pollution prevention sustainable development · captrue and proceses • restores hydrologic...

29
Pollution Prevention Sustainable Development

Upload: others

Post on 03-May-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

Pollution Prevention

Sustainable Development

Page 2: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

• Traditional Engineering solution - Conveythe storm water as quickly to the river aspossible. Treat water at the end of pipe.

• As urbanization continues (over decades)the resulting flow in rivers is a shorterduration higher peak flow causingerosion/deposition and degrade waterquality (TSS, BOD, etc).

Page 3: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

• BMPs are techniques used to control nonpoint source discharges by means of– Filtering out sediments - using permeable

pavers and sand/gravel beds.– Phytoremediation - natural indigenous plants to

remove or neutralize contaminants.– Retention of peak storm events to reduce down

stream erosion/sedimentation and improvegroundwater recharge.

Page 4: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

• Reduced irrigation• Reduced TSS• Reduced storm sewer

network and POTWCapacity

• Improved waterquality to mimicpredevelopment runoffquality.

• Recharge ofgroundwater

Page 5: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2
Page 6: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

Pilot Projects

• Willard Park Parking Area• Street Tree Filters• Street Sweeping Demonstration• Roof Leader Disconnect• Inlet Floatables Removal• Inlet Timing Project• Inlet Ponding Modification• Permeable Pavers Installation

Page 7: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

Bio “Retention”Bio “Retention”A major tool to maximizing the use of uplands areas for managementA major tool to maximizing the use of uplands areas for managementand treatment.and treatment.

Processes and FunctionsProcesses and Functions

Physical Physical (Sedimentation / Filtration / Volatize(Sedimentation / Filtration / Volatize

Chemical Chemical (CE / Adsorption / Chelation ……(CE / Adsorption / Chelation ……

Biological Biological (Cycling, Uptake, Transformation…(Cycling, Uptake, Transformation…

Hydrological Hydrological (Evaporation /Infiltration / Timing(Evaporation /Infiltration / Timing

PhysioPhysio-chemo-bio-hydro retention-chemo-bio-hydro retention

Captrue Captrue and and ProcesesProceses

Page 8: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

• Restores Hydrologic Functions• Economically Sustainable

– Efficient Use of Space / Reduced Infrastructure– Property Value– Scale of Maintenance Burdens– Reduces Development Costs

• New Tool for Urban Retrofit• Practical / Simple / Universally Applicable

Page 9: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

• Landscape Islands• Streetscape• Existing Forested Areas• Forest Fringe• Open Space (Meadows)• Open Swales (Off-line)• Landscape Trees• Gardens

“Hydrophytobiochemo-retention”

Page 10: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

• Roofs• Buildings• Down Spouts• Water Use• Yards• Sidewalks• Parking• Landscape Areas (trees / vegetation)• Open space• Pollution Prevention• Conventional BMP’s

Multifunctional Infrastructure

* Receiving Water Protection / Restoration* Receiving Water Protection / Restoration

* CSO Control (Flow / Frequency / Quality)* CSO Control (Flow / Frequency / Quality)

* TMDL’ Impaired Waters* TMDL’ Impaired Waters

Page 11: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

NDW

ADDED DETAILS AND PROFILE

SITE PLAN

IMPROVEMENT PRO☺ECT

WILLARD PARK WATER QUALITY

DR

AW

N

SC

ALE

:

BY

: C

HE

CK

ED

BY

: nw

DA

TE

:

NW

SH

EE

T

OF

8/14/00

PR

OJE

CT

NU

MB

ER

:920651/5

C - 23

2

NU

MB

ER

:D

RA

WIN

G

06/12/00

1

1. ALL STRUCTURES TO BE H-20 LOADING, EXCEPT STRUCTURE #2.2. CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS AND TEST PIT CROSSINGS BY HAND.3. STRUCTURE MODIFICATIONS: E-10/D5: AD☺UST TOP CB-6/2: DECOMISSION E-11/D3: DECOMISSION F-11/D-7: INSTALL SOLID COVER MH-2A: INSTALL SOLID MH COVER4. SEE SHEET C-3 FOR PROFILES, CROSS SECTIONS, DETAILS.5. SEE SHEET C-3 FOR LANDSCAPE PLAN.6. SEE SHEET C-3 FOR DETAIL OF AREA ONE.7. RAINBARRELS ARE ADDITIVE/ALTERNATE.

EX. STRUCTURE

NEW STORM DRAIN

EX. STORM DRAIN

NEW STRUCTURE

PAVEMENT OVERLAY

PERMEABLE PAVERS

EXISTING BUILDING

⌧ 7.5

7.5

7.5

MH - A7.5

NOTES

DRAINAGE AREA TO FACILITY

EXISTING DRAINAGE DIVIDE

PROPOSED ELEVATION

PROPOSED CONTOUREXISTING CONTOUR

ELEVATION / STRUCTURE

PRO☺ECT AREA

LEGEND

(609) 584-8900

TRENTON, NEW ☺ERSEY 08691

200 HORIZON CENTER BOULEVARD

CE

NT

ER

, IN

C.

DE

VE

LOP

ME

NT

TH

E L

OW

IMP

AC

T

BA

LAN

CIN

G G

RO

WT

HA

ND

EN

VIR

ON

ME

NT

AL

INT

EG

RIT

Y

SCALE: 1" = 20'PLAN VIEW

Page 12: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2
Page 13: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

Retrofit WithRetrofit WithBio-filtrationBio-filtrationStripsStrips

Page 14: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2
Page 15: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

Curb

Street

Storm Drain

High Rate

Biofilter

Side Walk

Tree

Inlet

Tree Box Filter

TREE FILTER SCHEMATIC

Page 16: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

Bioretention

Upland Plants / ShallowPonding Infiltration and/orFiltration Volume ControlAesthetic ValueHabitat ValueProperty ValueLow Cost Maintenance

“Rain Gardens”

Multifunctional useMultifunctional useof green spaceof green space

Treatment of urbanrunoff in the uplandplant / soil complex

Page 17: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

High Rate Bio-filtration

Page 18: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2
Page 19: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2
Page 20: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

Floatables RemovalInstalled at Structure D-3 for control ofpeak flows. The restricted openingreduces the peak flow rate, andeliminates debris from entering thesystem.

Vortex Flow Control

This prevents oils, grease, and trashfrom entering the storm drain system.

Page 21: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2
Page 22: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2
Page 23: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2
Page 24: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2
Page 25: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2
Page 26: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

Runoff UseRunoff Use

Runoff StorageRunoff Storage

National AirportNational Airport

Page 27: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

Buildings Buildings

DownspoutsDownspouts Disconnect / Water Use Disconnect / Water Use

Page 28: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2

Herbert Dreiseitl - ww.dreiseitl.deHerbert Dreiseitl - ww.dreiseitl.de

Page 29: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2