedlimit signs of 30 and 60 shall be
Final decisionfrom MC is still
Monthly ESMF ReportPeriod – September 2017
S. No. Description Current Status Remarks
contractor representative and he assuredthat he will get it fixed within a week.
installed. It will be done soon. awaited.
24. On Road S2: Absence of road furniturewas discussed with contractorrepresentative in presence of monitoringconsultant. Contractor representativeassured that he will get fixed within aweek.
The required road furniture has beeninstalled.
Non Complied Observation of World Bank visit in Nov 15 (As submitted by MC)
Observation Status Current Status Remarks
25. Remaining earth to beremoved along the completednetwork of road
Partiallycomplied
Removal of surplus earth materialalong the completed network of S2road has been done.
26. Shoulder need to bemaintained and protectionwork near culverts to controlthe soil erosion on OPRCnetwork
Underprogress
Shoulder is being maintained andexcessive soil from near the culvertshas been removed.
Monthly ESMF ReportPeriod – September 2017
S. No. Description Current Status Remarks
27. Hazard mark not installedproperly. The position is notcorrect, it needs to be installednear the parapet wall
Pending Hazard mark properly placed nearboth side of the parapet wall.
28. Safety wall prepared along thedrain is not properly paintedand delineators have not beeninstalled any many places
Partiallycomplied
Whitewash work on all safety wallshas been completed and alsodelineators have been installed atmany places.
29. Junction with S2 road isalready identified as BlackSpots, till now noimprovement has beenproposed and executed.
Longpending
Improvement of junction has beendone with zebra marking, fixing ofRRPMs, sign boards and rumblestrips.
30. Median markers in Sunam arebroken and need replacementaccordingly.
Partiallycomplied
Complied
31. Excessive earth on shoulder islying at many places; it needsto be shifted to stock yard forfurther uses.
Partiallycomplied
Removal of surplus earth materialalong the completed network of S2road has been completed.
32. Work Site safety was not asper the provision of IRC:
Partiallycomplied
Complied
Monthly ESMF ReportPeriod – September 2017
S. No. Description Current Status Remarks
SP55. Advance WarningBoards, work zone signboards, arrangement of safetycones, placement of flag manetc. was not according to IRC:SP : 55
Non Complied PRBDB Observation (17.09.2015)
33. Observation Status Current status Remarks
34. Installation of STP in Camp II PartiallyComplied
Complied fully.
35. Tree plantation in camp sitesto develop a green belt andlandscaping near securitygate.
PartiallyComplied
Plantation of the saplings iscompleted along the boundary walland maintenance work is being done.Also landscaping near security gate isdone.
36. Haul road maintenance. Not compliedThe patch work is being done asrequired.
37. At junction S1 & S2delineators are broken; itrequires immediatereplacement for night time
NotComplied
Improvement of junction has beendone with zebra marking, fixing ofRRPMs, sign boards and rumblestrips.
Monthly ESMF ReportPeriod – September 2017
S. No. Description Current Status Remarks
safety.
38. The contractor did notimprove any black spots,which are already identified inbid document. Theidentification of additionalblack spots should also bedone with available accidentinformation.
NotComplied
The black spots improvement is beingproposed for client’s approval whichincludes zebra marking, fixing ofRRPMs, sign boards and rumblestrips. It shall be done after the dueapproval.
39. Utility shifting (ElectricPoles) is long pending nearthe Sunam Bridge
In process It has been reminded to client andMC regularly but still utility shiftingis pending. The work progress issuffering due to these obstructions.
8. Site Visit on 22.11.2015Environmental Expert, Monitoring Consultant visited the OPRC project on 22.11.2015. A meeting was also held in PIPL site office at Khiala.
9. World Bank Site Visit on 16.11.2015Environmental Specialist, World Bank visited the OPRC project along with Project Manager (Environmental and Safety) PRBDB, Mohali, SDE ofPWD, Sangrur, Environmental Expert of MC and representatives of PIPL on dated 16.11.2015. A meeting was also held on 17.11.2015 in PRBDBoffice at Mohali. The site observations has complied which was discussed in meeting. Observation compliance status with photograph was submitted inESMFreport December 2015.
Monthly ESMF ReportPeriod – September 2017
10. Site Visit on 26.10.2015Project Manager (Environmental and Safety) PRBDB, Mohali visited the OPRC project along with SDE of PWD, Sangrur, Team Leader, PrincipalAuditor, Associate Environmental Expert of MC and representative of PIPL on dated 26.10.2015. A meeting was also held in PIPL site office atKhiala.
S. No. Observation Raised During SiteVisit on 26.10.15
Current Status of TheObservation Raised on Site
Visit on 26.10.15
Remarks
Sangrur- Sunam (S1) Road:
1. Safety Wall prepared along the drainis not properly painted anddelineators have been not installed atmany places.
Safety walls have been painted;the delineators also have beeninstalled for the raised safetywalls.
Bhawanigarh-Sunam-Kotshamir (S2) Road:
1. Median Markers in Sunam is brokenand need replacement accordingly.
The median markers to be fixedas rehabilitation work are over.
2. Excessive Earth on shoulder is lyingat many places, needs to be shifted tostock yard for further uses.
The excessive soil is being andhas to be reused for preparationof earthen shoulders.
The excessive earth shall be shifted only after completion ofearthen shoulders.
Monthly ESMF ReportPeriod – September 2017
Previous Observations Compliance Status
S. No. Previous Observation CurrentStatus duringSite Visit on
26.10.15
Remarks ofPRBDP
Current Status with Remarks
1. Tree plantation at bothcamp sites to developgreen belt andlandscaping nearsecurity gate.
PartiallyComplied
Need to dedicate theseparate Gardner forboth camps.Currently only oneGardner is lookingafter and this is notadequate.
New saplings are planted and maintained. The landscaping work also hasbeen completed at security gate. Additional helpers and gardener havebeen provided for proper gardening.
2. Haul RoadMaintenance.
Not Complied The contractor didnot responded onthis matter yet.
The patch work has been completed and shall be continued as per therequirement.
3 The contractor did notimprove any BlackSpots, which are alreadyidentified in BidDocument. Theidentification ofadditional black spotsshould also be donewith available accidentinformation.
Not Complied The black spots improvement design has been submitted to monitoringconsultant for approval vide letter no. PIPL/OPRC/995/2016 on dated13.09.2016.
Monthly ESMF ReportPeriod – September 2017
11. Site Visit on 17.09.2015Project Manager (Environmental and Safety) PRBDB, Mohali visited the OPRC project along with SDE of PWD, Sangrur, and Asset Manager of MCand representative of PIPL on dated 17.09.2015. A meeting was also held in PIPL site office at Khiala.
12. Site Visit on 10.08.2015Environmental Manager PRBDB, Mohali with Environmental Expert of MC and representatives of PIPL has visited the project on dated 10.08.2015. Ameeting was also held in the PIPL site office at Khiala. The compliance report of the observations of this visit is shown as below.
Table 20:- PRBDB Observation Compliance StatusS. No. Observation Compliance status Remarks1. Workers safety need to be improved with
arrangement of all necessary sign boardsand safety equipment’s as per IRC: SP:55:2014 for construction period.
Improvement has been done byusing more sign boards, sandbags, delineators, reflectivetapes etc. Training sessions hasalso been conducted for staff tomaintain safety.
Additional sign boards for safety measureshave been installed at site in theconstruction zones.
4. Utility shifting(Electrical Poles) is longpending near the SunamBridge.
In process ConstructionDivision, Sangrurhas prepared theestimate for utilityshifting.
It has been reminded to Client and MC regularly but still utility shifting ispending. The work progress is suffering due to these obstructions.
Monthly ESMF ReportPeriod – September 2017
14. CONCLUSIONS
It is concluded that all statutory requirements have been adhered. Meanwhile, the implementation of required compliances is being done regularly.Water consumption during month of September2017is 1234 KLD.26.74 % consumption of water is for continuously sprinklingon haul roads and basecamps. 44.57% consumption of water has been used on construction site for construction activities and sprinkling for dust suppression. Maintenance ofplants and vehicles are done as per schedule. All the vehicles are having valid PUC certificates and inspected. Quantity of earth produced on entireproject is 457704 cum.Out of this quantity 456903 cum has been reused in earthen shoulder preparation, maintenance of slopes and earthen shoulder andROB approaches.
Major Activities for the month ofSeptember-2017were clearing and grubbing, excavation, preparation of sub grade, laying of GSB and WMM, Millingof existing bituminous layer, DBM and BC,earthen shoulder preparation, low shoulder rectification and cleaning, hazard and sign boards maintenance,delineator cleaning, Main Carriageway cleaning, R.O.B cleaning, culvert cleaning, bund removal from the shoulder, kilometer and hectometer stonecleaning, new installation and reinstallation of sign boards, road marking, fixing of RRPMs, tree white washing, footpath cleaning and brick work forheadwall, catch pit wall, median kerb, parapet wall, roundabout and safety wall.
Package Skid Mounted Sewage treatment plant of capacity up to 20 KLD is in operation for treatment of waste water in base Camp-2. Landscapedareas have been maintained in both base camps.
Waste material management is being done. The sand and aggregate piling is done uniformly and proper storage is kept to avoid dusting. Properstorage of waste oil to prevent spillage is made. All environmental monitoring (Air, Water, Soil, and Noise) of OPRC projecthas been as scheduled inApril-2017.Segregation and storage areas have been marked and composting pit has been maintained in old camp. There is no negative impact ofconstruction activities which are being carried out.
Monthly ESMF ReportPeriod – September 2017
Annexure I: Good Environmental Practices
Monthly ESMF ReportPeriod – September 2017
Annexure I: Good Environmental Practices
Monthly ESMF ReportPeriod – September 2017
Annexure I: Good Environmental Practices
Monthly ESMF ReportPeriod – September 2017
Annexure II: Safety Tool Box Talk for the Month of September 2017
Monthly ESMF ReportPeriod – September 2017
ANNEXURE III: Details of the ESMF Performance Indicator
S. No. Description of Activity Status
1. ROW Encroachment within five working days of observing anyencroachment of ROW.
Nil.
2. Borrow area management Not applicable.
3. Construction plants and Contractor‘s facilities management. All regulatory compliance obtained and adequate implementation of sitespecific EMP.
4. Construction waste (both hazardous and non-hazardous waste)management.
Stored, reused, recycled & sold regularly.
5. Ambient Air Quality (AAQ) in construction stretches. Mitigation measures taken for enhancing the AAQ by regular sprinklingof water for dust suppression & monitoring has been carried as permonitoring schedule.
6. Ambient Noise Levels (ANL) in construction stretches. Mitigation measures taken for reducing the noise level & monitoring hasbeen carried as per monitoring schedule.
7. Regulatory compliance. Documentation and record keeping of licenses/permits/consents &renewed/ updated regularly
8. Environmental Management Process. Environmental Screening, Environmental impact Assessment, &Environmental Management Plan of link specific roads has beensubmitted and approved by client.
9. Operational Management Processes including labour deployment duringroutine and maintenance work.
As per schedule of routine and maintenance work.
10. Management of any chance discovery of archaeological remains at anysite excavated under the contract.
Not found.
11. Prevention of communicable diseases spreading to new areas due toincreased communications.
HIV-AIDS awareness camp is being conducted as per schedule andother measures are also being taken on daily bases.
OPRC for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bhatinda Contract Area
SETTING-UP CONSTRUCTION CAMP AND STORAGE AREA
OPRC-EMP -02-Rev 00
(Site layout of construction camp and working drawings of dwelling units with allied facilities to be attached with format).
Name of Project Road: S2 Date: 28.09.2017 Location of Camp:Khiala Kalan @ Ch.61+600 RHS
Sl. No. Item Unit Details Remarks if any
1. Details of Camp
a. Size of camp. mxm -
b. Area of camp. Sq. m 33803.0
c. Distance from nearest settlement. Km 1.6 KhialaKalan
d. Distance from nearest water source.
Type Size/Capacity Present Use/ Ownership
One minor canal 1.5 Kmaway from camp
e. Date of camp being operational (dd/mm/yy).
25.04.2014
f. Present land use. Industrial
g. No. of trees with girth > 0.3m. 38
h. Details of storage area (Availability of impervious surface).
mxm 20×10
i. Availability of separate waste disposal from storage area.
Sqm 600
2. Details of Topsoil Stacking
a. Quantity of top soil removed. Cum 5427.30
b. Detail of storage of topsoil.
Cum
4317.21 Cum top soil used in spreading on barren field,420.00
Cum in green development in camp
& 690.09 Cum in others activity (used in median
& slopes)
Top soil stacking is not possible due to long
period of project.
3. Details of Workforce.
a. Total no. of labours. Nos. 86
86 (local labours have been engaged on daily
basis.)
b. Total no. of male workers. Nos. 283
c. No. of male workers below 18 years of age.
Nos. Nil
d. Total no of female workers. Nos. Nil
e. No. of female workers below 18 years of age. Nos. Nil
f. No. of children. Nos. Nil
4. Details of Dwelling Units.
a. No of dwelling/huts. Nos. 34
b. Minimum size of dwelling. mxm 3×4.43
OPRC for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bhatinda Contract Area
c. No. of opening per dwelling. Nos. 3
d. Minimum size of opening. mxm 1×1.22
e. Walls Specifications
Bricks wall with cement mortar
f. Roofing Specifications Painted GI Sheets
g. Flooring Specifications Concrete
h. Drinking water tank. Specifications PVC
i Capacity of drinking water tank. Cum 2
J Size of drinking water tank. L 2000
K Total no. of WC. Nos. 11
l. No. of WCs for female workers. Nos. 01
m. Minimum size of WC. mxm 1.0 ×2.1
n. Total no of bathrooms. Nos. 12
o. Total No. of bathrooms for female workers.
Nos. Nil
p. Minimum size of bathrooms. mxm 0.8×2.1
q. Size of septic tank for WC/Baths. mxm 5.7×3.6
r. Capacity of water tank for WCs/bathrooms and general purpose.
L 2x2000
s. Fencing around camp. Y/N Yes
5. Details of Facilities.
a. Availability of security guard 24 hrs.a day.
Yes/No Yes
b. Details of First Aid facility. Yes/No Yes
c. Availability of Day Care center. Yes/No
No
d. Availability of dust bins. Yes/No
Yes
Prepared By: Checked By: Approved By:
Signature SignatureGGGGGG Signature GGGGGG
Name –Vardan Srivastava Name – Name–
Sr. EnvironmentalEngineer Environmental Expert, MC Environmental Expert, PWD/PRBDB
Remarks
1. Sewage treatment plant (Package Skid Mounted of Capacity up to 20 KL/D) has been in operation.
2. HIV/AIDS awareness slogans have been displayed and maintained at various locations in the camps.
3. Emergency alarm and windsock has been provided.
4. Staff quarters are facilitated with electrical fixtures, white wash, and ventilation and maintained.
5. Household dust bins are provided in camp.
6. Solid waste segregation and storage area has been prepared and maintained near laboratory.
7. Composting pit has been constructed near stone dust pit for disposal of bio-degradable kitchen waste
and others.
8. 1 No. mess is facilitated with table, chairs which is being used as dining hall.
9. Emergency response plan contacts details has been displayed in English and Hindi near emergency
assembly point.
10. PCC foundations with rubber mat, danger sign and shade have been provided to all electric panels in
camp and maintained.
OPRC for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bhatinda Contract Area
DETAILS OF HOT MIX PLANT
OPRC-EMP 05-Rev 00
Name of Plant Site: Camp-2 Date of Submission: 28.09.2017
1. Environment Features of the surrounding area
1.1 Name and location of Hot Mix Plant Khiala Kalan @, 1 Km from Ch. 61+600 RHS on S2 road
1.2 Wind direction NW
1.3 Name (s), distance population and
type of settlements in a 1.5 km
radius of site.
Khiala Kalan , 1.6 Km , Residential
2. Draw sketch plan of HMP clearly indicating distance roads.
3. Details of HMP and Mitigation Measures taken:
3.1 Installed capacity 200 TPH
3.2 Average utilization 170TPH
3.3 Make Linn off
3.4 Model MSD 3000
3.5 Last serviced 26.2.2017
OPRC for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bhatinda Contract Area
4. Explain Air Pollution Control Measures taken at the HMP site
5. Explain Noise Pollution Control Measures taken at the HMP site
Prepared By: Checked By: Approved By:
Signature Signature GGGGGG Signature GGGGGG
Name –Vardan Srivastava Name – Name –
Sr. Environmental Engineer Environmental Expert, MC Environmental Expert, PWD/PRBDB
1. HMP has been equipped with bag filters.
2. Cleaning and maintenance of HMP is being done on daily basis during the operation.
1. Noise reducing enclosures have been provided.
Remarks
1. Regular sprinkling of water around the plant is being ensured.
2. Pulley guard has been provided over running motor for compliance to observations.
3. Stack height of 82.5 KVA, 120 KVA and 500 KVA DG set have been increased up to adequate height
from roof top of DG set.
4. Identification mark has been displayed at electrical earth pit and monitored.
OPRC for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bhatinda Contract Area
CHECKLIST FOR ENVIRONMENT INSPECTION
(OPRC-EMP 10-Rev 00)
Name of Road:Sangrur-Mansa-Bathinda contract area. Date of inspection: 28.09.2017
Sl. No. ESMF Measures
1 Provision of personnel accountable for implementation of ESMP / Safety measures with contractor.
Yes
2 Consent of PCB to establish HMP. Yes
3 Consent of PCB to operate HMP. Yes
4 Compliance of PCB conditions for HMP installation and operation. Yes
5 Whether compliance reported through monthly progress report of divisional office of executive engineer.
Yes
6 PUC taken for all construction vehicles. Yes
7 Concrete platform with trap for bitumen boiler, fuel tank for HMP and generator set provided or not.
Yes
8 Precautions to prevent contamination of soil by emulsion, bituminous, oil and lubricant taken while storing.
Yes
9 Providing cover to fine construction material & bituminous mix during transportation. Yes
10 Borrow areas:
a) Borrow areas approved by department 1
b) Existed land use Soil dune
c) Nos. opened 1
d) Available quantity(initial) 8890
f) Balance quantity Nil
g) Nos. of borrow areas rehabilitated 1
11 Spoil and debris disposal:
a) Present status of land
NA
b) Closure and completion plan
12 Site specific traffic safety management plan:
a) Contractor installed the warning / regulatory traffic signs at the construction site Yes
b) The arrangement adequate Yes
OPRC for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bhatinda Contract Area
13 Safety equipment i.e. helmet, gloves, gumboot, mask, earplugs etc. provided to workers Yes
14 Health facility at camp and worksite i.e. First Aid kit & suitable vehicle for conveyance in case of emergency / accident
Yes
15 Permit for procuring river sand NA
16 License from department of mines for quarrying NA
17 Consent to establish/operation of crusher NA
18 Provision of labour camp with sanitation& potable water Yes
19 Fire precautions at Hot Mix Plant and site office Yes
20 Air and noise monitoring done in camp site Yes (AAQ,
ANQ)
21 Whether any cultural property is being impacted. No
22 Status of drainage provision in camp area OK
23 General house keeping OK
Prepared By: Checked By: Approved By:
Signature SignatureGGGGGG Signature GGGGGG
Name –Vardan Srivastava Name – Name –
Sr. Environmental Engineer Environmental Expert, MC Environmental Expert, PWD/PRBDB
Remarks
1. Plants have been maintained at Camp 2.
2. Awareness enhanced to workers to use PPEs every time while in working zone.
3. Regular disposal of kitchen & household waste is being done & recorded.
4. Housekeeping has been enhanced in labor and staff quarter.
5. Proper arrangement of windrows are provided in Camp-2
OPRC for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bhatinda Contract Area
IDENTIFICATION OF SOURSE OF WATER FOR CONSTRUCTION
(OPRC-EMP 12-Rev 00)
Name of the Project Road: Sangrur-Mansa-Bathinda contract area Date:28.09.2017
S. No. Source Name Location/
Ch.
Distance from
Road
Permission
Required Remarks
1 Bore well at Camp – 1 64+050 LHS,
S2 road 3 Km. NA
As per CWGA
guidelines, up to 1
Lac Liter/day
extraction of water
is exempted.
2
Bore well at Camp – 2
61+600
RHS, S2
road
1 Km. NA
3
Canal near project site
(Mansa Region) Bhikhi Canal - Obtained
Irrigation
Department Mansa
Prepared By: Checked By: Approved By:
Signature Signature GGGGGG Signature GGGGGG
Name –Vardan Srivastava Name – Name –
Sr. Environmental Engineer Environmental Expert, MC Environmental Expert, PWD/PRBDB
Remarks: As per the guidelines issued by Central Ground Water Authority on dated 26-Oct-2012, for
Infrastructure projects desirous of extracting ground water up to 100m³/day is exempted for permission.
OPRC for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bhatinda Contract Area
DETAILS OF MACHINERY IN OPERATION
(OPRC-EMP 13-Rev 00)
Name of Project Road: Sangrur-Mansa-Bathinda contract area Month: September-2017. (Attach copy of PSPCB emission control certificate every 3 months)
1. Details of Machinery in Operation
Sr.
No.
Vehicle No. Type of Vehicle PUC Due Date SITE
1 PB13AR8378 Bharatbenz Tipper 07-Dec.-2017 OPRC
2 PB13AR8078 Bharatbenz Tipper 07-Dec.-2017 OPRC
3 PB13AW8578 TATA Tipper 07-Dec.-2017 OPRC
4 PB13AR7278 Bharatbenz Tipper 07-Dec.-2017 OPRC
5 PB13AW2504 TATA Truck2518 07-Dec.-2017 OPRC
6 PB31AW3133 TATA Truck2518 07-Dec.-2017 OPRC
7 GJ3CR6697 Mahindra Camper 10-Dec.-2017 OPRC
8 PB31L2503 AMW Tipper 07-Dec.-2017 OPRC
9 PB31L2504 AMW Tipper 07-Dec.-2017 OPRC
10 PB03AJ7143 Bharatbenz Tipper 07-Dec.-2017 OPRC
11 GJ3AT2174 TATA Tanker 20-Nov.-2017 OPRC
12 PB13AR9978 Bharatbenz Tipper 07-Dec.-2017 OPRC
13 PB13AR8978 Bharatbenz Tipper 07-Dec.-2017 OPRC
14 PB13AW8578 Bharatbenz Tipper 07-Dec.-2017 OPRC
15 PB13AR8778 Bharatbenz Tipper 07-Dec.-2017 OPRC
16 PB03 AJ6992 Maruti Ritz 03-Jan.-2018 OPRC
17 PB31L5878 Mahindra Camper 09-Jan.-2018 OPRC
18 GJAV8601 Mahindra Pickup 07- Dec.-2017 OPRC
Prepared By: Checked By: Approved By:
Signature SignatureGGGGGG Signature GGGGGG
Name –Vardan Srivastava Name – Name –
Sr. Environmental Engineer Environmental Expert, MC Environmental Expert, PWD/PRBDB
Remark
1. Washing and cleaning of vehicles including machinery is being done from outside.
OPR
C for Im
pro
vem
ent, R
ehabili
tation, R
esurfacin
g &
Routine M
ain
tenance W
ork
s o
f R
oads o
f Sangru
r-M
ansa-B
atinda C
ontract Are
a
9
WASTE MANAGEMENT
OP
RC
-EM
P 1
4-R
ev 0
0
Na
me o
f P
roje
ct
Ro
ad
: S
an
gru
r-M
an
sa-B
ath
ind
a C
on
tra
ct
Are
a
Mo
nth
: S
ep
tem
be
r-20
17.
S. No.
Type of Waste
Characteristics of
Waste
Quantity of Waste Generation
Quantity of Waste Reused/Disposed Remarks
Up to Previous
Month
This M
onth
Total
Up to
Previous
Month
This
Month
Total
1
Bituminous milled
material
Hazardous
100514 Cum
443 Cum
100957 Cum
83812 Cum
676 Cum 84488 Cum
Reusable
2
Waste oil
Hazardous
6185L
40L
6225 L
3705L
250 L
3955 L
Reusable &
Sold
3
Cement Bags
Non-H
azardous
25004 Nos.
48 Nos.
25052Nos.
24545Nos.
68 Nos.
24613 Nos.
Reusable
4
Drums- Steel
Non-H
azardous
292 Nos.
135 Nos.
427Nos.
106 Nos.
Nil
106 Nos.
Reusable
5
Drums- Plastic
Non-H
azardous
38 Nos.
Nil
38 Nos.
Nil
Nil
Nil
Reusable
6
Tyres
Non-H
azardous
581Nos.
4 Nos.
585Nos.
490 Nos.
Nil.
490 Nos.
Sold
Pre
pare
d B
y:
C
hecked B
y:
Appro
ved B
y:
S
ignatu
re
S
ignatu
reG
GG
GG
G
S
ignatu
re G
GG
GG
G
Nam
e –
Vard
an S
rivasta
va
N
am
e –
N
am
e –
Sr.
Environm
enta
l E
ngin
eer
E
nvironm
enta
l E
xpert
, M
C
Environm
enta
l E
xpert
, P
WD
/PR
BD
B
OPRC for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Batinda Contract Area
10
SUMMERY SHEET FOR ENVIRONMENTAL REPORTS
(OPRC-EMP 16-Rev 00)
Name of the Project Road: OPRC Sangrur-Mansa-Bathinda Contract area Date:28.09.2017
Sl. No. Description Remarks
1 No Objection Certificate
A Hot Mix Plant
Location 164+050, LHS, S2 road Yes
Location 261+600, RHS S2 road Yes
Location 3 - -
B Cement Batching Plant
Location 1× NA
Location 2×
Location 3×
2 Pollution Under Control Certificate
Vehicles Yes
Machineries Yes
3 No Objection Certificate
Location 1 Yes
Location 2 Yes
4 Labour Camps
No. of sites identified 2
Approved 2
Opened 2
Conforms to conditions imposed at the time of opening of sites Satisfactory
Closed Nil
5 Workers
No. of workers employed 283 (including daily basis)
No. of male workers 283
No. of female workers Nil
No. of day workers 283 (including daily basis)
6 Borrow Area
No. of sites identified 3
Approved 1
Opened 1
Quantity of available material (initial) 8890
Quantity of material utilized 8890
Quantity of topsoil preserved Nil
Quantity of top soil used Nil
No of sites closed 1
No. of sites rehabilitated 1
7 Quarry
No. of sites identified NA Approved
Opened NA Material available
OPRC for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Batinda Contract Area
11
Material obtained
NA No. of sites rehabilitated
8 Disposal Locations
No. of sites identified 1
Approved 1
Opened 1
Amount of waste disposed Nil
Type of waste disposed Nil
No. of sites rehabilitated Nil
9 Road Safety
Road safety norms followed as per guidelines, IRC:SP:55:2014 and approved traffic management plan Yes
10 Cleaning of Culvert
No. of culverts 409
Nos. cleaned 216
11 Tree
No. of trees cut Ref. Table 6
No. of trees to be planted
Being done by forest department.
Trees planted
Being done by forest department.
12 Haul Roads
Adequacy of maintenance of haul road network Satisfactory
Prepared By: Checked By: Approved By:
Signature SignatureGGGGGG Signature GGGGGG
Name: Vardan Srivastava Name – Name –
Sr. Environmental Engineer Environmental Expert, MC Environmental Expert, PWD/PRBDB
Remarks: 1. One number mess for camp 2 for employees is in operation and camp 1 mess building is now being
used as dining hall. 2. Plastic crates have been provided for storage of vegetables in kitchen. 3. Ventilation facilities have been provided in staff quarters at Camp. 4. Environmental Monitoring (Ambient Air Quality) has been done as scheduled in April 2017. 5. Composting pit is constructed for biodegradable kitchen waste in Camp 1 and camp 2. But in camp 1
composting pit has been closed due to closure of mess. 6. Solid waste segregation and storage area has been prepared in Camp 1 and 2. 7. Sewerage treatment plant is in operation.
8. Plantation around Camps is being maintained and monitored.
MPR –September 2017
As per clause 8.6.1 of section VI specification& contract works,
incomplete work is completed under 1st year work program.
Sr.
No.
Name of Road Status
1. Rehabilitation of Dhanaula- Bhikhi (S-5) 0+000 to 25+340 Completed
2. Improvement of Bhawanigarh – Kotshamir (S-2) 67+840 to 79+000 Completed
3. Improvement of Bhawanigarh – Kotshamir (S-2) 2+240 to 18+300 Completed
As per clause 8.6.1 of section VI specification & contract works,
incomplete work is completed under 2ndyear work program.
Sr.
No.
Name of Road Status
1. Improvement works of Mansa- Talwandi Sabo (S-4) 0+000 to 24+970 Completed
2 Resurfacing of Bathinda to Talwandi Sabo B8 Road Km 9+200 to
14+850
Completed
3 Resurfacing of Bathinda to Talwandi Sabo B8 Road Km 14+850 to
37+850
Completed
As per clause 8.6.1 of section VI specification & contract works,
incomplete work is completed under 3rd year work program up to
15.08.2015 of Sr. No. 01 and 04.12.2015 of Sr. No. 02
Sr.
No.
Name of Road Status
1. Rehabilitation of Sangrur-Sunam (S-1) 0+000 to 11+300 Completed
2. Improvement of Bhawanigarh –Sunam –Kotshmair (S-2) 45+200 to
68+000
Completed
MPR –September 2017
As per clause 8.6.1 of section VI specification & contract works,
incomplete work is completed under 4th year work program up to
04.12.2016.
Improvement Works of S2 Road Remarks
Km 8.4 to 9.4
Km 18.15 to 24.4 From Km 18.15 to 18.4, the improvement work cannot be taken
up as 4 laning of NH71 is under progress; relevant drawing from
competent authority is required.
Km 28.6 to 39.3
Km 40.7 to 45.2 Km 40+700 to 42+400 cannot completed due to hindrance as
electric poles shifting has not been done till March 31, 2017. The
utility shifting was completed in April 2017. Few electric poles
were still balance in April 2017.
79.15 to 108.77 Km 84.040 to 86.060 has been proposed by client to be developed
as 4 lane, so cannot be taken up for improvement, Km 95+250 to
96+750 also cannot be taken up for improvement as ROB is to be
constructed by Client. The bridge approaches of bridge at
100+800 are to be constructed after the widening of bridge, from
100+420 to 100+700.
Rehabilitation Works of S2 Road
Km 24.4 to 26.4
Km 26.4 to 27.6 ROB length of 590 m has been excluded as it is not part of CA.
Km 27.6 to 28.6
Improvement Works of S2 Road Remarks
Km 8.4 to 9.4 Work Completed
Km 18.15 to 24.4 Work Completed
Km 28.6 to 39.3 Work Completed
Km 40.7 to 45.2 Work Completed.
79.15 to 108.77 Km 95+250 to 96+750 also cannot be taken up for improvement
as ROB is to be constructed by Client. The bridge approaches of
bridge at 100+800 are to be constructed after the widening of
bridge, from 100+420 to 100+700.
Rehabilitation Works of S2 Road
Km 24.4 to 26.4 Work Completed.
Km 26.4 to 27.6 ROB length of 590 m has been excluded as it is not part of CA.
Km 27.6 to 28.6 Work Completed.
As per section VI specification & contract works Clause no. 3.3, no
emergency work held during the month of June 2017.