ppm-55 · » project codes can be defined to enable grouping of projects » codes can allow for...
TRANSCRIPT
Topics Assignment Export/Import
Apply New Rates to Forecast Class
Summary Calendar Set
Project Preferences
Application Preferences
Zero-Out Data
Views
Calculated Results
User Fields
Quick Access Toolbar
Report Categories
Questions
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 2
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 4
» Cobra Budget / Forecast can be
exported into a MS Excel file
» Any or all control accounts ca be
exported
» Resource assignments can
modified within the MS Excel file
» The updated MS Excel file can be
imported back into Cobra
Assignment Export
Integration / Assignment Export
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 5
» Cobra Budget / Forecast can be
exported into a MS Excel file
» Any or all control accounts ca be
exported
» Resource assignments can
modified within the MS Excel file
» The updated MS Excel file can be
imported back into Cobra
Assignment Export
Integration / Assignment Export
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 6
Assignment Export
Can select export file result
• First Result – as defined in the
resource calculation
• Total Currency
• Another defined result
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 7
Assignment Export
Status DateClass can be changed to import
the file into a different cost class
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 8
» Cobra Budget / Forecast can be
exported into a MS Excel file
» Any or all control accounts ca be
exported
» Resource assignments can
modified within the MS Excel file
» The updated MS Excel file can be
imported back into Cobra
Assignment Import
Integration / Assignment Import
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 9
» Cobra Budget / Forecast can be
exported into a MS Excel file
» Any or all control accounts ca be
exported
» Resource assignments can
modified within the MS Excel file
» The updated MS Excel file can be
imported back into Cobra
Assignment Import
Integration / Assignment Import
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 16
Apply New Rates to Forecast Class
Default Rate FileThe Default Rate File is
used … unless there is
a Rate File specified for
a Cost Class
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 17
Apply New Rates to Forecast Class
Cost Class settings (including
Rate File) can be copied to one
or more projects. This is a great
way to ensure that new rates are
applied to ALL projects
When copying settings on an
existing Cost Class, make sure
to check the “Allow existing … to
be replaced” option
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 19
» Time-phased details will display
periods with “fixed” flags only
Summary Calendar Set
Calendar / Calendar Sets
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 20
» Time-phased details will display
periods with “fixed” flags only
» A non-default Calendar Set (not
Calendar Set 00) can be
associated with a Cost Class
» Useful for long duration records
where monthly time-phasing for
out-periods is not required
Summary Calendar Set
Project Properties / Classes
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 21
Summary Calendar Set
Time-phased details display
periods based on the Cost Class’
assigned Calendar Set
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 23
» The values in the “Selected”
column will display as the “default”
when running the associated
process
» If the “Secure” option is selected,
the “Selected” settings can not be
changed within the associated
process – changes must be made
in Project Preferences
» User access to “Secured” items can
be limited in EPMSA – this can be
used to “force” a process to run a
specific way every time
Project Preferences – Actual Costs
Project Properties / Preferences / Actual Costs
To identify actual costs associated with
planned and/or completed Control
Accounts/Work Packages, unselect the
“Allow … planned …” and “Allow …
completed …” options to generate the error
list; then reselect the options to post all
actual costs
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 24
» If there are LOE work packages in
Cobra that are not updated from a
schedule, this option will ensure
that LOE work packages are
opened on time
Project Preferences – Advance Calendar
Project Properties / Preferences / Advance Calendar
Project Preferences can be copied
from a project to one or many
other projects. This is useful if a
preference change needs to be
updated on all projects
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 25
» Select the projects to copy the
current Project Properties to
Project Preferences – Copy Preferences
Project Properties / Preferences / Copy Preferences
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 26
» The Project / Project Preferences
section does not have a “Secure”
column since there are no
associated processes
Project Preferences – Project
Project Properties / Preferences / Project
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 28
» Project Terminology can be
modified to provide consistency
and standardization within your
organization
Application Preferences -General
Application Preferences / General
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 29
» Project Codes can be defined to
enable grouping of projects
» Codes can allow for free-form text
entry or selection from a code file
» Code files can be flat or can include
hierarchal structure
» If a code file is used, it can be
Optional or Required
Application Preferences –Project Codes
Application Preferences / Project Codes
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 31
» Additional Note Categories can be
added to Cobra
Application Preferences –Notes
Application Preferences / Notes
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 32
» Spread Curves can be added /
modified to align resource
assignment spreads with your
organization’s standards
Application Preferences –Spread Curves
Application Preferences / Spread Curves
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 34
» All types of time-phased data can be Zero-Out to easily fix data issues / errors
» Budget
» Forecast
» Actual
» Performance
» Zero-Out Data can be applied at various levels
» WP or CA
» Structure (WBS, OBS, etc.)
» Resource Assignment
» Entire project or a time range
Zero-Out Data
Tools / Zero-Out Data
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 35
» All types of time-phased data can be Zero-Out to easily fix data issues / errors
» Budget
» Forecast
» Actual
» Performance
» Zero-Out Data can be applied at various levels
» WP or CA
» Structure (WBS, OBS, etc.)
» Resource Assignment
» Entire project or a time range
Zero-Out Data
Tools / Zero-Out Data
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 38
Zero-Out Data
Actuals for the selected
period(s) are now zero
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 40
ViewsBudget View
• Filtered for Budget
Cost Classes only
• Status and Cost
Class columns
moved to the left for
easier visibility
Cost Class filter includes “Cost Set” option
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 41
ViewsStatus View
• Does not include Resource
Assignments
• Includes Percent Complete
(WP) and Calculated
Percent Complete (CA)
• Filtered for In-Process and
Planned WP only
• Includes Actual and
Forecast Dates
• Includes WP / CA values
for easy reference
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 45
» “On The Fly” basic calculations with
defined results
» The data is presented on Cobra
reports
» The data is not stored in the
database
Calculated Results
Reporting / Tools / Calculated Results
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 46
» “On The Fly” basic calculations with
defined results
» The data is presented on Cobra
reports
» The data is not stored in the
database
Calculated Results
Reporting / Tools / Calculated Results
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 47
Calculated Results
Use care with “Currency” flag – if new Calculated Result is a sub-
total, then including the base results and the new Calculated
Result will double the base results in any report totals
Simple mathematical
calculations
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 48
Calculated Results
Include “Results” on Sub-Totals
screen of Report Wizard
Include Calculated Result on
Results screen of Report Wizard
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 51
» Cobra ships with 5 of each User Fields
» Character
» Date
» Numeric
» Data can be displayed in the Spreadsheet view
» Data can be imported from a schedule or MS Excel files
» Data can be added to report tags
» Another 5 of each type of User Fields can be added to Cobra
User Fields
User Fields
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 52
User Fields
User Fields are free form –
no code file validation
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 53
User Fields
Property Tag references
User Character Field #1
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 56
» Common Cobra functions can be
displayed on the Quick Access
Toolbar
» Option to display the Quick Access
Toolbar above or below the Ribbon
» Option to minimize the Ribbon
Quick Access Toolbar
Quick Access Toolbar
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 59
Quick Access Toolbar – Minimize the Ribbon
Click on a Ribbon title to
expand the Ribbon
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 61
Report Categories
When saving a report with
project specific criteria, the
“Category” field can be
modified to allow for easier
report sorting
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 62
Report Categories – All Reports
In “All Reports” - reports can
be sorted by Category.
Project specific reports will be
grouped together
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 63
Report Categories – Report Wizard
In “Report Wizard” - reports can be filtered by
Category. Only reports with the specified
Category will be displayed