    PLO minggu 3Shyntia Atica Putri, STP, M.Sc

    ALIRAN MATERIAL

    Penerimaan SusuSegar

    Raw Milk Tank (60 ton)PHE (Pasteurizer) 90 oC

    Pasteur Milk Tank (100ton)Evap Milk Tank (60 ton) Evaporator 3 efek

  • 7/31/2019 Plo 3-Aliran Bahan

    2/14

    20/09/2012

    Productivity is best served by an efficientflow of the elements that move throughthe facility.

    A primary objective in planning anefficient enterprise is to provide for element flows that will facilitate theefficient movement of the elementsthrough the activities

    SUCCESS OF ENTERPISEMINIMUM COST OF PRODUCTION

    EFFICIENT OPERATIONSEFFECTIVE ARRANGEMENT OF PHYSICAL FACILITIES

    PROPERLY PLANNED MATERIALS FLOW

    Important of the material flow pattern

  • 7/31/2019 Plo 3-Aliran Bahan

    3/14

    20/09/2012

    The material flow pattern becomes thefoundation for not only the basic designof the facility, but for the overallefficiency of the entire operation.The overall success of an enterprise or at least its profitability, is a directreflection of the effort that goes into theflow planning

    Advantages of planned materialflow:1. Increased efficiency of production,

    productivity2. Better utilization of floor space3. Simplified handling activities4. Better equipment utilization, less idle time5. Reduced in-process time6. Reduced in-process inventory7. More efficient utilization of work force8. Reduced product damage9. Minimal accident hazards

  • 7/31/2019 Plo 3-Aliran Bahan

    4/14

    20/09/2012

    10. Reduced walking distances11. Reduced traffic congestion in aisles12. Basis for an efficient layout13. Easier supervision14. Simplified production control15. Minimal back-tracking16. Smooth production flow17. Improved scheduling process

    18. Reduced crowded condition19. Better housekeeping20. Logical work sequece

    Factors for consideration in PMF:

    1. Material or product: characteristics,volume of production, number of different parts, number of operations,storage requirements

    2. Moves: frequency, speed, volume,scope, area, distances, sources,destinations, cross traffic, required flowbetween work areas, location of receiving and shipping

  • 7/31/2019 Plo 3-Aliran Bahan

    5/14

    20/09/2012

    3. Handling methods: unit handled, possibleuse of gravity, MH principles, desiredflexibility, equipment required, possiblealternatives, preliminary MH plans.

    4. Process: type, sequence of operations,possibility of performing during move,specific requirements of activities,

    product vs. process layout, quantity of equipment, space requirements, number of sub-assemblies

    5. Building: size, shape, type, number of floor, location of doors, location of columns, aisle width or location, ceilingheight, desired location of department

    6. Site: topography, transportation facilities,expansion possibilities7. Personnel: number, movement, safety,

    working conditions, supervisoryrequirements

  • 7/31/2019 Plo 3-Aliran Bahan

    6/14

    20/09/2012

    8. Miscellaneous: location of auxiliaryservices and activities, possible damageto materials, cost of implementation,production control, flexibility,expandability, levels of activity.

    General flow patterns

    Straight line

    Serpentine or zig-zag

  • 7/31/2019 Plo 3-Aliran Bahan

    7/14

    20/09/2012

    U-shaped

    Circular

    Odd-angle

  • 7/31/2019 Plo 3-Aliran Bahan

    8/14

  • 7/31/2019 Plo 3-Aliran Bahan

    9/14

    20/09/2012

    Assembly chart

    Produk 3

    Produk 1Material A

    Material B

    Produk 2Material

    D

  • 7/31/2019 Plo 3-Aliran Bahan

    10/14

    20/09/2012

  • 7/31/2019 Plo 3-Aliran Bahan

    11/14

    20/09/2012

  • 7/31/2019 Plo 3-Aliran Bahan

    12/14

    20/09/2012

    Flow diagram

    Flow diagram

    1

    2

    3 4

    5 6

    7

    2 5

  • 7/31/2019 Plo 3-Aliran Bahan

    13/14

    20/09/2012

  • 7/31/2019 Plo 3-Aliran Bahan

    14/14

    20/09/2012

    Quantitative techniques for analyzingMF:

    1. Linear programming technique2. Assignment problems3. Transportation programming problems4. Transshipment programming problems5. The traveling salesman problem6. Integer programming technique7. Dynamic programming technique8. Level curve technique

    9. Queuing theory technique10. Conveyor analysis11. Simulation