powerpoint presentationumanitoba.ca/admin/financial_services/media/fire_alarm... · ppt file ·...

48
Best Value Fire Alarm RFP; Refer to RFP FG102015 For Project Specifications

Upload: lynhan

Post on 28-Jun-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Best Value Fire Alarm RFP; Refer to RFP FG102015 For Project

Specifications

Page 2: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Agenda1. Arizona State University Research and Teaching

of Best Value Procurement. 2. What Do We Look For When We Look For

Supplier. What Does a Supplier Do When Looking for A Customer.

3. The Best Value Process

Page 3: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

20 Years | 210+ Publications | 550+ Presentations 2,000+ Projects | $4.6 Billion Procured

Page 4: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

InformationTechnologynetworkingdata centershardwareCOTS softwareERP systems

help desk serviceseProcurement

FacilityManagementmaintenancelandscapingsecurity servicebuilding systemsindustrial movingwaste managementenergy management

custodialconveyancepest control

Health Insurance/Medical Services

Manufacturing

Business /Municipal /University Servicesdiningmulti-media rightsfitness equipmentonline educationdocument managementproperty managementaudiovisualcommunications systemsemergency response systemslaundry

material recyclingbookstoresfurniture

Construction /Design /Engineeringlarge gcinfrastructuremunicipallaboratoryeducationhospitalfinanciallarge specialty

small gcrenovationrepairmaintenanceroofingdemolitiondevelopmentsupply chain

DBBCMARDBIDIQJOCLow BidIPD

Page 5: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Current Canadian Efforts– University of Alberta– University of Ottawa– University of Manitoba– Wilfrid Laurier

University– Queen’s University– University of Waterloo– Western University– Dalhousie University– Simon Fraser

University– City of Spruce Grove– Alberta Infrastructure– Workers Comp (NS)

Page 6: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

UofM Partnered With Arizona State University (ASU) • UofM Partnered with ASU in March 2013• It Started Out As An Alternative to Low Bid Construction Tendering• Can Be Applied Different Procurements.

• UofM Applications• Construction- Bird Construction – Windows Project Bannatyne

Campus• Food Service- Aramark• Cold Beverage- Coke • Fitness Equipment for Active Living Center- STAK Fitness• IT Project (Identity and Access Management)- In Process• Fire Alarm Monitoring- In Process

Page 7: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Objective of Minimum Standards

Supplier 1

Supplier 2

Supplier 3

Supplier 4

High

Low

PE

RF

OR

MA

NC

E

Supplier

High

LowP

ER

FO

RM

AN

CE

Page 8: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Who Will Be Selected

Supplier 1

Supplier 2

Supplier 3

Supplier 4

High

Low

PE

RF

OR

MA

NC

E

Supplier 2Supplier 4

High

LowP

ER

FO

RM

AN

CE

Supplier 1Supplier 3

Page 9: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Perception of Standard

SuppliersOwners

Page 10: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

What Percent of RFP’s Are 100% Accurate?

Page 11: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

What is Best-Value?Win-Win

Client:Outsource to expertsHigher performanceLess management and resources

SupplierControl of project/serviceAbility to increase profit by maximizing their efficiency

Page 12: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Factors For Success- Client Of ChoiceFair and Open (state/follow rules/open to all with experience)

Impartial and Transparent (minimize evaluator bias / provide debriefing)

Efficient (minimize efforts)Award based on value

Page 13: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

What Would You Purchase

Page 14: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Which Would You Purchase??

Page 15: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

What is Dominant Information

Page 16: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Our Goal Is To Obtain the Least Amount of Paper with the Most Important Information.

Page 17: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Written Approach

• Goal is to keep process efficient

• Minimize marketing material or general information

• Only focus on the specific project

• Only look at Risks and Value Added Ideas

Page 18: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Best-Value RFP• Best-Value does not mean:

– Eliminate the specification– Eliminate the standards– Eliminate the requirements

• Suppliers must now understand that these are the clients best attempt at identifying what they need.

• The RFP will still contain:– Goals, expectations, desired outcomes, requirements– Current conditions

RFP

Page 19: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Best Value Process/System

• Proposal ($)• Schedule• Past Performance• Risk Assessment• Value Assessment• Interviews

19

• Clarification• Pre-Planning

• Award • Weekly Reporting• Post Award Metrics• Final Documentation• Update PPI

High Level Overview Details

2CLARIFICATION 3MANAGEME

NT& METRICS1SELECTION

Page 20: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Criteria and Weights

20

No Fire Alarm RFP Criteria Weights1 Cost 3502 Interview 3003 Risk Assessment Plan 2004 Value Assessment Plan 100

5 Past Performance Information – Firm and Key Account Manager 50

Total Points: 1,000 Points

Page 21: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Proposal Package(Attachments)

• Attachment A – Proposal Cover Sheet• Attachment B – Proposal Form• Attachment C – Project Plan• Attachment D* – Risk Assessment• Attachment E* – Value Assessment• Attachment F – Survey Questionnaires • Attachment G – Cost Proposal Form• Attachment H – Copy of Valid ULC Certificate

• The * Item Refers to Attachments Being Anonymous. No Supplier Names. No Names of People

21

Page 22: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Critical Formatting Requirements• The evaluated proposal documents

MUST NOT contain any names that can be used to identify who the Proposer is.

• Including: company names, personnel names, project names, or product names.

22

Page 23: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Risk Assessment Plan• Identify and prioritize all major risks (applicable to this

project)

• Risk = – Not completing on time– Not finished within budget– Sources of dissatisfaction to the owner

• Controllable vs Non-Controllable– Controllable is covered in base proposal cost– Non-Controllable is outside of base cost

Page 24: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Risk Assessment Controllable Risk• Supplier 1

• RISK: Noise from our demolition may result in student/staff complaints (since we will be doing demo in an in-operational library during finals week).

• SOLUTION: Partnering is a key to success on any project. We will work with the user to develop the best strategies that can be implemented to minimize the impact of noise from demolition.

• Supplier 2• RISK: Noise from our demolition may result in student/staff complaints (since

we will be doing demo in an in-operational library during finals week).

• SOLUTION: To minimize this risk, we have planned to demolition during off hours and weekends. We will also install rubber sheets on the floors and foam pads around the wall to diminish noise and vibration

Page 25: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Risk Assessment Non-Controllable Risk• Supplier 1

– RISK: The local water company must have the water turned on by June in order for us to water the newly installed recreational fields (or the grass will die).

– SOLUTION: We will coordinate and plan our schedule with the water company as soon as the award is made to make sure that we get water to the site to irrigate the fields.

• Supplier 2– RISK: The local water company must have the water turned on by June in order for us

to water the newly installed fields (or the grass will die). On past projects, the water company has failed to meet the schedule 90% of the time.

– SOLUTION: To minimize this risk, we will coordinate our schedule with the water company as soon as we are awarded the project. If they fail to meet our schedule, we can connect temporary waterlines to the nearby fire hydrants, or we can also rent water trucks to irrigate the fields.

Page 26: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Value Assessment

• Opportunity to identify any value added options or ideas that may benefit the Owner and Agency.

• This may include ideas or suggestions on alternatives in implementation strategies, timelines, project scope, equipment, goals, financing, etc.

• All value added ideas must be logical and/or based on verifiable performance metrics.

• Value added ideas is a separated from the main cost proposal. Prior to award, the Owner will determine if the value added items will be accepted or rejected

Page 27: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Example Value Assessment

Reroofing this building will not stop all water leaks. The majority of the leaks are caused by cracks in the walls, broken/missing glass, and poor caulking. We can repair/replace all of these issues to minimize all water leaks, for a minimal impact to time/funding.

Page 28: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Things To Avoid Saying

• General items:– Clear communication between all parties is essential– Project planning is vital to keeping the project on schedule and on budget. – It is important to have buy-in from key stake holders. – An experienced project team will increase the chances of success

• Marketing data:– Our company is known worldwide as a leader in… – We will use our long history to…– We will use state-of-the-art process to…

• Technical data:– The system we propose has 200% elongation and 600psi tensile strength. – The system can process up to 24GB per second

• Transferring risk back to client:– We will work with the owner to resolve issues…– We will work with the user to establish the proper tests…– We will have team meetings / partnering meetings with the owner…

Page 29: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Critical Formatting Requirements

• Proposal is limited to– 1 Page = Assessment of Controllable Risks– 1 Page = Assessment of Uncontrollable Risks– 1 Page = Assessment of Value Added Ideas

Page 30: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Past Performance Information

• PPI will be collected on the following Entities:– The Firm– Key Account Manager

• Procedures1. Prepare a list of past clients/projects2. Send out the Survey Questionnaires3. Collect and receive completed surveys4. Submit the best surveys with proposal

Page 31: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Cost Proposal• Refer to Attachment G• Cost for Phase 1 – Implementation• Cost for Yearly Monitoring• Projected Cost for 3 to 5 Years

• Supplementary Cost Information• Value Added Costs• Cost for Phase 2• Supplementary Cost could be used in Clarification Phase.

Page 32: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

How The Submittal Process Works

Submittal

Evaluation Members

Proposal Form(1 page)

Non-Evaluated Documents

Proposal Form(1 page)

Evaluated Documents

Average Score

ContractingOfficer

PurchasingOfficer

Page 33: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Evaluated and Non EvaluatedEvaluated (Evaluation Committee) Risk Assessments Value Assessments

Non Evaluated (UofM Purchasing Services) Cost Survey Responses

Page 34: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Evaluation Committee• 3-5 individuals

• Will be used to evaluate specific portions of the Proposal

• Evaluators will not be provided with the names of any Proposers, product names, cost, or any additional information

• Evaluators will independently (not as a group or consensus) review and score the items comparatively to one another

• Objective of the scoring is to not make a decision (looking for “dominant” differential)

• Evaluations will be scored on a 1/5/10 scale– “10” = Dominantly higher value than the average (clearly shows differential) – “5” = About average (insufficient information to make a clear decision)– “1” = Dominantly below the average (clearly shows differential)

34

Page 35: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

35

Key Personnel Interviews• The Client may interview the following individuals:

• Key Account Manager (overall contact / involved on the project every day)

• All individuals must be available on the dates specified in the RFP. If a team member is not present for the interview, they will receive a 1 rating.

• No substitutes, proxies, phone, or electronic interviews will be allowed.

• Goals: • Meet the critical personnel that are being assigned to the project• Identify if personnel have experience and have thought about this

project• Identify if the personnel can think ahead and minimize potential

risks

Page 36: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

36

Interview Format• This is not a “presentation”.

• No other individual from the Proposer’s organization may attend

• The individuals cannot bring any notes or handouts.

• Interview times will be approximately 15-20 minutes per individual

• A standard set of questions will be asked to each individual. The client has the option to clarify any responses.

• Questions will be non-technical

• Evaluators will rate/score the interviews comparatively to one another on a 1-5-10 scale

Page 37: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

• Looking For Dominant Differences in Risk Assessment, Value Adds, and Interviews with the Key Account Manager

What Are We Looking For?

1051

Page 38: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Final PrioritizationNO Criteria Points Firm A Firm B Firm C Best Firm A Points Firm B Points Firm C Points

1 Cost 250 $145,000 $150,000 $170,000 $145,000 250 242 213

2 Interviews 350 4.5 8.1 6.2 8.1 194 350 268

3 Risk Assessment Plant

200 5.1 8.7 7.5 8.7 117 200 172

5 Value Assessment Plant

100 5.0 5.0 5.0 5 100 100 100

6 PPI- Firm (1-10)

25 9.5 9.2 9.1 9.5 25 24 24

7 PPI- Firm Surveys

25 1 5 5 5 5 25 25

8 PPI-Project Manager (1-10)

25 9.5 9.2 8.8 9.5 25 24 23

9 PPI Project Manger (Surveys)

25 1 4 2 4 6 25 13

Total 1000 723 990 838

Page 39: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Phase 2 - Clarification

39

2CLARIFICATION 3MANAGEME

NT& METRICS1SELECTION

Page 40: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

What is the Clarification Period? (Proactive vs Reactive)

Minimize All Surprises!!!

Page 41: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

What is the Clarification Period? (Proactive vs Reactive)

Minimize All Surprises!!!

Page 42: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

What Could Cause a Surprise• Delivering something that doesn’t work• Delivering something that isn’t what the client is expecting• Delivering something that isn’t what the client needed• Requiring the client to do something (that they did not know they

had to do)• Requiring things from the client that they cannot provide• Expecting that something will happen as planned• Assuming that things are clear and understandable• Assuming that things will be done/occur as planned• Changes that impact cost• Changes that impact time• Poor satisfaction

42

Page 43: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

How Can We Minimize Surprises• A Final Clarification Document is Created. Subject Mater Experts Required

• Carefully preplan the project in detail– Coordinate the project/service with all critical parties– Prepare a detailed project plan (work plan, staffing, implementation, etc) – Revisit the sites to do any additional investigating– Prepare a detailed project schedule identifying critical milestones

• Cost Verification– Detailed cost breakdown– Identify why the cost proposal may be significantly different from competitors– Review big-ticket items– Value added options

• Identify all assumptions– Prepare a list of all proposal assumptions

43

Page 44: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Obtain Internal UofM Approvals• Once Final Clarification Document is Completed and Recomened

by Evaluation Committee , Internal UofM Approvals are Obtained.

• Make the Formal Award

• Execute Contract Documents– Independent Contract Agreement (ICA)

44

Page 45: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Project Is Complete

45

AWARD

2CLARIFICATION 3MANAGEME

NT& METRICS1SELECTION

Page 46: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

• Spreadsheet that documents all risks on the service

• Risk = Anything that may impact cost or schedule. Risks can be caused by the Offeror or the Client

• Report must be submitted on Friday of every week (until service is complete)

• The WRRS does not substitute or eliminate weekly progress reports or any other traditional reporting systems or meetings (that the Offeror may perform or may be required to perform).

Weekly Risk Reporting System

46

Page 47: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

Weekly Risk Reporting System

47

Page 48: PowerPoint Presentationumanitoba.ca/admin/financial_services/media/Fire_Alarm... · PPT file · Web view2018-05-03 · PD – The names are cut off on the right. The last one I can

• Open, Fair and Transparent

• Better Environment (less adversarial)

• UofM Wants Suppliers to Send Their Best People On UofM Projects

• Suppliers are allowed to be accountable, efficient, and creative (drive performance and maximize profit)

• Reward performance (not ‘favorites’)•

UofM Wants To Be Client of Choice

48