Potential for Electrification from Biomass Gasification in Vanuatu
Barry Fischer
USA New Zealand Iceland
Energy in Vanuatu
GasifierA Biomass Gasifier
Delivering Rural Electricity
Demand
Who?
How much?
Where?
Delivering Rural Electricity
Demand
Who?
How much?
Where?
Where?
How much?
Supply
Electricity Demand and Supply
Demand Supply
How?andAt what Cost?
Answering the QuestionsExperts
ni-Vanuatu Villagers
Government
Industry
Demand:Who and How Much?
Villages (10 kW)
Schools (30 kW)
Town Grid (>50 kW)
Demand: Where?
Supply
Supply: Where and How Much ?
Cassis CordiaCassis
Loltong: 90 HH, >70 ha Cordia
Ipota: 33 HH, >1385 ha Cordia
Dillions Bay:53 HH, >41 ha Cordia
Matching Demand to Supply
“HH” = Households----“ha” = Hectares
At what Cost? PRELIMINARY RESULTS: Per-Unit Cost of Electricity
0 0.1 0.2 0.3 0.4 0.5 0.600000000000001
0.700000000000001
0.8 0.9 1$0.00$0.50$1.00$1.50$2.00$2.50$3.00$3.50$4.0010 kW Diesel vs. 10 kW Gasifier
Capacity Factor
$/kWh of electricity
PRELIMINARY RESULTS: Per-Unit Cost of Electricity
0 0.1 0.2 0.3 0.4 0.5 0.600000000000001
0.700000000000001
0.8 0.9 1$0.00$0.50$1.00$1.50$2.00$2.50$3.00$3.50$4.0010 kW Diesel vs. 10 kW Gasifier
Capacity Factor
$/kWh of electricity
Diesel
Gasifier
PRELIMINARY RESULTS: Per-Unit Cost of Electricity
0 0.1 0.2 0.3 0.4 0.5 0.600000000000001
0.700000000000001
0.8 0.9 1$0.00$0.50$1.00$1.50$2.00$2.50$3.00$3.50$4.0010 kW Diesel vs. 10 kW Gasifier
Capacity Factor
$/kWh of electricity
Diesel
Gasifier
How?
Tankyu Tumas!