post-2012 ptf pessto meeting 2012 avishay gal-yam weizmann institute of science

5
Post-2012 PTF PESSTO meeting 2012 Avishay Gal-Yam Weizmann Institute of Science

Upload: kaleigh-heathcoat

Post on 31-Mar-2015

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Post-2012 PTF PESSTO meeting 2012 Avishay Gal-Yam Weizmann Institute of Science

Post-2012 PTF

PESSTO meeting 2012Avishay Gal-Yam

Weizmann Institute of Science

Page 2: Post-2012 PTF PESSTO meeting 2012 Avishay Gal-Yam Weizmann Institute of Science

2013-2014: iPTF

PESSTO meeting 2012Avishay Gal-Yam

Weizmann Institute of Science

Same equipment, faster cadence: main goal for SNe: early time

Page 3: Post-2012 PTF PESSTO meeting 2012 Avishay Gal-Yam Weizmann Institute of Science

2013-2014: iPTF

PESSTO meeting 2012Avishay Gal-Yam

Weizmann Institute of Science

A lot of PTF resources will be pointed at rapid response; PESSTO is perfect for complementary long-term campaigns

Page 4: Post-2012 PTF PESSTO meeting 2012 Avishay Gal-Yam Weizmann Institute of Science

2013-onward: SEDM

PESSTO meeting 2012Avishay Gal-Yam

Weizmann Institute of Science

Dedicated low-res screening spectrograph on the 60” (perhaps also ICAM on INT). Crucial help for screening (only 46/month by PESSTO), while PESSTO can excel at follow-up

Page 5: Post-2012 PTF PESSTO meeting 2012 Avishay Gal-Yam Weizmann Institute of Science

2015-2018: NGTF

PESSTO meeting 2012Avishay Gal-Yam

Weizmann Institute of Science

Even at higher cadence SN discovery rate would equal PTF peak rates (~1000 year). PESSTO will be crucial for screening and follow-up.