![Page 1: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/1.jpg)
Pollution Prevention
Sustainable Development
![Page 2: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/2.jpg)
• Traditional Engineering solution - Conveythe storm water as quickly to the river aspossible. Treat water at the end of pipe.
• As urbanization continues (over decades)the resulting flow in rivers is a shorterduration higher peak flow causingerosion/deposition and degrade waterquality (TSS, BOD, etc).
![Page 3: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/3.jpg)
• BMPs are techniques used to control nonpoint source discharges by means of– Filtering out sediments - using permeable
pavers and sand/gravel beds.– Phytoremediation - natural indigenous plants to
remove or neutralize contaminants.– Retention of peak storm events to reduce down
stream erosion/sedimentation and improvegroundwater recharge.
![Page 4: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/4.jpg)
• Reduced irrigation• Reduced TSS• Reduced storm sewer
network and POTWCapacity
• Improved waterquality to mimicpredevelopment runoffquality.
• Recharge ofgroundwater
![Page 5: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/5.jpg)
![Page 6: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/6.jpg)
Pilot Projects
• Willard Park Parking Area• Street Tree Filters• Street Sweeping Demonstration• Roof Leader Disconnect• Inlet Floatables Removal• Inlet Timing Project• Inlet Ponding Modification• Permeable Pavers Installation
![Page 7: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/7.jpg)
Bio “Retention”Bio “Retention”A major tool to maximizing the use of uplands areas for managementA major tool to maximizing the use of uplands areas for managementand treatment.and treatment.
Processes and FunctionsProcesses and Functions
Physical Physical (Sedimentation / Filtration / Volatize(Sedimentation / Filtration / Volatize
Chemical Chemical (CE / Adsorption / Chelation ……(CE / Adsorption / Chelation ……
Biological Biological (Cycling, Uptake, Transformation…(Cycling, Uptake, Transformation…
Hydrological Hydrological (Evaporation /Infiltration / Timing(Evaporation /Infiltration / Timing
PhysioPhysio-chemo-bio-hydro retention-chemo-bio-hydro retention
Captrue Captrue and and ProcesesProceses
![Page 8: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/8.jpg)
• Restores Hydrologic Functions• Economically Sustainable
– Efficient Use of Space / Reduced Infrastructure– Property Value– Scale of Maintenance Burdens– Reduces Development Costs
• New Tool for Urban Retrofit• Practical / Simple / Universally Applicable
![Page 9: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/9.jpg)
• Landscape Islands• Streetscape• Existing Forested Areas• Forest Fringe• Open Space (Meadows)• Open Swales (Off-line)• Landscape Trees• Gardens
“Hydrophytobiochemo-retention”
![Page 10: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/10.jpg)
• Roofs• Buildings• Down Spouts• Water Use• Yards• Sidewalks• Parking• Landscape Areas (trees / vegetation)• Open space• Pollution Prevention• Conventional BMP’s
Multifunctional Infrastructure
* Receiving Water Protection / Restoration* Receiving Water Protection / Restoration
* CSO Control (Flow / Frequency / Quality)* CSO Control (Flow / Frequency / Quality)
* TMDL’ Impaired Waters* TMDL’ Impaired Waters
![Page 11: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/11.jpg)
NDW
ADDED DETAILS AND PROFILE
SITE PLAN
IMPROVEMENT PRO☺ECT
WILLARD PARK WATER QUALITY
DR
AW
N
SC
ALE
:
BY
: C
HE
CK
ED
BY
: nw
DA
TE
:
NW
SH
EE
T
OF
8/14/00
PR
OJE
CT
NU
MB
ER
:920651/5
C - 23
2
NU
MB
ER
:D
RA
WIN
G
06/12/00
1
1. ALL STRUCTURES TO BE H-20 LOADING, EXCEPT STRUCTURE #2.2. CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS AND TEST PIT CROSSINGS BY HAND.3. STRUCTURE MODIFICATIONS: E-10/D5: AD☺UST TOP CB-6/2: DECOMISSION E-11/D3: DECOMISSION F-11/D-7: INSTALL SOLID COVER MH-2A: INSTALL SOLID MH COVER4. SEE SHEET C-3 FOR PROFILES, CROSS SECTIONS, DETAILS.5. SEE SHEET C-3 FOR LANDSCAPE PLAN.6. SEE SHEET C-3 FOR DETAIL OF AREA ONE.7. RAINBARRELS ARE ADDITIVE/ALTERNATE.
EX. STRUCTURE
NEW STORM DRAIN
EX. STORM DRAIN
NEW STRUCTURE
PAVEMENT OVERLAY
PERMEABLE PAVERS
EXISTING BUILDING
⌧ 7.5
7.5
7.5
MH - A7.5
NOTES
DRAINAGE AREA TO FACILITY
EXISTING DRAINAGE DIVIDE
PROPOSED ELEVATION
PROPOSED CONTOUREXISTING CONTOUR
ELEVATION / STRUCTURE
PRO☺ECT AREA
LEGEND
(609) 584-8900
TRENTON, NEW ☺ERSEY 08691
200 HORIZON CENTER BOULEVARD
CE
NT
ER
, IN
C.
DE
VE
LOP
ME
NT
TH
E L
OW
IMP
AC
T
BA
LAN
CIN
G G
RO
WT
HA
ND
EN
VIR
ON
ME
NT
AL
INT
EG
RIT
Y
SCALE: 1" = 20'PLAN VIEW
![Page 12: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/12.jpg)
![Page 13: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/13.jpg)
Retrofit WithRetrofit WithBio-filtrationBio-filtrationStripsStrips
![Page 14: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/14.jpg)
![Page 15: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/15.jpg)
Curb
Street
Storm Drain
High Rate
Biofilter
Side Walk
Tree
Inlet
Tree Box Filter
TREE FILTER SCHEMATIC
![Page 16: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/16.jpg)
Bioretention
Upland Plants / ShallowPonding Infiltration and/orFiltration Volume ControlAesthetic ValueHabitat ValueProperty ValueLow Cost Maintenance
“Rain Gardens”
Multifunctional useMultifunctional useof green spaceof green space
Treatment of urbanrunoff in the uplandplant / soil complex
![Page 17: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/17.jpg)
High Rate Bio-filtration
![Page 18: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/18.jpg)
![Page 19: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/19.jpg)
![Page 20: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/20.jpg)
Floatables RemovalInstalled at Structure D-3 for control ofpeak flows. The restricted openingreduces the peak flow rate, andeliminates debris from entering thesystem.
Vortex Flow Control
This prevents oils, grease, and trashfrom entering the storm drain system.
![Page 21: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/21.jpg)
![Page 22: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/22.jpg)
![Page 23: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/23.jpg)
![Page 24: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/24.jpg)
![Page 25: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/25.jpg)
![Page 26: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/26.jpg)
Runoff UseRunoff Use
Runoff StorageRunoff Storage
National AirportNational Airport
![Page 27: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/27.jpg)
Buildings Buildings
DownspoutsDownspouts Disconnect / Water Use Disconnect / Water Use
![Page 28: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/28.jpg)
Herbert Dreiseitl - ww.dreiseitl.deHerbert Dreiseitl - ww.dreiseitl.de
![Page 29: Pollution Prevention Sustainable Development · Captrue and Proceses • Restores Hydrologic Functions ... 4 / 00 PROJECT NUMBER: 9 2 0 65 1/5 C - 2 3 2 DRAWING NUMBER: 0 6 /1 2](https://reader034.vdocuments.us/reader034/viewer/2022042210/5eaf251a8732215da2297a84/html5/thumbnails/29.jpg)