portfolio a3 long pages

2
This Chronogram attempts to map thecamera movements,placement of characters and architectural space, sound and gestures within a 5 minute clip of Win Wenders ‘Wings of Desire’. The diagram proves the difculties in showing all these elements accurately in two dimensions. 1. Star ts in Ali en’s h ome - Alien re cieve s an e-c ard fr om a fr iend in Spital elds 2. E-c ard op ens up o n computer i nterface and message is read. 4. Roman graveyard image 6. Present day Christ Church image. 3. Alien researches the history of Spitalelds. 5. St. Spital Hospital image 7. Alien explores publications produced by Spitalelds development Group in the 21st Century. The text is very positive and so the alien decides to take a trip there. 8. He then travels through his portal to Spitalelds 10. He explores the areas that are described in the publications. 11. Against the positive phrases from the books the alien hears peoples thoughts and sees scewnes beyond the frames of the pictures, which paint a more realistic view of the area as a whole. 9. Travelling to Earth Storyboard After condisering the storyboard’s content and narrative, we decided to solely use information from the Spitalelds Development Group books as the historic and present day content. However, the text is mis-interpreted by the alien who does not understand metaphorical corporate spiel. Therefore we will animate the pictures within the book to represent the literal translation of the text. We hope that, as well as educating the viewer about the history and economic drivers of the site, the short lm will communicate the interpretation of the coprporate language effectively. Film Stills

Upload: lauraedwards88

Post on 05-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Portfolio A3 Long pages

7/31/2019 Portfolio A3 Long pages

http://slidepdf.com/reader/full/portfolio-a3-long-pages 1/5

This Chronogram attempts to mapthe camera movements, placementof characters and architectural space,sound and gestures within a 5 minuteclip of Win Wenders ‘Wings of Desire’.The diagram proves the difculties inshowing all these elements accuratelyin two dimensions.

Page 2: Portfolio A3 Long pages

7/31/2019 Portfolio A3 Long pages

http://slidepdf.com/reader/full/portfolio-a3-long-pages 2/5

1. Starts in Alien’s home - Alien recieves an e-card from a friend in Spitalelds 2. E-card opens up on computer interface and message is re

4. Roman graveyard image

6. Present day Christ Church image.

3. Alien researches the history of Spitalelds.

5. St. Spital Hospital image

Storyboard

After condisering the storyboard’s content and narrative, we decidedto solely use information from the Spitalelds Development Groupbooks as the historic and present day content. However, the text ismis-interpreted by the alien who does not understand metaphoricalcorporate spiel. Therefore we will animate the pictures within thebook to represent the literal translation of the text. We hope that, aswell as educating the viewer about the history and economic driversof the site, the short lm will communicate the interpretation of thecoprporate language effectively.

Page 3: Portfolio A3 Long pages

7/31/2019 Portfolio A3 Long pages

http://slidepdf.com/reader/full/portfolio-a3-long-pages 3/5

Film Stills

Page 4: Portfolio A3 Long pages

7/31/2019 Portfolio A3 Long pages

http://slidepdf.com/reader/full/portfolio-a3-long-pages 4/5

1. Grey powder-coated aluminium brise Soliel.

2. Double-glazed, aluminium framed window.

3. 240 mm cross-laminated timber oor panel.

4. Turf, topsoil, drainage crates, damp proofmembrane, 500 mm CorbiaxDeck decksystem with self-compacting in-situ concrete300/400 mm, sand blasted shuttering(underside).

5. Paving, damp proof membrane, 240 mmCorbiaxDeck deck system in-situ concreteslab.

6. Suspended ceiling: slotted cross-laminatedtimber: silver r, with layer of acousticinsulation; 240 mm CorbiaxDeck decksystem in-situ concrete slab, damp proofmembrane, paving.

7. Pebbles, 60 mm screed, damp proofmembrane, slab.

8. Fire Curtain: grey powder coated steel.

9. Suspended glue laminated beam withintegrated lighting.

10. Laminated oak ooring, 60mm screed,10mm footstep sound proong, 240mmCorbiaxDeck deck system in-situ concreteslab.

11. 400 mm Self-compacting in-situ concrete300/400 mm, sand blasted shuttering(underside); retaining wall.

Perspective Detailed Section B-B1:75

KeyPlan 1:1250

3

4

5

2

1

   O  s   b  o  r  n   S   t  r  e  e   t

B B

Page 5: Portfolio A3 Long pages

7/31/2019 Portfolio A3 Long pages

http://slidepdf.com/reader/full/portfolio-a3-long-pages 5/5

11. First oor pre-fabricatewalls erected and joine

7. Glulam secondary struc1. Existing buildings demolished and debris removedfrom site.

4. Damp proof membrane laid and concrete walls andhollow-core concrete slab cast.

2. Site excavated. Excavated earth used to build upstreet level ground to raised ground oor level.

5. In-situ concete stair cores and structural ns cast informwork to form the primary structure.

3. Basement tanking: Drainage laid, formwork erectedand retaining wall cast.

6. Formwork erected and in-situ hollow core concretelower ground oor slab cast with central circulardipped area and integral pipe for rainwater collection.

Construction Sequence