1

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Types of PSOs

John ZacharPrincipal Consultant

CITI [email protected]

Lovat Bank, Silver StreetNewport Pagnell

BuckinghamshireMK16 0EJ

+44 (0) 1908 283 600

2

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Introduction

3

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Projects

Project

Sponsor

Impacts

Benefits

Project

Sponsor

Impacts

Benefits

Project

Sponsor

Impacts

Benefits

Project

Sponsor

Impacts

Benefits

4

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Status monitoring Cost tracking

Allocating project managersResource utilisation

Audit Trouble shooting projects Document management

Project performance

Project resourcing

Projectcontrol

Project support office

Milestone date

23

/05

/97

06

/06

/97

20

/06

/97

04

/07

/97

18

/07

/97

01

/08

/97

15

/08

/97

29

/08

/97

12

/09

/97

26

/09

/97

10

/10

/97

24

/10

/97

07

/11

/97

21

/11

/97

05

/12

/97

19

/12

/97

02

/01

/98

16

/01

/98

30

/01

/98

23/05 1

06/06 3 2 5 6 11

20/06

Reporting date 04/07 1

18/07

01/08

15/08

29/08 3 2 4 7 5 6 8 9

12/09 2 4 7 5 6 8 9

26/09 2 4 7 5 6 8 9

10/10 2 4 7 5 6 8 9

24/10 7 5 6 8 9

07/11 5 8 6

21/11 5 8 6

05/12 6 5 8

19/12 6 5 8

02/01

16/01

30/01

13/02

5

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Throughput

Project support office

6

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Admin

Types of project support office

Support

Capability

Partner

GuidanceControl

ImproveManage

Control

Emphasis

Admin

7

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Data collector

Keeps the ‘scores’ and ‘history’

Reports aggregator

Supports individual projects

Passive

Staffed by administrators

Conduit for information on current projects

Reviews

A

Project support office: admin

Information gathering reviewers

Facilitator

Secretariat

8

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Information management Interpreter Focus on project delivery Interventionist Staffed by functional specialists Some authority Perform audits Conduit for current projects

and reports on the ‘portfolio’ Reviews

Project support office: control

C

Time QualityTechnical

Cost

BusinessBenefits Risk

Cost

Criteria based reviewers

9

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Centre of excellence –

agency of change Pro-active and interventionist Staffed by process specialists Supports portfolio and projects Provides training and support May ‘own’ PMs and resource management Monitors portfolios and projects, - influences project

organisational performance Reviews

G

Project support office: guidance

Health clinic

StatusMilestone date

23

/05

/97

06

/06

/97

20

/06

/97

04

/07

/97

18

/07

/97

01

/08

/97

15

/08

/97

29

/08

/97

12

/09

/97

26

/09

/97

10

/10

/97

24

/10

/97

07

/11

/97

21

/11

/97

05

/12

/97

19

/12

/97

02

/01

/98

16

/01

/98

30

/01

/98

23/05 1

06/06 3 2 5 6 11

20/06

Reporting date 04/07 1

18/07

01/08

15/08

29/08 3 2 4 7 5 6 8 9

12/09 2 4 7 5 6 8 9

26/09 2 4 7 5 6 8 9

10/10 2 4 7 5 6 8 9

24/10 7 5 6 8 9

07/11 5 8 6

21/11 5 8 6

05/12 6 5 8

19/12 6 5 8

02/01

16/01

30/01

13/02

Expert reviewers

10

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Source of best practices

Reactive and demand-driven

Staffed by people capable/competent in PM

Supports business-led initiatives to improve

Monitors the portfolio and maintains information on the

capacity and capability

Involved in establishing strategic direction

Represents project management at board level

Reviews

P

Project support office: partner

Coach/trainer Portfolio reporting

11

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

PSO rolesStaff Planning role Implementation roleExecutive sponsor

Secure funding Make go/no go decisions Link strategy to PSO objectives

Integrate with company strategic initiatives PSO advocate

PSO manager

Oversee content development Specify technology, staffing & rollout

requirements Oversee PM method development

PSO staff

Company PMs

Customers

Develop content Document the method Solicit & document customer

requirements

Provide subject matter expertise & guidance on method & PSO operation

Buy in to PSO concept & operation

Provide project management support requirements

Run day to day operations Responsible for all PSO deliverables Champion method implementation Implement continuous improvement process

changes

Maintain project deliverables, solve problems Carry out PSO functions Maintain all PSO records

Access & use the PSO as agreed Implement PM method & PSO processes Implement training via PSO

Provide feedback on PSO products & services Support PSO continuous improvement process

12

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

PSO

Central project office

Pro

ject

Pro

ject

Pro

ject

Information management

Process consultants

PS PS PS

13

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

PSO

Virtual offices

Pro

ject

Pro

ject

Pro

ject

Information management

Process consultants

Project support

14

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Project support office and IT PSO

Businessproject

IT Exec

Information management

Process consultants

Project support

Info Mgt

IT p

roje

ct

15

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Project support office

Corporate HQ

Black studio Juice studio Red studio

Project supportoffice

Yellow studio

16

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Portfolio planning

17

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

The problemLive Dates

1st Qtr 2nd Qtr 3rd Qtr 4th Qtr

Project 1

Project 2

Project 3

Project 4

Project 5

Project 6

Project 7

Project 8

Project Title & Reference : Management Responsibilities :

CECA Fees Billing System Development Project Sponsor :

ProjectChampion :

Project Manager :

John

Graham, Alf

Primary Objective :

By the end of January, provide the CECA business with a system of fee billing that will remove theredundant processing effort that is creating an increasing and unsustainable cost overhead. Further, the newsystem shall equip CECA to better understand the needs of students and registration centres.

Critical Success Factors :

CSF1 The new system and resulting processes must satisfy the requirements of the public auditor.

CSF2

All invoice references must be singularly consistent from registration to the debtors and creditorssub-ledgers.

CSF3

That a cross reference mechanism be available between invoice, crediting and cash processes.

CSF4

The need and ability to create manual invoices be removed from the Student Administration group.

CSF5

That a consistent cross referencing mechanism be available between Student Administration detailsand all student related financial transactions.

Primary Products :

PRO1 Registration Process

PRO2

Invoicing, Payment and Reconciliation Process

PRO3

Student Change Management Process

PRO4

Management Reporting

Start Date : Estimated Completion Date : Budget/Effort :

8th of November 1988 31st January 1988 (Discuss Approach)

Problem/Purpose :

CECA is an organisation that is self reliant and must fund all of its activities without assistance. If it werenot for the sale of investments, which in themselves have yielded considerable income, the 1988 accountswould have shown an operating loss; it is vital to the survival of CECA as a going concern that it reduce itsmanagement, finance and company administration overheads.

The current fee billing process is a conglomeration of poorly integrated manual and electronic components.This current process architecture creates significant overhead for the Student Administration andAccounting departments.

CECA’s current billing system/process needs replacement. The current system and mechanisms provideonly a basic audit trail for invoicing and cash receipting processes; this situation has been noted by thepublic auditor and has been deemed as unacceptable.

CECA cannot seek to achieve it’s the future strategic business objective of better understanding the needs ofstudents and colleges given the current mechanisms; the fee billing system would be a vital source offeedback in achieving such an understanding.

Benefit Category Benefit Type : Impact Area :

Project Title & Reference : Management Responsibilities :

CECA Fees Billing System Development Project Sponsor :

ProjectChampion :

Project Manager :

John

Graham, Alf

Primary Objective :

By the end of January, provide the CECA business with a system of fee billing that will remove theredundant processing effort that is creating an increasing and unsustainable cost overhead. Further, the newsystem shall equip CECA to better understand the needs of students and registration centres.

Critical Success Factors :

CSF1 The new system and resulting processes must satisfy the requirements of the public auditor.

CSF2

All invoice references must be singularly consistent from registration to the debtors and creditorssub-ledgers.

CSF3

That a cross reference mechanism be available between invoice, crediting and cash processes.

CSF4

The need and ability to create manual invoices be removed from the Student Administration group.

CSF5

That a consistent cross referencing mechanism be available between Student Administration detailsand all student related financial transactions.

Primary Products :

PRO1 Registration Process

PRO2

Invoicing, Payment and Reconciliation Process

PRO3

Student Change Management Process

PRO4

Management Reporting

Start Date : Estimated Completion Date : Budget/Effort :

8th of November 1988 31st January 1988 (Discuss Approach)

Problem/Purpose :

CECA is an organisation that is self reliant and must fund all of its activities without assistance. If it werenot for the sale of investments, which in themselves have yielded considerable income, the 1988 accountswould have shown an operating loss; it is vital to the survival of CECA as a going concern that it reduce itsmanagement, finance and company administration overheads.

The current fee billing process is a conglomeration of poorly integrated manual and electronic components.This current process architecture creates significant overhead for the Student Administration andAccounting departments.

CECA’s current billing system/process needs replacement. The current system and mechanisms provideonly a basic audit trail for invoicing and cash receipting processes; this situation has been noted by thepublic auditor and has been deemed as unacceptable.

CECA cannot seek to achieve it’s the future strategic business objective of better understanding the needs ofstudents and colleges given the current mechanisms; the fee billing system would be a vital source offeedback in achieving such an understanding.

Benefit Category Benefit Type : Impact Area :

Project Title & Reference : Management Responsibilities :

CECA Fees Billing System Development Project Sponsor :

ProjectChampion :

Project Manager :

John

Graham, Alf

Primary Objective :

By the end of January, provide the CECA business with a system of fee billing that will remove theredundant processing effort that is creating an increasing and unsustainable cost overhead. Further, the newsystem shall equip CECA to better understand the needs of students and registration centres.

Critical Success Factors :

CSF1 The new system and resulting processes must satisfy the requirements of the public auditor.

CSF2

All invoice references must be singularly consistent from registration to the debtors and creditorssub-ledgers.

CSF3

That a cross reference mechanism be available between invoice, crediting and cash processes.

CSF4

The need and ability to create manual invoices be removed from the Student Administration group.

CSF5

That a consistent cross referencing mechanism be available between Student Administration detailsand all student related financial transactions.

Primary Products :

PRO1 Registration Process

PRO2

Invoicing, Payment and Reconciliation Process

PRO3

Student Change Management Process

PRO4

Management Reporting

Start Date : Estimated Completion Date : Budget/Effort :

8th of November 1988 31st January 1988 (Discuss Approach)

Problem/Purpose :

CECA is an organisation that is self reliant and must fund all of its activities without assistance. If it werenot for the sale of investments, which in themselves have yielded considerable income, the 1988 accountswould have shown an operating loss; it is vital to the survival of CECA as a going concern that it reduce itsmanagement, finance and company administration overheads.

The current fee billing process is a conglomeration of poorly integrated manual and electronic components.This current process architecture creates significant overhead for the Student Administration andAccounting departments.

CECA’s current billing system/process needs replacement. The current system and mechanisms provideonly a basic audit trail for invoicing and cash receipting processes; this situation has been noted by thepublic auditor and has been deemed as unacceptable.

CECA cannot seek to achieve it’s the future strategic business objective of better understanding the needs ofstudents and colleges given the current mechanisms; the fee billing system would be a vital source offeedback in achieving such an understanding.

Benefit Category Benefit Type : Impact Area :

Value

Criticality

Phasing

Size

Pj32Pj21Pj19Pj56Pj23

18

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Getting control

19

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Portfolio management

Portfolio management

Project

Sponsor

Project

Sponsor

Project

Sponsor

Project

Sponsor

Portfolio of projects

20

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Status monitoring Cost tracking

Allocating project managersResource utilisation

Audit Trouble shooting projects Document management

Project performance

Project resourcing

Projectcontrol

Portfolio planning

SchedulingProject prioritisation

Portfolio support office

Milestone date

23

/05

/97

06

/06

/97

20

/06

/97

04

/07

/97

18

/07

/97

01

/08

/97

15

/08

/97

29

/08

/97

12

/09

/97

26

/09

/97

10

/10

/97

24

/10

/97

07

/11

/97

21

/11

/97

05

/12

/97

19

/12

/97

02

/01

/98

16

/01

/98

30

/01

/98

23/05 1

06/06 3 2 5 6 11

20/06

Reporting date 04/07 1

18/07

01/08

15/08

29/08 3 2 4 7 5 6 8 9

12/09 2 4 7 5 6 8 9

26/09 2 4 7 5 6 8 9

10/10 2 4 7 5 6 8 9

24/10 7 5 6 8 9

07/11 5 8 6

21/11 5 8 6

05/12 6 5 8

19/12 6 5 8

02/01

16/01

30/01

13/02

21

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Responsibilities

Prioritisation Resource allocation Monitoring

Projects Portfolio perspective

Reporting Projects Portfolio perspective

22

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Portfolio resourcing

Availability

Suitability

Contention resolution

Escalation

Prioritisation

Arbitration

Things

People

23

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Relating calendar to effort

Too little

Too much

t d

Time

Stafflevel

td1

Planned effort

Fixed team

Actual effort

Size effort time/ /

24

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Year 1Year 2

Year 3Year 4

0

5

10

15

20

25

30

Core competencies

Develop? Contract?

Project managersProgramme managersProcurement managersRecruit?

25

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008Right project manager, right project

Do they know their job?

Is it too new? Are they accepted by stakeholders?

Have they the right knowledge, experience and

attitudes

0

1

2

3

Contract management

Schedule management

Client relationships

Risk management

Subcontractor management

High value contracts

Team management

Technical knowledge

26

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Portfolio support office

Corporate HQ

UK Sales USA

Portfolio supportoffice

UK IT development

Hardwareprojects

Softwareprojects

pro

jec

t

pro

jec

t

pro

jec

t

pro

jec

t

pro

jec

t

pro

jec

t

pro

jec

t

pro

jec

t

pro

jec

t

pro

jec

t

27

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

World wide management office

PgMO PgMO PgMO

PjSO PjSO

Pj 2

Pj 3Pj 1

PjSO

Pj 2

Pg 1Pj 1

Pg 1

Pj 2Pj 1

Corporate HQ

Europe USAPacific Asia

Africa S.America

PjSO

PgSO

WorldwidePMO

PjSO

PjSO

PgSO

PjSO

28

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Impact on throughput

29

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Monitoring

30

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

From PSO to PgSO

31

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008Projects, portfolios and programmes

Programme management

Programme

Portfolio management

Project

Sponsor

Portfolio of projects

Impacts

Benefits

Project

Sponsor

Impacts

Benefits

Project

Sponsor

Impacts

Benefits

Project

Sponsor

Impacts

Benefits

Benefits

32

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Project support office

PerformanceThroughput

Programme support office

33

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Benefits tracking Status monitoring Cost trackingKPI monitoring

Allocating project managersResource utilisationCommunication

Audit Issue managementTrouble shooting projects Document managementProgramme audit

Performance management

Programme resourcing

Programme control

Programme planning

Defining projectsProject prioritisation/schedulingDependency managementChange planning

The additional roles

Milestone date

23

/05

/97

06

/06

/97

20

/06

/97

04

/07

/97

18

/07

/97

01

/08

/97

15

/08

/97

29

/08

/97

12

/09

/97

26

/09

/97

10

/10

/97

24

/10

/97

07

/11

/97

21

/11

/97

05

/12

/97

19

/12

/97

02

/01

/98

16

/01

/98

30

/01

/98

23/05 1

06/06 3 2 5 6 11

20/06

Reporting date 04/07 1

18/07

01/08

15/08

29/08 3 2 4 7 5 6 8 9

12/09 2 4 7 5 6 8 9

26/09 2 4 7 5 6 8 9

10/10 2 4 7 5 6 8 9

24/10 7 5 6 8 9

07/11 5 8 6

21/11 5 8 6

05/12 6 5 8

19/12 6 5 8

02/01

16/01

30/01

13/02Project resourcing

Project control

Project planning

34

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Supporting what?

Programme support office

Substantial ambiguity around the physical solution

Programme board

Programme management

Discipline & visibility sustained by properly

structured projects

Delivery management

Balancing complexity of design

ability to deliver sensitivity to change

Design authority

Co-ordinated change made in do-able steps

Change management

35

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

The PMO teamProgramme

manager

PMOmanager

Policeman Umpire Programmeanalyst

PM Methodowner

Dataanalysts

Datacollectors

Resourcemanager

PMmanager

HRmanager

Benefitsmanager

• Policeman enforces discipline• Umpire – “play on” when appropriate• PM Method owner (1 per 6 projects)• Data analysts & collectors (1 per 4 projects)

• Resource manager allocates resources• PM manager allocates PM to projects &

manages PMs careers• HR manager manages HR aspects

Deliverymanagers (PMs)

Designauthority

Changemanager

36

PPSO SIG Spring Conference – 10 April 2008PPSO SIG Spring Conference – 10 April 2008

Thank you!

John ZacharPrincipal Consultant

CITI [email protected]

Are there any questions?