planning with a vision that embraces the …...projected to be 178,962 by 2015 and to reach...

27
PLANNING WITH A VISION THAT EMBRACES THE FUTURE

Upload: others

Post on 08-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

PLANNING WITH A VISION THAT EMBRACES THE FUTURE

TODAYrsquoS AGENDA

Welcome

Porterville College Overview

Community College Finance 101

Facilities Needs List Development Process

FeedbackQuestions

2

3

PORTERVILLE COLLEGE OVERVIEW

270000 280000 290000 300000 310000 320000 330000 340000

2000000 2100000 2200000 2300000 2400000 2500000 2600000 2700000 2800000

2010-11 2011-12 2012-13 2013-14 2014-15

Full

Tim

e Eq

uiva

lent

Stu

dent

s

Cens

us E

nrol

lmen

t

Fiscal Year

Enrollments - 5 Years

Enrollment FTES

17

08

37

736

183

19

02

AFRICAN hellip

AMERIChellip

ASIAN

HISPANIC

WHITE

TWO OR hellip

NOT hellip

Ethnicity

AAASAA-TAS-TSocial Science

Liberal ArtsSciencesBiological amp Physical Science

CertificatesCommunication StudiesIndustrial Technology

Administration of Justice

2015 Top Majors

315

55

98

30

0

50

100

150

200

250

300

350

400

450

500

2015 Degrees Conferred

Job Skills CertificateCertificate of AchievementAA-TAS-TASAS

Top Transfer Colleges

UC 13CSU 141

Student Transfers

CSU Northridge

UCUC Davis

CSU

UC Merced

UC Santa Cruz

CSU BakersfieldCSU Fresno

Male 394Female

605

Not Reported

01

Gender

Full Time Faculty

27

Adjunct Faculty37

Classified Staff29

Admin7

FALL 2015 EMPLOYEES

50 or Older

40-49

30-39

25-29

20-24

19 or Younger

29

59

125

137374

277

Age

Source Porterville College Fast Facts 2015Source ODS Query (Course Book) September 2015

4

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

2015 Degrees Conferred

ASAS

315AA-TAS-T

55Certificate of Achievement

98Job Skills Certificate

30

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

2015 Degrees Conferred

ASAS

315AA-TAS-T

55Certificate of Achievement

98Job Skills Certificate

30

COMMUNITY COLLEGE FINANCE 101

General Fund Revenue Unrestricted Funds received at the state and local levels of

government that may be utilized for any operating purposes

State Apportionment = based on Full Time Equivalent Students (15 lecture units = 1 FTES) course enrollment

Grant Funds ndash Restricted Funds received from federal state local and non-profit organizations that must be utilized for specific operating purposes

Capital Projects Funds - Restricted Funds received for construction or modernization capital projects

General Fund

Operations

Grant Funds

Capital Funds

5

FISCAL YEAR 2016-17 GENERAL FUND OPERATIONS

Local1

State Allocation 99

General Fund Unrestricted Revenue

Academic Salaries51

Classified amp Oth Nonacad Salaries

17

Employee Benefits23

Supplies amp Materials

2

ServiceUtilitiesOperating Exps

6Capital Outlay

1

General Fund Unrestricted Fund Expenditures

6

Source Porterville College FY 2016-17 Tentative Budget

FUTURE PROJECTSKEY PLANNING ASSUMPTIONS FROM THE EDUCATIONAL MASTER PLAN

Based on an analysis of residential zip codes reported by enrolled students the vast majority of students live with a drive time of 40-minutes from campus center This area comprises the effective service area of the College

bull The population of Porterville Collegersquos service area was 143724 in the year 2000 It was projected to be 178962 by 2015 and to reach approximately 200000 by year 2025

bull The effective service area is expected to grow at an annual rate of 119 as compared to the State annual growth rate of 70

bull Approximately 64 of the adult population is a high school graduate or less Almost half of the total population (466) 25+years has only a high school diploma or some college courses but do not have degree

bull The California Department of Finance projects an annual 44 increase in high school graduates between 2009-10 and 2020-2021 in Tulare County

7

Source Porterville College Facilities Master Plan 2013

Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and

equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the proposition

The Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County

2002 Measure G Bond Projects

2002 - SRID Expenditures By Site

HAZARDOUS amp SAFETYADA PROJECTS

Path of Travel ADA ImprovementPlano Fire Lane Improvement

Campus Security UpgradesNetwork Video Recorder amp Science Math Electronic Locks

10

LIBRARY amp LRC CAPITAL PROJECTSConstructed a library and learning center with modern computer equipment and furniture

Before Construction Completed Capital Project

11

Science Math RemodelRemodeled the building interior and installed new laboratory equipment

12

Fitness Center Capital ProjectConstructed a new fitness center building and installed modern exercise equipment

13

Campus Plant ImprovementsInstalled a newer chilled water loops with new air handlers to be installed to provide conditioned air

14

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Enrollments Student Awards 2015
ASAS 315 Student Transfers
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 55 UC 13
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 98 CSU 141
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 30
UC
2015 Top Majors UC Davis
ASASAA-TAS-T UC Merced
Social Science UC Santa Cruz
Liberal ArtsSciences CSU
Biological amp Physical Science CSU Bakersfield
CSU Fresno
Certificates CSU Northridge
Communication Studies
Industrial Technology
Administration of Justice
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Enrollments Student Awards 2015
ASAS 315 Student Transfers
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 55 UC 13
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 98 CSU 141
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 30
2015 Top Majors
ASASAA-TAS-T UC Davis
Social Science UC Merced
Liberal ArtsSciences UC Santa Cruz
Biological amp Physical Science CSU Bakersfield
CSU Fresno
Certificates CSU Northridge
Communication Studies
Industrial Technology
Administration of Justice
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Enrollments Student Awards 2015
ASAS 775
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 171
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 286
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 673
2015 Top Majors
ASASAA-TAS-T
Social Science
Liberal ArtsSciences
Biological amp Physical Science
Certificates
Communication Studies
Industrial Technology
Administration of Justice
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Enrollments Student Awards 2015
ASAS 775
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 171
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 286
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 673
2015 Top Majors
AAASAA-TAS-T
Social Science
Liberal ArtsSciences
Biological amp Physical Science
Certificates
Child Development
Nurse Assistant
Emergency Medical Technican
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Page 2: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

TODAYrsquoS AGENDA

Welcome

Porterville College Overview

Community College Finance 101

Facilities Needs List Development Process

FeedbackQuestions

2

3

PORTERVILLE COLLEGE OVERVIEW

270000 280000 290000 300000 310000 320000 330000 340000

2000000 2100000 2200000 2300000 2400000 2500000 2600000 2700000 2800000

2010-11 2011-12 2012-13 2013-14 2014-15

Full

Tim

e Eq

uiva

lent

Stu

dent

s

Cens

us E

nrol

lmen

t

Fiscal Year

Enrollments - 5 Years

Enrollment FTES

17

08

37

736

183

19

02

AFRICAN hellip

AMERIChellip

ASIAN

HISPANIC

WHITE

TWO OR hellip

NOT hellip

Ethnicity

AAASAA-TAS-TSocial Science

Liberal ArtsSciencesBiological amp Physical Science

CertificatesCommunication StudiesIndustrial Technology

Administration of Justice

2015 Top Majors

315

55

98

30

0

50

100

150

200

250

300

350

400

450

500

2015 Degrees Conferred

Job Skills CertificateCertificate of AchievementAA-TAS-TASAS

Top Transfer Colleges

UC 13CSU 141

Student Transfers

CSU Northridge

UCUC Davis

CSU

UC Merced

UC Santa Cruz

CSU BakersfieldCSU Fresno

Male 394Female

605

Not Reported

01

Gender

Full Time Faculty

27

Adjunct Faculty37

Classified Staff29

Admin7

FALL 2015 EMPLOYEES

50 or Older

40-49

30-39

25-29

20-24

19 or Younger

29

59

125

137374

277

Age

Source Porterville College Fast Facts 2015Source ODS Query (Course Book) September 2015

4

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

2015 Degrees Conferred

ASAS

315AA-TAS-T

55Certificate of Achievement

98Job Skills Certificate

30

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

2015 Degrees Conferred

ASAS

315AA-TAS-T

55Certificate of Achievement

98Job Skills Certificate

30

COMMUNITY COLLEGE FINANCE 101

General Fund Revenue Unrestricted Funds received at the state and local levels of

government that may be utilized for any operating purposes

State Apportionment = based on Full Time Equivalent Students (15 lecture units = 1 FTES) course enrollment

Grant Funds ndash Restricted Funds received from federal state local and non-profit organizations that must be utilized for specific operating purposes

Capital Projects Funds - Restricted Funds received for construction or modernization capital projects

General Fund

Operations

Grant Funds

Capital Funds

5

FISCAL YEAR 2016-17 GENERAL FUND OPERATIONS

Local1

State Allocation 99

General Fund Unrestricted Revenue

Academic Salaries51

Classified amp Oth Nonacad Salaries

17

Employee Benefits23

Supplies amp Materials

2

ServiceUtilitiesOperating Exps

6Capital Outlay

1

General Fund Unrestricted Fund Expenditures

6

Source Porterville College FY 2016-17 Tentative Budget

FUTURE PROJECTSKEY PLANNING ASSUMPTIONS FROM THE EDUCATIONAL MASTER PLAN

Based on an analysis of residential zip codes reported by enrolled students the vast majority of students live with a drive time of 40-minutes from campus center This area comprises the effective service area of the College

bull The population of Porterville Collegersquos service area was 143724 in the year 2000 It was projected to be 178962 by 2015 and to reach approximately 200000 by year 2025

bull The effective service area is expected to grow at an annual rate of 119 as compared to the State annual growth rate of 70

bull Approximately 64 of the adult population is a high school graduate or less Almost half of the total population (466) 25+years has only a high school diploma or some college courses but do not have degree

bull The California Department of Finance projects an annual 44 increase in high school graduates between 2009-10 and 2020-2021 in Tulare County

7

Source Porterville College Facilities Master Plan 2013

Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and

equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the proposition

The Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County

2002 Measure G Bond Projects

2002 - SRID Expenditures By Site

HAZARDOUS amp SAFETYADA PROJECTS

Path of Travel ADA ImprovementPlano Fire Lane Improvement

Campus Security UpgradesNetwork Video Recorder amp Science Math Electronic Locks

10

LIBRARY amp LRC CAPITAL PROJECTSConstructed a library and learning center with modern computer equipment and furniture

Before Construction Completed Capital Project

11

Science Math RemodelRemodeled the building interior and installed new laboratory equipment

12

Fitness Center Capital ProjectConstructed a new fitness center building and installed modern exercise equipment

13

Campus Plant ImprovementsInstalled a newer chilled water loops with new air handlers to be installed to provide conditioned air

14

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Enrollments Student Awards 2015
ASAS 315 Student Transfers
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 55 UC 13
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 98 CSU 141
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 30
UC
2015 Top Majors UC Davis
ASASAA-TAS-T UC Merced
Social Science UC Santa Cruz
Liberal ArtsSciences CSU
Biological amp Physical Science CSU Bakersfield
CSU Fresno
Certificates CSU Northridge
Communication Studies
Industrial Technology
Administration of Justice
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Enrollments Student Awards 2015
ASAS 315 Student Transfers
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 55 UC 13
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 98 CSU 141
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 30
2015 Top Majors
ASASAA-TAS-T UC Davis
Social Science UC Merced
Liberal ArtsSciences UC Santa Cruz
Biological amp Physical Science CSU Bakersfield
CSU Fresno
Certificates CSU Northridge
Communication Studies
Industrial Technology
Administration of Justice
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Enrollments Student Awards 2015
ASAS 775
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 171
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 286
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 673
2015 Top Majors
ASASAA-TAS-T
Social Science
Liberal ArtsSciences
Biological amp Physical Science
Certificates
Communication Studies
Industrial Technology
Administration of Justice
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Enrollments Student Awards 2015
ASAS 775
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 171
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 286
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 673
2015 Top Majors
AAASAA-TAS-T
Social Science
Liberal ArtsSciences
Biological amp Physical Science
Certificates
Child Development
Nurse Assistant
Emergency Medical Technican
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Page 3: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

3

PORTERVILLE COLLEGE OVERVIEW

270000 280000 290000 300000 310000 320000 330000 340000

2000000 2100000 2200000 2300000 2400000 2500000 2600000 2700000 2800000

2010-11 2011-12 2012-13 2013-14 2014-15

Full

Tim

e Eq

uiva

lent

Stu

dent

s

Cens

us E

nrol

lmen

t

Fiscal Year

Enrollments - 5 Years

Enrollment FTES

17

08

37

736

183

19

02

AFRICAN hellip

AMERIChellip

ASIAN

HISPANIC

WHITE

TWO OR hellip

NOT hellip

Ethnicity

AAASAA-TAS-TSocial Science

Liberal ArtsSciencesBiological amp Physical Science

CertificatesCommunication StudiesIndustrial Technology

Administration of Justice

2015 Top Majors

315

55

98

30

0

50

100

150

200

250

300

350

400

450

500

2015 Degrees Conferred

Job Skills CertificateCertificate of AchievementAA-TAS-TASAS

Top Transfer Colleges

UC 13CSU 141

Student Transfers

CSU Northridge

UCUC Davis

CSU

UC Merced

UC Santa Cruz

CSU BakersfieldCSU Fresno

Male 394Female

605

Not Reported

01

Gender

Full Time Faculty

27

Adjunct Faculty37

Classified Staff29

Admin7

FALL 2015 EMPLOYEES

50 or Older

40-49

30-39

25-29

20-24

19 or Younger

29

59

125

137374

277

Age

Source Porterville College Fast Facts 2015Source ODS Query (Course Book) September 2015

4

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

2015 Degrees Conferred

ASAS

315AA-TAS-T

55Certificate of Achievement

98Job Skills Certificate

30

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

2015 Degrees Conferred

ASAS

315AA-TAS-T

55Certificate of Achievement

98Job Skills Certificate

30

COMMUNITY COLLEGE FINANCE 101

General Fund Revenue Unrestricted Funds received at the state and local levels of

government that may be utilized for any operating purposes

State Apportionment = based on Full Time Equivalent Students (15 lecture units = 1 FTES) course enrollment

Grant Funds ndash Restricted Funds received from federal state local and non-profit organizations that must be utilized for specific operating purposes

Capital Projects Funds - Restricted Funds received for construction or modernization capital projects

General Fund

Operations

Grant Funds

Capital Funds

5

FISCAL YEAR 2016-17 GENERAL FUND OPERATIONS

Local1

State Allocation 99

General Fund Unrestricted Revenue

Academic Salaries51

Classified amp Oth Nonacad Salaries

17

Employee Benefits23

Supplies amp Materials

2

ServiceUtilitiesOperating Exps

6Capital Outlay

1

General Fund Unrestricted Fund Expenditures

6

Source Porterville College FY 2016-17 Tentative Budget

FUTURE PROJECTSKEY PLANNING ASSUMPTIONS FROM THE EDUCATIONAL MASTER PLAN

Based on an analysis of residential zip codes reported by enrolled students the vast majority of students live with a drive time of 40-minutes from campus center This area comprises the effective service area of the College

bull The population of Porterville Collegersquos service area was 143724 in the year 2000 It was projected to be 178962 by 2015 and to reach approximately 200000 by year 2025

bull The effective service area is expected to grow at an annual rate of 119 as compared to the State annual growth rate of 70

bull Approximately 64 of the adult population is a high school graduate or less Almost half of the total population (466) 25+years has only a high school diploma or some college courses but do not have degree

bull The California Department of Finance projects an annual 44 increase in high school graduates between 2009-10 and 2020-2021 in Tulare County

7

Source Porterville College Facilities Master Plan 2013

Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and

equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the proposition

The Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County

2002 Measure G Bond Projects

2002 - SRID Expenditures By Site

HAZARDOUS amp SAFETYADA PROJECTS

Path of Travel ADA ImprovementPlano Fire Lane Improvement

Campus Security UpgradesNetwork Video Recorder amp Science Math Electronic Locks

10

LIBRARY amp LRC CAPITAL PROJECTSConstructed a library and learning center with modern computer equipment and furniture

Before Construction Completed Capital Project

11

Science Math RemodelRemodeled the building interior and installed new laboratory equipment

12

Fitness Center Capital ProjectConstructed a new fitness center building and installed modern exercise equipment

13

Campus Plant ImprovementsInstalled a newer chilled water loops with new air handlers to be installed to provide conditioned air

14

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Enrollments Student Awards 2015
ASAS 315 Student Transfers
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 55 UC 13
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 98 CSU 141
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 30
UC
2015 Top Majors UC Davis
ASASAA-TAS-T UC Merced
Social Science UC Santa Cruz
Liberal ArtsSciences CSU
Biological amp Physical Science CSU Bakersfield
CSU Fresno
Certificates CSU Northridge
Communication Studies
Industrial Technology
Administration of Justice
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Enrollments Student Awards 2015
ASAS 315 Student Transfers
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 55 UC 13
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 98 CSU 141
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 30
2015 Top Majors
ASASAA-TAS-T UC Davis
Social Science UC Merced
Liberal ArtsSciences UC Santa Cruz
Biological amp Physical Science CSU Bakersfield
CSU Fresno
Certificates CSU Northridge
Communication Studies
Industrial Technology
Administration of Justice
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Enrollments Student Awards 2015
ASAS 775
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 171
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 286
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 673
2015 Top Majors
ASASAA-TAS-T
Social Science
Liberal ArtsSciences
Biological amp Physical Science
Certificates
Communication Studies
Industrial Technology
Administration of Justice
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Enrollments Student Awards 2015
ASAS 775
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 171
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 286
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 673
2015 Top Majors
AAASAA-TAS-T
Social Science
Liberal ArtsSciences
Biological amp Physical Science
Certificates
Child Development
Nurse Assistant
Emergency Medical Technican
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Page 4: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

PORTERVILLE COLLEGE OVERVIEW

270000 280000 290000 300000 310000 320000 330000 340000

2000000 2100000 2200000 2300000 2400000 2500000 2600000 2700000 2800000

2010-11 2011-12 2012-13 2013-14 2014-15

Full

Tim

e Eq

uiva

lent

Stu

dent

s

Cens

us E

nrol

lmen

t

Fiscal Year

Enrollments - 5 Years

Enrollment FTES

17

08

37

736

183

19

02

AFRICAN hellip

AMERIChellip

ASIAN

HISPANIC

WHITE

TWO OR hellip

NOT hellip

Ethnicity

AAASAA-TAS-TSocial Science

Liberal ArtsSciencesBiological amp Physical Science

CertificatesCommunication StudiesIndustrial Technology

Administration of Justice

2015 Top Majors

315

55

98

30

0

50

100

150

200

250

300

350

400

450

500

2015 Degrees Conferred

Job Skills CertificateCertificate of AchievementAA-TAS-TASAS

Top Transfer Colleges

UC 13CSU 141

Student Transfers

CSU Northridge

UCUC Davis

CSU

UC Merced

UC Santa Cruz

CSU BakersfieldCSU Fresno

Male 394Female

605

Not Reported

01

Gender

Full Time Faculty

27

Adjunct Faculty37

Classified Staff29

Admin7

FALL 2015 EMPLOYEES

50 or Older

40-49

30-39

25-29

20-24

19 or Younger

29

59

125

137374

277

Age

Source Porterville College Fast Facts 2015Source ODS Query (Course Book) September 2015

4

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

2015 Degrees Conferred

ASAS

315AA-TAS-T

55Certificate of Achievement

98Job Skills Certificate

30

Sheet1

Enrollments - 5 Years

Enrollment2010-112011-122012-132013-142014-152713825766242252399322983FTES2010-112011-122012-132013-142014-15330863247330405304929387

Fiscal Year

Census Enrollment

Full Time Equivalent Students

Ethnicity

African AmericanAmerican IndianAsianHispanicWhiteTwo or More RacesNot Reported17000000000000001E-280000000000000002E-336999999999999998E-2073599999999999999018319E-22E-3

2015 Degrees Conferred

ASAS

315AA-TAS-T

55Certificate of Achievement

98Job Skills Certificate

30

COMMUNITY COLLEGE FINANCE 101

General Fund Revenue Unrestricted Funds received at the state and local levels of

government that may be utilized for any operating purposes

State Apportionment = based on Full Time Equivalent Students (15 lecture units = 1 FTES) course enrollment

Grant Funds ndash Restricted Funds received from federal state local and non-profit organizations that must be utilized for specific operating purposes

Capital Projects Funds - Restricted Funds received for construction or modernization capital projects

General Fund

Operations

Grant Funds

Capital Funds

5

FISCAL YEAR 2016-17 GENERAL FUND OPERATIONS

Local1

State Allocation 99

General Fund Unrestricted Revenue

Academic Salaries51

Classified amp Oth Nonacad Salaries

17

Employee Benefits23

Supplies amp Materials

2

ServiceUtilitiesOperating Exps

6Capital Outlay

1

General Fund Unrestricted Fund Expenditures

6

Source Porterville College FY 2016-17 Tentative Budget

FUTURE PROJECTSKEY PLANNING ASSUMPTIONS FROM THE EDUCATIONAL MASTER PLAN

Based on an analysis of residential zip codes reported by enrolled students the vast majority of students live with a drive time of 40-minutes from campus center This area comprises the effective service area of the College

bull The population of Porterville Collegersquos service area was 143724 in the year 2000 It was projected to be 178962 by 2015 and to reach approximately 200000 by year 2025

bull The effective service area is expected to grow at an annual rate of 119 as compared to the State annual growth rate of 70

bull Approximately 64 of the adult population is a high school graduate or less Almost half of the total population (466) 25+years has only a high school diploma or some college courses but do not have degree

bull The California Department of Finance projects an annual 44 increase in high school graduates between 2009-10 and 2020-2021 in Tulare County

7

Source Porterville College Facilities Master Plan 2013

Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and

equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the proposition

The Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County

2002 Measure G Bond Projects

2002 - SRID Expenditures By Site

HAZARDOUS amp SAFETYADA PROJECTS

Path of Travel ADA ImprovementPlano Fire Lane Improvement

Campus Security UpgradesNetwork Video Recorder amp Science Math Electronic Locks

10

LIBRARY amp LRC CAPITAL PROJECTSConstructed a library and learning center with modern computer equipment and furniture

Before Construction Completed Capital Project

11

Science Math RemodelRemodeled the building interior and installed new laboratory equipment

12

Fitness Center Capital ProjectConstructed a new fitness center building and installed modern exercise equipment

13

Campus Plant ImprovementsInstalled a newer chilled water loops with new air handlers to be installed to provide conditioned air

14

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Enrollments Student Awards 2015
ASAS 315 Student Transfers
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 55 UC 13
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 98 CSU 141
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 30
UC
2015 Top Majors UC Davis
ASASAA-TAS-T UC Merced
Social Science UC Santa Cruz
Liberal ArtsSciences CSU
Biological amp Physical Science CSU Bakersfield
CSU Fresno
Certificates CSU Northridge
Communication Studies
Industrial Technology
Administration of Justice
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Enrollments Student Awards 2015
ASAS 315 Student Transfers
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 55 UC 13
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 98 CSU 141
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 30
2015 Top Majors
ASASAA-TAS-T UC Davis
Social Science UC Merced
Liberal ArtsSciences UC Santa Cruz
Biological amp Physical Science CSU Bakersfield
CSU Fresno
Certificates CSU Northridge
Communication Studies
Industrial Technology
Administration of Justice
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Enrollments Student Awards 2015
ASAS 775
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 171
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 286
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 673
2015 Top Majors
ASASAA-TAS-T
Social Science
Liberal ArtsSciences
Biological amp Physical Science
Certificates
Communication Studies
Industrial Technology
Administration of Justice
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Enrollments Student Awards 2015
ASAS 775
2010-11 2011-12 2012-13 2013-14 2014-15 AA-TAS-T 171
Enrollment 2713800 2576600 2422500 2399300 2298300 Certificate of Achievement 286
FTES 330860 324730 304050 304900 293870 Job Skills Certificate 673
2015 Top Majors
AAASAA-TAS-T
Social Science
Liberal ArtsSciences
Biological amp Physical Science
Certificates
Child Development
Nurse Assistant
Emergency Medical Technican
Ethnicity - 2015
African American 17
American Indian 08
Asian 37
Hispanic 736
White 183
Two or More Races 19
Not Reported 02
Page 5: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

COMMUNITY COLLEGE FINANCE 101

General Fund Revenue Unrestricted Funds received at the state and local levels of

government that may be utilized for any operating purposes

State Apportionment = based on Full Time Equivalent Students (15 lecture units = 1 FTES) course enrollment

Grant Funds ndash Restricted Funds received from federal state local and non-profit organizations that must be utilized for specific operating purposes

Capital Projects Funds - Restricted Funds received for construction or modernization capital projects

General Fund

Operations

Grant Funds

Capital Funds

5

FISCAL YEAR 2016-17 GENERAL FUND OPERATIONS

Local1

State Allocation 99

General Fund Unrestricted Revenue

Academic Salaries51

Classified amp Oth Nonacad Salaries

17

Employee Benefits23

Supplies amp Materials

2

ServiceUtilitiesOperating Exps

6Capital Outlay

1

General Fund Unrestricted Fund Expenditures

6

Source Porterville College FY 2016-17 Tentative Budget

FUTURE PROJECTSKEY PLANNING ASSUMPTIONS FROM THE EDUCATIONAL MASTER PLAN

Based on an analysis of residential zip codes reported by enrolled students the vast majority of students live with a drive time of 40-minutes from campus center This area comprises the effective service area of the College

bull The population of Porterville Collegersquos service area was 143724 in the year 2000 It was projected to be 178962 by 2015 and to reach approximately 200000 by year 2025

bull The effective service area is expected to grow at an annual rate of 119 as compared to the State annual growth rate of 70

bull Approximately 64 of the adult population is a high school graduate or less Almost half of the total population (466) 25+years has only a high school diploma or some college courses but do not have degree

bull The California Department of Finance projects an annual 44 increase in high school graduates between 2009-10 and 2020-2021 in Tulare County

7

Source Porterville College Facilities Master Plan 2013

Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and

equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the proposition

The Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County

2002 Measure G Bond Projects

2002 - SRID Expenditures By Site

HAZARDOUS amp SAFETYADA PROJECTS

Path of Travel ADA ImprovementPlano Fire Lane Improvement

Campus Security UpgradesNetwork Video Recorder amp Science Math Electronic Locks

10

LIBRARY amp LRC CAPITAL PROJECTSConstructed a library and learning center with modern computer equipment and furniture

Before Construction Completed Capital Project

11

Science Math RemodelRemodeled the building interior and installed new laboratory equipment

12

Fitness Center Capital ProjectConstructed a new fitness center building and installed modern exercise equipment

13

Campus Plant ImprovementsInstalled a newer chilled water loops with new air handlers to be installed to provide conditioned air

14

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 6: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

FISCAL YEAR 2016-17 GENERAL FUND OPERATIONS

Local1

State Allocation 99

General Fund Unrestricted Revenue

Academic Salaries51

Classified amp Oth Nonacad Salaries

17

Employee Benefits23

Supplies amp Materials

2

ServiceUtilitiesOperating Exps

6Capital Outlay

1

General Fund Unrestricted Fund Expenditures

6

Source Porterville College FY 2016-17 Tentative Budget

FUTURE PROJECTSKEY PLANNING ASSUMPTIONS FROM THE EDUCATIONAL MASTER PLAN

Based on an analysis of residential zip codes reported by enrolled students the vast majority of students live with a drive time of 40-minutes from campus center This area comprises the effective service area of the College

bull The population of Porterville Collegersquos service area was 143724 in the year 2000 It was projected to be 178962 by 2015 and to reach approximately 200000 by year 2025

bull The effective service area is expected to grow at an annual rate of 119 as compared to the State annual growth rate of 70

bull Approximately 64 of the adult population is a high school graduate or less Almost half of the total population (466) 25+years has only a high school diploma or some college courses but do not have degree

bull The California Department of Finance projects an annual 44 increase in high school graduates between 2009-10 and 2020-2021 in Tulare County

7

Source Porterville College Facilities Master Plan 2013

Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and

equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the proposition

The Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County

2002 Measure G Bond Projects

2002 - SRID Expenditures By Site

HAZARDOUS amp SAFETYADA PROJECTS

Path of Travel ADA ImprovementPlano Fire Lane Improvement

Campus Security UpgradesNetwork Video Recorder amp Science Math Electronic Locks

10

LIBRARY amp LRC CAPITAL PROJECTSConstructed a library and learning center with modern computer equipment and furniture

Before Construction Completed Capital Project

11

Science Math RemodelRemodeled the building interior and installed new laboratory equipment

12

Fitness Center Capital ProjectConstructed a new fitness center building and installed modern exercise equipment

13

Campus Plant ImprovementsInstalled a newer chilled water loops with new air handlers to be installed to provide conditioned air

14

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 7: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

FUTURE PROJECTSKEY PLANNING ASSUMPTIONS FROM THE EDUCATIONAL MASTER PLAN

Based on an analysis of residential zip codes reported by enrolled students the vast majority of students live with a drive time of 40-minutes from campus center This area comprises the effective service area of the College

bull The population of Porterville Collegersquos service area was 143724 in the year 2000 It was projected to be 178962 by 2015 and to reach approximately 200000 by year 2025

bull The effective service area is expected to grow at an annual rate of 119 as compared to the State annual growth rate of 70

bull Approximately 64 of the adult population is a high school graduate or less Almost half of the total population (466) 25+years has only a high school diploma or some college courses but do not have degree

bull The California Department of Finance projects an annual 44 increase in high school graduates between 2009-10 and 2020-2021 in Tulare County

7

Source Porterville College Facilities Master Plan 2013

Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and

equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the proposition

The Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County

2002 Measure G Bond Projects

2002 - SRID Expenditures By Site

HAZARDOUS amp SAFETYADA PROJECTS

Path of Travel ADA ImprovementPlano Fire Lane Improvement

Campus Security UpgradesNetwork Video Recorder amp Science Math Electronic Locks

10

LIBRARY amp LRC CAPITAL PROJECTSConstructed a library and learning center with modern computer equipment and furniture

Before Construction Completed Capital Project

11

Science Math RemodelRemodeled the building interior and installed new laboratory equipment

12

Fitness Center Capital ProjectConstructed a new fitness center building and installed modern exercise equipment

13

Campus Plant ImprovementsInstalled a newer chilled water loops with new air handlers to be installed to provide conditioned air

14

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 8: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and

equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the proposition

The Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County

2002 Measure G Bond Projects

2002 - SRID Expenditures By Site

HAZARDOUS amp SAFETYADA PROJECTS

Path of Travel ADA ImprovementPlano Fire Lane Improvement

Campus Security UpgradesNetwork Video Recorder amp Science Math Electronic Locks

10

LIBRARY amp LRC CAPITAL PROJECTSConstructed a library and learning center with modern computer equipment and furniture

Before Construction Completed Capital Project

11

Science Math RemodelRemodeled the building interior and installed new laboratory equipment

12

Fitness Center Capital ProjectConstructed a new fitness center building and installed modern exercise equipment

13

Campus Plant ImprovementsInstalled a newer chilled water loops with new air handlers to be installed to provide conditioned air

14

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 9: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

2002 - SRID Expenditures By Site

HAZARDOUS amp SAFETYADA PROJECTS

Path of Travel ADA ImprovementPlano Fire Lane Improvement

Campus Security UpgradesNetwork Video Recorder amp Science Math Electronic Locks

10

LIBRARY amp LRC CAPITAL PROJECTSConstructed a library and learning center with modern computer equipment and furniture

Before Construction Completed Capital Project

11

Science Math RemodelRemodeled the building interior and installed new laboratory equipment

12

Fitness Center Capital ProjectConstructed a new fitness center building and installed modern exercise equipment

13

Campus Plant ImprovementsInstalled a newer chilled water loops with new air handlers to be installed to provide conditioned air

14

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 10: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

HAZARDOUS amp SAFETYADA PROJECTS

Path of Travel ADA ImprovementPlano Fire Lane Improvement

Campus Security UpgradesNetwork Video Recorder amp Science Math Electronic Locks

10

LIBRARY amp LRC CAPITAL PROJECTSConstructed a library and learning center with modern computer equipment and furniture

Before Construction Completed Capital Project

11

Science Math RemodelRemodeled the building interior and installed new laboratory equipment

12

Fitness Center Capital ProjectConstructed a new fitness center building and installed modern exercise equipment

13

Campus Plant ImprovementsInstalled a newer chilled water loops with new air handlers to be installed to provide conditioned air

14

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 11: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

LIBRARY amp LRC CAPITAL PROJECTSConstructed a library and learning center with modern computer equipment and furniture

Before Construction Completed Capital Project

11

Science Math RemodelRemodeled the building interior and installed new laboratory equipment

12

Fitness Center Capital ProjectConstructed a new fitness center building and installed modern exercise equipment

13

Campus Plant ImprovementsInstalled a newer chilled water loops with new air handlers to be installed to provide conditioned air

14

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 12: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

Science Math RemodelRemodeled the building interior and installed new laboratory equipment

12

Fitness Center Capital ProjectConstructed a new fitness center building and installed modern exercise equipment

13

Campus Plant ImprovementsInstalled a newer chilled water loops with new air handlers to be installed to provide conditioned air

14

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 13: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

Fitness Center Capital ProjectConstructed a new fitness center building and installed modern exercise equipment

13

Campus Plant ImprovementsInstalled a newer chilled water loops with new air handlers to be installed to provide conditioned air

14

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 14: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

Campus Plant ImprovementsInstalled a newer chilled water loops with new air handlers to be installed to provide conditioned air

14

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 15: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

Student Center Repair ProjectReplaced the roof system removed the swamp coolers installed air conditioning asbestos removal

and refurbished the Student Center interior15

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 16: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

CLASSROOM amp BUILDING UPGRADES

Music Room Riser ReplacementNew Boiler for Locker Room Showers

Academic Center Fine Arts Communication Arts Health Careers and Science Math HVAC amp Roof Replacements

Purchased and installed new classroom carpetflooring and furniture or building equipment throughout the campus New furniture has been ordered and will be installed in late May 2016 in CT 1303 CT 1304 SM 101A SM 101B SM 125 AC 118 AC 119 Also new carpet is planned for the Theater

16

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 17: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

GYM Roof amp HVAC Project

Replaces repairs and restores the roof system and completely replaces all HVAC for the Gym

Coaches Row LockerShower rooms weight room 2 classrooms restrooms Trainerrsquos area

and Nurses office

The Gym will receive a new metal standing seam roof system the remainder of the project will have a Built up Roof (BUR) installed The old swamp coolers

will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air

Estimated CompletionDecember 31 2016

17

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 18: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

PC Photovoltaic SystemPC Asphalt Plano Fire LanePC Gymnasium RoofingStadium Parking Lot E amp W SectionsPC Allied Health HVACReroofFloorTransformer Repair

PC Allied Health RelocatablesPC Library Expansion (includes Remodel for Efficiency)PC Wellness CenterPC Childcare Facility (temporary space)PC ScienceMath Modernization

Capital Projects CompletedProjects in Constructions

Scheduled Maintenance Projects Completed

2002 Measure G Bond Projects

PC Ext Lighting Replacement Prop 39PC Campus Security Upgrades Phase 1PC Central Plant amp Chiller LoopPC Sci Math HVACBoilerH2O Htr ReplacementPC Electrical Mechanical Plumbing amp Repair Phase IPC Parking Lots and RoadsPC SM HVACHealth Careers - RN Program DevPC SMProjectsPC Gym Door HardwarePC Street Path of TravelPC Math Science Chiller ReplacementPC Academic Center Re-roofPC Fine Arts Re-roofPC Communication Arts Re-roofPC Pool DemolitionPC Safety LightingPC Chemical StoragePC Campus Alarm System

PC Communication Arts HVAC ReplacementPC Restore Frnt Mon Sign amp LightPC LRC amp Library Motion DetectorsPC Domestic Hot Water Boiler ReplacementPC Science Math Door LocksPC Bookstore Main ElecFloor AbatementPC Career Tech Floor amp Furn ReplacePC Gym Locker Rm Boiler (WH)PC Comm Arts Riser amp Floor ReplacementPC Fine Arts HVAC ReplacementPC Acad Ctr Server Rm AC ReplacementPC Gym Water Heater ReplacementPC Conc Walk amp Mow Strip LRC 2nd ExitPC RTU Replacement Wellness CtrPC AC Bldg RTU Replacement Ph1PC Academic Bldg HVAC ReplacementPC Gym Cooler ReplacementPC Main Campus Electrical Upgrade (SGIrr Shd)PC Weight Room 15 Ton HVAC

PC AC Bdg HVAC Packing Unit ReplacementPC Basketball Court RestripePC ADA Strobe InstallationPC Sci Math Forum Riser Chair ReplPC Student Center Roof RepairsPC On Campus Path of TravelPC Fire Lane amp ADA Parking Lot

18

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 19: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

FACILITIES NEEDS LIST DEVELOPMENT PROCESS

NEEDS AND PRIORITIES INCLUDE

bull Providing a science technology and engineering center for instruction in high-tech career fieldsbull Better preparing returning veterans students workers for good-paying jobsbull Creating job and career pathways in growing fields like nursing welding and constructionbull Repairingreplacing gas electrical and sewer lines and leaky roofsbull Better preparing students for transfer to four-year colleges and universitiesbull Ensuring accessibility for people with disabilitiesbull Improving water conservation

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 20: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

ADDRESSING AN AGING CAMPUSPorterville College was built in the 1960s and 1970s The Collegersquos oldest buildings have already surpassed the half-century mark and will be 65 years old in 2025 The infrastructure on campus is also old and in need of upgrading and replacement A strong consideration for the future will beto address the current campus deficiencies through a program of building replacement and renovation for reuse

PC Fine Arts ndash 2016 (Now)PC Library ndash 1960s (Then)

20

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 21: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

Future Capital Projects ndash 2013 Facilities Master Plan

21

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 22: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

PROJECT LISTINGS

The needs listing identifies the most relevant and needed projects as determined by community stakeholders and PC staff to reflect the best overall package of capital improvements and enhancements to address facility needs

Since not all needed projects can be accommodated selected projects must reflect a broad consensus of stakeholders

Potential bond projects are being identified in three categories

1 Capital Outlay Projects ndash providing new capacity through new facilities or expansions at existing facilities

2 Deferred MaintenanceSafety ndash improvements that extend the useful life of existing facilities replacements or renovations safety and security modifications etc

3 TechnologyEnergy ndashaccommodating technology advances in delivering educational content and replacement of obsolete technology

22

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 23: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

CAPITAL OUTLAY PROJECTSAllied Health Facility Career Technology Building

New building has been approved amp awaiting for project funding

Currently classes are held in modular structures Currently classes are held in metal butler building In alignment of the Facility Master Plan for Porterville College the Career Technology and the Trades and

Industry building are scheduled to be renovated for use by Maintenance and Operations which includes the Grounds

Department Additionally the Maintenance and Operations building is scheduled to be renovated to

support a central cooling plant

23

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 24: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

DEFERRED MAINTENANCE amp SAFETY PROJECTS

The regulatory environment pertaining to school facilities continues to evolve In some cases new requirements need to be addressed However in other cases a systematically phased effort over a reasonable period of time is acceptable to achieve the standards ADA Compliance Title IX Compliance Fire Life Safety Upgrades Clery Campus Safety Act Compliance

ADA Path of Travel Completed w 2002 Measure G Bond

24

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 25: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

POTENTIAL PROJECTSItem Current Projects - Porterville College Project Type Estimated Budget

1 Allied Health Facility Capital Outlay $218977952 Ball Fields Restroom Building Modernization Deferred Maintenance $2900003 Ball Fields Irrigation Modernization Deferred Maintenance $800004 Ball Fields Fencing and Gates Deferred Maintenance $950005 Ball Fields Storage Concession Stand Deferred Maintenance $3200006 Ball Fields Bleachers Deferred Maintenance $1750007 Demo Old Baseball Field Deferred Maintenance $350008 New Baseball Field Capital Outlay $15000009 Demo Old Softball Field Deferred Maintenance $35000

10 New Softball Field Capital Outlay $150000011 Career Technology Building Capital Outlay $2091155112 Campus AsbestosLead Abatement Plan Safety $28000013 Campus Restroom Remodel Deferred Maintenance $49000014 Gym Floor Replacment Deferred Maintenance $72000015 Gym Foyer Restroom Remodel Deferred Maintenance $26500016 Gym LockerRRShower Remodel Deferred Maintenance $320000

17 Land Acquisition Capital Outlay $800000

18 Fine Arts Building Capital Outlay $13097551

19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay$28292653

20 Campus Wide Irrigation Upgrade Deferred Maintenance $25000021 Quad Irrigation Upgrade Deferred Maintenance $4000022 Campus Wide Auto Flush Valves Installation Deferred Maintenance $2000023 Building Isolation Water System Capital Outlay $300000024 Relocate PC Backflow Preventer Deferred Maintenance $324000

25College Ave Sidewalk Curb amp Gutter Replacement

Deferred Maintenance$375000

26 Communication Arts Theater Remodel Capital Outlay $815000027 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000

Item Current Projects - Porterville College Project Type Estimated Budget

28 Kitchen Equipment Deferred Maintenance $9000029 Kitchen Plumbing Deferred Maintenance $40000030 Utility Corridor Around Campus Deferred Maintenance $280000031 Building Sub-Metering Energy Project Energy $40000032 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000

33CT HVAC Install for Cadet Training Area amp IDF Closet

Deferred Maintenance$16000

34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000

35Redundant HVAC Science Math Chemical Storage Closets

Deferred Maintenance$35000

36 Reclaim Water System Deferred Maintenance $50000037 TI Building Remodel Capital Outlay $115000038 Phone Block Switch-out Technology $1550039 Extend Chilled Water and Hot Water Loops Capital Outlay $358000040 Science Math Forum Remodel Capital Outlay $110000041 EMS Replacement Phase 1 Energy $13000042 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000

43Light Control Wiring Modernization Science Math Labs

Deferred Maintenance$15000

44 Art Gallery Roof Replacement Deferred Maintenance $43000045 Library ReroofRecoat Deferred Maintenance $25000046 LRC ReroofRecoat Deferred Maintenance $25000047 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $10000048 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $10000049 Student Services Modernization Capital Outlay $854600050 Greenhouse Modernization Deferred Maintenance $4000051 Parking Lot A amp B Deferred Maintenance $90000052 Parking Lot A amp B Lighting-Stadium Energy $90000053 Replace Monument in Front of College Deferred Maintenance $3600054 AC Building Roof Accent Lighting Replacement Energy $3400055 Campus Exterior Door ReplacmentPaint Deferred Maintenance $25000056 Student Center PA system Deferred Maintenance $25000

25

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 26: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

POTENTIAL PROJECTS

Deferred Maintenance 1127485000$ Technology 1550000$ Safety 28000000$ Capital Outlay 13553155000$ Energy 771400000$ Total 15481590000$

26

Item Current Projects - Porterville College Project Type Estimated Budget

57 Tennis Court Modernization Deferred Maintenance $45000

58 Replace all Exterior Trash Cans Deferred Maintenance $30000

59 Campus CenterStudent Activities Modernization Capital Outlay $7242000

60 Paint Interior Classrooms Deferred Maintenance $10850

61 Central Plant Energy $6000000

62 Exterior Building Painting Deferred Maintenance $110000

63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000

64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000

65 Human Performance amp Kinesiology Center Capital Outlay $12010000

66 Grounds Building Storage Shed Deferred Maintenance $13000

67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000

68 Maintenance amp Operations Modernization Capital Outlay $2754000

69 Van Replacement Deferred Maintenance $160000

70 Graduation StageStadium improvement Deferred Maintenance $20000

71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000

72 Parking Lot Restripe - Lot C Deferred Maintenance $26000

73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000

74 Fence and Gate Repair Deferred Maintenance $3000

$154815900

Summary by Cat

Summary by Site

BC Possible Bond Projects

DO Possible Bond Projects

CC Possible Bond Projects

PC Possible Bond Projects

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27
Item Current Projects - Porterville College Project Type Estimated Budget Comments
1 Allied Health Facility Capital Outlay $21897795 FMP 5050 match
2 Ball Fields Restroom Building Modernization Deferred Maintenance $290000
3 Ball Fields Irrigation Modernization Deferred Maintenance $80000
4 Ball Fields Fencing and Gates Deferred Maintenance $95000
5 Ball Fields Storage Concession Stand Deferred Maintenance $320000
6 Ball Fields Bleachers Deferred Maintenance $175000
7 Demo Old Baseball Field Deferred Maintenance $35000
8 New Baseball Field Capital Outlay $1500000
9 Demo Old Softball Field Deferred Maintenance $35000
10 New Softball Field Capital Outlay $1500000
11 Career Technology Building Capital Outlay $20911551 FMP 5050 match
12 Campus AsbestosLead Abatement Plan Safety $280000 New Item
13 Campus Restroom Remodel Deferred Maintenance $490000
14 Gym Floor Replacment Deferred Maintenance $720000
15 Gym Foyer Restroom Remodel Deferred Maintenance $265000
16 Gym LockerRRShower Remodel Deferred Maintenance $320000
17 Land Acquisition Capital Outlay $800000 New Item
18 Fine Arts Building Capital Outlay $13097551 FMP 2-story
19 Student Activity Center Veterans Bookstore Cafeteria Capital Outlay $28292653 FMP 2-story
20 Campus Wide Irrigation Upgrade Deferred Maintenance $250000
21 Quad Irrigation Upgrade Deferred Maintenance $40000
22 Campus Wide Auto Flush Valves Installation Deferred Maintenance $20000
23 Building Isolation Water System Capital Outlay $3000000
24 Relocate PC Backflow Preventer Deferred Maintenance $324000
25 College Ave Sidewalk Curb amp Gutter Replacement Deferred Maintenance $375000
26 Communication Arts Theater Remodel Capital Outlay $8150000
27 High Voltage Electrical Oil Switch Replacement Deferred Maintenance $275000
28 Kitchen Equipment Deferred Maintenance $90000
29 Kitchen Plumbing Deferred Maintenance $400000
30 Utility Corridor Around Campus Deferred Maintenance $2800000
31 Building Sub-Metering Energy Project Energy $400000
32 Relocate (2) Parking Lot Lights (Lot B) Deferred Maintenance $130000
33 CT HVAC Install for Cadet Training Area amp IDF Closet Deferred Maintenance $16000
34 Redundant HVAC for all Server Rooms Deferred Maintenance $150000
35 Redundant HVAC Science Math Chemical Storage Closets Deferred Maintenance $35000
36 Reclaim Water System Deferred Maintenance $500000 pending City Reclam
37 TI Building Remodel Capital Outlay $1150000
38 Phone Block Switch-out Technology $15500
39 Extend Chilled Water and Hot Water Loops Capital Outlay $3580000
40 Science Math Forum Remodel Capital Outlay $1100000
41 EMS Replacement Phase 1 Energy $130000
42 Exterior Lighting RetrofitT-statsOcc sensors Energy $250000
43 Light Control Wiring Modernization Science Math Labs Deferred Maintenance $15000
44 Art Gallery Roof Replacement Deferred Maintenance $430000
45 Library ReroofRecoat Deferred Maintenance $250000
46 LRC ReroofRecoat Deferred Maintenance $250000
47 Vehicle Storage 1 West Roof Replacement Deferred Maintenance $100000
48 Vehicle Storage 2 West Roof Replacement Deferred Maintenance $100000
49 Student Services Modernization Capital Outlay $8546000 FMP 5050 match
50 Greenhouse Modernization Deferred Maintenance $40000
51 Parking Lot A amp B Deferred Maintenance $900000
52 Parking Lot A amp B Lighting-Stadium Energy $900000
53 Replace Monument in Front of College Deferred Maintenance $36000
54 AC Building Roof Accent Lighting Replacement Energy $34000
55 Campus Exterior Door ReplacmentPaint Deferred Maintenance $250000
56 Student Center PA system Deferred Maintenance $25000
57 Tennis Court Modernization Deferred Maintenance $45000
58 Replace all Exterior Trash Cans Deferred Maintenance $30000
59 Campus CenterStudent Activities Modernization Capital Outlay $7242000 FMP
60 Paint Interior Classrooms Deferred Maintenance $10850
61 Central Plant Energy $6000000
62 Exterior Building Painting Deferred Maintenance $110000
63 Replace Cafeteria SCCR tablesChairs Deferred Maintenance $31000
64 Demo Student Center Basemant Air Handler Deferred Maintenance $25000
65 Human Performance amp Kinesiology Center Capital Outlay $12010000 FMP
66 Grounds Building Storage Shed Deferred Maintenance $13000
67 MampO Building Cart Parking Area Gates and Doors Deferred Maintenance $45000
68 Maintenance amp Operations Modernization Capital Outlay $2754000 FMP 5050 match
69 Van Replacement Deferred Maintenance $160000
70 Graduation StageStadium improvement Deferred Maintenance $20000
71 Parking Lot Slurry - Lot BampC Deferred Maintenance $125000
72 Parking Lot Restripe - Lot C Deferred Maintenance $26000
73 Parking Lot Repairs Pot Holes Deferred Maintenance $5000
74 Fence and Gate Repair Deferred Maintenance $2500
75 CA Building Water Heater Replacement Deferred Maintenance $500
$154815900
Deferred Maintenance $ 1127485000
Technology $ 1550000
Safety $ 28000000
Capital Outlay $ 13553155000
Energy $ 771400000
Total $ 15481590000
Item Current Projects Cerro Coso Bishop Southern OutreachKRV Project Type Estimated Budget
1 College Wide Water Conservation Renovation IrrigationlandscapeAthletic Fields $2000000 Soccer - $2100000 Basbell amp Softball - $4000000 Deferred Maintenance $ 6300000
2 Bishop Solar Parking Lot Incliding Parking Lot Repairs Energy $ 2000000 $ 2000000
3 Bishop Well Remediation Safety $ 500000 $ 500000
4 College Wide HVACCentral Plant (IWV-Bishop) Energy $ 5600000
5 IWV Solar Upgrade - Inverteres amp Panels Energy $ 3000000
6 Main Building Modernization Capital Outlay $ 5000000
7 Upgrade All ITV Systems to Ensure Connections amp Expand between IWV-Tehachapi-KRV-ESCC Technology $ 650000
8 KRV Remodel Capital Outlay $ 1000000
9 MampOIT Building Capital Outlay $ 1500000
10 Bridge - Elevator Capital Outlay $ 1750000
11 Gymnasium Modernization Capital Outlay $ 16000000
12 Outdoor Athletic Complex Renovation - Tennis CourtsRaquetball and Track Deferred Maintenance $ 1930000
13 ADA Egress on Walkways Safety $ 143949
14 BaseballSoftball Stadium Seating Press Box LavatorySnackbar UpgradeRenovation Capital Outlay $ 3000000
15 MonumentDigital Signage - IWV Capital Outlay $ 500000
16 Upgrade Fire Lane amp Parking Lots - LRC CDC Fine Arts Gymnasium Deferred Maintenance $ 2500000
17 New Fire Hydrant Booster Pump Safety $ 210000
18 Maintenance Building Shop Insulation Repair and Canopies Deferred Maintenance $ 110000
19 College Wide ADA Upgrades amp Path of Travel Safety $ 2500000
20 Exterior Paint College Wide Deferred Maintenance $ 500000
21 Electrical amp Data Cat 6 Replacement Deferred Maintenance $ 100000
22 Replace Roof on the CDC Deferred Maintenance $ 100000
23 Upgrade Security Alarm amp fire Alarm System Deferred Maintenance $ 200000
24 Backup Generator for MDF Main Building IWV Safety $ 75000
25 Bishop Carpet Deferred Maintenance $ 50000 $ 50000
26 Field House Capital Outlay $ 1323000
27 East Wing First Floor Classrooms Capital Outlay $ 4000000
28 Maintenance Storage Bishop Deferred Maintenance $ 15000 $ 15000
29 Southern Outreach Facility (Cal City) Capital Outlay $ 10000000
Total Cost $ 70556949 256500000
Deferred Maintenance $ 1180500000
Technology $ 65000000
Safety $ 342894900
Capital Outlay $ 4407300000
Energy $ 1060000000
Total $ 7055694900
Item Current Projects - District Office Project Type Estimated Budget
1 Wi-Fi Networks RefreshExpansion Technology $500000
2 IT Security Initiatives Technology $400000
3 Telephone System Upgrade Technology $1200000
4 Wide Area Network (WAN) RefreshUpdate (6-7 years) Technology $600000
5 Local Area Network (LAN) Core RefreshUpdate (6-7 years) Technology $500000
6 Disk Storage System (SAN) Refresh (5-6 years) Technology $600000
7 Server Systems Refresh (5-6 years) Technology $400000
8 Data Center ImprovementsRefresh (UPS HVAC Fire Suppression Generator etc) Technology $600000
9 District Office PC Refresh (4-5 years) Technology $250000
10 Upgrade Management Information Systems Technology $5000000
Total Cost $10050000
Deferred Maintenance
Technology $10050000
Safety
Capital Outlay
Energy
Total $10050000
Item Current Projects - BC DC and Weill Scope of Work (New Construction Renovation Modernization Deferred Maintenance and Repair) Project Type Project Type Estimated Budget
1 Construct ABC Building amp Campus Student Center Modernization New Construction Capital Capital Outlay $ 20291000
2 Construct New Agriculture Center New Construction Capital Capital Outlay $ 12124000
3 Fine Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15546000
4 Language Arts Building Modernization for Efficiency Modernization Capital Capital Outlay $ 15321000
5 Construct Restroom Building at the Athletic Practice Field New Construction Capital Capital Outlay $ 500000
6 Science amp Engineering Building Replacement New Construction Capital Capital Outlay $ 60000000
7 Student Services Building Modernization Modernization Capital Capital Outlay $ 15686000
8 Modernize Student Welcome Center Modernization Capital Capital Outlay $ 4789000
9 Construct Womens Field House for Athletics New Construction Capital Capital Outlay $ 8500000
10 Modernize Gymnasium Modernization Capital Capital Outlay $ 40000000
11 Memorial Stadium Modernization Modernization Capital Capital Outlay $ 6000000
12 Construct Veteran Center New Construction Capital Capital Outlay $ 10000000
13 Humanities Building Modernization Modernization Capital Capital Outlay $ 12000000
14 Family amp Consumer Education Building Modernization Modernization Capital Capital Outlay $ 8000000
15 Construct ArvinLamontGreenfield Facility New Construction Capital Capital Outlay $ 25000000
16 Relocate Disabled Student Services Modernization Capital Capital Outlay $ 200000
17 Construct Fire Technology Center New Construction Capital Capital Outlay $ 10000000
18 Construct Mt Vernon Building Construction Swing Space New Construction Capital Capital Outlay $ 5000000
19 Academic Facilities Modernization D-Capital Capital Outlay $ 12456000
20 Construct Multi-Purpose Building New Construction D-Capital Capital Outlay $ 25992000
21 Construct Student Campus Center New Construction D-Capital Capital Outlay $ 12762000
22 Build Veteran Center New Construction D-Capital Capital Outlay $ 2500000
23 Disabled Student Program amp Services Testing Sound Walls Modernization D-Capital Capital Outlay $ 40000
24 Campus Wide Carpet amp Hard Floor Replacement Deferred Maintenance amp Repair D-Capital Capital Outlay $ 250000
25 Baseball Field Turf Replacement New Construction Drought Deferred Maintenance $ 75000
26 Install Campus Wide Building Water Meters New Construction Drought Energy $ 250000
27 Campus Wide Xeriscaping Modernization Drought Deferred Maintenance $ 1200000
28 Upgrade Irrigation System amp Sprinkler Head Replacement Modernization Drought Deferred Maintenance $ 1200000
29 BaseballSoftball LED Lighting Replacement Modernization Energy Energy $ 100000
30 Install Campus Wide Electrical Meters New Construction Energy Energy $ 250000
31 Campus Wide Energy Management System Replacement Modernization Energy Energy $ 1500000
32 Campus Wide Interior LED Lighting Replacement Modernization Energy Energy $ 1200000
33 Construct Solar Field in Southwest Parking Lot New Construction Energy Energy $ 8000000
34 Replace Pool Boilers with Energy Efficient Boilers Modernization Energy Energy $ 250000
35 Southwest Parking Lot LED Lighting Replacement Modernization Energy Energy $ 600000
36 Ext Light Retrofit Deferred Maintenance amp Repair D-Energy Energy $ 30000
37 EMS Upgrade Modernization W-Energy Energy $ 25000
38 Ext Window Upgrade Modernization W-Energy Energy $ 250000
39 Int Lighting Retrofit Modernization W-Energy Energy $ 300000
40 Campus Wide Sidewalk Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 250000
41 Campus Wider Exterior Soffit Repair Deferred Maintenance amp Repair Exterior Deferred Maintenance $ 300000
42 Campus Wide New Outdoor Seating New Construction Exterior Deferred Maintenance $ 230000
43 Create Student Habitat Places Modernization Exterior Deferred Maintenance $ 500000
44 Construct Library Cart Shade Structure New Construction Exterior Deferred Maintenance $ 65000
45 Monument Signs at Southeast and Southwest Campus Entry New Construction Exterior Capital Outlay $ 300000
46 Campus Wide Ext Paint Deferred Maintenance amp Repair D-Exterior Deferred Maintenance $ 180000
47 Paint or Reskin Building Ext Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 150000
48 Replace Ext Concrete Deferred Maintenance amp Repair W-Exterior Deferred Maintenance $ 200000
49 Fill in Window Areas in Forums for Better Sound Control Modernization W-Exterior Deferred Maintenance $ 100000
50 Replace Roll Up Door at Shipping and Receiving Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 15000
51 Add Exterior Lighting for Path of Travel Safety New Construction Safety Safety $ 250000
52 Upgrade Campus Restrooms to make ADA Compliant Modernization Safety Safety $ 8500000
53 Campus Wide ADA Door Installation Modernization Safety Safety $ 175000
54 Campus Wide Asbestos Floor Removal amp Replacement Deferred Maintenance amp Repair Safety Safety $ 1500000
55 Campus Wide Exterior Lead Paint Abatement Deferred Maintenance amp Repair Safety Safety $ 2000000
56 Campus Wide Room Occupancy amp Exit Route Signage Update Modernization Safety Safety $ 850000
57 Upgrade Campus Wide Security Cameras Modernization Safety Safety $ 520000
58 Improve Campus Safety by Installing Barriers at Sidewalk Points of Entry New Construction Safety Safety $ 100000
59 Remove Campus Wide Exterior Stair Chair Lifts Deferred Maintenance amp Repair Safety Safety $ 200000
60 Replace Exterior Entry Doors Modernization Safety Safety $ 650000
61 Level Soccer Field Playing Surface Deferred Maintenance amp Repair Safety Safety $ 500000
62 Library Carpet Replacement Deferred Maintenance amp Repair Safety Safety $ 220000
63 Security Camera Install Modernization D-Safety Safety $ 25000
64 Campus Wide ADA Compliance amp Upgrade Modernization D-Safety Safety $ 145000
65 Fire Alarm Panel Upgrade Modernization W-Safety Safety $ 100000
66 Main Elevator Replacement Deferred Maintenance amp Repair W-Safety Safety $ 200000
67 Freight Elevator Replacement Deferred Maintenance amp Repair W-Def Maint Deferred Maintenance $ 150000
68 Administration Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 350000
69 Business Building Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 520000
70 Fine Arts Parking Lot Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 200000
71 Public Safety Parking Lot Asphalt Replacement Deferred Maintenance amp Repair Parking Deferred Maintenance $ 150000
72 Slurry Seal Campus Wide Parking Lots Deferred Maintenance amp Repair Parking Deferred Maintenance $ 500000
73 Southeast Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
74 Southeast Stadium Roadway Repairs Deferred Maintenance amp Repair Parking Deferred Maintenance $ 325000
75 Southwest Parking Lot Resurfacing Deferred Maintenance amp Repair Parking Deferred Maintenance $ 1560000
76 Parking Lot amp Parking lot Lighting Retrofit Modernization D-Parking Deferred Maintenance $ 520000
77 Campus Re-roofing Projects Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 3500000
78 FACE Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 100000
79 Forum Building Re-roof Deferred Maintenance amp Repair Roofing Deferred Maintenance $ 500000
80 Campus Wide Roof Replacement Deferred Maintenance amp Repair D-Roofing Deferred Maintenance $ 275000
81 Administration Building Air Intake Conversion Deferred Maintenance amp Repair Utility Deferred Maintenance $ 130000
82 Auto Tech IT3 IT4 Unit Heaters Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 26000
83 Campus Wide AMU Condensation Pan Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 200000
84 Replace Campus Wide Drinking Fountains Deferred Maintenance amp Repair Utility Deferred Maintenance $ 55000
85 Stadium Emergency Generator Repairs Deferred Maintenance amp Repair Utility Deferred Maintenance $ 260000
86 Campus Wide IDF Room Air Conditioning New Construction Utility Capital Outlay $ 1000000
87 Forums Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 500000
88 Add Air Conditioning to Gymnasium Huddle New Construction Utility Deferred Maintenance $ 200000
89 Gymnasium Space Heating Boiler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 162000
90 Interior Building Domestic Water Line Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 5000000
91 Repair Library Emergency Generator Deferred Maintenance amp Repair Utility Safety $ 26000
92 Math Science Building Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 1170000
93 Campus Wide HVAC System Replacement Modernization D-Utility Deferred Maintenance $ 300000
97 Replace AC Units on Science Engineering amp Family amp Consumer Education Buildings Deferred Maintenance amp Repair Utility Deferred Maintenance $ 800000
98 Science Engineering Air Handler Replacement Deferred Maintenance amp Repair Utility Deferred Maintenance $ 780000
99 Plumbing Fixture Replacement Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 100000
100 Generator Replacement Deferred Maintenance amp Repair W-Utility Safety $ 150000
101 Replace All HVAC Units Deferred Maintenance amp Repair W-Utility Deferred Maintenance $ 600000
102 Campus AudioVisual Improvements Modernization Technology Technology $ 2100000
103 Upgrades to Campus IT Power Management Modernization Technology Technology $ 1800000
104 Upgrade Campus Network Infrastructure Modernization Technology Technology $ 2200000
105 Campus Whiteboard Replacement Modernization Def Maint Deferred Maintenance $ 130000
106 Campus Wide Interior Clock Replacement Modernization Technology Technology $ 150000
107 Upgrade Campus Wireless Infrastructure Modernization Technology Technology $ 1900000
108 General Computer and Peripheral Upgrades Modernization Technology Technology $ 13100000
109 Purchase Non Instructional Equipment Identified Through Departmental Program Review Process Modernization Technology Technology $ 200000
110 Upgrade Nursing Technology and Purchase Additional Equipment Modernization Technology Technology $ 750000
111 William Thomas Planetarium Technology Upgrades Modernization Technology Technology $ 300000
112 Carpet Replacement and Floor tile Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 495000
113 Repaint Interior Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 90000
114 Interior Furniture and Equipment Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 700000
115 Door Hardware Replacement Deferred Maintenance amp Repair W-Interior Deferred Maintenance $ 100000
Total Cost $ 402096000
Deferred Maintenance $ 26473000
Technology $ 22500000
Safety $ 16111000
Capital Outlay $ 324257000
Energy $ 12755000
Total $ 402096000
Summary of all Possible Bond Projects District Wide by Site
Campus Amount of Total
BC DC and Weill Possible Bond Projects $ 402096000 631
District Office Possible Bond Projects $ 10050000 16
CC Possible Bond Projects $ 70556949 111
PC Possible Bond Projects $ 154815900 243
$ 637518849 1000
Maximum Bonding Capacity $ 527020000
Amount Over Maximum Bonding Capacity $ (110498849)
Summary of all Possible Bond Projects District Wide by Category
Campus Amount of Total
Major Capital Outlay $ 503861550 790
Energy $ 31069000 49
Deferred Maintenance $ 49552850 78
Technology $ 33215500 52
Safety $ 19819949 31
$ 637518849 1000
Maximum Bonding Capacity
Amount Over Maximum Bonding Capacity $ (637518849)
Page 27: PLANNING WITH A VISION THAT EMBRACES THE …...projected to be 178,962 by 2015 and to reach approximately 200,000 by year 2025. • The effective service area is expected to grow at

WHAT IS THE PLAN FOR ADDRESSING THESE NEEDS

Please let us know what your priorities are for our local community colleges by completing a community feedback survey TODAY

For more information visit wwwkccdedu or wwwportervillecollegeedufacilityneeds

If you have any specific questions feel free to contact PCrsquos Bond Steering Committee by phone at 559-791-2213 or by email at pcfacilitiesportervillecollegeedu

The Kern Community College District is considering placing a local funding measure on the November 2016 ballot

A recently commissioned independent survey shows as much as 68 of respondents would support a local funding measure in November 2016

  • Planning With A Vision That Embraces The Future
  • Todayrsquos Agenda
  • Slide Number 3
  • Porterville college overview
  • Community College Finance 101
  • Fiscal Year 2016-17 General Fund Operations
  • Future ProjectsKey Planning Assumptions From The Educational Master Plan
  • Measure G was placed on the ballot in November 5 2002 and the electors of the Improvement District approved $180 million in bonds to finance improvements renovations construction and equipment of Bakersfield Cerro Coso and Porterville Colleges More than 55 of the electors voted in favor of the propositionThe Improvement District is approximately 12800 square miles encompasses Kern County Tulare County and San Bernardino County
  • Slide Number 9
  • Hazardous amp SafetyADA Projects
  • Library amp LRC Capital Projects
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Classroom amp Building Upgrades
  • Slide Number 17
  • Slide Number 18
  • Facilities Needs List Development Process
  • Addressing An Aging Campus
  • Slide Number 21
  • Project Listings
  • Capital Outlay Projects
  • Deferred Maintenance amp Safety Projects
  • Potential Projects
  • Potential Projects
  • Slide Number 27