  • 8/10/2019 JX Events Studio - Planning Commission Packet

    1/12

    PLANNINGCOMMISSION

    MEETINGDATE: November 12, 2014

    Parking Commission:

    October 23, 2014

    Planning Commission: October 8 ,

    2014

    CASE

    NO.:

    SUP

    2014-

    31

    APPLICANT:

    Judd Sather

    REQUEST:

    Special Use

    Permit to

    operate

    an

    event

    center

    at 124

    Main Sreet

    South

    ZONING: CBD -

    Central Business COMPPLANDISTRICT: DMU-Downtown

    Mxed Use

    PREPARED

    BY:

    Abbi

    Jo Wittman, City

    Planner

    BACKGROUND

    At th e Planning

    Commission'

    s last

    regularly -

    scheduled

    meeting,

    th e

    Commission

    tabled an

    application from

    Judd

    Sather for th e

    creation of

    J X Events

    Venue,

    a two-

    story

    events center

    to

    be located at 120- 124 Main

    Street

    South. At

    that meeting

    th e

    Commission

    continued the public

    hearing, requesting th e following materials be

    submitted by

    th e applicant:

    1.

    An

    accessible exits

    and

    route

    plan depicting

    access

    to

    accessible parking

    spaces;

    and

    2.

    A

    parking

    plan depicting

    th e alternative

    parking provisions

    determined to

    be

    acceptable

    by

    the

    Downtown

    Parking

    Commission;

    and

    3.

    An

    event security

    plan; and

    4.

    Soundproofing details developed by a professional engineer that

    specializes

    in sound

    transmsson.

    Since

    th e

    Commission' s meeting in

    October, th e

    applicant ha s submitted an

    event

    security

    plan

    as

    well

    as soundproofing details which

    have

    been

    determined

    to

    be

    sufficient

    by City staff.

    Since

    the

    original application

    submission the

    appl icant ha s reduced the total

    occupancy

    of the

    venue

    to 630 people. This

    would be

    achieved

    by

    utilizing

    fixed

    seating

    in half of each of

    th e

    floor

    areas not designated as storage, office, restrooms,

    or

    kitchen. This reduces the total

    parking requirement to

    211

    parking spaces. The existing uses require45 spaces, leaving

    a

    deficit

    of

    166 parking spaces.

    Th e

    applicant

    met

    with th e

    Downtown

    Parking

    Commission

    DTPC) on October 23

    to

    discuss alternative provisions

    to

    the deficit of 166 parking spaces for

    this

    venue. In a 3- 3 vote, with

    on e member

    abstaining due to a conflict of

    interest,

    th e D T PC did

    not approve

    a

    parking

    plan.

    Since

    that meeting, the appl icant

    has

    proposed utilizing

    valet

    services

    with loading zones dedicated

    on

    Chestnut

    Street

    n ea r th e

    intersection

    with

    Main

    as

    well as

    on

    Union

    Alley. This

    proposal ha s

    not

    been reviewed by

    th e DTPC.

  • 8/10/2019 JX Events Studio - Planning Commission Packet

    2/12

    Th e applicant h as a lso

    proposed

    the

    creation

    of

    a

    main entrance off

    of

    Union

    Alley

    in th e

    first

    phase (

    the first story) of th e venue. A

    main

    entrance

    in

    this location, with an

    interior

    elevator,

    would provide for an accessible entrance with

    access to

    a single accessible on -

    street

    parking

    space

    Th e

    nearest

    public parking on an

    accessible route

    is located approximately on e and

    a

    half blocks (

    500 feet)

    away

    to th e surface

    lot #

    16, below the

    armory,

    and two

    blocks (

    600 feet)

    away

    to th e

    parking

    ramp.

    Th e

    Main

    Street

    entrance

    is

    also

    an

    accessible

    route

    but

    there

    is

    no

    parking or loading in this location. Lot #6 , at th e pedestr ian plaza,

    is

    approximately 450' away.

    u =

    c

    A

    First phase event

    center

    Theproposed use is

    surrounding

    uses.

    APPLICABLE

    GUIDELINES

    AND

    REGULATIONS

    Section 31- 325

    indicates that

    assembly

    halls

    in

    theCentral Business District

    require

    a

    Special Use

    Permt.

    Section

    31-

    207 establishes the reviewstandards

    for Special

    Use

    Permits:

    1) Theproposed

    structureor

    use

    conforms to the

    requirements

    and

    the

    intent

    of this chapter, and of

    th e

    comprehensve

    plan,

    reevant

    area

    plans andother

    lawful

    regulations.

    allowed within the subject zoning district, if it is found

    compatible

    with

    Comprehensive Plan Chapter 6, Local

    Economy,

    indicates an objective of

    supporting

    business

    expansion

    in

    the

    downtown

    commercial

    district.

    This would be

    achieved

    through

    the following

    implementation

    actions: [

    e ]

    ncourage

    small,

    locally

    owned,

    businesses

    particularly

    in

    th e

    Downton and [

    p]

    romote

    office and service

    jo b

    locations

    in

    and around the

    downtown."

    Comprehensive

    Plan

    Chapter 7 , Economic

    Development, indicates

    a

    goal of promoting and

    maintaining th e downtown as

    a

    central

    focus

    for community,

    econom ic and

    cultural

    activity

    as

    tourismhas

    allowed the

    Sillwater downtown to

    avoid thevacant buildings and

    physical

    decline seen

    in

    other

    traditional

    downtowns.

    While

    th e

    events center may help support these

    goals,

    objectives

    and

    implementation actions,

    the

    event

    center use of two

    storefronts

    will prohibit futureretail use in these

    units.

    While there

    is no ordinance requiring

    th e

    first floor

    to

    remain commercial, th e

    use

    of an events center is at

    odds with the

    Comprehensive

    Pan'

    s guidance.TheComprehensive

    Pan

    indicates an

    estimate

    20,

    00 0

    square

    feet

    of n ew

    retail

    space

    could

    be

    supported by

    2020.

    The loss

    of

    7,

    000

    square

    feet

    of

    retail space

    o n th is

    block

    of

    Main

    Street

    could

    have

    a potentially

    adverse effect

    to

    th e City' s

    goal of " increase[ ing]

    th e

    ta x base and

    providing

    economic growth for Stillwater."

    Oher

    Lawful Regulations

    In review of

    th e

    request

    with

    City staff, th e following items

    were

    determined

    to be

    some i tems

    of

    concern:

    CPC

    11-

    12-14 (SUP/ 2014-31)

    Continued Public Hearing

    120-124 Main Sreet South

    Page 2 of 4

  • 8/10/2019 JX Events Studio - Planning Commission Packet

    3/12

    ADA compliancy (

    including accessible routes and distance

    to

    accessible

    s p a c e s ) : ADA

    compliancy and

    building

    exiting

    ca n

    be achieved with

    significant

    upgrades and

    improvements

    to

    th e

    structure. Building Official

    Shilts,

    as

    well

    as

    Assistant

    Fire

    Chief

    Ballis,

    have

    conducted

    site

    inspections

    and determned

    plans

    will need to

    be submtted

    to

    show

    proof

    of

    th e

    applicant'

    s

    ability

    to m ee t

    current

    code

    standards.

    A

    condition

    of

    approval

    would

    include

    the

    appl icant

    shall secure all

    required

    approvals from

    the

    City'

    s

    Building Official

    and Fire

    Marshall, as well as

    Washington

    County

    Health Department,

    prior to operating the event

    center.

    This includes, but

    is not limited

    to, installing

    required exiting and meeting

    ADA

    requirements.

    Parking

    and

    Traffic (

    including, b ut n ot limited

    to,

    the inability

    to stop

    in front of the

    business

    on

    Main

    Street a s

    the South

    100 block ofMain

    Street

    has no parking or stopp ing

    provisions

    to

    accommodatefor

    drive and turn lanes at the Chestnut and Main intersections): The concerns

    of th e impact to

    th e

    traffic in this location, as well as th e deficit of

    parking,

    ha s not been

    resolved

    Event

    security

    and noise ( including impact to neighboring

    residences):

    Updated security and

    soundproofing details have been provided.

    2 Any

    additional

    conditions

    necessary

    for

    th e

    public interest

    have been

    imposed

    or use

    and/ or

    structurewll

    not constitute

    a nuisance

    or be

    detrimental

    to

    the

    public

    welfareof

    the

    community.

    The

    focus of

    this

    reviewstandard

    is

    whether

    the

    proposed

    use can operate

    in its proposed

    location without negatively

    impacting surrounding uses, or

    the general neighborhood.

    In

    October staff indicated if issues of security, soundproofing, accessibility as well as parking

    could

    be

    resolved, staff

    could

    determine

    necessary

    conditions

    for

    a

    recommendation

    of

    approval. However, issues regarding parking

    and

    traffic safe ty have

    not

    been resolved

    with a satisfactory level of detail.

    ALTERNATIVES

    AND

    RECOMMENDATION

    1.

    Approve

    the Special Use

    Permit

    request with

    or

    without

    conditions.

    If the

    Commssionwould like

    to

    approve the Special Use

    Permt with conditions, staff

    would recommend the following:

    a. No greater

    than

    3,500

    square

    feet of the first

    floor

    would beutilized

    as

    rentable areas for events or event

    functions

    for a

    total

    occupancy of no

    greater

    than

    367

    persons.

    O

    the

    total

    rentable

    area,

    no

    less

    than

    1 ,

    750

    square feet

    must

    be

    permanently

    fixed

    table seating. A total of 1 , 750 square feet

    may be

    dedicated to flexible

    seating.

    b.

    No

    greater

    than 2,500

    square feet

    of th e second floor may be utilized as

    rentable area for

    events

    or

    event

    functions for a maximum

    occupancy

    of 263

    persons.

    O the

    total

    rentable

    area,

    no less than

    1 ,

    250 square feet must be

    permanently fixed

    table

    seating.

    A

    total of 1 ,

    250

    square feet may

    be

    dedicated

    to

    flexible seating.

    CPC

    11-

    12-14 (SUP/ 2014-31)

    Continued Public Hearing

    120-124 Main Sreet South

    Page 3

    of4

  • 8/10/2019 JX Events Studio - Planning Commission Packet

    4/12

    c.

    Prior to

    th e

    operating of

    an

    event

    center, the

    applicant shall secure all

    required approvals

    from

    the

    Stillwater

    Building Department,

    Stillwater

    Fire

    Department and

    Washington

    County Health

    Department.

    d.

    The applicant

    shall

    implement th e

    soundproofing plan,

    as

    submitted

    with

    the

    Planning Commission'

    s November

    11, 2014, meeting packet.

    e.

    The

    event venue

    shall

    a d he re to

    the

    event

    security plan,

    as

    submitted

    with

    th e Planning Commission'

    s

    November 11,

    2014,

    meeting packet.

    f.

    All existing

    an d

    future trash receptacles

    shall

    be stored

    inside

    the

    building at all

    times with

    the

    exception of

    the d ay of

    trash

    collection.

    g.

    Prior to the commencement of any

    exterior

    work, including

    th e

    installation

    of

    lighting

    and signage, a

    Design

    Review permit

    shall be

    submitted and

    approved

    by

    the Heritage

    Preservation

    Commission prior to th e issuance of a building permit

    for this project.

    i.

    Any conditions attached to the Design

    Permit

    issued by th e Heritage

    Preservation

    Commission for th is addit ion

    are incorporated

    by

    reference

    into

    this

    Special Use

    Permt.

    h.

    Th e

    applicant

    must propose

    a

    detailed

    parking an d drop- off/

    pick-

    up

    plan that

    is

    found

    acceptable to th e City Council. Any required parking mitigation fees or

    other conditions required

    by the

    City Council must be

    included

    in

    the

    applicant' s

    Zoning Permit.

    i.

    The

    applicant shall

    secure all required

    approvals

    from

    th e

    City' s Building

    Official and Fire Marshall, as well as Washington County Health Department,

    prior to operating the event

    center.

    2.

    Determne

    that

    theproposed events

    center

    is not consistent with

    the

    Special

    UsePermit

    provisions

    or

    th e

    Comprehensive

    P la n a nd

    deny th e

    Special

    U se Permit.

    3.

    Table the

    application

    by

    extending

    the

    60 -

    day dead line

    to

    1 /

    17/

    2015

    and request the

    applicant develop

    a

    plan to alleviate traffic safety

    concerns

    as well as an alternative

    to th e parking provisions

    that

    is found to be acceptable to th e Downtown

    Parking

    Commission and/ or City Council.

    As

    there

    are still parking and traffic

    safety concerns

    with th e

    proposed

    events center, staff

    recommends

    the

    Planning

    Commission deny SUP/ 2014-

    31

    for JX

    Events Venue

    or

    table

    the

    application

    by extend ing

    the 60 -

    day

    deadline to

    1 / 17 / 2015.

    ATTACHMENTS

    Site

    Location Map

    Applicant Revised

    Narrative

    FirstFloor Pan

    Second Floor Pan

    Soundproofing

    Estimate

    CPC

    11-

    12-14 (SUP/ 2014-31)

    Continued Public Hearing

    120-124 Main Sreet South

    Page4 of 4

  • 8/10/2019 JX Events Studio - Planning Commission Packet

    5/12

    f_

    r

    22

    i

    102

    Sti1wate&

    1 1 0 s

    224

    e

    132

    9

    k

    rare

    EP

    SB

    PAC7crr

    1

    c

    t

    1 1 1 1

    0

    y

    P

    of

    lb

    ti

    a

    it

    Ilk

    1

    113

    p

    S

    4

    3

    08 -

    r

    201

    The

    Birthplace

    of Mnnesota

    120- 124 Main

    Sreet Sou

    SITE LOCATION

    0

    20 40 80

    Feet

    s

    A

    a

    M W t

    1

    f

    p

    y.

    tOg

    K

    A-

    Z. ...

    mai ''' 1101111SIN

    PS

    G N E S r . . . . . . . .

    14

    s

    2 ``

    Z

    N

    S Z

  • 8/10/2019 JX Events Studio - Planning Commission Packet

    6/12

    Planning

    Commission

    supplemental information for JX

    Event

    Venue

    November 1 ,

    2014

    Dear

    Planning

    Commission,

    We

    are

    exci ted to bring more people to

    th e

    north

    end of

    Stillwater, a s well

    as an d

    to bring th e parking

    ramp to h igher profitability

    with

    the proposed

    opening of J X

    Event

    Venue. We have worked hard with

    architect Mark Balay and

    building

    official Cindy Shi ltz

    to

    modify

    the

    floor

    plan

    so

    th e

    maximum

    capacity

    would be reduced

    to 367 people on the

    lower level

    and reduced to

    2 6 3 people on the

    upper

    level fo r

    a

    total

    of 6 3 0 total maximum occupants. This

    reduction

    was d one by

    adding bigger

    bathrooms, kitchens, storage areas, and fixed

    seating.

    Phase

    One ( 120/

    122

    South Main) Phase

    Two (

    124

    South Main)

    Z

    0

    6

    CR

    8

    N

    N

    4

  • 8/10/2019 JX Events Studio - Planning Commission Packet

    7/12

    It has been determined p er

    building

    code

    that

    an elevator would be

    required

    for accessibility

    a t th e

    Union Alley

    entrance.

    This would require that

    we

    would be asking for

    the

    special

    use

    permit for both

    phase one and phase

    two.

    The upper level (which has been vacant for

    25+

    years)

    would

    be built out

    as the budget

    allows

    over one to

    two

    years, and the elevator

    would

    be limited to

    lower

    level and

    the

    Union Alley

    grade level.

    An event

    venue

    provides

    business to

    many other

    local businesses. Following is

    a list of

    all

    of

    th e local

    businesses

    that

    have

    been

    contracted by clients

    of

    Th e

    Loft

    at Studio

    J (

    2 14

    Main

    Street

    South):

    Famous Dave s, Green

    Mill,

    The Green Room, LOLO, Marx, Lake Elmo Inn, Hanson's Liquor, Oaks Wine

    Spirits, Buttercream ofStillwater, Sara' s Tipsy

    Pies,

    Quickfire Pizza,

    Stillwater Trolley, Our

    Shop,

    Camrose

    Hill, and countless other vendors including hotels, B &

    B' s , musicians, DJs, florists, makeup

    artists and

    hair stylists.

    For comparison purposes, 95%

    of

    our current events at The Loft

    at

    Studio J are seated wedding

    dinners

    and

    receptions wth

    an

    average

    of

    54%

    of

    max

    occupancy (

    17 5 average

    guests

    with

    3 2 7

    max

    occupancy).

    W e have 2 5 of th e 31 Saturdays booked already in

    April -

    October of 2015. 2 3 of

    th e

    2 5

    events

    are

    weddings.

    W e are asking that

    the

    parking and planning

    commission

    grant

    a variance

    wherewe offer valet

    services

    to th e parking ramp and other public lots if needed. The Parking

    Commission

    voted

    3- 3

    on th e

    question

    to mitigate

    8 6

    permits

    for

    phase

    one

    only. At

    that

    time,

    it

    was

    n ot k no w n that the elevator would be

    necessary.

    Below

    is additional information requested

    by

    city staff

    including

    a security

    plan,

    soundproofing

    plan,

    parking

    plan, and

    map ofaccessible entrances.

    Parking Plan -

    JX

    Events (Event Venue)

    The

    parking

    ramp is on e

    block

    from th e p r op o se d e ve nt venue. The

    Parking

    Commission was

    concerned

    that

    we

    could

    not

    guarantee that

    guests

    would park

    in the

    ramp.

    Since

    that meeting,

    we

    came

    up

    with

    the

    valet

    idea

    that would

    guarantee

    that

    cars

    would

    ge t

    to

    the

    ramp

    and

    pay the

    fee,

    which would profit th e city

    more

    than mitigation. Also as an

    event

    center,

    we

    have

    the

    luxury of

    communicating

    with

    a bride exactly wherewe want her

    guests

    to park. After

    one

    year of operation of

    The Loft at Studio

    J (

    214 Main

    Street South),

    parking

    ha s

    not

    been an issue

    with very

    little

    complaints.

    We offer shuttle services through

    th e

    Stillwater Trolley

    that

    has only been

    contracted

    about 5 %

    of

    the

    time for

    clients

    that are

    most

    concerned about parking

    issues.

    Parking is largely a perceived issue, so I took some timeto

    check

    out the use of th e ramp over the last

    couple of weeks

    during

    peak times. The first check was 2 p m on

    Saturday,

    October 18. It was

    a

    beautiful autumn

    day

    in

    town

    with hundreds of people

    walking

    around

    and

    we

    had

    a wedding at

    Th e

    Loft as well as

    other venues.

    It

    wa s about th e

    time guests

    would show up for a wedding. I noted that

    5

    of

    the

    6

    accessible

    parking

    spaces

    within

    on e

    block

    of

    12 0

    and

    12 2

    M a in S tre et

    were

    open

    an d

    the

    parking

    ramp

    was

    only

    about 1 0 %

    occuped

    Th e

    next

    check was another beautiful fall

    day on Saturday , October

    25 an d

    at

    fpm

    th e

    ramp was

    about

    10%

    full,

    at

    2pm it was about

    20%

    full,

    and at

    6pm it

    was

    50% full. There were weddings

    at

    The

    Lowell

    Inn, Water Street Inn, T h e G ra nd , and The Loft at Studio J . This means that

    there were

    still

    over 100 parking spaces available

    in

    th e

    ramp

    at a peak time

    when

    all

    those

    wedding guests were at

    the venues. Many

    people

    have commented that

    th e

    only time the ramp is

    full

    is the

    fourth

    of

    July.

  • 8/10/2019 JX Events Studio - Planning Commission Packet

    8/12

    Adding

    phase

    2 to th e Special Use Permit

    would

    increase

    th e

    parking

    mitigation

    to

    1 6 6

    spaces. At $10

    per space that

    is $ 1 ,

    660 per month that

    is

    not

    feasible

    in our business

    plan. Wth the

    valet idea,

    two

    or three

    spaces

    in Union Alley or Chestnut St reet would be leased

    to

    allow for

    the

    valet service. This

    valet service could be s ha re d a m on g

    other

    businesses as well.

    The

    parking

    commission also

    had

    concerns with no stopping /

    loading near

    the

    front entrances.

    This

    would be alleviated with

    the

    creation

    of the main entrance

    on

    Union

    Alley.

    When the

    bridge closes in

    2 0 1 6 , there may be added

    drop-

    off areas on

    Main

    Street and/

    or

    Chestnut in

    the

    yellow

    curb

    area ( see

    below).

    Accessible Entrance # 1 x

    N ew fining for eevator(

    ix

    x - Accessible Entrance #2

    Events

    x - Accessible Entrance #3

    Pr0Qosed(

    f : , ,

    r

    J

    A- Nfr

    r

    FUTURE

    PLAZA?

    Moreparking

    and/

    or city-wide valeta

    1--

    We are

    op en to a

    reduction

    in

    the

    amount

    of

    occupants

    by ordinance to

    make

    this project

    work

    PRECEDENT: Th e Loft at Studio J is mitigating 12 parking spaces for a

    max

    occupant load of

    327.

    Here is a list

    of the parking

    lots nearest

    to the proposed

    J X Event Venue.

    Public Lots (Total of459 spaces):

    Parking

    Ram p: 218 spaces

    plus

    6

    Handicapped

    Teddy

    Bear

    Park: 88

    spaces

    plus

    4

    Handicapped

    Courthouse Memorial Lot:

    71 spaces

    plus 4 Handicapped

    Lower

    Courthouse Lot:

    82 spaces

    plus

    2

    Handicapped

    Private Lots (Total

    of 103

    spaces

    and

    would

    need to

    be privately contracted):

    Cub Lot: 51 spaces

    plus 3

    Handicapped

    US

    Bank:

    22-38 spaces

    Chestnut Building: 2 0- 4 0

    spaces

    Shorty'

    s : 7 - 1 0 spaces

  • 8/10/2019 JX Events Studio - Planning Commission Packet

    9/12

    Security

    Plan -

    JX Events (

    Event

    Venue)

    W e spokewith

    Nate

    Meredith

    from

    the

    Stillwater Police Department a nd cam e

    up with

    this

    security

    plan

    together:

    1.

    Security Cameras with DVR recording (

    4

    downstairs, 2 -

    4

    upstairs)

    a.

    Viewable on monitors at host office and on mobile devices

    2.

    Security

    personnel

    onsite (

    On e

    security

    person

    per 2 5 0

    guests)

    a.

    Training to

    keep

    out

    non -

    invited

    guests

    and

    keep

    all

    drinks

    inside

    building

    a t a ll

    three exits

    b.

    Call

    police

    in

    case

    of emergency

    c.

    Have

    enough

    staff onsite for on e security person per exit

    3.

    Keep gift tableadjacent to building host office

    4.

    Have

    bartenders serving

    alcohol be trained a nd h av e

    their ow n liquor

    liability insurance

    5.

    Put in

    writing

    to clients

    that

    loading /

    unloading is

    not

    to

    happen on th e

    curb in front

    of event

    center, but

    in

    Union Alley or

    parking

    on Chestnut

    Soundproofing plan -

    JX

    Events (Event Venue)

    W e conducted a sound

    test

    on November

    3

    and

    heard

    no

    sound transfer

    at neighboring business The

    T -

    Shirt Factory. Music could be heard in the off ices above theproposed venue. These businesses

    above

    will normally be

    closed during

    event hours, but th e

    following

    measures will be ta k en to stay

    within

    city

    noise ordinances.

    1. Carpet /

    Acoustic tiles on North

    and South

    walls providing

    maximum sound

    dampening

    a.

    This

    will minimize

    sound echo within the

    event

    venue,

    and

    virtually eliminatesound

    transmission to neighboring businesses (

    adjacent

    and above)

    that will

    generally

    not be

    open

    during event hours

    2.

    Sound tiles

    on

    ceiling (

    2x4'

    tiles spaced evenly every

    8')

    to eliminate sound transmission

    to

    second floor

    3.

    Blown insulation in

    second

    floor

    per

    fire

    code

    to eliminate

    sound

    transmission

    to between

    floors

    4.

    Monitor

    bass

    levels wth DJ s and bands, which is

    the sound

    that travels

    the most.

    5.

    Double 5 / 8

    layer of

    sheetrock

    in ceiling

    between

    lower

    level

    and apartment in Northwest

    corner that will

    be

    partof

    the

    venue lease.

    6. Vendor -

    ATS Acoustics -

    wwwatsacoustics.

    com(See

    attachedquotes)

    Thank you for considering

    our

    proposal to breathe life

    into

    this historic building. It is

    exciting to

    have

    thepossibility of

    a

    largeenough event center to attracthigh-end events and fundraisers

    that

    would

    normally stay in St. Paul or Minneapolis.

    JX

    Event Venue could also host craft fairs and the like that

    Stillwater

    residents

    currently

    only

    can

    enjoy

    during

    the summer.

    Use

    of

    th e

    space

    for

    citywide

    events

    could even be part of th e parking mitigation. This venue would be an upgrade from The Loft at Studio

    J in three ways:

    first floor access,

    larger, an d

    c loser to parking.

    A

    year-round,

    first

    class event

    space

    would

    be

    a benefit for

    many

    businesses in town an d bring th e city's parking ramp investment to

    higher profitability.

    Judd

    Sather

    Owner,The Loft at Studio J -

    214 Main Street South

    Judd@ studiojphoto.

    com,

    651-342-

    1476

  • 8/10/2019 JX Events Studio - Planning Commission Packet

    10/12

    066Y

    cons

    0

    1 3

    V1 N G

    E

    o

    2 A N C F fLOOP

    5-

    17 6

    CA -

    MING

    K I 1 '

    CH

    N

    UP

    V51-[3 L

    5 1 -

    O J A6

    MSCI -

    5 1 -

    0,

  • 8/10/2019 JX Events Studio - Planning Commission Packet

    11/12

    OFrIa

    100

    5 1 ' 0

    A(

    200

    CA

    VING K I 1 ' CN N

    200

    5-A6

    I/

    I5

    5 v A 1 1 N G

    7

    and I/

    15

    5f01Z66

    200

    W

    2OWN

    I

    vsi-

    m

    Scale

    when

    plotted o n I 1 x1 7 I s 3/ 52" -

    0

  • 8/10/2019 JX Events Studio - Planning Commission Packet

    12/12

    A\

    ACOUSTCS

    Just

    Listen,

    Quote

    Number:

    86595-

    8371

    Date:

    October

    27, 2014

    Valid through:

    November

    26, 2014

    Your

    contact: Heather

    Phone: 866-787-7881

    Fax: 815-364-0242

    15 W Main St, Box 260

    Piper

    City,

    IL ,

    60959

    [email protected]

    wwwatsacoustics.com

    Your Quote

    from ATS Acoustics

    Dear

    Judd

    Sather,

    Thank

    yo u

    for the opportunity to

    provide this quote. If yo u have any qu estions or ad di tiona l

    r eq u i re m e nt s p l ea s e do n't hesitate

    to

    contact

    me. I

    ll

    be h a ppy to help in

    an y way I

    can.

    Thanks

    Heather

    Sales Representative

    ATS Acoustics

    Items Quoted

    Description

    Unit Price

    Quantity

    Extended

    ATS Acoustic

    Pane - 24 x

    48

    x 2

    Color:

    Black

    Fire

    Rating:

    A ST M E 8 4 C la ss A

    Desired edge profile: Beveled

    57. 20 214 panels $

    12,

    240.

    80

    Subtotal $

    12,240.80

    Shipping

    to 55082

    via LTL Freight $

    1 , 093.

    52

    Total Before Dscount $ 13,

    334.

    32

    Discount

    Saves

    You $

    500.

    00

    Total $

    12,834. 32

    Hardware

    is

    included

    in this

    quote

    If customer requires a lift gate service, Conway

    w il l c h ar ge

    an

    additional $

    9 0 .00 ,

    which

    will

    be

    a dd ed to th e s hip p in g cost.