2014‐2020 Power Supply‐Demand Outlook2014 Daily Supply‐Demand Situation, Summer MonthsPower Projects: Committed and Indicative
OUTLINE
LUZON SUPPLY‐DEMAND OUTLOOK 2014‐2020
Notesa. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement b. 4.2 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national
economic growth applied to 7 percent GDP growth rate (GR) target for 2014‐2015.c. 4.8 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national
economic growth applied to 8 percent GDP growth rate (GR) target for 2016‐2020.d. Assumed 5.49 percent average forced outage of the total available capacity
2014Jul : 150 MW Southwest Luzon Coal U1Aug: 135 MW Puting Bato U1
18 MW Northwind P3Oct: 150 MW Southwest Luzon Coal U2Nov: 20 MW SJCI Biomass
2015Feb: 87 MW Burgos WindMar : 18 MW IBEC Biomass
67 MW Pililia Wind81 MW Caparispisan
Jun: 18 MW CJ Global Biomass200 MW EWC U1
Jul : 10.8 MW Green BiomassSep: 100 MW Avion NatgasNov: 135 MW Puting Bato U2
2016Mar : 82 MW Anda PowerJune: 200 MW EWC U2
2017June: 200 MW EWC U3
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
Jan 2014
Mar 2014
May 2014
Jul 2014
Sep 2014
Nov
2014
Jan 2015
Mar 2015
May 2015
Jul 2015
Sep 2015
Nov
2015
Jan 2016
Mar 2016
May 2016
Jul 2016
Sep 2016
Nov
2016
Jan 2017
Mar 2017
May 2017
Jul 2017
Sep 2017
Nov
2017
Jan 2018
Mar 2018
May 2018
Jul 2018
Sep 2018
Nov
2018
Jan 2019
Mar 2019
May 2019
Jul 2019
Sep 2019
Nov
2019
Jan 2020
Mar 2020
May 2020
Jul 2020
Sep 2020
Nov
2020
Available Capacity Committed Peak Demand Regulating Reserve Contingency & Dispatchable Reserve
0
2000
4000
6000
8000
10000
12000
W1W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27
Available capacity Peak Demand Regulating Reserve Contingency & Dispatchable Reserve
January February March April May June
2014 LUZON DAILY SUPPLY‐DEMAND SITUATIONACTUAL PROJECTED
2014 Projected Peak Demand =8,654 MW (22 May)
2014 Actual Peak Demand =8,225 MW (24 Apr)
Holy Week
COMMITTED POWER PROJECTSLuzon Grid Committed Power Projects, 1,724.65 MW
Type Name of the Project Project Proponent Mother/ JV Company LocationRated
Capacity (MW)
Project Cost (Php Billion)
Target Commissioning
COAL2 X 150 MW SLPGC
Coal-Fired Power Plant Phase I
Southwest Luzon Power Generation
Corporation (Project Company)
DMCI Power Corporation
Brgy. San Rafael, Calaca, Batangas 300 45.4 Unit I – Jul 2014;
Unit II – Oct 2014
COAL135 MW Puting Bato
Coal Fired Power Plant Phase I
South Luzon Thermal Energy Corp.
(SLTEC)
Trans Asia Oil and Energy Development Corporation (TAOil)
Brgy. Puting BatoWest, Calaca,
Batangas135 12.9 Aug 2014
WINDPhase 3:
Bangui Bay Wind Power Project
NorthWind Power Development Corporation
NorthWind Power Development Corporation
Bangui, Ilocos Norte 18 1.5 Aug 2014
BIOMASS
24 MW SJCiPowerRice Husk-Fired
Biomass power Plant Project
San Jose City I Power Corporation
San Jose City I Power Corporation
Brgy. Tulat, San Jose, Nueva Ecija 20.00 1.2 Nov 2014
(Subject to FIT)
WINDPhase 1:
Burgos Wind Power Project
EDC Burgos Wind Power Corporation
Energy Development Corporation (EDC)
Nagsurot-Saoit, Burgos, Ilocos Norte 87 12.8 Feb 2015
WINDPhase 1:
Pililla Wind Power Project
Alternergy Wind One Corporation Alternergy Brgy. Halayhayin,
Pililla, Rizal 67.5 7.7 Mar 2015
WIND Caparispisan Wind Energy Project
Northern Luzon UPC Asia Corporation UPC Asia Corporation
Brgy. Caparispisan, Pagudpud, Ilocos
Norte81 11.2 Mar 2015
BIOMASS 20 MW IBEC Biomass Power Plant
Isabela Biomass Energy Corporation
(IBEC)
Isabela Biomass Energy Corporation (IBEC) Isabela 18 1.9 Mar 2015
(Subject to FIT)
NATGASPagbilao 600 MW
Combined Cycle Gas Fired Power Plant
Energy World Corporation
Energy World Corporation
Brgy. Ibabang Polo, Grande Island,
Pagbilao, Quezon600 12.9
Jun 2015 U1Jun 2016 U2Jun 2017 U3
COMMITTED POWER PROJECTSLuzon Grid Committed Power Projects, 1,724.65 MW
Type Name of the Project Project Proponent Mother/ JV Company LocationRated
Capacity (MW)
Project Cost (Php Billion)
Target Commissioning
BIOMASS
20 MW Waste-to-Energy Project using
Thermal Gasifier Conversion
CJ Global Green Energy Philippine
Corp.
CJ Global Green Energy Philippine Corp. Camarines Sur 18 Jun 2015
BIOMASS 12 MW Biomass Power Plant Project
Green Innovations for Tomorrow
Corporation
Green Innovations for Tomorrow Corporation Nueva Ecija 10.80 Jul 2015
NATGAS 100 MW San Gabriel Avion Project
Prime Meridian PowerGen
Corporation (Project Company)First Gen
Corporation
First Gen Power Corporation
Barangay Bolbok, Batangas 100 10.0 Sep 2015
COAL135 MW Puting Bato
Coal Fired Power Plant Phase II
South Luzon Thermal Energy Corp.
(SLTEC)
Trans Asia Oil and Energy Development Corporation (TAOil)
Brgy. Puting Bato West, Calaca,
Batangas135 9.6 Nov 2015
BIOMASS 3.5 MW Bicol Biomass Energy Corporation
Bicol Biomass Energy Corporation
Bicol Biomass Energy Corporation Camarines Sur 3.15 Dec 2015
BIOMASS12 MW Multi-
Feedstock Biomass Power Plant Project
Cagayan Biomass Energy Corporation
Cagayan Biomass Energy Corporation Cagayan 10.80 Dec 2015
HYDRO Inabasan Ormin Power, Inc. Ormin Power, Inc. San Teodoro, Oriental Mindoro 10.0 Dec 2015
COAL
Anda Power Corporation's 82 MW Circulating Fluidized
Bed Coal Fired Power Plant
Anda Power Corporation
Anda Power Corporation
Brgy. Bundagul, Mabalacat, Pampanga
82 8.6 Mar 2016
COMMITTED POWER PROJECTSLuzon Grid Committed Power Projects, 1,724.65 MW
Type Name of the Project Project Proponent Mother/ JV Company LocationRated
Capacity (MW)
Project Cost (Php Billion)
Target Commissioning
HYDRO Catuiran Sta. Clara Power Corp. Sta. Clara Power Corp. Naujan, Oriental
Mindoro 8.0 Mar 2016
HYDRO Linao-Cawayan (Upper Cascade)
Oriental Mindoro Electric Cooperative,
Inc. (ORMECO)
Oriental Mindoro Electric Cooperative, Inc.
(ORMECO)
Baco, Oriental Mindoro 2.1 0.3 Mar 2016
TOTAL 1,724.65
INDICATIVE POWER PROJECTSLuzon Grid Indicative Power Projects, 10,185.20 MW
8
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)
Target Commissioning
300 MW Limay Power Plant Project Phase I
(2x150MW)
SMC Consolidated Power Corporation
SMC Consolidated Power Corporation Brgy. Lamao, Limay, Bataan 300.00
Unit 1 - 150 MW -Feb. 2016
Unit 2 - 150 MW -July 2016
2 X 20 MW FDC Camarines CFB Coal Power Plant FDC Utilities, Inc. FDC Utilities, Inc. Camarines Sur 40.00 Mar 2016
2 X 300 MW Coal-Fired Power Plant
Redondo Peninsula Energy, Inc.
MERALCO MGEN Power Corporation/ Aboitiz Power
Corporation/ Taiwan Cogeneration Corporation
Sitio Naglatore, Cawag, Subic Bay Freeport Zone 600.00 Unit I - Oct 2016
Unit II - Dec 2016
2 X 150 MW SLPGC Coal-Fired Power Plant Phase II
Southwest Luzon Power Generation Corporation
(Project Company)DMCI Power Corporation Brgy. San Rafael, Calaca,
Batangas 300.00 Unit I - 2016 Unit II - 2016
2 X 300 MW Masinloc Expansion
AES Masinloc Power Partners Co., Inc.
AES Philippines Power Partners Co., LTD. Zambales 600.00
Unit 3 (300 MW) -Oct 2017
Unit 4 (300 MW) -Oct 2017
Quezon Power Expansion Project Quezon Power Phils. SMC Consolidated Power
Corporation Mauban, Quezon 500.00 Jul 2017
300 MW Limay Power Plant Project Phase II
(2x150MW)
SMC Consolidated Power Corporation
SMC Consolidated Power Corporation Brgy. Lamao, Limay, Bataan 300.00
Unit 1 - 150 MW -Jan 2017
Unit 2 - 150 MW -Jul 2017
1 x 420 MW Pagbilao Coal-Fired Thermal Power Plant Pagbilao Energy Corporation TeaM Energy / Aboitiz Power
Pagbilao Power Station, Nrgy. Ibabang Polo, Pagbilao, Quezon
420.00 Jan 2018
2 X 600 MW Mariveles Expansion Project
GNPower Mariveles Coal Plant Ltd. Co. GNPower Ltd. Co. Mariveles, Bataan 1,200.00 2018
300 MW Limay Power Plant Project Phase III
1x300MW)
SMC Consolidated Power Corporation
SMC Consolidated Power Corporation Brgy. Lamao, Limay, Bataan 300.00 2019/2020
TOTAL COAL 4,560.00
INDICATIVE POWER PROJECTSLuzon Grid Indicative Power Projects, 10,185.20 MW
9
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)
Target Commissioning
Aero Derivative Combined Cycle Power Plant
Calamba Aero Power Corporation
MERALCO MGEN Power Corporation Calamba, Laguna 150.00 TBA
TOTAL OIL-BASED 150.00 San Gabriel Power Plant First Gas Power Corp. First Gen Power Corporation San Gabriel, Batangas 450.00 Dec 2015
2 x 1,200 MW Combined Cycle Gas Turbine Power
Plant Project
Atlantic, Gulf and Pacific Company of Manila, Inc AG&P
Limay, Bataan (PNOC-AFC Industrial
Estate)2,400.00 Unit 1 - Mar 2017
Unit II - Mar 2018
415 MW San Isidro Combined Cycle Gas Turbine Plant
Project
Trans Asia Oil and Energy Development Corporation
(TAOil)
Trans Asia Oil and Energy Development Corporation
(TAOil)
Pilipinas Shell Petroleum Co.'s Tabangao Refinery,
Brgy. San Isidro and Tabangao-Ambulong,
Batangas City
415.00 Sept 2017
LNG-Fired Combined Cycle Power Plant * Onshore
Regasification and Storage Terminal
Meralco PowerGen Corporation and Chubu
Electric Power
MERALCO MGEN Power Corporation Atimonan, Quezon 1,750.00 2018-2019
TOTAL NATGAS 5,015.00
Tanawon Geothermal Project Energy Development Corporation (EDC)
Energy Development Corporation (EDC) Guinlajon, Sorsogon 40.00 Dec 2018
Rangas Geothermal Project Energy Development Corporation (EDC)
Energy Development Corporation (EDC) Bacon District, Sorsogon 40.00 Jun 2019
Kayabon Geothermal Project Energy Development Corporation (EDC)
Energy Development Corporation (EDC) Manito, Albay 40.00 Dec 2019
TOTAL GEOTHERMAL 120.00
INDICATIVE POWER PROJECTSLuzon Grid Indicative Power Projects, 10,185.20 MW
10
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)
Target Commissioning
Ibulao Hydroelectric Power Project Hydrocore, Inc. Hydrocore, Inc. Lagawe, Ifugao 4.50 May 2015
Dupinga Hydroelectric Power Project
Constellation Energy Corporation Exelon Corporation Gabaldon, Nueva Ecija 3.00 Oct 2015
Main Aklan Sunwest Water & Electric Co., Inc. (SUWECO)
Sunwest Water & Electric Co., Inc. (SUWECO) Libacao, Albay 15.00 Jul 2016
Tinoc 2 Philnew Hydro Power Corporation Philnew Hydro Power Corporation Tinoc, Ifugao 11.00 Dec 2016
Tinoc 3 Philnew Hydro Power Corporation Philnew Hydro Power Corporation Tinoc, Ifugao 5.00 Jun 2017
Pinacanauan Sunwest Water & Electric Co., Inc.
Sunwest Water & Electric Co., Inc. (SUWECO) Peñablanca, Cagayan 6.00 Jul 2017
Tinoc 1 Quadriver Energy Corp. Quadriver Energy Corp. Tinoc, Ifugao 4.10 Apr 2018
Tinoc 4 Philnew Hydro Power Corporation Philnew Hydro Power Corporation Tinoc, Ifugao 5.00 Apr 2018
TOTAL HYDRO 53.60 Currimao Solar Photovoltaic
Power Project Mirae Asia Energy Corporation Mirae Asia Energy Corporation Currimao, Ilocos Norte 20.00 Aug 2014
Macabud Solar Photovoltaic Power Project
ATN Philippines Solar Energy Group, Inc.
ATN Philippines Solar Energy Group, Inc.
Brgy. Macabud, Rodriguez, Rizal 30.00 Feb 2016
TOTAL SOLAR 50.00 Phase 2:
Burgos Wind Power ProjectEDC Burgos Wind Power
CorporationEnergy Development Corporation
(EDC)Nagsurot-Saoit, Burgos, Ilocos
Norte 63.00 Sep 2014
Balaoi Wind Power Project Northern Luzon UPC Asia Corporation UPC Asia Corporation Brgy. Balaoi, Pagudpud, Ilocos
Norte 45.00 Aug 2015
Phase 2:Mabitac Wind Power Project
Alternergy Sembrano Wind Corporation Alternergy Mt. Sembrano, Mabitac, Laguna 72.00 Apr 2017
Phase 1:Pasuquin East Wind Power
ProjectEnergy Logics Philippines, Inc. Delgado Group of Companies Pasuquin, Ilocos Norte 48.00 Jan 2017
TOTAL WIND 228.00 10 MW Serin CorporationRice
Husk-Fired Power Plant Serin Corporation Tarlac 8.60 TBA
TOTAL BIOMASS 8.60
TOTAL 10,185.20
1000
1500
2000
2500
3000
3500Jan 2014
Mar 2014
May 2014
Jul 2014
Sep 2014
Nov
2014
Jan 2015
Mar 2015
May 2015
Jul 2015
Sep 2015
Nov
2015
Jan 2016
Mar 2016
May 2016
Jul 2016
Sep 2016
Nov
2016
Jan 2017
Mar 2017
May 2017
Jul 2017
Sep 2017
Nov
2017
Jan 2018
Mar 2018
May 2018
Jul 2018
Sep 2018
Nov
2018
Jan 2019
Mar 2019
May 2019
Jul 2019
Sep 2019
Nov
2019
Jan 2020
Mar 2020
May 2020
Jul 2020
Sep 2020
Nov
2020
Committed Available Capacity Peak Demand Regulating Reserve Contingency & Dispatchable Reserve
VISAYAS SUPPLY‐DEMAND OUTLOOK 2014‐2020
Notesa. Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement b. 7 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national
economic growth applied to 7 percent GDP growth rate (GR) target for 2014‐2015.c. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national
economic growth applied to 8 percent GDP growth rate (GR) target for 2016‐2020.d. Assumed 4.35 percent average forced outage of the total available capacity
2014Aug: 50 MW Nasulo Geo
54 MW Sn Lorenzo WindSep: 31 MW UR Biomass
82 MW TPC ExpansionOct: 8 MW Villasiga HEPDec: 50 MW Nabas Wind
3 MW HPC Biomass18 MW SC Biomass
2015Jun: 3.6 MW AES Biomass
2016Jul: 135 MW Concepcion Coal 1Sep: 135 MW Concepcion Coal 2
0
200
400
600
800
1000
1200
1400
1600
1800
2000
W1W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27
Available capacity Peak Demand Regulating Reserve Contingency & Dispatchable Reserve
January February March April May June
2014 VISAYAS DAILY SUPPLY‐DEMAND SITUATIONACTUAL PROJECTED
2014 Projected Peak Demand =1,612 MW (17 Jun)2014 Actual Peak Demand =
1,492 MW (4 Apr)
Holy WeekEarthquake in Leyte
Affected Power Plants:Mahiao Geo (120 MW)
COMMITTED POWER PROJECTSVisayas Grid Committed Power Projects, 579.60 MW
Type Name of the Project Project Proponent Mother/ JV Company LocationRated
Capacity (MW)
Project Cost (Php Billion)
Target Commissioning
GEOTHERMAL Nasulo Geothermal Project
Energy Development Corporation (EDC)
Energy Development Corporation (EDC)
Nasuji, Valencia, Negros Oriental 50.00 4 Aug 2014
WIND54 MW San Lorenzo Wind Power Project
(8 MW & 46 MW)
Trans-Asia Renewable Energy
Corporation
Trans Asia Oil and Energy Development Corporation (TAOil)
San Lorenzo, Guimaras Island 54.00 2.15 Aug 2014
BIOMASS
46 MW Universal Robina Corporation
Bagasse Cogeneration Facility
Universal Robina Corporation JG Summit Holdings Inc. Negros Occidental 31.00 Sep 2014
COAL
TPC Coal-Fired Power Plant
Expansion Project (1 x 82 MW Coal-Fired
Power Plant
Toledo Power Company
Global Business Power Corporation Toledo City, Cebu 82.00 10.2 Sep 2014
HYDRO Villasiga HEPSunwest Water & Electric Co., Inc.
(SUWECO)
Sunwest Water & Electric Co., Inc. (SUWECO)
Brgy. Igsoro, Bugasong, Antique 8.00 1.4 Oct 2014
WIND Nabas Wind Power Project
Petrogreen Energy Corporation
Petrogreen Energy Corporation
Brgy. Pawa, Nabas, Aklan 50.00 5.21 Dec 2014
BIOMASS20 MW SCBiopower
Bagasse-Fired Power Generation Project
San Carlos Biopower Inc. Bronzeoak Philippines Negros Occidental 18.00 1.7 Dec 2014
BIOMASS8.0 MW HPCo
Bagasse Cogeneration Plant
Hawaiian Philippines Company
Hawaiian Philippines Company Negros Occidental 3.00 Dec 2014
BIOMASS
Consolacion Landfill Methane Recovery
and Electricity Generation
Asian Energy System Corporation
Asian Energy System Corporation Cebu 3.60 0.2 Jun 2015
COMMITTED POWER PROJECTSVisayas Grid Committed Power Projects, 579.60 MW
Type Name of the Project Project Proponent Mother/ JV Company LocationRated
Capacity (MW)
Project Cost (Php Billion)
Target Commissioning
COAL
2 X 135 MW Concepcion Coal-fired Power Plant
Phase 1-135MW (1st Unit)
Phase 2-135MW (2nd Unit)
Palm Thermal Consolidated Holdings
Corp.
AC Energy Holdings, Inc./ Palm Thermal
Consolidated Holdings Corporation/ Jin Navitas
Resource, Inc.
Brgy. Nipa, Concepcion, Iloilo 270.00 26.4
1st Unit - Jul 2016 2nd Unit - Sep
2016
TOTAL 579.60
INDICATIVE POWER PROJECTSVisayas Grid Indicative Power Projects, 795.00 MW
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)
Target Commissioning
PEDC Expansion ProjectFormer report (1x150 MW Circulating Fluidized Bed (CFB) Coal-Fired Power
Plant)
Panay Energy Development Corporation
(Global Business Power Corporation)
Global Business Power Corporation Brgy. Ingore, La Paz, Iloilo 150.00 2015
1 X 20 MW FDC Danao CFB Coal Power Plant FDC Utilities, Inc. FDC Utilities, Inc. Danao City, Cebu 20.00 2016
300 MW Therma Visayas Energy Project Therma Visayas Inc. Aboitiz Power Corporation Brgy. Bato, Toledo City, Cebu 300.00 Mar 2017
TOTAL COAL 470.00 49 MW Biliran Geothermal
Plant ProjectBiliran Geothermal
Incorporated Orka Energy Philippines (Iceland) Biliran, Biliran 49.00 Dec 2015
Dauin Geothermal Project Energy Development Corporation (EDC)
Energy Development Corporation (EDC) Dauin, Negros Oriental 40.00 Dec 2018
Southern Leyte Geothermal Plant Geothermal Project (formerly known as Mt. Cabalian Geothermal)
Energy Development Corporation
Energy Development Corporation (EDC) Cabalian, Southern Leyte TBA
TOTAL GEOTHERMAL 89.00 San Carlos Solar
Photovoltaic Power ProjectSan Carlos Solar Energy Inc.
(SACASOL) Bronzeoak Philippines San Carlos City, Negros Occidental 20.00 May 2014
Leyte Solar Photovoltaic Power Project Phil. Solar Farm-Leyte, Inc. Phil. Solar Farm-Leyte, Inc. Ormoc City, Leyte 30.00 Jan 2015
TOTAL SOLAR 50.00 Pulupandan Wind Power
ProjectFirst Maxpower International
CorporationFirst Maxpower International
CorporationPulupandan, Negros
Occidental 50.00 Nov 2015
TOTAL WIND 50.00
INDICATIVE POWER PROJECTSVisayas Grid Indicative Power Projects, 795.00 MW
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)
Target Commissioning
Igbulo (Bais) Hydroelectric Power Project
Century Peak Energy Corporation
Century Peak Metals Holdings Corp Igbaras, Iloilo 5.10 Jan 2015
Hilabangan (Upper Cascade)
Century Peak Energy Corporation
Century Peak Metals Holdings Corp
Kabankalan, Negros Occidental 4.80 Aug 2015
Hilabangan (Lower Cascade)
Century Peak Energy Corporation
Century Peak Metals Holdings Corp
Kabankalan, Negros Occidental 3.00 Aug 2015
Maninila (Lower Cascade) Century Peak Energy Corporation
Century Peak Metals Holdings Corp San Remigio, Antique 4.50 Oct 2016
Maninila (Upper Cascade) Century Peak Energy Corporation
Century Peak Metals Holdings Corp San Remigio, Antique 3.10 Oct 2016
Sibalom (Upper Cascade) Century Peak Energy Corporation
Century Peak Metals Holdings Corp San Remigio, Antique 4.20 Oct 2016
Sibalom (Middle Cascade) Century Peak Energy Corporation
Century Peak Metals Holdings Corp San Remigio, Antique 4.00 Oct 2016
Sibalom (Lower Cascade) Century Peak Energy Corporation
Century Peak Metals Holdings Corp San Remigio, Antique 3.30 Oct 2016
Timbaban Hydroelectric Power Project
Oriental Energy and Power Generation Corporation
Oriental Peninsula Resources Group Inc (ORE) Madalag, Aklan 18.00 Aug 2017
TOTAL HYDRO 50.00 46 MW Biomass-Fired
Cogeneration Power PlantUniversal Robina
Corporation JG Summit Holdings Inc. Kabankalan, Negros Occidental 46.00 Jul 2014
TOTAL BIOMASS 46.00 40 MW Battery Storage
ProjectAES Philippines Power
Partners Co., LTD.AES Philippines Power Partners
Co., LTD.Kabankalan, Negros
Occidental 40.00 Mar 2015
TOTAL BATTERY 40.00
TOTAL 795.00
2015Mar: 150 MW Therma South 2Jun: 13.2 Sabangan HEPJul:30 MW Puyo HEPSep: 100 MW Sarangani CoalU1Dec: 40 MW Biomass
MINDANAO SUPPLY‐DEMAND OUTLOOK 2014‐20202014
May: 13.6 MW Tudaya15 MW Mapalad Diesel
Sep: 26.1 MW Peak PowerNov: 150 MW Therma South 1
2016Mar: 25 MW Lake Mainit HEPSep: 270 MW FDC Coal U1 & U2Nov: 100 MW Sarangani Coal U2
Notesa. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement b. 5.6 % peak demand growth rate resulted from observed 0.8 elasticity ratio of demand for electric power with national economic growth
applied to 7 percent GDP growth rate (GR) target for 2014‐2015.c. 12.8 % peak demand growth rate resulted from observed 1.6 elasticity ratio of demand for electric power with national economic growth
applied to 8 percent GDP growth rate (GR) target for 2016d. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth
applied to 8 percent GDP growth rate (GR) target for 2017‐2020e. Assumed 3.3 percent average forced outage of the total dependable capacity
2017Jan: 9 MW Limbatangon HEPSep: 135 MW FDC Coal U3
500
1000
1500
2000
2500
3000
Jan 2014
Mar 2014
May 2014
Jul 2014
Sep 2014
Nov
2014
Jan 2015
Mar 2015
May 2015
Jul 2015
Sep 2015
Nov
2015
Jan 2016
Mar 2016
May 2016
Jul 2016
Sep 2016
Nov
2016
Jan 2017
Mar 2017
May 2017
Jul 2017
Sep 2017
Nov
2017
Jan 2018
Mar 2018
May 2018
Jul 2018
Sep 2018
Nov
2018
Jan 2019
Mar 2019
May 2019
Jul 2019
Sep 2019
Nov
2019
Jan 2020
Mar 2020
May 2020
Jul 2020
Sep 2020
Nov
2020
Committed Available Capacity Peak Demand Regulating Reserve Contingency & Dispatchable Reserve
0
200
400
600
800
1000
1200
1400
1600
1800
W1W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27
Available capacity Peak Demand Regulating Reserve Contingency & Dispatchable Reserve
January February March April May June
2014 MINDANAO DAILY SUPPLY‐DEMAND SITUATIONACTUAL PROJECTED
2014 Projected Peak Demand =1,400 MW (26 May)
2014 Actual Peak Demand =1,320 MW (22 Apr)
Holy Week
27 Feb 2014Mindanao BlackoutAffected Power Plant
200 MW Mindanao Coal‐fired (MCF)
Restoration of 200 MW MCFUnit 1 : 4 May 2014Unit 2 : 1 June 2014
COMMITTED POWER PROJECTSMindanao Grid Committed Power Projects, 1,078.5 MW
Type Name of the Project Project Proponent Mother/ JV Company LocationRated
Capacity (MW)
Project Cost (Php
Billion)
Target Commissioning
HYDROTudaya 1
Hydroelectric Power Project
Hedcor Sibulan, Inc. Aboitiz Power Corporation Sta. Cruz, Davao del Sur 6.6 May 2014
HYDROTudaya 2
Hydroelectric Power Project
Hedcor Tudaya, Inc. Aboitiz Power Corporation Sta. Cruz, Davao del Sur 7 May 2014
OIL 15 MW Diesel Power Plant
Mapalad Energy Generating Corporation
Mapalad Power Corporation
Mapalad, Dalipuga, Iligan City 15 0.38 May 2014
OIL3x6.97 MW Bunker-Fired Power Plant Peak Power
Soccsargen, Inc. (PSI)Peak Power Energy Inc. (subsidiary of A Brown)
National Highway, Brgy.Apopong,
General Santos City20.9 1.91 Sep 2014
OIL1x5.2 MW Bunker-Fired Power Plant Peak Power San
Francisco (PSFI)Peak Power Energy Inc. (subsidiary of A Brown)
ASELCO Compound, Brgy. San Isidro,San
Francisco, Agusan del Sur
5.2 0.51 Sep 2014
COAL2 X 150 MW Coal-
Fired Therma South Energy Project
Therma South Inc. Aboitiz Power Corporation
Brgy. Binugao, Toril, Davao City and Brgy. Inawayan, Sta. Cruz,
Davao Del Sur
300 24.00 Nov 2014 U1Mar 2015 U2
HYDRO Sabangan Hedcor Sabangan, Inc.Aboitiz Power Corporation Davao City 13.2 Jun 2015
HYDRO Puyo Hydroelectric Power Project
First Gen Mindanao Hydropower Corp.
First Gen Power Corporation
Jabonga, Agusan del Norte 30 Jul 2015
COAL2 X 100 MW Southern Mindanao Coal Fired
Power Station
Sarangani Energy Corporation Alsons Power Corporation Brgy, Kamanga,
Maasim, Sarangani 200 19.50 Sep 2015 U1Nov 2016 U2
COMMITTED POWER PROJECTSMindanao Grid Committed Power Projects, 1,078.5 MW
Type Name of the Project Project Proponent Mother/ JV Company LocationRated
Capacity (MW)
Project Cost (Php
Billion)
Target Commissioning
BIOMASS
10 MW Kalilangan Bio-Energy
Corporation Multi Feedstock Power
Generating Facility
Kalilangan Bio-Energy Corporation
Kalilangan Bio-Energy Corporation
FIBECO, Anahawan, maramag, Bukidnon 10 Dec 2015
BIOMASS
10 MW Don Carlos Bio-Energy
Corporation Multi Feedstock Power
Generating Facility
Don Carlos Bio-Energy Corporation
Don Carlos Bio-Energy Corporation
FIBECO, Anahawan, maramag, Bukidnon 10 Dec 2015
BIOMASS
10 MW MalaybalayBio-Energy
Corporation Multi Feedstock Power
Generating Facility
Malaybalay Bioenergy Corporation
Malaybalay Bioenergy Corporation
FIBECO, Anahawan, maramag, Bukidnon 10 Dec 2015
BIOMASS 15 MW LPC Biomass Power Plant Project
Lamsan Power Corporation
Lamsan Power Corporation Maguindanao 10.00 Dec 2015
HYDRO Lake Mainit Agusan Power Corporation Tranzen Group Inc. Jabonga, Agusan del
Norte 25.0 Mar 2016
COAL
3 X 135 MW FDC-Misamis Circulating Fluidized Bed (CFB)
Coal-Fired Power Plant Project
FDC Utilities, Inc. FDC Utilities, Inc.Phividec Industrial Estate, Villanueva, Misamis Oriental
405 30.00 Jun 2016 U1 & U2Jun 2017 U3
HYDROLimbatangon
Hydroelectric Power Project
Turbines Resource & Development Corp.
Turbines Resources and Development Corp.
(TRDC)
Cagayan de Oro City, Misamis Oriental 9 Jan 2017
TOTAL 1,078.50
INDICATIVE POWER PROJECTSMindanao Grid Indicative Power Projects, 2,121.6 MW
Name of the Project Project Proponent Mother/ JV Company LocationRated
Capacity (MW)
Target Commissioning
Davao del Norte 20 MW Circulating Fluidized Bed
Biomass-Coal Fired Thermal Power Plant
FDC Utilities, Inc. FDC Utilities, Inc. Maco, Davao del Norte 20 Mar 2015
ZAM 100 MW Circulating Fluidized Bed (CFB) Coal-
Fired Power StationSan Ramon Power Inc. Mapalad Power Corporation Sitio San Ramon, Bgry.
Talisayan, Zamboanga City 100 Dec 2015
300 MW SMC Davao Power Plant Project Phase I
San Miguel Consolidated Power Corporation
San Miguel Consolidated Power Corporation
Brgy. Culaman, Malita, Davao del Sur 300
150 MW - Oct 2015
150 MW - Mar 2016
Sibuguey Power Plant Project
Philippine National Oil Company (PNOC-EC)
Philippine National Oil Company (PNOC) Sibugay, Zamboanga 100 Sep 2016
2x55 MW Balingasag Thermal Power Plant
(Circulating Fluidized Bed Combustion (CFBC) Coal-Fired Power Plant Plant)
Minergy Coal Corporation Minergy Brgy. Mandangoa, Balingasag, Misamis Oriental 110 Jan 2017
3x135 MW PsagCorp Coal-fired Power Plant GN Power GN Power Kauswagan, Lanao del Norte 405 Dec 2017
300 MW SMC Davao Power Plant Project Phase II
San Miguel Consolidated Power Corporation
San Miguel Consolidated Power Corporation
Brgy. Culaman, Malita, Davao del Sur 300 Dec 2018
600 MW SMC Davao Power Plant Project Phase III
San Miguel Consolidated Power Corporation
San Miguel Consolidated Power Corporation
Brgy. Culaman, Malita, Davao del Sur 600
300 MW - Dec 2019
300 MW - Dec 2020
TOTAL COAL 1,935.00
Mindanao 3 Geothermal Energy Development Corporation
Energy Development Corporation Kidapawan, North Cotabato 50 Dec 2017
TOTAL GEO 50.00
INDICATIVE POWER PROJECTSMindanao Grid Indicative Power Projects, 2,121.6 MW
Name of the Project Project Proponent Mother/ JV Company LocationRated
Capacity (MW)
Target Commissioning
Davao del Norte 20 MW Circulating Fluidized Bed
Biomass-Coal Fired Thermal Power Plant
FDC Utilities, Inc. FDC Utilities, Inc. Maco, Davao del Norte 20 Mar 2015
ZAM 100 MW Circulating Fluidized Bed (CFB) Coal-
Fired Power StationSan Ramon Power Inc. Mapalad Power Corporation Sitio San Ramon, Bgry.
Talisayan, Zamboanga City 100 Dec 2015
300 MW SMC Davao Power Plant Project Phase I
San Miguel Consolidated Power Corporation
San Miguel Consolidated Power Corporation
Brgy. Culaman, Malita, Davao del Sur 300
150 MW - Oct 2015
150 MW - Mar 2016
Sibuguey Power Plant Project
Philippine National Oil Company (PNOC-EC)
Philippine National Oil Company (PNOC) Sibugay, Zamboanga 100 Sept 2016
2x55 MW Balingasag Thermal Power Plant
(Circulating Fluidized Bed Combustion (CFBC) Coal-Fired Power Plant Plant)
Minergy Coal Corporation Minergy Brgy. Mandangoa, Balingasag, Misamis Oriental 110 Jan 2017
3x135 MW PsagCorp Coal-fired Power Plant GN Power GN Power Kauswagan, Lanao del Norte 405 Dec 2017
300 MW SMC Davao Power Plant Project Phase II
San Miguel Consolidated Power Corporation
San Miguel Consolidated Power Corporation
Brgy. Culaman, Malita, Davao del Sur 300 Dec 2018
600 MW SMC Davao Power Plant Project Phase III
San Miguel Consolidated Power Corporation
San Miguel Consolidated Power Corporation
Brgy. Culaman, Malita, Davao del Sur 600
300 MW - Dec 2019
300 MW - Dec 2020
TOTAL COAL 1,935.00
Mindanao 3 Geothermal Energy Development Corporation
Energy Development Corporation Kidapawan, North Cotabato 50 Dec 2017
TOTAL GEO 50.00
INDICATIVE POWER PROJECTSMindanao Grid Indicative Power Projects, 2,121.6 MW
Name of the Project Project Proponent Mother/ JV Company LocationRated
Capacity (MW)
Target Commissioning
Tagoloan Hydropower First Gen Mindanao Hydropower Corp. First Gen Power Corporation Impasugong & Sumilao,
Bukidnon 39 Oct 2015
Bubunawan Hydroelectric Power Project
First Gen Mindanao Hydropower Corp. First Gen Power Corporation Baungon and Libona,
Bukidnon 23 Oct 2015
Cabadbaran Hydroelectric Power Project
First Gen Mindanao Hydropower Corp. First Gen Power Corporation Cabadbaran, Agusan del
Norte 9.75 Dec 2015
Tumalaong Hydroelectric Power Project
First Gen Mindanao Hydropower Corp. First Gen Power Corporation Baungon, Bukidnon 9 Oct 2015
Pasonanca Philcarbon, Inc. Philcarbon, Inc. Zamboanga City 0.1 Mar 2017
Culaman Hydroelectric Power Project
Oriental Energy and Power Generation Corporation
Oriental Energy and Power Generation Corporation Manolo Fortich, Bukidnon 10 Jun 2018
TOTAL HYDRO 90.80
Darong Solar Photovoltaic Power Project PhilNew Energy Inc. PhilNew Energy Inc. Sta. Cruz, Davao del Sur 35 Sept 2015
(Subject to FIT)
TOTAL SOLAR 35.00 12 MW Biomass Power
Plant Project Misamis Oriental Bio-Energy
CorporationsMisamis Oriental Bio-Energy
Corporations Misamis Oriental 10.80 2015
TOTAL BIOMASS 10.80