pollution control solutions prowess-2k16-1-1
TRANSCRIPT
POLLUTION CONTROL SOLUTIONS
BY
PROWESS INTERNATIONAL (P) LTD.
POLLUTION CONTROL SOLUTIONS BY PROWESS
Primary & Secondary Fume Extraction System for EAF/ LRF/EOF/AOD
Secondary extraction through Roof canopy
De-dusting Systems for Raw Material Handling System, Stock House, Blast Furnace Cast House, Submerged Arc Furnace Cast House, Lime Plants etc.
Various components of Gas Cleaning System of BOF
Gas cooling through Gas Cooling Tower with High temperature water quenching or Forced Draft Coolers or Natural Hair Pin Coolers
Bag House : Pulse Jet Type or Reverse Air Bag House (RABH)
VVVF/ Soft starter start up of ID Fan
Complete Auto Operation through PLC with optimized Power consumption
Pneumatically operated feedback controlled dampers
Dust handling systems (Pneumatic Conveying & Conveying through Drag Chain Conveyors)
MAJOR INSTALLATIONS OF POLLUTION CONTROL SOLUTIONS BY PROWESS
Sl. No. Major Installations Year
1. Primary Fume Extraction System for 1x60T EAF of Jai Balaji Group, Durgapur
2008
2. Revamp of Primary Fume Extraction System of 1x50T EAF of Sunflag Steel, Bhandara Road, Nagpur
2008
3. Revamp of Primary Fume Extraction System of 1x100T EAF of Jindal Power & Steel Ltd., Raigarh
2009
4. Primary & Secondary Fume Extraction System for 2x30T EAF + 1x30T LRF for Geco Steel, Syria
2010
5. Primary Fume Extraction System for 1x30T EAF of Shyam Steels , Durgapur
2011
6. Lance Trolley, Movable Tubular Hood with Car & Water-cooled Tubular Ducts for 1x60T AOD of Salem Steel (SAIL)
2012
7. Primary & Secondary Fume Extraction System for 2x100T EAF + 4x100T LRF for Monnet Ispat & Energy Ltd., Raigarh
2013
8. Primary & Secondary Fume Extraction System for 1x30T EAF + 1x30T LRF for Muscat Steel Melting Co. LLC. , Muscat, Oman
2014
9. Primary & Secondary Fume Extraction System for 1x35T EAF + 1x35T LRF for Arora Iron Steel Rolling Mills Ltd., Ludhiana
2015
10. Gas Cleaning System for 1x35T VD for Arora Iron Steel Rolling Mills Ltd., Ludhiana
2015
11. Primary & Secondary Fume Extraction System for 1x45T EAF + 1x45T LRF for Sona Alloys Pvt. Ltd. , Lonand (Near Pune)
Commissioning due.
FUME EXTRACTION SYSTEMELECTRIC ARC FURNACE & LADLE FURNACE
AMOUNT OF DUST GENERATED : 10-20 Kg/T OF CHARGED WEIGHT
MECHANISM OF EAF/LF DUST FORMATION
ENTRAINMENT OF PARTICLES
VOLATILIZATION OF VOLATILE MATERIALS
CO (CARBON MONOXIDE) BUBBLE BURSTING
FUME EXTRACTION SYSTEMELECTRIC ARC FURNACE & LADLE FURNACE
MECHANISM OF CO, NOX & VOC FORMATION
OXYGEN LANCING IN THE MELT PROCESS REACTSWITH THE CARBON OF THE CHARGE-MIX ANDPRODUCES HUGE AMOUNT OF CO&CO2
NOX IS FORMED WHEN NITORGEN PASSES THROUGH THE ARC OF THE ELECTRODES
VOC FORMS DURING INITIAL STAGE OF MELTING WHEN ORGANIC COMPOUNDS AVAILABLE IN CHARGE-MIX BURNS OFF
CO FORMATION
NOX FORMATION
VOC FORMATION
FUME EXTRACTION SYSTEMELECTRIC ARC FURNACE & LADLE FURNACE
EMISSIONS FROM ELECTRIC ARC FURNACE
PRIMARY EMISSIONS
EMISSIONS PRODUCED DURING MELTING& REFINING
OPERATIONS OF ELECTRIC ARC FURNACE
SECONDARY EMISSIONS
EMISSIONS PRODUCED DURING CHARGING, DESLAGGING & TAPPING
OPERATIONS OF ELECTRIC ARC FURNACE
FUME EXTRACTION SYSTEMELECTRIC ARC FURNACE & LADLE FURNACE
TYPICAL FLOW DIAGRAM OF FUME EXTRACTION SYSTEM FOR EAF , LRF & MHS
FUME EXTRACTION SYSTEMELECTRIC ARC FURNACE & LADLE FURNACE
FUME EXTRACTION SYSTEM : 2X100T + 4x100T LRF EAF AT MONNET ISPAT, RAIGARH
TECHNICAL PARAMETERSTECHNICAL PARAMETER : FUME EXTRACTION SYSTEM : 2x100 EAF + 4x100T LRF
Volume of Fumes 22,00,000 Am3/Hr at 1160C at each Bag-house Inlet Fixed Elbow Duct to Combustion Chamber Tubular; 3800 mm Dia. x 12.5m LCombustion Chamber Tubular; 5m H x 7m W x 12m LWater-cooled Duct up to Forced Draught cooler GCT/HTQ Tubular; 4000mm Dia. x 22m LAir cooled Duct [Secondary Canopy to Secondary Junction ] ID 4800mmAir cooled Duct [4x100T LF to Sec. Duct ] ID 900mm Air cooled Duct [Sec. Jn. to Bag-house ] ID 6100mm Air cooled Duct [Bag-house to ID Fan] ID 6400mm Temp. at inlet of Gas Cooling Tower 800 - 1000 0CTemp. at Outlet of GCT / HTQ 250 - 280 0CFume Temp. at ID Fan Inlet 116 0CCommon Stack (for 2x100T EAFs + 4x100T LRFs) Dia. - 10000mm (at Top) (for 2x22,00,000Am3/hr flow)
Gas Cooling Tower / High Temp Quenching Tower Mist Spray on hot fumes dynamically controlled through
PLC & Lances
Bag House
2 Nos. (Each of Capacity 22,00,000 Am3/hr ) Pulse Jet Cleaning – Off Line Non-Woven Type Polyester, PTFE Treated A to C Ratio (Net) : 1.27 m3/m2/minute Pr. drop across BH : 150 mm WC Clean Gas dust content : 40mgm/Nm3
Booster Fan for LRF Fumes
4 Nos. ( 1 No. for each 100T LRF) 1,00,000 Am3/hr. at 120 0C ; Static Pr. : 300mmWC 110 KW @ 990rpm; 415V
ID Fan for Bag House
5 Nos. (2 Nos. running simultaneously for each EAF (EAF-1 & EAF-2) +1 No. Common Stand-by)
11,00,000 Am3/hr. at 120 0C ;Static Pr. : 380mmWC; 1600 KW @ 990rpm; 6.6 KV; with VVVF Drive
FUME EXTRACTION SYSTEM : 2X100T + 4x100T LRF EAF AT MONNET ISPAT, RAIGARH
GENERAL LAYOUT
BIGGEST FUME EXTRACTION SYSTEM FOR ANY EAF IN INDIA
FUME EXTRACTION SYSTEM : 2X100T + 4x100T LRF EAF AT MONNET ISPAT, RAIGARH
FIXED TUBULAR DUCT FOR PRIMARY FUMES
PLAIN DUCTS FOR SECONDARY FUMES COLLECTED THROUGH ROOF CANOPY
COMMON STACK (10M DIA AT EXIT- BIGGEST
FOR ANY EAF IN INDIA)
FUME EXTRACTION SYSTEM : 2X100T + 4x100T LRF EAF AT MONNET ISPAT, RAIGARH
GAS COOLING TOWER (GCT) OR HIGH TEMPERATURE QUENCHING (HTQ) TOWER TO COOL PRIMARY FUMES FROM 1200 DEG. C TO 280 DEG. C
PLC CONTROLEED WATER PUMPING & COMPRESSED AIR
VALVE STAND
SPRAY LANCE INSTALLATION AT GCT
GAS COOLING TOWER (GCT)
FUME EXTRACTION SYSTEM : 1x 30T EAF + 1x30T LRF AT MUSCAT STEEL MELTING CO. LLC. , MUSCAT, OMAN
TECHNICAL PARAMETERSTECHNICAL PARAMETER : FUME EXTRACTION SYSTEM : 1x30T EAF + 1x30T LRF
Volume of Fumes 5,10,000 Am3/Hr at 1100C at each Bag-house Inlet Fixed Elbow Duct to Combustion Chamber Tubular; 1450 mm Dia. x 6.0m LCombustion Chamber Tubular; 2600 mm Dia. x 5.5m LWater-cooled Duct up to Forced Draught Cooler (FDC) Tubular; 1350mm Dia. x 45.0m LAir cooled Duct [Secondary Canopy to Mixing Chamber ] ID 2600mmAir cooled Duct [ LF to Sec. Duct ] ID 600mm Air cooled Duct [Mixing Chamber to Bag-house ] ID 2400mm Air cooled Duct [Bag-house to ID Fan] ID 2800mmTemp. at inlet of Forced Draft Cooler 500 - 550 0CTemp. at Outlet of FDC 220 - 250 0CFume Temp. at ID Fan Inlet 110 0CStack Dia. - 3400mm x 45.0m L
Forced Draft Cooler (Horizontal type) Cooling Air in tube and hot dirty fumes on tubes outer
surface (3x22KW Motors for Centrifugal Fan)
Bag House
1 No. (Capacity: 5,10,000 Am3/hr ) Pulse Jet Cleaning – Off Line Non-Woven Type Polyester, PTFE Treated A to C Ratio (Net) : 1.3 m3/m2/minute Pr. drop across BH : 150 mm WC Clean Gas dust content : 10mgm/Nm3
Booster Fan for LRF Fumes
1 No. 20,000 Am3/hr. at 140 0C ; Static Pr. : 300mmWC 30 KW @ 990rpm; 415V
ID Fan for Bag House
3 Nos. (2 Nos. running +1 No. Stand-by) 2,55,000 Am3/hr. at 120 0C ;Static Pr. : 600mmWC; 600 KW @ 990rpm; 415V; with Soft Starter
FUME EXHAUST EXTRACTION SYSTEM : 1x 30T EAF + 1x30T LRF AT MUSCAT STEEL MELTING CO. LLC. , MUSCAT, OMAN
FLOW SHEET
FUME EXTRACTION SYSTEM : 1x 30T EAF + 1x30T LRF AT MUSCAT STEEL MELTING CO. LLC. , MUSCAT, OMAN
GENERAL LAYOUT
FUME EXTRACTION SYSTEM : 1x30T EAF + 1x30T LRF AT MUSCAT STEEL MELTING CO. LLC. , MUSCAT, OMAN
FUME EXTRACTION SYSTEM : 1x 35T EAF + 1x35T LRF AT ARORA IRON STEEL , LUDHIANA
FES LAYOUTTECHNICAL PARAMETER : FUME EXTRACTION SYSTEM : 1x35T EAF + 1x35T LRF
Volume of Fumes 5,50,000 Am3/Hr at 1100C at each Bag-house Inlet Fixed Elbow Duct to Combustion Chamber Tubular; 1450 mm Dia. x 6.0m LCombustion Chamber Tubular; 2600 mm Dia. x 5.5m LWater-cooled Duct up to Forced Draught cooler Tubular; 1350mm Dia. x 45.0m LAir cooled Duct [Secondary Canopy to Mixing Chamber ] ID 2600mmAir cooled Duct [ LF to Sec. Duct ] ID 600mm Air cooled Duct [Mixing Chamber to Bag-house ] ID 2400mm Air cooled Duct [Bag-house to ID Fan] ID 2800mmTemp. at inlet of Forced Draft Cooler 500 - 550 0CTemp. at Outlet of FDC 220 - 250 0CFume Temp. at ID Fan Inlet 110 0CStack Dia. - 3400mm x 35.0m L
Forced Draft Cooler (Horizontal type) Cooling Air in tube and hot dirty fumes on tubes outer
surface (3x22KW Motors for Centrifugal Fan)
Bag House
1 No. (Capacity: 5,50,000 Am3/hr ) Pulse Jet Cleaning – Off Line Non-Woven Type Polyester, PTFE Treated A to C Ratio (Net) : 1.3 m3/m2/minute Pr. drop across BH : 150 mm WC Clean Gas dust content : 30mgm/Nm3
Booster Fan for LRF Fumes
1 No. 25,000 Am3/hr. at 140 0C ; Static Pr. : 300mmWC 37 KW @ 990rpm; 415V
ID Fan for Bag House
3 Nos. (2 Nos. running +1 No. Stand-by) 2,75,000 Am3/hr. at 120 0C ;Static Pr. : 550mmWC; 600 KW @ 990rpm; 415V; with Soft Starter
FUME EXTRACTION SYSTEM : 1x 35T EAF + 1x35T LRF AT ARORA IRON STEEL , LUDHIANA
FES LAYOUT
GAS CLEANING SYSTEM GAS CLEANING SYSTEM FOR 1x35T VACUUM DEGASSING UNIT
AT ARORA IRON STEEL , LUDHIANA
a) Air flow rate at Bag Filter inlet : 60,000 m3/hr at 0.67 mbarb) Type of Bag Filter : Circular Pulse Jet Cyclonicc) Air temperature at the Bag filter inlet : 60 deg C d) No. of bags : 112 nos. 150 mm dia x 4000
mm longe) Filter media selected : PES with P84 on topf) Total Filter Surface Area : 211m2
g) Pressure drop across bag filter : 0.12 mbarh) Dust loading at filter inlet : Please specify
i) Dust emission limit : 30 mg/Nm3 j) Dust composition : Fines of metal oxides k) Dust properties : Free flowing l) Bag Filter Design criteria : To suit surge pressure of
600 – 800 mbar.
FUME EXTRACTION SYSTEM : 1x 60T AOD AT SALEM STEEL PLANT
LANCE CARRIAGE SYSTEM
MOVABLE DUCT WITH CAR
WATER-COOLED DUCT
WATER-COOLED COMPONENTS FOR FUME EXTRACTION SYSTEM : FOR LD-2 AT TATA STEEL
PORTION OF WATER COOLED HOOD
SKIRT WITH WATER-COOLED RING
AT TATA STEEL PROWESS CAN OFFER FOLLOWING POLLUTION CONTROL SOLUTIONS
Pollution Control Measures at Mines
Dust Emission Control at Stock House
Dust Suppression & Extraction System at RMHS of various plants like Coke Oven Plant, Sinter Plant, Lime Plant etc.
Cast House Fume Extraction System using VVVF Drives for ID Fans
Modification & Up gradation in existing system to meet latest pollution norms.
Reverse Engineering and Spares Supply for existing systems.
THANK YOU !!!THANK YOU !!!