1 1 Tigor M H GKU ITB Apr 26,10 Platform Concept in Offshore Development Faculty of Civil and Environmental Engineering of Bandung Institute of Technology April 26, 2010 Tigor Martahan Hutabarat* Lead Structure Engineer *) Guest Lecture for Prof. Ricky Tawekal PhD Reference: 1. Steve Balint, Overview of Deepwater Structures Design, Shell Malaysia, Miri January 2007 2. Tigor M.H, Subsea Wellhead Foundation, Shell EPA Structure Forum, Miri Nov 2007 3. N.D.P Barltrop, Floating Structure, a guide for design and analysis 2 Tigor M H GKU ITB Apr 26,10 TOPICS Platform Concepts Field Development Fixed Offshore Platform Deep Water Design Compliant Tower TLP SPAR Semi submersible FPSO Riser and Pipeline Subsea Wellhead

Upload: lammien

Post on 24-Apr-2018

232 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

1

1Tigor M HGKU ITB Apr 26,10

Platform Concept in Offshore Development

Faculty of Civil and Environmental Engineering of Bandung Institute of Technology

April 26, 2010

Tigor Martahan Hutabarat*Lead Structure Engineer

*) Guest Lecture for Prof. Ricky Tawekal PhD Reference:1. Steve Balint, Overview of Deepwater Structures Design, Shell Malaysia, Miri January 20072. Tigor M.H, Subsea Wellhead Foundation, Shell EPA Structure Forum, Miri Nov 20073. N.D.P Barltrop, Floating Structure, a guide for design and analysis

2Tigor M HGKU ITB Apr 26,10

TOPICS• Platform Concepts• Field Development • Fixed Offshore Platform• Deep Water Design

Compliant Tower TLPSPARSemi submersibleFPSO

• Riser and Pipeline• Subsea Wellhead

Page 2: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

2

3Tigor M HGKU ITB Apr 26,10

Offshore Development Options

FixedPlatform

CompliantTower

TLP SPAR FPSO SubseaCompletion

[ ]{ } [ ]{ } [ ]{ } { }FxKxCxM =++ &&&

Dynamic Response of Offshore Platforms

4Tigor M HGKU ITB Apr 26,10

Development Strategy

Field development strategy• Create sub-surface( reservoir )

models• Select sub surface

development concepts • Select surface development

concepts• Perform safety evaluation• Perform economic evaluation

Page 3: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

3

5Tigor M HGKU ITB Apr 26,10

Appraise Select Define Execute Operate

Execute OperateFEL-0 Identify

FEL-1 Appraise

FEL-1Select

FEL-2 Optimize

FEL-3 Define

Phase-1Identify & Assess Opportunity

Phase-2Generate & Select Alternative(s)

Phase-3Develop Preferred Alternative

Phase-4Execute

Phase-5Operate & Evaluate

Appraisal Design Pre-Project Basic Engineering EPSC Comm & StartUp

Operations

FEED Konstruksi OPERASIPra‐PODSource Rudianto Rimbono, ITB 2010

Our Topics

6Tigor M HGKU ITB Apr 26,10

PERFORM

MEASURE

PLAN

IMPROVE

Leadership and CommitmentPolicy and Strategic ObjectivesOrganization and ResourcesRisk Evaluation and ManagementPlanningMonitoring and ImplementationAudit and Review

Safety Continual Improvement

Page 4: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

4

7Tigor M HGKU ITB Apr 26,10

Platform Concept Elements in the oil/gas production process include• Wellhead

Surface/ dry wellheadSubsea wellhead

• Production Manifold • Production Separator• Glycol process to dry gas, • Gas Compressor • Water injection pumps • Oil/gas export metering and • Main online pumps. • Production and Storage

8Tigor M HGKU ITB Apr 26,10

Oil and Gas Production Overview

Page 5: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

5

9Tigor M HGKU ITB Apr 26,10

Wellhead- Casing Design

Conductor

Surface Casing

Production Tubing

Production casing

10Tigor M HGKU ITB Apr 26,10

Block Development Options

18" x 100 km

ADGF PLEM

BELANAKFPSO/ FSO

KERISI

24" x 93 km

WHP-K

KERISIPLEM

NORTH BELUT

WHP-D

WHP-C

22" x 10 km

gas phase - 16" x 37 kmliquid phase - 12" x 37 km

gas phase - 16" x 23 kmliquid phase - 12" x 23 km

DUYONG

CPP

16" x 0.5 km

MALAYSIA

INDONESIA

HIUSUBSEA

CPP

Page 6: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

6

11Tigor M HGKU ITB Apr 26,10

Hub Option

101Ubah (Block G)

78Malikai (Block G)

179TOTAL

Oil (MMbbl)SFR (100%)

Discovered volumes (incr. to Sabah Gas)

Ubah

Malikai

N

Sabah GasFields

Malikai

NUbah

Slide: 1

Sabah Gas Pro ject – La rg e Sca le In frastructu re Sco pe

Kinabalu

Erb W est

Samarang

Sarawak – Sabah Gas Pipeline750 MMscf/ d, 530km

Onshore gas plant with condensate export and pipeline gas compression.

24” gas pipeline

Kebabangan Hub Drilling, Processing & Link platforms750 MMscf/ d, Condensate 20kb/ d WD 130m, 13 wells, Compression

Kumunsu East Subsea tieback, W D = 800 m, 5wells

Kumunsu East U & UCSubsea tieback, W D = 1100m, 6wells

Pipeline 34” Multiphase

34” gas pipelineKBB-SOGT 125km

2x18”

2x18”

MLNG

SOGT

SOGT Condensate slug catchers, gas condensate stabilisation

MLNG25 mtpa, 4 bcf/ d

2x18”

Sabah Gas Project Scope

Sabah Gas: Gas custody transfer poi nt

Sabah Gas: Condensate custody transfer point

KBB

Malikai ? ? ? ?

Ubah Crest

?

Malikai is marginal as a tie-back to KBBUbah is subeconomic (TLVC highlighted upside potential which is being tested by appraisal well in 2008)

Other prospects with Shell interests include Leban (Block G)

Northern Area Development plan has been compiled

Malikai

Ubah

Leban

Kebabangan HubGas 750 MMscfpd

Oil 80 kbopd

GJ

12Tigor M HGKU ITB Apr 26,10

Key Challenges and Needs• Reduced CAPEX for (small) tie-back fields

• Pipelay, subsea installation• Reduced well count (ERD, multi-zone smart wells,

open hole smart wells)• Subsea boosting• Longer, more challenging tie-backs (50+ km)

• Flow assurance management• Thin Bed Reservoirs

• Optimised information from appraisal• Improved static and dynamic modelling• Water injection / Gas injection in thin beds

• Stranded (or sub-economic) Gas• Reservoir imaging below gas chimneys

Page 7: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

7

13Tigor M HGKU ITB Apr 26,10

AGXAGXPlatformPlatform AnoaAnoa

PlatformPlatform

Existing Assets

West Lobe PlatformWest Lobe Platform

Anoa Natuna FPSOAnoa Natuna FPSO

14Tigor M HGKU ITB Apr 26,10

Project Management TeamProject Management Team

PMT Base location is in Jakarta

Project Control/ Administration

Manager

Construction Manager / Site

Fabrication Manager

Client

Deputy Contractor Representative

Contractor Representative/ Project Manager

Project HSE Manager

Project QA/QC Manager

Interfaces Manager

Hook-up & Pre-Com./Com. Mgr

Engineering Manager

Procurement Manager

Offshore Installation

- Overall Project Co-ordination

- Quality Assurance/Control- Certification/Classification

- Health- Safety- Environment

- Equipment & Material - Procurement for Topsides / Jackets

- Topsides Engineering- Jacket Engineering* Process Engineer*HSE Engineer*Structure Engineer*Piping/Mechanical Engineer *Electrical/Instrument Engineer

- Offshore Hook-up - Onshore Pre-commissioning- Offshore Pre-commissioning- Overall Commissioning Supervision- Offshore Commissioning - Pipeline Hydro Testing

- Contract - Project Administration- Project Finance- Planning / Progress Reporting- Cost Control/ Reporting

- Fabrication (Topsides / Jackets)- Load Out & Seafastening

- Internal Interfaces- External Interfaces

- Jackets- Topsides

Page 8: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

8

15Tigor M HGKU ITB Apr 26,10

Global Model Fixed offshore Platform

Vent Boom

Jacket/ Substructure

TOPSIDEMain/ Weather DeckMezzanine DeckLower DeckSump deck

Conductor

Riser

Boat landing

Pedestal Crane

Pile

Helideck

Photo

16Tigor M HGKU ITB Apr 26,10

Engineering Deliverables • SPECIFICATION/ PROCEDURE

Structure Design CriteriaStructure Design BriefWeighing Control Procedure

• CALCULATION NOTEIn Place AnalysisSeismic AnalysisFatigue AnalysisLoad Out AnalysisTransportation AnalysisJacket On Bottom Stability and Mudmat DesignPile Drivability Analysis Cathodic ProtectionWeight Control ReportMaterial take off- MTODeck Local check / Miscellaneous Calculation

• DRAWINGStandard DrawingMain and Secondary framingDetail drawing PDMS model

LEAD/ SENIOR STRUCTURE ENGINEER

SENIOR STRUCTURE ENG.STRUCTURE ENG.

SENIOR DESIGN STRUCTURE ENG.DESIGN STRUCTURE ENG.

RESPONSIBILITY

Page 9: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

9

17Tigor M HGKU ITB Apr 26,10

Deep Water Development Floating Platform Advantage • Well testing can be extended and overlap with production to know long term

production rate without committing the large risk of field specific platform Disadvantage • Move too much in larger waves so that drilling or production may suspended

during storms

18Tigor M HGKU ITB Apr 26,10

Organization Chart, illustration

Page 10: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

10

19Tigor M HGKU ITB Apr 26,10

Compliant Tower Main Feature

• Custom design for site specific application

• Single Drilling centre• Surface completed well • Integral drilling / work-over

facilities • No oil storage, pipeline, FSU or

direct tanker loading • Tension rigid riser for production• Flexible or steel catenary for

import/export • Insensitive to topside load • Long development schedule

20Tigor M HGKU ITB Apr 26,10

Skid-able Platform Rig

Tendons

Production Risers/Wells

Direct Tendon/Pile Connection

Deck & Production EquipmenHull

245’ x 245’ x 40’ high5 separate modules100 MBOPD 150 MMCFD≅ 15,000 tons

H&P Lease≅ 6,000 Tons

8 wells maximum 4 - 13 5/8” risers4 -10 3/4” risers 12 -32” diameter x 1.25”

2900’ long≅ 625 tons each

URSA- type connectors12 piles 82” diameter x 340’ long≅ 245 tons each

4 columns 66.5’ diameter, 166 ‘ high200’ centers≅ 54,700 ton displacement≅ 13,500 tons steel

TLP- Tension Leg Platform

Page 11: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

11

21Tigor M HGKU ITB Apr 26,10

HULL DESIGN - STRENGTH, GUIDELINES, STANDARDS

Mooring Connection

Deck Connection

Pontoon – Column (Node) Connection

Deck Lower Chord

Riser Connections

Appurtenances

Pontoons

Crane Pedestals

Upper Chords

22Tigor M HGKU ITB Apr 26,10

TLP Main Feature

Photo

• Custom design for site specific application

• Single Drilling center• Surface completed well• Integral drilling/ work-over

facilities• No Oil Storage, Pipeline, FSU

or direct tanker loading• Tension rigid riser for

production• Flexible or steel catenaries for

import/ export• Sensitive to topside load• Relatively long development

schedule

Page 12: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

12

23Tigor M HGKU ITB Apr 26,10

Tendon Tension Components

TLP offset:MEAN OFFSET

TENSION

TLP motions:DYNAMICTENSION

MAXIMUM TENSION= mean offset tension

+ dynamic tension+ allowances

PRETENSION= Static Top

Tension

MINIMUM TENSION= mean offset tension

- dynamic tension- allowances

Bottom Tension= top tension- self weight

- the avoidance of wave impacts on the under side of the deck,

- the wave and low frequency horizontal forces and motions,

- the wave and current induced vortices,- the avoidance of slack tethers,- the maximum tether

24Tigor M HGKU ITB Apr 26,10

Wave Action

Page 13: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

13

25Tigor M HGKU ITB Apr 26,10

HULL DESIGN - STRENGTH, GUIDELINES, STANDARDS

26Tigor M HGKU ITB Apr 26,10

HULL DESIGN –Finite Element Model

Page 14: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

14

27Tigor M HGKU ITB Apr 26,10

SPAR Main Feature

• Custom design for site specific application

• Well OptionSingle Drilling center, surface completed well, integral work-overRemote well completed subsea by specialist vessel

• Export optionIntegral oil storage, export via offshore loading unit No oil storage, pipeline or direct tanker loading

• Tension riser, flexibles or catenary steel riser Flexible or steel catenaries for import/ export

• Medium development schedule

28Tigor M HGKU ITB Apr 26,10

Spar

Photo

Page 15: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

15

29Tigor M HGKU ITB Apr 26,10

Semi Submersible • New Built or conversion • Well Option1 Remote subsea with work over by specialist vessel• Well Option 2 Wells below with Integral drilling/ work-over facilities• No storage, pipeline, FSU, direct tanker loading • Sensitive to topside load• Flexible riser, large number flexible • Short to medium development schedule

30Tigor M HGKU ITB Apr 26,10

Semi Submersible

Page 16: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

16

31Tigor M HGKU ITB Apr 26,10

FPSO- Floating Production Storage Offshore

MAIN FEATURE • New build or tanker conversion• Remote wells, normally completed

subsea• Drilling/ work-over required special

vessel• Integral Oil Storage and offloading

Flexible riser• Insensitive to topside load• Short development schedule

32Tigor M HGKU ITB Apr 26,10

FPSO- Turret

Page 17: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

17

33Tigor M HGKU ITB Apr 26,10

FPSO- Internal Turret

34Tigor M HGKU ITB Apr 26,10

STRUCTURE-DESIGN PROCESS

Page 18: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

18

35Tigor M HGKU ITB Apr 26,10

FPSO- Discipline Dream Ships

36Tigor M HGKU ITB Apr 26,10

Design of Floaters – Naval Architectural Principles

Archimedes Principal “The upward force on a

submerged body in a fluid is equal to the weight of the fluid displaced by the volume of the body”

Buoyancy Force = rho*g*V

Page 19: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

19

37Tigor M HGKU ITB Apr 26,10

6 Degrees of Freedom • Surge (along x)• Sway (along y)• Heave (along z)• Pitch (about x)• Roll (about y)• Yaw (about z)

Design of Floaters – Naval Architectural Principles

38Tigor M HGKU ITB Apr 26,10

Stability

Metacentric height (GM) is a characteristic that determines vessel stability.

B is the center of gravity of the volume of water that the hull has displaced.

G is the center of gravity of the vessel itself.

M is the intersection of the centerline and line of buoyancy

K is the keel point

Righting MomentK K

A floating or submerged body is

stable if GM>0

Design of Floaters – Naval Architectural Principles

Page 20: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

20

39Tigor M HGKU ITB Apr 26,10

Heeling and Righting Curves

Heel angle

Moment

Wind Heeling Moment (HM)

1st Intercept

Stable Equilibrium

2nd Intercept

Unstable Equilibrium

Down flooding Angle

Righting Moment (RM)

Range of Stability

A

BC

Design of Floaters – Naval Architectural Principles

40Tigor M HGKU ITB Apr 26,10

Bonga Model Test at Texas A&M

Page 21: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

21

41Tigor M HGKU ITB Apr 26,10

Functional Requirements for Floaters

Environment – wind, wave and currentsTopsides payload requirements, including drilling

Riser connectionsFoundation Integrity

Appurtenances (external & internal)

DEEP WATER DESIGN

42Tigor M HGKU ITB Apr 26,10

Design Spiral

Mooring and Foundation Design

ArrangementsHydrostatic

Compartments

Hydrodynamics (including Model Tests)

Structural Design

Configuration Proportions

Weight estimate

Functional Requirements

Contract Strategy

DEEP WATER DESIGN

Page 22: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

22

43Tigor M HGKU ITB Apr 26,10

Global Performance AnalysisENVIRONMENTWind, Waves & Current

“operating storms”“design storm”“survival event”

RISERSloads to TLPangles, strokes

LATERAL MOORING SYSTEMconfigurationtensions

TENDON TENSIONSpretensionmaximum (strength)minimum (unlatch)

UNDERDECK WAVECLEARANCE (“Air Gap”)

SUBSIDENCE

RELATED ISSUEStendon components / fatigue liferiser components / fatigue lifedeck loading and strengthhull loading and strength

DEEP WATER DESIGN

44Tigor M HGKU ITB Apr 26,10

Facilities Design Considerations

• Potential equipment height limitations• Limitation of gravity systems caused by inadequate deck height• Maximum use of lightweight equipment• Shared utilities with drilling and hill systems• Loads generated by horizontal, vertical, and rotational movements of TLP

during fabrication, tow out, mooring, and operations.• Damping liquid movement and stabilize process levels• Drain system influence on buoyancy and CG.• TLP hydrodynamics impact • Riser connection locations• Regulatory requirements• Cool flowing temperatures and possible hydrate formation due to extreme

water depth• Potential souring of reservoir due to water injection.• Large power consumption associated with gas compression, product pumping

and water injection.

Page 23: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

23

45Tigor M HGKU ITB Apr 26,10

Riser System • Production riser• Export and import riser

46Tigor M HGKU ITB Apr 26,10

Platform Export Riser and Pipeline

Page 24: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

24

47Tigor M HGKU ITB Apr 26,10

Riser Type •Rigid: Usually steel, nominally vertical, top tensioned pipes•Flexible: usually steel polymer composite pipes hung in a simple or S shape catenary•Metal catenary riser ; steel or possibly titanium pipe hung in catenary

48Tigor M HGKU ITB Apr 26,10

Deep Water Free Standing hybrid riser SLOR=Single Line Offset riser

COR=Concentric Offset Riser

Page 25: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

25

49Tigor M HGKU ITB Apr 26,10

Deep Water Free Standing hybrid riser

Seabed

50Tigor M HGKU ITB Apr 26,10

Malikai seabed features

Sub sea tie back to existing facilities • Custom design for site specific application

• Multiple drilling centre• Remote subsea well • Well work over by specialist vessel• Integral drilling/ work-over facilities• No Oil Storage, oil/gas exported from

host platform• Hydraulic performance of long

flowlines key design issue• Topside load capacity/ullage

determined by host platform• Short development schedule

Page 26: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

26

51Tigor M HGKU ITB Apr 26,10

Malikai seabed features

Sub sea tie back to existing facilities

Pipeline• 24” Dry gas pipeline• Concrete weight coated• 650 MMscf/day total capacity so ~150 MMscf/d

spare (if operating pressure increased to 204 bara)Flowlines • 2 x 16” CRA wet gas flowlines (design

rate of 550 MMscf/d per flowline)• Scope for 3rd wet gas flowline (2021?)• Scope for additional control umbilical to

Malampaya/Camago

Wells• 5 Development wells• 4 Additional development wells (2009/2010)• Horizontal Xmas tree • 7” production tubing, max rates 200 MMscf/d (erosional velocity constrained) • 30-70 degree deviation• Cased and perforated (crestal interval 120-200 ’ or m? along hole)

Platform• 500 MMscf/d at OGP outlet conditions (conditioned gas)• 32,800 bbl/d condensate• 4,500 bbl/d aqueous phase• 30 yr design life (20-22 yr GSPA's)• 2 x 100% gas export compression• Continuous MeOH injection, MeOH coalescers• Supports for Spare risers (3rd Flowline, Camago, SC-38) & J-tubes

(3 x SSIV, 3 x Control Umbilicals)• Future depletion compression • Future additional facilities for depletion compression (fuel, water,

air)• Future compression re-wheeling • Future methanol injection control skid• Designed for load and space for all above

Subsea Manifold• 10 slot, 2-header manifold (5 slots used)• 2 slots planned for Camago, 2 for Malampaya, 1

"spare"• Electro hydraulic subsea control• 2 x control umbilicals• Tie-in porch for 3rd flowline• Tie-in porch for 3rd umbilical

Onshore Gas Plant• 2x 450 MMscf/d trains• Support systems up to 500 MMscf/d• 1000 ppm H2S• 300 ppm Methanol• Potential component of condensate

offtake scheme to Tabangao• Onshore operation of offshore

platform from Q2 2004

52Tigor M HGKU ITB Apr 26,10

Malikai

Ubah

Slump scars

TaranganPinitukidan

Morongo

20 km

GumusutPoint source

Rendered 3D image of the NW Borneo Slope

Malikai seabed features

Seabed Relief

Page 27: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

27

53Tigor M HGKU ITB Apr 26,10

Subsea ArchitectureSubsea Package•Subsea wellhead, trees, PFB•Subsea Control Module•Electro-Control hydraulic Umbilical

BUTA=Bullnose umbilical termination assemblySUTU= Subsea umbilical termination unit TUTU= topside umbilical termination unit

54Tigor M HGKU ITB Apr 26,10

Subsea Umbilicals

Function WP (Psia)

2 HP Super Duplex tube 7,500

2 LP Super Duplex tube 3,000

1 MeOH Super Duplex tube 5,000

1 spare Super Duplex tube 7500

2 COP 10mm2 screen pair

All are pre filled with transaqua

Page 28: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

28

55Tigor M HGKU ITB Apr 26,10

Subsea Control Module

ProductionChoke Valve

ROVPanel

Lateral subsea Tree

56Tigor M HGKU ITB Apr 26,10

Subsea Installation

Page 29: Platform Concept in Offshore Development - … Concept in Offshore Development ... Slide: 1 Sabah Gas Project ... Direct Tendon/Pile Connection Deck & Production Equipmen Hull

29

57Tigor M HGKU ITB Apr 26,10

Question ?

Thanks