powering the water industry issues and opportunities e-mail:...

15
POWERING THE WATER INDUSTRY Issues and Opportunities E-mail: [email protected] Phone: 0117 328 6564 Dr Jay Millington BEng (Hons) PhD

Upload: timothy-davidson

Post on 24-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

POWERING THE WATER INDUSTRY

Issues and Opportunities

E-mail: [email protected]

Phone: 0117 328 6564

Dr Jay Millington BEng (Hons) PhD

P

Regional breakdown◦UK wide◦Opportunities

Novel approaches◦Sutton Poyntz◦Esholt◦Cotton Valley

Traditional example◦Meldon Reservoir

Issues◦Banding◦ROC vs FIT and

energy recovery◦Water industry

Introduction

Photo by: Millington (2011)

UK schemesEngland N Ireland Scotland Wales UK

>5MWno. 1 - 43 6 50

S MW 5.5 - 1,114.9 136.8 1,257.2

2 to 5MWno. 1 - 30 3 34

S MW 2.6 - 93.7 12.2 108.6

500kW to 2MWno. 5 2 53 7 67

S MW 5.0 1.3 53.9 5.0 65.2

100 to 500kWno. 43 6 62 19 130

S MW 11.0 1.2 18.0 4.5 34.7

15 to 100kWno. 43 17 38 16 114

S MW 2.07 0.75 1.85 0.87 5.54

<15kWno. 77 3 28 21 129

S MW 0.49 0.04 0.17 0.15 0.86

All hydrono. 170 28 254 72 524

S MW 26.6 3.3 1,282.6 159.6 1,472.0

B

capa

city

num

ber

Growth?

Benefits for water industryGovernment strategy

◦Reduce greenhouse gases◦Provide energy security◦Investment in new technology

Green credentials ↑ Customer bills ↓

Novel approaches◦In addition to ‘win / win’ schemes◦Don’t need environmental regulation

P

P

South West Water – Meldon Reservoir

Photos by: Millington (2011)

400kW Francis turbine on scour

30kW KSB centrifugal Pump-as-Turbine

Wessex Water – Sutton Poyntz

photo by: Millington (2011)Image from: Ecowave 2011,

15 m , 140 l/s 14 kW

Yorkshire Water – Esholt

Photo by: Yorkshire Water (2011)

9 m , 2700 l/s 180 kW

Anglian Water – Cotton Valley

Photo by: Millington (2011)

2.6 m , 870 l/s 15 kW

Replace FITs banding?

Under FiTs, who’s going to install 100-120kW, 500-599kW and 2-3.6MW schemes?

TURBINE ANNUAL INCOMECapacity Generation Feed-in Tariff Export Tariff LECs @ Total

kW MW h / year p / kW h £k / year @ 4.5 p/kWh 0.509 p/kWh £k / year15.000 46.9 21.0 9.9xx 2.1 0.2 12.2xx 15.001 46.9 19.6 9.2xx 2.1 0.2 11.5xx 15.853 49.6 19.6 9.7xx 2.2 0.3 12.2xx

100.000 312.7 19.6 61.3xx 14.1 1.6 77.0xx 100.001 312.7 15.5 48.5xx 14.1 1.6 64.1xx 119.991 375.3 15.5 58.2xx 16.9 1.9 77.0xx 500.000 1,563.7 15.5 242.4xx 70.4 8.0 320.7xx 500.001 1,563.7 12.1 189.2xx 70.4 8.0 267.5xx 599.362 1,874.4 12.1 226.8xx 84.3 9.5 320.7xx

2000.000 6,254.6 12.1 756.8xx 281.6 31.8 1,070.1xx 2000.001 6,254.6 4.48 280.2xx 281.6 31.8 593.5xx 3606.068 11,277.3 4.48 505.2xx 507.5 57.4 1,070.1xx 5000.000 15,636.6 4.48 700.5xx 703.6 79.6 1,483.8xx

(Not included: on-site electric use, operational costs, interest on loans…)

Downsize for max profit?Constructed pre FIT

Capacity no. S kW15 to 16kW 1 16x

100 to 120kW 16 1,826x 500 to 599kW 8 4,335x

2000 to 3600kW 26 73,857x Total 51 80,034x

Constructed pre FITCapacity no. S kW

15 to 16kW 1 16 100 to 143kW 23 2,765

2000 to 3373kW 22 59,857 Total 46 62,638

If constructed Apr 2010?kW lost £FIT extra

1 428 465 329,150 15,857 6,712,589 16,323 7,042,168

If constructed Dec 2012?kW lost £FIT extra 1 44

226A 95,602B

335 298,550 21,857 9,329,441 22,419 9,723,637

96kW

and

£65k

mor

e

1 mor

e sc

hem

e

S

Calcs?A = 1,826 – (16 x 100)B = (16 x 100 x 19.6p – 1,826 x 15.5p) x 24 x 365 x 35.7%

Input electricityROCs

◦Esholt: 10% pre-pumped flow netted off

FITs◦15kW scheme in Wales: drought

pumps 200 hours in last 12 years ineligible (& can’t opt for

ROCs)

Energy recovery ethics

£

£ £

£ £

G

Other factorsPump and system efficiency

Operation within OFWAT regulations

Identified opportunities reality

Other renewable energy sources

Conclusions If a banding system must be

used, FITs should be based on MWh generated to prevent downsizing

FITs should have an allowance for input electricity to ‘net-off’ pre-pumping as with ROCs

Energy recovery systems should be subsidised

Other factors need to be considered

Arup (2011) Review of the generation costs and deployment potential of renewable electricity technologies in the UK, Study Report – Department of Energy and Climate Change [online, accessed Jun 2012] BHA (2010) England and Wales hydropower resource final report (version 13). DECC and WAG [online, accessed Jun 2012] BHA (2011) List of installations. British Hydropower Association [online, accessed Sep 2011] Burgess, A. (2010) [[email protected]] Re: Micro hydro in the water industry, 18th August. Email to: Millington, J. [[email protected]]The UK Renewable Energy Strategy (Command 7686, 2009) [online, accessed Jun 2012] Costyn, J. (2011) Feed-in tariffs: current situation and comprehensive review. BHA Hydropower Conference, Cardiff 29 June 2011: British Hydropower Association [online, accessed Jun 2012] Crompton, C. (2010) The Feed-in Tariff – The consultation story and opportunities for the hydro industry. BHA Annual Conference, Glasgow 13-14 October 2010: British Hydropower Association [online, accessed Jun 2012]DECC (2011) List of generators. Department of Energy and Climate Change [online, accessed Sep 2011] Dent, M. (2010) Stoke Bardolph Energy Crop AD (Anaerobic Digestion) Plant. Severn Trent Water [online, accessed Jun 2012] Elliot, C. (2011) Small Hydro and the FIT. BHA Hydropower Conference, Cardiff 29 June 2011: British Hydropower Association [online, accessed Jun 2012] Entec (2010) Mapping Hydropower Opportunities and Sensitivities in England and Wales – Technical Report, Bristol: Environment Agency. [online, accessed Jun 2012] Great Britain (2009) Electricity, England and Wales. The Renewables Obligation Order. 2009 No.785. London: The Stationery Office [online, accessed Jun 2012] Harrison, G. P. (2004) Developing Renewable Energy within the Water Industry, IDS-Water [online, accessed May 2012] The EU’s target for renewable energy: 20% by 2020 HL Paper 175-I (2007-08) [online, accessed Jun 2012] Howe, A. (2009) Renewable energy potential for the water industry. Bristol: Environment Agency [online, accessed Jun 2012] Hughes, C. (2011) Water resources planning in Wales – potential applications for hydropower. BHA Hydropower Conference, Cardiff 29 June 2011: British Hydropower Association [online, accessed Jun 2012] Hughes, N. (2012) [[email protected]] Re: Hydro at Elan Valley, 11th June. Email to: Millington, J. [[email protected]]Kirk, T. (1999) Small scale hydropower in the UK. Water and Environment Journal Volume 13 Issue 3, CIWEM: 207-212 Loening, A. (2010) An early FIT? BHA Annual Conference, Glasgow 13-14 October 2010: British Hydropower Association [online, accessed Jun 2012] Millington, J. D. (2013) Powering the Water Industry. In: Booth, C. and Charlesworth, S., eds. Water Resources in the Built Environment – Management Issues and Solutions. Oxford: Blackwell Publishing Ltd. (forthcoming)Nautiyal. H., Varun, P. R. and Kumar, A. (2010a) CFD analysis on pumps working as turbines. Hydro Nepal, Issue 6, Journal of Water Energy and Environment: 35-37 Nautiyal. H., Varun, P. R. and Kumar, A. (2010b) Reverse running pumps analytical, experimental and computational study: A review. Renewable and Sustainable Energy Reviews Volume 14 Issue 7, Elsevier [online, accessed Jun 2012] REF (2011) List of generators. Renewable Energy Foundation [online, accessed Sep 2011] Singh, P. and Nestmann, F. (2010) An optimization routine on a prediction and selection model for the turbine operation of centrifugal pumps. Journal of Experimental Thermal Fluid Science, Volume 34, Issue 2: 152-164.Singh, P. and Nestmann, F. (2011) A Consolidated Model for the Turbine Operation of Centrifugal Pumps. Journal of engineering for gas turbines and power, Volume 133, Issue 6: Article Number 063002Water UK (2009) Consultation of REF incentives. Water UK [online, accessed Jun 2012] Williams, A. A., Smith, N. P. A., Bird, C. and Howard, M. (1998) Pumps as turbines and induction motors as generators for energy recovery in water supply systems. Water and Environment Journal Volume 12 Issue 3, CIWEM: 175-178.Williams, A. A., (2010) Centrifugal Pumps as Turbines: a Review of Technology and Applications. In: Hidroenergia 2B.06 [online, accessed Jun 2012]

References

Millington, J. D. (2013) Powering the Water Industry. In: Booth, C. and Charlesworth, S., eds. Water Resources in the Built Environment – Management Issues and Solutions. Oxford: Blackwell Publishing Ltd. (forthcoming)