planning timeline
DESCRIPTION
Rollover. Initialize Planning Module Inspectors begin planning. Pre-generate Generate. Review and update VIS. Incorporate RAMPS Inspectors finish planning. Oct. Aug. Nov. Jul. Sep. RAMPS download. (Date determined by regional RAMPS coordinator). RAMPS snapshot. Start FY 08. (Oct 1). - PowerPoint PPT PresentationTRANSCRIPT
Jul
Aug
Sep
Oct
Nov
RAMPS snapshot.
Review and update VIS.
Planning module released.
RAMPS download.(Date determined by regional RAMPS coordinator)
Initialize Planning ModuleInspectors begin planning.
Incorporate RAMPSInspectors finish planning.
Start FY 08. (Oct 1)
Rollover.
Pre-generateGenerate.
Planning Timeline
Risk-based Oversight System
• Continuous assessment of each air operator/repair station and prioritization of surveillance.
• Targeting of Flight Standards’ resources for use in the areas of highest level of risk.
• Use of a Risk Management Process by certificate management personnel for issues of concern.
3650/5650
Required Annually
3608/56083654/56543656/56563661/5661
VIS Dependent
3606/56063607/56073618/56183663/56633669/5669
Risk Based
3601/5601 3658/5658
3604/5604 3659/56593605/5605 3660/56603657/5657
Repair Station Oversight System
3. Repair Station Assessment Tool
6. Risk Management Process to be Initiated for Issues of
Concern
7. New Surveillance Data, RMP and Other Information.
4. Modified Surveillance
5. Overall Assessment of Repair Station
1. Baseline Repair Station Surveillance
2. Repair Station Profile
3. Repair Station Assessment Tool
Assessment and Planning Module.lnk
ISO
• AOD is available for your review
• August 2008 we may be receiving a visit from AFS-40
• Training on Thursday?