1 PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 14 EQUIPMENT: DEFOAMER METERING PUMP (ZENITH)............................................................................................................................................................... 14 PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 15 EQUIPMENT: DEFOAMER METERING PUMP (ZENITH)............................................................................................................................................................... 15 PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 16 EQUIPMENT: DEFOAMER METERING PUMP (ZENITH)............................................................................................................................................................... 16 PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 17 EQUIPMENT: DEFOAMER METERING PUMP (ZENITH)............................................................................................................................................................... 17 PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 18 EQUIPMENT: VAPORIZER CONDENSATE TANK ......................................................................................................................................................................... 18 PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 19 EQUIPMENT: VAPORIZER CONDENSATE TANK ......................................................................................................................................................................... 19 PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 20 EQUIPMENT: RG PRESCRUBBER PUMP ........................................................................................................................................................................................ 20 PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 21 EQUIPMENT: RG PRESCRUBBER PUMP ........................................................................................................................................................................................ 21 PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 22 EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR............................................................................................................................................ 22 PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 23 EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR............................................................................................................................................ 23 PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 24 EQUIPMENT: COOLER FEED CONVEYOR..................................................................................................................................................................................... 24 PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 25 EQUIPMENT: COOLER FEED CONVEYOR..................................................................................................................................................................................... 25 PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 26 EQUIPMENT: R/G PRESCRUBBER PUMP ....................................................................................................................................................................................... 26 PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 27 EQUIPMENT: R/G PRESCRUBBER PUMP ....................................................................................................................................................................................... 27 PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 28 EQUIPMENT: DRYER DISCHARGE LUMP BREAKER ................................................................................................................................................................... 28 PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 29

Upload: others

Post on 26-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

1

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 14

EQUIPMENT: DEFOAMER METERING PUMP (ZENITH) ............................................................................................................................................................... 14

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 15

EQUIPMENT: DEFOAMER METERING PUMP (ZENITH) ............................................................................................................................................................... 15

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 16

EQUIPMENT: DEFOAMER METERING PUMP (ZENITH) ............................................................................................................................................................... 16

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 17

EQUIPMENT: DEFOAMER METERING PUMP (ZENITH) ............................................................................................................................................................... 17

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 18

EQUIPMENT: VAPORIZER CONDENSATE TANK ......................................................................................................................................................................... 18

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 19

EQUIPMENT: VAPORIZER CONDENSATE TANK ......................................................................................................................................................................... 19

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 20

EQUIPMENT: RG PRESCRUBBER PUMP ........................................................................................................................................................................................ 20

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 21

EQUIPMENT: RG PRESCRUBBER PUMP ........................................................................................................................................................................................ 21

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 22

EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR ............................................................................................................................................ 22

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 23

EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR ............................................................................................................................................ 23

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 24

EQUIPMENT: COOLER FEED CONVEYOR..................................................................................................................................................................................... 24

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 25

EQUIPMENT: COOLER FEED CONVEYOR..................................................................................................................................................................................... 25

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 26

EQUIPMENT: R/G PRESCRUBBER PUMP ....................................................................................................................................................................................... 26

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 27

EQUIPMENT: R/G PRESCRUBBER PUMP ....................................................................................................................................................................................... 27

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 28

EQUIPMENT: DRYER DISCHARGE LUMP BREAKER ................................................................................................................................................................... 28

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 29

Page 2: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

2

EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE ................................................................................................................................................................ 29

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 30

EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE ................................................................................................................................................................ 30

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 31

EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE ................................................................................................................................................................ 31

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 32

EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE ................................................................................................................................................................ 32

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 33

EQUIPMENT: EAST COOLER SCRUBBER FAN .............................................................................................................................................................................. 33

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 34

EQUIPMENT: EAST COOLER SCRUBBER FAN .............................................................................................................................................................................. 34

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 35

EQUIPMENT: VENTURI SCRUBBER PUMPS .................................................................................................................................................................................. 35

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 36

EQUIPMENT: VENTURI SCRUBBER PUMPS .................................................................................................................................................................................. 36

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 37

EQUIPMENT: VENTURI SCRUBBER PUMPS .................................................................................................................................................................................. 37

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 38

EQUIPMENT: VENTURI SCRUBBER PUMPS .................................................................................................................................................................................. 38

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 39

EQUIPMENT: VENTURI SCRUBBER PUMPS .................................................................................................................................................................................. 39

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 40

EQUIPMENT: "A" REACTOR SLURRY PUMP ................................................................................................................................................................................. 40

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 41

EQUIPMENT: "A" REACTOR SLURRY PUMP ................................................................................................................................................................................. 41

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 42

EQUIPMENT: "B" REACTOR SLURRY PUMP ................................................................................................................................................................................. 42

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 43

EQUIPMENT: "B" REACTOR SLURRY PUMP ................................................................................................................................................................................. 43

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 44

EQUIPMENT: "A" REACTOR SLURRY PUMP ................................................................................................................................................................................. 44

Page 3: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

3

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 45

EQUIPMENT: "A" REACTOR SLURRY PUMP ................................................................................................................................................................................. 45

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 46

EQUIPMENT: "B" REACTOR SLURRY PUMP ................................................................................................................................................................................. 46

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 47

EQUIPMENT: "B" REACTOR SLURRY PUMP ................................................................................................................................................................................. 47

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 48

EQUIPMENT: TAIL GAS SCRUBBER PUMP .................................................................................................................................................................................... 48

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 49

EQUIPMENT: TAIL GAS SCRUBBER PUMP .................................................................................................................................................................................... 49

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 50

EQUIPMENT: TAIL GAS SCRUBBER PUMP .................................................................................................................................................................................... 50

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 51

EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 51

PLANT: DAP 2 EAST ......................................................................................................................................................................................................................... 52

EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 52

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 53

EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 53

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 54

EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 54

PLANT: DAP 2 WEST ........................................................................................................................................................................................................................ 55

EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 55

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 56

EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 56

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 57

EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 57

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 58

EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 58

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 60

EQUIPMENT: GRANULATOR .......................................................................................................................................................................................................... 60

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 61

Page 4: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

4

EQUIPMENT: SCRUBBER SEAL TANK AGITATOR ....................................................................................................................................................................... 61

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 62

EQUIPMENT: SCRUBBER SEAL TANK AGITATOR ....................................................................................................................................................................... 62

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 63

EQUIPMENT: SCRUBBER SEAL TANK AGITATOR ....................................................................................................................................................................... 63

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 64

EQUIPMENT: SCRUBBER SEAL TANK AGITATOR ....................................................................................................................................................................... 64

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 65

EQUIPMENT: COOLER SCRUBBER BOOSTER PUMP.................................................................................................................................................................... 65

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 66

EQUIPMENT: COOLER SCRUBBER BOOSTER PUMP.................................................................................................................................................................... 66

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 67

EQUIPMENT: COOLER SCRUBBER CIRCULATING PUMP ........................................................................................................................................................... 67

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 68

EQUIPMENT: COOLER SCRUBBER CIRCULATING PUMP ........................................................................................................................................................... 68

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 69

EQUIPMENT: BFL CONDENSATE TRANSFER PUMP .................................................................................................................................................................... 69

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 70

EQUIPMENT: BFL CONDENSATE TRANSFER PUMP .................................................................................................................................................................... 70

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 71

EQUIPMENT: COOLER VENT FAN ................................................................................................................................................................................................. 71

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 72

EQUIPMENT: COOLER VENT FAN ................................................................................................................................................................................................. 72

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 73

EQUIPMENT: DRYER BURNER FAN ............................................................................................................................................................................................... 73

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 74

EQUIPMENT: DRYER BURNER FAN ............................................................................................................................................................................................... 74

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 75

EQUIPMENT: DRYER BURNER FAN ............................................................................................................................................................................................... 75

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 76

EQUIPMENT: DRYER BURNER FAN ............................................................................................................................................................................................... 76

Page 5: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

5

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 77

EQUIPMENT: DRYER TAILGAS SCRUBBER FAN.......................................................................................................................................................................... 77

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 78

EQUIPMENT: DRYER TAILGAS SCRUBBER FAN.......................................................................................................................................................................... 78

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 79

EQUIPMENT: DRYER TAILGAS SCRUBBER FAN.......................................................................................................................................................................... 79

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 80

EQUIPMENT: DRYER TAILGAS SCRUBBER FAN.......................................................................................................................................................................... 80

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 81

EQUIPMENT: RGV TAILGAS SCRUBBER FAN .............................................................................................................................................................................. 81

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 82

EQUIPMENT: RGV TAILGAS SCRUBBER FAN .............................................................................................................................................................................. 82

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 83

EQUIPMENT: RGV TAILGAS SCRUBBER FAN .............................................................................................................................................................................. 83

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 84

EQUIPMENT: RGV TAILGAS SCRUBBER FAN .............................................................................................................................................................................. 84

PLANT: DAP 2 EAST AND WEST ..................................................................................................................................................................................................... 85

EQUIPMENT: COOLER BAG COLLECTOR AIR HEATER FAN ...................................................................................................................................................... 85

PLANT: DAP 2 EAST AND WEST ..................................................................................................................................................................................................... 86

EQUIPMENT: COOLER BAG COLLECTOR AIR HEATER FAN ...................................................................................................................................................... 86

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 87

EQUIPMENT: PROCESS SCREENS .................................................................................................................................................................................................. 87

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 88

EQUIPMENT: PROCESS SCREENS .................................................................................................................................................................................................. 88

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 89

EQUIPMENT: PROCESS SCREENS .................................................................................................................................................................................................. 89

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 90

EQUIPMENT: DRYER COMBUSTION CHAMBER .......................................................................................................................................................................... 90

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 91

EQUIPMENT: DRYER COMBUSTION CHAMBER .......................................................................................................................................................................... 91

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 92

Page 6: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

6

EQUIPMENT: DRYER COMBUSTION CHAMBER .......................................................................................................................................................................... 92

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 93

EQUIPMENT: ROTARY DRYER ....................................................................................................................................................................................................... 93

PLANT: DAP 2 EAST .......................................................................................................................................................................................................................... 94

EQUIPMENT: ROTARY DRYER ....................................................................................................................................................................................................... 94

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 95

EQUIPMENT: ROTARY DRYER ....................................................................................................................................................................................................... 95

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 96

EQUIPMENT: ROTARY DRYER ....................................................................................................................................................................................................... 96

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 97

EQUIPMENT: WEST ROTARY COOLER ......................................................................................................................................................................................... 97

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 98

EQUIPMENT: WEST ROTARY COOLER ......................................................................................................................................................................................... 98

PLANT: DAP 2 WEST ......................................................................................................................................................................................................................... 99

EQUIPMENT: WEST ROTARY COOLER ......................................................................................................................................................................................... 99

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 101

EQUIPMENT: WEST ROTARY COOLER ....................................................................................................................................................................................... 101

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 102

EQUIPMENT: WEST ROTARY COOLER ....................................................................................................................................................................................... 102

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 103

EQUIPMENT: DRYER AIR PREHEATER ....................................................................................................................................................................................... 103

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 104

EQUIPMENT: DRYER AIR PREHEATER ....................................................................................................................................................................................... 104

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 105

EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE ............................................................................................................................................. 105

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 106

EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE ............................................................................................................................................. 106

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 107

EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE ............................................................................................................................................. 107

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 108

EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE ............................................................................................................................................. 108

Page 7: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

7

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 109

EQUIPMENT: DRYER CYCLONE DUST BIN VALVE ................................................................................................................................................................... 109

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 110

EQUIPMENT: DRYER CYCLONE DUST BIN VALVE ................................................................................................................................................................... 110

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 111

EQUIPMENT: DRYER CYCLONE DUST BIN VALVE ................................................................................................................................................................... 111

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 112

EQUIPMENT: DRYER CYCLONE DUST BIN VALVE ................................................................................................................................................................... 112

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 113

EQUIPMENT: COOLER BAG COLLECTOR SCREW CONVEYOR ............................................................................................................................................... 113

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 114

EQUIPMENT: COOLER BAG COLLECTOR SCREW CONVEYOR ............................................................................................................................................... 114

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 115

EQUIPMENT: COOLER BAG COLLECTOR SCREW CONVEYOR ............................................................................................................................................... 115

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 116

EQUIPMENT: PRODUCT CONVEYOR .......................................................................................................................................................................................... 116

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 117

EQUIPMENT: PRODUCT CONVEYOR .......................................................................................................................................................................................... 117

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 118

EQUIPMENT: RECYCLE FLIGHT CONVEYOR............................................................................................................................................................................. 118

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 119

EQUIPMENT: RECYCLE FLIGHT CONVEYOR............................................................................................................................................................................. 119

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 120

EQUIPMENT: RECYCLE FLIGHT CONVEYOR (DRAGFLIGHT) ................................................................................................................................................. 120

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 121

EQUIPMENT: RECYCLE FLIGHT CONVEYOR (DRAGFLIGHT) ................................................................................................................................................. 121

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 122

EQUIPMENT: DRYER DISCHARGE ELEVATOR .......................................................................................................................................................................... 122

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 123

EQUIPMENT: DRYER DISCHARGE ELEVATOR .......................................................................................................................................................................... 123

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 124

Page 8: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

8

EQUIPMENT: DRYER DISCHARGE ELEVATOR .......................................................................................................................................................................... 124

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 125

EQUIPMENT: DRYER DISCHARGE ELEVATOR .......................................................................................................................................................................... 125

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 126

EQUIPMENT: RECYCLE ELEVATOR ............................................................................................................................................................................................ 126

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 127

EQUIPMENT: RECYCLE ELEVATOR ............................................................................................................................................................................................ 127

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 128

EQUIPMENT: RECYCLE ELEVATOR ............................................................................................................................................................................................ 128

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 129

EQUIPMENT: RECYCLE ELEVATOR ............................................................................................................................................................................................ 129

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 130

EQUIPMENT: RECYCLE FEEDER (JEFFERY) .............................................................................................................................................................................. 130

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 131

EQUIPMENT: RECYCLE FEEDER (JEFFERY) .............................................................................................................................................................................. 131

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 132

EQUIPMENT: RECYCLE FEEDER (JEFFERY) .............................................................................................................................................................................. 132

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 133

EQUIPMENT: RECYCLE FEEDER (JEFFERY) .............................................................................................................................................................................. 133

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 134

EQUIPMENT: PROCESS SCREEN PRIMARY SPLITTER, & DISCH DIVERTER .......................................................................................................................... 134

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 135

EQUIPMENT: PROCESS SCREEN PRIMARY SPLITTER, & DISC DIVERTER ............................................................................................................................. 135

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 136

EQUIPMENT: PROCESS SCREEN PRIMARY SPLITTER, & DISCH DIVERTER .......................................................................................................................... 136

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 137

EQUIPMENT: RGV TAILGAS SCRUBBER ..................................................................................................................................................................................... 137

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 138

EQUIPMENT: RGV TAILGAS SCRUBBER ..................................................................................................................................................................................... 138

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 139

EQUIPMENT: R/G PRESCRUBBER PUMP TANK .......................................................................................................................................................................... 139

Page 9: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

9

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 140

EQUIPMENT: R/G PRESCRUBBER PUMP TANK .......................................................................................................................................................................... 140

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 141

EQUIPMENT: R/G PRESCRUBBER ................................................................................................................................................................................................ 141

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 142

EQUIPMENT: R/G PRESCRUBBER ................................................................................................................................................................................................ 142

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 143

EQUIPMENT: R/G PRESCRUBBER PUMP TANK .......................................................................................................................................................................... 143

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 144

EQUIPMENT: R/G PRESCRUBBER PUMP TANK .......................................................................................................................................................................... 144

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 145

EQUIPMENT: DRYER TAILGAS SCRUBBER ................................................................................................................................................................................ 145

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 146

EQUIPMENT: DRYER TAILGAS SCRUBBER ................................................................................................................................................................................ 146

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 147

EQUIPMENT: RGV TAILGAS SCRUBBER ..................................................................................................................................................................................... 147

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 148

EQUIPMENT: RGV TAILGAS SCRUBBER ..................................................................................................................................................................................... 148

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 149

EQUIPMENT: DRYER VENTURI SCRUBBER ............................................................................................................................................................................... 149

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 150

EQUIPMENT: DRYER VENTURI SCRUBBER ............................................................................................................................................................................... 150

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 151

EQUIPMENT: RGV VENTURI SCRUBBER .................................................................................................................................................................................... 151

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 152

EQUIPMENT: RGV VENTURI ........................................................................................................................................................................................................ 152

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 153

EQUIPMENT: DRYER CYCLONE .................................................................................................................................................................................................. 153

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 154

EQUIPMENT: DRYER CYCLONE .................................................................................................................................................................................................. 154

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 155

Page 10: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

10

EQUIPMENT: R/G PRESCRUBBER ................................................................................................................................................................................................ 155

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 156

EQUIPMENT: R/G PRESCRUBBER ................................................................................................................................................................................................ 156

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 157

EQUIPMENT: AMMONIA CHILLER .............................................................................................................................................................................................. 157

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 158

EQUIPMENT: AMMONIA CHILLER .............................................................................................................................................................................................. 158

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 159

EQUIPMENT: AMMONIA CHILLER .............................................................................................................................................................................................. 159

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 160

EQUIPMENT: AMMONIA CHILLER .............................................................................................................................................................................................. 160

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 161

EQUIPMENT: AMMONIA CHILLER .............................................................................................................................................................................................. 161

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 162

EQUIPMENT: AMMONIA CHILLER .............................................................................................................................................................................................. 162

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 163

EQUIPMENT: BFL AMMONIA VAPORIZER ................................................................................................................................................................................. 163

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 164

EQUIPMENT: BFL AMMONIA VAPORIZER ................................................................................................................................................................................. 164

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 165

EQUIPMENT: BFL AMMONIA VAPORIZER ................................................................................................................................................................................. 165

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 166

EQUIPMENT: BFL AMMONIA VAPORIZER ................................................................................................................................................................................. 166

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 167

EQUIPMENT: AIR CHILLER ........................................................................................................................................................................................................... 167

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 168

EQUIPMENT: AIR CHILLER ........................................................................................................................................................................................................... 168

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 169

EQUIPMENT: AIR CHILLER ........................................................................................................................................................................................................... 169

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 170

EQUIPMENT: AIR CHILLER ........................................................................................................................................................................................................... 170

Page 11: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

11

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 171

EQUIPMENT: AIR CHILLER ........................................................................................................................................................................................................... 171

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 172

EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 172

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 173

EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 173

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 174

EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 174

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 175

EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 175

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 176

EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 176

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 177

EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 177

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 178

EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 178

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 179

EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 179

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 180

EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 180

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 181

EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 181

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 182

EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 182

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 183

EQUIPMENT: REACTOR ................................................................................................................................................................................................................ 183

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 184

EQUIPMENT: DEFOAMER SHIFT TANK ...................................................................................................................................................................................... 184

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 185

EQUIPMENT: DEFOAMER SHIFT TANK ...................................................................................................................................................................................... 185

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 186

Page 12: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

12

EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR .................................................................................................................................................................. 186

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 187

EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR .................................................................................................................................................................. 187

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 188

EQUIPMENT: DEFOAMER SHIFT TANK ...................................................................................................................................................................................... 188

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 189

EQUIPMENT: DEFOAMER SHIFT TANK ...................................................................................................................................................................................... 189

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 190

EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR .................................................................................................................................................................. 190

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 191

EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR .................................................................................................................................................................. 191

PLANT: DAP2 WEST ........................................................................................................................................................................................................................ 192

EQUIPMENT: COOLER FEED ROTARY FEEDER ......................................................................................................................................................................... 192

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 193

EQUIPMENT: COOLER FEED ROTARY FEEDER ......................................................................................................................................................................... 193

PLANT: DAP2 WEST ........................................................................................................................................................................................................................ 194

EQUIPMENT: COOLER FEED ROTARY FEEDER ......................................................................................................................................................................... 194

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 195

EQUIPMENT: COOLER FEED ROTARY FEEDER ......................................................................................................................................................................... 195

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 196

EQUIPMENT: DRYER CYCLONE DUST BIN VIBRATOR ............................................................................................................................................................. 196

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 197

EQUIPMENT: DRYER CYCLONE DUST BIN VIBRATOR ............................................................................................................................................................. 197

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 198

EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR .......................................................................................................................................... 198

PLANT: DAP 2 EAST ........................................................................................................................................................................................................................ 199

EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR .......................................................................................................................................... 199

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 200

EQUIPMENT: NR. 2 ROTARY VALVE COOLER DUST COLLECTOR .......................................................................................................................................... 200

SPECIFIC LOCKOUT PROCEDURE PAGE 2 ................................................................................................................................................................................ 201

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 201

Page 13: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

13

EQUIPMENT: NO. 2 ROTARY VALVE COOLER DUST COLLECTOR ......................................................................................................................................... 201

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 202

EQUIPMENT: NR. 2 ROTARY VALVE COOLER DUST COLLECTOR .......................................................................................................................................... 202

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 203

EQUIPMENT: NO. 2 ROTARY VALVE COOLER DUST COLLECTOR ......................................................................................................................................... 203

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 204

EQUIPMENT: 200 AMP, TEMPORARY WELDING MACHINE, & TWO WELDING OUTLETS ................................................................................................... 204

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 205

EQUIPMENT: 200 AMP TEMPORARY WELDING MACHINE, & TWO WELDING OUTLETS .................................................................................................... 205

PLANT: AMMONIA STORAGE ..................................................................................................................................................................................................... 206

EQUIPMENT: NO.1 AMMONIA STORAGE TANK (501A) ............................................................................................................................................................. 206

PLANT: AMMONIA STORAGE ..................................................................................................................................................................................................... 208

EQUIPMENT: NO.2 AMMONIA STORAGE TANK (501B) ............................................................................................................................................................. 208

PLANT: AMMONIA STORAGE ..................................................................................................................................................................................................... 210

EQUIPMENT: NO.3 AMMONIA STORAGE TANK (501C) ............................................................................................................................................................. 210

PLANT: AMMONIA STORAGE ..................................................................................................................................................................................................... 212

EQUIPMENT: NO.4 AMMONIA STORAGE TANK (501D) ............................................................................................................................................................. 212

PLANT: AMMONIA STORAGE ..................................................................................................................................................................................................... 214

EQUIPMENT: NO.1 AMMONIA COMPRESSOR (502A) ................................................................................................................................................................ 214

PLANT: AMMONIA STORAGE ..................................................................................................................................................................................................... 216

EQUIPMENT: NO.2 AMMONIA COMPRESSOR (502B) ................................................................................................................................................................ 216

PLANT: AMMONIA STORAGE ..................................................................................................................................................................................................... 218

EQUIPMENT: AMMONIA VAPORIZER (506) ............................................................................................................................................................................... 218

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 220

EQUIPMENT: LIGHTING, RECEPTACLES, AND SMALL EQUIPMENT PANELS ....................................................................................................................... 220

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 221

EQUIPMENT: 200 AMP TEMPORARY WELDING MACHINE & TWO WELDING OUTLETS ..................................................................................................... 221

PLANT: DAP 2 WEST ....................................................................................................................................................................................................................... 222

EQUIPMENT: 200 AMP TEMPORARY WELDING MACHINE & TWO WELDING OUTLETS ..................................................................................................... 222

Page 14: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

14

SPECIFIC LOCKOUT PROCEDURE PAGE 14

PLANT: DAP 2 EAST

EQUIPMENT: DEFOAMER METERING PUMP (ZENITH)

EQUIPMENT NUMBER:

DWG. NO.: 44-F-0027

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Defoamer Metering Pump by

pushing the stop button on the panel board.

2. Open the disconnect (#28) for the

pump, in the 200 amp panel, located behind

the East Control Panel.

3. Lock/Tag the disconnect for the

agitator with a production lock/tag.

4. Close and chain lock the 2" (420)

suction valve with a production lock and

close and tag l" discharge valve (421).

5. Employees required to work on these

pumps will place their personal locks on the

equipment designated.

1. Electrical/120 volts.

2. Electrical/120 volts.

4. Defoamer (oil)/140 F.

1. Unexpected energization.

Accidental start-up or release of stored

energy.

2.

4.Thermal burns.

2/6/5

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 15: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

15

SPECIFIC LOCKOUT PROCEDURE

PLANT: DAP 2 EAST

EQUIPMENT: DEFOAMER METERING PUMP (ZENITH)

EQUIPMENT NUMBER:

DWG. NO.: 44-F-0027

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. After work completion, inspect

equipment and reverse procedure to put

equipment back in service.

6. Electrical/480 volts. 6. Cubical explosion. Unexpected

energization.

C:\DAP2E\0000EZEN 2/6/5

Page 16: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

16

SPECIFIC LOCKOUT PROCEDURE PAGE 16

PLANT: DAP 2 WEST

EQUIPMENT: DEFOAMER METERING PUMP (ZENITH)

EQUIPMENT NUMBER:

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Defoamer Metering Pump by

pushing the stop button on the panel board.

2. Open the disconnect (#28) for the pump,

in the 200 amp panel, located behind the

West Control Panel.

3. Lock/Tag the disconnect for the agitator

with a production lock/tag.

4. Close and chain lock the 2" (410) or 3/8"

suction valve and 1" discharge valve with a

production valve.

1. Electrical/120 volts.

2. Electrical/120 volts.

4. Defoamer (oil)/140 F.

1. Unexpected energization.

Accidental start-up or release of stored

energy.

2.

4.Thermal burns.

1/2

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 17: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

17

SPECIFIC LOCKOUT PROCEDURE PAGE 17

PLANT: DAP 2 WEST

EQUIPMENT: DEFOAMER METERING PUMP (ZENITH)

EQUIPMENT NUMBER:

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Employees required to work on these

pumps will place their personal locks on the

equipment designated by the originator of the

Safe Work Permit.

6. Issue Safe Work Permit when required

and locate near equipment.

7. After work completion , inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

8. Reverse procedure to put equipment back

in service.

7. Electrical/480 volts.

7. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W1\0000W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 18: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

18

SPECIFIC LOCKOUT PROCEDURE PAGE 18

PLANT: DAP 2 WEST

EQUIPMENT: VAPORIZER CONDENSATE TANK

EQUIPMENT NUMBER: 0047-01-059

DWG. NO.: 44-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Follow Specific Lockout Procedures to

take the BFL Ammonia Vaporiozer out of

Service.

2. Open 2" drain valve (105) and drain tank

to RGV Tailgas Scrubber.

3. Close and tag 4" overflow valve (106).

4. Employees required to work in this tank

will place their personal locks on the

equipment designated.

5. Reverse procedure to put equipment back

in service.

2. Aqua Ammonia/10%+

2. Health

2/10/95

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 19: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

19

SPECIFIC LOCKOUT PROCEDURE PAGE 19

PLANT: DAP 2 WEST

EQUIPMENT: VAPORIZER CONDENSATE TANK

EQUIPMENT NUMBER: 0047-01-059

DWG. NO.: 44-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. After Work Completion inspect

equipment and remove locks.

7. Reverse procedure to put equipment back

in service.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 20: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

20

SPECIFIC LOCKOUT PROCEDURE PAGE 20

PLANT: DAP 2 WEST

EQUIPMENT: RG PRESCRUBBER PUMP

EQUIPMENT NUMBER: 44-22-079AW & 078BW

DWG. NO.: 44-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the "A" or

"B" R/G Prescrubber Pump by pushing the

stop button on the panel board.

2. Open and lock the disconnect for the "A"

or "B" pump in the West Motor Control

Center (West MCC) with a production lock.

3. Close and lock designated pumps 12"

suction valve. Valve numbers are "A"-121,

and "B"-119.

4. Close and lock designated pumps 12"

discharge valve. Valve numbers are "A"-

124, and "B"-123.

1. Electrical/480 volts.

2. Electrical/480 volts.

3. Phosphoric acid/180 F.

4. Phosphoric acid/180 F.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

3. Thermal and chemical burns.

4. Thermal and chemical burns.

1/26/95

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 21: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

21

SPECIFIC LOCKOUT PROCEDURE PAGE 21

PLANT: DAP 2 WEST

EQUIPMENT: RG PRESCRUBBER PUMP

EQUIPMENT NUMBER: 44-22-079AW & 078BW

DWG. NO.: 44-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Open and tag designated pumps 2" drain

valve. Valve numbers are "A"-122, and "B"-

120.

6. Employees required to work on these

pumps will place their personal locks on the

equipment designated.

7. Reverse procedure to put equipment back

in service.

5. Phosphoric acid/180 F.

7. Electrical/480 volts.

5. Thermal and chemical burns.

7. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\079A078B

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 22: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

22

SPECIFIC LOCKOUT PROCEDURE PAGE 22

PLANT: DAP 2 EAST

EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR

EQUIPMENT NUMBER: 0047-47-87

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Nr. 1

Rotary Valve Cooler Dust Collector and

Screw Conveyor (4305-06-2155A) by

pushing the stop button on the panel board.

2. Open the disconnect for the rotary valve

and screw conveyor in the East Motor

Control Center (East MCC).

3. Lock the disconnect for the rotary valve

and screw conveyor with a production lock.

4. Employees required to work on this valve

will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 23: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

23

SPECIFIC LOCKOUT PROCEDURE PAGE 23

PLANT: DAP 2 EAST

EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR

EQUIPMENT NUMBER: 0047-47-87

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work Permit when required

and locate near equipment.

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\087E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 24: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

24

SPECIFIC LOCKOUT PROCEDURE PAGE 24

PLANT: DAP 2 EAST

EQUIPMENT: COOLER FEED CONVEYOR

EQUIPMENT NUMBER: 44-53-094

DWG. NO.: 44-F-0026

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Cooler

Feed Conveyor and Cooler Feed Rotary Feeder

(44-47-658) by pushing the stop button on the

panel board.

2. Open the disconnect for the conveyor and

rotary feeder in the East Motor Control Center

(East MCC).

3. Lock the disconnect for the conveyor and

rotary feeder with a production lock.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 25: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

25

SPECIFIC LOCKOUT PROCEDURE PAGE 25

PLANT: DAP 2 EAST

EQUIPMENT: COOLER FEED CONVEYOR

EQUIPMENT NUMBER: 44-53-094

DWG. NO.: 44-F-0026

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

4. Employees required to work on this

conveyor will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

5. Issue Safe Work Permit when required and

locate near equipment.

6. After work completion, inspect equipment

and remove locks. Close the disconnect for all

equipment to be energized.

7. Reverse procedure to put equipment back in

service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\094E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 26: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

26

SPECIFIC LOCKOUT PROCEDURE PAGE 26

PLANT: DAP 2 EAST

EQUIPMENT: R/G PRESCRUBBER PUMP

EQUIPMENT NUMBER: 4305-06-1001A&BE

DWG. NO.: 44-F-0021

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the "A" or "B"

R/G Prescrubber Pump by pushing the stop

button on the panel board.

2. Open the disconnect for the "A" or "B"

pump in the East Motor Control Center (East

MCC).

3. Lock the disconnect for the "A" or "B" pump

with a production lock.

4. Close and chain lock designated pump 12"

suction valve. Valve numbers are "A"- 148,

and "B"-146

5. Close and chain lock designated pump 12"

discharge valve. Valve numbers are "A"-51,

and "B"-150.

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Phosphoric acid/180 F.

5. Phosphoric acid/180 F.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4. Thermal and chemical burns.

5. Thermal and chemical burns.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 27: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

27

SPECIFIC LOCKOUT PROCEDURE PAGE 27

PLANT: DAP 2 EAST

EQUIPMENT: R/G PRESCRUBBER PUMP

EQUIPMENT NUMBER: 44-22-1001A&BE

DWG. NO.: 44-F-0021

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Open and tag designated pumps 2" drain

valve. Valve numbers are "A"-149, and "B"-

147.

7. Employees required to work on these pumps

will place their personal locks on the equipment

designated by the originator of the Safe Work

Permit.

8. Issue Safe Work Permit when required and

locate near equipment.

9. After work completion, inspect equipment

and remove locks. Close the disconnect for all

equipment to be energized.

10. Reverse procedure to put equipment back in

service.

9. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\1001A&BE

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 28: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

28

SPECIFIC LOCKOUT PROCEDURE PAGE 28

PLANT: DAP 2 WEST

EQUIPMENT: DRYER DISCHARGE LUMP BREAKER

EQUIPMENT NUMBER: 4305-06-1061W

DWG. NO.:44-F-0033

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Dryer

Discharge Lump Breaker by pushing the stop

button on the panel board.

2. Open and lock the disconnect for the Dryer

Discharge Lump Breaker in the West Motor

Control Center (West MCC) with a

production lock.

3. When entry to the Dryer Discharge Lump

Breaker is required, the Rotary Dryer

(1561W) must be locked-out.

4. Employees working on this lump breaker

will place their personal lock on the

equipment designated.

5. Reverse procedure to put

equipment back in service.

1. Electrical/480 volts.

2. Electrical/480 volts.

5. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

5. Cubical explosion. Unexpected

energization.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 29: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

29

SPECIFIC LOCKOUT PROCEDURE PAGE 29

PLANT: DAP 2 EAST

EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE

EQUIPMENT NUMBER: 4305-06-1062E A1 THRU D1 AND 1062E A2 THRU D2

DWG. NO.: 44-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Unit that will be taken out of service will

have the product diverted.

2. The Chief Operator will stop the inner

and outer cage mill by pushing the stop

button on the panel board.

3. Lock the disconnect for the inner and

outer cage mill in the East Motor Control

Center (East MCC).

4. Lock the disconnect for the inner and

outer cage mill with a production lock.

5. Employees required to work on the cage

mills will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

2. Electrical/480 volts.

3. Electrical/480 volts.

2. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

3. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 30: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

30

SPECIFIC LOCKOUT PROCEDURE PAGE 30

PLANT: DAP 2 EAST

EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE

EQUIPMENT NUMBER: 4305-06-1062EA1 THRU D1 AND 1062W A2 THRU D2

DWG. NO.: 44-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Issue Safe Work Permit when required

and locate near equipment.

7. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

8. Reverse procedure to put equipment back

in service.

7. Electrical/480 volts.

7. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\1062EA-D

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 31: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

31

SPECIFIC LOCKOUT PROCEDURE PAGE 31

PLANT: DAP 2 WEST

EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE

EQUIPMENT NUMBER: 4305-06-1062W A1 THRU D1 AND 1062W A2 THRU D2

DWG. NO.: 44-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the inner

and outer cage mill by pushing the stop

button on the panel board.

2. Open and lock the disconnect for the

inner and outer cage mill in the West Motor

Control Center (West MCC) with a

production lock.

3. Employees required to work on the cage

mills will place their personal lock on the

equipment designated.

4. Reverse procedure to put equipment back

in service.

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4. Cubical explosion. Unexpected

energization.

1/27/95 C:\WP51\DAP2W\1062WA-D

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 32: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

32

SPECIFIC LOCKOUT PROCEDURE PAGE 32

PLANT: DAP 2 WEST

EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE

EQUIPMENT NUMBER: 4305-06-1062W A1 THRU D1 AND 1062W A2 THRU D2

DWG. NO.: 44-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Issue Safe Work Permit when required

and locate near equipment.

7. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

8. Reverse procedure to put equipment back

in service.

7. Electrical/480 volts.

7. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\1062WA-D

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 33: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

33

SPECIFIC LOCKOUT PROCEDURE PAGE 33

PLANT: DAP 2 EAST

EQUIPMENT: EAST COOLER SCRUBBER FAN

EQUIPMENT NUMBER: 44-44-114

DWG. NO.: 44-F-0026

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the East

Cooler Scrubber Fan by pushing the stop

button on the panel board.

2. Open the disconnect for the scrubber fan

in the East Motor Control Center (East

MCC).

3. Lock the disconnect for the scrubber fan

with a production lock.

4. Employees required to work on the

condensate pump, will place their personal

locks on the equipment designated by the

originator of the Safe Work Permit.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

1/17/5

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 34: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

34

SPECIFIC LOCKOUT PROCEDURE PAGE 34

PLANT: DAP 2 EAST

EQUIPMENT: EAST COOLER SCRUBBER FAN

EQUIPMENT NUMBER: 344-44-114

DWG. NO.: 44-F-0026

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work Permit when required

and locate near equipment.

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\114E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 35: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

35

SPECIFIC LOCKOUT PROCEDURE PAGE 35

PLANT: DAP 2 EAST

EQUIPMENT: VENTURI SCRUBBER PUMPS

EQUIPMENT NUMBER: 4305-06-1163E "A" & "B"

DWG. NO.: 44-F-0027

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the "A" or "B"

Venturi Scrubber Pump by pushing the stop

button on the panel board.

2. Open the disconnect for the "A" or "B"

pump in the East Motor Control Center (East

MCC).

3. Lock the disconnect for the "A" or "B" pump

with a production lock.

4. Close and chain lock the 12" suction valve

(381) or (380) and 12" discharge valve (387) or

(386).

5. Open and tag 2" drain valve (383) or (382).

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Phosphoric acid/180 F.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4. Thermal and chemical burns.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 36: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

36

SPECIFIC LOCKOUT PROCEDURE PAGE 36

PLANT: DAP 2 EAST

EQUIPMENT: VENTURI SCRUBBER PUMPS

EQUIPMENT NUMBER: 4305-06-1163E "A" & "B"

DWG. NO.: 44-F-0027

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6.Employees required to work on these pumps

will place their personal locks on the equipment

designated by the originator of the Safe Work

Permit.

7. When one of the pumps is operating, the

discharge valve (387) or (386) must be blinded

or employees "fully suited out".

8. Issue Safe Work Permit when

required and locate near

equipment.

9. After work completion, inspect equipment

and remove locks. Close the disconnect for all

equipment to be energized.

10. Reverse procedure to put equipment back in

service.

9. Electrical/480 volts.

9. Cubical explosion. Unexpected

energization.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 37: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

37

C:\WP51\DAP2W\1163EA&B

SPECIFIC LOCKOUT PROCEDURE PAGE 37

PLANT: DAP 2 WEST

EQUIPMENT: VENTURI SCRUBBER PUMPS

EQUIPMENT NUMBER: 4305-06-1163 W "A" & "B"

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the "A" or

"B" Venturi Scrubber Pump by pushing the

stop button on the panel board.

2. Open and lock the disconnect for the "A"

or "B" pump in the West Motor Control

Center (West MCC) with a production lock.

3. Close and lock designated pumps 12"

suction valve. Valve numbers are "A"-(391),

and "B"-(390).

4. Close and lock designated pumps 12"

discharge valve. Valve numbers are "A"-

(395), and "B"-(394).

1. Electrical/480 volts.

2. Electrical/480 volts.

3. Phosphoric acid/180 F.

4. Phosphoric acid/180 F.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

3. Thermal and chemical burns.

4. Thermal and chemical burns.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 38: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

38

SPECIFIC LOCKOUT PROCEDURE PAGE 38

PLANT: DAP 2 WEST

EQUIPMENT: VENTURI SCRUBBER PUMPS

EQUIPMENT NUMBER: 4305-06-1163W "A" & "B"

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Open and tag designated pumps 2" drain

valve. Valve Numbers are "A"-(393), and

"B"- (392).

6. Employees required to work on these

pumps will place their personal locks on the

equipment designated.

7. Reverse procedure to put equipment back

in service.

6. Phosphoric acid/180 F.

7. Electrical/480 volts.

6. Thermal and chemical burns.

7. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\1163WA&B

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 39: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

39

SPECIFIC LOCKOUT PROCEDURE PAGE 3

PLANT: DAP 2 WEST

EQUIPMENT: VENTURI SCRUBBER PUMPS

EQUIPMENT NUMBER: 4305-06-1163W "A" & "B"

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

8. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

9. Reverse procedure to put equipment back

in service.

8. Electrical/480 volts. 8. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\1163WA&B

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 40: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

40

SPECIFIC LOCKOUT PROCEDURE PAGE 40

PLANT: DAP 2 EAST

EQUIPMENT: "A" REACTOR SLURRY PUMP

EQUIPMENT NUMBER: 4305-06-1165E "A"

DWG. NO.: 44-F-0020

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the "A"

reactor slurry pump by pushing the stop

button on the panel board.

2. Open the disconnect for the slurry pump in

the East Motor Control Center (East MCC).

3. Lock the disconnect for the slurry pump

with a production lock.

4. When operating "B" slurry pump with "A"

or "B" line, close and chain lock with a

production lock, 6" suction valve (072), and

4" discharge valve (075).

5. Open and tag 3" drain valve (073). Close

and tag 3" pond water valve in 6" suction.

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Diammonium phosphates/180 F.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release or stored energy.

2. Cubical explosion.

4. Thermal and chemical burns.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 41: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

41

SPECIFIC LOCKOUT PROCEDURE PAGE 41

PLANT: DAP 2 EAST

EQUIPMENT: "A" REACTOR SLURRY PUMP

EQUIPMENT NUMBER: 4305-06-1165E "A"

DWG. NO.: 44-F-0020

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Employees required to work on the slurry

pump, will place their personal locks on the

equipment designated by the originator of the

Safe Work Permit.

7. Issue Safe Work Permit when required

and locate near equipment.

8. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

9. Reverse procedure to put equipment back

in service.

8. Electrical/480 volts.

8. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\1165E"A"

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 42: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

42

SPECIFIC LOCKOUT PROCEDURE PAGE 42

PLANT: DAP 2 EAST

EQUIPMENT: "B" REACTOR SLURRY PUMP

EQUIPMENT NUMBER: 4305-06-1165E "B"

DWG. NO.: 44-F-0020

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the "B"

reactor slurry pump by pushing the stop

button on the panel board.

2. Open the disconnect for the slurry pump in

the East Motor Control Center (East MCC).

3. Lock the disconnect for the slurry pump

with a production lock.

4. When operating "A" slurry pump with "A"

or "B" line, close and chain lock with a

production lock, 6" suction valve (070), and

4" discharge valve (074).

5. Open and tag 3" drain valve (071). Close

and tag 3" pond water valve in 6" suction.

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Diammonium phosphates/180 F.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release or stored energy.

2. Cubical explosion.

4. Thermal and chemical burns.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 43: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

43

SPECIFIC LOCKOUT PROCEDURE PAGE 43

PLANT: DAP 2 EAST

EQUIPMENT: "B" REACTOR SLURRY PUMP

EQUIPMENT NUMBER: 4305-06-1165E "B"

DWG. NO.: 44-F-0020

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Employees required to work on the slurry

pump, will place their personal locks on the

equipment designated by the originator of the

Safe Work Permit.

7. Issue Safe Work Permit when required

and locate near equipment.

8. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

9. Reverse procedure to put equipment back

in service.

8. Electrical/480 volts.

8. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\1165E"B"

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 44: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

44

SPECIFIC LOCKOUT PROCEDURE PAGE 44

PLANT: DAP 2 WEST

EQUIPMENT: "A" REACTOR SLURRY PUMP

EQUIPMENT NUMBER: 4305-06-1165W "A"

DWG. NO.: 44-F-0030

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the "A"

reactor slurry pump by pushing the stop

button on the panel board.

2. Open and lock the disconnect for the

slurry pump in the West Motor Control

Center (West MCC) with a production lock.

3. When operating "B" slurry pump with

"A" or "B" line, close and lock with a

production lock, 6" suction valve (066), and

4" discharge valve (070).

4. Open and tag 3" drain valve (068). Close

and tag 3" pond water valve in 6" suction.

1. Electrical/480 volts.

2. Electrical/480 volts.

3. Diammonium phosphates/180 F.

4. Diammonium phosphates/180 F.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release or stored energy.

2. Cubical explosion.

3. Thermal and chemical burns.

4. Thermal and chemical burns.

2/1/95

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 45: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

45

SPECIFIC LOCKOUT PROCEDURE PAGE 45

PLANT: DAP 2 WEST

EQUIPMENT: "A" REACTOR SLURRY PUMP

EQUIPMENT NUMBER: 4305-06-1165W "A"

DWG. NO.: 44-F-0030

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Employees required to work on the slurry

pump, will place their personal locks on the

equipment designated.

6. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\1165WA

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 46: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

46

SPECIFIC LOCKOUT PROCEDURE PAGE 46

PLANT: DAP 2 WEST

EQUIPMENT: "B" REACTOR SLURRY PUMP

EQUIPMENT NUMBER: 4305-06-1165W "B"

DWG. NO.: 44-F-0030

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the "B"

reactor slurry pump by pushing the stop

button on the panel board.

2. Open and lock the disconnect for the

slurry pump in the West Motor Control

Center (West MCC) with a production lock.

3. When operating "A" slurry pump with

"A" or "B" line, close and lock with a

production lock, 6" suction valve (067), and

4" discharge valve (071).

4. Open and tag 3" drain valve (069). Close

and tag 3" pond water valve in 6" suction.

1. Electrical/480 volts.

2. Electrical/480 volts.

3. Diammonium phosphates/180 F.

4. Diammonium phosphates/180 F.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release or stored energy.

2. Cubical explosion.

3. Thermal and chemical burns.

4. Thermal and chemical burns.

2/1/95

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 47: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

47

SPECIFIC LOCKOUT PROCEDURE PAGE 47

PLANT: DAP 2 WEST

EQUIPMENT: "B" REACTOR SLURRY PUMP

EQUIPMENT NUMBER: 43405-06-1165W "B"

DWG. NO.: 44-F-0030

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Employees required to work on the slurry

pump, will place their personal locks on the

equipment designated.

6. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\1165WB

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 48: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

48

SPECIFIC LOCKOUT PROCEDURE PAGE 48

PLANT: DAP 2 EAST

EQUIPMENT: TAIL GAS SCRUBBER PUMP

EQUIPMENT NUMBER: 4305-06-1169, "A", "B", & "C"

DWG. NO.: 44-F-0028

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Tail Gas

Scrubber Pump by pushing the stop button

on the panel board.

2. Open the disconnect for the Tail Gas

Scrubber Pump in the East Motor Control

Center (East MCC).

3. Lock the disconnect for the Tail Gas

Scrubber Pump with a production lock.

4. If motor is to be repaired or replaced,

only lock out disconnect and close and tag

suction valve.

5. Close and chain lock designated pumps

18" suction valve. Valve numbers are "A"-

533, "B"-531, and "C"- 529.

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Mechanical/

5. Phosphoric acid/180 F.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 49: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

49

SPECIFIC LOCKOUT PROCEDURE PAGE 49

PLANT: DAP 2 EAST

EQUIPMENT: TAIL GAS SCRUBBER PUMP

EQUIPMENT NUMBER: 4305-06-1169, "A", "B", & "C"

DWG. NO.: 44-F-0028

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Close and chain lock designated pumps

14" discharge valve. Valve numbers are

"A"-526, "B"-524, and "C"-522.

7. Open, drain, and tag designated pumps 1"

drain valve. Valve numbers are, "A"-532,

"B"-530, and "C"-528.

8. Close and tag designated pumps 1" seal

water valve. Valve numbers are "A"-563,

"B"-560, and "C"-557.

9. Employees required to work on this pump

will place their personal lock on the

equipment designated by the originator of

the Safe Work Permit.

6. Phosphoric acid/180 F.

7. Phosphoric acid/180 F.

6. Thermal burns.

7. Thermal burns.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 50: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

50

SPECIFIC LOCKOUT PROCEDURE PAGE 50

PLANT: DAP 2 EAST

EQUIPMENT: TAIL GAS SCRUBBER PUMP

EQUIPMENT NUMBER: 4305-06-1169W, "A", "B", & "C"

DWG. NO.: 44-F-0028

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

10. Issue Safe Work Permit when required

and locate near equipment.

11. After work completion inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

12. Reverse procedure to put equipment

back in service.

11. Electrical/480 volts.

11. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\1169ABCE

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 51: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

51

SPECIFIC LOCKOUT PROCEDURE PAGE 51

PLANT: DAP 2 EAST

EQUIPMENT: GRANULATOR

EQUIPMENT NUMBER: 4305-06-1264E

DWG. NO.: 44-F-0020, 0021, & 0024

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Granulator,

Recycle Elevator, and "A" & "B" Slurry Pumps

by pushing the stop button on the panel board.

2. When entry to the granulator is not required,

only electrically lockout the granulator.

3. Open the disconnect for the Granulator,

Recycle Elevator, and "A" & "B" Slurry Pumps

in the East Motor Control Center (East MCC).

4. Lock the disconnect for the Granulator,

Recycle Elevator, "A" & "B" Slurry Pumps in

the OFF position with a production lock.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or release

of stored energy.

2. Cubical explosion.

12/26

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 52: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

52

SPECIFIC LOCKOUT PROCEDURE PAGE 52

PLANT: DAP 2 EAST

EQUIPMENT: GRANULATOR

EQUIPMENT NUMBER: 4305-06-1264E

DWG. NO.: 44-F-0020, 0021, & 0024

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Close and chain lock with a production lock

the two 6" valves (121, 028, & 032) and tag

open 3/4" bleed valve (031) on the ammonia

vapor line to the granulator.

6. Close and chain lock with a production lock

the two 3" valves (017 & 020) and tag open

3/4" vent valve (019) on the liquid ammonia

line to the granulator.

7. Close and chain lock with a production lock

the two 3" slurry discharge valves (085 & 086)

to the granulator, and the 1 1/2", 170 PSIG

steam valve (089).

5. Ammonia liquid and vapors./250 PSIG.

6. Ammonia liquid and vapors./250 PSIG.

7. Diammonium phosphates/235 F. 170 PSIG

steam.

5. Health. Fire or explosion.

6. Health. Fire or explosion.

7. Chemical and thermal burns.

Unexpected energization. Accidental start-

up or release of stored energy.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 53: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

53

SPECIFIC LOCKOUT PROCEDURE PAGE 53

PLANT: DAP 2 EAST

EQUIPMENT: GRANULATOR

EQUIPMENT NUMBER: 4305-06-1264E

DWG. NO.: 44-F-0020, 0021, & 0024

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

8. Close and chain lock with a production lock

the 1 1/2" (302) valve on the 170 PSIG steam

line to the granulator.

9. When seed material has been removed to

make repairs, granulator will be mechanically

secured per applicable J. S. A., to prevent

movement.

10. Issue Safe Work and Confined Space

Permit when required and locate near entrance

to granulator.

11. After work completion, inspect equipment

and remove locks. Close the disconnect for all

equipment to be energized.

12. Reverse procedure to put equipment back

in service.

8. 170 PSIG steam/360 F.

9. Mechanical/tons.

11. Electrical/480 volts.

8. Thermal burns.

9. Release of stored energy.

11. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\1264E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 54: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

54

SPECIFIC LOCKOUT PROCEDURE PAGE 54

PLANT: DAP 2 WEST

EQUIPMENT: GRANULATOR

EQUIPMENT NUMBER: 4305-06-1264W

DWG. NO.: 44-F-0030 & 0035

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Specific Lockout Procedure steps 2 thru 8

are applicable when entry to the granulator is

required. When entry is not required only

electrically lockout the granulator.

2. The Chief Operator will stop the

Granulator, Recycle Elevator, and "A" &

"B" Slurry Pumps by pushing the stop button

on the panel board.

3. Open and lock the disconnect for the

Granulator, Recycle Elevator, and "A" &

"B" Slurry Pumps in the West Motor Control

Center (West MCC) with a production lock.

2. Electrical/480 volts.

3. Electrical/480 volts.

2. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

3. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 55: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

55

SPECIFIC LOCKOUT PROCEDURE PAGE 55

PLANT: DAP 2 WEST

EQUIPMENT: GRANULATOR

EQUIPMENT NUMBER: 4305-06-1264W

DWG. NO.: 44-F-0030 & 0035

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

4. Close and lock with a production lock the

two 6" valves (027 & 029) and tag open 3/4"

bleed valve (028) on the ammonia vapor line

to the granulator.

5. Close and lock with a production lock the

two 3" valves (013 & 015) and tag open 3/4"

bleed valve (014 vent) on the liquid ammonia

line to the granulator.

6. Close and lock with a production lock the

two 3" slurry discharge valves (082 & 083)

to the granulator, and the 1 1/2", 170 PSIG

steam valve (086).

4. Ammonia liquid and vapors./250 PSIG.

5. Ammonia liquid and vapors./250 PSIG.

6. Diammonium phosphates\235 F.

170PSIG steam/360 F.

4. Health. Fire or explosion.

5. Health. Fire or explosion.

6. Chemical and thermal burns.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 56: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

56

SPECIFIC LOCKOUT PROCEDURE PAGE 56

PLANT: DAP 2 WEST

EQUIPMENT: GRANULATOR

EQUIPMENT NUMBER: 4305-06-1264W

DWG. NO.: 44-F-0030 & 0035

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

7. Close and lock with a production lock the

1 1/2" (302) valve on the 170 PSIG steam

line to the granulator.

8. When seed material has been removed to

make repairs, granulator will be

mechanically secured per applicable J. S. A.,

to prevent movement.

9. Reverse procedure to put equipment back

in service.

7. 170 PSIG steam/360 F.

8. Mechanical/tons.

9. Electrical/480 volts.

7. Thermal burns.

8. Release of stored energy.

9. Cubical explosion. Unexpected

energization.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 57: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

57

SPECIFIC LOCKOUT PROCEDURE PAGE 57

PLANT: DAP 2 WEST

EQUIPMENT: GRANULATOR

EQUIPMENT NUMBER: 4305-06-1264W

DWG. NO.: 44-F-0030 & 0035

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

11. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

12. Reverse procedure to put equipment

back in service.

11. Electrical/480 volts. 11. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\1264W 2/2/95

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 58: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

58

SPECIFIC LOCKOUT PROCEDURE PAGE 1

PLANT: DAP 2 WEST

EQUIPMENT: GRANULATOR

EQUIPMENT NUMBER: 4305-06-1264W

DWG. NO.: 44-F-0030 & 0035

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Granulator (1264W) by

pushing the stop button on the panel board.

2. Open and lock the disconnect for the

Granulator (1264W) in the West Motor

Control Center (West MCC) with a

Production Lock.

If entry is necessary, Steps 3 through 8 apply

3. Stop the Recycle Elevator (2167W),

and

"A" and "B" Slurry Pumps (1165W A & B)

by pushing the stop button on the panel

board.

4. Open and lock the disconnect for the

Recycle Elevator (2167W) and "A" and "B"

Slurry Pumps (1165W A & B) in the West

1. Electrical/480 volts.

2. Electrical/480 volts.

3. Electrical/480 volts.

4. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or release of stored energy.

2. Cubical explosion.

3. Cubical explosion. Unexpected

energization. Accidental start-up or release of stored energy.

4. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 59: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

59

Motor Control Center (West MCC) with a

Production Lock.

Page 60: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

60

SPECIFIC LOCKOUT PROCEDURE PAGE 2

PLANT: DAP 2 WEST

EQUIPMENT: GRANULATOR

EQUIPMENT NUMBER: 4305-06-1264W

DWG. NO.: 44-F-0030 & 0035

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

4. Close and lock with a Production Lock

the two 6" block valves [027 & 029] on the

ammonia vapor line to the granulator and tag

open the 3/4" bleed valve [028].

5. Close and lock with a Production Lock

the two 3" valves [013 & 015] on the liquid

ammonia line to the granulator and tag open

the 3/4" bleed valve [014].

6. Close and lock with a Production Lock

the two 3" slurry discharge valves [082 &

083] to the granulator, and the 1 1/2" Medium

Pressure Steam block valve [086].

7. Close and lock with a Production Lock

the 1 1/2" [302] valve on the Medium

Pressure Steam line to the granulator.

8. Employees working on this equipment

will place their personal lock on the

equipment designated.

9. After work completion, inspect the

equipment and reverse procedure to put

equipment back into service.

4. Ammonia liquid and vapors./250 PSIG.

5. Ammonia liquid and vapors./250 PSIG.

6. Diammonium phosphates/235 F.

170PSIG steam/360 F.

7. 170 PSIG Steam/ 360 F.

9. Electrical/480 volts.

4. Health. Fire or explosion.

5. Health. Fire or explosion.

6. Chemical and thermal burns.

7. Thermal burns.

9. Cubical explosion. Unexpected

energization.

Page 61: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

61

C:\WP51\DAP2W\1264W 2/14/95

SPECIFIC LOCKOUT PROCEDURE PAGE 61

PLANT: DAP 2 EAST

EQUIPMENT: SCRUBBER SEAL TANK AGITATOR

EQUIPMENT NUMBER: 4305-06-1265E

DWG. NO.: 44-F-0027

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the

Scrubber Seal Tank Agitator by pushing the

stop button on the panel board.

2. Open the disconnect in the East Motor

Control Center (East MCC).

3. Lock the disconnect for the agitator with

a production lock.

4. Employees required to work on the

agitator will place their personal locks on the

equipment designated by the originator or the

Safe Work Permit.

5. Follow the Specific Lockout Procedure

for the Scrubber Seal Tank (535E) when

entry is required.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 62: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

62

SPECIFIC LOCKOUT PROCEDURE PAGE 62

PLANT: DAP 2 EAST

EQUIPMENT: SCRUBBER SEAL TANK AGITATOR

EQUIPMENT NUMBER: 4305-06-1265E

DWG. NO.: 44-F-0027

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Issue Safe Work Permit when required

and locate near equipment.

7. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment.

8. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\1265E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 63: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

63

SPECIFIC LOCKOUT PROCEDURE PAGE 63

PLANT: DAP 2 WEST

EQUIPMENT: SCRUBBER SEAL TANK AGITATOR

EQUIPMENT NUMBER: 4305-06-1265W

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the

Scrubber Seal Tank Agitator by pushing the

stop button on the panel board.

2. Open and lock the disconnect in the West

Motor Control Center (West MCC) with a

production lock.

3. Employees required to work on the

agitator will place their personal locks on the

equipment designated.

4. Follow the Specific Lockout Procedure

for the Scrubber Seal Tank (555W) when

entry is required.

5. Reverse procedure to put equipment back

in service.

1. Electrical/480 volts.

2. Electrical/480 volts.

5. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

5. Cubical explosion. Unexpected

energization.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 64: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

64

SPECIFIC LOCKOUT PROCEDURE PAGE 64

PLANT: DAP 2 WEST

EQUIPMENT: SCRUBBER SEAL TANK AGITATOR

EQUIPMENT NUMBER: 4305-06-1265W

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Issue Safe Work Permit when required

and locate near equipment.

7. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment.

8. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\1265W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 65: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

65

SPECIFIC LOCKOUT PROCEDURE PAGE 65

PLANT: DAP 2 EAST

EQUIPMENT: COOLER SCRUBBER BOOSTER PUMP

EQUIPMENT NUMBER: 44-28-127 "A" & "B"

DWG. NO.: 44-F-0026

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Cooler

Scrubber Booster Pump by pushing the stop

button on the panel board.

2. Open the disconnect for the Cooler Scrubber

Booster Pump in the East Motor Control Center

(East MCC).

3. Lock the disconnect for the Cooler Scrubber

Booster Pump with a production lock.

4. If motor is to be repaired or replaced, only

lock out disconnect and close and tag suction

valve.

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4. Cubical explosion.

1/17/5

PECIFIC LOCKOUT PROCEDURE PAGE 65

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 66: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

66

PLANT: DAP 2 EAST

EQUIPMENT: COOLER SCRUBBER BOOSTER PUMP

EQUIPMENT NUMBER: 44-28-127 "A" & "B"

DWG. NO.: 44-F-0028

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Close and chain lock designated pumps 4"

suction and 4" discharge valve. Open and tag 1

1/2" drain valve.

6. Employees required to work on this pump

will place their personal lock on the equipment

designated by the originator of the Safe Work

Permit.

7. Issue Safe Work Permit when required and

locate near equipment.

8. After work completion inspect equipment

and remove locks. Close the disconnect for all

equipment to be energized.

9. Reverse procedure to put equipment back in

service.

8. Electrical/480 volts.

8. Cubical explosion.

C:\WP51\DAP2E\127A&BE

Page 67: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

67

SPECIFIC LOCKOUT PROCEDURE PAGE 67

PLANT: DAP 2 EAST

EQUIPMENT: COOLER SCRUBBER CIRCULATING PUMP

EQUIPMENT NUMBER: 44-28-128 "A" & "B"

DWG. NO.: 44-F-0026

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Cooler

Scrubber Circulating Pump by pushing the

stop button on the panel board.

2. Open the disconnect for the Cooler

Scrubber Circulating Pump in the East Motor

Control Center (East MCC).

3. Lock the disconnect for the Cooler

Scrubber Circulating Pump with a

production lock.

4. If motor is to be repaired or replaced,

only lock out disconnect and close and tag

suction valve.

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4. Cubical explosion.

1/17/5

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 68: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

68

SPECIFIC LOCKOUT PROCEDURE PAGE 68

PLANT: DAP 2 EAST

EQUIPMENT: COOLER SCRUBBER CIRCULATING PUMP

EQUIPMENT NUMBER: 44-28-128 "A" & "B"

DWG. NO.: 44-F-0026

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Close and chain lock designated pumps 10"

suction and 8" discharge valve. Open and tag

1 1/2" drain valve.

6. Employees required to work on this pump

will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

7. Issue Safe Work Permit when required and

locate near equipment.

8. After work completion inspect equipment

and remove locks. Close the disconnect for

all equipment to be energized.

9. Reverse procedure to put equipment back

in service.

8. Electrical/480 volts.

8. Cubical explosion.

C:\WP51\DAP2E\128A&B

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 69: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

69

SPECIFIC LOCKOUT PROCEDURE PAGE 69

PLANT: DAP 2 EAST

EQUIPMENT: BFL CONDENSATE TRANSFER PUMP

EQUIPMENT NUMBER: 44-28-131

DWG. NO.: 44-F-00

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the BFL

Condensate Transfer Pump by pushing the

stop button on the panel board.

2. Open the disconnect for the condensate

pump in the East Motor Control Center (East

MCC).

3. Lock the disconnect for the condensate

pump with a production lock.

4. Close and tag suction and discharge

valves. Open and tag 3/4" drain valve.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

1/17/5

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 70: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

70

SPECIFIC LOCKOUT PROCEDURE PAGE 70

PLANT: DAP 2 EAST

EQUIPMENT: BFL CONDENSATE TRANSFER PUMP

EQUIPMENT NUMBER: 44-28-131

DWG. NO.: 44-F-00

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Employees required to work on the

condensate pump, will place their personal

locks on the equipment designated by the

originator of the Safe Work Permit.

6. Issue Safe Work Permit when required

and locate near equipment.

7. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

8. Reverse procedure to put equipment back

in service.

7. Electrical/480 volts.

7. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\131E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 71: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

71

SPECIFIC LOCKOUT PROCEDURE PAGE 71

PLANT: DAP 2 WEST

EQUIPMENT: COOLER VENT FAN

EQUIPMENT NUMBER: 4305-06-1361W

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Cooler

Vent Fan by pushing the stop button on the

panel board.

2. Open the disconnect for the fan in the

East Motor Control Center (East MCC).

3. Lock the disconnect for the fan with a

production lock.

4. Employees required to work on this fan

will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

5. Issue Safe Work Permit when required

and locate near equipment.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

Page 72: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

72

SPECIFIC LOCKOUT PROCEDURE PAGE 72

PLANT: DAP 2 WEST

EQUIPMENT: COOLER VENT FAN

EQUIPMENT NUMBER: 4305-06-1361W

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\1361W

SPECIFIC LOCKOUT PROCEDURE PAGE 72

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 73: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

73

PLANT: DAP 2 EAST

EQUIPMENT: DRYER BURNER FAN

EQUIPMENT NUMBER: 4305-06-1362E

DWG. NO.: 44-F-0023

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will have his

designee stop the Dryer Burner Fan by

pushing the start/stop button in the field.

2. Open the disconnect for the Dryer Burner

Fan in the East motor Control Center

(East MCC).

3. Lock the disconnect for the fan with a

production lock.

4. Employees required to work on this fan

will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

5. Issue Safe Work Permit when required

and locate near equipment.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

12/26

Page 74: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

74

SPECIFIC LOCKOUT PROCEDURE PAGE 74

PLANT: DAP 2 EAST

EQUIPMENT: DRYER BURNER FAN

EQUIPMENT NUMBER: 4305-06-1362E

DWG. NO.: 44-F-0023

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts. 6. Cubical explosion . Unexpected

energization.

C:\WP51\DAP2E\1362E

SPECIFIC LOCKOUT PROCEDURE PAGE 74

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 75: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

75

PLANT: DAP 2 WEST

EQUIPMENT: DRYER BURNER FAN

EQUIPMENT NUMBER: 4305-06-1362W

DWG. NO.: 44-F-0034

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will have his

designee stop the Dryer Burner Fan by

pushing the start/stop button in the field.

2. Open and lock the disconnect for the

Dryer Burner Fan in the West Motor Control

Center (West MCC) with a production lock.

3. Employees required to work on this fan

will place their personal lock on the

equipment designated.

4. Reverse procedure to put equipment back

in service.

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4. Cubical explosion. Unexpected

energization.

2/1/95

SPECIFIC LOCKOUT PROCEDURE PAGE 75

Page 76: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

76

PLANT: DAP 2 WEST

EQUIPMENT: DRYER BURNER FAN

EQUIPMENT NUMBER: 4305-06-1362W

DWG. NO.: 44-F-0034

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts. 6. Cubical explosion . Unexpected

energization.

C:\WP51\DAP2W\1362W

SPECIFIC LOCKOUT PROCEDURE PAGE 76

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 77: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

77

PLANT: DAP 2 EAST

EQUIPMENT: DRYER TAILGAS SCRUBBER FAN

EQUIPMENT NUMBER: 4305-06-1364E

DWG. NO.: 44-F-0028

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Dryer

Tailgas Scrubber Fan by pushing the stop

button on the panel board.

2. Open the disconnect for the Dryer Tailgas

Scrubber Fan in the East Motor Control

Center (East MCC).

3. Lock the disconnect for the Dryer Tailgas

Scrubber Fan with a production lock.

4. Employees required to work on fan will

place their personal lock on the equipment

designated by the originator of the Safe

Work Permit.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

12/26

Page 78: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

78

SPECIFIC LOCKOUT PROCEDURE PAGE 78

PLANT: DAP 2 EAST

EQUIPMENT: DRYER TAILGAS SCRUBBER FAN

EQUIPMENT NUMBER: 4305-06-1364E

DWG. NO.: 44-F-0028

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Issue Safe Work Permit when required

and locate near equipment.

7. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

8. Reverse procedure to put equipment back

in service.

7. Electrical/480 volts.

7. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\1364E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 79: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

79

SPECIFIC LOCKOUT PROCEDURE PAGE 79

PLANT: DAP 2 WEST

EQUIPMENT: DRYER TAILGAS SCRUBBER FAN

EQUIPMENT NUMBER: 4305-06-1364W

DWG. NO.: 44-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Dryer

Tailgas Scrubber Fan by pushing the stop

button on the panel board.

2. Open and lock the disconnect for the

Dryer Tailgas Scrubber Fan in the West

Motor Control Center (West MCC) with a

production lock.

3. Employees required to work on the fan

will place their personal lock on the

equipment designated.

4. Reverse procedure to put equipment back

in service.

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4. Cubical explosion. Unexpected

energization.

2/1/95 C:\WP51\DAP2W\1364W

Page 80: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

80

SPECIFIC LOCKOUT PROCEDURE PAGE 80

PLANT: DAP 2 WEST

EQUIPMENT: DRYER TAILGAS SCRUBBER FAN

EQUIPMENT NUMBER: 4305-06-1364W

DWG. NO.:44-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Issue Safe Work Permit when required

and locate near equipment.

7. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

8. Reverse procedure to put equipment back

in service.

7. Electrical/480 volts.

7. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\1364W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 81: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

81

SPECIFIC LOCKOUT PROCEDURE PAGE 81

PLANT: DAP 2 EAST

EQUIPMENT: RGV TAILGAS SCRUBBER FAN

EQUIPMENT NUMBER: 4305-06-1365E

DWG. NO.: 44-F-0028

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the RGV

Tailgas Scrubber Fan by pushing the stop

button on the panel board.

2. Open the disconnect for the RGV Tailgas

Scrubber Fan in the East Motor Control

Center (East MCC).

3. Lock the disconnect for the RGV Tailgas

Scrubber Fan with a production lock.

4. Employees required to work on fan will

place their personal lock on the equipment

designated by the originator of the Safe

Work Permit.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

Page 82: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

82

SPECIFIC LOCKOUT PROCEDURE PAGE 82

PLANT: DAP 2 EAST

EQUIPMENT: RGV TAILGAS SCRUBBER FAN

EQUIPMENT NUMBER: 4305-06-1365E

DWG. NO.: 44-F-0028

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work Permit when required

and locate near equipment.

6. After work completion,

inspect equipment and remove locks. Close

the disconnect for all equipment to be

energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\1365E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 83: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

83

SPECIFIC LOCKOUT PROCEDURE PAGE 83

PLANT: DAP 2 WEST

EQUIPMENT: RGV TAILGAS SCRUBBER FAN

EQUIPMENT NUMBER: 4305-06-1365W

DWG. NO.: 44-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the RGV

Tailgas Scrubber Fan by pushing the stop

button on the panel board.

2. Open and lock the disconnect for the

RGV Tailgas Scrubber Fan in the West

Motor Control Center (West MCC) with a

production lock.

4. Employees required to work on the fan

will place their personal lock on the

equipment designated.

5. Reverse procedure to put equipment back

in service.

1. Electrical/480 volts.

2. Electrical/480 volts.

5. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

5. Cubical explosion. Unexpected

energization.

2/1/95 C:\WP51\DAP2W\1365W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 84: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

84

SPECIFIC LOCKOUT PROCEDURE PAGE 84

PLANT: DAP 2 WEST

EQUIPMENT: RGV TAILGAS SCRUBBER FAN

EQUIPMENT NUMBER: 4305-06-1365W

DWG. NO.: 44-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work Permit when required

and locate near equipment.

6. After work completion,

inspect equipment and remove locks. Close

the disconnect for all equipment to be

energized.

7. Reverse procedure to put equipment back

in service.

7. Electrical/480 volts.

7. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\1365W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 85: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

85

SPECIFIC LOCKOUT PROCEDURE PAGE 85

PLANT: DAP 2 EAST AND WEST

EQUIPMENT: COOLER BAG COLLECTOR AIR HEATER FAN

EQUIPMENT NUMBER: 4305-06-1372A & 1372B

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Cooler

Bag Collector Air Heater Fan by pushing the

top button on the panel board.

2. Open the disconnect for the fan in the

East (1372A) and West (1372B) Motor

Control Center (East or West MCC).

3. Lock the disconnect for the fan with a

production lock.

4. Employees required to work on this fan

will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

5. Issue Safe Work Permit when required

and locate near equipment.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical Explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 86: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

86

SPECIFIC LOCKOUT PROCEDURE PAGE 86

PLANT: DAP 2 EAST AND WEST

EQUIPMENT: COOLER BAG COLLECTOR AIR HEATER FAN

EQUIPMENT NUMBER: 4305-06-1372A & 1372B

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts. 6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\1372A&B

SPECIFIC LOCKOUT PROCEDURE PAGE 86

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 87: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

87

PLANT: DAP 2 EAST

EQUIPMENT: PROCESS SCREENS

EQUIPMENT NUMBER: 4305-06-1461E "A" THRU "D"

DWG. NO.: 44-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the process

screens and Dryer Discharge Elevator by

pushing the stop button on the panel board.

2. Open the disconnect for the screens and

elevator in the East Motor Control Center

(East MCC).

3. Lock the disconnect for the screens with

a production lock.

4. Employees required to work on these

screens will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 88: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

88

SPECIFIC LOCKOUT PROCEDURE PAGE 88

PLANT: DAP 2 EAST

EQUIPMENT: PROCESS SCREENS

EQUIPMENT NUMBER: 4305-06-1461E "A" THRU "D"

DWG. NO.: 44-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work Permit when required

and locate near equipment.

6. After work completion, inspect

equipment to be energized. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion.

C:\WP51\DAP2E\1461EA-D

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 89: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

89

SPECIFIC LOCKOUT PROCEDURE PAGE 89

PLANT: DAP 2 WEST

EQUIPMENT: PROCESS SCREENS

EQUIPMENT NUMBER: 4305-06-1461W "A" THRU "D"

DWG. NO.: 44-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the process

screens by pushing the stop button on the

panel board.

2. Open and lock the disconnect for the

screens in the West Motor Control Center

(West MCC) with a production lock.

3. Employees required to work on these

screens will place their personal lock on the

equipment designated.

4. Reverse procedure to put equipment back

in service.

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4. Cubicial explosion. Unexpected

energization.

2/10/95 C:\WP51\DAP2W\1461WA-D

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 90: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

90

SPECIFIC LOCKOUT PROCEDURE PAGE 90

PLANT: DAP 2 EAST

EQUIPMENT: DRYER COMBUSTION CHAMBER

EQUIPMENT NUMBER: 4305-06-1561-1E

DWG. NO.: 44-F-0022

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the fuel (Natural Gas/ #6 fuel oil,

and propane) down stream of metering

stations or return lines by closing block

valve.

2. Stop the Dryer Burner Fan and Dryer by

pushing the stop button on the panel board.

3. Close 6" block valve on 45 PSIG steam

line to Dryer Air Preheater.

4. Open the disconnect for the Dryer Burner

Fan and Dryer, in the East Motor Control

Center (East MCC).

5. Lock the disconnect for the Dryer Burner

Fan and Dryer in the OFF position with a

production lock.

1. Natural Gas. #6 Fuel Oil. Propane./fire

and explosion.

2. Electrical/480 volts.

3. Steam/284 F.

4. Electrical/480 volts.

1. Fire. Explosion.

2. Cubical explosion. Unexpected

energization. Accidental start-up or

released energy.

3. Thermal burns.

4. Cubical explosion

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 91: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

91

SPECIFIC LOCKOUT PROCEDURE PAGE 2

PLANT: DAP 2 EAST

EQUIPMENT: DRYER COMBUSTION CHAMBER

EQUIPMENT NUMBER: 4305-06-1561-1E

DWG. NO.: 44-F-0022

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Employees working on this equipment

will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

7. Issue Safe Work Permit when required

and locate near equipment.

8. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

9. Reverse procedure to put equipment back

in service.

8. Electrical/480 volts.

8. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\1561-1E

Page 92: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

92

SPECIFIC LOCKOUT PROCEDURE PAGE 92

PLANT: DAP 2 WEST

EQUIPMENT: DRYER COMBUSTION CHAMBER

EQUIPMENT NUMBER: 4305-06-1561-1W

DWG. NO.: 44-F-0033

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The fuel source will be secured by

closing and locking the following, 1/2"

propane valve, 2" natural gas valve and 1"

fuel oil valve. (Fuel source will be secured

by removing the gun)

2. Close and lock 170 PSIG atomizing

steam with a production lock.

3. Stop the Dryer by pushing the stop

button on the panel board.

4. Open and lock the disconnect for the

Dryer in the West Motor Control Center

(West MCC) with a production lock.

1. Fire. Explosion.

2. Thermal burns.

3. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

4.Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 93: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

93

SPECIFIC LOCKOUT PROCEDURE PAGE 93

PLANT: DAP 2 EAST

EQUIPMENT: ROTARY DRYER

EQUIPMENT NUMBER: 4305-06-1561E

DWG. NO.:44-F-0022

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the dryer by

pushing the stop button on the panel board.

2. Open the disconnect for the Dryer in the

East Motor Control Center (East MCC).

3. Lock the disconnect for the Dryer in the

OFF position with a production lock.

4. When entry is necessary, the above

procedure must be followed, to include the

following equipment, Dryer Scrubber Fan,

Combustion Air Blower, LP gas, natural gas/

fuel oil (Fuel source will be secured by

removing the gun). Close and chain lock 170

PSIG atomizing steam with a production lock.

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Electrical/480 volts.

Steam/170 PSIG

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4. Cubical explosion.

Thermal burns.

12/26

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 94: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

94

SPECIFIC LOCKOUT PROCEDURE PAGE 94

PLANT: DAP 2 EAST

EQUIPMENT: ROTARY DRYER

EQUIPMENT NUMBER: 4305-06-1561E

DWG. NO.:44-F-0022

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. When seed material has been removed to

make repairs, dryer will be mechanically

secured, per applicable J. S. A., to prevent

movement.

6. Employees required to work on the dryer

will place their personal lock on the equipment

designated by the originator of the Safe Work

Permit.

7. Issue Safe Work and Confined Space Permit

when required and locate near entrance.

8. After work completion, inspect equipment

and remove locks. Close the disconnect for all

equipment to be energized.

9. Reverse procedure to put equipment back in

service.

5. Mechanical/Tons

8. Electrical /480 volts.

5. Release of stored energy.

8. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\1561E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 95: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

95

SPECIFIC LOCKOUT PROCEDURE PAGE 95

PLANT: DAP 2 WEST

EQUIPMENT: ROTARY DRYER

EQUIPMENT NUMBER: 4305-06-1561W

DWG. NO.: 44-F-0033

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the dryer by

pushing the stop button on the panel board.

2. Open and lock the disconnect for the

Dryer in the West Motor Control Center

(West MCC) with a production lock.

3. When entry is necessary, the above

procedure must be followed, to include the

following equipment, Dryer Scrubber Fan,

Combustion Air Blower, LP gas, natural gas/

fuel oil (Fuel source will be secured by

removing the gun). Close and chain lock

170 PSIG atomizing steam with a production

lock.

1. Electrical/480 volts.

2. Electrical/480 volts.

3. Electrical/480 volts.

Steam/170 PSIG

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

3. Cubical explosion.

Thermal burns.

2/1/95

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 96: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

96

SPECIFIC LOCKOUT PROCEDURE PAGE 96

PLANT: DAP 2 WEST

EQUIPMENT: ROTARY DRYER

EQUIPMENT NUMBER: 4305-06-1561W

DWG. NO.:44-F-0033

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE

MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

4. When seed material has been removed to

make repairs, dryer will be mechanically

secured, per applicable J. S. A., to prevent

movement.

5. Employees required to work on the dryer

will place their personal lock on the

equipment designated.

6. Reverse procedure to put equipment back

in service.

4. Mechanical/Tons

6. Electrical/480 volts.

4. Release of stored energy.

6. Cubical explosion.

Unexpected energization.

C:\WP51\DAP2W\1561W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 97: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

97

SPECIFIC LOCKOUT PROCEDURE PAGE 97

PLANT: DAP 2 WEST

EQUIPMENT: WEST ROTARY COOLER

EQUIPMENT NUMBER: 4305-06-1661W

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE

MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Rotary

Cooler by pushing the stop button on the panel

board.

2. When entry to the cooler is not required,

only electrically lockout the cooler

3. Open the disconnect for the cooler in the

East Motor Control Center (East MCC).

4. Lock the disconnect for the cooler in the

OFF position, with a production lock.

5. When entry is necessary, the above

procedure must be followed to include the

following equipment, Cooler Rotary Feeder

(44-47-661), Cooler Vent Fan (4305-06-1361)

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 98: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

98

and Product Elevator (4305-06-2168).

SPECIFIC LOCKOUT PROCEDURE PAGE 98

PLANT: DAP 2 WEST

EQUIPMENT: WEST ROTARY COOLER

EQUIPMENT NUMBER: 4305-06-1661W

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE

MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Employees required to work on this cooler

will place their personal lock on the equipment

designated by the originator of the Safe Work

Permit.

7. When seed material has been removed to

make repairs, cooler will be mechanically

secured per applicable J. S. A., to prevent

7. Mechanical/Tons.

7. Release of stored energy.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 99: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

99

movement.

8. Issue Safe Work Permit when required and

locate near equipment.

9. After work completion, inspect equipment

and remove locks. Close the disconnect for all

equipment to be energized.

10. Reverse procedure to put equipment back in

service.

9. Electrical/480 volts

9. Cubical explosion. Unexpected

energization.

LOCKOUT PROCEDURE PAGE 99

PLANT: DAP 2 WEST

EQUIPMENT: WEST ROTARY COOLER

EQUIPMENT NUMBER: 4305-06-1661W

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE

MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Rotary 1. Electrical/480 volts. 1. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 100: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

100

Cooler by pushing the stop button on

the panel board.

2. When entry to the cooler is not required,

only electrically lockout the cooler

3. Open the disconnect for the cooler in the

East Motor Control Center (East MCC).

4. Lock the disconnect for the cooler in the

OFF position, with a production lock.

5. When entry is necessary, the above

procedure must be followed to include

the following equipment, Cooler Rotary

Feeder (44-47-661), Cooler Vent Fan

(4305-06-1361) and Product Elevator

(4305-06-2168).

2. Electrical/480 volts.

Unexpected energization. Accidental start-up or release of stored energy.

2. Cubical explosion.

Page 101: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

101

SPECIFIC LOCKOUT PROCEDURE PAGE 101

PLANT: DAP 2 WEST

EQUIPMENT: WEST ROTARY COOLER

EQUIPMENT NUMBER: 4305-06-1661W

DWG. NO.: 44-F-0029

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Employees required to work on this

cooler will place their personal lock on

the equipment designated by the

originator of the Safe Work Permit.

7. When seed material has been removed to

make repairs, cooler will be

mechanically secured per applicable J.

S. A., to prevent movement.

8. Issue Safe Work Permit when required

and locate near equipment.

9. After work completion, inspect

equipment and remove locks. Close

the disconnect for all equipment to be

energized.

10. Reverse procedure to put equipment

back in service.

7. Mechanical/Tons.

9. Electrical/480 volts

7. Release of stored energy.

9. Cubical explosion.

Unexpected energization.

C:\WP51\DAP2W\1661W 02/10/95

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 102: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

102

SPECIFIC LOCKOUT PROCEDURE PAGE 102

PLANT: DAP 2 WEST

EQUIPMENT: WEST ROTARY COOLER

EQUIPMENT NUMBER: 4305-06-1661W

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE

MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

When entry to the cooler is required:

1. If seed material has been removed to

make repairs, cooler will be mechanically

secured, per applicable J.S.A.

2. Follow Specific LockoutProcedure for

the Cooler Vent Fan (1361W).

3. At the Product Oiling System loop,

close and lock 1 1/2" main line valve and 1

1/2" by-pass valve with a production lock.

4. The Chief Operator will stop the

Rotary Cooler by pushing the stop button on

the panel board.

2. Electrical/480 volts.

3. Product oil/200 F.

2. Cubical explosion.

Unexpected energization.

Accidental start-up or release of

stored energy.

3. Thermal burns.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 103: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

103

SPECIFIC LOCKOUT PROCEDURE PAGE 103

PLANT: DAP 2 WEST

EQUIPMENT: DRYER AIR PREHEATER

EQUIPMENT NUMBER: 4305-06-1802W

DWG. NO.: 44-F-0034

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Follow the Specific Lockout Procedure for

the Dryer Burner Fan 4305-06-1362.

2. Close and chain lock 6" isolation steam

valve with a production lock to the four coil

banks. Open and tag blow down valves.

3. Employees required to work on this

preheater will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

4. Issue Safe Work Permit when required and

locate near equipment.

1. Electrical/480 volts.

2. Steam/45 PSIG

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Thermal burns.

1/10/5

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 104: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

104

SPECIFIC LOCKOUT PROCEDURE PAGE 104

PLANT: DAP 2 WEST

EQUIPMENT: DRYER AIR PREHEATER

EQUIPMENT NUMBER: 4305-06-1802W

DWG. NO.: 44-F-0034

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. After work completion. inspect equipment

and remove locks. Close the disconnect for all

equipment to be energized.

6. Reverse procedure to put equipment back in

service.

5. Electrical/480 volts. 5. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\1802W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 105: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

105

SPECIFIC LOCKOUT PROCEDURE PAGE 105

PLANT: DAP 2 EAST

EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE

EQUIPMENT NUMBER: 4305-06-2152E

DWG. NO.: 44-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Equipment

Vents Cyclone Dust Bin Valve by pushing the

stop button on the panel board.

2. Open the disconnect for the valve in the East

Motor Control Center (East MCC).

3. Lock the disconnect for the valve with a

production lock.

4. Employees required to work on this valve

will place their personal locks on the equipment

designated by the originator of the Safe Work

Permit.

5. Issue Safe Work Permit when required and

locate near equipment.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

12/26

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 106: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

106

SPECIFIC LOCKOUT PROCEDURE PAGE 106

PLANT: DAP 2 EAST

EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE

EQUIPMENT NUMBER: 4305-06-2152E

DWG. NO.: 44-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. After work completion, inspect equipment

and remove locks. Close the disconnect for

all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts. 6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\2152E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 107: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

107

SPECIFIC LOCKOUT PROCEDURE PAGE 107

PLANT: DAP 2 WEST

EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE

EQUIPMENT NUMBER: 4305-06-2152W

DWG. NO.: 44-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the

Equipment Vents Cyclone Dust Bin Valve

by pushing the stop button on the panel

board.

2. Open and lock the disconnect for the

valve in the West Motor Control Center

(West MCC) with a production lock.

3. Employees required to work on this valve

will place their personal locks on the

equipment designated.

4. Reverse procedure to put equipment back

in service.

1. Electrical /480 volts.

2. Electrical/480 volts.

4. Electrical/480 volts.

1. Cubical Explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4. Cubical explosion. Unexpected

energization.

2/2/95 C:\WP51\DAP2W\2152W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 108: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

108

SPECIFIC LOCKOUT PROCEDURE PAGE 108

PLANT: DAP 2 WEST

EQUIPMENT: EQUIPMENT VENTS CYCLONE DUST BIN VALVE

EQUIPMENT NUMBER: 4305-06-2152W

DWG. NO.: 44-5-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts. 6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\2152W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 109: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

109

SPECIFIC LOCKOUT PROCEDURE PAGE 109

PLANT: DAP 2 EAST

EQUIPMENT: DRYER CYCLONE DUST BIN VALVE

EQUIPMENT NUMBER: 4305-06-2154E

DWG. NO.: 44-F-0022

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the

Equipment Vents Cyclone Dust Bin Valve by

pushing the stop button on the panel board.

2. Open the disconnect for the valve in the

East Motor Control Center (East MCC).

3. Lock the disconnect for the valve with a

production lock.

4. Employees required to work on this valve

will place their personal locks on the

equipment designated by the originator of the

Safe Work Permit.

1. Electrical/480 volts. 1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

Page 110: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

110

SPECIFIC LOCKOUT PROCEDURE PAGE 110

PLANT: DAP 2 EAST

EQUIPMENT: DRYER CYCLONE DUST BIN VALVE

EQUIPMENT NUMBER: 4305-06-2154E

DWG. NO.:44-F-0022

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work Permit when required and

locate near equipment.

6. After work completion, inspect equipment

and remove locks. Close the disconnect for

all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\2154E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 111: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

111

SPECIFIC LOCKOUT PROCEDURE PAGE 111

PLANT: DAP 2 WEST

EQUIPMENT: DRYER CYCLONE DUST BIN VALVE

EQUIPMENT NUMBER: 4305-06-2154W

DWG. NO.: 44-F-0033

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the

Equipment Vents Cyclone Dust Bin Valve

by pushing the stop button on the panel

board.

2. Open and lock the disconnect for the

valve in the West Motor Control Center

(West MCC) with a production lock.

3. Employees required to work on this valve

will place their personal locks on the

equipment designated.

4. Reverse procedure to put equipment back

in service.

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4. Cubical explosion. Unexpected

energization.

2/2/95 C:\WP51\DAP2W\2154W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 112: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

112

SPECIFIC LOCKOUT PROCEDURE PAGE 112

PLANT: DAP 2 WEST

EQUIPMENT: DRYER CYCLONE DUST BIN VALVE

EQUIPMENT NUMBER: 4305-06-2154W

DWG. NO.: 44-F-0033

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work Permit when required

and locate near equipment.

6. After work completion. inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\2154W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 113: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

113

SPECIFIC LOCKOUT PROCEDURE PAGE 113

PLANT: DAP 2 EAST

EQUIPMENT: COOLER BAG COLLECTOR SCREW CONVEYOR

EQUIPMENT NUMBER: 4305-06-2155 "A"

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the East

Cooler Bag Collector Screw Conveyor by

pushing the stop button on the panel board.

2. Open the disconnect for the screw

conveyor in the East Motor Control Center

(East MCC).

3. Lock the disconnect for the screw

conveyor with a production lock.

4. Employees required to work on this

conveyor will place their personal lock on

the equipment designated by the originator of

the Safe Work Permit.

5. Issue Safe Work Permit when required

and locate near equipment.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 114: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

114

SPECIFIC LOCKOUT PROCEDURE PAGE 114

PLANT: DAP 2 EAST

EQUIPMENT: COOLER BAG COLLECTOR SCREW CONVEYOR

EQUIPMENT NUMBER: 4305-06-2155 "A"

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts. 6. Cubical explosion. Unexpected

energization

A:\DAP2E\2155AE

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 115: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

115

SPECIFIC LOCKOUT PROCEDURE PAGE 115

PLANT: DAP 2 WEST

EQUIPMENT: COOLER BAG COLLECTOR SCREW CONVEYOR

EQUIPMENT NUMBER: 4305-06-2155W "B"

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

l. The Chief Operator will stop the West

Cooler Bag Collector Screw Conveyor by

pushing the stop button on the panel board.

2. Open the disconnect for the screw

conveyor in the West Motor Control Center

(West MCC).

3. Lock the disconnect for the screw

conveyor with a production lock.

4. Employees required to work on this

conveyor will place their personal lock on

the equipment designated by the originator of

the Safe Work Permit.

5. Issue Safe Work Permit when required

and locate near equipment.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 116: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

116

SPECIFIC LOCKOUT PROCEDURE PAGE 116

PLANT: DAP 2 WEST

EQUIPMENT: PRODUCT CONVEYOR

EQUIPMENT NUMBER: 4305-06-2162W

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Product

Conveyor and Dryer Discharge Elevator

(4305-06-2166W) by pushing the stop

button on the panel board.

2. Open the disconnect for the conveyor in

the East Motor Control Center (East MCC)

and open the disconnect for the Dryer

Discharge Elevator in the West Motor

Control Center (West MCC).

3. Lock the disconnect for the conveyor and

elevator with a production lock.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 117: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

117

SPECIFIC LOCKOUT PROCEDURE PAGE 117

PLANT: DAP 2 WEST

EQUIPMENT: PRODUCT CONVEYOR

EQUIPMENT NUMBER: 4305-06-2162W

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

4. Employees required to work on this

conveyor will place their personal lock on

the equipment designated by the originator of

the Safe Work Permit.

5. Issue Safe Work Permit when required

and locate near equipment.

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\2162W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 118: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

118

SPECIFIC LOCKOUT PROCEDURE PAGE 118

PLANT: DAP 2 EAST

EQUIPMENT: RECYCLE FLIGHT CONVEYOR

EQUIPMENT NUMBER: 4305-06-2164E

DWG. NO.: 44-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Recycle

Flight Conveyor, Dryer Discharge Elevator

(2166E), and Cage Mills, (1062E A1 thru D1

and A2 thru D2, by pushing the stop button on

the panel board.

2. Open the disconnect for the Recycle Flight

Conveyor, Dryer Discharge Elevator, and

Cage Mills in the East Motor Control

Center (East MCC).

3. Lock the disconnect for the Recycle Flight

Conveyor, Dryer Discharge Elevator, and

Cage Mills with a production lock.

4. Employees required to work on the

conveyor will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 119: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

119

SPECIFIC LOCKOUT PROCEDURE PAGE 2

PLANT: DAP 2 EAST

EQUIPMENT: RECYCLE FLIGHT CONVEYOR

EQUIPMENT NUMBER: 4305-06-2164E

DWG. NO.: 44-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work Permit when required

and locate near equipment.

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\2164E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 120: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

120

SPECIFIC LOCKOUT PROCEDURE PAGE 120

PLANT: DAP 2 WEST

EQUIPMENT: RECYCLE FLIGHT CONVEYOR (DRAGFLIGHT)

EQUIPMENT NUMBER: 4305-06-2164W

DWG. NO.: 44-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. When entry to the Recycle Flight Conveyor

is required, steps 2 thru 4 of the electrical

lockout will be followed.

2. The Chief Operator will stop the Recycle

Flight Conveyor, Dryer Discharge Elevator

(2166W), and Cage Mills (1062W A1 thru D1

and A2 thru D2) by pushing the stop button on

the panel board.

3. Open the disconnect for the Recycle Flight

Conveyor, Dryer Discharge Elevator, and Cage

Mills in the West Motor Control

Center (West MCC).

4. Lock the disconnect for the Recycle Flight

Conveyor, Dryer Discharge Elevator, and Cage

Mills with a production lock.

2. Electrical/480 volts.

3. Electrical/480 volts.

2. Cubical explosion. Unexpected

energization. Accidental start-up or release

of stored energy.

3. Cubical explosion.

12/29

Page 121: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

121

SPECIFIC LOCKOUT PROCEDURE PAGE 2

PLANT: DAP 2 WEST

EQUIPMENT: RECYCLE FLIGHT CONVEYOR (DRAGFLIGHT)

EQUIPMENT NUMBER: 4305-06-2164W

DWG. NO.: 44-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. When entry is not required, only follow

steps to electrically lockout the Recycle flight

conveyor.

6. Employees required to work on the conveyor

will place their personal lock on the equipment

designated by the originator of the Safe Work

Permit.

7. Issue Safe Work Permit when required and

locate near equipment.

8. After work completion, inspect equipment

and remove locks. Close the disconnect for all

equipment to be energized.

9. Reverse procedure to put equipment back in

service.

8. Electrical/480 volts.

8. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\2164W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 122: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

122

SPECIFIC LOCKOUT PROCEDURE PAGE 122

PLANT: DAP 2 EAST

EQUIPMENT: DRYER DISCHARGE ELEVATOR

EQUIPMENT NUMBER: 4305-06-2166E

DWG. NO.: 44-F-0022

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Lump Breaker is to be locked out only

when entrance to the elevator boot is required.

2. The Chief Operator will stop the Dryer

Discharge Elevator and Lump Breaker by

pushing the stop button on the panel board.

3. Open the disconnect for the Dryer

Discharge Elevator and Lump Breaker in the

West Motor Control Center (West MCC).

4. Lock the disconnect for the Dryer

Discharge Elevator and Lump Breaker in the

OFF position with a production lock.

5. When performing task on the gear box or

coupling, the backstop will be inspected per

applicable J. S. A.

2. Electrical/480 volts.

3. Electrical/480 volts.

5. Mechanical/torque.

2. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

3. Cubical explosion.

5. Personal injury/rotating parts.

SPECIFIC LOCKOUT PROCEDURE PAGE 122

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 123: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

123

PLANT: DAP 2 EAST

EQUIPMENT: DRYER DISCHARGE ELEVATOR

EQUIPMENT NUMBER: 4305-06-2166E

DWG. NO.: 44-F-0022

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. If elevator chain has to be separated,

mechanically secure to prevent movement.

7. When system is

seeded, dryer must be electrically locked.

8. Employees working on the elevator will

place their personal lock on the equipment

designated by the originator of the Safe Work

Permit.

9. Issue Safe Work Permit when required and

locate near equipment.

10. After work completion, inspect equipment

and remove locks. Close the disconnect for

all equipment to be energized.

11. Reverse procedure to put equipment back

in service.

6. Mechanical/

10. Electrical/480 volts.

10. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\2166E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 124: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

124

SPECIFIC LOCKOUT PROCEDURE PAGE 124

PLANT: DAP 2 WEST

EQUIPMENT: DRYER DISCHARGE ELEVATOR

EQUIPMENT NUMBER: 4305-06-2166W

DWG. NO.: 44-F-0033

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Dryer

Discharge Elevator and Lump Breaker by

pushing the stop button on the panel board.

2. Open and lock the disconnect for the

Dryer Discharge Elevator and Lump Breaker

in the West Motor Control Center (West

MCC) with a production lock.

3. The Lump Breaker and Rotary Dryer is to

be locked out only when entrance to the

elevator boot is required.

4. Inspect elevator backstop, per applicable

J. S. A., prior to working on gear box,

coupling or removing motor.

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Mechanical/

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4. Moving parts.

2/1/95

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 125: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

125

SPECIFIC LOCKOUT PROCEDURE PAGE 125

PLANT: DAP 2 WEST

EQUIPMENT: DRYER DISCHARGE ELEVATOR

EQUIPMENT NUMBER: 4305-06-2166W

DWG. NO.: 44-F-0033

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. If elevator chain has to be separated,

mechanically secure to prevent movement.

6. When system

is seeded, dryer must be electrically locked.

7. Employees working on the elevator will

place their personal lock on the equipment

designated.

8. Reverse procedure to put equipment back

in service.

5. Mechanical\

8. Electrical/480 volts.

5. Release of stored energy.

8. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\2166W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 126: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

126

SPECIFIC LOCKOUT PROCEDURE PAGE 126

PLANT: DAP 2 EAST

EQUIPMENT: RECYCLE ELEVATOR

EQUIPMENT NUMBER: 4305-06-2167E

DWG. NO.: 44-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Recycle Flight Conveyor (2164E) is to

be locked out only when entrance to the

elevator boot is required.

2. The Chief Operator will stop the Recycle

Elevator by pushing the stop button on the

panel board.

3. Open the disconnect for the Recycle

Elevator in the East Motor Control Center (East

MCC).

3. Lock the disconnect for the Recycle Elevator

with a production lock.

4. Employees working on the elevator will

place their personal lock on the equipment

designated by the originator of the Safe Work

Permit.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental Start-up or release

of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 127: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

127

SPECIFIC LOCKOUT PROCEDURE PAGE 127

PLANT: DAP 2 EAST

EQUIPMENT: RECYCLE ELEVATOR

EQUIPMENT NUMBER: 4305-06-2167E

DWG. NO.: 44-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Inspect elevator backstop per applicable J. S.

A., prior to working on gear box, coupling or

removing motor.

6. If elevator chain has to be separated,

mechanically secure to prevent movement.

7. Employees working on the elevator will

place their personal lock on the equipment

designated by the originator of the Safe Work

Permit

8. Issue Safe Work Permit when required and

locate near equipment.

9. After work completion, inspect equipment

and remove locks. Close the disconnect for all

equipment to be energized.

10. Reverse procedure to put equipment back in

service.

11. Reverse procedure to put equipment back in

service.

5. Mechanical/

6. Mechanical/

9. Electrical/480 volts.

11. Electrical/480 volts.

5. Accidental release of stored energy.

6. Release of stored energy.

9. Cubical explosion. Unexpected

energization.

11. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\2167E

Page 128: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

128

SPECIFIC LOCKOUT PROCEDURE PAGE 128

PLANT: DAP 2 WEST

EQUIPMENT: RECYCLE ELEVATOR

EQUIPMENT NUMBER: 4305-06-2167W

DWG. NO.: 44-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Recycle

Elevator by pushing the stop button on the

panel board.

2. Open and lock the disconnect for the

Recycle Elevator in the West Motor Control

Center (West MCC) with a production lock.

3. The Recycle Flight Conveyor

(Dragflight) (2164W) is to be locked out

only when entrance to the elevator boot is

required.

4. Employees working on the elevator will

place their personal lock on the equipment

designated.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental Start-up or

release of stored energy.

2. Cubical explosion.

2/1/95

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 129: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

129

SPECIFIC LOCKOUT PROCEDURE PAGE 129

PLANT: DAP 2 WEST

EQUIPMENT: RECYCLE ELEVATOR

EQUIPMENT NUMBER: 4305-06-2167W

DWG. NO.: 44-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Inspect elevator backstop per applicable

J. S. A., prior to working on gear box,

coupling or removing motor.

7. If elevator chain has to be separated,

mechanically secure, per applicable J. S. A.,

to prevent movement.

8. Employees working on the elevator will

place their personal lock on the equipment

designated.

9. Reverse procedure to put equipment back

in service.

6. Mechanical/

7. Mechanical/

9. Electrical/480 volts.

6. Accidental release of stored energy.

7. Release of stored energy.

9. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\2167W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 130: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

130

SPECIFIC LOCKOUT PROCEDURE PAGE 130

PLANT: DAP 2 EAST

EQUIPMENT: RECYCLE FEEDER (JEFFERY)

EQUIPMENT NUMBER: 4305-06-2169E

DWG. NO.: 44-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Recycle

Feeder by pushing the stop button on the

panel board.

2. Open the disconnect for the feeder in the

East Motor Control Center (East MCC).

3. Lock the disconnect for the feeder with a

production lock.

4. Employees required to work on this

feeder will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

5. Issue Safe Work Permit when required

and locate near equipment.

1. Electrical/480 volts.

2..Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 131: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

131

SPECIFIC LOCKOUT PROCEDURE PAGE 131

PLANT: DAP 2 EAST

EQUIPMENT: RECYCLE FEEDER (JEFFERY)

EQUIPMENT NUMBER: 4305-06-2169E

DWG. NO.: 44-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts. 6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\2169E

SPECIFIC LOCKOUT PROCEDURE PAGE 131

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 132: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

132

PLANT: DAP 2 WEST

EQUIPMENT: RECYCLE FEEDER (JEFFERY)

EQUIPMENT NUMBER: 4305-06-2169W

DWG. NO.: 44-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Recycle

Feeder by pushing the stop button on the

panel board.

2. Open and lock the disconnect for the

feeder in the West Motor Control Center

(West MCC) with a production lock.

3. Employees required to work on this

feeder will place their personal lock on the

equipment designated.

4. Reverse procedure to put equipment back

in service.

1. Electrical/480 volts.

2..Electrical/480 volts.

4. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion

4. Cubical explosion.

2/3/95 C:\WP51\DAP2W\2169W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 133: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

133

SPECIFIC LOCKOUT PROCEDURE PAGE 133

PLANT: DAP 2 WEST

EQUIPMENT: RECYCLE FEEDER (JEFFERY)

EQUIPMENT NUMBER: 4305-06-2169W

DWG. NO.: 44-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts. 6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\2169W

SPECIFIC LOCKOUT PROCEDURE PAGE 133

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 134: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

134

PLANT: DAP 2 EAST

EQUIPMENT: PROCESS SCREEN PRIMARY SPLITTER, & DISCH DIVERTER

EQUIPMENT NUMBER: 4305-06--2961E, 2962E A&B, & 2966E A&B

DWG. NO.: 44-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Follow Specific Lockout Procedure for

the Hydraulic System Pumps, 4305-06-2562

"A" or "B".

2. If the above can not be complied with,

close and chain lock the hydraulic isolation

valves located near the equipment. Bleed

down cylinder and remove connector pin.

3. Employees required to work on splitters

& diverters will place their lock on the

equipment designated by the originator of the

Safe Work Permit.

1. Electrical/480 volts.

2. Hydraulic pressure/3,000 PSIG.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Personal injury.

Page 135: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

135

SPECIFIC LOCKOUT PROCEDURE PAGE 135

PLANT: DAP 2 EAST

EQUIPMENT: PROCESS SCREEN PRIMARY SPLITTER, & DISC DIVERTER

EQUIPMENT NUMBER: 4305-06-2961E, 2962E, A&B, & 2966E A&B

DWG. NO.: 44-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

4. Issue Safe Work Permit when required

and locate near equipment.

5. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

6. Reverse procedure to put equipment back

in service.

5. Electrical/480 volts.

5. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\4305-06-2961E, 2962E A&B, & 2966E A&B

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 136: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

136

SPECIFIC LOCKOUT PROCEDURE PAGE 136

PLANT: DAP 2 WEST

EQUIPMENT: PROCESS SCREEN PRIMARY SPLITTER, & DISCH DIVERTER

EQUIPMENT NUMBER: 4305-06--2961W, 2962W A&B, & 2966W A&B

DWG. NO.: 44-F-00

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Follow Specific Lockout Procedure for the Hydraulic System Pumps, 4305-06-2562 "A" or "B".

2. If the above can not be complied with, close and chain lock the hydraulic isolation valves located near the equipment. Bleed down cylinder and remove connector

pin.

3. Employees required to work on splitters & diverters will place their lock on the equipment designated by the originator of the Safe Work Permit.

4.Issue Safe Work Permit when required

and locate near equipment.

1. Electrical/480 volts.

2. Hydraulic pressure/3,000 PSIG.

1. Cubical explosion. Unexpected energization. Accidental start-up or release of stored energy.

2. Personal injury.

C:\WP51\DAP2W\4305-06-2961W, 2962W A&B, & 2966W A&B

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 137: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

137

SPECIFIC LOCKOUT PROCEDURE PAGE 137

PLANT: DAP 2 EAST

EQUIPMENT: RGV TAILGAS SCRUBBER

EQUIPMENT NUMBER: 0044-50-332

DWG. NO.: 44-F-0028

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Follow specific lockout procedure for the

following pieces of equipment, "A", "B", and

"C" Tailgas Scrubber Pumps, Dryer, and

RGV Tailgas Scrubber Fan.

2. Blind 24" equalizing line from Dryer

Tailgas Scrubber and Drain sump if required.

3. Close and chain lock with a production

lock 1" sulfuric acid valve (537).

4. Close and tag pond water valves, 6" -

(548), 8" - (519) and 10" - (544 & 545). and

16" pond water valve (475)).

1. Electrical/480 volts.

3. Sulfuric acid/98%

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

3. Chemical burns./corrosive

1/18/5

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 138: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

138

SPECIFIC LOCKOUT PROCEDURE PAGE 138

PLANT: DAP 2 EAST

EQUIPMENT: RGV TAILGAS SCRUBBER

EQUIPMENT NUMBER: 0044-50-332

DWG. NO.: 44-F-0028

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Employees required to work on this

equipment will place their personal locks on

the equipment designated by the originator of

the Safe Work and Confined Space Permit.

6. Issue Safe Work and Confined Space

Permit when required and locate near

entrance to personway.

7. After work completion, inspect

equipment and remove all locks. Close the

disconnect for all equipment to be energized.

8. Reverse procedure to put equipment back

in service.

7. Electrical/480 volts.

7. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\332E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 139: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

139

SPECIFIC LOCKOUT PROCEDURE PAGE 139

PLANT: DAP 2 EAST

EQUIPMENT: R/G PRESCRUBBER PUMP TANK

EQUIPMENT NUMBER: 0044-50-333E

DWG. NO.: 44-F-0021

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Follow the Specific Lockout Procedure for

the R/G Prescrubber (0044-50-360).

2. Drain tank by opening 2" drain valve (145).

3. Employees required to work in this tank

will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

4. Issue Safe Work Permit and Confined

Space Permit when required and locate near

entrance.

5. After work completion, inspect equipment

and remove locks. Close the disconnect for

all equipment to be energized.

1. Electrical/480 volts.

5. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

5. Cubical explosion. Unexpected

energization

1/18/5

Page 140: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

140

SPECIFIC LOCKOUT PROCEDURE

PAGE 140

PLANT: DAP 2 EAST

EQUIPMENT: R/G PRESCRUBBER PUMP TANK

EQUIPMENT NUMBER: 0044-50-333E

DWG. NO.: 44-F-0021

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Reverse procedure to put equipment back

in service.

C:\WP51\DAP2E\0044-50-333E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 141: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

141

SPECIFIC LOCKOUT PROCEDURE PAGE 141

PLANT: DAP 2 WEST

EQUIPMENT: R/G PRESCRUBBER

EQUIPMENT NUMBER: 0047-50-333W

DWG. NO.: 44-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the RGV

Prescrubber Pump "A" & "B" by pushing the

stop button on the panel board.

2. Open the disconnect for the fan & pumps in

the West Motor Control Center (West MCC).

3. Lock the disconnect for the fan & pumps

with a production lock.

4. Close and lock with a production lock,

hydraulic control valves to discharge valves Nr.

123 & 124.

5. Close and chain lock with a production lock

4" acid valve Nr. 110 & 1" steam valves Nr. lll

2. Electrical/480 volts.

2. Electrical/480 volts.

4. Hydraulic pressure/3,000 PSIG.

5. Phosphoric acid/180 F.

1. Cubical explosion. Unexpected

energization. Accidental start-up or release

of stored energy.

2. Cubical explosion.

4. Personal injury.

5. Thermal/chemical burns.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 142: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

142

& 116.

SPECIFIC LOCKOUT PROCEDURE PAGE 142

PLANT: DAP 2 WEST

EQUIPMENT: R/G PRESCRUBBER

EQUIPMENT NUMBER: 0047-50-333W

DWG. NO.: 44-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Employees required to work in this tank will

place their personal lock on the equipment

designated by the originator of the Safe Work

Permit.

7. Issue Safe Work and Confined Space Permit

when required and locate at entrance.

8. After work completion, inspect equipment

and remove locks. Close the disconnect for all

equipment to be energized.

9. Reverse procedure to put equipment back in

service.

8. Electrical/480 volts.

8. Cubical explosion. Unexpected

energization

C:\WP51\DAP2W\0047-50-333W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 143: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

143

SPECIFIC LOCKOUT PROCEDURE PAGE 143

PLANT: DAP 2 WEST

EQUIPMENT: R/G PRESCRUBBER PUMP TANK

EQUIPMENT NUMBER: 0047-50-334W

DWG. NO.: 44-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Follow the Specific Lockout Procedure

for the R/G Prescrubber (0047-50-333).

2. Drain tank by opening 3" drain valve

(118).

3. Employees required to work in this tank

will place their personal lock on the

equipment designated.

4. Reverse procedure to put equipment back

in service.

1. Electrical/480 volts.

5. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

5. Cubical explosion. Unexpected

energization

2\10\95 C:\WP51\DAP2W\0047-50-334W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 144: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

144

SPECIFIC LOCKOUT PROCEDURE PAGE 144

PLANT: DAP 2 WEST

EQUIPMENT: R/G PRESCRUBBER PUMP TANK

EQUIPMENT NUMBER: 0047-50-334W

DWG. NO.: 44-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Reverse procedure to put equipment back

in service.

C:\WP51\DAP2W\0047-50-334W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 145: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

145

SPECIFIC LOCKOUT PROCEDURE PAGE 145

PLANT: DAP 2 WEST

EQUIPMENT: DRYER TAILGAS SCRUBBER

EQUIPMENT NUMBER: 0047-50-350

DWG. NO.: 44-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Follow specific lockout procedure for the

following pieces of equipment, No. 1, 2, and

3 tailgas scrubber pumps, and Drye and

RGV Tailgas Scrubber Fan.

2. Drain vessel if required to work in this

area.

3. Close and tag 10" pond water valve (502,

479, & 480) and 16" pond water valve

(477).

4. Employees required to work on this

equipment will place their personal locks on

the equipment designated by the originator of

the Safe Work and Confined Space Permit.

1. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

/12/5

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 146: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

146

PECIFIC LOCKOUT PROCEDURE PAGE 146

PLANT: DAP 2 WEST

EQUIPMENT: DRYER TAILGAS SCRUBBER

EQUIPMENT NUMBER: 0047-50-350

DWG. NO.: 44-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work and Confined Space

Permit when required and locate near

entrance to personway.

6. After work completion, inspect

equipment and remove all locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

7. Electrical/480 volts.

7. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\350W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 147: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

147

SPECIFIC LOCKOUT PROCEDURE PAGE 147

PLANT: DAP 2 WEST

EQUIPMENT: RGV TAILGAS SCRUBBER

EQUIPMENT NUMBER: 0047-50-352

DWG. NO.: 44-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Follow specific lockout procedure for the

following pieces of equipment, No. 1, 2, and

3 tailgas scrubber pumps, and Dryer and

RGV Tailgas Scrubber Fan.

2. Drain vessel if required to work in this

area.

3. Close and tag 10" pond water valve (501,

474, & 473) and 16" pond water valve

(475)).

4. Employees required to work on this

equipment will place their personal locks on

the equipment designated by the originator of

the Safe Work and Confined Space Permit.

1. Electrical/480 volts.

1/12/5

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 148: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

148

SPECIFIC LOCKOUT PROCEDURE PAGE 148

PLANT: DAP 2 WEST

EQUIPMENT: RGV TAILGAS SCRUBBER

EQUIPMENT NUMBER: 0047-50-352

DWG. NO.: 44-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work and Confined Space

Permit when required and locate near

entrance to personway.

6. After work completion, inspect

equipment and remove all locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

7. Electrical/480 volts.

7. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\352W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 149: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

149

SPECIFIC LOCKOUT PROCEDURE PAGE 149

PLANT: DAP 2 WEST

EQUIPMENT: DRYER VENTURI SCRUBBER

EQUIPMENT NUMBER: 0047-50-354

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Dryer Tailgas Scrubber Fan and the Venturi Scrubber Pumps by pushing the stop button on the panel board.

2. Open the disconnect for the fan and pump in the West Motor Control Center (West MCC).

3. Lock the disconnect for the fan and pump with a production lock.

4. Close and tag fan damper valve (457).

5. Close and chain lock 8" acid valve (397) and steam valve (375) and (381) with a production lock.

1. Electrical/480 volts.

2. Electrical/480 volts.

5. Phosphoric acid/180 F.

1. Cubical explosion. Unexpected energization. Accidental start-up or release of stored energy.

2. Cubical explosion.

5. Chemical and thermal burns.

1/12/5

Page 150: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

150

SPECIFIC LOCKOUT PROCEDURE PAGE 150

PLANT: DAP 2 WEST

EQUIPMENT: DRYER VENTURI SCRUBBER

EQUIPMENT NUMBER: 0047-50-354

DWG. NO.: 44-F-0037

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Employees required to work in this vessel will place their personal locks on the equipment designated by the originator of the Safe Work and Confined Space Permit.

7. Issue Safe Work and Confined Space Permit when required and locate near entrance to personway.

8. After work completion inspect equipment and remove all locks. Close the disconnect for all equipment to be energized.

9. Reverse procedure to put equipment back in service.

8. Electrical/480 volts.

8. Cubical explosion. Unexpected energization.

C:\WP51\DAP2W\354W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 151: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

151

SPECIFIC LOCKOUT PROCEDURE PAGE 151

PLANT: DAP 2 WEST

EQUIPMENT: RGV VENTURI SCRUBBER

EQUIPMENT NUMBER: 0047-50-356

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the RGV Tailgas scrubber Fan and

the Venturi Scrubber Pumps by pushing the

stop button on the panel board.

2. Open the disconnect for the fan and pump

in the West Motor Control Center (West

MCC).

3. Lock the disconnect for the fan and pump

with a production lock.

4. Close and tag fan damper valve (467).

5. Close and chain lock 8" acid valve (403)

and steam valve (366) and (379) with a

production lock.

1. Electrical/480 volts.

2. Electrical/480 volts.

5. Phosphoric acid/180 F.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

5. Chemical and thermal burns.

1/12/5

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 152: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

152

SPECIFIC LOCKOUT PROCEDURE PAGE 152

PLANT: DAP 2 WEST

EQUIPMENT: RGV VENTURI

EQUIPMENT NUMBER: 0047-50-356

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Employees required to work in this vessel

will place their personal locks on the

equipment designated by the originator of the

Safe Work and Confined Space Permit.

7. Issue Safe Work and Confined Space

Permit when required and locate near

entrance to personway.

8. After work completion inspect equipment

and remove all locks. Close the disconnect

for all equipment to be energized.

9. Reverse procedure to put equipment back

in service.

8. Electrical/480 volts.

8. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\356W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 153: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

153

SPECIFIC LOCKOUT PROCEDURE PAGE 153

PLANT: DAP 2 WEST

EQUIPMENT: DRYER CYCLONE

EQUIPMENT NUMBER: 0047-50-358

DWG. NO.: 44-F-0033

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Dryer Tailgas Scrubber Fan and

Dryer Cyclone Dust Bin Valve by pushing

the stop button on the panel board.

2. Open the disconnect for the fan and valve

in the West Motor Control Center (West

MCC).

3. Lock the disconnect for the fan and valve

with a production lock.

4. Close and tag fan damper valve Nr. 457.

5. Employees required to work in this vessel

will place their personal locks on the

equipment designated by the originator of the

Safe Work Permit.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical Explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

1/5/5

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 154: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

154

SPECIFIC LOCKOUT PROCEDURE PAGE 154

PLANT: DAP 2 WEST

EQUIPMENT: DRYER CYCLONE

EQUIPMENT NUMBER: 0047-50-358

DWG. NO.: 44-F-0033

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Issue Safe Work Permit and locate near

equipment.

7. After work completion, inspect

equipment and remove all locks. Close the

disconnect for all equipment to be energized.

8. Reverse procedure to put equipment back

in service.

7. Electrical/480 volts.

7. Cubical explosion.

C:\WP51\DAP2W\358W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 155: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

155

SPECIFIC LOCKOUT PROCEDURE PAGE 155

PLANT: DAP 2 EAST

EQUIPMENT: R/G PRESCRUBBER

EQUIPMENT NUMBER: 0047-50- 360E

DWG. NO.: 44-F-0021

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the RGV

Prescrubber Pump "A" & "B" (1001EA&B)

by pushing the stop button on the panel

board.

2. Open the disconnect for the fan & pumps

in the East Motor Control Center (East

MCC).

3. Lock the disconnect for the fan & pumps

with a production lock.

4. Close and lock with a production lock,

hydraulic control valves to discharge valves

Nr. (151 & 150).

5. Close and chain lock with a production

lock 4" acid valve Nr. (138).

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Hydraulic pressure/3,000 PSIG.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4. Personal injury.

5. Thermal/chemical burns.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 156: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

156

SPECIFIC LOCKOUT PROCEDURE PAGE 156

PLANT: DAP 2 EAST

EQUIPMENT: R/G PRESCRUBBER

EQUIPMENT NUMBER: 0047-50-360E

DWG. NO.: 44-F-0021

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Close and tag 1" steam valve Nr. (139).

Close and tag 3" pond water valves Nr. (163

& 166).

7. Employees required to work in this tank

will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

8. Issue Safe Work and Confined Space

Permit when required and locate at entrance.

9. After work completion, inspect equipment

and remove locks. Close the disconnect for

all equipment to be energized.

10. Reverse procedure to put equipment back

in service.

6. 170 PSIG steam/360 F.

8. Electrical/480 volts.

6. Thermal burns.

8. Cubical explosion. Unexpected

energization.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 157: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

157

SPECIFIC LOCKOUT PROCEDURE PAGE 157

PLANT: DAP 2 EAST

EQUIPMENT: AMMONIA CHILLER

EQUIPMENT NUMBER: 0044-41-444E

DWG. NO.: 44-F-0020

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. In the 3" ammonia supply line from the

Ammonia Storage Area to the Ammonia

Chiller, close and chain lock with a production

lock, 3" valve (005) and install a SS blind.

2. In the 3" exit ammonia line from the

chiller, close and chain lock with a production

lock 3" valve (010).

3. In the 6" exit ammonia line from the

chiller, close and chain lock with a production

lock 6" valve (026).

4. Employees required to work on the chiller

will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

1. Ammonia/250PSIG.

2. Ammonia/250PSIG.

3. Ammonia/250PSIG.

1. Health. Fire or explosion.

2. Health. Fire or explosion.

3. Health. Fire or explosion.

SPECIFIC LOCKOUT PROCEDURE PAGE 157

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 158: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

158

PLANT: DAP 2 EAST

EQUIPMENT: AMMONIA CHILLER

EQUIPMENT NUMBER: 0044-41-444E

DWG. NO.: 44-F-0020

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work and Confine Space

Permit when required and locate near

entrance to tank.

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

7. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\444E

SPECIFIC LOCKOUT PROCEDURE PAGE 158

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 159: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

159

PLANT: DAP 2 WEST

EQUIPMENT: AMMONIA CHILLER

EQUIPMENT NUMBER: 0047-41-464W

DWG. NO.: 44-F-0030

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. In the 3" ammonia supply line from the

Ammonia Storage Area to the Ammonia

Chiller, close and chain lock with a production

lock, 3" valve (209) and close and tag 3" valve

(001).

2. In the 3" exit ammonia line from the chiller,

close and chain lock with a production lock 3"

valve (005).

3. In the 6" exit ammonia line from the chiller,

close and chain lock with a production lock 6"

valve (022).

4. Employees required to work on the chiller

will place their personal lock on the equipment

designated by the originator of the Safe Work

Permit.

1. Ammonia/250PSIG.

2. Ammonia/250PSIG.

3. Ammonia/250PSIG.

1. Health. Fire or explosion.

2. Health. Fire or explosion.

3. Health. Fire or explosion.

SPECIFIC LOCKOUT PROCEDURE PAGE 159

Page 160: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

160

PLANT: DAP 2 WEST

EQUIPMENT: AMMONIA CHILLER

EQUIPMENT NUMBER: 0047-41-464W

DWG. NO.: 44-F-0030

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work and Confine Space Permit

and locate near entrance to tank.

6. After work completion, inspect equipment

and remove locks. Close the disconnect for all

equipment to be energized.

7. Reverse procedure to put equipment back in

service.

7. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\464W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 161: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

161

SPECIFIC LOCKOUT PROCEDURE PAGE 161

PLANT: DAP 2 WEST

EQUIPMENT: AMMONIA CHILLER

EQUIPMENT NUMBER: 0047-41-464W

DWG. NO.: 44-F-0030

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. In the 3" ammonia supply line from the

Ammonia Storage Area to the Ammonia

Chiller, close and chain lock with a

production lock, 3" valve (001) and install a

SS blind.

2. In the 3" exit ammonia line from the

chiller, close and chain lock with a

production lock 3" valve (005).

3. In the 6" exit ammonia line from the

chiller, close and chain lock with a

production lock 6" valve (022).

4. Employees required to work on the

chiller will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

1. Ammonia/250PSIG.

2. Ammonia/250 PSIG.

3. Ammonia/250 PSIG.

1. Health. Fire or explosion.

2. Health. Fire or explosion.

3. Health. Fire or explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 162: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

162

SPECIFIC LOCKOUT PROCEDURE PAGE 162

PLANT: DAP 2 WEST

EQUIPMENT: AMMONIA CHILLER

EQUIPMENT NUMBER: 0047-41-464W

DWG. NO.: 44-F-0030

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work and Confine Space

Permit and locate near entrance to tank.

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment

back in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\464W 1/20/95

Page 163: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

163

SPECIFIC LOCKOUT PROCEDURE PAGE 163

PLANT: DAP 2 WEST

EQUIPMENT: BFL AMMONIA VAPORIZER

EQUIPMENT NUMBER: 0047-41-469

DWG. NO.: 44-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop ammonia flow by closing and chain

locking with a production lock, 6" valves (020

& 100). Blind line 6" PAM-0024-CBD down

stream of valve (100).

2. Isolate low pressure steam by closing and

chain locking valve (104), with a production

lock.

3. Follow the Specific Lockout Procedure for

the R/G Prescrubber (0047-50-333W) and

close blast gate (108).

4. Close manual damper (102).

5. Employees required to work in this tank

will place their personal locks on the

equipment designated by the originator of the

Safe Work Permit.

1. Ammonia/250PSIG.

2. Steam/45 PSIG.

1. Health. Fire or explosion.

2. Thermal burns.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 164: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

164

SPECIFIC LOCKOUT PROCEDURE PAGE 164

PLANT: DAP 2 WEST

EQUIPMENT: BFL AMMONIA VAPORIZER

EQUIPMENT NUMBER: 0047-41-469

DWG. NO.: 44-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Issue Safe Work and Confined Space

Permit when required, and locate at tank

entrance.

7. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

8. Close the disconnect for all equipment to

be energized.

7. Electrical/480 volts.

7. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\469W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 165: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

165

SPECIFIC LOCKOUT PROCEDURE PAGE 165

PLANT: DAP 2 WEST

EQUIPMENT: BFL AMMONIA VAPORIZER

EQUIPMENT NUMBER: 0047-41-469W

DWG. NO.: 44-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop ammonia flow by closing and

locking with a production lock, 6" valve

(100). Blind line (6" PAM-0024-CBD) and

(30"PV-0112-SS).

2. Isolate low pressure steam by closing and

locking valve (104), with a production lock.

3. Close blast gate (108).

5. Employees required to work in this tank

will place their personal locks on the

equipment designated.

5. Reverse procedure to put equipment back

in service.

1. Ammonia liquid and vapors./250PSIG.

2. Steam/45 PSIG.

1. Health. Fire or explosion.

2. Thermal burns.

1/27/95 C:\WP51\DAP2W\469W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 166: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

166

SPECIFIC LOCKOUT PROCEDURE PAGE 166

PLANT: DAP 2 WEST

EQUIPMENT: BFL AMMONIA VAPORIZER

EQUIPMENT NUMBER: 0047-41-469

DWG. NO.: 44-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Issue Safe Work and Confined Space

Permit when required, and locate at tank

entrance.

7. After work completion, inspect

equipment and remove locks.

8. Reverse procedure to put equipment back

in service.

C:\WP51\DAP2W\469W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 167: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

167

SPECIFIC LOCKOUT PROCEDURE PAGE 167

PLANT: DAP 2 EAST

EQUIPMENT: AIR CHILLER

EQUIPMENT NUMBER: 0044-41-470E

DWG. NO.: 44-F-0040

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. When entry to the Air Chiller is required, the

East Cooler Fan (114E) will be locked-out in

accordance with steps 2 and 3.

2. The Chief Operator will stop the East Cooler

Fan (114E) by

pushing the stop button on the panel board.

3. Open the disconnect for the fan in the East

Motor Control Center (East MCC).

4. Lock the disconnect for the

fan with a production lock.

2. Electrical/480 volts.

3. Electrical/480 volts.

2. Cubical explosion. Unexpected

energization. Accidental start up or release

of stored energy.

3. Cubical explosion.

1/20/5

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 168: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

168

SPECIFIC LOCKOUT PROCEDURE PAGE 168

PLANT: DAP 2 EAST

EQUIPMENT: AIR CHILLER

EQUIPMENT NUMBER: 0044-41-470E

DWG. NO.: 44-F-0040

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. In the 3" ammonia supply line to the chiller,

close and chain lock with a production lock 3"

valve (600), close and tag 4" ammonia valve

(611) and open and tag 3/4" bleed valves (610

& 612).

6. In the 8" discharge line from chiller, close

and chain lock with a production lock 8"

ammonia valve (629), and close and tag 8"

valve (626). Close and tag, 3/4" bleed valve

(627).

7. Employees required to work on this chiller

will place their personal lock on the equipment

designated by the originator of the Safe Work

Permit.

8. Issue Safe Work and Confined Space Permit

when required and locate near equip.

5. Ammonia/250 PSIG.

6. Ammonia/250 PSIG.

5. Health. Fire or explosion.

6. Health. Fire or explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 169: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

169

SPECIFIC LOCKOUT PROCEDURE PAGE 169

PLANT: DAP 2 EAST

EQUIPMENT: AIR CHILLER

EQUIPMENT NUMBER: 0044-41-470E

DWG. NO.: 44-F-0040

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

9. After work completion, inspect equipment

and remove locks. Close the disconnect for all

equipment to be energized.

10. Reverse procedure to put

equipment back in service.

9. Electrical/480 volts.

9. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\0047-41-470E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 170: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

170

SPECIFIC LOCKOUT PROCEDURE PAGE 170

PLANT: DAP 2 WEST

EQUIPMENT: AIR CHILLER

EQUIPMENT NUMBER: 0047-41-470W

DWG. NO.: 44-F-0039

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. When entry to the Air Chiller is required,

the Cooler Vent Fan (1361W) will be locked-

out in accordance with steps 2 and 3

2. The Chief Operator will stop the Cooler

Vent Fan (1361W) by pushing the stop button

on the panel board.

3. Open the disconnect for the fan in the East

Motor Control Center (East MCC).

4. Lock the disconnect for the fan with a

production lock.

5. In the 3" ammonia supply line to the

chiller , close and chain lock with a production

lock 3" valve (553), close and tag 4" ammonia

valve (559) and open and tag 3/4" bleed valves

(571 & 558).

2. Electrical/480 volts.

3. Electrical/480 volts.

5. Ammonia/250 PSIG.

2. Cubical explosion. Unexpected

energization. Accidental start up or release

of stored energy.

3. Cubical explosion.

5. Health. Fire or explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 171: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

171

SPECIFIC LOCKOUT PROCEDURE PAGE 171

PLANT: DAP 2 WEST

EQUIPMENT: AIR CHILLER

EQUIPMENT NUMBER: 0047-41-470W

DWG. NO.: 44-F-0039

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. In the 8" discharge line from chiller,

close and chain lock with a production lock 8"

ammonia valve (582), and close and tag 8"

valve (578). Close and tag 3/4" bleed valve

(579).

6. Employees required to work on this

chiller will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

7. Issue Safe Work and Confined Space

Permit when required and locate near

equipment.

8. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

10. Reverse procedure to put equipment

back in service.

6. Ammonia/250 PSIG.

9. Electrical/480 volts.

6. Health. Fire or explosion.

9. Cubical explosion. Unexpected tion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 172: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

172

SPECIFIC LOCKOUT PROCEDURE PAGE 172

PLANT: DAP 2 EAST

EQUIPMENT: REACTOR

EQUIPMENT NUMBER: 0044-02-530

DWG. NO.: 44-F-0020, 0021, 0027, & 0032

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the R/G

Prescrubber (1001A&B), and 54% DAP

Feed Pump (1182 B) by pushing the stop

button on the panel board.

2. Open the disconnect for the R/G

Prescrubber, Venture, and 54% DAP Feed

Pump.

3. Follow applicable J. S. A's pertaining to

acid, ammonia, slurry lines, and reactor so

they can be purged/cleaned prior to lockout.

4. Blind main ammonia supply line, at 3"

valve (005), in 3" line to Ammonia Chiller

(444).

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Ammonia liquid and vapors./ 250 PSIG.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4.Health. Fire or explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 173: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

173

SPECIFIC LOCKOUT PROCEDURE PAGE 173

PLANT: DAP 2 EAST

EQUIPMENT: REACTOR

EQUIPMENT NUMBER: 0044-02-530

DWG. NO.: 44-F-0020, 0021, 0027, & 0032

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Close and chain lock with a production

lock, 4" acid valve (153), on line (4"PPA-013-

BED), from R/G Prescrubber Pump.

6. Close and chain lock with a production

lock, 4" valve, on 22% line (4" PPA-24-HHK-

06), from Venturi Scrubber Pumps.

7. To lockout the AP and Regular 54% acid

lines close and chain lock, with a production

lock, 4" valve in discharge line above by-pass

tie-in from 1182C pump. Close and chain lock

4" valve in by-pass line (4"PPA-4-ALD-06).

Open and tag 4" discharge and 2" drain valve

on 54% DAP Feed Pump (1182C).

5. Phosphoric Acid/180 F.

6. Phosphoric Acid/180 F.

7. Phosphoric Acid/180 F.

5. Chemical and thermal burns.

6. Chemical and thermal burns.

7. Chemical and thermal burns.

SPECIFIC LOCKOUT PROCEDURE PAGE 173

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 174: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

174

PLANT: DAP 2 EAST

EQUIPMENT: REACTOR

EQUIPMENT NUMBER: 0044-02-530

DWG. NO.: 44-F-0020, 0021, 0027, & 0032

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

10. To lock out medium pressure steam,

close and chain lock with a production lock

two, 2" valves (042 & 043) by-pass and 1/2"

valve to level elements.

11. Disconnect any hoses to the reactor.

12. Employees required to work in this tank

will place their personal locks on the

equipment designated by the originator of the

Safe Work Permit.

13. Issue Safe Work and Confined Space

Permit when required and locate near

equipment.

10. 170 PSIG/360 F. 10. Thermal burns.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 175: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

175

SPECIFIC LOCKOUT PROCEDURE PAGE 4

PLANT: DAP 2 EAST

EQUIPMENT: REACTOR

EQUIPMENT NUMBER: 0044-02-530

DWG. NO.: 44-F-0020, 0021, 0027, & 0032

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

14. After work completion, inspect

equipment and remove all locks. Close the

disconnect for all equipment to be energized.

15. Reverse procedure to put equipment

back in service.

14. Electrical/480 volts.

14. Cubical explosion.

C:\WP51\DAP2E\530E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 176: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

176

SPECIFIC LOCKOUT PROCEDURE PAGE 176

PLANT: DAP 2 WEST

EQUIPMENT: REACTOR

EQUIPMENT NUMBER: 0047-02-550

DWG. NO.: 44-F-0030

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop flows and pump solution forward to

empty reactor.

2. Follow applicable J. S. A's pertaining to

acid, ammonia, slurry lines, and reactor so

they can be purged/cleaned prior to locked

out.

3. Blind 8" ammonia line from Air Chiller

and 6" ammonia line from Ammonia Chiller.

4. Close and chain lock ,6", 1165 "A" and "B"

reactor slurry pump suction valves (066 &

067).

Tag closed two 3" pond water valves, and tag

open drain valves (068 & 069.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 177: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

177

SPECIFIC LOCKOUT PROCEDURE PAGE 177

PLANT: DAP 2 WEST

EQUIPMENT: REACTOR

EQUIPMENT NUMBER: 0047-02-550

DWG. NO.: 44-F-0030

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Close and chain lock 12" 44-22-079A and

44-22-078B R/G Prescrubber Pump

discharge, KGA valves (124 & 123)), 4" valve

(126) and tag open 2" drain.

6. Open and lock with a production lock, the

disconnect for the Venturi Scrubber pumps

(1163W A & B) in the West Motor Control

Center (West MCC).

7. Close and chain lock 4",1163W "A" & "B"

Venturi Scrubber Pump branch valve (396).

8. To lock out acid flows to the reactor stop

the 54% DAP Feed Pump (1182A), by

pushing the stop button on the panel board

and open the disconnect.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 178: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

178

SPECIFIC LOCKOUT PROCEDURE PAGE 178

PLANT: DAP 2 WEST

EQUIPMENT: REACTOR

EQUIPMENT NUMBER: 0047-02-550

DWG. NO.: 44-F-0030

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

Lock the disconnect with a production lock.

Close and chain lock the 4" valves (14, 16 &

2) and tag open 2" (5) drain valve.

9. To lock out the 54% acid, from AP line to

the reactor, close and chain lock 3' by=-pass

valve and two 3" valves upstream and

downstream of loop FE6775. Open 3" and 1"

bleed valve.

10. To lock out medium pressure steam, close

and chain lock with a production lock two, 2"

valves (035 & 036) by-pass and 1/2" valve to

level elements.

11. Disconnect any hoses to the reactor.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 179: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

179

SPECIFIC LOCKOUT PROCEDURE PAGE 179

PLANT: DAP 2 WEST

EQUIPMENT: REACTOR

EQUIPMENT NUMBER: 0047-02-550

DWG. NO.: 44-F-0030

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

12. Employees required to work in this tank

will place their personal locks on the

equipment designated by the originator of the

Safe Work Permit.

13. Issue Safe Work Permit and locate near

equipment.

14. After work completion, inspect

equipment and remove all locks. Close the

disconnect for all equipment to be energized.

15. Reverse procedure to put equipment

back in service.

14. Electrical/480 volts.

14. Cubical explosion.

C:\WP51\DAP2W\550W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 180: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

180

SPECIFIC LOCKOUT PROCEDURE PAGE 180

PLANT: DAP 2 WEST

EQUIPMENT: REACTOR

EQUIPMENT NUMBER: 0047-02-550

DWG. NO.: 44-F-0030, 0031, 0032, 0037, & 0039

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the R/G

Prescrubber (078A & 079B), Venturi (1163W

A & B), and 54% DAP Feed Pumps (1182 A)

by pushing the stop button on the panel board.

2. Open the disconnect for the R/G

Prescrubber, Venture, and 54% DAP Feed

Pumps. 3.

Follow applicable J. S. A's pertaining to acid,

ammonia, slurry lines, and reactor so they

can be purged/cleaned prior to lockout.

4. Close and chain lock valve (001) with a

production lock. Blind main ammonia supply

line (3" PAM-205-CBD-06), at Ammonia

Chiller (464).

1. Electrical/480 volts.

2. Electrical/480 volts.

4. Ammonia liquid and vapors./ 250 PSIG.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

4. Health. Fire or explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 181: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

181

SPECIFIC LOCKOUT PROCEDURE PAGE 2

PLANT: DAP 2 WEST

EQUIPMENT: REACTOR

EQUIPMENT NUMBER: 0047-02-550

DWG. NO.: 44-F-0030, 0031, 0032, 0037, & 0039

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Close and chain lock with a production

lock, 4" acid valve (126), on line (4"PPA-

0137-BED), from R/G Prescrubber pumps.

6. Close and chain lock

with a production lock, 4" valve, on 22% line

(4"PPA-224-HK-06), from Venturi Scrubber

Pumps.

7. To lockout the AP and Regular 54% acid

lines, close and chain lock, with a production

lock, 4" valve in discharge line above by-pass

tie-in from 1182A pump. Close and chain

lock 4" valve in by-pass line (4" PPA-204-

ALD-06). Open and tag 4" discharge and 2"

drain valve on 54% DAP Feed Pump

(1182A).

5. Phosphoric Acid/180 F.

6. Phosphoric Acid/180 F.

7. Phosphoric Acid/180 F.

5. Chemical and thermal burns.

6. Chemical and thermal burns.

7. Chemical and thermal burns.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 182: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

182

SPECIFIC LOCKOUT PROCEDURE PAGE 3

PLANT: DAP 2 WEST

EQUIPMENT: REACTOR

EQUIPMENT NUMBER: 0047-02-550

DWG. NO.: 44-F-0030, 0031, 0032, 0037, & 0039

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

8. To lock out the 54% acid, from AP

line,close and chain lock last 3" valve before

reactor. close and tag 3" valve, in by-pass line

from 54% line (4" PPA-204-HHK-06) to

reactor. Open and tag 3" acid and 1" bleed

valve on venturi scrubber sump line.

9. To lock out medium pressure steam, close

and chain lock with a production lock 2"

valves (035), 2" by-pass Valve and 1/2" valve

to level elements.

10. Close and chain lock with a production

lock, Reactor Slurry Pumps (1165W A & B),

6" suction valves (066 & 067) and open and

tag 3" drain valve.

8. Phosphoric Acid/180 F.

9. 170 PSIG/360 F.

8. Thermal/Chemical burns.

9. Thermal burns.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 183: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

183

SPECIFIC LOCKOUT PROCEDURE PAGE 4

PLANT: DAP 2 WEST

EQUIPMENT: REACTOR

EQUIPMENT NUMBER: 0047-02-550

DWG. NO.: 44-F-0030, 0031, 0032, 0037, & 0039

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

11. Disconnect any hoses that empty into the

reactor.

12. Employees required to work in this tank

will place their personal locks on the

equipment designated by the originator of the

Safe Work Permit.

13. Issue Safe Work and Confined Space

Permit when required and locate near

equipment.

14. After work completion, inspect equipment

and remove all locks. Close the disconnect

for all equipment to be energized.

15. Reverse procedure to put equipment back

in service.

14. Electrical/480 volts.

14. Cubical explosion.

C:\WP51\DAP2W\550W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 184: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

184

SPECIFIC LOCKOUT PROCEDURE PAGE 184

PLANT: DAP 2 WEST

EQUIPMENT: DEFOAMER SHIFT TANK

EQUIPMENT NUMBER: 0047-01-557W

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Follow the Specific Lockout Procedure

for the West Defoamer Shift Tank Agitator.

2. Close and chain lock 3" defoamer valve

(407) and close and tag defoamer transfer

discharge valves (524) & (525).

3. Employees required to work on this tank

will place their personal locks on the

equipment designated by the originator of the

Safe Work Permit.

4. Issue Safe Work and Confined Space

Permit when required and locate near

entrance to tank.

1. Electrical/120 volts. 1. Unexpected energization. Accidental

start-up or release of stored energy.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 185: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

185

SPECIFIC LOCKOUT PROCEDURE PAGE 185

PLANT: DAP 2 WEST

EQUIPMENT: DEFOAMER SHIFT TANK

EQUIPMENT NUMBER: 0047-01-557W

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

6. Reverse procedure to put equipment back

in service.

5. Electrical/480 volts 5. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\557W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 186: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

186

SPECIFIC LOCKOUT PROCEDURE PAGE 186

PLANT: DAP 2 WEST

EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR

EQUIPMENT NUMBER: 0047-01-557WW

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will have his

designee stop the 120 volt agitator, by

pushing the start/stop button in the field.

2. Open the disconnect for the agitator in the

West Motor Control Center (West MCC).

Lighting panel EP 01, Nr. l breaker.

3. Lock/Tag the disconnect for the agitator

with a production lock/tag.

4. Employees required to work on this

agitator will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

1. Electrical/120 volt.

2. Electrical/120 volt.

1. Unexpected energization. Accidental

start-up or release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 187: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

187

SPECIFIC LOCKOUT PROCEDURE PAGE 187

PLANT: DAP 2 WEST

EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR

EQUIPMENT NUMBER: 0047-01-557WW

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work Permit and locate near

equipment.

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\557WW

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 188: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

188

SPECIFIC LOCKOUT PROCEDURE PAGE 188

PLANT: DAP 2 WEST

EQUIPMENT: DEFOAMER SHIFT TANK

EQUIPMENT NUMBER: 0047-01-557W

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Follow the Specific Lockout Procedure

for the West Defoamer Shift Tank Agitator.

2. Close and chain lock 3" defoamer valve

(407) and close and tag defoamer transfer

discharge valves (524) & (525).

3. Employees required to work on this tank

will place their personal locks on the

equipment designated by the originator of the

Safe Work Permit.

4. Issue Safe Work and Confined Space

Permit when required and locate near

entrance to tank.

1. Electrical/120 volts. 1. Unexpected energization. Accidental

start-up or release of stored energy.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 189: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

189

SPECIFIC LOCKOUT PROCEDURE PAGE 189

PLANT: DAP 2 WEST

EQUIPMENT: DEFOAMER SHIFT TANK

EQUIPMENT NUMBER: 0047-01-557W

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

6. Reverse procedure to put equipment back

in service.

5. Electrical/480 volts 5. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\557W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 190: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

190

SPECIFIC LOCKOUT PROCEDURE PAGE 190

PLANT: DAP 2 WEST

EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR

EQUIPMENT NUMBER: 0047-01-557WW

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will have his

designee stop the 120 volt agitator, by

pushing the start/stop button in the field.

2. Open the disconnect for the agitator in the

West Motor Control Center (West MCC).

Lighting panel EP 01, Nr. l breaker.

3. Lock/Tag the disconnect for the agitator

with a production lock/tag.

4. Employees required to work on this

agitator will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

1. Electrical/120 volt.

2. Electrical/120 volt.

1. Unexpected energization. Accidental

start-up or release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 191: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

191

SPECIFIC LOCKOUT PROCEDURE PAGE 191

PLANT: DAP 2 WEST

EQUIPMENT: DEFOAMER SHIFT TANK AGITATOR

EQUIPMENT NUMBER: 0047-01-557WW

DWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work Permit and locate near

equipment.

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\557WW

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 192: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

192

SPECIFIC LOCKOUT PROCEDURE PAGE 192

PLANT: DAP2 WEST

EQUIPMENT: COOLER FEED ROTARY FEEDER

EQUIPMENT NUMBER: 44-47-661W

DWG. NO.: 44-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

l. The Chief Operator will stop the Cooler

Feed Rotary Feeder or Dryer Discharge

Elevator (4305-06-2166W) by pushing the

stop button on the panel board.

2. Open the disconnect for the feeder &

elevator in the West Motor Control Center

(West MCC).

3. Lock the disconnect for the feeder &

elevator with a production lock.

4. Employees required to work on this

feeder will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

5. Issue Safe Work Permit and locate near

equipment.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 193: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

193

SPECIFIC LOCKOUT PROCEDURE PAGE 193

PLANT: DAP 2 WEST

EQUIPMENT: COOLER FEED ROTARY FEEDER

EQUIPMENT NUMBER: 44-47-661W

DWG. NO.: 44-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts. 6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\661W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 194: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

194

SPECIFIC LOCKOUT PROCEDURE PAGE 194

PLANT: DAP2 WEST

EQUIPMENT: COOLER FEED ROTARY FEEDER

EQUIPMENT NUMBER: 44-47-661W

DWG. NO.: 44-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

l. The Chief Operator will stop the Cooler

Feed Rotary Feeder or Dryer Discharge

Elevator (4305-06-2166W) by pushing the

stop button on the panel board.

2. Open the disconnect for the feeder &

elevator in the West Motor Control Center

(West MCC).

3. Lock the disconnect for the feeder &

elevator with a production lock.

4. Employees required to work on this

feeder will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

5. Issue Safe Work Permit and locate near

equipment.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 195: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

195

SPECIFIC LOCKOUT PROCEDURE PAGE 195

PLANT: DAP 2 WEST

EQUIPMENT: COOLER FEED ROTARY FEEDER

EQUIPMENT NUMBER: 44-47-661W

DWG. NO.: 44-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts. 6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\661W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 196: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

196

SPECIFIC LOCKOUT PROCEDURE PAGE 196

PLANT: DAP 2 WEST

EQUIPMENT: DRYER CYCLONE DUST BIN VIBRATOR

EQUIPMENT NUMBER: 0047-79-678W

DWG. NO.: 44-F-0033

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Close and lock the 1" plant air line to the

Dust Bin Vibrator, with a production lock.

2. Employees required to work on this

vibrator will place their personal lock on the

equipment designated.

3. Reverse procedure to put equipment back

in service.

2/10/95 C:\WP51\DAP2W\678W

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 197: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

197

SPECIFIC LOCKOUT PROCEDURE PAGE 197

PLANT: DAP 2 WEST

EQUIPMENT: DRYER CYCLONE DUST BIN VIBRATOR

EQUIPMENT NUMBER: 0047-79-678W

DWG. NO.: 44-F-0033

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Employees required to work on this

vibrator will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

6. Issue Safe Work Permit when required

and locate near equipment.

7. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

8. Reverse procedure to put equipment back

in service.

7. Electrical/480 volts.

Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\678W

SPECIFIC LOCKOUT PROCEDURE PAGE 197

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 198: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

198

PLANT: DAP 2 EAST

EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR

EQUIPMENT NUMBER: 0047-47-87

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Nr. 1

Rotary Valve Cooler Dust Collector and

Screw Conveyor (4305-06-2155A) by

pushing the stop button on the panel board.

2. Open the disconnect for the rotary valve

and screw conveyor in the East Motor

Control Center (East MCC).

3. Lock the disconnect for the rotary valve

and screw conveyor with a production lock.

4. Employees required to work on this valve

will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 199: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

199

SPECIFIC LOCKOUT PROCEDURE PAGE 199

PLANT: DAP 2 EAST

EQUIPMENT: NR. 1 ROTARY VALVE COOLER DUST COLLECTOR

EQUIPMENT NUMBER: 0047-47-87

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work Permit when required

and locate near equipment.

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2E\87E

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 200: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

200

SPECIFIC LOCKOUT PROCEDURE PAGE 200

PLANT: DAP 2 WEST

EQUIPMENT: NR. 2 ROTARY VALVE COOLER DUST COLLECTOR

EQUIPMENT NUMBER: 0047-47-88W

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Nr. 2

Rotary Valve Cooler Dust Collector and

Screw Conveyor (4305-06-2155B) by

pushing the stop button on the panel

board.

2. Open the disconnect for the rotary valve

and screw conveyor in the West Motor

Control Center (West MCC).

3. Lock the disconnect for the rotary valve

and screw conveyor with a production

lock.

4. Employees required to work on this

valve will place their personal lock on the

equipment designated by the originator of the

Safe Work Permit.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or

release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 201: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

201

SPECIFIC LOCKOUT PROCEDURE PAGE 201

PLANT: DAP 2 WEST

EQUIPMENT: NO. 2 ROTARY VALVE COOLER DUST COLLECTOR

EQUIPMENT NUMBER: 0047-47-88W

DWG. NO.: 44-F-0029

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work Permit when required

and locate near equipment.

6. After work completion, inspect

equipment and remove locks. Close

the disconnect for all equipment to be

energized.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

C:\WP51\DAP2W\0047-47-88W 1/10/5

Page 202: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

202

SPECIFIC LOCKOUT PROCEDURE PAGE 202

PLANT: DAP 2 WEST

EQUIPMENT: NR. 2 ROTARY VALVE COOLER DUST COLLECTOR

EQUIPMENT NUMBER: 0047-47-88W

DWG. NO.: 44-F-0029

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will stop the Nr. 2 Rotary Valve Cooler Dust Collector and Screw Conveyor (4305-06-2155B) by pushing the stop button on the panel board.

2. Open the disconnect for the rotary valve and screw conveyor in the West Motor Control Center (West MCC).

3. Lock the disconnect for the rotary valve and screw conveyor with a production lock.

4. Employees required to work on this valve will place their personal lock on the equipment designated by the originator of the Safe Work Permit.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected energization. Accidental start-up or release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 203: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

203

SPECIFIC LOCKOUT PROCEDURE PAGE 203

PLANT: DAP 2 WEST

EQUIPMENT: NO. 2 ROTARY VALVE COOLER DUST COLLECTOR

EQUIPMENT NUMBER: 0047-47-88W

DWG. NO.: 44-F-0029

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work Permit when required and locate near equipment.

6. After work completion, inspect equipment and remove locks. Close the disconnect for all equipment to be energized.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected energization.

C:\WP51\DAP2W\0047-47-88W 1/10/5

Page 204: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

204

SPECIFIC LOCKOUT PROCEDURE PAGE 204

PLANT: DAP 2 WEST

EQUIPMENT: 200 AMP, TEMPORARY WELDING MACHINE, & TWO WELDING

OUTLETS

EQUIPMENT NUMBER: 200 AMP, WR 06-1, & WR 06-2

DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will have his

designee, have all equipment or welding

machines unplugged.

2. Open the disconnect for the welding

machine outlet in the West Motor Control

Center (West MCC).

3. Lock the disconnect for the welding

outlet with a production lock.

4. Employees required to work on these

welding machines or electrical outlets will

place their personal lock on the equipment

designated by the originator of the Safe

Work Permit.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up or release

of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 205: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

205

SPECIFIC LOCKOUT PROCEDURE PAGE 205

PLANT: DAP 2 WEST

EQUIPMENT: 200 AMP TEMPORARY WELDING MACHINE, & TWO WELDING

OUTLETS

EQUIPMENT NUMBER: 200 AMP, WR 06-1, & WR 06-2

DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Issue Safe Work Permit when required

and locate near equipment.

6. After work completion, inspect

equipment and remove locks. Close the

disconnect for all equipment to be energized.

7. Reverse procedure to put equipment back

in service.

6. Electrical/480 volts.

6. Cubical explosion. Unexpected

energization.

SPECIFIC LOCKOUT PROCEDURE

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 206: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

206

PLANT: AMMONIA STORAGE

EQUIPMENT: No.1 AMMONIA STORAGE TANK (501A)

EQUIPMENT NUMBER: 0045-01-501A

DWG. NO.: 45-F-0016/17

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The No.1 Ammonia Storage

Tank (501A) will be emptied

and de-pressurized per

applicable J.S.A./operating

Procedures.

2. The following valves will be

Closed and Chain locked with a

Production Lock: The 3"

Compressor Supply/Return Line

valves, the 6" Tampa bay

Pipeline Line valves, the 8"

Ammonia Vaporizer Supply Line

valve, and the two (2) 4" valves

on the bottom of the Ammonia

Bullets. Open and tag vent valve.

3. Employees working on this

equipment will place their

personal lock(s) on the equipment

1. Ammonia liquid and vapors/250 PSIG.

2. Ammonia liquid and vapors/250 PSIG.

3. None

4. None

1. Health hazard/Fire/Explosion.

2. Health hazard/Fire/explosion.

3. No hazard.

4. No hazard

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 11/14/96

Page 207: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

207

designated.

4. After work completion, inspect

equipment and reverse

procedures to put the equipment

back in service.

Page 208: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

208

SPECIFIC LOCKOUT PROCEDURE

PLANT: AMMONIA STORAGE

EQUIPMENT: No.2 AMMONIA STORAGE TANK (501B)

EQUIPMENT NUMBER: 0045-01-501B

DWG. NO.: 45-F-0016/17

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The No.2 Ammonia Storage

Tank (501B) will be emptied

and de-pressurized per

applicable J.S.A./operating

Procedures.

2. The following valves will be

Closed and Chain locked with a

Production Lock: The 3"

Compressor Supply/Return Line

valves, the 6" Tampa bay

Pipeline Line valves, the 8"

Ammonia Vaporizer Supply

Line valve, and the two (2) 4"

valves on the bottom of the

Ammonia Bullets. Open and tag

vent valve.

1. Ammonia liquid and vapors/250

PSIG.

2. Ammonia liquid and vapors/250

PSIG.

3. None

1. Health hazard/Fire/Explosion.

2. Health hazard/Fire/explosion.

3. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 11/14/96

Page 209: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

209

3. Employees working on this

equipment will place their

personal lock(s) on the

equipment designated.

4. After work completion, inspect

equipment and reverse

procedures to put the equipment

back in service.

4. None

4. No hazard

Page 210: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

210

SPECIFIC LOCKOUT PROCEDURE

PLANT: AMMONIA STORAGE

EQUIPMENT: No.3 AMMONIA STORAGE TANK (501C)

EQUIPMENT NUMBER: 0045-01-501C

DWG. NO.: 45-F-0016/17

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The No.3 Ammonia Storage

Tank (501C) will be emptied

and de-pressurized per

applicable J.S.A./operating

Procedures.

2. The following valves will be

Closed and Chain locked with a

Production Lock: The 3"

Compressor Supply/Return Line

valves, the 6" Tampa bay

Pipeline Line valves, the 8"

Ammonia Vaporizer Supply

Line valve, and the two (2) 4"

valves on the bottom of the

Ammonia Bullets. Open and tag

vent valve.

1. Ammonia liquid and vapors/250

PSIG.

2. Ammonia liquid and vapors/250

PSIG.

3. None

1. Health hazard/Fire/Explosion.

2. Health hazard/Fire/explosion.

3. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 11/14/96

Page 211: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

211

3. Employees working on this

equipment will place their

personal lock(s) on the

equipment designated.

4. After work completion, inspect

equipment and reverse

procedures to put the equipment

back in service.

4. None

4. No hazard

Page 212: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

212

SPECIFIC LOCKOUT PROCEDURE

PLANT: AMMONIA STORAGE

EQUIPMENT: No.4 AMMONIA STORAGE TANK (501D)

EQUIPMENT NUMBER: 0045-01-501D

DWG. NO.: 45-F-0016/17

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The No.4 Ammonia Storage

Tank (501D) will be emptied

and de-pressurized per

applicable J.S.A./operating

Procedures.

2. The following valves will be

Closed and Chain locked with a

Production Lock: The 3"

Compressor Supply/Return Line

valves, the 6" Tampa bay

Pipeline Line valves, the 8"

Ammonia Vaporizer Supply

Line valve, and the two (2) 4"

valves on the bottom of the

Ammonia Bullets. Open and tag

vent valve.

1. Ammonia liquid and vapors/250

PSIG.

2. Ammonia liquid and vapors/250

PSIG.

3. None

1. Health hazard/Fire/Explosion.

2. Health hazard/Fire/explosion.

3. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 11/14/96

Page 213: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

213

3. Employees working on this

equipment will place their

personal lock(s) on the

equipment designated.

4. After work completion, inspect

equipment and reverse

procedures to put the equipment

back in service.

4. None

4. No hazard

Page 214: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

214

SPECIFIC LOCKOUT PROCEDURE

PLANT: AMMONIA STORAGE

EQUIPMENT: No.1 AMMONIA COMPRESSOR (502A)

EQUIPMENT NUMBER: 0045-01-502A

DWG. NO.: 45-F-0017

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop The No.1 Ammonia

Compressor Motor (502A) by

pushing the stop button on the

Field Switch.

2. Open and lock the disconnect for the

No.1 Ammonia Compressor (502A)

in the Motor Control Center (MCC).

3. The following valves will be

Closed and Chain locked with a

Production Lock: The 3"

Ammonia Inlet and outlet

valves, the Water Inlet and

outlet Valves, the Oil Separator

inlet and outlet valves. Open

Bleed valves and de-pressurize

system. Open and tag the Water

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Ammonia/Water under

pressure/motor oil.

1. Accidental equipment start-up.

2. Cubical explosion.

3. Eye irritation/Personal health.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 11/14/96

Page 215: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

215

Inlet and Outlet Drain Valves.

4. Employees working on this

equipment will place their

personal lock(s) on the

equipment designated.

5. After work completion, inspect

equipment and reverse

procedures to put the equipment

back in service.

4. None

5. None

4. No hazard.

5. No hazard.

Page 216: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

216

SPECIFIC LOCKOUT PROCEDURE

PLANT: AMMONIA STORAGE

EQUIPMENT: No.2 AMMONIA COMPRESSOR (502B)

EQUIPMENT NUMBER: 0045-01-502B

DWG. NO.: 45-F-0017

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop The No.2 Ammonia

Compressor Motor (502B) by

pushing the stop button on the

Field Switch.

2. Open and lock the disconnect for the

No.2 Ammonia Compressor (502B)

in the Motor Control Center (MCC).

3. The following valves will be

Closed and Chain locked with a

Production Lock: The 3"

Ammonia Inlet and outlet

valves, the Water Inlet and

outlet Valves, the Oil Separator

inlet and outlet valves. Open

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Ammonia/Water under

pressure/motor oil.

1. Accidental equipment start-up.

2. Cubical explosion.

3. Eye irritation/Personal health.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 11/14/96

Page 217: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

217

Bleed valves and de-pressurize

system. Open and tag the Water

Inlet and Outlet Drain Valves.

4. Employees working on this

equipment will place their

personal lock(s) on the

equipment designated.

5. After work completion, inspect

equipment and reverse

procedures to put the equipment

back in service.

4. None

5. None

4. No hazard.

5. No hazard.

Page 218: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

218

SPECIFIC LOCKOUT PROCEDURE

PLANT: AMMONIA STORAGE

EQUIPMENT: AMMONIA VAPORIZER (506)

EQUIPMENT NUMBER: 0045-01-506

DWG. NO.: 45-F-0016

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Ammonia Vaporizer (506)

will be emptied and de-

pressurized per applicable

J.S.A./Operating Procedures.

2. The following valves will be

Closed and Chain locked with a

Production Lock: The 3" Steam

Supply Line valve, the 3/4"

Condensate valve, the 4"

Ammonia Supply line valves.

Open and tag the 1" vent valves.

Open and tag 3/4" Condensate

Drain valve and the 1" Bleed

valves to the ditch.

1. Ammonia liquid and vapors/250

PSIG.

2. Steam/Hot Condensate/Ammonia

liquid and vapors/250 PSIG.

1. Health hazard/Fire/Explosion.

2. Health hazard/Fire/explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 11/14/96

Page 219: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

219

3. Employees working on this

equipment will place their

personal lock(s) on the

equipment designated.

4. After work completion, inspect

equipment and reverse

procedures to put the equipment

back in service.

3. None

4. None

3. No hazard.

4. No hazard

Page 220: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

220

SPECIFIC LOCKOUT PROCEDURE PAGE 220

PLANT: DAP 2 WEST

EQUIPMENT: LIGHTING, RECEPTACLES, AND SMALL EQUIPMENT PANELS

EQUIPMENT NUMBER: LP___, ___, ___, ___, ___, ___.

DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Field switches will be placed in the OFF position by production.

2. Breakers will be placed in the OFF position, locked out, tagged or entire panel locked by production. Located in (West MCC).

3. Employees required to work on the equipment will place their personal lock/tag on the equipment designated by the originator of the Safe Work Permit.

4. After work completion, inspect equipment and remove locks. Close the disconnect for all equipment to be energized.

5. Reverse procedure to put equipment back in service.

1. Electrical/120 volts.

2. Electrical/120 volts.

4. Electrical/120 volts.

1. Unexpected energization. Accidental start-up or release of stored energy.

4. Unexpected energization.

C:\DAP2W\W-LP 2/6/5

SPECIFIC LOCKOUT PROCEDURE

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 221: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

221

PAGE 221

PLANT: DAP 2 WEST

EQUIPMENT: 200 AMP TEMPORARY WELDING MACHINE & TWO WELDING

OUTLETS

EQUIPMENT NUMBER: 200 AMP, WR 06-1, & WR 06-2

DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.

AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. The Chief Operator will have his

designee, have all equipment or

welding machines unplugged.

2. Open the disconnect for the welding

machine outlet in the West Motor

Control Center (West MCC).

3. Lock the disconnect for the welding

outlet with a production lock.

4. Employees required to work on these

welding machines or electrical outlets will

place their personal lock on the equipment

designated.

1. Electrical/480 volts.

2. Electrical/480 volts.

1. Cubical explosion. Unexpected

energization. Accidental start-up

or release of stored energy.

2. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 222: PLANT: DAP 2 EAST 14 - The Mosaic Company · 3 plant: dap 2 west ..... 45

222

SPECIFIC LOCKOUT PROCEDURE PAGE 222

PLANT: DAP 2 WEST

EQUIPMENT: 200 AMP TEMPORARY WELDING MACHINE & TWO WELDING OUTLETS

EQUIPMENT NUMBER: 200 AMP, WR 06-1, & WR 06-2

DWG. NO.:

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. After work completion, inspect

equipment and remove locks. Close

the disconnect for all equipment to be

energized.

6. Reverse procedure to put equipment

back in service.

5. Electrical/480 volts. 5. Cubical explosion. Unexpected

energization.

C:\DAP2W\WR 2/6/5