ME CIVIL – TOWN & COUNTRY PLANNING
BY:ROLL NO 4 . PATEL MANOJENROLMENT NO: 120420748004ROLL NO 7 . SHAH PALAK ENROLMENT NO: 120420748007
GUIDED BY : - PROF. SEJAL BHAGATSCET SUBJECT: -PLANNING STUDIO -2
DEPARTMENT OF CIVIL ENGINEERINGSARVAJANIK COLLEGE OF ENGINEERING & TECHNOLOGYATHWALINES, SURAT, GUJARAT
![Page 2: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/2.jpg)
04/13/2023
2
Contents
IntroductionObjectivesTown Planning Scheme ScenarioAnalysis of Existing T.P. SchemeProposed T.P. SchemeDifferent block detailsRoad details and costingProposal of Road intersectionProposal of LandscapeProposal of Rotary
![Page 3: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/3.jpg)
04/13/2023
3
Introduction
A Town Planning scheme popularly known as “Land Acquisition without Tears”
Gujarat state land management land pooling & readjusting.
Town Planning Scheme involves Public Participation at all stages of Proposal & development.
The Town Planning Scheme thus is a legal document that is the basis for assessing and determining proposals for the use and development of land in the Town at micro level.
![Page 4: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/4.jpg)
04/13/2023
4
Objectives
1. To study land use patterns & land management practices in India.
2. To study the provision of Gujarat Town Planning Act, 1976 for urban
expansion.
3. To study the TP proposed in Adajan (T.P. 32) with the total area of
79.10 Ha.
4. To prepare an alternative of T.P. Scheme for the area where T.P. Scheme
is proposed.
5. To compare the Existing & Proposed T.P. Scheme with Salient features.
![Page 5: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/5.jpg)
04/13/2023
5
Study approach
Site study Analysis of the existing O.P. from size and location
point Options for road network layout
Finalization of the road network Identification of Block diagram
Options for reconstitution through deductions(25-40%)
Identifications of reserved plots
Accessibility assessment
Project Evaluation
![Page 6: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/6.jpg)
04/13/2023
6
The Town Planning Scheme scenario
First town planning act was implemented in 1915. This provided for planning of small areas around the city, which is growing or proposed for growth through Town Planning Schemes.
Act was modified in 1954. This Act provided for preparation of development plan (master plan) for the entire city along with detail planning through T.P. Scheme.
The recent version of the Act is of 1976. Today we have provision for covering areas beyond city limit.
![Page 7: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/7.jpg)
04/13/2023
7
Surat city scenario
Sr. No. T.P. Scheme detailsNo. of
Schemes
Total Scheme
area (Hector)
1Sanctioned Final
Schemes25 3089.54
2Sanctioned Preliminary
Schemes33 3527.82
3Sanctioned Draft
Schemes60 8826.26
4Draft Scheme submitted
to Govt. for sanction7 1570.94
5Proposed Town Planning
Schemes3 734.00
Total 128 17748.56
Source – SMC Website (updated on 21st June 2013)
![Page 8: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/8.jpg)
04/13/2023
8
Site location of our T.P. Scheme
![Page 9: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/9.jpg)
04/13/2023
9
![Page 10: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/10.jpg)
04/13/2023
10
Locational features of T.P 32
At South of site, T.P no. 31 (Adajan) is proposed. In North-East of site T.P no. 13 (Adajan) is proposed.
Parshuram garden is situated inside our TP. SMC swimming pool is located in the North-East of our T.P.
There is 36 m wide proposed DP road adjoining at north-south part, a 24 m wide road connecting Adajan-Ramnagar is passing in the northern direction of TP, & a 18 m wide Honey Park road at the eastern direction of T.P. is passing
![Page 11: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/11.jpg)
04/13/2023
11
Original Plot
![Page 12: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/12.jpg)
04/13/2023
12
Laying out of plots
![Page 13: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/13.jpg)
04/13/2023
13
Final Plot
![Page 14: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/14.jpg)
04/13/2023
14
Salient features of the proposed T.P. Scheme
TP area is 791006.6558sqm. For transportation link mix pattern is adopted.
Proposed Spaces
AreasSq.mt
Percentage GuidelineGTPA
Residential 587171.6558 74.23% 65 % to 75%
Roads 108544 15.91% 15 % to 17 %
Open spaces 25375 3.2 % 3 % to 5 %
Public amenities
42994 5.43 % 5 % to 10 %
Reservation as per DP
SUDA
15371 1.94% Balance
EWS reservation
11551 1.46 % Up to 5%
Total TP area 791006.6558 100% 100 %
![Page 15: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/15.jpg)
04/13/2023
S I M I L A R LY O T H E R B L O C K D E TA I L S H AV E B E E N TA B U L AT E D
Block details
Sr. No. R.S No. O.P No. O.P Area % Deductio
n
F.P Area
155 1 10724 40% 6434.4
278/1 2 7891 35%
5129.15
378/2 3 6779 35%
4406.35
479/Part 4 9207 35%
5984.55
579/Part 5 9207 35%
5984.55
680/1 6 1315 35% 854.75
![Page 16: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/16.jpg)
04/13/2023
16
Reservation for educational purpose
Reservation for recreational purpose
Sr. No. Purpose Area (Sq.m)
1. Primary school
13291
2. High school
8500
3. Aganwadi 2758
Sr. No. Purpose Area (Sq.m)
1. Garden 14384
2. Playground
4794
![Page 17: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/17.jpg)
04/13/2023
17
Road details
Sr. no. Road Width
No. of Roads
Length of Roads
Area (Sqm)
Area (%)
1. 24 m 1 1200 m 17315 2.18 %
2. 18 m 9 3858 m 78544 9.92 %
3. 36 m 1 900 m 30000 3.79 %
Total 5985 m 125859
![Page 18: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/18.jpg)
04/13/2023
18
Development cost of roads
Source SOR 2012-13
Sr. No. Road Width Road Area (Sqm)
Cost per Sqm
Cost in lacs
1. 24 m 17315 1721 297.99
2. 18 m 3858 1474 56.86
3. 36 m 900 1072 9.64
Total 364.498
![Page 19: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/19.jpg)
04/13/2023
19
Proposal for Road Section
![Page 20: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/20.jpg)
04/13/2023
20
Development cost of street lights
Erecting the MS – steel pole with concrete foundation having Tube Light; the height of poles being 7.5mt with a spacing of 25mt and 5mt with a spacing of 25mt
Source: SOR 2011
Description Proposal
No. of Poles 271
Cost per Pole 11000 Rs per pole
Total cost (lacs) 29.81
![Page 21: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/21.jpg)
04/13/2023
21
Development cost of drainage service
Description Proposal
Main Pipe: 450mm Ø
Length in Running Mt. 5985
Cost per Rmt. 2000 Rs per Rmt
Total cost (lacs) 119.70
![Page 22: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/22.jpg)
04/13/2023
22
Proposal for landscape
![Page 23: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/23.jpg)
04/13/2023
23
Proposal for Rotary Intersection
![Page 24: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/24.jpg)
04/13/2023
24
Conclusion
After studying all aspects of Town Planning Scheme and various models we conclude that land pooling and land acquisition is most effective tool for land management because of the involvement of public participation to develop non-gamtal area.
With the help of this studio exercise, we learn how to forecast the growth of the city in proper manner and how to control the haphazard development of the city.
![Page 25: Planning Studio-2](https://reader033.vdocuments.us/reader033/viewer/2022061616/5589e41cd8b42a95558b46ae/html5/thumbnails/25.jpg)
04/13/2023
25
Thank you