powerpoint presentation...construction phases rad phase i: 2015-2017 rad phase iia&b: 2016-2018...
TRANSCRIPT
![Page 1: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/1.jpg)
![Page 2: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/2.jpg)
![Page 3: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/3.jpg)
![Page 4: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/4.jpg)
![Page 5: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/5.jpg)
![Page 6: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/6.jpg)
![Page 7: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/7.jpg)
![Page 8: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/8.jpg)
Federal Funding Baseline vs. Actual Appropriation
20.521.6
13.5
16.7
1011121314151617181920212223
2012 2013
Baseline
Actual
$11.9 Million Funding Shortfall in Last Two Years Alone.
![Page 9: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/9.jpg)
![Page 10: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/10.jpg)
![Page 11: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/11.jpg)
![Page 12: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/12.jpg)
![Page 13: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/13.jpg)
![Page 14: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/14.jpg)
![Page 15: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/15.jpg)
![Page 16: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/16.jpg)
![Page 17: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/17.jpg)
![Page 18: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/18.jpg)
![Page 19: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/19.jpg)
![Page 20: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/20.jpg)
Public Housing Map
2015-2017
2016-2018
![Page 21: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/21.jpg)
Construction Phases
RAD Phase I: 2015-2017
RAD Phase IIA&B: 2016-2018
1,885 Families
36%
3,400 Families
64%
![Page 22: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/22.jpg)
Construction Timeline
RAD Phase I
1,885 units
2015 2016 2017 2018 2019
RAD Phase IIA
1,700 units
RAD Phase IIB
1,700 units
1,4
00
Vac
anci
es
(80
0 s
ho
rt)
![Page 23: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/23.jpg)
RAD Phase I Construction Start Months
APRIL
Eisenhower, Kennedy Bros.
MAY
Marmolejo
JUNE
Krupp, Ochoa, Tays (Part 1)
JULY
Alvarez
AUGUST
Johnson
SEPTEMBER
Bean
NOVEMBER
Kennedy Estates
JANUARY
Truman
APRIL
Webber
AUGUST
Hart
SEPTEMBER
Baird, Telles
OCTOBER
Anderson
2015 2016 2017 2018To Be Determined To Be Determined
![Page 24: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/24.jpg)
RAD Phase II Communities (2016-2018)
1. Baines
2. Chelsea
3. Cramer
4. DeWetter
5. Fr. Pinto
6. Graham
7. Guillen
8. Kathy White
9. King
10. Pooley
11. Rio Grande
12. Robinson
13. Roosevelt
14. Salazar
15. Sandoval
16. Sherman
17. Sun Plaza
18. Tays (Part II and Part III)
19. Valle Verde
20. Westfall
21. Williams
![Page 25: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/25.jpg)
Construction Work
Work performed in each site will vary based on each property’s age and design. Generally speaking, the following work will apply to all properties:
• Permanently remove all asbestos (if present).
• Kitchen and bathroom upgrades.
• Replace decaying ventilation shafts and ducts behind the walls.
• Replace outdated electrical, plumbing, and lighting systems and fixtures.
• Replace appliances with new Energy Star certified appliances.
• Install more energy efficient insulation, windows, and doors (where necessary).
• New landscaping and playgrounds.
• Install new property signs.
• Resurface parking lots.
• Improve common area lighting.
![Page 26: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/26.jpg)
Refrigerated AirSwamp Coolers
![Page 27: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/27.jpg)
ANTICIPATED CONSTRUCTIONINVESTMENT 2015-2017
RAD PHASE I = 1,591 renovated
units and 294 new units
Dist. 1: TBD (9% Tax Credit)
Dist. 2: $15,943,156
Dist. 3: $9,651,131
Dist. 4: $13,193,454
Dist. 5: TBD
Dist. 6: $28,527,035
Dist. 7: $40,590,587
Dist. 8: $17,387,658
TOTAL: $125,293,021*
*Hard costs only
![Page 28: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/28.jpg)
Vacancy Logistics
HACEP Must Move 180 Families Every 60 Days for Five Years.
• Creating and managing vacancies for construction and relocation is one of the greatest challenges to our RAD efforts.
• On average, families will be temporarily relcoated for 6 months.
![Page 29: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/29.jpg)
Group 1
Relocation Logistics
Property >100 unitsGroup 1
Other Property(ies)
Renovation of Group 1 Units
Renovation of Group 2 UnitsGroup 2
Renovation of Group 3 UnitsGroup 3Renovation of
Group 4 UnitsGroup 4
![Page 30: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/30.jpg)
Relocation Logistics
Group 2 Group 3
Group 1 Group 4
Group 1 Property >100 units
![Page 31: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/31.jpg)
Relocation Logistics
Property <100 units
Group 1
Group 1
Other Property(ies)
Renovation of All Units
![Page 32: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/32.jpg)
Relocation Logistics
Property <100 units
Group 1
Group 1
![Page 33: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/33.jpg)
Relocation Logistics
RELOCATION PROCESSExample for Kennedy Bros. (Phase I of 3)Renovation: April 2015 – November 2015
December 2014
Verify Survey Data at Sites w/Residents
January2015
*On Site Case Management
February2015
Resident Care Plan Issued with Address
of Temporary Housing
February 2015
30 Day Notice to
Vacate Issued
March 2015
Residents Move Out
Incrementally
April 2015Pre-
Construction Activities Begin
April 2015
Construction Begins
UNDER CONSTRUCTION
October 2015
Residents Contacted for
Return Planning
November 2015
Return Moves to Kennedy
Scheduled
NOVEMBER - DECEMBER 2015RESIDENTS RETURN TO FULLY RENOVATED HOME AND COMMUNITY !!!
*Case Management consists of assessing households needs to include reasonable accommodation, medical needs, family composition, etc. to determine temporary housing.
![Page 34: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/34.jpg)
Resident Engagement Sessions
![Page 36: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/36.jpg)
RAD Communications
Feature RAD as lead story in monthly bilingual newsletter.
![Page 37: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/37.jpg)
RAD Communications
Flyers, Posters, Pull Up Banners for public housing sites.
![Page 38: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/38.jpg)
HACEP & HUD Leadership Communications
Meetings with HUD Secretaries and HUD Staff together with HACEP Commissioners and HACEP Staff and Partners.
![Page 39: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/39.jpg)
![Page 40: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/40.jpg)
WE CAN DO IT.
AFTER ALL…
WE’VE DONE IT BEFORE!
![Page 41: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/41.jpg)
![Page 42: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/42.jpg)
![Page 43: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/43.jpg)
![Page 44: PowerPoint Presentation...Construction Phases RAD Phase I: 2015-2017 RAD Phase IIA&B: 2016-2018 1,885 Families 36% 3,400 Families 64%](https://reader033.vdocuments.us/reader033/viewer/2022042802/5f3afb6969653d1ebc6eb9c7/html5/thumbnails/44.jpg)
for supporting HACEP in this critical opportunity to revitalize local public housing while bringing $500 million of investment to El Paso!
Gerald Cichon – Chief Executive [email protected] | (915) 849-3702 | www.hacep.org