planning and strategic management
DESCRIPTION
Planning And Strategic ManagementPlanning And Strategic ManagementTRANSCRIPT
![Page 1: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/1.jpg)
Industrial Design and Industrial Design and ManufactutringManufactutring
IDM IDM VakgroepVakgroep VoorlichtingVoorlichting
22 22 maartmaart 20062006
![Page 2: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/2.jpg)
ProgramProgram12.40 IDM 12.40 IDM (Tom Vaneker)(Tom Vaneker)
–– IDM (IDM (generalgeneral))–– IDM IDM –– M.EM.E..–– IDM IDM CoursesCourses and and ProjectsProjects
13.00 IDM 13.00 IDM fromfrom a a studentsstudents pointpoint of view of view (Ronald Liefhebber)(Ronald Liefhebber)
13.20 Lunch en Vragen13.20 Lunch en Vragen
![Page 3: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/3.jpg)
IDM General (1)IDM General (1)Dortmund
•600.000 inhabitants
•+- 140 km from Enschede
Campus
•23.000 students
•North and South Campus
IDM cooperation
•Design (Twente)
•Manufacturing (Dortmund)
![Page 4: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/4.jpg)
IDM General (2)IDM General (2)FromFrom september 2006 IDM september 2006 IDM willwill alsoalso includeinclude–– University of University of StratchclydeStratchclyde((GlasgowGlasgow, Schotland, >20.000 , Schotland, >20.000 studentsstudents))
–– University of Aalborg University of Aalborg (Denmark, +(Denmark, +-- 14.000 14.000 studentsstudents))
![Page 5: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/5.jpg)
IDM General (3)IDM General (3)
As of 2006 As of 2006 –– You choose a You choose a ““Home UniversityHome University””–– Exchange based on Exchange based on ““SocratesSocrates””–– At least one regular semester abroadAt least one regular semester abroad–– Internship or Master thesis abroadInternship or Master thesis abroad–– No 1 year project but long semester projectsNo 1 year project but long semester projects–– No longer master degrees of all participantsNo longer master degrees of all participants
![Page 6: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/6.jpg)
Industrial Design and Industrial Design and ManufactutringManufactutring
Courses of IDM IDM Projects 2001-2005
Ronald
![Page 7: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/7.jpg)
IDM Projects 2001-2004
2001 2002 2003 2004
(Click on project image to proceed)
![Page 8: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/8.jpg)
IDM Project 2001 IDM Project 2001 -- 20022002
Design and build an apparatus that, for inspection Design and build an apparatus that, for inspection purposes, is able to move along high voltage wirepurposes, is able to move along high voltage wire’’ss
![Page 9: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/9.jpg)
High voltage wires inspection High voltage wires inspection devicedevice
![Page 10: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/10.jpg)
High voltage wires inspection High voltage wires inspection devicedevice
![Page 11: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/11.jpg)
High voltage wires inspection High voltage wires inspection devicedevice
![Page 12: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/12.jpg)
High voltage wires inspection High voltage wires inspection devicedevice
![Page 13: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/13.jpg)
High voltage wires inspection High voltage wires inspection devicedevice
Project Index
![Page 14: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/14.jpg)
IDM Project 2002 IDM Project 2002 -- 20032003
Design and build an apparatus that can transport large items Design and build an apparatus that can transport large items (Refrigerators etc) or people in wheelchairs up and down stairs(Refrigerators etc) or people in wheelchairs up and down stairs
![Page 15: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/15.jpg)
A wheelchair moverA wheelchair mover
![Page 16: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/16.jpg)
A wheelchair moverA wheelchair mover
![Page 17: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/17.jpg)
Moving RefrigeratorsMoving Refrigerators
![Page 18: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/18.jpg)
Moving RefrigeratorsMoving Refrigerators
![Page 19: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/19.jpg)
Wheelchair mover: prototypeWheelchair mover: prototype
![Page 20: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/20.jpg)
Refrigerator mover: prototypeRefrigerator mover: prototype
![Page 21: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/21.jpg)
Refrigerator mover: prototypeRefrigerator mover: prototype
Project Index
![Page 22: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/22.jpg)
IDM Project 2003 IDM Project 2003 -- 20042004
Design and build an apparatus that can cut thin, large slabs Design and build an apparatus that can cut thin, large slabs of recycled car tires into predefined tilesof recycled car tires into predefined tiles
![Page 23: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/23.jpg)
Solution 1Solution 1
![Page 24: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/24.jpg)
Solution 1: DetailsSolution 1: Details
![Page 25: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/25.jpg)
MechanismMechanism OverviewOverview
![Page 26: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/26.jpg)
MechanismMechanism OverviewOverview
![Page 27: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/27.jpg)
WorkingWorking principleprinciple
Pushed manually
4
![Page 28: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/28.jpg)
Solution 1: TestingSolution 1: Testing
![Page 29: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/29.jpg)
Solution 1: TestingSolution 1: Testing
![Page 30: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/30.jpg)
Solution 2Solution 2
![Page 31: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/31.jpg)
Solution 2: TestingSolution 2: Testing
![Page 32: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/32.jpg)
Solution 2: TestingSolution 2: Testing
![Page 33: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/33.jpg)
20032003--2004: The teams2004: The teams
Project Index
![Page 34: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/34.jpg)
IDM Project 2004 IDM Project 2004 -- 20052005
Design and build an apparatus that can change light bulbs Design and build an apparatus that can change light bulbs in hard to reach placesin hard to reach places
![Page 35: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/35.jpg)
Solution Team ASolution Team A
![Page 36: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/36.jpg)
Solution Team ASolution Team A
![Page 37: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/37.jpg)
Solution Team ASolution Team A
![Page 38: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/38.jpg)
Solution Team BSolution Team B
![Page 39: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/39.jpg)
Solution Team BSolution Team B
![Page 40: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/40.jpg)
IDM CoursesIDM Courses
Skip
![Page 41: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/41.jpg)
IDM CoursesIDM Courses
Courses 7 - 12
Manufacturing
Technology66 Teaches improvement strategies to minimize the impact on
the environment and to reduce the ecological burden, considering the total, integrated life-cycle of a desired product. This means that the development, production, usage and disposal phases of the product are studied.
Enterprise Design55
Manufacturing Facility Design44
Product Design33
Industrial Marketing22
Life cycle strategy11
End
![Page 42: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/42.jpg)
IDM CoursesIDM Courses
The basic principles of marketing will be explained in this The basic principles of marketing will be explained in this course. Attention will be paid to the buying behavior of course. Attention will be paid to the buying behavior of consumers and industrial purchase, marketing planning, consumers and industrial purchase, marketing planning, market segmentation, marketing mix (product, place, price market segmentation, marketing mix (product, place, price and promotion) and marketing research.and promotion) and marketing research.
Courses 7 - 12
Manufacturing
Technology66
Enterprise Design55
Manufacturing Facility Design44
Product Design33
Industrial Marketing22
Life cycle strategy11
End
![Page 43: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/43.jpg)
IDM CoursesIDM Courses
Courses 7 - 12
Manufacturing
Technology66
This module focuses on views on the design process, design principles, design tools and the design context, practicing this knowledge and skills by the realization of a design assignment.
Enterprise Design55
Manufacturing Facility Design44
Product Design33
Industrial Marketing22
Life cycle strategy11
End
![Page 44: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/44.jpg)
IDM CoursesIDM Courses
Courses 7 - 12
Manufacturing
Technology66
This module deals with the logical design of a process plan, based on the geometric interpretation of the technical drawings, focusing on the dimensioning and tolerancing for the production and resulting in a general selection of the primary production processes. The next step is the selection of the most suitable production machines.
Enterprise Design55
Manufacturing Facility Design44
Product Design33
Industrial Marketing22
Life cycle strategy11
End
Raw material handlertraffic lane
Processed materialand scrap handler
traffic lane
![Page 45: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/45.jpg)
IDM CoursesIDM Courses
Courses 7 - 12
Manufacturing
Technology66
This module presents a systematic approach to specifying, planning, realization and maintenance of industrial systems, based on system modeling and quantitative methods. Main . Main topics include, Enterprise Strategy, Supply Chain topics include, Enterprise Strategy, Supply Chain Management & Business and Management of TransportationManagement & Business and Management of Transportation
Enterprise Design55
Manufacturing Facility Design44
Product Design33
Industrial Marketing22
Life cycle strategy11
End
![Page 46: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/46.jpg)
IDM CoursesIDM Courses
Courses 7 - 12
Manufacturing
Technology66 This module teaches new trends and developments in This module teaches new trends and developments in
cutting, forming, laser technology, rapid manufacturing cutting, forming, laser technology, rapid manufacturing technology and robot technology.technology and robot technology.
Enterprise Design55
Manufacturing Facility Design44
Product Design33
Industrial Marketing22
Life cycle strategy11
End
![Page 47: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/47.jpg)
IDM CoursesIDM Courses
The lecture presents the different planning tasks, The lecture presents the different planning tasks, --processes processes and and --methods of the methods of the Supply Chain Management Supply Chain Management . One of the . One of the main focuses will lie on the concepts, which have been main focuses will lie on the concepts, which have been established within the last years in different trades.established within the last years in different trades.
Courses 1 - 6
Project Project 1212
Strategic Planning1111
Work Science1010
Quality99
Cost Management and Engineering88
Production Management77
End
![Page 48: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/48.jpg)
IDM CoursesIDM Courses
Courses 1 - 6
Project Project 1212
In the work of engineers there are a lot of decisions with In the work of engineers there are a lot of decisions with implications for the costs and rewards for the designs they implications for the costs and rewards for the designs they make, the products they work on and the companies they make, the products they work on and the companies they work for. The course addresses various topics of cost work for. The course addresses various topics of cost management that are relevant to engineers, with a particular management that are relevant to engineers, with a particular focus on new product development processes focus on new product development processes
Strategic Planning1111
Work Science1010
Quality99
Cost Management and Engineering88
Production Management77
End
![Page 49: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/49.jpg)
IDM CoursesIDM Courses
Courses 1 - 6
Project Project 1212 "Quality Assurance During Product"Quality Assurance During Product--LifeLife--Cycle". It presents Cycle". It presents a systematic approach of quality assurance during the entire a systematic approach of quality assurance during the entire product lifeproduct life--cycle, including quality management and cycle, including quality management and measuring techniques.measuring techniques.
Strategic Planning1111
Work Science1010
Quality99
Cost Management and Engineering88
Production Management77
End
![Page 50: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/50.jpg)
IDM CoursesIDM Courses
Courses 1 - 6
Project Project 1212 This module focuses on work organization, work conditions, This module focuses on work organization, work conditions, ergonomic aspects and industrial psychology. It consists of ergonomic aspects and industrial psychology. It consists of main topics; Industrial Psychology & Work Science and main topics; Industrial Psychology & Work Science and OrganizationOrganization
Strategic Planning1111
Work Science1010
Quality99
Cost Management and Engineering88
Production Management77
End
![Page 51: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/51.jpg)
IDM CoursesIDM Courses
Courses 1 - 6
Project Project 1212 In this module executives from the industry will present and In this module executives from the industry will present and overall view on aspects related to strategy, organization, overall view on aspects related to strategy, organization, quality, information structuring and management. These quality, information structuring and management. These presentations are combined with company visits.presentations are combined with company visits.
Strategic Planning1111
Work Science1010
Quality99
Cost Management and Engineering88
Production Management77
End
![Page 52: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/52.jpg)
IDM CoursesIDM Courses
Courses 1 - 6
Project Project 1212The project gives the students the experience of working in a The project gives the students the experience of working in a team and applying the knowledge gained from coursework to team and applying the knowledge gained from coursework to realreal--life business situations life business situations
Strategic Planning1111
Work Science1010
Quality99
Cost Management and Engineering88
Production Management77
End
![Page 53: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/53.jpg)
Industrial Design and Manufacturing
Student’s view
![Page 54: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/54.jpg)
Presentation contents:
• Short overview of the past 1,5 years
• Twente and Dortmund
• Pre-master in Denmark
![Page 55: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/55.jpg)
First year:
• Twente phase •Subjects and project
•Visits to companies
•Milestone meetings
![Page 56: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/56.jpg)
First year:
• Dortmund phase Subjects and project
Milestone meetings
Workshops
Differences in teaching and examinations
![Page 57: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/57.jpg)
First year:
• Dortmund phase
![Page 58: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/58.jpg)
Twente and Dortmund phase:
• Subjects
• Project
• ...
International master, everything in English
Corresponding in (technical) meetings is difficult at first, but you learn fast.
Even the teachers sometimes have a hard time!
![Page 59: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/59.jpg)
Overall conclusion:
1. Twente phase was hard work and more theoretical
2. Dortmund phase was more relaxed (due to hard work in Twente phase) and more practical
![Page 60: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/60.jpg)
IDM group 2004/2005 consisted of:• 13 Dutch• 1 Mexican• 1 Thai
2 projectgroups
In Dortmund all in 1 ‘house’
![Page 61: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/61.jpg)
Due to a renovation of the dorm for foreign students in Dortmund
Accomodation in Witten, 9 km south-west of Dortmund
House in Witten was also renovated
![Page 62: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/62.jpg)
![Page 63: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/63.jpg)
Project: Lamp changer
“…Design and develop a prototype for a device which can change a variety of lamps at a height of 5 meters both straight and under an angle …”
Compared to former assignments, not reallychallenging.
But,
![Page 64: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/64.jpg)
• More time:
• to implement the given subjects into the project
• to develop a perfect drawing package
• to test and adjust the prototype
• to find a suitable internship
• to do fun things (going out in Dortmund, BBQ in March, sports)
![Page 65: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/65.jpg)
Team A
Team B
![Page 66: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/66.jpg)
Time to start with the internship
Pre-master
• 6 i.s.o. 3 months
• 30 i.s.o. 15 ECTS
• Report and presentation i.s.o.just a report
• Broader assignment
• More depth is expected from the UT.
![Page 67: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/67.jpg)
Pre master:
Company: Scandinavian Micro Biodevices (SMB), Farum, Denmark
Products: Plastic strips containing ‘micro fluidic systems’(Comparable with test strips fordiabetes patients)
![Page 68: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/68.jpg)
Pre master:
Technology: Ultrasonic welding
Assignment: The development of design rules for ‘energydirectors’ used in the assembly of polystyrene parts by means of ultrasonicwelding.
![Page 69: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/69.jpg)
Ultrasonic welding:
“…joining method which uses the principles of acoustics to create frictional heat and produce a molecular bond between two plastic materials…“
![Page 70: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/70.jpg)
•Top angle
•Height
Energy directors:
”V-shaped protrusions which direct the ultrasonic vibrations to initiate welding at a specific line”
![Page 71: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/71.jpg)
Good weldBad weld
![Page 72: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/72.jpg)
Eventually a test piece was designed and produced
![Page 73: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/73.jpg)
Result
• Assignment shifted to gain a better understanding of the behaviour of energy directors when ultrasonically welded.
• Interaction between machine and welding parameters was investigated
• Submitting design recommendations for energy directors to the design team at SMB
![Page 74: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/74.jpg)
01-09-2005 untill 29-01-2006
Approximately 1400 photographs,
and loads of stories
![Page 75: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/75.jpg)
IDM IDM -- WBWB
Praktijk i.p.v. research gerichtPraktijk i.p.v. research gerichtEnige Enige mastermaster met projectaanpakmet projectaanpakExtra eisen t.o.v. internationalisatieExtra eisen t.o.v. internationalisatieStage afstuderenStage afstuderen–– Stage 15 Stage 15 ECEC, , MasterMaster 45 AC45 AC–– PrePre--mastermaster 30 30 ECEC, , MasterMaster 30 EC30 EC
![Page 76: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/76.jpg)
AuxiliaryAuxiliary
ProfessorProfessor
Coordination IDM/UTCoordination IDM/UTHans PonsenTel: [email protected]
Tom VanekerTel: [email protected]
Fred van HoutenTel: 2520 (Secr.)[email protected]
![Page 77: Planning And Strategic Management](https://reader033.vdocuments.us/reader033/viewer/2022060202/559b53bf1a28ab9b4e8b4861/html5/thumbnails/77.jpg)
Auxilary(2)Auxilary(2)
Excursion DortmundExcursion Dortmund–– Tuesday 25 April, whole dayTuesday 25 April, whole day–– Timetable laterTimetable later–– Subscription for the excursionSubscription for the excursion
TodayTodayBy mail (Mail: By mail (Mail: [email protected]@ctw.utwente.nl))