Page 1: Portfolio Vicente

PORTFOLIO

1

Page 2: Portfolio Vicente

SUMMARY

Page 3-4- Biography and CV.

Page 5-28- Projects performed as

an ARCHITECTURAL TECHNICIAN

Page 29-42- Projects performed

as a SITE MANAGER and

CONSTRUCTION MANAGER

Page 43- Certificate from General

Secretary of the Council Spanish of

Technical Architecture

2

Page 3: Portfolio Vicente

ABOUT ME

I Consider myself as a resourceful, focused and determined Technical Architect who has considerable experience working in the construction industry designing new buildings, restoring and conserving old buildings and developing new ways of using existing buildings as well as producing detailed drawings and material schedules which are clear, accurate and cost effective. Possessing a proven ability to produce work that minimizes scrap and re-work and also meets the requirements of the specification and which can be constructed and commissioned safely and effectively. Also capable of minimizing cost of projects. Able to use a wide range of IT tools (including AutoCAD, Office, Cypecad, Presto, power point, publisher, etc.) and quick to learn new software packages as required.

Currently looking for a suitable ARCHITECTURAL TECHNICIAN or CAD TECHNICIAN with a company where my skills and knowledge can be used to the full and where I can grow both personally and professionally.

Actually, I am learning a new software called REVIT and reading UK Building regulations in order to get enough knowledge which allows me to work as a CAD Technician or Architectural Technician in UK and, in my spare time, I carry on studying English to get an advanced level.

3

Page 4: Portfolio Vicente

CURRICULUM VITAE

ARCHIVAL Social Service Centre NGO 1999 – 2000

Social Service Assistant

Duties

Helping elderly people

Receptionistt. Including Welcoming and greeting guests and scheduling the arrival of the guests.

AREAS OF EXPERTISE

Autocad 2D and ·3D- -Value management

Cost control--Concrete steel

Building structure and foundation

Infrastructure of buildings--Project management

LANGUAGES

Spanish: Native

English: currently improving my level of English to get and advance level.

EDUCATION

POLYTECHNIC UNIVERSITY OF VALENCIA

1992 – 1998 Degree in Technical Architecture

POLYTECHNIC UNIVERSITY OF MADRID

2008-2009.

Course of 100 hours about concrete steel with the teacher Mr. Alvaro García Messeguer

EDUTEL ( Barcelona) 2008-2009

Course 100 Hours. Expert witness with expertise in Real State.

European School of Managment and Business of Madrid ( EUDE) 2010-2012

MBA Business and Administration.

REFERENCES AVAILABLE ON REQUEST

WORK EXPERIENCE

Parkstone Golf Club, Poole, UK

2012-2015

Duties:

In order to improve my English I am working in a golf club

doing different tasks.

SELF-EMPlPLOYED 2005 – 2012

Technical Architect ( Site manager)

Duties:

Managing the physical execution of projects and carrying out

checks on the construction.

Undertaking costs analysis for building projects.

Attending meetings and liaising with stakeholders on

commercial matters.

Monitoring the cost of site resources.

LECURMIER SLU; CDESMA S.L and LEVANTINA DE

CONSTRUCCIONES GAMAR S.L (Building Industry

Companies) 2000 – 2005

Technical Architect (Construction manager)

Duties:

Drafting plans of buildings and managing their execution,

Control of the costs, budgets and management of all technical

aspects of buildings and facilities.

Making preparations before work begins on site including

communicating with the public, architects and engineers.

Provide technical advice and assistance to the production

team.

Managing CAD projects.

4

Page 5: Portfolio Vicente

PROJECTS I PERFORMED AS A CAD TECHNICIAN : 1- BUILDING 12 FLATS AND TWO CELLAR

2.-BAR - RESTAURANT

3.-SINGLE HOUSE

4.- PROJECTS I DID WORKING FOR LECURMIER S.L

5.- DRAWINGS I DID TO LEARN AUTOCAD 3D

Layout floor.

Building 12

flats.

5

Page 6: Portfolio Vicente

I started to work in the building industry before finishing my studies. In Spain

to get the degree, when we finish the 26 subjects, which form my degree, we

have to do a Final Project. I decided to do a Graphic develop of a building, in

order to get enough skills to work as an Architectural Technician.

Layout

electricity

Building 12

flats. Details Electricity

6

Page 7: Portfolio Vicente

I spent a year doing this project and during this time I learnt to manage

different software: autocad 2d, Cypecad ( to work out structures), Presto (

Budgets and planning). A part of this I reviewed how to calculate all facilities:

Plumber, electricity, central heating, air conditioner, telecommunication etc.

Layout general facilities and how they are distributed:

Grand floor and cellar.

Building 12 flats.

7

Page 8: Portfolio Vicente

Layout about the geometry of the rooms and if the flat complies with Spanish

regulations: Minimum square, length, width, furniture etc.

8

Page 9: Portfolio Vicente

Layout of structure”: Concrete steel. Column , beam, joist. The constructive typology

used in Spain to make structure is concrete steel. Twelve years managing buildings with

this kind of material has provided me with a specific knowledge on this material. And to

go deeper with this kind of material I attended during a year to get lesson from Mr.

Alvaro García Messeguer.

9

Page 10: Portfolio Vicente

Layout fire and a study about the different sectors of fire in the building.

10

Page 11: Portfolio Vicente

Detail of roof; Flat and with slope.

11

Page 12: Portfolio Vicente

Constructive sections

12

Page 13: Portfolio Vicente

Constructive details: sections

13

Page 14: Portfolio Vicente

Layout measure and constructive composition of partition wall, floor and

ceilling.

14

Page 15: Portfolio Vicente

Section and Facade

15

Page 16: Portfolio Vicente

Facade

16

Page 17: Portfolio Vicente

Estudy in 3D of the building. Point of view: North-West

Last months, being aware what

the market demand I have

been learning

AUTOCAD 3D by myself. This

is an example about my new

skills.

17

Page 18: Portfolio Vicente

As a self-employed I had two clients to who I did a project.

Firstly I present you the project about a Bar –Restaurant located in Chella.

The client was Mrs.Cristina Caballero.

Layout

distribution,

accesibility, and

machines.

18

Page 19: Portfolio Vicente

Layout facilities: Plumber and electricity

19

Page 20: Portfolio Vicente

Layout facilities: Study of the sound and the composition of the wall and

floor to avoid the sound was transmited netx houses. Study of regulations

about fire as well.

20

Page 21: Portfolio Vicente

Surfaces, measures and section.

21

Page 22: Portfolio Vicente

Another project I did was a single house. Collaborating with the Architect

Mr. Enrique Terol Lllopis. I would not like to be repetitive, showing you the

same drawings you have been seeing before. Last five months I have

been learning how to manage Autocad 3D, and to do this I used this

project.”

Just let me present you a layout in 2D: Distributiion:

22

Page 23: Portfolio Vicente

Next drawing represent the process of my learning at 3D CAD.

23

Page 24: Portfolio Vicente

More perspectives

24

Page 25: Portfolio Vicente

More perspectives

25

Page 26: Portfolio Vicente

Different views in 2D of the single house

26

Page 27: Portfolio Vicente

Projects performed when I was working for LECURMIER S.L. I was

working as a assistant architect drawing differents projects of buildings”,

designed by the Architect Mr. Mario cuenca García. This is a little resume.

( LECURMIER 15,16,17 )

27

Page 28: Portfolio Vicente

Section and facade: LECURMIER S.L.

28

Page 29: Portfolio Vicente

PROJECTS PERFORMED AS A SITE MANAGER

Main responsibilities as a Site Manager.

1.- Quality control : I managed the physical execution of the project and carried out

qualitative and quantitative checks on the construction.

2.- I verified of the receipt of the construction products on site, organizing the carrying out of

trials and tests.

3- I managed the material of execution of works, verifying grounds plans, materials and the

correct execution and arrangement of the constructive elements and services according to

the project.

4-I recorded the necessary instructions in the books of orders and attendance.

5.-Site preparation, including land clearing and earth moving

6.-I signed the site preparation certificate and the final certificate ( which has to be produced

to the minutes of acceptance of the project).

7.- I prepared and signed the partial economic certifications and the final settlement of the

units of work performed.

8.- I received the result of the service trials or tests on materials, systems and facilities, which

have to be delivered to me by the building quality control entities and labs.

9.- I collaborated on the preparation of the documentation for works performed ( building

book) and facilitates the results of the check carried out.

As a Site manager I was part of the Directors team. Consisting in the Director of the building

and the director of the execution of the building.

29

Page 30: Portfolio Vicente

The structure of these building is made by concrete steel. At picture 1, the foundation is a slab of concrete

steel and at picture 2 footings isolated. The rest of structure is formed by column, beam of concrete steel,

prefabricate joists with a inverted “T” shape made by concrete steel and, as a piece between them, blocks.

As exterior wall, there is a cavity wall executed by two leaves of bricks, with a camera between them. The

exterior leaf has on its interior side a layer of mortar, plus waterproof sheet ( usually done just painting) and

to comply with the thermal and acoustic insulation I used mineral wool 3 cm thick.

The roof at picture 1 is a flat floor. The slopes are made by lightweight concrete, acting this as a thermal

and acoustic insulation. On slopes I placed an asphalt cloth to waterproof. On the asphalt cloth there is a

layer of mortar and, as finished tales.

At picture 2, this building has a cavity wall made with leafs of bricks, but in this building I changed the

composition of the layer on the exterior wall. I placed a layer of projected polyurethane 4-5 cm thick and

30 kg/m3 of density. This layer replaced the mortar, impermeable sheet and complied with the conditions

about thermal and acoustic insulation. A part of this I reduced the cost of this constructive element and the

time of execution.

RESIDENTIAL BLOCKS 3 FLOORS 3 FLATS

Location: C/Valencia 1ª-46815 Llosa de

Ranes

Developer: Promociones Gozalvez C.B

Budget without VAT: 220,475.43 Euros

RESIDENCIAL BLOCKS 4 FLOORS 6 FLATS

Location: C/Diputación 21- 46829 Anna

Developer: Promociones Camino Hondo S.L

Budget without VAT: 422,999.00 Euros

1 2

30

Page 31: Portfolio Vicente

The unfinished detached house is fruit of a bankrupt. There are no secrets in this building. Just to

emphasize the change I ordered in the corrugated steel on a wall. Every wall of containment is

calculated with one of its sizes working on flexion. It is say, the main layer of steel absorb efforts of

traction. This layer is placed on the size that resists the pressure of the ground. But in a building,

when we make the first floor and connect this with the top of the wall, then the wall work like beam.

Therefore we should have armed the wall as the beam is armed. To do that I kept the armed of the

original wall and I just reinforce another size that, at the beginning should have had less amount of

steel. I think is a common error not to think on the constructive process. The wall was calculated in

base its primary use, without thinking that throughout the construction of the building, the loads

affecting the wall could change.

About picture number four, the most remarkable in this building was that the main contractor was

fired. I advised to my client no to contract the company because, in my opinion, they have done a

budget completely unreal. Not according to the normal prices working at the market and, we would

probably have problems in the future. The point was that the main contractor finally realized of it and

a building that it should be built in a year; after a year had been built the structure, roof and exterior

wall.

RESIDENTIAL BLOCKS 5 FLOORS 5 FLATS

Location: C/Marqués de Montortal 83

46019 Valencia Developer: LEVANTERRES S.L Budget without VAT: 261,822.38 Euros

SEMI-DETACHED-SINGLE HOUSES(3 HOUSES)

Location: C/Ronda la Costera 35-46815 Llosa de Ranes

Developer: Promociones Gozalbez S.L.

Budget without VAT: 454,654.33 Euros

3 4

31

Page 32: Portfolio Vicente

Location: C/Castilla CP13-CP14-46690 Alcudia de Crenspins

Developer: Constrtucciones Manuel González S.L

.

SEMIDETACHED SINGLE FAMILY HOUSES.12

HOUSES

Budget without VAT: 1,108,556.00 Euros.

5 6

32

Before designing a foundation we need to know the properties of the soil. If it is rock, sand, clay and the bearing ground. To do this we need a geotechnical study but as it could be a little bit expensive, usually the study just checks a small proportion of all ground so that not all surface is covered by the geotechnical study. The most interesting in these 12 detached house was that during the excavation we found that the geotechnical study had not detected that there were part of the soil with a different properties not established at the study. This soil was not suitable to get part of the foundation due to the different resistance of it. In this case we had to change the level of this part of the foundation, getting it down to a level that could support the loads sent through the structure down to the ground, Part of my work as a site manager, performed for eight years, consist in detecting the possible mistakes done at the project and take decisions to sort them out.

Page 33: Portfolio Vicente

This house is formed by a grand floor, used as a garage, first floor, second floor and loft. The most

remarkable in this house was that we created a basement with a surface approximately half of the area,

not contemplated at the beginning on the project. This new space to be used was possible because the

ground had enough slope. To access this part we had to design a new stairs and modified the layout of

structure.

To illuminate this space and save electricity we used a mechanism of the company “Solatube” to get

natural sunlight. A part of this we designed a network of pipes to get natural ventilation in this closed

space.

DETACHED SINGLE FAMILY HOUSE

Location: C/Ignacio Arnau 15-46814 Torrella

Developer. Mrs.María Jose Martínez Arnau

Budget without VAT: 113,713.00 Euros.

7

33

Page 34: Portfolio Vicente

RESIDENTIAL BLOCKS: 3 FLOORS,3 FLATS Location: C75 Zapadores-46660 Manuel

Developer: Bernat Gadea promociones S.L

Budget without VAT: 240,000 Euros

8

34

The problem with this way to execute the foundation was

that we had to decompress the ground which is used to

counteract the horizontal push of the vault. A part of this,

there were two old building next to our land so that if we

dug 5 m. the soil, the foundation of these building would have

been decompressed and it could have moved, affecting the

structural stability of these building.

I have to add the likely problems about humidity and

leaking caused by the canal. Leaking that may have changed the

resistance of the soil affecting the foundation of these two old

building. Having clear in my mind of these dangers I talked to the

contractor and Architect proposing another method to solve the

foundation.

The way we used was to split up the foundation and do it in

alternatively batch. First we dug till the level of foundation and

spread a concrete with less resistance ( HM-150Kp/cm2). When

we reached the level of our Foundation (-1.5 m), then we did the

armed and finally we spread our concrete HA-250Kp/cm2).

In this way we did not decompress totally the plot and kept safe

the vault and my workers. A part of this, economically this way to

do this foundation was cheaper than the original process

established by the project.

This is one of the buildings where I really enjoyed as a site manager. Firstly, the geotechnical study to

determine the bearing-ground said that the deep of foundation had to go down -5 m. Secondly, at the

middle of the land there was an irrigation canal used by the farmers of five different towns to irrigate their

lands. The dimensions of it were 4 m width and 3.5 m height. The canal was covered by a vault made by

bricks.

The project also said that to do the foundation we had to dig -5 m. Execute the foundation and do a floor

at the level of the street and a contain wall of concrete steel around the perimeter, leaving between this

floor and the top of foundation a camera of air.

Page 35: Portfolio Vicente

The structure of the house at picture 9 is a combination of concrete steel ( grand floor and first floor)

and wall of bricks and roof of wood beams( second floor). In the second picture the foundation is

concrete steel and the rest of the structure is made by brick wall and the roof is a flat terrace.

In this house, I used as a material of waterproofing that covered all terrace´s surface so that we

eliminated the biggest problem this kind of material has: the joints. The material I was used to using

had a dimension of 1 m width and 20 m length. With this kind of material, to cover a surface,

necessarily we have to do a lot of joints. With this kind of asphalt cloth, which covered almost all

surface, I could reduce, in a huge proportion, the risk of having filtration through the joints.

SEMI-DETACHED SINGLE-FAMILY HOUSE

Location: C/San pedro 6-46822 Bolbaite Developer: Mrs. Angels Martínez Bataller Budget without VAT: 85,065.08 Euros

SEMI-DETACHED SINGLE-FAMILY HOUSE

Location: Polígono 8 parcela 70- 46821 Chella

Developer: Mr. Juan Jose Granero Granero

Budget without VAT: 98,130.49 Euros.

9 10

35

Page 36: Portfolio Vicente

This is a nursing home of 125 bedrooms split up in two floors. There is a basement as well. The structure

is concrete steel and joists are made by concrete steel “in situ”. Cavity wall made by bricks with a camera

of air inside. The interior walls are plasterboards in metallic profiles.

Analyzing this project I realized that one of the sides of the structure had 50 m length and the Architect

had not designed the necessary expansion joint when the structure of concrete, one of the sizes, has a

length more than 30 m.

When the structure was being made at level of the basement, I realized that most of the column was 5

cm into beam´s section. Doing a structure is to know how to solve encounters, and always, always a

proper execution is that never the section of the column goes into section of the beam.

The best thing is that the section of the beam goes a couple of centimeters into the column. Doing the

column centimeter less tall and using the thick of the formwork to finish the proper length of the column.

Location: P.R.D ( Parc.131-83-84-78-77-16) 46820 ANNA

Developer: Gestion de Calidad y Confort S.L.

Budget without VAT: 2,154,479.27 Euros.

RESIDENTIAL COLLECTIVE ( HOME

CARE)

36

Page 37: Portfolio Vicente

PROJECTS PERFORMED AS CONSTRUCTION

MANAGER

When I finished my degree I started to work for companies in which I

performed the role of CONSTRUCTION MANAGER”. This role

basically consists in:

The manager gave me a project and a land to be built. After this

moment I was in charge of contracting all materials, professions that

were necessary to build the construction.

1.- I contracted all personal who built the house.

2.-I negotiated prices and carry out all kind of meetings with the

contractor and the Director team in order to the building comply all

project´s specifications.

3.-I set up a methodology to control the costs of the building.

4.- I organized through graphic of GANTT the production of the

building to get the objectives in terms of time and cost.

5.- I prepared monthly certification and I dealt it with the director

team and clients.

6.- I made reports to the manager about the situation of the building in

economics and constructive terms.

7.- I calculated prices of the different elements of a building in order

to prepare a general budget to be presented at the company´s

client.

37

Page 38: Portfolio Vicente

In this building I worked as a construction manager for the company CDESMA S.L. Briefly, my work

as a construction manager consists in getting a project and a plot from my boss. After that, he tells me

my aim in terms of benefits and a limited time to finish the building.

Secondly, I start to organized all works contracting the companies that have to stay at the building:

People to do the excavation, foundation, walls, roofs. I Negotiate with them budgets and prices,

carrying out checks about the quality of their work and, If it is doing according to the plan. I also have

set a control about costs and incomes, detecting if there are a divergences between the original

budget and what I have already executed.

A part of this, an important role I have got as a construction manager is to deal with the director of the

building and customers. With the director trying to solve any problem we could have and interrupt the

normal developing of the work. In relation with the customers I attend their needs and certificate each

month to present the invoice.

Residential blocks;Supermarket in grand floor and 2 floor more and 6 flats Location: CHELLA

Developer: CDESMA S.L

Budget without VAT: 850,000.00 Euros

13 14

38

Page 39: Portfolio Vicente

In this building I worked as a construction manager for the company CDESMA S.L. This 20 detached

houses were made to the public administration as a social houses. I was working as a construction

manager as well.

To CDESMA S.L I was managing other works as : -

- A building of 4 floor and 8 flats in Mogente.

- Industrial building with metallic structure Steel- A42 b in la llosa de Ranes

- Three single family home in Navarres.

- Refurbishment s throughout all Valencia.

- 7 Detached house in Quesa.

Location: GAVARDA

Developer: CDESMA S.L

Semi-detached single family house ( 20 Houses) BUDGET WITHOUT VAT: 1,500,000.00 Euros

15 16

39

Page 40: Portfolio Vicente

This is a Industrial Building of 10,000 m2. and annexed to it a building used as a office. In this building I

was working as a construction manager to my company LLANERA S.L. The warehouse is used as a huge

fridge to store food and send it to rest of Spain. The structure of the warehouse is metal ( Steel A42b), and

the wall that cover all warehouse is a special material to keep the cold. The roof is made by metal with a

panel sandwich with Insulation incorporated.

The area of the land had 50,000 m2 and one of the most important parts of the work was the movement of

ground. Previously to start the foundation the land was divided by small lands and we had to create a flat

surface taking the ground out from some places and adding new soil to another one. Basically, underneath

of the warehouse there is a 1 m of different kind of soil and compressed by an steamroller. Once done

this movement of ground we started to dig to do the foundation that was formed by isolated slabs at the

warehouse and building. Technically one of the challenges of this building was that the machine to keep a

temperature in the warehouse had to be located in a room underneath of the offices. The problem was the

sound produced by this machine. We had to prepare an special Insulation in this room against the sound

up to level of DBA permitted by the legislation.

Finally, the most remarkable for me in this work was that we had 6 months to do everything. This was a

challenge in terms of organization. Planning fifteen different companies and approximately 70 men,

working at the same time at the peaks of the work, was a hard work and a pleasure as well. Seeing like

monthly the objectives we had planned was being reached, was a gratifying experience.

LOCATION: VILLANUEVA DE CASTELLON ( VALENCIA)

DEVELOPER:LLANERA S.L

LOGISTIC CENTRE GRUPAG-DHL. OFFICES AND INDUSTRIAL BUILDING ( 10,000 M2)

BUDGET WITHOUT VAT: 1,750,000.00 Euros

17 18

40

Page 41: Portfolio Vicente

LOCATION:CHELLA (VALENCIA)

DEVELOPER: SEINCHE S.L

URBANIZATION OF CONSTITUCION ROAD IN CHELLA

BUDGET WITHOUT VAT: 325,000.00 Euros

19 20

41

I was working for this company as a self-employed. This is a urbanization I managed and where we

changed the main facilities. Water, drainpipe, electricity and lights. This was a small company

specialized in doing wall with natural stone.

Page 42: Portfolio Vicente

I was working for this company as a self-employed. We did the urbanization and after constructed

the facilities to do both sport. This was a small company specialized in doing wall with natural

stone.

LOCATION: CHELLA( VALENCIA)

DEVELOPER: MAPIT S.L

URBANIZATION WITH PADEL AND SQUASH

BUDGET WITHOUT VAT: 105,000.00 Euros

42

19 20

Page 43: Portfolio Vicente

Certificate of the General Secretary of the Spanish Council of Technical Architecture. To

work as a self-employed in Spain is mandatory to be member of this professional

association. This association comply the same function than RIBA, RICS or CIOB in United

Kingdom. I am member of this association from May of 2.005.

43