INTRODUCTION OF HYUNDAI’S
PACKAGED POWER STATION
Page 2
HHI DIVISIONS & BUSINESS ACTIVITIES
SHIPBUILDINGENGINE & MACHINERY OFFSHORE & ENGINEERING
INDUSTRIAL PLANT & ENGINEERING ELECTRO ELECTRIC SYSTEMS CONSTRUCTION EQUIPMENT
CLOSE COOPERATION IN DIVERSE BUSINESS FIELDS
Page 3
SALES VOLUME & MARKET SHARE
Sales Volume : USD 21 Billion (2010)
No. of Employees : 25,308
(In-house sub-suppliers : 22,000)
World Market Share
- Shipbuilding : 14%- Diesel Engine : 35%
Rank #219 on the Fortune Global 500
Credit Rating by KIS : AA+ (March. 2011)
(Korea Investors Service Inc.)
Page 4
H21/32 H25/33
1 ~ 1.8MW 1.8 ~ 2.7MW
TYPES OF HYUNDAI HiMSEN ENGINE
H32/40
2.8 ~ 9.5MW
H35/40G
2.8 ~ 9.5MW
Page 5
DIESEL/GAS POWER PLANT
PRIME MOVER : DIESEL / GAS ENGINE
Page 6
GMR 200MW (50MW x 4) Power Plant, INDIA
Page 7
CAMACARI 150MW (2.5MW x 60) Power Plant, BRAZIL
Page 8
PACKAGED POWER STATION
Page 9
MAIN D/G UNIT
Page 10
SIMPLE TRANSPORTATION3
FAST DELIVERY2
QUICK INSTALLATION4
EASY MAINTENANCE5
STRENGTHS OF HYUNDAI PPS
FULL AUTOMATION6
LOW OPERATION COST1
EASILY TRANSFERABLE7
Page 11
1. LOW OPERATION COST
TYPE HYUNDAI PPS HIGH SPEED GENERATOR
Engine Speed (rpm) 1,000 (50Hz) 1,500 (50Hz)
Purpose Base Load Continuous Operation Emergency Operation
Fuel Used Heavy Fuel Oil / Diesel Oil Diesel Oil
Maintenance Performed at Site Must be Transferred to Shop
SFOC (g/kWh) 187 > 215
Life Span 30 years Less than 10 years
HYUNDAI PPS VS. HIGH SPEED GENERATORS
Page 12
POWER GENERATION COST
1. LOW OPERATION COST
Page 13
2. FAST DELIVERY
MONTHS 1 2 3 4 5 6
Contract
Manufacture
Transportation
Installation & Commissioning
Commercial Operation
Only 6 months from PURCHASE to COMMERCIAL OPERATION
DELIVERY SCHEDULE (100MW PPS)
Page 14
Page 15
3. SIMPLE TRANSPORTATION
Page 16
4. QUICK INSTALLATION – Various Foundations
H-BEAMWOODEN SLEEPER
CONCRETE BLOCK POSITIONING
Page 17
4. QUICK INSTALLATION – Simple Piping & Cabling
PIPING
CABLING
Page 18
5. EASY MAINTENANCE
Modularized Feed System
Easily Detachable Cylinder Unit
Page 19
6. FULL AUTOMATION
Remote Control Monitoring System
(RCMS) allows easy control of all
functions from Main Control Room
Page 20
SITE : MANZANILLO
SITE : SAMANA
7. EASILY TRANSFERABLE
RE-INSTALLATION WORKS FOR ONE PPS UNIT : 2 WEEKS
Page 21
REFERENCE LIST WORLDWIDEREFERENCE LIST WORLDWIDE
LOCATION TYPENO. OF
GENSETSCAPACITY
(MW)
MIDDLE EAST & AFRICADPP/GPP 207 721
PPS 79 111
LATIN AMERICADPP/GPP 395 1,329
PPS 839 1,416
OTHERSDPP/GPP 127 686
PPS 24 41
SUB TOTALDPP/GPP 729 2,736
PPS 942 1,568
TOTAL (DPP/GPP + PPS) 1,671 4,304
Page 22
SANTA ELENA 90MW (53 units) PPS, ECUADOR
Page 23
QUEVEDO 102MW (60 units) PPS, ECUADOR
Page 24
SULAYMANIAH 51MW (30 units) PPS, IRAQ
Page 25
REGLA 45MW (28 units) PPS, CUBA
Page 26
JAPAN 4MW (4 units) PPS – Donation for Tsunami Crisis
“THANK YOU, KOREA and HYUNDAI!”
Page 27
CHILE 20MW (8 units) PPS
“Even after the 8.8 magnitude earthquake and over 20 aftershocks, HHI’s PPS have successfully operated and they are playing a critical role in recovering the damages. “
Page 28
Copenhagen
Wilhelmshaven
Rotterdam
Napoli
Dubai
Durban
New Delhi
Singapore Taguig
Kaohsiung
Ho Chi Min
ShanghaiUlsan
Brisbane
Vancouver
Quebec
Houston
Santo Domingo
Panama
Buenos Aires
Rio De Janeiro
Santos
Pusan
HHI-EMD Direct Service Center(6) Authorized Repairer(30) Spare Parts Depot(4)
Parts Sales Agent(7)Cooperative Repairer(21)
Havana
Nicaragua
Keratsini
Istanbul
Ecuador
Tallinn
La SpeziaSantander
GLOBAL SERVICE NETWORK
Page 29
THANK YOU FOR YOUR ATTENTION
Hyundai Heavy Industries Co., Ltd.