ppts first review

Upload: arminbaig

Post on 06-Apr-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/2/2019 PPTs First Review

    1/19

    EnterpriseCatalog

    Submitted By

    MOHAMMED ALI RAZA MOHAMMED ABULKALAM SHABAZ

    [08D51A1219] [08D51A1218]

    ABDUL MERAJ[08D51A1201]

    Under The Esteemed Guidance ofMrs. SHEEMA SULTANA SHAIK

  • 8/2/2019 PPTs First Review

    2/19

    Enterprise Catalog is a simple, fast,accurate and easy way to know aboutan organization with flexible optionsfor viewing the essential details

    related to it.

    The solution is best suited forindividuals working on variousprojects, which helps to keep track ofall the projects and their schedulesand helps in selecting any project.

    ABSTRACT

  • 8/2/2019 PPTs First Review

    3/19

    Purpose

    Purpose is to maintain the projects for clients withall details:

    The Rate/Hour for a particular project work to bedone.

    Start and End date of the project.

    Total working hours of a day (adjusted with thebreak time option).

    Current status and Percentage of work completed

    (Progress Bar). Payment / pending amount of the project from the

    client.

  • 8/2/2019 PPTs First Review

    4/19

    The present systems are maintainedmanually using spreadsheets.

    This does not provide security for the

    data. Exchange of information anddata is time-consuming process.

    There is no proper coordinationamong the users. Often, the data ismismanaged and leads to data lossesand inconsistencies.

    Existing System

  • 8/2/2019 PPTs First Review

    5/19

    In this system each schedule can be

    tracked from the start till the end ofany particular Project cycle.

    User friendliness is provided in this

    project with various controls, facilitiesand security.

    There is no risk of data

    mismanagement at any level while theproject is being developed or viewed.

    It provides a high level security with

    different levels of authentication.

    Proposed System

  • 8/2/2019 PPTs First Review

    6/19

    MODULES

  • 8/2/2019 PPTs First Review

    7/19

    The modules of thesystem are

    Administrator Employee Client Projects list Backup and restore Report

  • 8/2/2019 PPTs First Review

    8/19

    SYSTEM REQUIREMENT

  • 8/2/2019 PPTs First Review

    9/19

    Software

    RequirementsWindows XP/2003 Operating SystemMicrosoft Visual Studio-2008 3.5

    Framework

    Microsoft SQL Server-2005IIS Web Server

    Internet Explorer 6 or 7

  • 8/2/2019 PPTs First Review

    10/19

    Hard Ware

    RequirementsPentium IV System with 2.8 GHZ

    Processor

    1 GB RAM40 GB Hard Disk

  • 8/2/2019 PPTs First Review

    11/19

    og nprocess:

  • 8/2/2019 PPTs First Review

    12/19

    Admin add project Specification:

  • 8/2/2019 PPTs First Review

    13/19

    Admin Manage Employee:

    R i t ti Di

  • 8/2/2019 PPTs First Review

    14/19

    Registration Diagram:

    Ad i A ti it Di

  • 8/2/2019 PPTs First Review

    15/19

    Admin Activity Diagram:

    M b A ti it Di

  • 8/2/2019 PPTs First Review

    16/19

    Member Activity Diagram:

  • 8/2/2019 PPTs First Review

    17/19

    CONCLUSION

    It has been a great pleasure for us towork on this project.

    This project proved good for me practicalknowledge of not only programming inasp.net and c#.net.

    Its a webenabled project. This project offers us to enter the data

    through simple and interactive forms.

  • 8/2/2019 PPTs First Review

    18/19

  • 8/2/2019 PPTs First Review

    19/19

    AnyQueries?