1
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 14
EQUIPMENT: DEFOAMER METERING PUMP (ZENITH) ............................................................................................................................................................... 14
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 15
EQUIPMENT: DEFOAMER METERING PUMP (ZENITH) ............................................................................................................................................................... 15
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 16
EQUIPMENT: DEFOAMER METERING PUMP (ZENITH) ............................................................................................................................................................... 16
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 17
EQUIPMENT: DEFOAMER METERING PUMP (ZENITH) ............................................................................................................................................................... 17
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 18
EQUIPMENT: VAPORIZER CONDENSATE TANK ......................................................................................................................................................................... 18
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 19
EQUIPMENT: VAPORIZER CONDENSATE TANK ......................................................................................................................................................................... 19
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 20
EQUIPMENT: RG PRESCRUBBER PUMP ........................................................................................................................................................................................ 20
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 21
EQUIPMENT: RG PRESCRUBBER PUMP ........................................................................................................................................................................................ 21
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 22
EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR ............................................................................................................................................ 22
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 23
EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR ............................................................................................................................................ 23
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 24
EQUIPMENT: COOLER FEED CONVEYOR..................................................................................................................................................................................... 24
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 25
EQUIPMENT: COOLER FEED CONVEYOR..................................................................................................................................................................................... 25
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 26
EQUIPMENT: R/G PRESCRUBBER PUMP ....................................................................................................................................................................................... 26
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 27
EQUIPMENT: R/G PRESCRUBBER PUMP ....................................................................................................................................................................................... 27
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 28
EQUIPMENT: DRYER DISCHARGE LUMP BREAKER ................................................................................................................................................................... 28
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 29
2
EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE ................................................................................................................................................................ 29
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 30
EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE ................................................................................................................................................................ 30
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 31
EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE ................................................................................................................................................................ 31
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 32
EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE ................................................................................................................................................................ 32
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 33
EQUIPMENT: EAST COOLER SCRUBBER FAN .............................................................................................................................................................................. 33
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 34
EQUIPMENT: EAST COOLER SCRUBBER FAN .............................................................................................................................................................................. 34
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 35
EQUIPMENT: VENTURI SCRUBBER PUMPS .................................................................................................................................................................................. 35
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 36
EQUIPMENT: VENTURI SCRUBBER PUMPS .................................................................................................................................................................................. 36
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 37
EQUIPMENT: VENTURI SCRUBBER PUMPS .................................................................................................................................................................................. 37
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 38
EQUIPMENT: VENTURI SCRUBBER PUMPS .................................................................................................................................................................................. 38
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 39
EQUIPMENT: VENTURI SCRUBBER PUMPS .................................................................................................................................................................................. 39
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 40
EQUIPMENT: "A" REACTOR SLURRY PUMP ................................................................................................................................................................................. 40
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 41
EQUIPMENT: "A" REACTOR SLURRY PUMP ................................................................................................................................................................................. 41
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 42
EQUIPMENT: "B" REACTOR SLURRY PUMP ................................................................................................................................................................................. 42
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 43
EQUIPMENT: "B" REACTOR SLURRY PUMP ................................................................................................................................................................................. 43
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 44
EQUIPMENT: "A" REACTOR SLURRY PUMP ................................................................................................................................................................................. 44
3
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 45
EQUIPMENT: "A" REACTOR SLURRY PUMP ................................................................................................................................................................................. 45
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 46
EQUIPMENT: "B" REACTOR SLURRY PUMP ................................................................................................................................................................................. 46
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 47
EQUIPMENT: "B" REACTOR SLURRY PUMP ................................................................................................................................................................................. 47
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 48
EQUIPMENT: TAIL GAS SCRUBBER PUMP .................................................................................................................................................................................... 48
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 49
EQUIPMENT: TAIL GAS SCRUBBER PUMP .................................................................................................................................................................................... 49
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 50
EQUIPMENT: TAIL GAS SCRUBBER PUMP .................................................................................................................................................................................... 50
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 51
EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 51
PLANT: DAP 2 EAST ......................................................................................................................................................................................................................... 52
EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 52
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 53
EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 53
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 54
EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 54
PLANT: DAP 2 WEST ........................................................................................................................................................................................................................ 55
EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 55
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 56
EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 56
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 57
EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 57
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 58
EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 58
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 60
EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 60
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 61
4
EQUIPMENT: SCRUBBER SEAL TANK AGITATOR ....................................................................................................................................................................... 61
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 62
EQUIPMENT: SCRUBBER SEAL TANK AGITATOR ....................................................................................................................................................................... 62
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 63
EQUIPMENT: SCRUBBER SEAL TANK AGITATOR ....................................................................................................................................................................... 63
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 64
EQUIPMENT: SCRUBBER SEAL TANK AGITATOR ....................................................................................................................................................................... 64
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 65
EQUIPMENT: COOLER SCRUBBER BOOSTER PUMP.................................................................................................................................................................... 65
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 66
EQUIPMENT: COOLER SCRUBBER BOOSTER PUMP.................................................................................................................................................................... 66
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 67
EQUIPMENT: COOLER SCRUBBER CIRCULATING PUMP ........................................................................................................................................................... 67
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 68
EQUIPMENT: COOLER SCRUBBER CIRCULATING PUMP ........................................................................................................................................................... 68
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 69
EQUIPMENT: BFL CONDENSATE TRANSFER PUMP .................................................................................................................................................................... 69
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 70
EQUIPMENT: BFL CONDENSATE TRANSFER PUMP .................................................................................................................................................................... 70
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 71
EQUIPMENT: COOLER VENT FAN ................................................................................................................................................................................................. 71
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 72
EQUIPMENT: COOLER VENT FAN ................................................................................................................................................................................................. 72
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 73
EQUIPMENT: DRYER BURNER FAN ............................................................................................................................................................................................... 73
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 74
EQUIPMENT: DRYER BURNER FAN ............................................................................................................................................................................................... 74
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 75
EQUIPMENT: DRYER BURNER FAN ............................................................................................................................................................................................... 75
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 76
EQUIPMENT: DRYER BURNER FAN ............................................................................................................................................................................................... 76
5
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 77
EQUIPMENT: DRYER TAILGAS SCRUBBER FAN.......................................................................................................................................................................... 77
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 78
EQUIPMENT: DRYER TAILGAS SCRUBBER FAN.......................................................................................................................................................................... 78
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 79
EQUIPMENT: DRYER TAILGAS SCRUBBER FAN.......................................................................................................................................................................... 79
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 80
EQUIPMENT: DRYER TAILGAS SCRUBBER FAN.......................................................................................................................................................................... 80
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 81
EQUIPMENT: RGV TAILGAS SCRUBBER FAN .............................................................................................................................................................................. 81
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 82
EQUIPMENT: RGV TAILGAS SCRUBBER FAN .............................................................................................................................................................................. 82
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 83
EQUIPMENT: RGV TAILGAS SCRUBBER FAN .............................................................................................................................................................................. 83
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 84
EQUIPMENT: RGV TAILGAS SCRUBBER FAN .............................................................................................................................................................................. 84
PLANT: DAP 2 EAST AND WEST ..................................................................................................................................................................................................... 85
EQUIPMENT: COOLER BAG COLLECTOR AIR HEATER FAN ...................................................................................................................................................... 85
PLANT: DAP 2 EAST AND WEST ..................................................................................................................................................................................................... 86
EQUIPMENT: COOLER BAG COLLECTOR AIR HEATER FAN ...................................................................................................................................................... 86
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 87
EQUIPMENT: PROCESS SCREENS .................................................................................................................................................................................................. 87
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 88
EQUIPMENT: PROCESS SCREENS .................................................................................................................................................................................................. 88
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 89
EQUIPMENT: PROCESS SCREENS .................................................................................................................................................................................................. 89
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 90
EQUIPMENT: DRYER COMBUSTION CHAMBER .......................................................................................................................................................................... 90
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 91
EQUIPMENT: DRYER COMBUSTION CHAMBER .......................................................................................................................................................................... 91
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 92
6
EQUIPMENT: DRYER COMBUSTION CHAMBER .......................................................................................................................................................................... 92
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 93
EQUIPMENT: ROTARY DRYER ....................................................................................................................................................................................................... 93
PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 94
EQUIPMENT: ROTARY DRYER ....................................................................................................................................................................................................... 94
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 95
EQUIPMENT: ROTARY DRYER ....................................................................................................................................................................................................... 95
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 96
EQUIPMENT: ROTARY DRYER ....................................................................................................................................................................................................... 96
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 97
EQUIPMENT: WEST ROTARY COOLER ......................................................................................................................................................................................... 97
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 98
EQUIPMENT: WEST ROTARY COOLER ......................................................................................................................................................................................... 98
PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 99
EQUIPMENT: WEST ROTARY COOLER ......................................................................................................................................................................................... 99
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 101
EQUIPMENT: WEST ROTARY COOLER ....................................................................................................................................................................................... 101
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 102
EQUIPMENT: WEST ROTARY COOLER ....................................................................................................................................................................................... 102
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 103
EQUIPMENT: DRYER AIR PREHEATER ....................................................................................................................................................................................... 103
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 104
EQUIPMENT: DRYER AIR PREHEATER ....................................................................................................................................................................................... 104
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 105
EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE ............................................................................................................................................. 105
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 106
EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE ............................................................................................................................................. 106
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 107
EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE ............................................................................................................................................. 107
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 108
EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE ............................................................................................................................................. 108
7
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 109
EQUIPMENT: DRYER CYCLONE DUST BIN VALVE ................................................................................................................................................................... 109
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 110
EQUIPMENT: DRYER CYCLONE DUST BIN VALVE ................................................................................................................................................................... 110
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 111
EQUIPMENT: DRYER CYCLONE DUST BIN VALVE ................................................................................................................................................................... 111
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 112
EQUIPMENT: DRYER CYCLONE DUST BIN VALVE ................................................................................................................................................................... 112
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 113
EQUIPMENT: COOLER BAG COLLECTOR SCREW CONVEYOR ............................................................................................................................................... 113
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 114
EQUIPMENT: COOLER BAG COLLECTOR SCREW CONVEYOR ............................................................................................................................................... 114
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 115
EQUIPMENT: COOLER BAG COLLECTOR SCREW CONVEYOR ............................................................................................................................................... 115
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 116
EQUIPMENT: PRODUCT CONVEYOR .......................................................................................................................................................................................... 116
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 117
EQUIPMENT: PRODUCT CONVEYOR .......................................................................................................................................................................................... 117
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 118
EQUIPMENT: RECYCLE FLIGHT CONVEYOR............................................................................................................................................................................. 118
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 119
EQUIPMENT: RECYCLE FLIGHT CONVEYOR............................................................................................................................................................................. 119
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 120
EQUIPMENT: RECYCLE FLIGHT CONVEYOR (DRAGFLIGHT) ................................................................................................................................................. 120
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 121
EQUIPMENT: RECYCLE FLIGHT CONVEYOR (DRAGFLIGHT) ................................................................................................................................................. 121
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 122
EQUIPMENT: DRYER DISCHARGE ELEVATOR .......................................................................................................................................................................... 122
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 123
EQUIPMENT: DRYER DISCHARGE ELEVATOR .......................................................................................................................................................................... 123
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 124
8
EQUIPMENT: DRYER DISCHARGE ELEVATOR .......................................................................................................................................................................... 124
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 125
EQUIPMENT: DRYER DISCHARGE ELEVATOR .......................................................................................................................................................................... 125
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 126
EQUIPMENT: RECYCLE ELEVATOR ............................................................................................................................................................................................ 126
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 127
EQUIPMENT: RECYCLE ELEVATOR ............................................................................................................................................................................................ 127
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 128
EQUIPMENT: RECYCLE ELEVATOR ............................................................................................................................................................................................ 128
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 129
EQUIPMENT: RECYCLE ELEVATOR ............................................................................................................................................................................................ 129
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 130
EQUIPMENT: RECYCLE FEEDER (JEFFERY) .............................................................................................................................................................................. 130
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 131
EQUIPMENT: RECYCLE FEEDER (JEFFERY) .............................................................................................................................................................................. 131
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 132
EQUIPMENT: RECYCLE FEEDER (JEFFERY) .............................................................................................................................................................................. 132
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 133
EQUIPMENT: RECYCLE FEEDER (JEFFERY) .............................................................................................................................................................................. 133
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 134
EQUIPMENT: PROCESS SCREEN PRIMARY SPLITTER, & DISCH DIVERTER .......................................................................................................................... 134
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 135
EQUIPMENT: PROCESS SCREEN PRIMARY SPLITTER, & DISC DIVERTER ............................................................................................................................. 135
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 136
EQUIPMENT: PROCESS SCREEN PRIMARY SPLITTER, & DISCH DIVERTER .......................................................................................................................... 136
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 137
EQUIPMENT: RGV TAILGAS SCRUBBER ..................................................................................................................................................................................... 137
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 138
EQUIPMENT: RGV TAILGAS SCRUBBER ..................................................................................................................................................................................... 138
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 139
EQUIPMENT: R/G PRESCRUBBER PUMP TANK .......................................................................................................................................................................... 139
9
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 140
EQUIPMENT: R/G PRESCRUBBER PUMP TANK .......................................................................................................................................................................... 140
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 141
EQUIPMENT: R/G PRESCRUBBER ................................................................................................................................................................................................ 141
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 142
EQUIPMENT: R/G PRESCRUBBER ................................................................................................................................................................................................ 142
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 143
EQUIPMENT: R/G PRESCRUBBER PUMP TANK .......................................................................................................................................................................... 143
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 144
EQUIPMENT: R/G PRESCRUBBER PUMP TANK .......................................................................................................................................................................... 144
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 145
EQUIPMENT: DRYER TAILGAS SCRUBBER ................................................................................................................................................................................ 145
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 146
EQUIPMENT: DRYER TAILGAS SCRUBBER ................................................................................................................................................................................ 146
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 147
EQUIPMENT: RGV TAILGAS SCRUBBER ..................................................................................................................................................................................... 147
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 148
EQUIPMENT: RGV TAILGAS SCRUBBER ..................................................................................................................................................................................... 148
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 149
EQUIPMENT: DRYER VENTURI SCRUBBER ............................................................................................................................................................................... 149
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 150
EQUIPMENT: DRYER VENTURI SCRUBBER ............................................................................................................................................................................... 150
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 151
EQUIPMENT: RGV VENTURI SCRUBBER .................................................................................................................................................................................... 151
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 152
EQUIPMENT: RGV VENTURI ........................................................................................................................................................................................................ 152
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 153
EQUIPMENT: DRYER CYCLONE .................................................................................................................................................................................................. 153
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 154
EQUIPMENT: DRYER CYCLONE .................................................................................................................................................................................................. 154
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 155
10
EQUIPMENT: R/G PRESCRUBBER ................................................................................................................................................................................................ 155
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 156
EQUIPMENT: R/G PRESCRUBBER ................................................................................................................................................................................................ 156
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 157
EQUIPMENT: AMMONIA CHILLER .............................................................................................................................................................................................. 157
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 158
EQUIPMENT: AMMONIA CHILLER .............................................................................................................................................................................................. 158
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 159
EQUIPMENT: AMMONIA CHILLER .............................................................................................................................................................................................. 159
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 160
EQUIPMENT: AMMONIA CHILLER .............................................................................................................................................................................................. 160
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 161
EQUIPMENT: AMMONIA CHILLER .............................................................................................................................................................................................. 161
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 162
EQUIPMENT: AMMONIA CHILLER .............................................................................................................................................................................................. 162
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 163
EQUIPMENT: BFL AMMONIA VAPORIZER ................................................................................................................................................................................. 163
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 164
EQUIPMENT: BFL AMMONIA VAPORIZER ................................................................................................................................................................................. 164
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 165
EQUIPMENT: BFL AMMONIA VAPORIZER ................................................................................................................................................................................. 165
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 166
EQUIPMENT: BFL AMMONIA VAPORIZER ................................................................................................................................................................................. 166
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 167
EQUIPMENT: AIR CHILLER ........................................................................................................................................................................................................... 167
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 168
EQUIPMENT: AIR CHILLER ........................................................................................................................................................................................................... 168
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 169
EQUIPMENT: AIR CHILLER ........................................................................................................................................................................................................... 169
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 170
EQUIPMENT: AIR CHILLER ........................................................................................................................................................................................................... 170
11
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 171
EQUIPMENT: AIR CHILLER ........................................................................................................................................................................................................... 171
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 172
EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 172
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 173
EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 173
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 174
EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 174
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 175
EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 175
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 176
EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 176
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 177
EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 177
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 178
EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 178
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 179
EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 179
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 180
EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 180
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 181
EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 181
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 182
EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 182
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 183
EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 183
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 184
EQUIPMENT: DEFOAMER SHIFT TANK ...................................................................................................................................................................................... 184
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 185
EQUIPMENT: DEFOAMER SHIFT TANK ...................................................................................................................................................................................... 185
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 186
12
EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR .................................................................................................................................................................. 186
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 187
EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR .................................................................................................................................................................. 187
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 188
EQUIPMENT: DEFOAMER SHIFT TANK ...................................................................................................................................................................................... 188
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 189
EQUIPMENT: DEFOAMER SHIFT TANK ...................................................................................................................................................................................... 189
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 190
EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR .................................................................................................................................................................. 190
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 191
EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR .................................................................................................................................................................. 191
PLANT: DAP2 WEST ........................................................................................................................................................................................................................ 192
EQUIPMENT: COOLER FEED ROTARY FEEDER ......................................................................................................................................................................... 192
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 193
EQUIPMENT: COOLER FEED ROTARY FEEDER ......................................................................................................................................................................... 193
PLANT: DAP2 WEST ........................................................................................................................................................................................................................ 194
EQUIPMENT: COOLER FEED ROTARY FEEDER ......................................................................................................................................................................... 194
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 195
EQUIPMENT: COOLER FEED ROTARY FEEDER ......................................................................................................................................................................... 195
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 196
EQUIPMENT: DRYER CYCLONE DUST BIN VIBRATOR ............................................................................................................................................................. 196
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 197
EQUIPMENT: DRYER CYCLONE DUST BIN VIBRATOR ............................................................................................................................................................. 197
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 198
EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR .......................................................................................................................................... 198
PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 199
EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR .......................................................................................................................................... 199
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 200
EQUIPMENT: NR. 2 ROTARY VALVE COOLER DUST COLLECTOR .......................................................................................................................................... 200
SPECIFIC LOCKOUT PROCEDURE PAGE 2 ................................................................................................................................................................................ 201
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 201
13
EQUIPMENT: NO. 2 ROTARY VALVE COOLER DUST COLLECTOR ......................................................................................................................................... 201
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 202
EQUIPMENT: NR. 2 ROTARY VALVE COOLER DUST COLLECTOR .......................................................................................................................................... 202
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 203
EQUIPMENT: NO. 2 ROTARY VALVE COOLER DUST COLLECTOR ......................................................................................................................................... 203
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 204
EQUIPMENT: 200 AMP, TEMPORARY WELDING MACHINE, & TWO WELDING OUTLETS ................................................................................................... 204
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 205
EQUIPMENT: 200 AMP TEMPORARY WELDING MACHINE, & TWO WELDING OUTLETS .................................................................................................... 205
PLANT: AMMONIA STORAGE ..................................................................................................................................................................................................... 206
EQUIPMENT: NO.1 AMMONIA STORAGE TANK (501A) ............................................................................................................................................................. 206
PLANT: AMMONIA STORAGE ..................................................................................................................................................................................................... 208
EQUIPMENT: NO.2 AMMONIA STORAGE TANK (501B) ............................................................................................................................................................. 208
PLANT: AMMONIA STORAGE ..................................................................................................................................................................................................... 210
EQUIPMENT: NO.3 AMMONIA STORAGE TANK (501C) ............................................................................................................................................................. 210
PLANT: AMMONIA STORAGE ..................................................................................................................................................................................................... 212
EQUIPMENT: NO.4 AMMONIA STORAGE TANK (501D) ............................................................................................................................................................. 212
PLANT: AMMONIA STORAGE ..................................................................................................................................................................................................... 214
EQUIPMENT: NO.1 AMMONIA COMPRESSOR (502A) ................................................................................................................................................................ 214
PLANT: AMMONIA STORAGE ..................................................................................................................................................................................................... 216
EQUIPMENT: NO.2 AMMONIA COMPRESSOR (502B) ................................................................................................................................................................ 216
PLANT: AMMONIA STORAGE ..................................................................................................................................................................................................... 218
EQUIPMENT: AMMONIA VAPORIZER (506) ............................................................................................................................................................................... 218
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 220
EQUIPMENT: LIGHTING, RECEPTACLES, AND SMALL EQUIPMENT PANELS ....................................................................................................................... 220
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 221
EQUIPMENT: 200 AMP TEMPORARY WELDING MACHINE & TWO WELDING OUTLETS ..................................................................................................... 221
PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 222
EQUIPMENT: 200 AMP TEMPORARY WELDING MACHINE & TWO WELDING OUTLETS ..................................................................................................... 222
14
SPECIFIC LOCKOUT PROCEDURE PAGE 14
PLANT: DAP 2 EAST
EQUIPMENT: DEFOAMER METERING PUMP (ZENITH)
EQUIPMENT NUMBER:
DWG. NO.: 44-F-0027
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Stop the Defoamer Metering Pump by
pushing the stop button on the panel board.
2. Open the disconnect (#28) for the
pump, in the 200 amp panel, located behind
the East Control Panel.
3. Lock/Tag the disconnect for the
agitator with a production lock/tag.
4. Close and chain lock the 2" (420)
suction valve with a production lock and
close and tag l" discharge valve (421).
5. Employees required to work on these
pumps will place their personal locks on the
equipment designated.
1. Electrical/120 volts.
2. Electrical/120 volts.
4. Defoamer (oil)/140 F.
1. Unexpected energization.
Accidental start-up or release of stored
energy.
2.
4.Thermal burns.
2/6/5
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
15
SPECIFIC LOCKOUT PROCEDURE
PLANT: DAP 2 EAST
EQUIPMENT: DEFOAMER METERING PUMP (ZENITH)
EQUIPMENT NUMBER:
DWG. NO.: 44-F-0027
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. After work completion, inspect
equipment and reverse procedure to put
equipment back in service.
6. Electrical/480 volts. 6. Cubical explosion. Unexpected
energization.
C:\DAP2E\0000EZEN 2/6/5
16
SPECIFIC LOCKOUT PROCEDURE PAGE 16
PLANT: DAP 2 WEST
EQUIPMENT: DEFOAMER METERING PUMP (ZENITH)
EQUIPMENT NUMBER:
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Stop the Defoamer Metering Pump by
pushing the stop button on the panel board.
2. Open the disconnect (#28) for the pump,
in the 200 amp panel, located behind the
West Control Panel.
3. Lock/Tag the disconnect for the agitator
with a production lock/tag.
4. Close and chain lock the 2" (410) or 3/8"
suction valve and 1" discharge valve with a
production valve.
1. Electrical/120 volts.
2. Electrical/120 volts.
4. Defoamer (oil)/140 F.
1. Unexpected energization.
Accidental start-up or release of stored
energy.
2.
4.Thermal burns.
1/2
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
17
SPECIFIC LOCKOUT PROCEDURE PAGE 17
PLANT: DAP 2 WEST
EQUIPMENT: DEFOAMER METERING PUMP (ZENITH)
EQUIPMENT NUMBER:
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Employees required to work on these
pumps will place their personal locks on the
equipment designated by the originator of the
Safe Work Permit.
6. Issue Safe Work Permit when required
and locate near equipment.
7. After work completion , inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
8. Reverse procedure to put equipment back
in service.
7. Electrical/480 volts.
7. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W1\0000W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
18
SPECIFIC LOCKOUT PROCEDURE PAGE 18
PLANT: DAP 2 WEST
EQUIPMENT: VAPORIZER CONDENSATE TANK
EQUIPMENT NUMBER: 0047-01-059
DWG. NO.: 44-F-0031
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Follow Specific Lockout Procedures to
take the BFL Ammonia Vaporiozer out of
Service.
2. Open 2" drain valve (105) and drain tank
to RGV Tailgas Scrubber.
3. Close and tag 4" overflow valve (106).
4. Employees required to work in this tank
will place their personal locks on the
equipment designated.
5. Reverse procedure to put equipment back
in service.
2. Aqua Ammonia/10%+
2. Health
2/10/95
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
19
SPECIFIC LOCKOUT PROCEDURE PAGE 19
PLANT: DAP 2 WEST
EQUIPMENT: VAPORIZER CONDENSATE TANK
EQUIPMENT NUMBER: 0047-01-059
DWG. NO.: 44-F-0031
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. After Work Completion inspect
equipment and remove locks.
7. Reverse procedure to put equipment back
in service.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
20
SPECIFIC LOCKOUT PROCEDURE PAGE 20
PLANT: DAP 2 WEST
EQUIPMENT: RG PRESCRUBBER PUMP
EQUIPMENT NUMBER: 44-22-079AW & 078BW
DWG. NO.: 44-F-0031
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the "A" or
"B" R/G Prescrubber Pump by pushing the
stop button on the panel board.
2. Open and lock the disconnect for the "A"
or "B" pump in the West Motor Control
Center (West MCC) with a production lock.
3. Close and lock designated pumps 12"
suction valve. Valve numbers are "A"-121,
and "B"-119.
4. Close and lock designated pumps 12"
discharge valve. Valve numbers are "A"-
124, and "B"-123.
1. Electrical/480 volts.
2. Electrical/480 volts.
3. Phosphoric acid/180 F.
4. Phosphoric acid/180 F.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
3. Thermal and chemical burns.
4. Thermal and chemical burns.
1/26/95
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
21
SPECIFIC LOCKOUT PROCEDURE PAGE 21
PLANT: DAP 2 WEST
EQUIPMENT: RG PRESCRUBBER PUMP
EQUIPMENT NUMBER: 44-22-079AW & 078BW
DWG. NO.: 44-F-0031
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Open and tag designated pumps 2" drain
valve. Valve numbers are "A"-122, and "B"-
120.
6. Employees required to work on these
pumps will place their personal locks on the
equipment designated.
7. Reverse procedure to put equipment back
in service.
5. Phosphoric acid/180 F.
7. Electrical/480 volts.
5. Thermal and chemical burns.
7. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\079A078B
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
22
SPECIFIC LOCKOUT PROCEDURE PAGE 22
PLANT: DAP 2 EAST
EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR
EQUIPMENT NUMBER: 0047-47-87
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Nr. 1
Rotary Valve Cooler Dust Collector and
Screw Conveyor (4305-06-2155A) by
pushing the stop button on the panel board.
2. Open the disconnect for the rotary valve
and screw conveyor in the East Motor
Control Center (East MCC).
3. Lock the disconnect for the rotary valve
and screw conveyor with a production lock.
4. Employees required to work on this valve
will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
23
SPECIFIC LOCKOUT PROCEDURE PAGE 23
PLANT: DAP 2 EAST
EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR
EQUIPMENT NUMBER: 0047-47-87
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work Permit when required
and locate near equipment.
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\087E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
24
SPECIFIC LOCKOUT PROCEDURE PAGE 24
PLANT: DAP 2 EAST
EQUIPMENT: COOLER FEED CONVEYOR
EQUIPMENT NUMBER: 44-53-094
DWG. NO.: 44-F-0026
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Cooler
Feed Conveyor and Cooler Feed Rotary Feeder
(44-47-658) by pushing the stop button on the
panel board.
2. Open the disconnect for the conveyor and
rotary feeder in the East Motor Control Center
(East MCC).
3. Lock the disconnect for the conveyor and
rotary feeder with a production lock.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
25
SPECIFIC LOCKOUT PROCEDURE PAGE 25
PLANT: DAP 2 EAST
EQUIPMENT: COOLER FEED CONVEYOR
EQUIPMENT NUMBER: 44-53-094
DWG. NO.: 44-F-0026
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
4. Employees required to work on this
conveyor will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
5. Issue Safe Work Permit when required and
locate near equipment.
6. After work completion, inspect equipment
and remove locks. Close the disconnect for all
equipment to be energized.
7. Reverse procedure to put equipment back in
service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\094E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
26
SPECIFIC LOCKOUT PROCEDURE PAGE 26
PLANT: DAP 2 EAST
EQUIPMENT: R/G PRESCRUBBER PUMP
EQUIPMENT NUMBER: 4305-06-1001A&BE
DWG. NO.: 44-F-0021
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the "A" or "B"
R/G Prescrubber Pump by pushing the stop
button on the panel board.
2. Open the disconnect for the "A" or "B"
pump in the East Motor Control Center (East
MCC).
3. Lock the disconnect for the "A" or "B" pump
with a production lock.
4. Close and chain lock designated pump 12"
suction valve. Valve numbers are "A"- 148,
and "B"-146
5. Close and chain lock designated pump 12"
discharge valve. Valve numbers are "A"-51,
and "B"-150.
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Phosphoric acid/180 F.
5. Phosphoric acid/180 F.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4. Thermal and chemical burns.
5. Thermal and chemical burns.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
27
SPECIFIC LOCKOUT PROCEDURE PAGE 27
PLANT: DAP 2 EAST
EQUIPMENT: R/G PRESCRUBBER PUMP
EQUIPMENT NUMBER: 44-22-1001A&BE
DWG. NO.: 44-F-0021
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Open and tag designated pumps 2" drain
valve. Valve numbers are "A"-149, and "B"-
147.
7. Employees required to work on these pumps
will place their personal locks on the equipment
designated by the originator of the Safe Work
Permit.
8. Issue Safe Work Permit when required and
locate near equipment.
9. After work completion, inspect equipment
and remove locks. Close the disconnect for all
equipment to be energized.
10. Reverse procedure to put equipment back in
service.
9. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\1001A&BE
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
28
SPECIFIC LOCKOUT PROCEDURE PAGE 28
PLANT: DAP 2 WEST
EQUIPMENT: DRYER DISCHARGE LUMP BREAKER
EQUIPMENT NUMBER: 4305-06-1061W
DWG. NO.:44-F-0033
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Dryer
Discharge Lump Breaker by pushing the stop
button on the panel board.
2. Open and lock the disconnect for the Dryer
Discharge Lump Breaker in the West Motor
Control Center (West MCC) with a
production lock.
3. When entry to the Dryer Discharge Lump
Breaker is required, the Rotary Dryer
(1561W) must be locked-out.
4. Employees working on this lump breaker
will place their personal lock on the
equipment designated.
5. Reverse procedure to put
equipment back in service.
1. Electrical/480 volts.
2. Electrical/480 volts.
5. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
5. Cubical explosion. Unexpected
energization.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
29
SPECIFIC LOCKOUT PROCEDURE PAGE 29
PLANT: DAP 2 EAST
EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE
EQUIPMENT NUMBER: 4305-06-1062E A1 THRU D1 AND 1062E A2 THRU D2
DWG. NO.: 44-F-0025
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Unit that will be taken out of service will
have the product diverted.
2. The Chief Operator will stop the inner
and outer cage mill by pushing the stop
button on the panel board.
3. Lock the disconnect for the inner and
outer cage mill in the East Motor Control
Center (East MCC).
4. Lock the disconnect for the inner and
outer cage mill with a production lock.
5. Employees required to work on the cage
mills will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
2. Electrical/480 volts.
3. Electrical/480 volts.
2. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
3. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
30
SPECIFIC LOCKOUT PROCEDURE PAGE 30
PLANT: DAP 2 EAST
EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE
EQUIPMENT NUMBER: 4305-06-1062EA1 THRU D1 AND 1062W A2 THRU D2
DWG. NO.: 44-F-0025
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Issue Safe Work Permit when required
and locate near equipment.
7. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
8. Reverse procedure to put equipment back
in service.
7. Electrical/480 volts.
7. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\1062EA-D
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
31
SPECIFIC LOCKOUT PROCEDURE PAGE 31
PLANT: DAP 2 WEST
EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE
EQUIPMENT NUMBER: 4305-06-1062W A1 THRU D1 AND 1062W A2 THRU D2
DWG. NO.: 44-F-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the inner
and outer cage mill by pushing the stop
button on the panel board.
2. Open and lock the disconnect for the
inner and outer cage mill in the West Motor
Control Center (West MCC) with a
production lock.
3. Employees required to work on the cage
mills will place their personal lock on the
equipment designated.
4. Reverse procedure to put equipment back
in service.
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4. Cubical explosion. Unexpected
energization.
1/27/95 C:\WP51\DAP2W\1062WA-D
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
32
SPECIFIC LOCKOUT PROCEDURE PAGE 32
PLANT: DAP 2 WEST
EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE
EQUIPMENT NUMBER: 4305-06-1062W A1 THRU D1 AND 1062W A2 THRU D2
DWG. NO.: 44-F-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Issue Safe Work Permit when required
and locate near equipment.
7. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
8. Reverse procedure to put equipment back
in service.
7. Electrical/480 volts.
7. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\1062WA-D
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
33
SPECIFIC LOCKOUT PROCEDURE PAGE 33
PLANT: DAP 2 EAST
EQUIPMENT: EAST COOLER SCRUBBER FAN
EQUIPMENT NUMBER: 44-44-114
DWG. NO.: 44-F-0026
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the East
Cooler Scrubber Fan by pushing the stop
button on the panel board.
2. Open the disconnect for the scrubber fan
in the East Motor Control Center (East
MCC).
3. Lock the disconnect for the scrubber fan
with a production lock.
4. Employees required to work on the
condensate pump, will place their personal
locks on the equipment designated by the
originator of the Safe Work Permit.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
1/17/5
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
34
SPECIFIC LOCKOUT PROCEDURE PAGE 34
PLANT: DAP 2 EAST
EQUIPMENT: EAST COOLER SCRUBBER FAN
EQUIPMENT NUMBER: 344-44-114
DWG. NO.: 44-F-0026
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work Permit when required
and locate near equipment.
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\114E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
35
SPECIFIC LOCKOUT PROCEDURE PAGE 35
PLANT: DAP 2 EAST
EQUIPMENT: VENTURI SCRUBBER PUMPS
EQUIPMENT NUMBER: 4305-06-1163E "A" & "B"
DWG. NO.: 44-F-0027
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the "A" or "B"
Venturi Scrubber Pump by pushing the stop
button on the panel board.
2. Open the disconnect for the "A" or "B"
pump in the East Motor Control Center (East
MCC).
3. Lock the disconnect for the "A" or "B" pump
with a production lock.
4. Close and chain lock the 12" suction valve
(381) or (380) and 12" discharge valve (387) or
(386).
5. Open and tag 2" drain valve (383) or (382).
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Phosphoric acid/180 F.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4. Thermal and chemical burns.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
36
SPECIFIC LOCKOUT PROCEDURE PAGE 36
PLANT: DAP 2 EAST
EQUIPMENT: VENTURI SCRUBBER PUMPS
EQUIPMENT NUMBER: 4305-06-1163E "A" & "B"
DWG. NO.: 44-F-0027
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6.Employees required to work on these pumps
will place their personal locks on the equipment
designated by the originator of the Safe Work
Permit.
7. When one of the pumps is operating, the
discharge valve (387) or (386) must be blinded
or employees "fully suited out".
8. Issue Safe Work Permit when
required and locate near
equipment.
9. After work completion, inspect equipment
and remove locks. Close the disconnect for all
equipment to be energized.
10. Reverse procedure to put equipment back in
service.
9. Electrical/480 volts.
9. Cubical explosion. Unexpected
energization.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
37
C:\WP51\DAP2W\1163EA&B
SPECIFIC LOCKOUT PROCEDURE PAGE 37
PLANT: DAP 2 WEST
EQUIPMENT: VENTURI SCRUBBER PUMPS
EQUIPMENT NUMBER: 4305-06-1163 W "A" & "B"
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the "A" or
"B" Venturi Scrubber Pump by pushing the
stop button on the panel board.
2. Open and lock the disconnect for the "A"
or "B" pump in the West Motor Control
Center (West MCC) with a production lock.
3. Close and lock designated pumps 12"
suction valve. Valve numbers are "A"-(391),
and "B"-(390).
4. Close and lock designated pumps 12"
discharge valve. Valve numbers are "A"-
(395), and "B"-(394).
1. Electrical/480 volts.
2. Electrical/480 volts.
3. Phosphoric acid/180 F.
4. Phosphoric acid/180 F.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
3. Thermal and chemical burns.
4. Thermal and chemical burns.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
38
SPECIFIC LOCKOUT PROCEDURE PAGE 38
PLANT: DAP 2 WEST
EQUIPMENT: VENTURI SCRUBBER PUMPS
EQUIPMENT NUMBER: 4305-06-1163W "A" & "B"
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Open and tag designated pumps 2" drain
valve. Valve Numbers are "A"-(393), and
"B"- (392).
6. Employees required to work on these
pumps will place their personal locks on the
equipment designated.
7. Reverse procedure to put equipment back
in service.
6. Phosphoric acid/180 F.
7. Electrical/480 volts.
6. Thermal and chemical burns.
7. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\1163WA&B
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
39
SPECIFIC LOCKOUT PROCEDURE PAGE 3
PLANT: DAP 2 WEST
EQUIPMENT: VENTURI SCRUBBER PUMPS
EQUIPMENT NUMBER: 4305-06-1163W "A" & "B"
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
8. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
9. Reverse procedure to put equipment back
in service.
8. Electrical/480 volts. 8. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\1163WA&B
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
40
SPECIFIC LOCKOUT PROCEDURE PAGE 40
PLANT: DAP 2 EAST
EQUIPMENT: "A" REACTOR SLURRY PUMP
EQUIPMENT NUMBER: 4305-06-1165E "A"
DWG. NO.: 44-F-0020
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the "A"
reactor slurry pump by pushing the stop
button on the panel board.
2. Open the disconnect for the slurry pump in
the East Motor Control Center (East MCC).
3. Lock the disconnect for the slurry pump
with a production lock.
4. When operating "B" slurry pump with "A"
or "B" line, close and chain lock with a
production lock, 6" suction valve (072), and
4" discharge valve (075).
5. Open and tag 3" drain valve (073). Close
and tag 3" pond water valve in 6" suction.
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Diammonium phosphates/180 F.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release or stored energy.
2. Cubical explosion.
4. Thermal and chemical burns.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
41
SPECIFIC LOCKOUT PROCEDURE PAGE 41
PLANT: DAP 2 EAST
EQUIPMENT: "A" REACTOR SLURRY PUMP
EQUIPMENT NUMBER: 4305-06-1165E "A"
DWG. NO.: 44-F-0020
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Employees required to work on the slurry
pump, will place their personal locks on the
equipment designated by the originator of the
Safe Work Permit.
7. Issue Safe Work Permit when required
and locate near equipment.
8. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
9. Reverse procedure to put equipment back
in service.
8. Electrical/480 volts.
8. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\1165E"A"
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
42
SPECIFIC LOCKOUT PROCEDURE PAGE 42
PLANT: DAP 2 EAST
EQUIPMENT: "B" REACTOR SLURRY PUMP
EQUIPMENT NUMBER: 4305-06-1165E "B"
DWG. NO.: 44-F-0020
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the "B"
reactor slurry pump by pushing the stop
button on the panel board.
2. Open the disconnect for the slurry pump in
the East Motor Control Center (East MCC).
3. Lock the disconnect for the slurry pump
with a production lock.
4. When operating "A" slurry pump with "A"
or "B" line, close and chain lock with a
production lock, 6" suction valve (070), and
4" discharge valve (074).
5. Open and tag 3" drain valve (071). Close
and tag 3" pond water valve in 6" suction.
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Diammonium phosphates/180 F.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release or stored energy.
2. Cubical explosion.
4. Thermal and chemical burns.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
43
SPECIFIC LOCKOUT PROCEDURE PAGE 43
PLANT: DAP 2 EAST
EQUIPMENT: "B" REACTOR SLURRY PUMP
EQUIPMENT NUMBER: 4305-06-1165E "B"
DWG. NO.: 44-F-0020
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Employees required to work on the slurry
pump, will place their personal locks on the
equipment designated by the originator of the
Safe Work Permit.
7. Issue Safe Work Permit when required
and locate near equipment.
8. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
9. Reverse procedure to put equipment back
in service.
8. Electrical/480 volts.
8. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\1165E"B"
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
44
SPECIFIC LOCKOUT PROCEDURE PAGE 44
PLANT: DAP 2 WEST
EQUIPMENT: "A" REACTOR SLURRY PUMP
EQUIPMENT NUMBER: 4305-06-1165W "A"
DWG. NO.: 44-F-0030
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the "A"
reactor slurry pump by pushing the stop
button on the panel board.
2. Open and lock the disconnect for the
slurry pump in the West Motor Control
Center (West MCC) with a production lock.
3. When operating "B" slurry pump with
"A" or "B" line, close and lock with a
production lock, 6" suction valve (066), and
4" discharge valve (070).
4. Open and tag 3" drain valve (068). Close
and tag 3" pond water valve in 6" suction.
1. Electrical/480 volts.
2. Electrical/480 volts.
3. Diammonium phosphates/180 F.
4. Diammonium phosphates/180 F.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release or stored energy.
2. Cubical explosion.
3. Thermal and chemical burns.
4. Thermal and chemical burns.
2/1/95
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
45
SPECIFIC LOCKOUT PROCEDURE PAGE 45
PLANT: DAP 2 WEST
EQUIPMENT: "A" REACTOR SLURRY PUMP
EQUIPMENT NUMBER: 4305-06-1165W "A"
DWG. NO.: 44-F-0030
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Employees required to work on the slurry
pump, will place their personal locks on the
equipment designated.
6. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\1165WA
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
46
SPECIFIC LOCKOUT PROCEDURE PAGE 46
PLANT: DAP 2 WEST
EQUIPMENT: "B" REACTOR SLURRY PUMP
EQUIPMENT NUMBER: 4305-06-1165W "B"
DWG. NO.: 44-F-0030
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the "B"
reactor slurry pump by pushing the stop
button on the panel board.
2. Open and lock the disconnect for the
slurry pump in the West Motor Control
Center (West MCC) with a production lock.
3. When operating "A" slurry pump with
"A" or "B" line, close and lock with a
production lock, 6" suction valve (067), and
4" discharge valve (071).
4. Open and tag 3" drain valve (069). Close
and tag 3" pond water valve in 6" suction.
1. Electrical/480 volts.
2. Electrical/480 volts.
3. Diammonium phosphates/180 F.
4. Diammonium phosphates/180 F.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release or stored energy.
2. Cubical explosion.
3. Thermal and chemical burns.
4. Thermal and chemical burns.
2/1/95
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
47
SPECIFIC LOCKOUT PROCEDURE PAGE 47
PLANT: DAP 2 WEST
EQUIPMENT: "B" REACTOR SLURRY PUMP
EQUIPMENT NUMBER: 43405-06-1165W "B"
DWG. NO.: 44-F-0030
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Employees required to work on the slurry
pump, will place their personal locks on the
equipment designated.
6. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\1165WB
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
48
SPECIFIC LOCKOUT PROCEDURE PAGE 48
PLANT: DAP 2 EAST
EQUIPMENT: TAIL GAS SCRUBBER PUMP
EQUIPMENT NUMBER: 4305-06-1169, "A", "B", & "C"
DWG. NO.: 44-F-0028
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Tail Gas
Scrubber Pump by pushing the stop button
on the panel board.
2. Open the disconnect for the Tail Gas
Scrubber Pump in the East Motor Control
Center (East MCC).
3. Lock the disconnect for the Tail Gas
Scrubber Pump with a production lock.
4. If motor is to be repaired or replaced,
only lock out disconnect and close and tag
suction valve.
5. Close and chain lock designated pumps
18" suction valve. Valve numbers are "A"-
533, "B"-531, and "C"- 529.
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Mechanical/
5. Phosphoric acid/180 F.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
49
SPECIFIC LOCKOUT PROCEDURE PAGE 49
PLANT: DAP 2 EAST
EQUIPMENT: TAIL GAS SCRUBBER PUMP
EQUIPMENT NUMBER: 4305-06-1169, "A", "B", & "C"
DWG. NO.: 44-F-0028
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Close and chain lock designated pumps
14" discharge valve. Valve numbers are
"A"-526, "B"-524, and "C"-522.
7. Open, drain, and tag designated pumps 1"
drain valve. Valve numbers are, "A"-532,
"B"-530, and "C"-528.
8. Close and tag designated pumps 1" seal
water valve. Valve numbers are "A"-563,
"B"-560, and "C"-557.
9. Employees required to work on this pump
will place their personal lock on the
equipment designated by the originator of
the Safe Work Permit.
6. Phosphoric acid/180 F.
7. Phosphoric acid/180 F.
6. Thermal burns.
7. Thermal burns.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
50
SPECIFIC LOCKOUT PROCEDURE PAGE 50
PLANT: DAP 2 EAST
EQUIPMENT: TAIL GAS SCRUBBER PUMP
EQUIPMENT NUMBER: 4305-06-1169W, "A", "B", & "C"
DWG. NO.: 44-F-0028
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
10. Issue Safe Work Permit when required
and locate near equipment.
11. After work completion inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
12. Reverse procedure to put equipment
back in service.
11. Electrical/480 volts.
11. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\1169ABCE
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
51
SPECIFIC LOCKOUT PROCEDURE PAGE 51
PLANT: DAP 2 EAST
EQUIPMENT: GRANULATOR
EQUIPMENT NUMBER: 4305-06-1264E
DWG. NO.: 44-F-0020, 0021, & 0024
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Granulator,
Recycle Elevator, and "A" & "B" Slurry Pumps
by pushing the stop button on the panel board.
2. When entry to the granulator is not required,
only electrically lockout the granulator.
3. Open the disconnect for the Granulator,
Recycle Elevator, and "A" & "B" Slurry Pumps
in the East Motor Control Center (East MCC).
4. Lock the disconnect for the Granulator,
Recycle Elevator, "A" & "B" Slurry Pumps in
the OFF position with a production lock.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or release
of stored energy.
2. Cubical explosion.
12/26
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
52
SPECIFIC LOCKOUT PROCEDURE PAGE 52
PLANT: DAP 2 EAST
EQUIPMENT: GRANULATOR
EQUIPMENT NUMBER: 4305-06-1264E
DWG. NO.: 44-F-0020, 0021, & 0024
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Close and chain lock with a production lock
the two 6" valves (121, 028, & 032) and tag
open 3/4" bleed valve (031) on the ammonia
vapor line to the granulator.
6. Close and chain lock with a production lock
the two 3" valves (017 & 020) and tag open
3/4" vent valve (019) on the liquid ammonia
line to the granulator.
7. Close and chain lock with a production lock
the two 3" slurry discharge valves (085 & 086)
to the granulator, and the 1 1/2", 170 PSIG
steam valve (089).
5. Ammonia liquid and vapors./250 PSIG.
6. Ammonia liquid and vapors./250 PSIG.
7. Diammonium phosphates/235 F. 170 PSIG
steam.
5. Health. Fire or explosion.
6. Health. Fire or explosion.
7. Chemical and thermal burns.
Unexpected energization. Accidental start-
up or release of stored energy.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
53
SPECIFIC LOCKOUT PROCEDURE PAGE 53
PLANT: DAP 2 EAST
EQUIPMENT: GRANULATOR
EQUIPMENT NUMBER: 4305-06-1264E
DWG. NO.: 44-F-0020, 0021, & 0024
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
8. Close and chain lock with a production lock
the 1 1/2" (302) valve on the 170 PSIG steam
line to the granulator.
9. When seed material has been removed to
make repairs, granulator will be mechanically
secured per applicable J. S. A., to prevent
movement.
10. Issue Safe Work and Confined Space
Permit when required and locate near entrance
to granulator.
11. After work completion, inspect equipment
and remove locks. Close the disconnect for all
equipment to be energized.
12. Reverse procedure to put equipment back
in service.
8. 170 PSIG steam/360 F.
9. Mechanical/tons.
11. Electrical/480 volts.
8. Thermal burns.
9. Release of stored energy.
11. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\1264E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
54
SPECIFIC LOCKOUT PROCEDURE PAGE 54
PLANT: DAP 2 WEST
EQUIPMENT: GRANULATOR
EQUIPMENT NUMBER: 4305-06-1264W
DWG. NO.: 44-F-0030 & 0035
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Specific Lockout Procedure steps 2 thru 8
are applicable when entry to the granulator is
required. When entry is not required only
electrically lockout the granulator.
2. The Chief Operator will stop the
Granulator, Recycle Elevator, and "A" &
"B" Slurry Pumps by pushing the stop button
on the panel board.
3. Open and lock the disconnect for the
Granulator, Recycle Elevator, and "A" &
"B" Slurry Pumps in the West Motor Control
Center (West MCC) with a production lock.
2. Electrical/480 volts.
3. Electrical/480 volts.
2. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
3. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
55
SPECIFIC LOCKOUT PROCEDURE PAGE 55
PLANT: DAP 2 WEST
EQUIPMENT: GRANULATOR
EQUIPMENT NUMBER: 4305-06-1264W
DWG. NO.: 44-F-0030 & 0035
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
4. Close and lock with a production lock the
two 6" valves (027 & 029) and tag open 3/4"
bleed valve (028) on the ammonia vapor line
to the granulator.
5. Close and lock with a production lock the
two 3" valves (013 & 015) and tag open 3/4"
bleed valve (014 vent) on the liquid ammonia
line to the granulator.
6. Close and lock with a production lock the
two 3" slurry discharge valves (082 & 083)
to the granulator, and the 1 1/2", 170 PSIG
steam valve (086).
4. Ammonia liquid and vapors./250 PSIG.
5. Ammonia liquid and vapors./250 PSIG.
6. Diammonium phosphates\235 F.
170PSIG steam/360 F.
4. Health. Fire or explosion.
5. Health. Fire or explosion.
6. Chemical and thermal burns.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
56
SPECIFIC LOCKOUT PROCEDURE PAGE 56
PLANT: DAP 2 WEST
EQUIPMENT: GRANULATOR
EQUIPMENT NUMBER: 4305-06-1264W
DWG. NO.: 44-F-0030 & 0035
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
7. Close and lock with a production lock the
1 1/2" (302) valve on the 170 PSIG steam
line to the granulator.
8. When seed material has been removed to
make repairs, granulator will be
mechanically secured per applicable J. S. A.,
to prevent movement.
9. Reverse procedure to put equipment back
in service.
7. 170 PSIG steam/360 F.
8. Mechanical/tons.
9. Electrical/480 volts.
7. Thermal burns.
8. Release of stored energy.
9. Cubical explosion. Unexpected
energization.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
57
SPECIFIC LOCKOUT PROCEDURE PAGE 57
PLANT: DAP 2 WEST
EQUIPMENT: GRANULATOR
EQUIPMENT NUMBER: 4305-06-1264W
DWG. NO.: 44-F-0030 & 0035
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
11. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
12. Reverse procedure to put equipment
back in service.
11. Electrical/480 volts. 11. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\1264W 2/2/95
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
58
SPECIFIC LOCKOUT PROCEDURE PAGE 1
PLANT: DAP 2 WEST
EQUIPMENT: GRANULATOR
EQUIPMENT NUMBER: 4305-06-1264W
DWG. NO.: 44-F-0030 & 0035
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Stop the Granulator (1264W) by
pushing the stop button on the panel board.
2. Open and lock the disconnect for the
Granulator (1264W) in the West Motor
Control Center (West MCC) with a
Production Lock.
If entry is necessary, Steps 3 through 8 apply
3. Stop the Recycle Elevator (2167W),
and
"A" and "B" Slurry Pumps (1165W A & B)
by pushing the stop button on the panel
board.
4. Open and lock the disconnect for the
Recycle Elevator (2167W) and "A" and "B"
Slurry Pumps (1165W A & B) in the West
1. Electrical/480 volts.
2. Electrical/480 volts.
3. Electrical/480 volts.
4. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or release of stored energy.
2. Cubical explosion.
3. Cubical explosion. Unexpected
energization. Accidental start-up or release of stored energy.
4. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
59
Motor Control Center (West MCC) with a
Production Lock.
60
SPECIFIC LOCKOUT PROCEDURE PAGE 2
PLANT: DAP 2 WEST
EQUIPMENT: GRANULATOR
EQUIPMENT NUMBER: 4305-06-1264W
DWG. NO.: 44-F-0030 & 0035
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
4. Close and lock with a Production Lock
the two 6" block valves [027 & 029] on the
ammonia vapor line to the granulator and tag
open the 3/4" bleed valve [028].
5. Close and lock with a Production Lock
the two 3" valves [013 & 015] on the liquid
ammonia line to the granulator and tag open
the 3/4" bleed valve [014].
6. Close and lock with a Production Lock
the two 3" slurry discharge valves [082 &
083] to the granulator, and the 1 1/2" Medium
Pressure Steam block valve [086].
7. Close and lock with a Production Lock
the 1 1/2" [302] valve on the Medium
Pressure Steam line to the granulator.
8. Employees working on this equipment
will place their personal lock on the
equipment designated.
9. After work completion, inspect the
equipment and reverse procedure to put
equipment back into service.
4. Ammonia liquid and vapors./250 PSIG.
5. Ammonia liquid and vapors./250 PSIG.
6. Diammonium phosphates/235 F.
170PSIG steam/360 F.
7. 170 PSIG Steam/ 360 F.
9. Electrical/480 volts.
4. Health. Fire or explosion.
5. Health. Fire or explosion.
6. Chemical and thermal burns.
7. Thermal burns.
9. Cubical explosion. Unexpected
energization.
61
C:\WP51\DAP2W\1264W 2/14/95
SPECIFIC LOCKOUT PROCEDURE PAGE 61
PLANT: DAP 2 EAST
EQUIPMENT: SCRUBBER SEAL TANK AGITATOR
EQUIPMENT NUMBER: 4305-06-1265E
DWG. NO.: 44-F-0027
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the
Scrubber Seal Tank Agitator by pushing the
stop button on the panel board.
2. Open the disconnect in the East Motor
Control Center (East MCC).
3. Lock the disconnect for the agitator with
a production lock.
4. Employees required to work on the
agitator will place their personal locks on the
equipment designated by the originator or the
Safe Work Permit.
5. Follow the Specific Lockout Procedure
for the Scrubber Seal Tank (535E) when
entry is required.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
62
SPECIFIC LOCKOUT PROCEDURE PAGE 62
PLANT: DAP 2 EAST
EQUIPMENT: SCRUBBER SEAL TANK AGITATOR
EQUIPMENT NUMBER: 4305-06-1265E
DWG. NO.: 44-F-0027
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Issue Safe Work Permit when required
and locate near equipment.
7. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment.
8. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\1265E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
63
SPECIFIC LOCKOUT PROCEDURE PAGE 63
PLANT: DAP 2 WEST
EQUIPMENT: SCRUBBER SEAL TANK AGITATOR
EQUIPMENT NUMBER: 4305-06-1265W
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the
Scrubber Seal Tank Agitator by pushing the
stop button on the panel board.
2. Open and lock the disconnect in the West
Motor Control Center (West MCC) with a
production lock.
3. Employees required to work on the
agitator will place their personal locks on the
equipment designated.
4. Follow the Specific Lockout Procedure
for the Scrubber Seal Tank (555W) when
entry is required.
5. Reverse procedure to put equipment back
in service.
1. Electrical/480 volts.
2. Electrical/480 volts.
5. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
5. Cubical explosion. Unexpected
energization.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
64
SPECIFIC LOCKOUT PROCEDURE PAGE 64
PLANT: DAP 2 WEST
EQUIPMENT: SCRUBBER SEAL TANK AGITATOR
EQUIPMENT NUMBER: 4305-06-1265W
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Issue Safe Work Permit when required
and locate near equipment.
7. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment.
8. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\1265W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
65
SPECIFIC LOCKOUT PROCEDURE PAGE 65
PLANT: DAP 2 EAST
EQUIPMENT: COOLER SCRUBBER BOOSTER PUMP
EQUIPMENT NUMBER: 44-28-127 "A" & "B"
DWG. NO.: 44-F-0026
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Cooler
Scrubber Booster Pump by pushing the stop
button on the panel board.
2. Open the disconnect for the Cooler Scrubber
Booster Pump in the East Motor Control Center
(East MCC).
3. Lock the disconnect for the Cooler Scrubber
Booster Pump with a production lock.
4. If motor is to be repaired or replaced, only
lock out disconnect and close and tag suction
valve.
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4. Cubical explosion.
1/17/5
PECIFIC LOCKOUT PROCEDURE PAGE 65
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
66
PLANT: DAP 2 EAST
EQUIPMENT: COOLER SCRUBBER BOOSTER PUMP
EQUIPMENT NUMBER: 44-28-127 "A" & "B"
DWG. NO.: 44-F-0028
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Close and chain lock designated pumps 4"
suction and 4" discharge valve. Open and tag 1
1/2" drain valve.
6. Employees required to work on this pump
will place their personal lock on the equipment
designated by the originator of the Safe Work
Permit.
7. Issue Safe Work Permit when required and
locate near equipment.
8. After work completion inspect equipment
and remove locks. Close the disconnect for all
equipment to be energized.
9. Reverse procedure to put equipment back in
service.
8. Electrical/480 volts.
8. Cubical explosion.
C:\WP51\DAP2E\127A&BE
67
SPECIFIC LOCKOUT PROCEDURE PAGE 67
PLANT: DAP 2 EAST
EQUIPMENT: COOLER SCRUBBER CIRCULATING PUMP
EQUIPMENT NUMBER: 44-28-128 "A" & "B"
DWG. NO.: 44-F-0026
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Cooler
Scrubber Circulating Pump by pushing the
stop button on the panel board.
2. Open the disconnect for the Cooler
Scrubber Circulating Pump in the East Motor
Control Center (East MCC).
3. Lock the disconnect for the Cooler
Scrubber Circulating Pump with a
production lock.
4. If motor is to be repaired or replaced,
only lock out disconnect and close and tag
suction valve.
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4. Cubical explosion.
1/17/5
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
68
SPECIFIC LOCKOUT PROCEDURE PAGE 68
PLANT: DAP 2 EAST
EQUIPMENT: COOLER SCRUBBER CIRCULATING PUMP
EQUIPMENT NUMBER: 44-28-128 "A" & "B"
DWG. NO.: 44-F-0026
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Close and chain lock designated pumps 10"
suction and 8" discharge valve. Open and tag
1 1/2" drain valve.
6. Employees required to work on this pump
will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
7. Issue Safe Work Permit when required and
locate near equipment.
8. After work completion inspect equipment
and remove locks. Close the disconnect for
all equipment to be energized.
9. Reverse procedure to put equipment back
in service.
8. Electrical/480 volts.
8. Cubical explosion.
C:\WP51\DAP2E\128A&B
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
69
SPECIFIC LOCKOUT PROCEDURE PAGE 69
PLANT: DAP 2 EAST
EQUIPMENT: BFL CONDENSATE TRANSFER PUMP
EQUIPMENT NUMBER: 44-28-131
DWG. NO.: 44-F-00
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the BFL
Condensate Transfer Pump by pushing the
stop button on the panel board.
2. Open the disconnect for the condensate
pump in the East Motor Control Center (East
MCC).
3. Lock the disconnect for the condensate
pump with a production lock.
4. Close and tag suction and discharge
valves. Open and tag 3/4" drain valve.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
1/17/5
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
70
SPECIFIC LOCKOUT PROCEDURE PAGE 70
PLANT: DAP 2 EAST
EQUIPMENT: BFL CONDENSATE TRANSFER PUMP
EQUIPMENT NUMBER: 44-28-131
DWG. NO.: 44-F-00
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Employees required to work on the
condensate pump, will place their personal
locks on the equipment designated by the
originator of the Safe Work Permit.
6. Issue Safe Work Permit when required
and locate near equipment.
7. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
8. Reverse procedure to put equipment back
in service.
7. Electrical/480 volts.
7. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\131E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
71
SPECIFIC LOCKOUT PROCEDURE PAGE 71
PLANT: DAP 2 WEST
EQUIPMENT: COOLER VENT FAN
EQUIPMENT NUMBER: 4305-06-1361W
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Cooler
Vent Fan by pushing the stop button on the
panel board.
2. Open the disconnect for the fan in the
East Motor Control Center (East MCC).
3. Lock the disconnect for the fan with a
production lock.
4. Employees required to work on this fan
will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
5. Issue Safe Work Permit when required
and locate near equipment.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
72
SPECIFIC LOCKOUT PROCEDURE PAGE 72
PLANT: DAP 2 WEST
EQUIPMENT: COOLER VENT FAN
EQUIPMENT NUMBER: 4305-06-1361W
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\1361W
SPECIFIC LOCKOUT PROCEDURE PAGE 72
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
73
PLANT: DAP 2 EAST
EQUIPMENT: DRYER BURNER FAN
EQUIPMENT NUMBER: 4305-06-1362E
DWG. NO.: 44-F-0023
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will have his
designee stop the Dryer Burner Fan by
pushing the start/stop button in the field.
2. Open the disconnect for the Dryer Burner
Fan in the East motor Control Center
(East MCC).
3. Lock the disconnect for the fan with a
production lock.
4. Employees required to work on this fan
will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
5. Issue Safe Work Permit when required
and locate near equipment.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
12/26
74
SPECIFIC LOCKOUT PROCEDURE PAGE 74
PLANT: DAP 2 EAST
EQUIPMENT: DRYER BURNER FAN
EQUIPMENT NUMBER: 4305-06-1362E
DWG. NO.: 44-F-0023
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts. 6. Cubical explosion . Unexpected
energization.
C:\WP51\DAP2E\1362E
SPECIFIC LOCKOUT PROCEDURE PAGE 74
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
75
PLANT: DAP 2 WEST
EQUIPMENT: DRYER BURNER FAN
EQUIPMENT NUMBER: 4305-06-1362W
DWG. NO.: 44-F-0034
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will have his
designee stop the Dryer Burner Fan by
pushing the start/stop button in the field.
2. Open and lock the disconnect for the
Dryer Burner Fan in the West Motor Control
Center (West MCC) with a production lock.
3. Employees required to work on this fan
will place their personal lock on the
equipment designated.
4. Reverse procedure to put equipment back
in service.
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4. Cubical explosion. Unexpected
energization.
2/1/95
SPECIFIC LOCKOUT PROCEDURE PAGE 75
76
PLANT: DAP 2 WEST
EQUIPMENT: DRYER BURNER FAN
EQUIPMENT NUMBER: 4305-06-1362W
DWG. NO.: 44-F-0034
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts. 6. Cubical explosion . Unexpected
energization.
C:\WP51\DAP2W\1362W
SPECIFIC LOCKOUT PROCEDURE PAGE 76
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
77
PLANT: DAP 2 EAST
EQUIPMENT: DRYER TAILGAS SCRUBBER FAN
EQUIPMENT NUMBER: 4305-06-1364E
DWG. NO.: 44-F-0028
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Dryer
Tailgas Scrubber Fan by pushing the stop
button on the panel board.
2. Open the disconnect for the Dryer Tailgas
Scrubber Fan in the East Motor Control
Center (East MCC).
3. Lock the disconnect for the Dryer Tailgas
Scrubber Fan with a production lock.
4. Employees required to work on fan will
place their personal lock on the equipment
designated by the originator of the Safe
Work Permit.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
12/26
78
SPECIFIC LOCKOUT PROCEDURE PAGE 78
PLANT: DAP 2 EAST
EQUIPMENT: DRYER TAILGAS SCRUBBER FAN
EQUIPMENT NUMBER: 4305-06-1364E
DWG. NO.: 44-F-0028
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Issue Safe Work Permit when required
and locate near equipment.
7. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
8. Reverse procedure to put equipment back
in service.
7. Electrical/480 volts.
7. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\1364E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
79
SPECIFIC LOCKOUT PROCEDURE PAGE 79
PLANT: DAP 2 WEST
EQUIPMENT: DRYER TAILGAS SCRUBBER FAN
EQUIPMENT NUMBER: 4305-06-1364W
DWG. NO.: 44-F-0038
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Dryer
Tailgas Scrubber Fan by pushing the stop
button on the panel board.
2. Open and lock the disconnect for the
Dryer Tailgas Scrubber Fan in the West
Motor Control Center (West MCC) with a
production lock.
3. Employees required to work on the fan
will place their personal lock on the
equipment designated.
4. Reverse procedure to put equipment back
in service.
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4. Cubical explosion. Unexpected
energization.
2/1/95 C:\WP51\DAP2W\1364W
80
SPECIFIC LOCKOUT PROCEDURE PAGE 80
PLANT: DAP 2 WEST
EQUIPMENT: DRYER TAILGAS SCRUBBER FAN
EQUIPMENT NUMBER: 4305-06-1364W
DWG. NO.:44-F-0038
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Issue Safe Work Permit when required
and locate near equipment.
7. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
8. Reverse procedure to put equipment back
in service.
7. Electrical/480 volts.
7. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\1364W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
81
SPECIFIC LOCKOUT PROCEDURE PAGE 81
PLANT: DAP 2 EAST
EQUIPMENT: RGV TAILGAS SCRUBBER FAN
EQUIPMENT NUMBER: 4305-06-1365E
DWG. NO.: 44-F-0028
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the RGV
Tailgas Scrubber Fan by pushing the stop
button on the panel board.
2. Open the disconnect for the RGV Tailgas
Scrubber Fan in the East Motor Control
Center (East MCC).
3. Lock the disconnect for the RGV Tailgas
Scrubber Fan with a production lock.
4. Employees required to work on fan will
place their personal lock on the equipment
designated by the originator of the Safe
Work Permit.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
82
SPECIFIC LOCKOUT PROCEDURE PAGE 82
PLANT: DAP 2 EAST
EQUIPMENT: RGV TAILGAS SCRUBBER FAN
EQUIPMENT NUMBER: 4305-06-1365E
DWG. NO.: 44-F-0028
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work Permit when required
and locate near equipment.
6. After work completion,
inspect equipment and remove locks. Close
the disconnect for all equipment to be
energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\1365E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
83
SPECIFIC LOCKOUT PROCEDURE PAGE 83
PLANT: DAP 2 WEST
EQUIPMENT: RGV TAILGAS SCRUBBER FAN
EQUIPMENT NUMBER: 4305-06-1365W
DWG. NO.: 44-F-0038
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the RGV
Tailgas Scrubber Fan by pushing the stop
button on the panel board.
2. Open and lock the disconnect for the
RGV Tailgas Scrubber Fan in the West
Motor Control Center (West MCC) with a
production lock.
4. Employees required to work on the fan
will place their personal lock on the
equipment designated.
5. Reverse procedure to put equipment back
in service.
1. Electrical/480 volts.
2. Electrical/480 volts.
5. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
5. Cubical explosion. Unexpected
energization.
2/1/95 C:\WP51\DAP2W\1365W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
84
SPECIFIC LOCKOUT PROCEDURE PAGE 84
PLANT: DAP 2 WEST
EQUIPMENT: RGV TAILGAS SCRUBBER FAN
EQUIPMENT NUMBER: 4305-06-1365W
DWG. NO.: 44-F-0038
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work Permit when required
and locate near equipment.
6. After work completion,
inspect equipment and remove locks. Close
the disconnect for all equipment to be
energized.
7. Reverse procedure to put equipment back
in service.
7. Electrical/480 volts.
7. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\1365W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
85
SPECIFIC LOCKOUT PROCEDURE PAGE 85
PLANT: DAP 2 EAST AND WEST
EQUIPMENT: COOLER BAG COLLECTOR AIR HEATER FAN
EQUIPMENT NUMBER: 4305-06-1372A & 1372B
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Cooler
Bag Collector Air Heater Fan by pushing the
top button on the panel board.
2. Open the disconnect for the fan in the
East (1372A) and West (1372B) Motor
Control Center (East or West MCC).
3. Lock the disconnect for the fan with a
production lock.
4. Employees required to work on this fan
will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
5. Issue Safe Work Permit when required
and locate near equipment.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical Explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
86
SPECIFIC LOCKOUT PROCEDURE PAGE 86
PLANT: DAP 2 EAST AND WEST
EQUIPMENT: COOLER BAG COLLECTOR AIR HEATER FAN
EQUIPMENT NUMBER: 4305-06-1372A & 1372B
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts. 6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\1372A&B
SPECIFIC LOCKOUT PROCEDURE PAGE 86
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
87
PLANT: DAP 2 EAST
EQUIPMENT: PROCESS SCREENS
EQUIPMENT NUMBER: 4305-06-1461E "A" THRU "D"
DWG. NO.: 44-F-0025
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the process
screens and Dryer Discharge Elevator by
pushing the stop button on the panel board.
2. Open the disconnect for the screens and
elevator in the East Motor Control Center
(East MCC).
3. Lock the disconnect for the screens with
a production lock.
4. Employees required to work on these
screens will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
88
SPECIFIC LOCKOUT PROCEDURE PAGE 88
PLANT: DAP 2 EAST
EQUIPMENT: PROCESS SCREENS
EQUIPMENT NUMBER: 4305-06-1461E "A" THRU "D"
DWG. NO.: 44-F-0025
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work Permit when required
and locate near equipment.
6. After work completion, inspect
equipment to be energized. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion.
C:\WP51\DAP2E\1461EA-D
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
89
SPECIFIC LOCKOUT PROCEDURE PAGE 89
PLANT: DAP 2 WEST
EQUIPMENT: PROCESS SCREENS
EQUIPMENT NUMBER: 4305-06-1461W "A" THRU "D"
DWG. NO.: 44-F-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the process
screens by pushing the stop button on the
panel board.
2. Open and lock the disconnect for the
screens in the West Motor Control Center
(West MCC) with a production lock.
3. Employees required to work on these
screens will place their personal lock on the
equipment designated.
4. Reverse procedure to put equipment back
in service.
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4. Cubicial explosion. Unexpected
energization.
2/10/95 C:\WP51\DAP2W\1461WA-D
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
90
SPECIFIC LOCKOUT PROCEDURE PAGE 90
PLANT: DAP 2 EAST
EQUIPMENT: DRYER COMBUSTION CHAMBER
EQUIPMENT NUMBER: 4305-06-1561-1E
DWG. NO.: 44-F-0022
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Stop the fuel (Natural Gas/ #6 fuel oil,
and propane) down stream of metering
stations or return lines by closing block
valve.
2. Stop the Dryer Burner Fan and Dryer by
pushing the stop button on the panel board.
3. Close 6" block valve on 45 PSIG steam
line to Dryer Air Preheater.
4. Open the disconnect for the Dryer Burner
Fan and Dryer, in the East Motor Control
Center (East MCC).
5. Lock the disconnect for the Dryer Burner
Fan and Dryer in the OFF position with a
production lock.
1. Natural Gas. #6 Fuel Oil. Propane./fire
and explosion.
2. Electrical/480 volts.
3. Steam/284 F.
4. Electrical/480 volts.
1. Fire. Explosion.
2. Cubical explosion. Unexpected
energization. Accidental start-up or
released energy.
3. Thermal burns.
4. Cubical explosion
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
91
SPECIFIC LOCKOUT PROCEDURE PAGE 2
PLANT: DAP 2 EAST
EQUIPMENT: DRYER COMBUSTION CHAMBER
EQUIPMENT NUMBER: 4305-06-1561-1E
DWG. NO.: 44-F-0022
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Employees working on this equipment
will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
7. Issue Safe Work Permit when required
and locate near equipment.
8. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
9. Reverse procedure to put equipment back
in service.
8. Electrical/480 volts.
8. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\1561-1E
92
SPECIFIC LOCKOUT PROCEDURE PAGE 92
PLANT: DAP 2 WEST
EQUIPMENT: DRYER COMBUSTION CHAMBER
EQUIPMENT NUMBER: 4305-06-1561-1W
DWG. NO.: 44-F-0033
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The fuel source will be secured by
closing and locking the following, 1/2"
propane valve, 2" natural gas valve and 1"
fuel oil valve. (Fuel source will be secured
by removing the gun)
2. Close and lock 170 PSIG atomizing
steam with a production lock.
3. Stop the Dryer by pushing the stop
button on the panel board.
4. Open and lock the disconnect for the
Dryer in the West Motor Control Center
(West MCC) with a production lock.
1. Fire. Explosion.
2. Thermal burns.
3. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
4.Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
93
SPECIFIC LOCKOUT PROCEDURE PAGE 93
PLANT: DAP 2 EAST
EQUIPMENT: ROTARY DRYER
EQUIPMENT NUMBER: 4305-06-1561E
DWG. NO.:44-F-0022
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the dryer by
pushing the stop button on the panel board.
2. Open the disconnect for the Dryer in the
East Motor Control Center (East MCC).
3. Lock the disconnect for the Dryer in the
OFF position with a production lock.
4. When entry is necessary, the above
procedure must be followed, to include the
following equipment, Dryer Scrubber Fan,
Combustion Air Blower, LP gas, natural gas/
fuel oil (Fuel source will be secured by
removing the gun). Close and chain lock 170
PSIG atomizing steam with a production lock.
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Electrical/480 volts.
Steam/170 PSIG
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4. Cubical explosion.
Thermal burns.
12/26
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
94
SPECIFIC LOCKOUT PROCEDURE PAGE 94
PLANT: DAP 2 EAST
EQUIPMENT: ROTARY DRYER
EQUIPMENT NUMBER: 4305-06-1561E
DWG. NO.:44-F-0022
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. When seed material has been removed to
make repairs, dryer will be mechanically
secured, per applicable J. S. A., to prevent
movement.
6. Employees required to work on the dryer
will place their personal lock on the equipment
designated by the originator of the Safe Work
Permit.
7. Issue Safe Work and Confined Space Permit
when required and locate near entrance.
8. After work completion, inspect equipment
and remove locks. Close the disconnect for all
equipment to be energized.
9. Reverse procedure to put equipment back in
service.
5. Mechanical/Tons
8. Electrical /480 volts.
5. Release of stored energy.
8. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\1561E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
95
SPECIFIC LOCKOUT PROCEDURE PAGE 95
PLANT: DAP 2 WEST
EQUIPMENT: ROTARY DRYER
EQUIPMENT NUMBER: 4305-06-1561W
DWG. NO.: 44-F-0033
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the dryer by
pushing the stop button on the panel board.
2. Open and lock the disconnect for the
Dryer in the West Motor Control Center
(West MCC) with a production lock.
3. When entry is necessary, the above
procedure must be followed, to include the
following equipment, Dryer Scrubber Fan,
Combustion Air Blower, LP gas, natural gas/
fuel oil (Fuel source will be secured by
removing the gun). Close and chain lock
170 PSIG atomizing steam with a production
lock.
1. Electrical/480 volts.
2. Electrical/480 volts.
3. Electrical/480 volts.
Steam/170 PSIG
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
3. Cubical explosion.
Thermal burns.
2/1/95
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
96
SPECIFIC LOCKOUT PROCEDURE PAGE 96
PLANT: DAP 2 WEST
EQUIPMENT: ROTARY DRYER
EQUIPMENT NUMBER: 4305-06-1561W
DWG. NO.:44-F-0033
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE
MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
4. When seed material has been removed to
make repairs, dryer will be mechanically
secured, per applicable J. S. A., to prevent
movement.
5. Employees required to work on the dryer
will place their personal lock on the
equipment designated.
6. Reverse procedure to put equipment back
in service.
4. Mechanical/Tons
6. Electrical/480 volts.
4. Release of stored energy.
6. Cubical explosion.
Unexpected energization.
C:\WP51\DAP2W\1561W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
97
SPECIFIC LOCKOUT PROCEDURE PAGE 97
PLANT: DAP 2 WEST
EQUIPMENT: WEST ROTARY COOLER
EQUIPMENT NUMBER: 4305-06-1661W
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE
MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Rotary
Cooler by pushing the stop button on the panel
board.
2. When entry to the cooler is not required,
only electrically lockout the cooler
3. Open the disconnect for the cooler in the
East Motor Control Center (East MCC).
4. Lock the disconnect for the cooler in the
OFF position, with a production lock.
5. When entry is necessary, the above
procedure must be followed to include the
following equipment, Cooler Rotary Feeder
(44-47-661), Cooler Vent Fan (4305-06-1361)
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
98
and Product Elevator (4305-06-2168).
SPECIFIC LOCKOUT PROCEDURE PAGE 98
PLANT: DAP 2 WEST
EQUIPMENT: WEST ROTARY COOLER
EQUIPMENT NUMBER: 4305-06-1661W
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE
MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Employees required to work on this cooler
will place their personal lock on the equipment
designated by the originator of the Safe Work
Permit.
7. When seed material has been removed to
make repairs, cooler will be mechanically
secured per applicable J. S. A., to prevent
7. Mechanical/Tons.
7. Release of stored energy.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
99
movement.
8. Issue Safe Work Permit when required and
locate near equipment.
9. After work completion, inspect equipment
and remove locks. Close the disconnect for all
equipment to be energized.
10. Reverse procedure to put equipment back in
service.
9. Electrical/480 volts
9. Cubical explosion. Unexpected
energization.
LOCKOUT PROCEDURE PAGE 99
PLANT: DAP 2 WEST
EQUIPMENT: WEST ROTARY COOLER
EQUIPMENT NUMBER: 4305-06-1661W
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE
MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Rotary 1. Electrical/480 volts. 1. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
100
Cooler by pushing the stop button on
the panel board.
2. When entry to the cooler is not required,
only electrically lockout the cooler
3. Open the disconnect for the cooler in the
East Motor Control Center (East MCC).
4. Lock the disconnect for the cooler in the
OFF position, with a production lock.
5. When entry is necessary, the above
procedure must be followed to include
the following equipment, Cooler Rotary
Feeder (44-47-661), Cooler Vent Fan
(4305-06-1361) and Product Elevator
(4305-06-2168).
2. Electrical/480 volts.
Unexpected energization. Accidental start-up or release of stored energy.
2. Cubical explosion.
101
SPECIFIC LOCKOUT PROCEDURE PAGE 101
PLANT: DAP 2 WEST
EQUIPMENT: WEST ROTARY COOLER
EQUIPMENT NUMBER: 4305-06-1661W
DWG. NO.: 44-F-0029
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Employees required to work on this
cooler will place their personal lock on
the equipment designated by the
originator of the Safe Work Permit.
7. When seed material has been removed to
make repairs, cooler will be
mechanically secured per applicable J.
S. A., to prevent movement.
8. Issue Safe Work Permit when required
and locate near equipment.
9. After work completion, inspect
equipment and remove locks. Close
the disconnect for all equipment to be
energized.
10. Reverse procedure to put equipment
back in service.
7. Mechanical/Tons.
9. Electrical/480 volts
7. Release of stored energy.
9. Cubical explosion.
Unexpected energization.
C:\WP51\DAP2W\1661W 02/10/95
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
102
SPECIFIC LOCKOUT PROCEDURE PAGE 102
PLANT: DAP 2 WEST
EQUIPMENT: WEST ROTARY COOLER
EQUIPMENT NUMBER: 4305-06-1661W
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE
MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
When entry to the cooler is required:
1. If seed material has been removed to
make repairs, cooler will be mechanically
secured, per applicable J.S.A.
2. Follow Specific LockoutProcedure for
the Cooler Vent Fan (1361W).
3. At the Product Oiling System loop,
close and lock 1 1/2" main line valve and 1
1/2" by-pass valve with a production lock.
4. The Chief Operator will stop the
Rotary Cooler by pushing the stop button on
the panel board.
2. Electrical/480 volts.
3. Product oil/200 F.
2. Cubical explosion.
Unexpected energization.
Accidental start-up or release of
stored energy.
3. Thermal burns.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
103
SPECIFIC LOCKOUT PROCEDURE PAGE 103
PLANT: DAP 2 WEST
EQUIPMENT: DRYER AIR PREHEATER
EQUIPMENT NUMBER: 4305-06-1802W
DWG. NO.: 44-F-0034
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Follow the Specific Lockout Procedure for
the Dryer Burner Fan 4305-06-1362.
2. Close and chain lock 6" isolation steam
valve with a production lock to the four coil
banks. Open and tag blow down valves.
3. Employees required to work on this
preheater will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
4. Issue Safe Work Permit when required and
locate near equipment.
1. Electrical/480 volts.
2. Steam/45 PSIG
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Thermal burns.
1/10/5
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
104
SPECIFIC LOCKOUT PROCEDURE PAGE 104
PLANT: DAP 2 WEST
EQUIPMENT: DRYER AIR PREHEATER
EQUIPMENT NUMBER: 4305-06-1802W
DWG. NO.: 44-F-0034
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. After work completion. inspect equipment
and remove locks. Close the disconnect for all
equipment to be energized.
6. Reverse procedure to put equipment back in
service.
5. Electrical/480 volts. 5. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\1802W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
105
SPECIFIC LOCKOUT PROCEDURE PAGE 105
PLANT: DAP 2 EAST
EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE
EQUIPMENT NUMBER: 4305-06-2152E
DWG. NO.: 44-F-0025
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Equipment
Vents Cyclone Dust Bin Valve by pushing the
stop button on the panel board.
2. Open the disconnect for the valve in the East
Motor Control Center (East MCC).
3. Lock the disconnect for the valve with a
production lock.
4. Employees required to work on this valve
will place their personal locks on the equipment
designated by the originator of the Safe Work
Permit.
5. Issue Safe Work Permit when required and
locate near equipment.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
12/26
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
106
SPECIFIC LOCKOUT PROCEDURE PAGE 106
PLANT: DAP 2 EAST
EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE
EQUIPMENT NUMBER: 4305-06-2152E
DWG. NO.: 44-F-0025
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. After work completion, inspect equipment
and remove locks. Close the disconnect for
all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts. 6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\2152E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
107
SPECIFIC LOCKOUT PROCEDURE PAGE 107
PLANT: DAP 2 WEST
EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE
EQUIPMENT NUMBER: 4305-06-2152W
DWG. NO.: 44-F-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the
Equipment Vents Cyclone Dust Bin Valve
by pushing the stop button on the panel
board.
2. Open and lock the disconnect for the
valve in the West Motor Control Center
(West MCC) with a production lock.
3. Employees required to work on this valve
will place their personal locks on the
equipment designated.
4. Reverse procedure to put equipment back
in service.
1. Electrical /480 volts.
2. Electrical/480 volts.
4. Electrical/480 volts.
1. Cubical Explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4. Cubical explosion. Unexpected
energization.
2/2/95 C:\WP51\DAP2W\2152W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
108
SPECIFIC LOCKOUT PROCEDURE PAGE 108
PLANT: DAP 2 WEST
EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE
EQUIPMENT NUMBER: 4305-06-2152W
DWG. NO.: 44-5-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts. 6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\2152W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
109
SPECIFIC LOCKOUT PROCEDURE PAGE 109
PLANT: DAP 2 EAST
EQUIPMENT: DRYER CYCLONE DUST BIN VALVE
EQUIPMENT NUMBER: 4305-06-2154E
DWG. NO.: 44-F-0022
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the
Equipment Vents Cyclone Dust Bin Valve by
pushing the stop button on the panel board.
2. Open the disconnect for the valve in the
East Motor Control Center (East MCC).
3. Lock the disconnect for the valve with a
production lock.
4. Employees required to work on this valve
will place their personal locks on the
equipment designated by the originator of the
Safe Work Permit.
1. Electrical/480 volts. 1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
110
SPECIFIC LOCKOUT PROCEDURE PAGE 110
PLANT: DAP 2 EAST
EQUIPMENT: DRYER CYCLONE DUST BIN VALVE
EQUIPMENT NUMBER: 4305-06-2154E
DWG. NO.:44-F-0022
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work Permit when required and
locate near equipment.
6. After work completion, inspect equipment
and remove locks. Close the disconnect for
all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\2154E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
111
SPECIFIC LOCKOUT PROCEDURE PAGE 111
PLANT: DAP 2 WEST
EQUIPMENT: DRYER CYCLONE DUST BIN VALVE
EQUIPMENT NUMBER: 4305-06-2154W
DWG. NO.: 44-F-0033
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the
Equipment Vents Cyclone Dust Bin Valve
by pushing the stop button on the panel
board.
2. Open and lock the disconnect for the
valve in the West Motor Control Center
(West MCC) with a production lock.
3. Employees required to work on this valve
will place their personal locks on the
equipment designated.
4. Reverse procedure to put equipment back
in service.
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4. Cubical explosion. Unexpected
energization.
2/2/95 C:\WP51\DAP2W\2154W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
112
SPECIFIC LOCKOUT PROCEDURE PAGE 112
PLANT: DAP 2 WEST
EQUIPMENT: DRYER CYCLONE DUST BIN VALVE
EQUIPMENT NUMBER: 4305-06-2154W
DWG. NO.: 44-F-0033
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work Permit when required
and locate near equipment.
6. After work completion. inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\2154W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
113
SPECIFIC LOCKOUT PROCEDURE PAGE 113
PLANT: DAP 2 EAST
EQUIPMENT: COOLER BAG COLLECTOR SCREW CONVEYOR
EQUIPMENT NUMBER: 4305-06-2155 "A"
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the East
Cooler Bag Collector Screw Conveyor by
pushing the stop button on the panel board.
2. Open the disconnect for the screw
conveyor in the East Motor Control Center
(East MCC).
3. Lock the disconnect for the screw
conveyor with a production lock.
4. Employees required to work on this
conveyor will place their personal lock on
the equipment designated by the originator of
the Safe Work Permit.
5. Issue Safe Work Permit when required
and locate near equipment.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
114
SPECIFIC LOCKOUT PROCEDURE PAGE 114
PLANT: DAP 2 EAST
EQUIPMENT: COOLER BAG COLLECTOR SCREW CONVEYOR
EQUIPMENT NUMBER: 4305-06-2155 "A"
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts. 6. Cubical explosion. Unexpected
energization
A:\DAP2E\2155AE
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
115
SPECIFIC LOCKOUT PROCEDURE PAGE 115
PLANT: DAP 2 WEST
EQUIPMENT: COOLER BAG COLLECTOR SCREW CONVEYOR
EQUIPMENT NUMBER: 4305-06-2155W "B"
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
l. The Chief Operator will stop the West
Cooler Bag Collector Screw Conveyor by
pushing the stop button on the panel board.
2. Open the disconnect for the screw
conveyor in the West Motor Control Center
(West MCC).
3. Lock the disconnect for the screw
conveyor with a production lock.
4. Employees required to work on this
conveyor will place their personal lock on
the equipment designated by the originator of
the Safe Work Permit.
5. Issue Safe Work Permit when required
and locate near equipment.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
116
SPECIFIC LOCKOUT PROCEDURE PAGE 116
PLANT: DAP 2 WEST
EQUIPMENT: PRODUCT CONVEYOR
EQUIPMENT NUMBER: 4305-06-2162W
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Product
Conveyor and Dryer Discharge Elevator
(4305-06-2166W) by pushing the stop
button on the panel board.
2. Open the disconnect for the conveyor in
the East Motor Control Center (East MCC)
and open the disconnect for the Dryer
Discharge Elevator in the West Motor
Control Center (West MCC).
3. Lock the disconnect for the conveyor and
elevator with a production lock.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
117
SPECIFIC LOCKOUT PROCEDURE PAGE 117
PLANT: DAP 2 WEST
EQUIPMENT: PRODUCT CONVEYOR
EQUIPMENT NUMBER: 4305-06-2162W
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
4. Employees required to work on this
conveyor will place their personal lock on
the equipment designated by the originator of
the Safe Work Permit.
5. Issue Safe Work Permit when required
and locate near equipment.
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\2162W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
118
SPECIFIC LOCKOUT PROCEDURE PAGE 118
PLANT: DAP 2 EAST
EQUIPMENT: RECYCLE FLIGHT CONVEYOR
EQUIPMENT NUMBER: 4305-06-2164E
DWG. NO.: 44-F-0025
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Recycle
Flight Conveyor, Dryer Discharge Elevator
(2166E), and Cage Mills, (1062E A1 thru D1
and A2 thru D2, by pushing the stop button on
the panel board.
2. Open the disconnect for the Recycle Flight
Conveyor, Dryer Discharge Elevator, and
Cage Mills in the East Motor Control
Center (East MCC).
3. Lock the disconnect for the Recycle Flight
Conveyor, Dryer Discharge Elevator, and
Cage Mills with a production lock.
4. Employees required to work on the
conveyor will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
119
SPECIFIC LOCKOUT PROCEDURE PAGE 2
PLANT: DAP 2 EAST
EQUIPMENT: RECYCLE FLIGHT CONVEYOR
EQUIPMENT NUMBER: 4305-06-2164E
DWG. NO.: 44-F-0025
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work Permit when required
and locate near equipment.
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\2164E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
120
SPECIFIC LOCKOUT PROCEDURE PAGE 120
PLANT: DAP 2 WEST
EQUIPMENT: RECYCLE FLIGHT CONVEYOR (DRAGFLIGHT)
EQUIPMENT NUMBER: 4305-06-2164W
DWG. NO.: 44-F-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. When entry to the Recycle Flight Conveyor
is required, steps 2 thru 4 of the electrical
lockout will be followed.
2. The Chief Operator will stop the Recycle
Flight Conveyor, Dryer Discharge Elevator
(2166W), and Cage Mills (1062W A1 thru D1
and A2 thru D2) by pushing the stop button on
the panel board.
3. Open the disconnect for the Recycle Flight
Conveyor, Dryer Discharge Elevator, and Cage
Mills in the West Motor Control
Center (West MCC).
4. Lock the disconnect for the Recycle Flight
Conveyor, Dryer Discharge Elevator, and Cage
Mills with a production lock.
2. Electrical/480 volts.
3. Electrical/480 volts.
2. Cubical explosion. Unexpected
energization. Accidental start-up or release
of stored energy.
3. Cubical explosion.
12/29
121
SPECIFIC LOCKOUT PROCEDURE PAGE 2
PLANT: DAP 2 WEST
EQUIPMENT: RECYCLE FLIGHT CONVEYOR (DRAGFLIGHT)
EQUIPMENT NUMBER: 4305-06-2164W
DWG. NO.: 44-F-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. When entry is not required, only follow
steps to electrically lockout the Recycle flight
conveyor.
6. Employees required to work on the conveyor
will place their personal lock on the equipment
designated by the originator of the Safe Work
Permit.
7. Issue Safe Work Permit when required and
locate near equipment.
8. After work completion, inspect equipment
and remove locks. Close the disconnect for all
equipment to be energized.
9. Reverse procedure to put equipment back in
service.
8. Electrical/480 volts.
8. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\2164W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
122
SPECIFIC LOCKOUT PROCEDURE PAGE 122
PLANT: DAP 2 EAST
EQUIPMENT: DRYER DISCHARGE ELEVATOR
EQUIPMENT NUMBER: 4305-06-2166E
DWG. NO.: 44-F-0022
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Lump Breaker is to be locked out only
when entrance to the elevator boot is required.
2. The Chief Operator will stop the Dryer
Discharge Elevator and Lump Breaker by
pushing the stop button on the panel board.
3. Open the disconnect for the Dryer
Discharge Elevator and Lump Breaker in the
West Motor Control Center (West MCC).
4. Lock the disconnect for the Dryer
Discharge Elevator and Lump Breaker in the
OFF position with a production lock.
5. When performing task on the gear box or
coupling, the backstop will be inspected per
applicable J. S. A.
2. Electrical/480 volts.
3. Electrical/480 volts.
5. Mechanical/torque.
2. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
3. Cubical explosion.
5. Personal injury/rotating parts.
SPECIFIC LOCKOUT PROCEDURE PAGE 122
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
123
PLANT: DAP 2 EAST
EQUIPMENT: DRYER DISCHARGE ELEVATOR
EQUIPMENT NUMBER: 4305-06-2166E
DWG. NO.: 44-F-0022
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. If elevator chain has to be separated,
mechanically secure to prevent movement.
7. When system is
seeded, dryer must be electrically locked.
8. Employees working on the elevator will
place their personal lock on the equipment
designated by the originator of the Safe Work
Permit.
9. Issue Safe Work Permit when required and
locate near equipment.
10. After work completion, inspect equipment
and remove locks. Close the disconnect for
all equipment to be energized.
11. Reverse procedure to put equipment back
in service.
6. Mechanical/
10. Electrical/480 volts.
10. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\2166E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
124
SPECIFIC LOCKOUT PROCEDURE PAGE 124
PLANT: DAP 2 WEST
EQUIPMENT: DRYER DISCHARGE ELEVATOR
EQUIPMENT NUMBER: 4305-06-2166W
DWG. NO.: 44-F-0033
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Dryer
Discharge Elevator and Lump Breaker by
pushing the stop button on the panel board.
2. Open and lock the disconnect for the
Dryer Discharge Elevator and Lump Breaker
in the West Motor Control Center (West
MCC) with a production lock.
3. The Lump Breaker and Rotary Dryer is to
be locked out only when entrance to the
elevator boot is required.
4. Inspect elevator backstop, per applicable
J. S. A., prior to working on gear box,
coupling or removing motor.
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Mechanical/
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4. Moving parts.
2/1/95
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
125
SPECIFIC LOCKOUT PROCEDURE PAGE 125
PLANT: DAP 2 WEST
EQUIPMENT: DRYER DISCHARGE ELEVATOR
EQUIPMENT NUMBER: 4305-06-2166W
DWG. NO.: 44-F-0033
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. If elevator chain has to be separated,
mechanically secure to prevent movement.
6. When system
is seeded, dryer must be electrically locked.
7. Employees working on the elevator will
place their personal lock on the equipment
designated.
8. Reverse procedure to put equipment back
in service.
5. Mechanical\
8. Electrical/480 volts.
5. Release of stored energy.
8. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\2166W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
126
SPECIFIC LOCKOUT PROCEDURE PAGE 126
PLANT: DAP 2 EAST
EQUIPMENT: RECYCLE ELEVATOR
EQUIPMENT NUMBER: 4305-06-2167E
DWG. NO.: 44-F-0025
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Recycle Flight Conveyor (2164E) is to
be locked out only when entrance to the
elevator boot is required.
2. The Chief Operator will stop the Recycle
Elevator by pushing the stop button on the
panel board.
3. Open the disconnect for the Recycle
Elevator in the East Motor Control Center (East
MCC).
3. Lock the disconnect for the Recycle Elevator
with a production lock.
4. Employees working on the elevator will
place their personal lock on the equipment
designated by the originator of the Safe Work
Permit.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental Start-up or release
of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
127
SPECIFIC LOCKOUT PROCEDURE PAGE 127
PLANT: DAP 2 EAST
EQUIPMENT: RECYCLE ELEVATOR
EQUIPMENT NUMBER: 4305-06-2167E
DWG. NO.: 44-F-0025
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Inspect elevator backstop per applicable J. S.
A., prior to working on gear box, coupling or
removing motor.
6. If elevator chain has to be separated,
mechanically secure to prevent movement.
7. Employees working on the elevator will
place their personal lock on the equipment
designated by the originator of the Safe Work
Permit
8. Issue Safe Work Permit when required and
locate near equipment.
9. After work completion, inspect equipment
and remove locks. Close the disconnect for all
equipment to be energized.
10. Reverse procedure to put equipment back in
service.
11. Reverse procedure to put equipment back in
service.
5. Mechanical/
6. Mechanical/
9. Electrical/480 volts.
11. Electrical/480 volts.
5. Accidental release of stored energy.
6. Release of stored energy.
9. Cubical explosion. Unexpected
energization.
11. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\2167E
128
SPECIFIC LOCKOUT PROCEDURE PAGE 128
PLANT: DAP 2 WEST
EQUIPMENT: RECYCLE ELEVATOR
EQUIPMENT NUMBER: 4305-06-2167W
DWG. NO.: 44-F-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Recycle
Elevator by pushing the stop button on the
panel board.
2. Open and lock the disconnect for the
Recycle Elevator in the West Motor Control
Center (West MCC) with a production lock.
3. The Recycle Flight Conveyor
(Dragflight) (2164W) is to be locked out
only when entrance to the elevator boot is
required.
4. Employees working on the elevator will
place their personal lock on the equipment
designated.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental Start-up or
release of stored energy.
2. Cubical explosion.
2/1/95
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
129
SPECIFIC LOCKOUT PROCEDURE PAGE 129
PLANT: DAP 2 WEST
EQUIPMENT: RECYCLE ELEVATOR
EQUIPMENT NUMBER: 4305-06-2167W
DWG. NO.: 44-F-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Inspect elevator backstop per applicable
J. S. A., prior to working on gear box,
coupling or removing motor.
7. If elevator chain has to be separated,
mechanically secure, per applicable J. S. A.,
to prevent movement.
8. Employees working on the elevator will
place their personal lock on the equipment
designated.
9. Reverse procedure to put equipment back
in service.
6. Mechanical/
7. Mechanical/
9. Electrical/480 volts.
6. Accidental release of stored energy.
7. Release of stored energy.
9. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\2167W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
130
SPECIFIC LOCKOUT PROCEDURE PAGE 130
PLANT: DAP 2 EAST
EQUIPMENT: RECYCLE FEEDER (JEFFERY)
EQUIPMENT NUMBER: 4305-06-2169E
DWG. NO.: 44-F-0025
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Recycle
Feeder by pushing the stop button on the
panel board.
2. Open the disconnect for the feeder in the
East Motor Control Center (East MCC).
3. Lock the disconnect for the feeder with a
production lock.
4. Employees required to work on this
feeder will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
5. Issue Safe Work Permit when required
and locate near equipment.
1. Electrical/480 volts.
2..Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
131
SPECIFIC LOCKOUT PROCEDURE PAGE 131
PLANT: DAP 2 EAST
EQUIPMENT: RECYCLE FEEDER (JEFFERY)
EQUIPMENT NUMBER: 4305-06-2169E
DWG. NO.: 44-F-0025
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts. 6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\2169E
SPECIFIC LOCKOUT PROCEDURE PAGE 131
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
132
PLANT: DAP 2 WEST
EQUIPMENT: RECYCLE FEEDER (JEFFERY)
EQUIPMENT NUMBER: 4305-06-2169W
DWG. NO.: 44-F-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Recycle
Feeder by pushing the stop button on the
panel board.
2. Open and lock the disconnect for the
feeder in the West Motor Control Center
(West MCC) with a production lock.
3. Employees required to work on this
feeder will place their personal lock on the
equipment designated.
4. Reverse procedure to put equipment back
in service.
1. Electrical/480 volts.
2..Electrical/480 volts.
4. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion
4. Cubical explosion.
2/3/95 C:\WP51\DAP2W\2169W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
133
SPECIFIC LOCKOUT PROCEDURE PAGE 133
PLANT: DAP 2 WEST
EQUIPMENT: RECYCLE FEEDER (JEFFERY)
EQUIPMENT NUMBER: 4305-06-2169W
DWG. NO.: 44-F-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts. 6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\2169W
SPECIFIC LOCKOUT PROCEDURE PAGE 133
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
134
PLANT: DAP 2 EAST
EQUIPMENT: PROCESS SCREEN PRIMARY SPLITTER, & DISCH DIVERTER
EQUIPMENT NUMBER: 4305-06--2961E, 2962E A&B, & 2966E A&B
DWG. NO.: 44-F-0025
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Follow Specific Lockout Procedure for
the Hydraulic System Pumps, 4305-06-2562
"A" or "B".
2. If the above can not be complied with,
close and chain lock the hydraulic isolation
valves located near the equipment. Bleed
down cylinder and remove connector pin.
3. Employees required to work on splitters
& diverters will place their lock on the
equipment designated by the originator of the
Safe Work Permit.
1. Electrical/480 volts.
2. Hydraulic pressure/3,000 PSIG.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Personal injury.
135
SPECIFIC LOCKOUT PROCEDURE PAGE 135
PLANT: DAP 2 EAST
EQUIPMENT: PROCESS SCREEN PRIMARY SPLITTER, & DISC DIVERTER
EQUIPMENT NUMBER: 4305-06-2961E, 2962E, A&B, & 2966E A&B
DWG. NO.: 44-F-0025
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
4. Issue Safe Work Permit when required
and locate near equipment.
5. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
6. Reverse procedure to put equipment back
in service.
5. Electrical/480 volts.
5. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\4305-06-2961E, 2962E A&B, & 2966E A&B
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
136
SPECIFIC LOCKOUT PROCEDURE PAGE 136
PLANT: DAP 2 WEST
EQUIPMENT: PROCESS SCREEN PRIMARY SPLITTER, & DISCH DIVERTER
EQUIPMENT NUMBER: 4305-06--2961W, 2962W A&B, & 2966W A&B
DWG. NO.: 44-F-00
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Follow Specific Lockout Procedure for the Hydraulic System Pumps, 4305-06-2562 "A" or "B".
2. If the above can not be complied with, close and chain lock the hydraulic isolation valves located near the equipment. Bleed down cylinder and remove connector
pin.
3. Employees required to work on splitters & diverters will place their lock on the equipment designated by the originator of the Safe Work Permit.
4.Issue Safe Work Permit when required
and locate near equipment.
1. Electrical/480 volts.
2. Hydraulic pressure/3,000 PSIG.
1. Cubical explosion. Unexpected energization. Accidental start-up or release of stored energy.
2. Personal injury.
C:\WP51\DAP2W\4305-06-2961W, 2962W A&B, & 2966W A&B
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
137
SPECIFIC LOCKOUT PROCEDURE PAGE 137
PLANT: DAP 2 EAST
EQUIPMENT: RGV TAILGAS SCRUBBER
EQUIPMENT NUMBER: 0044-50-332
DWG. NO.: 44-F-0028
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Follow specific lockout procedure for the
following pieces of equipment, "A", "B", and
"C" Tailgas Scrubber Pumps, Dryer, and
RGV Tailgas Scrubber Fan.
2. Blind 24" equalizing line from Dryer
Tailgas Scrubber and Drain sump if required.
3. Close and chain lock with a production
lock 1" sulfuric acid valve (537).
4. Close and tag pond water valves, 6" -
(548), 8" - (519) and 10" - (544 & 545). and
16" pond water valve (475)).
1. Electrical/480 volts.
3. Sulfuric acid/98%
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
3. Chemical burns./corrosive
1/18/5
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
138
SPECIFIC LOCKOUT PROCEDURE PAGE 138
PLANT: DAP 2 EAST
EQUIPMENT: RGV TAILGAS SCRUBBER
EQUIPMENT NUMBER: 0044-50-332
DWG. NO.: 44-F-0028
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Employees required to work on this
equipment will place their personal locks on
the equipment designated by the originator of
the Safe Work and Confined Space Permit.
6. Issue Safe Work and Confined Space
Permit when required and locate near
entrance to personway.
7. After work completion, inspect
equipment and remove all locks. Close the
disconnect for all equipment to be energized.
8. Reverse procedure to put equipment back
in service.
7. Electrical/480 volts.
7. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\332E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
139
SPECIFIC LOCKOUT PROCEDURE PAGE 139
PLANT: DAP 2 EAST
EQUIPMENT: R/G PRESCRUBBER PUMP TANK
EQUIPMENT NUMBER: 0044-50-333E
DWG. NO.: 44-F-0021
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Follow the Specific Lockout Procedure for
the R/G Prescrubber (0044-50-360).
2. Drain tank by opening 2" drain valve (145).
3. Employees required to work in this tank
will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
4. Issue Safe Work Permit and Confined
Space Permit when required and locate near
entrance.
5. After work completion, inspect equipment
and remove locks. Close the disconnect for
all equipment to be energized.
1. Electrical/480 volts.
5. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
5. Cubical explosion. Unexpected
energization
1/18/5
140
SPECIFIC LOCKOUT PROCEDURE
PAGE 140
PLANT: DAP 2 EAST
EQUIPMENT: R/G PRESCRUBBER PUMP TANK
EQUIPMENT NUMBER: 0044-50-333E
DWG. NO.: 44-F-0021
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Reverse procedure to put equipment back
in service.
C:\WP51\DAP2E\0044-50-333E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
141
SPECIFIC LOCKOUT PROCEDURE PAGE 141
PLANT: DAP 2 WEST
EQUIPMENT: R/G PRESCRUBBER
EQUIPMENT NUMBER: 0047-50-333W
DWG. NO.: 44-F-0031
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the RGV
Prescrubber Pump "A" & "B" by pushing the
stop button on the panel board.
2. Open the disconnect for the fan & pumps in
the West Motor Control Center (West MCC).
3. Lock the disconnect for the fan & pumps
with a production lock.
4. Close and lock with a production lock,
hydraulic control valves to discharge valves Nr.
123 & 124.
5. Close and chain lock with a production lock
4" acid valve Nr. 110 & 1" steam valves Nr. lll
2. Electrical/480 volts.
2. Electrical/480 volts.
4. Hydraulic pressure/3,000 PSIG.
5. Phosphoric acid/180 F.
1. Cubical explosion. Unexpected
energization. Accidental start-up or release
of stored energy.
2. Cubical explosion.
4. Personal injury.
5. Thermal/chemical burns.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
142
& 116.
SPECIFIC LOCKOUT PROCEDURE PAGE 142
PLANT: DAP 2 WEST
EQUIPMENT: R/G PRESCRUBBER
EQUIPMENT NUMBER: 0047-50-333W
DWG. NO.: 44-F-0031
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Employees required to work in this tank will
place their personal lock on the equipment
designated by the originator of the Safe Work
Permit.
7. Issue Safe Work and Confined Space Permit
when required and locate at entrance.
8. After work completion, inspect equipment
and remove locks. Close the disconnect for all
equipment to be energized.
9. Reverse procedure to put equipment back in
service.
8. Electrical/480 volts.
8. Cubical explosion. Unexpected
energization
C:\WP51\DAP2W\0047-50-333W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
143
SPECIFIC LOCKOUT PROCEDURE PAGE 143
PLANT: DAP 2 WEST
EQUIPMENT: R/G PRESCRUBBER PUMP TANK
EQUIPMENT NUMBER: 0047-50-334W
DWG. NO.: 44-F-0031
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Follow the Specific Lockout Procedure
for the R/G Prescrubber (0047-50-333).
2. Drain tank by opening 3" drain valve
(118).
3. Employees required to work in this tank
will place their personal lock on the
equipment designated.
4. Reverse procedure to put equipment back
in service.
1. Electrical/480 volts.
5. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
5. Cubical explosion. Unexpected
energization
2\10\95 C:\WP51\DAP2W\0047-50-334W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
144
SPECIFIC LOCKOUT PROCEDURE PAGE 144
PLANT: DAP 2 WEST
EQUIPMENT: R/G PRESCRUBBER PUMP TANK
EQUIPMENT NUMBER: 0047-50-334W
DWG. NO.: 44-F-0031
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Reverse procedure to put equipment back
in service.
C:\WP51\DAP2W\0047-50-334W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
145
SPECIFIC LOCKOUT PROCEDURE PAGE 145
PLANT: DAP 2 WEST
EQUIPMENT: DRYER TAILGAS SCRUBBER
EQUIPMENT NUMBER: 0047-50-350
DWG. NO.: 44-F-0038
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Follow specific lockout procedure for the
following pieces of equipment, No. 1, 2, and
3 tailgas scrubber pumps, and Drye and
RGV Tailgas Scrubber Fan.
2. Drain vessel if required to work in this
area.
3. Close and tag 10" pond water valve (502,
479, & 480) and 16" pond water valve
(477).
4. Employees required to work on this
equipment will place their personal locks on
the equipment designated by the originator of
the Safe Work and Confined Space Permit.
1. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
/12/5
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
146
PECIFIC LOCKOUT PROCEDURE PAGE 146
PLANT: DAP 2 WEST
EQUIPMENT: DRYER TAILGAS SCRUBBER
EQUIPMENT NUMBER: 0047-50-350
DWG. NO.: 44-F-0038
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work and Confined Space
Permit when required and locate near
entrance to personway.
6. After work completion, inspect
equipment and remove all locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
7. Electrical/480 volts.
7. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\350W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
147
SPECIFIC LOCKOUT PROCEDURE PAGE 147
PLANT: DAP 2 WEST
EQUIPMENT: RGV TAILGAS SCRUBBER
EQUIPMENT NUMBER: 0047-50-352
DWG. NO.: 44-F-0038
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Follow specific lockout procedure for the
following pieces of equipment, No. 1, 2, and
3 tailgas scrubber pumps, and Dryer and
RGV Tailgas Scrubber Fan.
2. Drain vessel if required to work in this
area.
3. Close and tag 10" pond water valve (501,
474, & 473) and 16" pond water valve
(475)).
4. Employees required to work on this
equipment will place their personal locks on
the equipment designated by the originator of
the Safe Work and Confined Space Permit.
1. Electrical/480 volts.
1/12/5
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
148
SPECIFIC LOCKOUT PROCEDURE PAGE 148
PLANT: DAP 2 WEST
EQUIPMENT: RGV TAILGAS SCRUBBER
EQUIPMENT NUMBER: 0047-50-352
DWG. NO.: 44-F-0038
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work and Confined Space
Permit when required and locate near
entrance to personway.
6. After work completion, inspect
equipment and remove all locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
7. Electrical/480 volts.
7. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\352W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
149
SPECIFIC LOCKOUT PROCEDURE PAGE 149
PLANT: DAP 2 WEST
EQUIPMENT: DRYER VENTURI SCRUBBER
EQUIPMENT NUMBER: 0047-50-354
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Stop the Dryer Tailgas Scrubber Fan and the Venturi Scrubber Pumps by pushing the stop button on the panel board.
2. Open the disconnect for the fan and pump in the West Motor Control Center (West MCC).
3. Lock the disconnect for the fan and pump with a production lock.
4. Close and tag fan damper valve (457).
5. Close and chain lock 8" acid valve (397) and steam valve (375) and (381) with a production lock.
1. Electrical/480 volts.
2. Electrical/480 volts.
5. Phosphoric acid/180 F.
1. Cubical explosion. Unexpected energization. Accidental start-up or release of stored energy.
2. Cubical explosion.
5. Chemical and thermal burns.
1/12/5
150
SPECIFIC LOCKOUT PROCEDURE PAGE 150
PLANT: DAP 2 WEST
EQUIPMENT: DRYER VENTURI SCRUBBER
EQUIPMENT NUMBER: 0047-50-354
DWG. NO.: 44-F-0037
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Employees required to work in this vessel will place their personal locks on the equipment designated by the originator of the Safe Work and Confined Space Permit.
7. Issue Safe Work and Confined Space Permit when required and locate near entrance to personway.
8. After work completion inspect equipment and remove all locks. Close the disconnect for all equipment to be energized.
9. Reverse procedure to put equipment back in service.
8. Electrical/480 volts.
8. Cubical explosion. Unexpected energization.
C:\WP51\DAP2W\354W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
151
SPECIFIC LOCKOUT PROCEDURE PAGE 151
PLANT: DAP 2 WEST
EQUIPMENT: RGV VENTURI SCRUBBER
EQUIPMENT NUMBER: 0047-50-356
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Stop the RGV Tailgas scrubber Fan and
the Venturi Scrubber Pumps by pushing the
stop button on the panel board.
2. Open the disconnect for the fan and pump
in the West Motor Control Center (West
MCC).
3. Lock the disconnect for the fan and pump
with a production lock.
4. Close and tag fan damper valve (467).
5. Close and chain lock 8" acid valve (403)
and steam valve (366) and (379) with a
production lock.
1. Electrical/480 volts.
2. Electrical/480 volts.
5. Phosphoric acid/180 F.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
5. Chemical and thermal burns.
1/12/5
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
152
SPECIFIC LOCKOUT PROCEDURE PAGE 152
PLANT: DAP 2 WEST
EQUIPMENT: RGV VENTURI
EQUIPMENT NUMBER: 0047-50-356
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Employees required to work in this vessel
will place their personal locks on the
equipment designated by the originator of the
Safe Work and Confined Space Permit.
7. Issue Safe Work and Confined Space
Permit when required and locate near
entrance to personway.
8. After work completion inspect equipment
and remove all locks. Close the disconnect
for all equipment to be energized.
9. Reverse procedure to put equipment back
in service.
8. Electrical/480 volts.
8. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\356W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
153
SPECIFIC LOCKOUT PROCEDURE PAGE 153
PLANT: DAP 2 WEST
EQUIPMENT: DRYER CYCLONE
EQUIPMENT NUMBER: 0047-50-358
DWG. NO.: 44-F-0033
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Stop the Dryer Tailgas Scrubber Fan and
Dryer Cyclone Dust Bin Valve by pushing
the stop button on the panel board.
2. Open the disconnect for the fan and valve
in the West Motor Control Center (West
MCC).
3. Lock the disconnect for the fan and valve
with a production lock.
4. Close and tag fan damper valve Nr. 457.
5. Employees required to work in this vessel
will place their personal locks on the
equipment designated by the originator of the
Safe Work Permit.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical Explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
1/5/5
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
154
SPECIFIC LOCKOUT PROCEDURE PAGE 154
PLANT: DAP 2 WEST
EQUIPMENT: DRYER CYCLONE
EQUIPMENT NUMBER: 0047-50-358
DWG. NO.: 44-F-0033
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Issue Safe Work Permit and locate near
equipment.
7. After work completion, inspect
equipment and remove all locks. Close the
disconnect for all equipment to be energized.
8. Reverse procedure to put equipment back
in service.
7. Electrical/480 volts.
7. Cubical explosion.
C:\WP51\DAP2W\358W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
155
SPECIFIC LOCKOUT PROCEDURE PAGE 155
PLANT: DAP 2 EAST
EQUIPMENT: R/G PRESCRUBBER
EQUIPMENT NUMBER: 0047-50- 360E
DWG. NO.: 44-F-0021
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the RGV
Prescrubber Pump "A" & "B" (1001EA&B)
by pushing the stop button on the panel
board.
2. Open the disconnect for the fan & pumps
in the East Motor Control Center (East
MCC).
3. Lock the disconnect for the fan & pumps
with a production lock.
4. Close and lock with a production lock,
hydraulic control valves to discharge valves
Nr. (151 & 150).
5. Close and chain lock with a production
lock 4" acid valve Nr. (138).
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Hydraulic pressure/3,000 PSIG.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4. Personal injury.
5. Thermal/chemical burns.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
156
SPECIFIC LOCKOUT PROCEDURE PAGE 156
PLANT: DAP 2 EAST
EQUIPMENT: R/G PRESCRUBBER
EQUIPMENT NUMBER: 0047-50-360E
DWG. NO.: 44-F-0021
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Close and tag 1" steam valve Nr. (139).
Close and tag 3" pond water valves Nr. (163
& 166).
7. Employees required to work in this tank
will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
8. Issue Safe Work and Confined Space
Permit when required and locate at entrance.
9. After work completion, inspect equipment
and remove locks. Close the disconnect for
all equipment to be energized.
10. Reverse procedure to put equipment back
in service.
6. 170 PSIG steam/360 F.
8. Electrical/480 volts.
6. Thermal burns.
8. Cubical explosion. Unexpected
energization.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
157
SPECIFIC LOCKOUT PROCEDURE PAGE 157
PLANT: DAP 2 EAST
EQUIPMENT: AMMONIA CHILLER
EQUIPMENT NUMBER: 0044-41-444E
DWG. NO.: 44-F-0020
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. In the 3" ammonia supply line from the
Ammonia Storage Area to the Ammonia
Chiller, close and chain lock with a production
lock, 3" valve (005) and install a SS blind.
2. In the 3" exit ammonia line from the
chiller, close and chain lock with a production
lock 3" valve (010).
3. In the 6" exit ammonia line from the
chiller, close and chain lock with a production
lock 6" valve (026).
4. Employees required to work on the chiller
will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
1. Ammonia/250PSIG.
2. Ammonia/250PSIG.
3. Ammonia/250PSIG.
1. Health. Fire or explosion.
2. Health. Fire or explosion.
3. Health. Fire or explosion.
SPECIFIC LOCKOUT PROCEDURE PAGE 157
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
158
PLANT: DAP 2 EAST
EQUIPMENT: AMMONIA CHILLER
EQUIPMENT NUMBER: 0044-41-444E
DWG. NO.: 44-F-0020
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work and Confine Space
Permit when required and locate near
entrance to tank.
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
7. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\444E
SPECIFIC LOCKOUT PROCEDURE PAGE 158
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
159
PLANT: DAP 2 WEST
EQUIPMENT: AMMONIA CHILLER
EQUIPMENT NUMBER: 0047-41-464W
DWG. NO.: 44-F-0030
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. In the 3" ammonia supply line from the
Ammonia Storage Area to the Ammonia
Chiller, close and chain lock with a production
lock, 3" valve (209) and close and tag 3" valve
(001).
2. In the 3" exit ammonia line from the chiller,
close and chain lock with a production lock 3"
valve (005).
3. In the 6" exit ammonia line from the chiller,
close and chain lock with a production lock 6"
valve (022).
4. Employees required to work on the chiller
will place their personal lock on the equipment
designated by the originator of the Safe Work
Permit.
1. Ammonia/250PSIG.
2. Ammonia/250PSIG.
3. Ammonia/250PSIG.
1. Health. Fire or explosion.
2. Health. Fire or explosion.
3. Health. Fire or explosion.
SPECIFIC LOCKOUT PROCEDURE PAGE 159
160
PLANT: DAP 2 WEST
EQUIPMENT: AMMONIA CHILLER
EQUIPMENT NUMBER: 0047-41-464W
DWG. NO.: 44-F-0030
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work and Confine Space Permit
and locate near entrance to tank.
6. After work completion, inspect equipment
and remove locks. Close the disconnect for all
equipment to be energized.
7. Reverse procedure to put equipment back in
service.
7. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\464W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
161
SPECIFIC LOCKOUT PROCEDURE PAGE 161
PLANT: DAP 2 WEST
EQUIPMENT: AMMONIA CHILLER
EQUIPMENT NUMBER: 0047-41-464W
DWG. NO.: 44-F-0030
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. In the 3" ammonia supply line from the
Ammonia Storage Area to the Ammonia
Chiller, close and chain lock with a
production lock, 3" valve (001) and install a
SS blind.
2. In the 3" exit ammonia line from the
chiller, close and chain lock with a
production lock 3" valve (005).
3. In the 6" exit ammonia line from the
chiller, close and chain lock with a
production lock 6" valve (022).
4. Employees required to work on the
chiller will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
1. Ammonia/250PSIG.
2. Ammonia/250 PSIG.
3. Ammonia/250 PSIG.
1. Health. Fire or explosion.
2. Health. Fire or explosion.
3. Health. Fire or explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
162
SPECIFIC LOCKOUT PROCEDURE PAGE 162
PLANT: DAP 2 WEST
EQUIPMENT: AMMONIA CHILLER
EQUIPMENT NUMBER: 0047-41-464W
DWG. NO.: 44-F-0030
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work and Confine Space
Permit and locate near entrance to tank.
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment
back in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\464W 1/20/95
163
SPECIFIC LOCKOUT PROCEDURE PAGE 163
PLANT: DAP 2 WEST
EQUIPMENT: BFL AMMONIA VAPORIZER
EQUIPMENT NUMBER: 0047-41-469
DWG. NO.: 44-F-0031
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Stop ammonia flow by closing and chain
locking with a production lock, 6" valves (020
& 100). Blind line 6" PAM-0024-CBD down
stream of valve (100).
2. Isolate low pressure steam by closing and
chain locking valve (104), with a production
lock.
3. Follow the Specific Lockout Procedure for
the R/G Prescrubber (0047-50-333W) and
close blast gate (108).
4. Close manual damper (102).
5. Employees required to work in this tank
will place their personal locks on the
equipment designated by the originator of the
Safe Work Permit.
1. Ammonia/250PSIG.
2. Steam/45 PSIG.
1. Health. Fire or explosion.
2. Thermal burns.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
164
SPECIFIC LOCKOUT PROCEDURE PAGE 164
PLANT: DAP 2 WEST
EQUIPMENT: BFL AMMONIA VAPORIZER
EQUIPMENT NUMBER: 0047-41-469
DWG. NO.: 44-F-0031
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Issue Safe Work and Confined Space
Permit when required, and locate at tank
entrance.
7. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
8. Close the disconnect for all equipment to
be energized.
7. Electrical/480 volts.
7. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\469W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
165
SPECIFIC LOCKOUT PROCEDURE PAGE 165
PLANT: DAP 2 WEST
EQUIPMENT: BFL AMMONIA VAPORIZER
EQUIPMENT NUMBER: 0047-41-469W
DWG. NO.: 44-F-0031
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Stop ammonia flow by closing and
locking with a production lock, 6" valve
(100). Blind line (6" PAM-0024-CBD) and
(30"PV-0112-SS).
2. Isolate low pressure steam by closing and
locking valve (104), with a production lock.
3. Close blast gate (108).
5. Employees required to work in this tank
will place their personal locks on the
equipment designated.
5. Reverse procedure to put equipment back
in service.
1. Ammonia liquid and vapors./250PSIG.
2. Steam/45 PSIG.
1. Health. Fire or explosion.
2. Thermal burns.
1/27/95 C:\WP51\DAP2W\469W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
166
SPECIFIC LOCKOUT PROCEDURE PAGE 166
PLANT: DAP 2 WEST
EQUIPMENT: BFL AMMONIA VAPORIZER
EQUIPMENT NUMBER: 0047-41-469
DWG. NO.: 44-F-0031
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. Issue Safe Work and Confined Space
Permit when required, and locate at tank
entrance.
7. After work completion, inspect
equipment and remove locks.
8. Reverse procedure to put equipment back
in service.
C:\WP51\DAP2W\469W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
167
SPECIFIC LOCKOUT PROCEDURE PAGE 167
PLANT: DAP 2 EAST
EQUIPMENT: AIR CHILLER
EQUIPMENT NUMBER: 0044-41-470E
DWG. NO.: 44-F-0040
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. When entry to the Air Chiller is required, the
East Cooler Fan (114E) will be locked-out in
accordance with steps 2 and 3.
2. The Chief Operator will stop the East Cooler
Fan (114E) by
pushing the stop button on the panel board.
3. Open the disconnect for the fan in the East
Motor Control Center (East MCC).
4. Lock the disconnect for the
fan with a production lock.
2. Electrical/480 volts.
3. Electrical/480 volts.
2. Cubical explosion. Unexpected
energization. Accidental start up or release
of stored energy.
3. Cubical explosion.
1/20/5
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
168
SPECIFIC LOCKOUT PROCEDURE PAGE 168
PLANT: DAP 2 EAST
EQUIPMENT: AIR CHILLER
EQUIPMENT NUMBER: 0044-41-470E
DWG. NO.: 44-F-0040
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. In the 3" ammonia supply line to the chiller,
close and chain lock with a production lock 3"
valve (600), close and tag 4" ammonia valve
(611) and open and tag 3/4" bleed valves (610
& 612).
6. In the 8" discharge line from chiller, close
and chain lock with a production lock 8"
ammonia valve (629), and close and tag 8"
valve (626). Close and tag, 3/4" bleed valve
(627).
7. Employees required to work on this chiller
will place their personal lock on the equipment
designated by the originator of the Safe Work
Permit.
8. Issue Safe Work and Confined Space Permit
when required and locate near equip.
5. Ammonia/250 PSIG.
6. Ammonia/250 PSIG.
5. Health. Fire or explosion.
6. Health. Fire or explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
169
SPECIFIC LOCKOUT PROCEDURE PAGE 169
PLANT: DAP 2 EAST
EQUIPMENT: AIR CHILLER
EQUIPMENT NUMBER: 0044-41-470E
DWG. NO.: 44-F-0040
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
9. After work completion, inspect equipment
and remove locks. Close the disconnect for all
equipment to be energized.
10. Reverse procedure to put
equipment back in service.
9. Electrical/480 volts.
9. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\0047-41-470E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
170
SPECIFIC LOCKOUT PROCEDURE PAGE 170
PLANT: DAP 2 WEST
EQUIPMENT: AIR CHILLER
EQUIPMENT NUMBER: 0047-41-470W
DWG. NO.: 44-F-0039
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. When entry to the Air Chiller is required,
the Cooler Vent Fan (1361W) will be locked-
out in accordance with steps 2 and 3
2. The Chief Operator will stop the Cooler
Vent Fan (1361W) by pushing the stop button
on the panel board.
3. Open the disconnect for the fan in the East
Motor Control Center (East MCC).
4. Lock the disconnect for the fan with a
production lock.
5. In the 3" ammonia supply line to the
chiller , close and chain lock with a production
lock 3" valve (553), close and tag 4" ammonia
valve (559) and open and tag 3/4" bleed valves
(571 & 558).
2. Electrical/480 volts.
3. Electrical/480 volts.
5. Ammonia/250 PSIG.
2. Cubical explosion. Unexpected
energization. Accidental start up or release
of stored energy.
3. Cubical explosion.
5. Health. Fire or explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
171
SPECIFIC LOCKOUT PROCEDURE PAGE 171
PLANT: DAP 2 WEST
EQUIPMENT: AIR CHILLER
EQUIPMENT NUMBER: 0047-41-470W
DWG. NO.: 44-F-0039
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. In the 8" discharge line from chiller,
close and chain lock with a production lock 8"
ammonia valve (582), and close and tag 8"
valve (578). Close and tag 3/4" bleed valve
(579).
6. Employees required to work on this
chiller will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
7. Issue Safe Work and Confined Space
Permit when required and locate near
equipment.
8. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
10. Reverse procedure to put equipment
back in service.
6. Ammonia/250 PSIG.
9. Electrical/480 volts.
6. Health. Fire or explosion.
9. Cubical explosion. Unexpected tion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
172
SPECIFIC LOCKOUT PROCEDURE PAGE 172
PLANT: DAP 2 EAST
EQUIPMENT: REACTOR
EQUIPMENT NUMBER: 0044-02-530
DWG. NO.: 44-F-0020, 0021, 0027, & 0032
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the R/G
Prescrubber (1001A&B), and 54% DAP
Feed Pump (1182 B) by pushing the stop
button on the panel board.
2. Open the disconnect for the R/G
Prescrubber, Venture, and 54% DAP Feed
Pump.
3. Follow applicable J. S. A's pertaining to
acid, ammonia, slurry lines, and reactor so
they can be purged/cleaned prior to lockout.
4. Blind main ammonia supply line, at 3"
valve (005), in 3" line to Ammonia Chiller
(444).
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Ammonia liquid and vapors./ 250 PSIG.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4.Health. Fire or explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
173
SPECIFIC LOCKOUT PROCEDURE PAGE 173
PLANT: DAP 2 EAST
EQUIPMENT: REACTOR
EQUIPMENT NUMBER: 0044-02-530
DWG. NO.: 44-F-0020, 0021, 0027, & 0032
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Close and chain lock with a production
lock, 4" acid valve (153), on line (4"PPA-013-
BED), from R/G Prescrubber Pump.
6. Close and chain lock with a production
lock, 4" valve, on 22% line (4" PPA-24-HHK-
06), from Venturi Scrubber Pumps.
7. To lockout the AP and Regular 54% acid
lines close and chain lock, with a production
lock, 4" valve in discharge line above by-pass
tie-in from 1182C pump. Close and chain lock
4" valve in by-pass line (4"PPA-4-ALD-06).
Open and tag 4" discharge and 2" drain valve
on 54% DAP Feed Pump (1182C).
5. Phosphoric Acid/180 F.
6. Phosphoric Acid/180 F.
7. Phosphoric Acid/180 F.
5. Chemical and thermal burns.
6. Chemical and thermal burns.
7. Chemical and thermal burns.
SPECIFIC LOCKOUT PROCEDURE PAGE 173
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
174
PLANT: DAP 2 EAST
EQUIPMENT: REACTOR
EQUIPMENT NUMBER: 0044-02-530
DWG. NO.: 44-F-0020, 0021, 0027, & 0032
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
10. To lock out medium pressure steam,
close and chain lock with a production lock
two, 2" valves (042 & 043) by-pass and 1/2"
valve to level elements.
11. Disconnect any hoses to the reactor.
12. Employees required to work in this tank
will place their personal locks on the
equipment designated by the originator of the
Safe Work Permit.
13. Issue Safe Work and Confined Space
Permit when required and locate near
equipment.
10. 170 PSIG/360 F. 10. Thermal burns.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
175
SPECIFIC LOCKOUT PROCEDURE PAGE 4
PLANT: DAP 2 EAST
EQUIPMENT: REACTOR
EQUIPMENT NUMBER: 0044-02-530
DWG. NO.: 44-F-0020, 0021, 0027, & 0032
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
14. After work completion, inspect
equipment and remove all locks. Close the
disconnect for all equipment to be energized.
15. Reverse procedure to put equipment
back in service.
14. Electrical/480 volts.
14. Cubical explosion.
C:\WP51\DAP2E\530E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
176
SPECIFIC LOCKOUT PROCEDURE PAGE 176
PLANT: DAP 2 WEST
EQUIPMENT: REACTOR
EQUIPMENT NUMBER: 0047-02-550
DWG. NO.: 44-F-0030
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Stop flows and pump solution forward to
empty reactor.
2. Follow applicable J. S. A's pertaining to
acid, ammonia, slurry lines, and reactor so
they can be purged/cleaned prior to locked
out.
3. Blind 8" ammonia line from Air Chiller
and 6" ammonia line from Ammonia Chiller.
4. Close and chain lock ,6", 1165 "A" and "B"
reactor slurry pump suction valves (066 &
067).
Tag closed two 3" pond water valves, and tag
open drain valves (068 & 069.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
177
SPECIFIC LOCKOUT PROCEDURE PAGE 177
PLANT: DAP 2 WEST
EQUIPMENT: REACTOR
EQUIPMENT NUMBER: 0047-02-550
DWG. NO.: 44-F-0030
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Close and chain lock 12" 44-22-079A and
44-22-078B R/G Prescrubber Pump
discharge, KGA valves (124 & 123)), 4" valve
(126) and tag open 2" drain.
6. Open and lock with a production lock, the
disconnect for the Venturi Scrubber pumps
(1163W A & B) in the West Motor Control
Center (West MCC).
7. Close and chain lock 4",1163W "A" & "B"
Venturi Scrubber Pump branch valve (396).
8. To lock out acid flows to the reactor stop
the 54% DAP Feed Pump (1182A), by
pushing the stop button on the panel board
and open the disconnect.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
178
SPECIFIC LOCKOUT PROCEDURE PAGE 178
PLANT: DAP 2 WEST
EQUIPMENT: REACTOR
EQUIPMENT NUMBER: 0047-02-550
DWG. NO.: 44-F-0030
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
Lock the disconnect with a production lock.
Close and chain lock the 4" valves (14, 16 &
2) and tag open 2" (5) drain valve.
9. To lock out the 54% acid, from AP line to
the reactor, close and chain lock 3' by=-pass
valve and two 3" valves upstream and
downstream of loop FE6775. Open 3" and 1"
bleed valve.
10. To lock out medium pressure steam, close
and chain lock with a production lock two, 2"
valves (035 & 036) by-pass and 1/2" valve to
level elements.
11. Disconnect any hoses to the reactor.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
179
SPECIFIC LOCKOUT PROCEDURE PAGE 179
PLANT: DAP 2 WEST
EQUIPMENT: REACTOR
EQUIPMENT NUMBER: 0047-02-550
DWG. NO.: 44-F-0030
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
12. Employees required to work in this tank
will place their personal locks on the
equipment designated by the originator of the
Safe Work Permit.
13. Issue Safe Work Permit and locate near
equipment.
14. After work completion, inspect
equipment and remove all locks. Close the
disconnect for all equipment to be energized.
15. Reverse procedure to put equipment
back in service.
14. Electrical/480 volts.
14. Cubical explosion.
C:\WP51\DAP2W\550W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
180
SPECIFIC LOCKOUT PROCEDURE PAGE 180
PLANT: DAP 2 WEST
EQUIPMENT: REACTOR
EQUIPMENT NUMBER: 0047-02-550
DWG. NO.: 44-F-0030, 0031, 0032, 0037, & 0039
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the R/G
Prescrubber (078A & 079B), Venturi (1163W
A & B), and 54% DAP Feed Pumps (1182 A)
by pushing the stop button on the panel board.
2. Open the disconnect for the R/G
Prescrubber, Venture, and 54% DAP Feed
Pumps. 3.
Follow applicable J. S. A's pertaining to acid,
ammonia, slurry lines, and reactor so they
can be purged/cleaned prior to lockout.
4. Close and chain lock valve (001) with a
production lock. Blind main ammonia supply
line (3" PAM-205-CBD-06), at Ammonia
Chiller (464).
1. Electrical/480 volts.
2. Electrical/480 volts.
4. Ammonia liquid and vapors./ 250 PSIG.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
4. Health. Fire or explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
181
SPECIFIC LOCKOUT PROCEDURE PAGE 2
PLANT: DAP 2 WEST
EQUIPMENT: REACTOR
EQUIPMENT NUMBER: 0047-02-550
DWG. NO.: 44-F-0030, 0031, 0032, 0037, & 0039
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Close and chain lock with a production
lock, 4" acid valve (126), on line (4"PPA-
0137-BED), from R/G Prescrubber pumps.
6. Close and chain lock
with a production lock, 4" valve, on 22% line
(4"PPA-224-HK-06), from Venturi Scrubber
Pumps.
7. To lockout the AP and Regular 54% acid
lines, close and chain lock, with a production
lock, 4" valve in discharge line above by-pass
tie-in from 1182A pump. Close and chain
lock 4" valve in by-pass line (4" PPA-204-
ALD-06). Open and tag 4" discharge and 2"
drain valve on 54% DAP Feed Pump
(1182A).
5. Phosphoric Acid/180 F.
6. Phosphoric Acid/180 F.
7. Phosphoric Acid/180 F.
5. Chemical and thermal burns.
6. Chemical and thermal burns.
7. Chemical and thermal burns.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
182
SPECIFIC LOCKOUT PROCEDURE PAGE 3
PLANT: DAP 2 WEST
EQUIPMENT: REACTOR
EQUIPMENT NUMBER: 0047-02-550
DWG. NO.: 44-F-0030, 0031, 0032, 0037, & 0039
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
8. To lock out the 54% acid, from AP
line,close and chain lock last 3" valve before
reactor. close and tag 3" valve, in by-pass line
from 54% line (4" PPA-204-HHK-06) to
reactor. Open and tag 3" acid and 1" bleed
valve on venturi scrubber sump line.
9. To lock out medium pressure steam, close
and chain lock with a production lock 2"
valves (035), 2" by-pass Valve and 1/2" valve
to level elements.
10. Close and chain lock with a production
lock, Reactor Slurry Pumps (1165W A & B),
6" suction valves (066 & 067) and open and
tag 3" drain valve.
8. Phosphoric Acid/180 F.
9. 170 PSIG/360 F.
8. Thermal/Chemical burns.
9. Thermal burns.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
183
SPECIFIC LOCKOUT PROCEDURE PAGE 4
PLANT: DAP 2 WEST
EQUIPMENT: REACTOR
EQUIPMENT NUMBER: 0047-02-550
DWG. NO.: 44-F-0030, 0031, 0032, 0037, & 0039
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
11. Disconnect any hoses that empty into the
reactor.
12. Employees required to work in this tank
will place their personal locks on the
equipment designated by the originator of the
Safe Work Permit.
13. Issue Safe Work and Confined Space
Permit when required and locate near
equipment.
14. After work completion, inspect equipment
and remove all locks. Close the disconnect
for all equipment to be energized.
15. Reverse procedure to put equipment back
in service.
14. Electrical/480 volts.
14. Cubical explosion.
C:\WP51\DAP2W\550W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
184
SPECIFIC LOCKOUT PROCEDURE PAGE 184
PLANT: DAP 2 WEST
EQUIPMENT: DEFOAMER SHIFT TANK
EQUIPMENT NUMBER: 0047-01-557W
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Follow the Specific Lockout Procedure
for the West Defoamer Shift Tank Agitator.
2. Close and chain lock 3" defoamer valve
(407) and close and tag defoamer transfer
discharge valves (524) & (525).
3. Employees required to work on this tank
will place their personal locks on the
equipment designated by the originator of the
Safe Work Permit.
4. Issue Safe Work and Confined Space
Permit when required and locate near
entrance to tank.
1. Electrical/120 volts. 1. Unexpected energization. Accidental
start-up or release of stored energy.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
185
SPECIFIC LOCKOUT PROCEDURE PAGE 185
PLANT: DAP 2 WEST
EQUIPMENT: DEFOAMER SHIFT TANK
EQUIPMENT NUMBER: 0047-01-557W
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
6. Reverse procedure to put equipment back
in service.
5. Electrical/480 volts 5. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\557W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
186
SPECIFIC LOCKOUT PROCEDURE PAGE 186
PLANT: DAP 2 WEST
EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR
EQUIPMENT NUMBER: 0047-01-557WW
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will have his
designee stop the 120 volt agitator, by
pushing the start/stop button in the field.
2. Open the disconnect for the agitator in the
West Motor Control Center (West MCC).
Lighting panel EP 01, Nr. l breaker.
3. Lock/Tag the disconnect for the agitator
with a production lock/tag.
4. Employees required to work on this
agitator will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
1. Electrical/120 volt.
2. Electrical/120 volt.
1. Unexpected energization. Accidental
start-up or release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
187
SPECIFIC LOCKOUT PROCEDURE PAGE 187
PLANT: DAP 2 WEST
EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR
EQUIPMENT NUMBER: 0047-01-557WW
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work Permit and locate near
equipment.
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\557WW
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
188
SPECIFIC LOCKOUT PROCEDURE PAGE 188
PLANT: DAP 2 WEST
EQUIPMENT: DEFOAMER SHIFT TANK
EQUIPMENT NUMBER: 0047-01-557W
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Follow the Specific Lockout Procedure
for the West Defoamer Shift Tank Agitator.
2. Close and chain lock 3" defoamer valve
(407) and close and tag defoamer transfer
discharge valves (524) & (525).
3. Employees required to work on this tank
will place their personal locks on the
equipment designated by the originator of the
Safe Work Permit.
4. Issue Safe Work and Confined Space
Permit when required and locate near
entrance to tank.
1. Electrical/120 volts. 1. Unexpected energization. Accidental
start-up or release of stored energy.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
189
SPECIFIC LOCKOUT PROCEDURE PAGE 189
PLANT: DAP 2 WEST
EQUIPMENT: DEFOAMER SHIFT TANK
EQUIPMENT NUMBER: 0047-01-557W
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
6. Reverse procedure to put equipment back
in service.
5. Electrical/480 volts 5. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\557W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
190
SPECIFIC LOCKOUT PROCEDURE PAGE 190
PLANT: DAP 2 WEST
EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR
EQUIPMENT NUMBER: 0047-01-557WW
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will have his
designee stop the 120 volt agitator, by
pushing the start/stop button in the field.
2. Open the disconnect for the agitator in the
West Motor Control Center (West MCC).
Lighting panel EP 01, Nr. l breaker.
3. Lock/Tag the disconnect for the agitator
with a production lock/tag.
4. Employees required to work on this
agitator will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
1. Electrical/120 volt.
2. Electrical/120 volt.
1. Unexpected energization. Accidental
start-up or release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
191
SPECIFIC LOCKOUT PROCEDURE PAGE 191
PLANT: DAP 2 WEST
EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR
EQUIPMENT NUMBER: 0047-01-557WW
DWG. NO.: 44-F-0037
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work Permit and locate near
equipment.
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\557WW
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
192
SPECIFIC LOCKOUT PROCEDURE PAGE 192
PLANT: DAP2 WEST
EQUIPMENT: COOLER FEED ROTARY FEEDER
EQUIPMENT NUMBER: 44-47-661W
DWG. NO.: 44-F-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
l. The Chief Operator will stop the Cooler
Feed Rotary Feeder or Dryer Discharge
Elevator (4305-06-2166W) by pushing the
stop button on the panel board.
2. Open the disconnect for the feeder &
elevator in the West Motor Control Center
(West MCC).
3. Lock the disconnect for the feeder &
elevator with a production lock.
4. Employees required to work on this
feeder will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
5. Issue Safe Work Permit and locate near
equipment.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
193
SPECIFIC LOCKOUT PROCEDURE PAGE 193
PLANT: DAP 2 WEST
EQUIPMENT: COOLER FEED ROTARY FEEDER
EQUIPMENT NUMBER: 44-47-661W
DWG. NO.: 44-F-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts. 6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\661W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
194
SPECIFIC LOCKOUT PROCEDURE PAGE 194
PLANT: DAP2 WEST
EQUIPMENT: COOLER FEED ROTARY FEEDER
EQUIPMENT NUMBER: 44-47-661W
DWG. NO.: 44-F-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
l. The Chief Operator will stop the Cooler
Feed Rotary Feeder or Dryer Discharge
Elevator (4305-06-2166W) by pushing the
stop button on the panel board.
2. Open the disconnect for the feeder &
elevator in the West Motor Control Center
(West MCC).
3. Lock the disconnect for the feeder &
elevator with a production lock.
4. Employees required to work on this
feeder will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
5. Issue Safe Work Permit and locate near
equipment.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
195
SPECIFIC LOCKOUT PROCEDURE PAGE 195
PLANT: DAP 2 WEST
EQUIPMENT: COOLER FEED ROTARY FEEDER
EQUIPMENT NUMBER: 44-47-661W
DWG. NO.: 44-F-0036
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts. 6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\661W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
196
SPECIFIC LOCKOUT PROCEDURE PAGE 196
PLANT: DAP 2 WEST
EQUIPMENT: DRYER CYCLONE DUST BIN VIBRATOR
EQUIPMENT NUMBER: 0047-79-678W
DWG. NO.: 44-F-0033
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Close and lock the 1" plant air line to the
Dust Bin Vibrator, with a production lock.
2. Employees required to work on this
vibrator will place their personal lock on the
equipment designated.
3. Reverse procedure to put equipment back
in service.
2/10/95 C:\WP51\DAP2W\678W
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
197
SPECIFIC LOCKOUT PROCEDURE PAGE 197
PLANT: DAP 2 WEST
EQUIPMENT: DRYER CYCLONE DUST BIN VIBRATOR
EQUIPMENT NUMBER: 0047-79-678W
DWG. NO.: 44-F-0033
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Employees required to work on this
vibrator will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
6. Issue Safe Work Permit when required
and locate near equipment.
7. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
8. Reverse procedure to put equipment back
in service.
7. Electrical/480 volts.
Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\678W
SPECIFIC LOCKOUT PROCEDURE PAGE 197
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
198
PLANT: DAP 2 EAST
EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR
EQUIPMENT NUMBER: 0047-47-87
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Nr. 1
Rotary Valve Cooler Dust Collector and
Screw Conveyor (4305-06-2155A) by
pushing the stop button on the panel board.
2. Open the disconnect for the rotary valve
and screw conveyor in the East Motor
Control Center (East MCC).
3. Lock the disconnect for the rotary valve
and screw conveyor with a production lock.
4. Employees required to work on this valve
will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
199
SPECIFIC LOCKOUT PROCEDURE PAGE 199
PLANT: DAP 2 EAST
EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR
EQUIPMENT NUMBER: 0047-47-87
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work Permit when required
and locate near equipment.
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2E\87E
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
200
SPECIFIC LOCKOUT PROCEDURE PAGE 200
PLANT: DAP 2 WEST
EQUIPMENT: NR. 2 ROTARY VALVE COOLER DUST COLLECTOR
EQUIPMENT NUMBER: 0047-47-88W
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Nr. 2
Rotary Valve Cooler Dust Collector and
Screw Conveyor (4305-06-2155B) by
pushing the stop button on the panel
board.
2. Open the disconnect for the rotary valve
and screw conveyor in the West Motor
Control Center (West MCC).
3. Lock the disconnect for the rotary valve
and screw conveyor with a production
lock.
4. Employees required to work on this
valve will place their personal lock on the
equipment designated by the originator of the
Safe Work Permit.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or
release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
201
SPECIFIC LOCKOUT PROCEDURE PAGE 201
PLANT: DAP 2 WEST
EQUIPMENT: NO. 2 ROTARY VALVE COOLER DUST COLLECTOR
EQUIPMENT NUMBER: 0047-47-88W
DWG. NO.: 44-F-0029
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work Permit when required
and locate near equipment.
6. After work completion, inspect
equipment and remove locks. Close
the disconnect for all equipment to be
energized.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
C:\WP51\DAP2W\0047-47-88W 1/10/5
202
SPECIFIC LOCKOUT PROCEDURE PAGE 202
PLANT: DAP 2 WEST
EQUIPMENT: NR. 2 ROTARY VALVE COOLER DUST COLLECTOR
EQUIPMENT NUMBER: 0047-47-88W
DWG. NO.: 44-F-0029
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will stop the Nr. 2 Rotary Valve Cooler Dust Collector and Screw Conveyor (4305-06-2155B) by pushing the stop button on the panel board.
2. Open the disconnect for the rotary valve and screw conveyor in the West Motor Control Center (West MCC).
3. Lock the disconnect for the rotary valve and screw conveyor with a production lock.
4. Employees required to work on this valve will place their personal lock on the equipment designated by the originator of the Safe Work Permit.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected energization. Accidental start-up or release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
203
SPECIFIC LOCKOUT PROCEDURE PAGE 203
PLANT: DAP 2 WEST
EQUIPMENT: NO. 2 ROTARY VALVE COOLER DUST COLLECTOR
EQUIPMENT NUMBER: 0047-47-88W
DWG. NO.: 44-F-0029
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work Permit when required and locate near equipment.
6. After work completion, inspect equipment and remove locks. Close the disconnect for all equipment to be energized.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected energization.
C:\WP51\DAP2W\0047-47-88W 1/10/5
204
SPECIFIC LOCKOUT PROCEDURE PAGE 204
PLANT: DAP 2 WEST
EQUIPMENT: 200 AMP, TEMPORARY WELDING MACHINE, & TWO WELDING
OUTLETS
EQUIPMENT NUMBER: 200 AMP, WR 06-1, & WR 06-2
DWG. NO.:
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will have his
designee, have all equipment or welding
machines unplugged.
2. Open the disconnect for the welding
machine outlet in the West Motor Control
Center (West MCC).
3. Lock the disconnect for the welding
outlet with a production lock.
4. Employees required to work on these
welding machines or electrical outlets will
place their personal lock on the equipment
designated by the originator of the Safe
Work Permit.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up or release
of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
205
SPECIFIC LOCKOUT PROCEDURE PAGE 205
PLANT: DAP 2 WEST
EQUIPMENT: 200 AMP TEMPORARY WELDING MACHINE, & TWO WELDING
OUTLETS
EQUIPMENT NUMBER: 200 AMP, WR 06-1, & WR 06-2
DWG. NO.:
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. Issue Safe Work Permit when required
and locate near equipment.
6. After work completion, inspect
equipment and remove locks. Close the
disconnect for all equipment to be energized.
7. Reverse procedure to put equipment back
in service.
6. Electrical/480 volts.
6. Cubical explosion. Unexpected
energization.
SPECIFIC LOCKOUT PROCEDURE
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
206
PLANT: AMMONIA STORAGE
EQUIPMENT: No.1 AMMONIA STORAGE TANK (501A)
EQUIPMENT NUMBER: 0045-01-501A
DWG. NO.: 45-F-0016/17
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The No.1 Ammonia Storage
Tank (501A) will be emptied
and de-pressurized per
applicable J.S.A./operating
Procedures.
2. The following valves will be
Closed and Chain locked with a
Production Lock: The 3"
Compressor Supply/Return Line
valves, the 6" Tampa bay
Pipeline Line valves, the 8"
Ammonia Vaporizer Supply Line
valve, and the two (2) 4" valves
on the bottom of the Ammonia
Bullets. Open and tag vent valve.
3. Employees working on this
equipment will place their
personal lock(s) on the equipment
1. Ammonia liquid and vapors/250 PSIG.
2. Ammonia liquid and vapors/250 PSIG.
3. None
4. None
1. Health hazard/Fire/Explosion.
2. Health hazard/Fire/explosion.
3. No hazard.
4. No hazard
REVIEWED BY:
AREA SAFETY COMMITTEE: YES
CHAIRMAN: JEFF GOLWITZER
DATE: 11/14/96
207
designated.
4. After work completion, inspect
equipment and reverse
procedures to put the equipment
back in service.
208
SPECIFIC LOCKOUT PROCEDURE
PLANT: AMMONIA STORAGE
EQUIPMENT: No.2 AMMONIA STORAGE TANK (501B)
EQUIPMENT NUMBER: 0045-01-501B
DWG. NO.: 45-F-0016/17
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The No.2 Ammonia Storage
Tank (501B) will be emptied
and de-pressurized per
applicable J.S.A./operating
Procedures.
2. The following valves will be
Closed and Chain locked with a
Production Lock: The 3"
Compressor Supply/Return Line
valves, the 6" Tampa bay
Pipeline Line valves, the 8"
Ammonia Vaporizer Supply
Line valve, and the two (2) 4"
valves on the bottom of the
Ammonia Bullets. Open and tag
vent valve.
1. Ammonia liquid and vapors/250
PSIG.
2. Ammonia liquid and vapors/250
PSIG.
3. None
1. Health hazard/Fire/Explosion.
2. Health hazard/Fire/explosion.
3. No hazard.
REVIEWED BY:
AREA SAFETY COMMITTEE: YES
CHAIRMAN: JEFF GOLWITZER
DATE: 11/14/96
209
3. Employees working on this
equipment will place their
personal lock(s) on the
equipment designated.
4. After work completion, inspect
equipment and reverse
procedures to put the equipment
back in service.
4. None
4. No hazard
210
SPECIFIC LOCKOUT PROCEDURE
PLANT: AMMONIA STORAGE
EQUIPMENT: No.3 AMMONIA STORAGE TANK (501C)
EQUIPMENT NUMBER: 0045-01-501C
DWG. NO.: 45-F-0016/17
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The No.3 Ammonia Storage
Tank (501C) will be emptied
and de-pressurized per
applicable J.S.A./operating
Procedures.
2. The following valves will be
Closed and Chain locked with a
Production Lock: The 3"
Compressor Supply/Return Line
valves, the 6" Tampa bay
Pipeline Line valves, the 8"
Ammonia Vaporizer Supply
Line valve, and the two (2) 4"
valves on the bottom of the
Ammonia Bullets. Open and tag
vent valve.
1. Ammonia liquid and vapors/250
PSIG.
2. Ammonia liquid and vapors/250
PSIG.
3. None
1. Health hazard/Fire/Explosion.
2. Health hazard/Fire/explosion.
3. No hazard.
REVIEWED BY:
AREA SAFETY COMMITTEE: YES
CHAIRMAN: JEFF GOLWITZER
DATE: 11/14/96
211
3. Employees working on this
equipment will place their
personal lock(s) on the
equipment designated.
4. After work completion, inspect
equipment and reverse
procedures to put the equipment
back in service.
4. None
4. No hazard
212
SPECIFIC LOCKOUT PROCEDURE
PLANT: AMMONIA STORAGE
EQUIPMENT: No.4 AMMONIA STORAGE TANK (501D)
EQUIPMENT NUMBER: 0045-01-501D
DWG. NO.: 45-F-0016/17
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The No.4 Ammonia Storage
Tank (501D) will be emptied
and de-pressurized per
applicable J.S.A./operating
Procedures.
2. The following valves will be
Closed and Chain locked with a
Production Lock: The 3"
Compressor Supply/Return Line
valves, the 6" Tampa bay
Pipeline Line valves, the 8"
Ammonia Vaporizer Supply
Line valve, and the two (2) 4"
valves on the bottom of the
Ammonia Bullets. Open and tag
vent valve.
1. Ammonia liquid and vapors/250
PSIG.
2. Ammonia liquid and vapors/250
PSIG.
3. None
1. Health hazard/Fire/Explosion.
2. Health hazard/Fire/explosion.
3. No hazard.
REVIEWED BY:
AREA SAFETY COMMITTEE: YES
CHAIRMAN: JEFF GOLWITZER
DATE: 11/14/96
213
3. Employees working on this
equipment will place their
personal lock(s) on the
equipment designated.
4. After work completion, inspect
equipment and reverse
procedures to put the equipment
back in service.
4. None
4. No hazard
214
SPECIFIC LOCKOUT PROCEDURE
PLANT: AMMONIA STORAGE
EQUIPMENT: No.1 AMMONIA COMPRESSOR (502A)
EQUIPMENT NUMBER: 0045-01-502A
DWG. NO.: 45-F-0017
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Stop The No.1 Ammonia
Compressor Motor (502A) by
pushing the stop button on the
Field Switch.
2. Open and lock the disconnect for the
No.1 Ammonia Compressor (502A)
in the Motor Control Center (MCC).
3. The following valves will be
Closed and Chain locked with a
Production Lock: The 3"
Ammonia Inlet and outlet
valves, the Water Inlet and
outlet Valves, the Oil Separator
inlet and outlet valves. Open
Bleed valves and de-pressurize
system. Open and tag the Water
1. Electrical/120 volts.
2. Electrical/480 volts.
3. Ammonia/Water under
pressure/motor oil.
1. Accidental equipment start-up.
2. Cubical explosion.
3. Eye irritation/Personal health.
REVIEWED BY:
AREA SAFETY COMMITTEE: YES
CHAIRMAN: JEFF GOLWITZER
DATE: 11/14/96
215
Inlet and Outlet Drain Valves.
4. Employees working on this
equipment will place their
personal lock(s) on the
equipment designated.
5. After work completion, inspect
equipment and reverse
procedures to put the equipment
back in service.
4. None
5. None
4. No hazard.
5. No hazard.
216
SPECIFIC LOCKOUT PROCEDURE
PLANT: AMMONIA STORAGE
EQUIPMENT: No.2 AMMONIA COMPRESSOR (502B)
EQUIPMENT NUMBER: 0045-01-502B
DWG. NO.: 45-F-0017
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Stop The No.2 Ammonia
Compressor Motor (502B) by
pushing the stop button on the
Field Switch.
2. Open and lock the disconnect for the
No.2 Ammonia Compressor (502B)
in the Motor Control Center (MCC).
3. The following valves will be
Closed and Chain locked with a
Production Lock: The 3"
Ammonia Inlet and outlet
valves, the Water Inlet and
outlet Valves, the Oil Separator
inlet and outlet valves. Open
1. Electrical/120 volts.
2. Electrical/480 volts.
3. Ammonia/Water under
pressure/motor oil.
1. Accidental equipment start-up.
2. Cubical explosion.
3. Eye irritation/Personal health.
REVIEWED BY:
AREA SAFETY COMMITTEE: YES
CHAIRMAN: JEFF GOLWITZER
DATE: 11/14/96
217
Bleed valves and de-pressurize
system. Open and tag the Water
Inlet and Outlet Drain Valves.
4. Employees working on this
equipment will place their
personal lock(s) on the
equipment designated.
5. After work completion, inspect
equipment and reverse
procedures to put the equipment
back in service.
4. None
5. None
4. No hazard.
5. No hazard.
218
SPECIFIC LOCKOUT PROCEDURE
PLANT: AMMONIA STORAGE
EQUIPMENT: AMMONIA VAPORIZER (506)
EQUIPMENT NUMBER: 0045-01-506
DWG. NO.: 45-F-0016
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Ammonia Vaporizer (506)
will be emptied and de-
pressurized per applicable
J.S.A./Operating Procedures.
2. The following valves will be
Closed and Chain locked with a
Production Lock: The 3" Steam
Supply Line valve, the 3/4"
Condensate valve, the 4"
Ammonia Supply line valves.
Open and tag the 1" vent valves.
Open and tag 3/4" Condensate
Drain valve and the 1" Bleed
valves to the ditch.
1. Ammonia liquid and vapors/250
PSIG.
2. Steam/Hot Condensate/Ammonia
liquid and vapors/250 PSIG.
1. Health hazard/Fire/Explosion.
2. Health hazard/Fire/explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE: YES
CHAIRMAN: JEFF GOLWITZER
DATE: 11/14/96
219
3. Employees working on this
equipment will place their
personal lock(s) on the
equipment designated.
4. After work completion, inspect
equipment and reverse
procedures to put the equipment
back in service.
3. None
4. None
3. No hazard.
4. No hazard
220
SPECIFIC LOCKOUT PROCEDURE PAGE 220
PLANT: DAP 2 WEST
EQUIPMENT: LIGHTING, RECEPTACLES, AND SMALL EQUIPMENT PANELS
EQUIPMENT NUMBER: LP___, ___, ___, ___, ___, ___.
DWG. NO.:
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. Field switches will be placed in the OFF position by production.
2. Breakers will be placed in the OFF position, locked out, tagged or entire panel locked by production. Located in (West MCC).
3. Employees required to work on the equipment will place their personal lock/tag on the equipment designated by the originator of the Safe Work Permit.
4. After work completion, inspect equipment and remove locks. Close the disconnect for all equipment to be energized.
5. Reverse procedure to put equipment back in service.
1. Electrical/120 volts.
2. Electrical/120 volts.
4. Electrical/120 volts.
1. Unexpected energization. Accidental start-up or release of stored energy.
4. Unexpected energization.
C:\DAP2W\W-LP 2/6/5
SPECIFIC LOCKOUT PROCEDURE
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
221
PAGE 221
PLANT: DAP 2 WEST
EQUIPMENT: 200 AMP TEMPORARY WELDING MACHINE & TWO WELDING
OUTLETS
EQUIPMENT NUMBER: 200 AMP, WR 06-1, & WR 06-2
DWG. NO.:
PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.
AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
1. The Chief Operator will have his
designee, have all equipment or
welding machines unplugged.
2. Open the disconnect for the welding
machine outlet in the West Motor
Control Center (West MCC).
3. Lock the disconnect for the welding
outlet with a production lock.
4. Employees required to work on these
welding machines or electrical outlets will
place their personal lock on the equipment
designated.
1. Electrical/480 volts.
2. Electrical/480 volts.
1. Cubical explosion. Unexpected
energization. Accidental start-up
or release of stored energy.
2. Cubical explosion.
REVIEWED BY:
AREA SAFETY COMMITTEE
CHAIRMAN:
DATE:
222
SPECIFIC LOCKOUT PROCEDURE PAGE 222
PLANT: DAP 2 WEST
EQUIPMENT: 200 AMP TEMPORARY WELDING MACHINE & TWO WELDING OUTLETS
EQUIPMENT NUMBER: 200 AMP, WR 06-1, & WR 06-2
DWG. NO.:
WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS
5. After work completion, inspect
equipment and remove locks. Close
the disconnect for all equipment to be
energized.
6. Reverse procedure to put equipment
back in service.
5. Electrical/480 volts. 5. Cubical explosion. Unexpected
energization.
C:\DAP2W\WR 2/6/5