Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
West Torrens Council Public Services
Depot
07-Jul-2017
Planning Report - West Torrens
Council Public Services Depot,
Morphett Precinct
Merit Use Proposal for Public Consultation
AECOM
West Torrens Council Public Services Depot
Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
Planning Report - West Torrens Council Public Services Depot,
Morphett Precinct
Merit Use Proposal for Public Consultation
Client: Adelaide Airport Limited
ABN: 78075176653
Prepared by
AECOM Australia Pty Ltd
Level 28, 91 King William Street, Adelaide SA 5000, Australia
T +61 8 7223 5400 F +61 8 7223 5499 www.aecom.com
ABN 20 093 846 925
07-Jul-2017
Job No.: 60542734
AECOM in Australia and New Zealand is certified to ISO9001, ISO14001 AS/NZS4801 and OHSAS18001.
© AECOM Australia Pty Ltd (AECOM). All rights reserved.
AECOM has prepared this document for the sole use of the Client and for a specific purpose, each as expressly stated in the document. No other
party should rely on this document without the prior written consent of AECOM. AECOM undertakes no duty, nor accepts any responsibility, to any
third party who may rely upon or use this document. This document has been prepared based on the Client’s description of its requirements and
AECOM’s experience, having regard to assumptions that AECOM can reasonably be expected to make in accordance with sound professional
principles. AECOM may also have relied upon information provided by the Client and other third parties to prepare this document, some of which
may not have been verified. Subject to the above conditions, this document may be transmitted, reproduced or disseminated only in its entirety." ""
AECOM
Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
Quality Information
Document Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Ref
60542734
p:\605x\60542734\6. draft docs\6.1 reports\draft planning report - council depot 07072017.docxp:\605x\60542734\6. draft docs\6.1 reports\draft planning report - council depot 05072017.docx
Date 07-Jul-2017
Prepared by Michael Davis, Molly Gifford
Reviewed by Brenton Burman
Revision History
Rev Revision Date Details
Authorised
Name/Position Signature
A 30-Jun-2017 Draft for Review Michael Davis Principal Planner
B 03-Jul-2017 Draft for Client Review Brenton Burman Technical Director
C 05-Jul-2017 Updated Report Brenton Burman Technical Director
D 07-Jul-2017 Final Report Brenton Burman
Technical Director
AECOM
Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
1
1.0 Introduction
Parclay Pty Ltd is the current under-leasehold holder of the site at 240 Morphett Road, which is leased from Adelaide Airport Ltd (AAL). The site presently contains a purpose built manufacturing and office facility which was occupied by Manuele Engineering.
The City of West Torrens proposes to acquire the under-lease, and utilise the site as a Council Works Depot. Parclay Pty Ltd, on behalf of the City of West Torrens, applied to Adelaide Airport Limited (AAL) to change the use of land and associated buildings within the Morphett Precinct to a Public Works Depot.
AECOM Australia Pty Ltd (AECOM) has been engaged by AAL to assist in its assessment of the proposal against the provisions of the Adelaide Airport Master Plan 2014 in accordance with the requirements of the Airports Act 1996.
The proposed change of use is considered to be a ‘merit use’ under the Adelaide Airport Master Plan, requiring agency and public consultation period, and an assessment against the relevant provisions of the Master Plan.
This report has been prepared to consolidate information submitted in support of the proposal and enable stakeholders and members of the public the opportunity to review the proposed development during the public consultation period. The report includes:
A description of the subject land and locality
Details of the proposed change of use
Summary of the assessment process
An outline of the relevant provisions of the Master Plan.
The site and building plans should be considered in conjunction with this report.
Following the agency and public consultation period and review of any submissions received, a formal assessment of the proposed development against the provisions of the Master Plan and impacts on aviation operations will be undertaken by AAL.
AECOM
Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
2
2.0 Subject Land and Locality
2.1 The Subject Land
The subject land, known as 240 Morphett Road, is located at the intersection of Morphett and James Melrose Roads, in the southern portion of the Adelaide Airport site (refer to Figure 1). The site is approximately 4.3 hectares in area, with frontages of approximately 105 metres to Morphett Road and 172.7 metres to James Melrose Road.
Figure 1: Subject Land (Source: nearmap 8 June 2017)
Formerly occupied by Manuele Engineering as its corporate headquarters and manufacturing facility, the subject land has existing use rights as a ‘general industry, including steel fabrication, grit blasting and painting’.
Manuele Engineering is no longer operating from the site, but the approved use of the subject land remains operative.
The existing site layout, building location, access arrangements, car parking and hard stand areas are shown on Figure 2.
The existing main building has a footprint of approximately 19,000 square metres, with the majority of this dedicated to factory use. The factory is divided into five bays, each approximately 3,500 to 4,000 square metres in area. One bay (the western bay) is fully separated from the remaining bays by a fire-rated wall. The office area is approximately 3,000 square metres in area, spread over two floors. The office building is built to the southern and eastern boundaries of the subject land.
A smaller building with a footprint of approximately 700 square metres is built along the northern boundary of the site. It previously was used as a spray booth and wash down bay. Another small building formerly containing air compressor equipment is located on the western boundary of the subject land, in line with the northern wall of the main building.
Three vehicle access points are provided to the subject land; two from Morphett Road and one from James Melrose Road. The James Melrose Road entrance has historically been the primary access point for heavy vehicles. The two access points to Morphett Road primarily accommodate passenger vehicle access for staff and visitors.
The northern vehicle access point from Morphett Road also provides emergency vehicle access through the subject land to the airside areas of Adelaide Airport via a bridge over Keswick-Brownhill
AECOM
Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
3
Creek. This also facilitates access to the shared use pathway, creek and stormwater infrastructure by maintenance vehicles.
Aside from the existing buildings, the remainder of the subject land is almost entirely paved with concrete or bitumen, apart from small strips of landscaping alongside the car parking areas adjacent to the eastern boundary and along the roadside of the southern boundary wall.
Figure 2 Manuele Engineering – Site Plan
AECOM
Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
4
2.2 The Locality
The locality surrounding the subject land has a mixed character, with vacant land, open space, airport, industrial, residential and recreation land uses in close proximity. The existing building on the subject land is the most visually striking feature of the locality due to its size and prominent position adjacent to the intersection of Morphett and James Melrose Roads.
Of particular relevance is the residential development opposite the subject land south of James Melrose Road, which is a low-scale, medium density development comprising residential flat buildings set in landscaped grounds. To the west of this residential development lies the Glenelg Golf Course.
The City of West Torrens owns the site of the adjacent waste resource and recovery facility, situated immediately to the north-east of the subject land and accessed from Morphett Road. This is a regional waste resource and recovery facility, operated by Solo Resource Recovery.
The section of Morphett Road north of Stonehouse Road is utilised by commercial and heavy vehicles to access the former Manuele Engineering site, the waste resource and recovery facility, and adjacent industrial areas.
The airside areas of Adelaide Airport are located north of the subject land, separated by the open space corridor accommodating Keswick-Brownhill Creek. A shared use path is located in this corridor, connecting Tapleys Hill Road to Watson Avenue in Netley, on the eastern side of the airport.
The Keswick-Brownhill Creek line runs from a north-east to south-west direction from Netley to Patawalonga Creek in Glenelg North, and directly abuts the north of the site.
Vacant land exists directly to the west of the subject land.
AECOM
Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
5
3.0 Proposed Change of Use
The existing City of West Torrens Council Public Services Depot is located at Marion Road, West Richmond. Council has utilised this site as a works depot for more than 70 years. The existing works depot is very limited for space, consists of numerous older buildings which are not suitable for a modern council public services depot, and is located on a very busy arterial road, making access to the site difficult and problematic.
Further, the existing City of West Torrens Council Public Services Depot provides no opportunity for expansion to meet the future needs of Council, or to address safety and security issues required for such a facility.
3.1 Description of the proposed change of use
The former Manuele Engineering building was ‘purpose-built’ as an office and industry facility. The site has existing use rights as a ‘general industry, including steel fabrication, grit blasting and painting’.
The site employed over 250 people, with the industry bays used for the fabrication of large steel structures.
The current proposal involves a change of use of the premises to ‘Public Services Depot’.
It should be noted that the Council operations will not require the entire site. A portion of the existing offices are currently leased to a third party and a number of the existing factory bays will be sub-tenanted for uses complementary to the Council Public Services Depot. Such use will likely be consistent with Envisaged Uses prescribed within the Morphett Precinct (ie industry, office/warehouse, warehouse, car parking and storage, etc.) and be the subject of further consideration and assessment.
No external building works are proposed, apart from changes to existing signage. No changes to access arrangements are proposed to the subject land.
Further details of the proposed change of use of the subject land are outlined below.
3.1.1 Existing and proposed site layout
A copy of the original site plan and building application plans are included as Appendix A.
No changes are proposed to these plans.
The site layout and Council operations are presently being considered, with the existing factory bays and external hardstand areas being divided into the five principal areas of the Council Works Depot operations (see detail in section 3.1.2). An indicative layout plan has been prepared and is included as Figure 3.
3.1.2 Nature of operations
The City of West Torrens proposes to relocate its current depot operations and staff to the subject land and maintain such operations within a modern configuration, over a larger footprint than the existing site on Marion Road.
The Council Works Depot operations (City Works Department) are divided into five principal areas, being:
Civil
Horticulture
Cleansing
Fleet/workshop
Stores & administration.
AECOM
Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
6
Figure 3 Proposed Site Layout
AECOM
Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
7
The total operations of the Council Public Services Depot include approximately 80 staff, more than 75% of which are field and workshop staff. The operational fleet consists of approximately 42 trucks and larger plant, plus four motor vehicles, all of which are stored on-site overnight. In addition, there are various trailers and smaller items of plant.
Operations of the five different areas are outlined below:
Civil is responsible for Council’s ongoing minor works programme. This area has approximately 20 staff, 80% of whom are workforce and the balance management. This area accounts for about one third of the vehicle fleet, including three backhoes and two loaders.
Horticulture is responsible for the maintenance of Council’s open space, amenity areas and trees. This area has approximately 30 staff, including three supervisory staff. The area accounts for approximately 50% of the vehicle fleet.
Cleansing is responsible for street sweeping and public bins. This area has 10 staff, including one supervisor, and operates a small fleet of light sweepers and light trucks.
Fleet/workshop area undertakes repairs on maintenance tools and infrastructure, including a wash-down bay with pressurised hoses. All vehicles are washed down weekly.
Administration has a staff of 10, including a storeman and two mechanics.
Generally, the operational model of the depot includes an early start, with all crews leaving in their council vehicles. The depot remains relatively quiet for most of the working day, until crews and vehicles return late in the afternoon. The majority of crews return to the depot for lunch, around the same time.
A meeting consisting of all staff occurs quarterly, while team meetings occur fortnightly. Thus, meeting/training facilities to accommodate up to 25 persons are required, with an expanded capacity for the larger more infrequent group meetings.
Deliveries to site include articulated vehicles for bulk supplies, including fuel tankers for the delivery of both diesel and petrol. There is a requirement for approximately 20,000 litres of diesel storage and 5,000 litres of petrol storage on site, all of which will be stored above-ground. Such fuel storage facilities will be installed to EPA specifications.
Beyond deliveries, there is a low level of public visitation to the site.
3.1.3 Employment numbers
As mentioned above, the depot on Marion Road currently employs approximately 80 staff, all of whom will be transfer to the new Morphett Precinct site.
There are approximately 20 staff who will require a permanent desk, these being a mixture of supervisory and administration staff.
3.1.4 Hours of operation
Most staff at the depot will generally begin work from 7.00am to 4.30pm each weekday. Crews working with the street sweepers generally commence earlier (around 5.30am).
Due to the nature of operations however, the Council Public Services Depot must be a 24-hour facility seven days per week, catering for emergency call-out and operational requirements.
3.1.5 Traffic movement
No other changes are proposed to the existing access arrangements to the site. Primary access to the Council Public Services Depot for trucks and service vehicles will be via the existing entrance from
AECOM
Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
8
James Melrose Road (through a gated entrance adjacent the site’s western property boundary). Staff and visitor parking will continue to be provided from Morphett Road.
It is Council’s intention that all vehicles stored and operated from its existing Council Public Services Depot will be relocated and operate from the new Public Services Depot. Over time, there may be some minor increase in the vehicle fleet numbers.
Both Morphett and James Melrose Roads are local roads, but are signed for 60km/hour speed operation and frequently utilised by large trucks and commercial vehicles accessing the waste resource and recovery facility (situated at the northern end of Morphett Road), the adjacent industrial area east of Morphett Road, and the subject site.
The current Council Public Services Depot site on Marion Road has 24 secure spaces on site adjacent to Edwin Street and 14 non-secure bays on Marion Road. Beyond this, staff park on the street. The proposed facility has an on-site car parking area for 50 vehicles (staff and visitor parking). No changes are proposed to this existing car parking area.
3.1.6 Fencing, gates and existing landscaped areas
There is no changes to existing site fencing and gates or existing landscaped areas.
3.1.7 Other relevant information
There are no changes proposed to existing stormwater, energy or sustainability measures on-site.
Waste management facilities at the proposed Morphett Precinct location are likely to reflect the storage at the current Marion Road site, including the following:
Green Waste / Street Sweepings - Storage Bin, 60m3 to 80m
3 (bin capacity)
Paper / Cardboard / Boxes - Storage bins 2 x 3m3 each
General Rubbish - Storage bins - 2 x 1.5m3 each
Steel (Recyclables) - Storage bin -1 x 10m3
Such waste management facilities will be designed to so as not to attract birds to the subject site, to ensure that there is no adverse impact to airport operations.
AECOM
Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
1
4.0 Procedural Matters
4.1 Nature of development
The current proposal involves the change of use of the existing former ‘industry building with associated offices’ (the former Manuele Engineering site) to a ‘public service depot’- to accommodate the relocation of the West Torrens Council Works Depot.
A ‘public service depot’ is not defined within the Adelaide Airport Master Plan. Reference is made to the definitions contained within Schedule 1 of the Development Regulations 2008, which defines a public service depot as follows:
“public service depot means land used for storage and operations connected with the provision of public services (including gas, electricity, water supply, sewerage, drainage, roadworks or telecommunications services) by a body responsible for the provision of those services.”
Furthermore, the Development Regulations make further distinction on size, with a ‘major public services depot’ defined as follows:
“major public service depot means a public service depot on a site of 8,000 square metres or more.”
The proposed development meets the definition of a major public service depot.
4.2 Assessment process
The subject land is located within the Morphett Precinct of the Airport (Adelaide) Zone of the Master Plan. A ‘public service depot’ is neither listed as an envisaged nor non-complying development within the Precinct. Therefore, the proposed development will need to be assessed by AAL as a merit use against the Master Plan.
The assessment process is illustrated in Figure 7.5 of the Master Plan and indicates that the proposed development is subject to a 15 business day public notification process. Members of the public may make a written representation to AAL on the proposed development, which will be considered in its assessment.
In addition to this public notification, Commonwealth aviation authorities, State Government agencies, affected local councils and the Adelaide Airport Consultative Committee will be advised of the proposed development and given the opportunity to comment.
AECOM
Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
1
5.0 Adelaide Airport Master Plan
The subject site is located within the Morphett Precinct in the Airport (Adelaide) Zone of the Adelaide Airport Master Plan 2014.
The Precinct encourages development accommodating a mix of activities including industry, office/warehouse, commercial and aviation-related support industries and future development directed to commercial services.
The proposed change of land use to accommodate the Public Services Depot is considered to align with industry, office and warehouse uses, all of which are listed as Envisaged Development within the Precinct.
Desired Character
Future development within the Morphett Precinct is required to take into account potential impacts on residential areas located to the south of the Precinct.
It is important to consider the past use and activities of the site, and the scale, use and hours of activities proposed as part of the current development. The site was ‘purpose-developed’ for Manuele Engineering, a steel fabrication and engineering company – which previously utilised the premises as their corporate headquarters, and the associated factory bays used for fabrication and construction of complex steel structures.
The proposed use of ‘Public Services Depot’ is significantly less intensive and will have lesser impact than the existing approved use of ‘general industry, including steel fabrication, grit blasting and painting’ previously operated by Manuele Engineering.
Structure Plan
The proposed change of land use will not alter the form of development currently on the site.
The primary frontage of the building will be retained as the Morphett Road frontage. Existing landscaping along James Melrose Road will be retained.
Access to the linear park will not be altered as part of this proposal.
Access and Movement
Existing access arrangements will remain unchanged.
Built Form
The external building form will not be changed as part of this proposal. The current building materials were previously approved and are compatible with aeronautical equipment facilities and operations.
Form of development
Within the Morphett Precinct, development is required to consider the need for noise attenuation methods and the provision of aquifer storage and recovery systems. As the application is for a change of use of the existing building, with no further upgrade proposed, it is understood that the existing building was designed to address such issues.
Appearance
There is no change to the existing buildings on the site and thus, the appearance of the site will remain unchanged.
AECOM
Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
2
6.0 Conclusion
The current proposal involves the change of use of the subject land to a ‘public service depot’ for use by the City of West Torrens as its relocated Council Public Services Depot.
A ‘public service depot’ is a merit form of development within the Morphett Precinct of the Airport (Adelaide) Zone, as prescribed in the Adelaide Airport Master Plan 2014.
The proposed use is considered to be significantly less intensive than the current approved use of the site, that being for a ‘general industry, including steel fabrication, grit blasting and painting’– previously used by Manuele Engineering.
The proposed change of land use to accommodate the Public Services Depot is considered to align with industry, office and warehouse uses, all of which are listed as Envisaged Development within the Morphett Precinct.
Following the merit use consultation period, and giving due consideration to any submissions arising from the stakeholder and public consultation process, a detailed assessment of the proposed development against the relevant provisions of the Adelaide Airport Master Plan 2014 will be undertaken by Adelaide Airport Ltd.
AECOM
West Torrens Council Public Services Depot
Planning Report - West Torrens Council Public Services Depot, Morphett Precinct
Revision DC – 07-Jul-2017 Prepared for – Adelaide Airport Limited – ABN: 78075176653
Appendix A
Existing Site and Building Plans
Plot Date:
Cover Sheet Site Location PlanSHEET:
Architecture Interior DesignGIORDANO & ASSOCIATES
SHEET TITLE: DATE:SCALE:
CHECKED:DRAWN:
DWG. NO.: REV:
All dimensions to be verified on site and any discrepanciesreported to the Architect prior to proceeding with any work C COPYRIGHT
194 Glynburn Road, Tranmere SA 5073Ph: (08) 8332 3777 Fax: (08) 8332 7627
Email : giordano@giordanoassociates.com.au 4/06/2009
A06/20/AG
JUNE 09
1.1.1
1.1.1
A1REV. DATE DESCRIPTION
MANUELE ENGINEERS HEADQUARTERSCnr. MORPHETT & JAMES MELROSE ROADS, ADELAIDE AIRPORT
PRELIMINARY (APPROVAL ISSUE)A 11/9/2008
B 19/11/2008 CLIENT & CONSULTANT ISSUE FOR REVIEW
C 1/12/2008 TENDER ISSUE
ECONSTRUCTION ISSUE
1:714.3, 1:125, 1:0.9
D 5/5/2009 CONSTRUCTION ISSUEArchitecture Interior DesignGIORDANO & ASSOCIATES
194 Glynburn Road, Tranmere SA 5073 Ph: (08) 8332 3777 Fax: (08) 8332 7627Email : giordano @giordanoassociates.com.au
MANUELE ENGINEERS HEADQUARTERSCNR. MORPHETT & JAMES MELROSE RDS. ADELAIDE AIRPORT
PLEASE NOTE: INTERIOR DETAIL DRAWINGS REGISTER LISTED ON DRAWING No.A06/20/6.1HYDRAULIC DRAWINGS REGISTER LISTED ON DRAWING No.C06020/H1.1
BAY1
BAY2
BAY3
BAY4
BAY5
ADELAIDEAIRPORT
FACTORY
DEDICATEDSPRAY AREA
Special Finishes
WASH DOWN BAY
JA
ME
S
ME
LR
OS
E
RO
AD
M O R P H E T T R O A D
5 CARPARKING
BAY
ENTRYGATES
OFFICE2STOREY
OFFICE CARPARK 21 CARS
FACTORY CARPARK 110 CARS
WASTE TRANSFER STATION
D1
720
2,040
D.P
PCF150
SC
SF
CF
NOTES:KEY TO SITE PLAN150mm THICK PRECAST CONCRETE PANEL FENCEReinforced concrete wall to Engineer's spec.External Class 2 finish as specifiedColour Grey
STEEL SCREEN COLUMN150SHS Steel Column as part of Steel ScreenRefer to detail drawings
FIRE HYDRANTSTwin head Refer to Engineers' Documentation
GATE as per scheduleD Door1 Door numberNote Dimensions are nominal only
100mm or 150mm DIAMETER COLORBOND DOWNPIPEColour to selection Rainwater Head to selection
STEEL FENCING (FABRICATED)2400mm high Steel Fencing as per Fabricators' detailsHot Dip Galvanised Steel Finish
COLORBOND FENCING (W/BARB WIRE)2400mm high Colorbond 'Good Neighbor' Fencingw/3 x lines of Barbwire above (150mm spacing)50mm SHS Duragal posts in min. 600mm deep concrete
CONCRETE BLOCK PAVING400x400x40mm thick Concrete Block Paving60mm thick to DrivewaysRefer To Engineers' documentation & detailsBest Pavers 'New Dimension' Charcoal or equivalent
LANDSCAPED PLANTER (600mm HIGH)Refer To Engineers' documentation & detailsPlanting as per Landscaping PlanBoral capping block to top of walls or equivalent
LANDSCAPED BED (150mm HIGH)Refer To Engineers' documentation & detailsPlanting as per Landscaping Plan
PAVING
LandscapedPlanter
Landscaping
FH
Refer to Engineers details for site levels, drainage and details
All dimensions, setouts are to be confirmed on site
Contractor to provide all footings to all Precast Concrete,Colorbond & Steel fencing as per details
IMPORTANT NOTE:Where Noted Dedicated Spray Building Superstructure by Others
Superstructure refers to the following breakdown: Precast Concrete walls Structural Steel (as per Appendix C) Wall & Roof Cladding Reinforced concrete slab Waterproofing to panels Access Doors Second Fix Services & Hardware Any other items as required in the course of general construction to satisfy the
above
ARCHITECTURAL DOCUMENTATION CONSTRUCTION ISSUE MAY 2009
Layout No:
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.1.6
1.1.7
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.2.6
1.2.7
1.2.8
1.2.9
1.2.10
1.2.11
1.2.12
1.2.13
1.3.1
1.3.2
1.3.3
1.3.4
1.4.1
1.4.2
1.5.1
1.5.2
2.1
2.2
2.3
2.4
2.5
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
4.14
4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
5.1
Layout NameMachinery Layout Plan
Cover Sheet Site Location Plan
Site Plan 1
Site Plan 2
Site Plan 3
Site Plan 4
Site Details
Landscaping Plan
Floor Plan Key
Overall Floor Plan
Ground Floor Plan 1
Ground Floor Plan 2
Ground Floor Plan 3
Ground Floor Plan 4
Ground Floor Plan 5
Ground Floor Plan 6
Ground Floor Plan 7
Ground Floor Plan 8
Ground Floor Plan 9
Ground Floor Plan 10
Level 1 Plan
Roof Plan Office
Roof Plan Factory 1
Roof Plan Factory 2
Roof Plan Details
Floor Finishes Plan Ground Floor
Floor Finishes Plan Upper Floor
Reflected Ceiling Plan Ground
Reflected Ceiling Plan Upper
South Elevation
North Elevation
East Elevation
West Elevation
Dedicated Spray Building (Special Finish)
Section S/1
Section S/2
Section S/3
Section S/4
Section S/5
Section S/6 & S/8
Section S/7 & S/9
Section S/18A
Section S/18B
Section S/10
Section S/11
Section S/12
Section S/13 & S/15
Section S/16 & S/17
Stair Details
Stair Details
Stair Details
Screen Details
Screen Details
Screen Details
Screen Details
Atrium Details
Atrium Details
Plan Details
Plan Details
Plan Details Bunkers
Plan Details Bunkers
Plan Details Bunkers
Plan Details Bunkers
Section Details
Section Details
Section Details
Section Details
Section Details
Section Details
Section Details
Aluminium Window & Door Schedule
Size
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
Date
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
MAY 09
Rev
E
D
D
D
D
D
D
C
D
D
D
E
D
D
D
D
D
D
D
D
C
C
C
C
D
D
D
D
D
D
C
C
D
C
C
C
C
C
C
C
C
C
C
D
C
C
C
D
D
D
C
C
C
C
C
C
C
C
D
D
D
D
C
C
C
C
C
C
C
D
Site Location Plan1
NTS
Plot Date:
Site Plan 1SHEET:
Architecture Interior DesignGIORDANO & ASSOCIATES
SHEET TITLE: DATE:SCALE:
CHECKED:DRAWN:
DWG. NO.: REV:
All dimensions to be verified on site and any discrepanciesreported to the Architect prior to proceeding with any work C COPYRIGHT
194 Glynburn Road, Tranmere SA 5073Ph: (08) 8332 3777 Fax: (08) 8332 7627
Email : giordano@giordanoassociates.com.au 4/06/2009
A06/20/AG
JUNE 09
1.1.2
1.1.2
A1REV. DATE DESCRIPTION
MANUELE ENGINEERS HEADQUARTERSCnr. MORPHETT & JAMES MELROSE ROADS, ADELAIDE AIRPORT
PRELIMINARY (APPROVAL ISSUE)A 11/9/2008
B 19/11/2008 CLIENT & CONSULTANT ISSUE FOR REVIEW
C 1/12/2008 TENDER ISSUE
DCONSTRUCTION ISSUE
1:2000, 1:200
D 5/5/2009 CONSTRUCTION ISSUE4 32
DWG. No.A0620/1.1.5
DWG. No.A0620/1.1.4
DWG. No.A0620/1.1.3
PCF150
PCF150
PCF
150
PCF
150
PCF150
PCF
150
PCF150
PCF
150
XA
XB
XC
XE
XF
XG
XH
XI
X1X2X3X4X5X6X7X8X9X10X11X12X13
XD
dp
dp
dp
dp
dp
dp
dp
dp
dp
3,150 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 4,000 2,500 3,200
2,400 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500
4,600
6,200
5,500
900
1,900
415
5,920
1,117
3,000
3,000
7,200
R = 6,300
8,600
3,100 3,000 1,900 15,040
7,037
2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400
6,000 6,000 6,000 6,000 6,000 6,000
5,500
150 GAP 5,025 150 726
3,950
6,095
2,000
150
6,087
6,095
3,950
6,095
6,095
6,095
3,950
82,99
4
2,827
900
3,727
900
1,100 3,920 180 3,920
FACTORY STAFFCOURTYARD
Stobie PoleStobie Pole
JA
ME
S
ME
LR
OS
E
RO
AD
M O R P H E T T R O A DNew Crossover toEngineers' details
OFFICE2STOREY
FACTORY FACTORY
1234567891011
121314151617181920
21
ETSATRANSFORMER
OFFICE CARPARK 21 CARS
MC
New footpath by others New footpath by others
SF
SF
SF
SF
SF
LIQUIFIEDOXYGEN
TANK
SF SF SF SF SF SF
VISITOR
150SHS Steel column ofScreen Frame
SFSF
SF
SF
SF
SLIDING GATE
Sliding Gate Motor
Steel framed sliding gateon steel track as per details
Steel Fence aroundETSA TransformerEasement refer toEngineer's documentation
VISITORVISITORVISITORVISITOR
Carpark linemarkingas shown
Carpark linemarkingas shown
Liquified Oxygen Tank onconcrete pad base as persuppliers' detailsBY OTHERS
38
2345
1200x2400mm highsteel framed entry gate
as per details
2400mm high steelfence panels between
posts as per details
Selected concreteblock paving to
2100mm wide path
SF SF
SF
SFSFSF
SF
SF
SF
landscaping
landscaping
landscaping landscaping landscaping
landscaping landscaping landscaping landscaping
landscaping
landscapinglandscapinglandscaping
FIREBRIGADEBOOSTER
Fire Brigade BoosterConnection & Cabinet
as per Engineers' details
landscapingConcrete kerbing
PAVING
PAVING PAVING
60mm PAVING
PAVING
PAVINGPAVINGPAVING
394041424344454647484950515253
1
Kerb Ramp w/tactileindicators to AS1428
landscaping landscaping
SF
SF
Steel panel fence attachesto screen frame of building
New footpath by others
New
footpa
th by
othe
rsNe
w foo
tpath
by ot
hers
New
footpa
th by
othe
rs
New Crossover toEngineers' details
Broken line of proposednew line of roadway
(by others)
PAVING PAVING
PAVI
NGPA
VING
PAVI
NG
PAVING
FHRFH
FH
SF
landscaping
landscapedplanter
lands
capin
g
lands
capin
g
lands
capin
g
lands
capin
g
lands
capin
glan
dsca
ping
lands
capin
g
lands
capin
g
PAVING
Single concrete blockpavers set between selectedgravel pathway
Concrete kerbing togroung level planter bed
Concrete kerbing togroung level planter bedin front of raised planter
Raised planter bedas per Engineers' details
lands
capin
glan
dsca
ping
lands
capin
glan
dsca
ping
lands
capin
glan
dsca
ping
New
footpa
th by
othe
rs
Feature steel bladesfixed to concrete wall
panel as per fabricators'details (typical)
Steel column support to150mm thick precastconcrete walls as per
Engineers' details (typical)
150mm thick precastconcrete wall panels
as per Engineers' details(typical)
landscapedplanter
landscapedplanter
landscapedplanter
landscapedplanter
Raised planter bedas per Engineers' details
Concrete kerbing togroung level planter bedin front of raised planter
Concrete kerbing togroung level planter bed
Single concrete blockpavers set between selectedgravel pathway
landscaping
SF
SF
SF
2 x Bushmans (T6500Rnd)above ground rainwater tanksw/associates pump, etc. as perEngineerss details All insidefenced enclosure
30,000LRAINWATER
TANK
30,000LRAINWATER
TANK
SFSFSF
SFSFSF
SFSF
SF
landscaping
Mountable concrete kerbfor vehicular access toExecutive Garages
dp dp dp dp dp dp dp dp dp
dp
dp
dp
Plot Date:
Site Plan 2SHEET:
Architecture Interior DesignGIORDANO & ASSOCIATES
SHEET TITLE: DATE:SCALE:
CHECKED:DRAWN:
DWG. NO.: REV:
All dimensions to be verified on site and any discrepanciesreported to the Architect prior to proceeding with any work C COPYRIGHT
194 Glynburn Road, Tranmere SA 5073Ph: (08) 8332 3777 Fax: (08) 8332 7627
Email : giordano@giordanoassociates.com.au 4/06/2009
A06/20/AG
JUNE 09
1.1.3
1.1.3
A1REV. DATE DESCRIPTION
MANUELE ENGINEERS HEADQUARTERSCnr. MORPHETT & JAMES MELROSE ROADS, ADELAIDE AIRPORT
PRELIMINARY (APPROVAL ISSUE)A 11/9/2008
B 19/11/2008 CLIENT & CONSULTANT ISSUE FOR REVIEW
C 1/12/2008 TENDER ISSUE
DCONSTRUCTION ISSUE
1:2000, 1:200
D 5/5/2009 CONSTRUCTION ISSUE
14 3DWG. No.
A0620/1.1.5DWG. No.
A0620/1.1.4
DWG. No.A0620/1.1.2
C
D
E
F
dp
dp
5,500
14,29
75,4
002,6
46
44,322
2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400
2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 3,500 7,730 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000
27,01
4
2,400 2,400
2,400 2,400 2,4002,400
2,4002,400
2,4002,400
2,4002,400
2,400
2,400
2,400
2,400
2,400
2,400
2,400
2,400
2,400
2,400625 2,5
00
18,73
5
6,214
10,362
10,362
10,285
5,644
21,30
021
,300
21,10
0
5,000
5,000
WASHDOWNBAY
FACTORY
345678910
landscapinglandscapinglandscapinglandscapinglandscapinglandscapinglandscapinglandscaping
landscaping
landscaping
landscaping
landscaping
PAVINGPAVINGPAVING
4647484950515253545556575859606162636465666768697071727374757677787980818283848586878889909192
11
1213141516171819202122232425262728293031323334353637
939495969798
99100
101102
103104
105
106
107
108
109
110
CF
CFCFCF
CFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCF
3200x2400mm highsteel framed entry gates
w/Colorbond cladding 2400mm high Colorbondsheet fencing w/barbwireas per details
CFCFCF
CF
FACTORY CARPARK 110 CARS
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CFCF
CF
CF
CF
CFCF
CFCFCF
CF
CFCF
CFCF
CF
CF
CF
Kerb Ramp w/tactileindicators to AS1428
landscaping landscaping landscaping
Concrete sleeper retaining wallalong boundary (shown dotted) below Colorbond fenceas per Engineers' details
Concrete sleeper retaining wallalong boundary (shown dotted) below Colorbond fenceas per Engineers' details
Concrete sleeper retaining wallalong boundary (shown dotted) below Colorbond fenceas per Engineers' details
OIL SEPARATOR
FHFH
Roadway continues toExisting Bridge to AdelaideAirport by Others
CF CF
Setdown & Drainage toWash Down Bay as perEngineers' details
dp dp dp dp dp dp dp
Plot Date:
Site Plan 3SHEET:
Architecture Interior DesignGIORDANO & ASSOCIATES
SHEET TITLE: DATE:SCALE:
CHECKED:DRAWN:
DWG. NO.: REV:
All dimensions to be verified on site and any discrepanciesreported to the Architect prior to proceeding with any work C COPYRIGHT
194 Glynburn Road, Tranmere SA 5073Ph: (08) 8332 3777 Fax: (08) 8332 7627
Email : giordano@giordanoassociates.com.au 4/06/2009
A06/20/AG
JUNE 09
1.1.4
1.1.4
A1REV. DATE DESCRIPTION
MANUELE ENGINEERS HEADQUARTERSCnr. MORPHETT & JAMES MELROSE ROADS, ADELAIDE AIRPORT
PRELIMINARY (APPROVAL ISSUE)A 11/9/2008
B 19/11/2008 CLIENT & CONSULTANT ISSUE FOR REVIEW
C 1/12/2008 TENDER ISSUE
DCONSTRUCTION ISSUE
1:2000, 1:200
D 5/5/2009 CONSTRUCTION ISSUE42 1
DWG. No.A0620/1.1.5
DWG. No.A0620/1.1.3
DWG. No.A0620/1.1.2
PCF150
PCF
150
PCF150
PCF
150
PCF150
PCF
150
PCF150
PCF
150
PCF150
PCF
150
PCF
150
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 116 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
dp
7,000
241,860
76,429 3,000 80,710
35,91
0 FRO
M SE
TOUT
26,200 FROM SETOUT
1,850
3,150
2,000
27,000 6508,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000
6,095
6,095
6,095
6,095
6,095
6,095
3,754
1,070 1,480
1,070 1,520
21,17
515
015
014
,000
150
150
3,950
3,950
3,950
3,950
21,47
514
,000
11,95
082
,994
3,950
3,950
6,095
6,095
R 21,483
R 10,111
FACTORY
JA
ME
S
ME
LR
OS
E
RO
AD
WEIGHBRIDGE
ENTRYGATES
FACTORY
CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF
CF
CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF
CF CF CF
PAINTSEPARATOR
New Crossover toEngineers' details
SETOUTPOINT
SLID
ING
GATE
Sliding GateMotor
SLID
ING
GATE
Sliding GateMotor
FH FH
FH
lands
capin
glan
dsca
ping
lands
capin
glan
dsca
ping
lands
capin
glan
dsca
ping
New
footpa
th by
othe
rsNe
w foo
tpath
by ot
hers
New
footpa
th by
othe
rs
lands
capin
glan
dsca
ping
lands
capin
g
New
footpa
th by
othe
rs
Feature steel bladesfixed to concrete wall
panel as per fabricators'details (typical)
Steel column support to150mm thick precastconcrete walls as per
Engineers' details (typical)
150mm thick precastconcrete wall panels
as per Engineers' details(typical)
Feature steel bladesfixed to concrete wall
panel as per fabricators'details (typical)
150mm thick precastconcrete wall panels
as per Engineers' details(typical)
Steel column support to150mm thick precastconcrete walls as per
Engineers' details (typical)
By Others
Concrete works by the Contractorto meet the specifications of Weighbridgecontractor
Mountable concretemedian kerb
dp dp dp dp dp dp dp dp dp dp dp dp dp dp dp
Plot Date:
Site Plan 4SHEET:
Architecture Interior DesignGIORDANO & ASSOCIATES
SHEET TITLE: DATE:SCALE:
CHECKED:DRAWN:
DWG. NO.: REV:
All dimensions to be verified on site and any discrepanciesreported to the Architect prior to proceeding with any work C COPYRIGHT
194 Glynburn Road, Tranmere SA 5073Ph: (08) 8332 3777 Fax: (08) 8332 7627
Email : giordano@giordanoassociates.com.au 4/06/2009
A06/20/AG
JUNE 09
1.1.5
1.1.5
A1REV. DATE DESCRIPTION
MANUELE ENGINEERS HEADQUARTERSCnr. MORPHETT & JAMES MELROSE ROADS, ADELAIDE AIRPORT
PRELIMINARY (APPROVAL ISSUE)A 11/9/2008
B 19/11/2008 CLIENT & CONSULTANT ISSUE FOR REVIEW
C 1/12/2008 TENDER ISSUE
DCONSTRUCTION ISSUE
1:2000, 1:200
D 5/5/2009 CONSTRUCTION ISSUE
2 13
DWG. No.A0620/1.1.3
DWG. No.A0620/1.1.2
DWG. No.A0620/1.1.4
F
G
F
E
D
C
B
A
1
2
3
19 18 17 16 15
A
20 19 18 17 16 15
B
C
dp dp dp
dp
dp
dp
dp
dp
28,49
87,0
006,8
70
38,353
35,565
44,322
5,000
48,440 26,550 8,000 8,000 8,000 8,000 8,000 8,000
7,650
7,650
35,91
321
,000
21,10
021
,300
5,000
5,000
5,000
5,000
5,000
5,000
5,000
15,300
DEDICATEDSPRAY AREA
Special Finishes
WASHDOWNBAY
FACTORY
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CONVEYOR CANOPY
CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF
CF CF
CF CF CF CF CF CF CF CF CF CF CF
COMPRESSORSHELTER
OIL SEPARATOR
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
CF
FH
Setdown & Drainage toWash Down Bay as perEngineers' details
dp dp dp dp dp dp
Plot Date:
Overall Floor PlanSHEET:
Architecture Interior DesignGIORDANO & ASSOCIATES
SHEET TITLE: DATE:SCALE:
CHECKED:DRAWN:
DWG. NO.: REV:
All dimensions to be verified on site and any discrepanciesreported to the Architect prior to proceeding with any work C COPYRIGHT
194 Glynburn Road, Tranmere SA 5073Ph: (08) 8332 3777 Fax: (08) 8332 7627
Email : giordano@giordanoassociates.com.au 4/06/2009
A06/20/AG
JUNE 09
1.2.2
1.2.2
A1REV. DATE DESCRIPTION
MANUELE ENGINEERS HEADQUARTERSCnr. MORPHETT & JAMES MELROSE ROADS, ADELAIDE AIRPORT
PRELIMINARY (APPROVAL ISSUE)A 11/9/2008
B 19/11/2008 CLIENT & CONSULTANT ISSUE FOR REVIEW
C 1/12/2008 TENDER ISSUE
DCONSTRUCTION ISSUE
1:285.7
D 5/5/2009 CONSTRUCTION ISSUE
AC2 AC2
AC2
AC2
AC2 AC2
AC2
AC2
PB9
0a
PC1
75
PC1
75
PC175
PC175
2,400
1,000
DG13
PC175
PC175
2,700600
W10
2,7005,249
W9
2,7001,000
DG49
PC1
50
PB9
0
2,400900
DG9
2,400900
DG8
1,400
2,400
DG22
PB90
PB90a
PC1
75
2,4001,100
DG23
PB9
0a
1,0002,400
DG25
PB90
PB90
2,7001,720
DG.41 PC1
50
W3
W2
W2
1,0007,000 DG43
PC1
75
W1 3,550
2,000
DG44
PB9
0
PB9
0
2,400
900
DG2
PB90a
2,400900
DG1
PB9
0a
PB90
PC150
PB9
0
PB90a
PB9
0
PB9
0
1,0002,400 DG11
PB9
0a
2,700
3,382
GP
2,700
2,510
GP
2,700
1,000
DG16
2,700
1,000
DG48
2,700
3,040
GP
2,700
1,000
DG39
PB90
1,7353,450
DG36
PB9
0
PB90
PB90a
PC175
1,000
2,460
DG27
PC150
6,600
865 W5
FRC
150
3,000
3,110 DG37
PC1
50
2,4002,460
DG32
2,4002,460
DG30
2,4002,460
DG31
PC1
50
6,600
865 W6
FRC
150
6,600
865 W7
FRC
150
1,000
2,460
DG26
PB90a
PB90a
PB9
0a
PB90a
PB9
0a
1,330
2,700
WG1
1,255
2,700
WG22,000
2,700
DG33 PC1
75
2,400
1,000
DG29
PB90
2,7001,698
WG5
2,700
1,710 WG3
2,7001,710
WG4
1,7002,700
DG42
1,710
2,700
WG6
1,710
2,700 WG7
1,490
2,700 WG8
2,700
1,000 DG15
PB90 PB90a
PB90
PB90a
PC150
W4
1,000
7,000
DG40
PB3
5
PB90a
1,000
2,400
DG10
PB90
5,000
1,800
SL
5,000
1,800
SL
5,000
1,800
SL
5,000
1,800
SL
5,000
1,800
SL
5,000
1,800
SL
5,000
1,800
SL
5,000
1,800
SL
5,000
1,800
SL
5,000
1,800
SL
5,000
1,800
SL
5,000
1,800
SL
PC1
75
1,100
3,600
WF21
2,100
900
DW3
900
2,100
DW5
900
2,100
DW6
900
2,100
DW7
900
2,100
DW8
3,000
3,560
DF9
3,000
3,560
DF7
3,000
3,560
DF8
900
2,100
DW9
3,000
3,560
DF6
3,000
3,560
DF10
3,000
3,560
DF11
1,8004,000
SL
1,8004,000
SL
1,8004,000
SL
1,8004,000
SL
1,8005,000
SL
12,00010,000
DF17
12,00010,000
DF16
6,5005,000
DF12
7,0007,000
DF13
7,0007,000
DF14
7,0006,000
DF15
9002,100 DW10
9002,100 DW11
6,5004,500
DF18
2,100900
DW4
9002,400
DW20
DW19
4,0001,800
SL
4,0001,800
SL
8,0007,000
DF4
9,0007,000
DF3
9,0007,000
DF2
2,100900
DW2
2,100900
DW1
8,0007,000
DF1
1,800
1,200
WF6
1,800
1,200
WF5
1,800
1,200
WF4
1,800
1,200
WF3
1,800
1,200
WF2
1,800
1,200
WF1 2,700
2,000
DG34
1,280
1,260
DG35
2,400
900
DW13
PC175
PB3
5
PB3
51,0
002,4
00
DG20
PB90
1,0002,700
DG18
1,0002,700
DG19
1,0002,700
DG50
2,7001,000 DG38
PB9
0
PB90c
PB9
0
PB90a
PB35
PB35
PB9
0b
PB90b
PB90a
PB90
PB9
01,0
002,4
00
DG17
2,4001,000 DG24
1,0002,400
DG21
8002,400
DG47
2,400800
DG46
1,000
2,400
DG28
PC150
2,400
900
DG4
PB90a
2,400
900
DG3
PB90a
PB90a
1,0002,700
DG5
PB9
0a
PB90c
3,000
1,000
WF15
1,000
3,000
WF16
2,100900
DW17
DW15
DW16
PC1
50
PC150
PB35
PB3
5
PB35
PB35 PB35 PB35
PB35 PB35
3,000
1,200
WF13
1,200
3,000
WF14
2,100900
DW14
3,000
1,000
WF17
1,000
3,000
WF18
2,100900
DW18
8,0007,000
DF5
1,0002,400 DG6
PB9
0a
1,0002,400
DG14
1,000
2,400
DG7
PB90a
PB9
0
PB90a
PB90a
2,400
900
DG45
PB9
0 PB90
2,400
1,640
DG12
PB90 PB90
PC
175
C1
C1
C1
C1
C1
C1
C1 C1 C1 C1
C1
C1
C1
UP
UP
UP
UP
TB
TB
TB
TB
XA
XB
XC
XG
XH
XI
X2X3X5X6X7X8X9X10X11X12X13
XD
19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
A
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
B
C
D
E
F
RE
F.
SB
CW
T
SB
C3
C3
D/W
F
D/W
F
F
AC
AC
AC
AC AC
AC
AC
AC
TB
TB
C1
C1 C1
C1
C1
C1
C1
C1
C1
C1 C1
C1
C1
C1
C1
C1
RE
F.
SB
CW
T
SB
RE
F.
SB
CW
T
C1 C1 C1
C1 C1 C1
C1
C1
TB
19 18 17 16 15 14 13 12 11 10 9 820 19 18 17 16 15 14 13 12 11 10 9 8
A
B
C
D
E
dp
dp
dp
dp
dp
dp dp dp
dp
dp
dp
dp
dp
PD14.10
PD34.10
PD64.10
PD74.10
PD84.10
PD104.10
PD44.10
PD54.8
PD94.10
PD224.11
PD184.14
PD174.14
PD144.12
PD154.13
PD134.12
PD204.15
PD164.13
PD194.15
PD114.10
PD214.10
PD274.10
PD124.10
PD314.11
PD314.11
1,853
8,370
1,556
6,815
1,873
7,869
7,868
1,425
1,4258,2508,3008,3008,3001,4256,2257,3867,5007,5003,8152,175
175
1,425
642,3
5864
2,999
64
1,425
600
641,8
3064
1,837
641,0
2664
1,425
644,1
0017
561
164
600
1,690
3517
5 954
175
848
175 85
817
53,0
9615
0
954
175
848
175 85
817
53,0
9615
0
954
175
848
175 85
817
53,0
9615
0
150
6,760
8,000
6,090
150
6,815
8,000
7,150
900
4,600
9,100
12,24
99,0
004,6
5090
01,5
508,0
0060
617
511
,638
175
21,00
073
,671
11,81
317
5
150
2,000
150
152,000
175
1,748
150
5064
3,551
641,6
8964
1,110
613
645,7
4864
150
1,503
150
50 643,4
1464
1,826
641,1
2364
5,185
644,6
5264
2,336
6410
,771
644,7
3115
01,2
25
1501,0751505,868643,536644,40835175
2,4001751,213644,066641,931648481,891351506,3501501,075150
2,418 2,850 2,700 2,700
1,225 7,030 9,795 2,750 14,125 1,225
7,510
644,7
3115
01,0
7515
0
4,257
642,0
0764
5,913
150
1,225
10,57
064
1,700
150
12,20
164
1,700
150
2,460
812
2,460
812
2,460
2,526
1,900 150 11,670 64 8,397 CHANGEROOM 64 1,739 64 1,243 64 1,736 64 1,981 64 1,981 64 4,692 175 1,646 64 13,439 FACTORY STORE 64
150 11,670 64 6,962 175 1,260 641,273 SHR.
64 3,509 AMENITIES 64 4,026 WASH TROUGHS 64 2,142 2,500 STAIR50
175 3,613 FIRST AID 64
150 8,616 35150
1,100 175 5,266 64 3,290 175 15,115 64 3,626 CLEANER 64
150
1,850
150
570
1,360
570
150
2,200150 64
2,468
2,184
64
1,258
175
1,725
642,9
9764
2,060
64
1,830
3,750
STA
IR50
90
1,200
1,425
6492
664
4,431
64
5,553
3515
0 1,115
3515
01,9
00
64 1,506 64 16,404 150 1,075 150
64 1,506 64 6,494 64 9,846 150 1,225
175 2,286 175 35 3,09364
3,40364
9,096 STAFF 150
8,0008,0008,0008,0008,0008,0008,0008,0008,0008,0008,0008,0008,0008,0008,0008,0008,0008,000
1503,70090031,10090031,10090028,3009006,5001753,630903,630175
300
1753,630903,630175
300
1753,630903,6301756,5009008,750150150
17548,3005,70085,3005,000150
2,000 150 4,250 150 1,000150
2,000 5,700
150
2,000
150
2,300
2,000 150 1,370 1,000 150 2,880 150
2,000 5,700
150
2,000
150
2,300
2,000 150 4,250 150 1,000 150
2,000 5,700
150
2,000
150
2,300
2,000 150 2,370 150 2,880 150
2,000 5,700
2,000 150 4,250 150 1,000150
2,000 5,700
2,300
150
2,000
150
150
2,000
150
2,300
150 2,370 150 2,880 150
2,000 5,700
150
1,265
175
560
150
150
2,000
150
2,300
150 4,850 150 3,0005,150 3,000
150
2,000
175
2,150
8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000
150 1,650 5,000 3,000 5,000 3,000 5,000 3,000 5,000 3,000 5,000 3,000 5,000 3,000 5,000 3,000 5,000 3,000 5,000 3,000 5,000 3,000 5,000 1,500 1,500 5,000 1,500
21,00
021
,100
21,30
021
,300
21,10
0
150
150
1,515
5,000
4,300
7,000
3,450
1,250
7,000
1,500
6,000
3,250
900
1,850
4,000
1,000
10,00
065
04,0
002,0
004,0
0065
010
,000
1,000
4,000
3,635
4,500
2,000
900
10,98
515
0
21,00
021
,100
21,30
021
,300
21,36
915
0
4,258 4,258 4,258 4,258 4,258 4,258 455 150
25,700 305
150
205
360
6,155
6,515
150
1,345
175
4,000
64 1,376 64 1,476 64
1,110
613
641,5
6864
641,6
2664
641,1
2364
1,170
64 2,226 DIS G.1 64
4,000
175 2,675 150 5,000 150
175 775 900 1,550 3,600 1,000 150
8,000
S/133.13
S/133.13
S/153.13
S/153.13
S/14#LayID
S/14#LayID
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
C1
C1
C1
SC
SC
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
ATRIUM
ARCHIVESG.1FIRST AID
G.1
CHANGE ROOMG.1
STAFF ROOMG.2 KITCHEN G.2
CLEANERG.2
AMENITIES G.1
SHOWERG.1
ENTRYG.1
WASH TROUGHSG.1
FACTORY STOREG.1
FEMALE G.2
EXECUTIVEGARAGE
G.1
PRINT ROOMG.1
SERVERG.1
FILES G.1
STAFF ROOMG.1
MALE G.1
DISG.1.
KITCHEN G.1
CLNR.G.1
ENTRYG.2
MEETINGROOM
G.1OFFICE
G.1OFFICE
G.2
GYMNASIUMG.1
STOREG.2
ARCHIVESG.2
STOREG.1
VOIDOVER
VOIDOVER
VOIDOVERENTRY
G.3
Canopyover
MALE G.2
OPEN OFFICE AREAG.1
STAIR G.1
STAIR 3
STAIR 4
STAIR 5
FHRDB
DB
2100x900mmfloor m
at
STAIR 2
1200
x900
mmflo
or m
at
M S B
FHR
LIFT
Canopyover
Canopyover
Canopyover
1200x
900mmfloor mat
HDTD TDHD
HDTD
SHOWERG.2
PP
HD
P P
HD
HD
FEMALEG.1
HD
UP
HWS
HWS
HWS
FHR
BAY1
BAY2
BAY3
BAY4
BAY5
DBDB
DBDB HD
DBDB HD
DBDB
HD
OFFICE BUNKER G.1
BAY1
BAY2
BAY3
BAY4
BAY5
OFFICE BUNKER G.2
OFFICE BUNKER G.3
OFFICE BUNKER G.5
OFFICE BUNKER G.4AMENITY BUNKER G.3
AMENITY BUNKER G.2
AMENITY BUNKER G.1
FIRE VALVE
G.1
PAINT STORE G.1PAINT STORE G.2PAINT STORE G.3
slidin
g doo
rs
FHR
FHR
FHR
FHR
FHR
FHR
FHR
FHR
FH
FH
FH
FH
FH
FH FH
FHFH
D E D I C A T E D S P R A Y A R E A
DBDB
DBDB
FH
DB
225mm diameter PVC internaldownpipe protected w/1500mm high,
6mm thick, folded galv. steel plate boltedto concrete wall @ 400centres w/M12 bolts
dpdp
225mm diameter PVC internaldownpipe protected w/1500mm high,
6mm thick, folded galv. steel plate boltedto concrete wall @ 400centres w/M12 bolts
Line of steel framed canopyover as per details
Exposed steel framing to bepainted in selected finish (typical)
BROKEN LINE OF STEEL FRAMED SCREEN AS PER DETAILS BROKEN LINE OF STEEL FRAMED SCREEN AS PER DETAILS
BROK
EN L
INE
OF S
TEEL
FRA
MED
SCRE
EN A
S PE
R DE
TAIL
SBR
OKEN
LIN
E OF
STE
EL F
RAME
D SC
REEN
AS
PER
DETA
ILS
BROKEN LINE OF STEEL FRAMED SCREEN AS PER DETAILS
BROK
EN L
INE
OF S
TEEL
FRA
MED
SCRE
EN A
S PE
R DE
TAIL
S150SHS column of steelframed screen as per details
100mm diameterColorbond downpipe
w/matching proprietarystainless steel
brackets (typical to Office)
Selected Colorbond GarageRoller doors w/remote automaticopeners
90/90/90 Door & Steel Frame
25mm recess castinto slab w/alum. angles
25mm recess castinto slab w/alum. angles
25mm recess castinto slab w/alum. angles
2100x900mmfloor mat
1200
x900
mmflo
or m
at
90/90/90 Door & Steel frame toFactory Store Room Servery door
CONVEYOR CANOPY G.1
Lift as specified
100mm diameterColorbond downpipew/matching proprietarystainless steelbrackets (typical to Office)
150mm diameterColorbond downpipe
I N D I C A T I V E F U R N I T U R E L A Y O U T O N L Y
HD
3600x2000mmfloor mat 25mm recess cast
into slab w/alum. angles
Line of 150mm thick precastconcrete panel over
Fabricated steel louvre screenw/100x100mm angle frameand fully welded folded steel finsas per details
150mm thick precast concrete wall panel
Steel portal frame of Factory asper Engineers' documentation
Colorbond Trimdek wall claddingscrew fixed to 200Z girts aboveprecast panel wall
Line of Factory Equipment by Others
Line of Steel Frame overFabricated steel louvre screenw/100x100mm angle frameand fully welded folded steel finsas per details
150mm thick precast concrete wall panel
Steel portal frame of Factory asper Engineers' documentation
Colorbond Trimdek wall claddingscrew fixed to 200Z girts aboveprecast panel wall
Line of Factory Equipment by Others
Line of Steel Frame over
BAY1
BAY2
BAY3
BAY4
BAY5
Fabricated steel louvre screenw/100x100mm angle frameand fully welded folded steel finsas per details
150mm thick precast concrete wall panel
Steel portal frame of Factory asper Engineers' documentation
Colorbond Trimdek wall claddingscrew fixed to 200Z girts aboveprecast panel wall
Line of Factory Equipment by Others
Line of Steel Frame over
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
Concrete panel walls & roofto Bunker as per details
Concrete panel walls & roofto Bunker as per details
Concrete panel walls & roofto Bunker as per details
Concrete panel walls & roofto Bunker as per details
Concrete panel walls & roofto Bunker as per details
Concrete panel walls & roofto Bunker as per details
150mm thick precast concrete wall panel
Steel portal frame of Factory asper Engineers' documentation
Colorbond Trimdek wall claddingscrew fixed to 200Z girts aboveprecast panel wall
Line of Steel Frame over
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
Steel framed sliding door as per Fabricators'details w/Trimdek wall cladding
Steel portal frame of Factory asper Engineers' documentation
Line of Steel Frame over
Steel portal frame of Factory asper Engineers' documentation
Line of Steel Frame over
Fabricated steel louvre screenw/100x100mm angle frame
and fully welded folded steel finsas per details
150mm thick precastconcrete wall panel
Steel portal frame of Factory asper Engineers' documentation
Colorbond Trimdek wall claddingscrew fixed to 200Z girts above
precast panel wall
Line of Factory Equipment by Others
Line of Steel Frame over
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
Steel framed sliding dooras per Fabricators'
details w/Trimdek wall cladding
150mm thick precastconcrete wall panel
Steel portal frame of Factory asper Engineers' documentation
Colorbond Trimdek wall claddingscrew fixed to 200Z girts above
precast panel wall
Line of Steel Frame over
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
Steel framed sliding dooras per Fabricators' detailsw/Trimdek wall cladding
Colorbond roller door to selection
Fabricated steel louvre screenw/100x100mm angle frame
and fully welded folded steel finsas per details
Fabricated steel louvre screenw/100x100mm angle frame
and fully welded folded steel finsas per details
Colorbond roller door to selection
Colorbond roller door to selection
Steel portal frame of Factory asper Engineers' documentation
Line of Steel Frame over
Colorbond roller door to selection
Concrete panel walls & roofto Bunker as per details
175mm thick Fire Separation wall betweenFactory & Dedicated Spray Area (typical)
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
175mm thick Fire Separation wall betweenFactory & Dedicated Spray Area (typical)
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
175mm thick Fire Separation wall betweenFactory & Dedicated Spray Area (typical)
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
175mm thick Fire Separation wall betweenFactory & Dedicated Spray Area (typical)
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
Line of Factory Equipment by Others
150mm thick precastconcrete wall panel
Colorbond Trimdek wall claddingscrew fixed to 200Z girts above
precast panel wall
150mm thick precastconcrete wall panel
Colorbond Trimdek wall claddingscrew fixed to 200Z girts above
precast panel wall
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
Selected Roller Grilles to Paint Storage area150x50mm nonloadbearingRHS Steel columnas fixing for roller grille tracks
Line of Cantilevered Steelbeam to Canopy over
Colorbond Trimdek wall claddingscrew fixed to 150Z girts
150mm diameter Colorbond downpipe
150mm diameter PVC downpipew/proprietary s/steel brackets
150mm thick precast concrete wall panel
Steel portal frame of Factory asper Engineers' documentation
Colorbond Trimdek wall claddingscrew fixed to 200Z girts aboveprecast panel wall
Line of Steel Frame over
150mm thick precast concrete wall panel
Colorbond Trimdek wall claddingscrew fixed to 200Z girts aboveprecast panel wall
Line of Steel Frame overSteel portal frame of Factory asper Engineers' documentation
1200mm highstud wall Line of bridge over
HWS1.1
TIMECLOCK
1200x1800mmfloor mat
TEA G.1
100mm diameterColorbond downpipew/matching proprietarystainless steelbrackets (typical to Office)
Steel column of screenas per details
150x50 Capral flushglazesuite aluminium framedglazing
Glass filler between endof partition wall & perimeter
glazing as per details
Steel framed stairsas per details
Broken line denotesacoustic panelling A17 towall as per Internal details
100x50 Capral flushglazesuite aluminium framedglazing
100x50 Capral flushglazesuite aluminium framedglazing
Broken line denotes 100mm gapbetween Office structure &factory structure as per details
Steel lockers to selection
Aluminium framed windoww/laminated clear glass
150mm diameter PVC downpipew/proprietary s/steel brackets
150mm diameter PVC downpipew/proprietary s/steel brackets
150mm diameter PVC downpipew/proprietary s/steel brackets
150mm diameter PVC downpipew/proprietary s/steel brackets
All plumbing to beconcealed in walls to
this area
Full height panel
S/053.5
S/053.5
S/013.1
S/013.1
S/073.7
S/073.7
S/083.6
S/083.6
S/093.7
S/093.7
S/123.12
S/123.12
S/113.11
S/113.11
S/043.4
S/043.4
S/063.6
S/063.6
S/033.3
S/033.3
S/183.8
S/183.8
PC 175
2,100
900
DW23
PC 175 PC 175 PC 175 PC 175
2,100
900
DW25
PC 175 PC 175 PC 175 PC 175
2,100
900
DW24
PC 175 PC 175 PC 175 PC 175
2,100
900
DW21
PC 175 PC 175 PC 175 PC 175 PC 175
3,600
1,200
WF20
1,200
3,600
WF19
PC175
GF
GF
GF
GF
GF GF GF GF GF
PB90
PC175 PC175
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
UP
XE
XF
X1X4
C1
C1
PD24.10
R = 4,800
R = 3,000
1,800
FHR
ALL STEELWORK ALONG DIVIDING WALL BETWEEN OFFICE & FACTORY TO BE PROTECTED W/SELECTED INTUMESCENT PAINT AS SPECIFIED LEVEL OF PROTECTION TO GAIN FRL OF 90/90/90
IMPORTANT NOTE:CONTRACTOR TO ALLOW FOR CONCRETE LINED PIT
UP TO 2400mm DEEP UNDER BROKEN LINE OF MACHINERYBETWEEN GRID 19 & GRID 15 TO BE ADVISED BY THE OWNER
dp dp dp dp dp dp dp dp dp dp dp dp dp dp
dp dp dp dp dp
dp dp dp dp dp dp dp dp dp dp dp dp dp
dp
dp
dp
S/023.2
S/023.2
S/103.10
S/103.10
Ground Floor Plan
NTS
Plot Date:
Ground Floor Plan 1SHEET:
Architecture Interior DesignGIORDANO & ASSOCIATES
SHEET TITLE: DATE:SCALE:
CHECKED:DRAWN:
DWG. NO.: REV:
All dimensions to be verified on site and any discrepanciesreported to the Architect prior to proceeding with any work C COPYRIGHT
194 Glynburn Road, Tranmere SA 5073Ph: (08) 8332 3777 Fax: (08) 8332 7627
Email : giordano@giordanoassociates.com.au 4/06/2009
A06/20/AG
JUNE 09
1.2.3
1.2.3
A1REV. DATE DESCRIPTION
MANUELE ENGINEERS HEADQUARTERSCnr. MORPHETT & JAMES MELROSE ROADS, ADELAIDE AIRPORT
PRELIMINARY (APPROVAL ISSUE)A 11/9/2008
B 19/11/2008 CLIENT & CONSULTANT ISSUE FOR REVIEW
C 1/12/2008 TENDER ISSUE
DCONSTRUCTION ISSUE
1:100
D 5/5/2009 CONSTRUCTION ISSUE
AC2 AC2
AC2
AC2
AC2 AC2
AC2
AC2
PB9
0a
PC1
75
PC1
75
PC175
PC175
2,400
1,000
DG13
PC175
PC175
2,700600
W10
2,7005,249
W9
2,7001,000
DG49
PC1
50
PB9
0
2,400900
DG9
2,400900
DG8
1,400
2,400
DG22
PB90
PB90a
PC1
75
2,4001,100
DG23
PB9
0a
1,0002,400
DG25
PB90
PB90
2,7001,720
DG.41 PC1
50
W3
W2
W2
1,0007,000 DG43
PC1
75
W1 3,550
2,000
DG44
PB9
0
PB9
0
2,400
900
DG2
PB90a
2,400900
DG1
PB9
0a
PB90
PC150
PB9
0
PB90a
PB9
0
PB9
0
1,0002,400 DG11
PB9
0a
2,700
3,382
GP
2,700
2,510
GP
2,700
1,000
DG16
2,700
1,000
DG48
2,700
3,040
GP
2,700
1,000
DG39
PB90
1,7353,450
DG36
PB9
0
PB90
PB90a
PC175
1,000
2,460
DG27
PC150
6,600
865 W5
FRC1
50
3,000
3,110 DG37
PC1
50
2,4002,460
DG32
2,4002,460
DG30
2,4002,460
DG31
PC1
50
6,600
865 W6
FRC1
506,600
865 W7
FRC1
50
1,000
2,460
DG26
PB90a
PB90a
PB9
0a
PB90a
PB9
0a
1,330
2,700
WG1
1,255
2,700
WG22,000
2,700
DG33 PC1
75
2,400
1,000
DG29
PB90
2,7001,698
WG5
2,700
1,710 WG3
2,7001,710
WG4
1,7002,700
DG42
1,710
2,700
WG6
1,710
2,700 WG7
1,490
2,700 WG8
2,700
1,000 DG15
PB90 PB90a
PB90
PB90a
PC150
W4
1,000
7,000
DG40
PB3
5
PB90a
1,000
2,400
DG10
PB90
PC1
75
2,100900
DW1
8,0007,000
DF1
1,800
1,200
WF6
1,800
1,200
WF5
1,800
1,200
WF4
1,800
1,200
WF3
1,800
1,200
WF2
1,800
1,200
WF1 2,700
2,000
DG34
1,280
1,260
DG35
PC175
PB3
5
PB3
51,0
002,4
00
DG20
PB90
1,0002,700
DG18
1,0002,700
DG19
1,0002,700
DG50
2,7001,000 DG38
PB9
0
PB90c
PB9
0
PB90a
PB35
PB35
PB9
0b
PB90b
PB90a
PB90
PB9
01,0
002,4
00
DG17
2,4001,000 DG24
1,0002,400
DG21
8002,400
DG47
2,400800
DG46
1,000
2,400
DG28
PC150
2,400
900
DG4
PB90a
2,400
900
DG3
PB90a
PB90a
1,0002,700
DG5
PB9
0a
PB90c
PC1
50
PC150
PB35
PB3
5
PB35
PB35 PB35 PB35
PB35 PB35
3,000
1,200
WF13
1,200
3,000
2,100900
DW14
1,0002,400 DG6
PB9
0a
1,0002,400
DG14
1,000
2,400
DG7
PB90a
PB9
0
PB90a
PB90a
2,400
900
DG45
PB9
0 PB90
2,400
1,640
DG12
PB90 PB90
C1
C1
C1
C1
C1
C1
C1 C1 C1 C1
C1
C1
C1
UP
UP
UP
UP
TB
TB
TB
TB
XA
XB
XC
XG
XH
XI
X2X3X5X6X7X8X9X10X11X12X13
XD C3
C3
D/W
F
D/W
F
F
AC
AC
AC
AC AC
AC
AC
AC
TB
TB
C1
C1 C1
C1
C1
C1
C1
C1
C1
C1 C1
C1
C1
C1
C1
C1
C1 C1 C1
C1 C1 C1
C1
C1
TB
E
dp
dp
dp
dp
dp
dp
dp
dp
dp
PD14.10
PD34.10
PD64.10
PD74.10
PD84.10
PD104.10
PD44.10
PD54.8
PD94.10
PD134.12
PD114.10
PD274.10
PD124.10
PD314.11
PD314.11
1,853
8,370
1,556
6,815
1,873
7,869
7,868
1,425
1,4258,2508,3008,3008,3001,4256,2257,3867,5007,5003,8152,175
954
175
848
175 85
817
53,0
9615
0
954
175
848
175 85
817
53,0
9615
0
954
175
848
175 85
817
53,0
9615
0
900
1,550
8,000
606
175
11,63
817
5
11,81
317
5
175
1,748
150
5064
3,551
641,6
8964
1,110
613
645,7
4864
150
1,503
150
50 643,4
1464
1,826
641,1
2364
5,185
644,6
5264
2,336
6410
,771
644,7
3115
01,2
25
1501,0751505,868643,536644,40835175
2,4001751,213644,066641,931648481,891351506,3501501,075150
2,418 2,850 2,700 2,700
1,225 7,030 9,795 2,750 14,125 1,225
7,510
644,7
3115
01,0
7515
0
4,257
642,0
0764
5,913
150
1,225
10,57
064
1,700
150
12,20
164
1,700
150
2,460
812
2,460
812
2,460
2,526
1,900 150 11,670 64 8,397 CHANGEROOM 64 1,739 64 1,243 64 1,736 64 1,981 64 1,981 64 4,692 175 1,646 64 13,439 FACTORY STORE 64
150 11,670 64 6,962 175 1,260 641,273 SHR.
64 3,509 AMENITIES 64 4,026 WASH TROUGHS 64 2,142 2,500 STAIR50
175 3,613 FIRST AID 64
150 8,616 35150
1,100 175 5,266 64 3,290 175 15,115 64 3,626 CLEANER 64
150
1,850
150
570
1,360
570
150
2,200150 64
2,468
2,184
64
1,258
175
1,725
642,9
9764
2,060
64
1,830
3,750
STA
IR50
90
1,200
1,425
6492
664
4,431
64
64 1,506 64 16,404 150 1,075 150
64 1,506 64 6,494 64 9,846 150 1,225
175 2,286 175 35 3,09364
3,40364
9,096 STAFF 150
2,300
150
2,000
150
4,000
64 1,376 64 1,476 64
1,110
613
641,5
6864
641,6
2664
641,1
2364
1,170
64 2,226 DIS G.1 64
S/153.13
S/153.13
S/14#LayID
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
B1
B1
ATRIUM
ARCHIVESG.1FIRST AID
G.1
CHANGE ROOMG.1
STAFF ROOMG.2 KITCHEN G.2
CLEANERG.2
AMENITIES G.1
SHOWERG.1
ENTRYG.1
WASH TROUGHSG.1
FACTORY STOREG.1
FEMALE G.2
EXECUTIVEGARAGE
G.1
PRINT ROOMG.1
SERVERG.1
FILES G.1
STAFF ROOMG.1
MALE G.1
DISG.1.
KITCHEN G.1
CLNR.G.1
ENTRYG.2
MEETINGROOM
G.1OFFICE
G.1OFFICE
G.2
GYMNASIUMG.1
STOREG.2
ARCHIVESG.2
STOREG.1
VOIDOVER
VOIDOVER
VOIDOVERENTRY
G.3
Canopyover
MALE G.2
OPEN OFFICE AREAG.1
STAIR G.1
STAIR 3
STAIR 4
STAIR 5
FHRDB
DB
2100x900mm
floor mat
STAIR 2
1200
x900
mm
floor
mat
MSB
FHR
LIFT
Canopyover
Canopyover
Canopyover
1200x
900mmfloor mat
HDTD TDHD
HDTD
SHOWERG.2
PP
HD
P P
HD
HD
FEMALEG.1
HD
UP
HWS
HWS
HWS
FHR
BAY1
OFFICE BUNKER G.1
FIRE VALVE
G.1
slidin
g doo
rs
FHR
FHR
FH
FH
FH
DBDB
DB
225mm diameter PVC internaldownpipe protected w/1500mm high,
6mm thick, folded galv. steel plate boltedto concrete wall @ 400centres w/M12 bolts
dpdp
225mm diameter PVC internaldownpipe protected w/1500mm high,
6mm thick, folded galv. steel plate boltedto concrete wall @ 400centres w/M12 bolts
Line of steel framed canopyover as per details
Exposed steel framing to bepainted in selected finish (typical)
BROKEN LINE OF STEEL FRAMED SCREEN AS PER DETAILS BROKEN LINE OF STEEL FRAMED SCREEN AS PER DETAILS
BROK
EN L
INE
OF S
TEEL
FRA
MED
SCRE
EN A
S PE
R DE
TAIL
SBR
OKEN
LIN
E OF
STE
EL F
RAME
D SC
REEN
AS
PER
DETA
ILS
BROKEN LINE OF STEEL FRAMED SCREEN AS PER DETAILS
BROK
EN L
INE
OF S
TEEL
FRA
MED
SCRE
EN A
S PE
R DE
TAIL
S150SHS column of steelframed screen as per details
100mm diameterColorbond downpipe
w/matching proprietarystainless steel
brackets (typical to Office)
Selected Colorbond GarageRoller doors w/remote automaticopeners
90/90/90 Door & Steel Frame
25mm recess castinto slab w/alum. angles
25mm recess castinto slab w/alum. angles
25mm recess castinto slab w/alum. angles
2100x900mmfloor mat
1200
x900
mm
floor
mat
90/90/90 Door & Steel frame toFactory Store Room Servery door
Lift as specified
100mm diameterColorbond downpipew/matching proprietarystainless steelbrackets (typical to Office)
150mm diameterColorbond downpipe
I N D I C A T I V E F U R N I T U R E L A Y O U T O N L Y
HD
3600x2000mmfloor mat 25mm recess cast
into slab w/alum. angles
Line of 150mm thick precastconcrete panel over
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
Concrete panel walls & roofto Bunker as per details
Exit Door fixed to 150mm fabricatedsteel door frame cast into concretepanel as per fabricators details (typical)
1200mm highstud wall Line of bridge over
HWS1.1
TIMECLOCK
1200x1800mmfloor mat
TEA G.1
100mm diameterColorbond downpipew/matching proprietarystainless steelbrackets (typical to Office)
Steel column of screenas per details
150x50 Capral flushglazesuite aluminium framedglazing
Glass filler between endof partition wall & perimeter
glazing as per details
Steel framed stairsas per details
Broken line denotesacoustic panelling A17 towall as per Internal details
100x50 Capral flushglazesuite aluminium framedglazing
100x50 Capral flushglazesuite aluminium framedglazing
Broken line denotes 100mm gapbetween Office structure &factory structure as per details
Steel lockers to selection
All plumbing to beconcealed in walls to
this area
S/053.5
S/053.5
S/013.1
S/013.1
S/073.7
S/073.7
S/083.6
S/083.6
S/093.7
S/093.7
S/043.4
S/063.6
S/063.6
S/033.3
S/033.3
S/183.8
S/183.8
GF
GF
GF
GF
GF GF GF GF GF
PB90
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
UP
XE
XF
X1X4
C1
C1
PD24.10
R = 4,800
R = 3,000
1,800
FHR
ALL STEELWORK ALONG DIVIDING WALL BETWEEN OFFICE & FACTORY TO BE PROTECTED W/SELECTED INTUMESCENT PAINT AS SPECIFIED LEVEL OF PROTECTION TO GAIN FRL OF 90/90/90
dp
dp
dp
S/023.2
S/023.2
7 6 5 4 37 6 5 4 3
Plot Date:
Level 1 PlanSHEET:
Architecture - Interior DesignGIORDANO & ASSOCIATES
SHEET TITLE: DATE:SCALE:
CHECKED:DRAWN:
DWG. NO.: REV:
All dimensions to be verified on site and any discrepanciesreported to the Architect prior to proceeding with any work C COPYRIGHT
194 Glynburn Road, Tranmere SA 5073Ph: (08) 8332 3777 Fax: (08) 8332 7627
Email : [email protected] 26/11/2010
A06/20/AG
SEPT 10
1.2.13
1.2.13
A1REV. DATE DESCRIPTION
MANUELE ENGINEERS HEADQUARTERSCnr. MORPHETT & JAMES MELROSE ROADS, ADELAIDE AIRPORT
C
DCONSTRUCTION ISSUE
1:100D
5/5/2009 CONSTRUCTION ISSUE
30/4/2010 CHANGES TO DSB BUILDING
COPY STATION1.2
2,400
1,000
1,000
2,400
1,1002,400
1,0007,000
6,600
8656,600
8656,600
865
1,000
7,000
1,8001,800
8,0007,000
1,800
1,200
1,800
1,200
1,800
2,000
1,800
4,800
1,800
2,000
1,0002,400
3,200
2,000
2,5302,700
2,4852,700
2,5402,700
2,5302,700
1,0002,700
1,0002,700
1,0002,700
1,0002,700
2,4001,000 900
2,400
2,400900
2,400
900
2,400
900
2,400
1,000
2,000
2,700
2,400
900
2,400
900
2,400
900
2,7001,000
2,7002,670
2,7002,720
2,7002,485
2,7001,000
2,7001,000
2,7001,000
1,1002,700
1,1002,700
1,1002,700
1,0002,700
1,0002,400
2,4001,000
900
2,400
2,700
1,000
4,055
2,700
2,340
2,700
1,000
2,700
1,000
2,700
1,000
2,700
2,392
2,700
1,800
2,700
2,392
2,700
1,000
2,700
1,000
2,700
1,000
2,700
1,000
2,700
2,400
900
1,000
2,700
2,400900
2,700
1,000
1,700
2,7002,700
475
1,275
2,700
2,1302,700 2,7
002,1
30
2,7001,300
2,0002,700
475
2,700
1,353
2,700
1,353
2,700
2,700
1,000
2,000
2,700 1,000
2,700
1,0002,400
1,0002,700
2,7001,000
2,7001,0
00
1,000
2,700
2,7001,000
DN
DN
DN
DN
XA
XB
XC
XG
XH
XI
X2X3X5X6X7X8X9X10X11X12X13
XD
D/WF
D/W
F F
PD234.11
PD244.10
PD254.10
PD264.11
PD284.11
PD294.11
PD30#
PD314.11
S/153.13
S/153.13
S/14#LayID
S/19#LayID
S/19#LayID
W3
W2
W2
W13
PC1
75
WF12
PB35 PB35 PB35 C1
C1
1,1501504,013641,245642,9898,3003,954647,340641,226644,0131501,0751506,1507,3867,5007,5003,8152,175
1,853
8,370
8,370
1,873
7,869
7,868
1,425
1,578
150
5,418
643,0
146,7
0464
3,606
643,6
0664
3,606
643,6
0664
4,656
150
1,150
150
1,503
150
8,495
6,704
643,6
0664
3,606
643,6
0664
334
3,272
644,5
3112
515
01,1
50
1,1501509,237 BOARDROOM642,483 K.642,106641,6371752,14364
1,15015,2103,056
1,1501505,220643,510645,082351752,40012550
351,826646,935647,7511501,075150
150150200
7258,5255,6002,7508,2508,575725200
2256,2257,3867,5007,5003,8152,175
150
1,077
150
4,666
643,4
8864
3,702
643,7
3664
13
7,6507,3867,5007,5003,8152,175
15015
020
0 1,153
150
8,370
1,669
4,435
641,7
5064
388
1,873
7,869
7,868
1,425
3,000
64
1,15564
1,24564
897
64
641,226
64
2,891
64
3,230
1,559
641,8
1364
3,345
1,235
1,4258,2508,300
1,150 64 2,952
150
642,0
0064
3,290
641,2
1351
364
150
642,0
0064
1,218
642,0
0864
1,213
513
64
150
645,3
54 B
OARD
ROOM
641,2
13
3,415
64 5,304 64 517
2,1302,1301,367
490
64
2,077
64
1,419
1,419
1,419
1,572
1,277
1,407
650 1,000 1,1625,380
3,090
945
1,250
1,250
1,900
2,337 2,700
1,319
2,700
1,200 1,200 1,200
4,110
1,200
3,200
1,200
400 900600
1,200 1,438 800 600 1,200
900
400
900
600
900
1,500
1,500
1,500
1,092
1,800 900 1,900 900 1,800
1,500
1,500
2,092
4,000
5,000
1,800
2,400
800 1,800 4,100
1,698
1,800
1,200
900
5,600
2,198 2,000 1,200 900
5,000
R 4,868
R 10,652
R 7,033
R 10,846
SC
W11
DF28
DF4
PB90
DF29
DF26
PB90
PB90
D19
DF40b
C1 C1
B
C1
LIFT
WAITING 1.1
TRAINING ROOM1.1
ATRIUM(Void)
SUPERVISOROFFICE 1.13
RECEPTION1.1
OFFICE 1.1
OFFICE1.4
OFFICE1.5
OFFICE1.6
OFFICE1.7
VOID VOID
WALKWAY 1.1
BRIDGE
BREAKOUT1.1
MEETING ROOM1.1
STAIR 1
STORE1.2
OFFICE1.3
OFFICE1.14
BATH 1.1
KITCHEN1.1
LOUNGE 1.1
STAFF ROOM1.1
KITCHEN1.2
CLEANER1.1
OFFICE1.2
BOARDROOM 1.1
OFFICE1.12
MALE 1.1
OFFICE1.8
STORE1.3
OFFICE1.11
OFFICE1.10
BALCONY1.1
FEMALE1.1
DISABLEDWC1.1
STAIR 2
LAYOUT AREA 1.1
STORE1.1
FILES1.1
(2Hr Fire Rated)
SERVER1.1
FILES ROOM1.2
(2Hr Fire Rated)
COPYSTATION
1.1
OFFICE1.9
STAIR 4
STAIR 3
ROOF BELOW
BOX
GUTT
ERBOX
GUTT
ER
TEA 1.1
BOX
GUTT
ER
HD
PHD
HD
HD
HWS
STAIR 5
FH
FH
BAY1
225mm diameter PVC internaldownpipe - protected w/1500mm high,6mm thick, folded galv. steel plate boltedto concrete wall @ 400centres w/M12 bolts
dpdp
225mm diameter downpipedischarges into 450x500x350mmdeep receiver & carries down tosub floor drainage
150mm downpipe connectedto 225mm diameter downpipe
150mm downpipe connectedto 225mm diameter downpipe
100mm diameter Colorbonddownpipe from 450x450x300mm
deep box receiver
Folded Colorbond capping to topof parapet walls (typical)
100mmm diameter Colorbond downpipefrom Canopy roof to stormwater reticulation
300x100mm deep Colorbond box gutterto Canopy roof
100mm diameter Colorbonddownpipe w/selected rainwater head& spreader to discharge into lower roof gutter
450x150mm deep Colorbond box gutteron Spandek support base or similar
BROKEN LINE OF STEEL FRAMED SCREEN AS PER DETAILS BROKEN LINE OF STEEL FRAMED SCREEN AS PER DETAILS
BROK
EN L
INE
OF S
TEEL
FRA
MED
SCRE
EN A
S PE
R DE
TAIL
SBR
OKEN
LIN
E OF
STE
EL F
RAME
D SC
REEN
AS
PER
DETA
ILS
BROKEN LINE OF STEEL FRAMED SCREEN AS PER DETAILS
BROK
EN L
INE
OF S
TEEL
FRA
MED
SCRE
EN A
S PE
R DE
TAIL
S
BOX GUTTERBOX GUTTER BOX GUTTER
Folded Colorbond capping to topof parapet walls (typical)
100mmm diameter Colorbond downpipefrom Canopy roof to stormwater reticulation
300x100mm deep Colorbond box gutterto Canopy roof
Internal face of precast concretepanel to remain exposed
Glazed partitioning from 1150mm AFLto ceiling height along this wall - refer to Sections
Double glazed fixed viewing windowin precast concrete wall panel Reception desk as per
details
1200mm high plasterboard lined wallw/integrated steel column supportsbolted to slab as per Fabricators details
Full height aluminium framed glazedpartition system
100x50mm Alcan flushglaze framing toStair 4 area as per Schedule
1200x1800mmfloor mat
Full height aluminium angle trimbetween column & Factory wall(both sides) - fix to Factory only
Broken line denotes100mm gap betweenOffice structure &factory structure asper details
Top of floor beam flush w/polished floor
1000x1000x1900mm highclear glass shower screenw/pivot door
shr.
Glass ballustrade to end of balcony
50mm diam. along Balcony fixed to backof Screen frame
100x50 Alcan flushglazealuminium framing w/clear glass
OFFICE1.15
FHRDB
FHRDB
FHRDB
OFFICE1.16
= 1200mm circulation space
2100x900
900x900 1200x1200
1600x800
3200x1200
800x800
800x800
800x800
600
600
900
2400x900
900x900 900x900450
5200x1700
800x800800x800
2100x900
3600diam Rug
900x900
1500
x900
1500
x900
1500
x900
1500
x900
1500
x900
BENCHA
BENCH B
BENC
H B
DESK
SHEL
VES
1200x600
1200x600
450
SHEL
VES
SHELVES
S/053.5
S/053.5
S/013.1
S/013.1
S/073.7
S/073.7
S/083.6
S/083.6
S/093.7
S/093.7
S/043.4
S/063.6
S/063.6
S/033.3
S/033.3
S/183.8
S/183.8
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
DN
XE
XF
X1X4
AC2 AC2
AC2
AC2
AC2 AC2
AC2
AC2
PC1
75
PC1
75
PC175
DF12
PC175
DF38
PC175
PC175
PC1
50
DF48
PC1
75
PC1
50
DG43
PC1
75
PC150
PC175
PC150
W5
FRC1
50
PC1
50
W6
FRC1
50
W7
FRC1
50
W12
PC150
W4
DG40
PC1
75
DF1
WF8 WF7 WF10 WF11 WF9
PC175
PB35
PB3
5
DF39
C1
C1
C1
C1
C1
C1 C1 C1 C1
C1
C1
C1
AC
AC
AC
AC AC
AC
AC
AC
C1
C1 C1
C1
C1
C1
C1
C1
C1
C1 C1
C1
C1
C1 PB90
GF
GF
GF
GF GF GF GF
GF
GF
GF
GF
GF
GF
GF
GF
C1
C1
C1
C1
F
4,800
175 64 7,359 TRAINING ROOM64
2,774 64 2,123 2,569 17513
35 6,711 SUPERVISOR 64 2,712 64 1,718 64 3,770 64
GB GB
GB GB GB
GB
GB
GB
GB
GB GB
GB
GB
GB
GB
DF31
PB9
0
GP
GP
GP
GP
DF20
DF18
DF21
DF17
PB9
0
PB90
PB9
0
PB9
0a
DF2
PB9
0
DF44
DF42
PB9
0a
DF33 DF36 DF32
PB90
PB9
0a
DF35 DF37
DF34
DF30
PB9
0
PB9
0a
GP
GP
GP
DF6
DF7
DF8
GP
GP
GP
DF25 PB9
0
PB90
PB90
PB90
PB90
PB90a
DF47
DF45
PB9
0a
DF43
PB90
DF5
PB90
PB9
0 GP GP DF16 DF15 DF13
PB90
GP GP GP DF9 DF11 DF10 DF10a
DF46
PB90a
PB9
0
PB90
PB90
PB9
0
DF24
PB120
DF41
PB90
PB90
DF23
PB1
20
PB1
20
PB9
0
PB90
PB9
0
PB9
0
PB9
0a
DF40
WU3
GP GP GP
DF14
PB120 PB90
PB90
PB1
20
PB90a
PB3
5
PB3
5
PB35
PB9
0a
PB9
0a
PB90
PB3
5
DF27 PB90
PB90
WU4
WU1 WU2
DF1
DF3
PB90
PB90a
PB90
GB GB GB GB GB
GB
GB
GB GB GB GB GB GB GB
GB
GB
DF22
PB9
0
PB120
GB
GB
GB
PB9
0a
PB120
PB120
PB9
0
DF40a
B B B B B B B
B
B
B
B B B B B B B B
B
B
B B
B
B
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL FALL
Folded Colorbond capping totop of parapet walls (typical)
Colorbond 'Kliplok' roof sheeting@ 2° pitch w/insulation as specified (typical)
450x100mm deep Colorbondbox gutter on Spandek support base (typical)
FRC
200
dp dp dp
dp
dp dp
dp
dp
dp
S/023.2
S/023.2
FRC200 FRC200
FRC200
FRC
200
FRC35
dp
dp
dp
dp
dp
dp
dp
dp
dp
Plot Date:
Front Fence & Gate
Architecture - Interior DesignGIORDANO & ASSOCIATES
SHEET TITLE:
All dimensions to be verified on site and any discrepanciesreported to the Architect prior to proceeding with any work C COPYRIGHT
194 Glynburn Road, Tranmere SA 5073Ph: (08) 8332 3777 Fax: (08) 8332 7627
Email : giordano @giordano-associates.com.au
MANUELE ENGINEERSHEADQUARTERS
Cnr. MORPHETT & JAMES MELROSE ROADS,ADELAIDE AIRPORT
REV. DATE DESCRIPTION
A 7/12/2009
SHEET:
DATE:SCALE:
CHECKED:DRAWN:
DWG. NO.: REV:
13/04/2010
A06/20/AG
MAR 101:100, 1:223.22,1:10
A1
CLIENT REVIEW
A
5,000
2,400
1,100
3,500
150 f
ram
e
50 gap 50 gap
50 gap100x100 angles
PLAN DETAIL
Front Fence - details1:1002
Front Fence - details1:223.221