pp-qm with subcontractor

92
Production order with external processing and Quality Checks Hexagon Bolt (finished Goods manufacturing) BOM - Hexagon Bolt

Upload: rama-y

Post on 23-Feb-2017

39 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: PP-QM with Subcontractor

Production order with external processing and Quality Checks

Hexagon Bolt (finished Goods manufacturing)

BOM - Hexagon Bolt

Page 2: PP-QM with Subcontractor

Prebolt – Logical (dummy material) not relevant to costing

Page 3: PP-QM with Subcontractor
Page 4: PP-QM with Subcontractor

Routing:

PP02 – External Processing.

Page 5: PP-QM with Subcontractor

Component Allocation

Page 6: PP-QM with Subcontractor

Inprocess Inspection setup on operation 0050 with control key PP04

Inspection chars assigned for inprocess inspection

Page 7: PP-QM with Subcontractor
Page 8: PP-QM with Subcontractor

Auto goods receipt setup at last operation 0060 – PP03

Quality Management – inspection setup in the material master:

Page 9: PP-QM with Subcontractor
Page 10: PP-QM with Subcontractor

03 and 04 – Inspection Type active.

Page 11: PP-QM with Subcontractor

Stock requirement list for the finished good.

Page 12: PP-QM with Subcontractor

Converting Planned order to production order

Page 13: PP-QM with Subcontractor

Save the order

Page 14: PP-QM with Subcontractor

Production order created and saved.

Page 15: PP-QM with Subcontractor
Page 16: PP-QM with Subcontractor

Display of Production order.

Page 17: PP-QM with Subcontractor

In the assignment tab we see the inspection lot generated for the created production order.

Page 18: PP-QM with Subcontractor

Production order – operation overview.

Let’s confirm the order operation wise. Transaction: Co11n

Enter the order & operation 0010

Page 19: PP-QM with Subcontractor

Click on good movements

Page 20: PP-QM with Subcontractor

We see the auto goods issue.

Page 21: PP-QM with Subcontractor

Save the order. Operation 0010 confirmed now.

Lets check the operation overview display of production order – co03

Page 22: PP-QM with Subcontractor

See the status CNF Mile rel.

Lets confirm operation 0020.

Page 23: PP-QM with Subcontractor
Page 24: PP-QM with Subcontractor
Page 25: PP-QM with Subcontractor

Operation 0020 confirmed.

Operation 0030 – External processing

Page 26: PP-QM with Subcontractor

We see Purchase requisition generated here.

Convert PR to PO.

Page 27: PP-QM with Subcontractor
Page 28: PP-QM with Subcontractor

Save the PO .

Page 29: PP-QM with Subcontractor

PO generated - 4500004328.

Goto ME2o

Page 30: PP-QM with Subcontractor
Page 31: PP-QM with Subcontractor
Page 32: PP-QM with Subcontractor

Click on Post goods Issue

Page 33: PP-QM with Subcontractor
Page 34: PP-QM with Subcontractor

Inbound delivery created against – Vendor & PO.

3160002598 - Indound delivery.

MIGO – Goods receipt against the Inbound delivery

Page 35: PP-QM with Subcontractor
Page 36: PP-QM with Subcontractor
Page 37: PP-QM with Subcontractor
Page 38: PP-QM with Subcontractor

GR done for the external operation. Now lets see the Production order.

Page 39: PP-QM with Subcontractor

I see the external operation EODL.

Page 40: PP-QM with Subcontractor

Now can confirm the operation 0030.

Page 41: PP-QM with Subcontractor
Page 42: PP-QM with Subcontractor
Page 43: PP-QM with Subcontractor

Operation 0030 confirmed.

Now We got the external operation done. So we can go ahead with the next operations. Let’s confirm 0040 painting here.

Page 44: PP-QM with Subcontractor
Page 45: PP-QM with Subcontractor

0040 –Confirmed.

Page 46: PP-QM with Subcontractor

0040 – Confirmed.

Lets go with 0050 confirmation - We had setup in process inspection here with PP04.

Page 47: PP-QM with Subcontractor

When I try to confirm I get a pop message - QM Characteristics.

So let perform the QM operations on the Inspection lot for the order.

Page 48: PP-QM with Subcontractor
Page 49: PP-QM with Subcontractor
Page 50: PP-QM with Subcontractor

Lets do the result recording….

Page 51: PP-QM with Subcontractor
Page 52: PP-QM with Subcontractor
Page 53: PP-QM with Subcontractor
Page 54: PP-QM with Subcontractor
Page 55: PP-QM with Subcontractor
Page 56: PP-QM with Subcontractor
Page 57: PP-QM with Subcontractor
Page 58: PP-QM with Subcontractor
Page 59: PP-QM with Subcontractor
Page 60: PP-QM with Subcontractor
Page 61: PP-QM with Subcontractor
Page 62: PP-QM with Subcontractor
Page 63: PP-QM with Subcontractor
Page 64: PP-QM with Subcontractor
Page 65: PP-QM with Subcontractor

Status - INSP

Lets do the UD for this

Page 66: PP-QM with Subcontractor
Page 67: PP-QM with Subcontractor
Page 68: PP-QM with Subcontractor
Page 69: PP-QM with Subcontractor

Status: UD ICCO STUP

Now we can confirm the operation 0050

Page 70: PP-QM with Subcontractor
Page 71: PP-QM with Subcontractor
Page 72: PP-QM with Subcontractor

Operation 0050 status.

Last operation 0060. PP03 control key for auto goods receipt.

Also we have Inspection setup – 04 for this, hence stock would be visible in Quality – Final goods receipt for inspection (PP QM)

Current stock :

Page 73: PP-QM with Subcontractor

Lets confirm 0060

Page 74: PP-QM with Subcontractor
Page 75: PP-QM with Subcontractor
Page 76: PP-QM with Subcontractor
Page 77: PP-QM with Subcontractor

Order confirmed.

Stock overview list

Page 78: PP-QM with Subcontractor

See Final goods - stock in Quality.

We will have to the Result recording and UD.

Page 79: PP-QM with Subcontractor
Page 80: PP-QM with Subcontractor
Page 81: PP-QM with Subcontractor
Page 82: PP-QM with Subcontractor
Page 83: PP-QM with Subcontractor
Page 84: PP-QM with Subcontractor
Page 85: PP-QM with Subcontractor
Page 86: PP-QM with Subcontractor

Lets do UD

Page 87: PP-QM with Subcontractor
Page 88: PP-QM with Subcontractor
Page 89: PP-QM with Subcontractor
Page 90: PP-QM with Subcontractor

Now lets check the stock overview list.

Page 91: PP-QM with Subcontractor

I see 3 have been moved to unrestricted.

Page 92: PP-QM with Subcontractor