planning and development
DESCRIPTION
Planning and Development. March 28, 2013. MTC / ABAG Plan Bay Area (2040) Regional Sustainability. Job Growth ~ 1,000,000 > 25% of growth near BART Household Growth ~ 625,000 San Francisco100,000 Alameda160,000 Contra Costa 90,000 San Mateo 60,000 - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Planning and Development](https://reader036.vdocuments.us/reader036/viewer/2022062520/56816150550346895dd0d8ba/html5/thumbnails/1.jpg)
Planning and Development
March 28, 2013
0
![Page 2: Planning and Development](https://reader036.vdocuments.us/reader036/viewer/2022062520/56816150550346895dd0d8ba/html5/thumbnails/2.jpg)
MTC / ABAG Plan Bay Area (2040)
Regional Sustainability
2Note: For five BART served counties: Alameda, Contra Costa, San Francisco, San Mateo, and Santa Clara
Job Growth• ~ 1,000,000• > 25% of growth near BART
Household Growth• ~ 625,000
• San Francisco 100,000• Alameda 160,000• Contra Costa
90,000 • San Mateo
60,000• Santa Clara 215,000
• > 25% of growth near BART
![Page 3: Planning and Development](https://reader036.vdocuments.us/reader036/viewer/2022062520/56816150550346895dd0d8ba/html5/thumbnails/3.jpg)
Agenda
A. Current Projects
B. BART Challenges / Opportunities
![Page 4: Planning and Development](https://reader036.vdocuments.us/reader036/viewer/2022062520/56816150550346895dd0d8ba/html5/thumbnails/4.jpg)
Oakland Airport ConnectorAutomated People Mover System (APM)
Replace AirBART Bus with:Automated People Mover (APM) DriverlessElectrically drivenExclusive 3.1 mile guidewayExtremely consistent & reliable Seamless ticketing Comfortably carry 3.2 Million Annual Passengers (MAP) Expandable to 4.9 MAPTrains every 4.5 minutes Ride time 8 minutes – door to door 14 min
4
![Page 5: Planning and Development](https://reader036.vdocuments.us/reader036/viewer/2022062520/56816150550346895dd0d8ba/html5/thumbnails/5.jpg)
OAC Alignment
Doppelmayr Cable Car • DCC’s Development of Pinched Loop Technology
Page # 14
OAK BART
![Page 6: Planning and Development](https://reader036.vdocuments.us/reader036/viewer/2022062520/56816150550346895dd0d8ba/html5/thumbnails/6.jpg)
OAC Construction Progress
Col
iseu
m B
ART
I-880 Hegenberger
Hegenberger
Connector Station
6
![Page 7: Planning and Development](https://reader036.vdocuments.us/reader036/viewer/2022062520/56816150550346895dd0d8ba/html5/thumbnails/7.jpg)
OAC Look Ahead
Activity Start Estimated Finish
Station(s) Construction September 2011 November 2013
Guideway Construction June 2011
Maintenance & Storage Facility July 2011
Vehicle Fabrication December 2012
Train Control System Fabrication January 2013 June 2013
System Testing
Start of OAC Service
September 2013
August 2013
August 2013
September 2014
Fall 2014
December 2013
7
![Page 8: Planning and Development](https://reader036.vdocuments.us/reader036/viewer/2022062520/56816150550346895dd0d8ba/html5/thumbnails/8.jpg)
Project Location
8