  • Procurement and Materials Management NPD & VA / VE

    Arvind Tiwari

    Guest Faculty

  • Overview

    Role and Importance of Procurement in New Product Development

    Role and Importance of Procurement in Value Analysis / Value Engineering

  • New Product Development

    Increasing demand for new products in every industry. E.g.

    Mobiles

    Consumer Durables

    Automobiles

    Apparel

    Food

    Expectation of more frequent introductions

  • New Product Development

    NPIP New Product Introduction Process

    Parent company / top management / market need drives it.

    NPD is always a cross functional exercise

    Companies which introduce new products frequently may have dedicated team for this.

    Others put together teams based on requirements

    NPD usually follows a Gate Process

  • New Product Development

    Usually coordinated by the Product / Program Manager within the organisation

    Concept developed by Marketing based on Market scenario

    Engineering

    Confirms technical feasibility

    Compiles basic specifications

    Purchase gets cost information based on specifications

  • New Product Development

    Manufacturing provides inputs on capacity , investments required and time frame

    Finance helps is verifying the profitability and other financial parameters

    Product Manager puts together the Product Plan based on above

    If feasible the plan is presented to the top management of the organisation for approval

  • New Product Development

    The plan may or may not be approved or approved with changes

    If not, the above process is repeated till approval obtained or project shelved

    If approved a budget and a time plan is specified for the project.

    CFT is formed to drive the project. Members are from all the above functions

  • New Product Development

    Engineering works on detailed specifications & drawings. Longer lead time item specifications are first

    Manufacturing works on plan for facility enhancement capability and capacity (where necessary)

    Trend is to procure more and produce less inhouse

    Only final assembly and some critical operations are planned inhouse

  • New Product Development In more and more cases full products are

    outsourced

    Procurement works with suppliers on development of parts as specifications are released

    Today suppliers work with engineering to work out detailed specifications

    This saves a lot of time & iterations

    So Procurement gets fully involved in the process from the earliest stage

  • New Product Development

    Procurement negotiates prices with suppliers

    Proto parts are received / manufactured without full tooling

    A ( or more) proto product is assembled by Engineering for trials and final approval

    Periodic review by the CFT to ensure project is on track

    At proto stage with actual cost estimation there are usually changes in features and specifications approved by Marketing

    A top level review at this stage give the final go ahead to the project and allocates the resources

  • New Product Development With final go ahead finances are committed internally

    & by suppliers on equipment , tooling , manpower etc.

    Regular reviews by CFT which works closely together

    Periodic high level reviews to monitor progress , resolve issues & take key decisions where required

    With fully tooled up parts available there are filed trials for specified periods under controlled conditions to rectify problems if any

    Process continues till launch of product

    CFT continues till after launch to ensure swift response to field problems if any.

  • Role Of Procurement in NPD

    Full products or most of the parts bought out

    To be competitive existing products of MNCs for launch in India need to start with very high level of localisation

    For locally developed products suppliers need to get involved at the design stage itself

    Opportunity for outsourcing as new product / part may be procured instead of manufacturing inhouse

  • Role Of Procurement in NPD

    Outsourced Full product Most of parts in product

    So procurement and suppliers become responsible for Design & features ( details ) Quality Cost Development time Quantity based on their Capacity Modifications or upgrades

  • Importance Of Procurement in NPD

    Procurement plays the pivotal role in NPD today

    An aggressive Procurement team with a good Supplier Base can drive the New Product Strategy of the company

    This substantially reduces company investment and lead time for new products

    It provides immense flexibility to face and lead the market

  • Value Analysis / Value Engineering

    Large part of product cost is material and conversion cost

    Most of this is outsourced

    The constant quest for increase in profitability has to focus on these costs

    Negotiation and Productivity gains have limitations and have reducing returns

    Another tool deployed today specially for longer life products is VA

  • VA / VE

    What is Value ?

    Value = Function / Cost

    VA & VE used together

    Generally VA is for existing products while VE is for new products

    VA for reducing or eliminating unnecessary cost

    VE for enhancing performance without increasing cost

  • VA / VE

    Cost Components

    Material

    Conversion

    Overheads

    Packaging

    Logistics

  • VA/VE

    Structured Process

    CFT follows the process to list out and validate possible VA/VE initiatives

    Ideas can be generated from inside or outside the organisation suppliers as most parts outsourced

    Change or modification in features requires Marketing approval

  • VA / VE

    Change is design or material requires both Marketing and Engineering approval

    Activity usually driven by Procurement as they have the responsibility of product cost

    Engineering is made co- owner of the process as their validation and approval is essential

  • Gather Information Stage Why does customer buy this product?

    What does this product do for customer?

    Primary vs. secondary functions

    Is the function or feature essential ?

    Does the customer perceive the same value for the feature as does the organisation ?

    Is the customer willing to pay extra for that ?

    Can the feature be combined with another without reducing functionality / value ?

  • Gather Information Stage

    Is cost of final product proportionate to its usefulness?

    Are there additional uses for this product?

    Does product need all its features or internal parts?

    Is there anything else available to our customers given intended use of product?

    Is the value attached to aesthetics appropriate?

  • Gather Information Stage

    Are product weight reductions possible?

    Are there equally effective but lower cost materials available?

    Can lower cost standard part replace customized part?

    Are we using proper tooling considering quantities required?

    Is there better production method to produce item or product?

  • Gather Information Stage

    Are design or quality specification too tight given customer requirements?

    Do material, labor, overhead, and profit equal products cost?

    If we are making item now, can we buy it for less? Or vice versa?

    Are packaging cost reductions possible?

  • Speculate Stage

    Wide-open, creative thinking

    Use brainstorming or other idea creating techniques

    Develop as many improvement ideas as possible withholding judgment

  • Analyze Stage

    Perform critical evaluation of ideas created in speculate stage

    Cost/benefit analyses

    Feasibility assessment

    Do ideas address original goals and objectives?

    General specific

  • Analyze Stage

    Can the same function be carried out by

    Simplifying the design

    Increasing manufacturability

    Reducing weight

    Changing material

    Standardization

    Reducing inherent wastage

    Simplifying packaging

  • Recommend and Execute Stage

    Determine priorities

    Make proposal to management for approval

    Requires:

    Motivation and creativity

    Good communication skills

    Analytical thinking and product knowledge

    Commitment and salesmanship

  • Recommend and Execute Stage

    Implement

    Timing

    Budget requirements

    Responsibilities

    Develop project plan

    Generate support from outside the team

  • Summarize and Follow Up Stage

    Ensure that implementation progress is being made

    VA team may follow up

    Separate implementation team may have this responsibility

  • Importance of Procurement in VA/VE

    Reduced times for new Product launches

    Focus on getting design first time right

    So higher factor of safety may be used

    Provides scope for value analysis

    Responsibility of material cost of existing products with Procurement

    So Procurement drives this exercise and the benefits directly accrue to company