powerpoint-presentasjon - miljøstiftelsen zero · 2019-06-10 · electric status e-bus test...

15

Upload: others

Post on 08-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging
Page 2: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging

387millionboardings 4,2% growth

Page 3: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging

Development 2000-2018

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

80

90

100

110

120

130

140

150

160

170

180

190

200

Befolkning Oslo og Akershus Biltrafikk Oslo

Passasjerer kollektivtransport Oslo Biltrafikk Akershus

Passasjerer kollektivtransport Akershus Vognkm

Page 4: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging

Boardings: Distribution

Page 5: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging

Our target: emission free by 2028

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Share of bus fleet zero emission

Zero emission

special transport Zero emission

boats

Pace towards 100%

emission free is

constrained by:

- Contract termination

dates

- Market offerings

(availability of

adequate bus types)

- Change processes

(internal/external)

- Cost / Financial

feasibility

Contracts signed Contracts under preparation

Page 6: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging

Electric status

E-bus test started

30.11.2017

• 6 e-buses

• 3 operators

• 3 charging solutions

- Slow charging on depot

- Fast opportunity charging

- Bus mounted pantograph

- Pole-mounted pantograph

Phase in 70 e-buses in

existing Oslo service

contracts in 2019

• 70 e-buses

• 3 operators

• 4th charging solution

- Fast charging on depot

• Operations start May 2019

E-buses included in the

new Romerike service

contract in 2019

• 39 e-buses

• 2 operators

• Operations start July 2019

Page 7: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging

Line 60

Charging at Vippetangen

Line 74

Charging at Mortensrud T

Line 31 / 31E

Charging at depot Jernkroken

Foto: Statnett

Going electric for city buses – the current e-bus test

Fast charging

400kW – 8 mins

Charging in one end of

2x12km route

Fast charging

300kW – 12 mins

Charging in one end of

14km route

Slow charging

80kW – 3 hrs

Charging at depot, close to 24km route

Page 8: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging

70 E-buses in existing Oslo service contracts

VDL

BYD

VDL

Mercedes

Page 9: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging

9

Depot

Operator

Buses

Charging

Persveien

Norgesbuss

4 Solaris solo

6 Mercedes solo

Medcom 1x600kW

Depot

Operator

Buses

Charging

Klemetsrud

Unibuss

10 VDL solo

Heliox 10x50kW

Depot

Operator

Buses

Charging

Jernkroken

Nobina

20 BYD articulated

Heliox, 8x300kW and

20x80kW

Depot

Operator

Buses

Charging

Alnabru

Unibuss

30 VDL articulated

Heliox 12x300kW and

18x50kW

Page 10: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging

39 E-buses included in the new Romerike

service contract in 2019

Depot

Operator

Buses

Charging

Leiraveien

Nobina

22 BYD articulated

Heliox

Depot

Operator

Buses

Charging

Brubakkveien

Norgesbuss

17 Volvo solo

ABB

Page 11: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging

We have to listen,

test, fail, and learn

Page 12: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging

Lessons learned – feedback from operators

• Change of work pattern, new logistics, new routines, uncertainty

• Problems related to prototype / early production models- IT issues, door issues - replacement of battery pack - rear axle broken (new in-hub motor design)- depot charger problems → lack of battery balancing every 2-3 days

• Lower mileage than expected

• No special challenges with buses in winter conditions, even with range or pantograph

• Two operators have selected drivers (pantograph charging)

• One operator trained all drivers (plugin charging on depot)

Page 13: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging

Lessons learned – Ruter

• The market has learned and matured

• The operator handle the e-bus risks in the tenders Romerike 2018 and West Region 2019

• Demanding to establish fast charging infrastructure

- many players - good collaboration, but takes time

• Area requirements - both for end stop fast charging, and increased number of buses

• What is the optimal (or practical) business model for charging – grid owner, depot owner, operator, any new e-infrastructure operator…

Page 14: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging

14

In 2019 Ruter will expand to 115 electric buses

Photo: www.tu.no

Page 15: PowerPoint-presentasjon - Miljøstiftelsen ZERO · 2019-06-10 · Electric status E-bus test started 30.11.2017 • 6 e-buses • 3 operators • 3 charging solutions - Slow charging

15