2012 EOR AsiaKuala Lumpur, Malaysia
Mike Dupont P.Eng, EOR Implementation Manager
December 6th, 2012
Planning and Development of a Chemical
Flood in a Heavy Oil Pool - Coleville
Saskatchewan, Canada
![Page 2: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/2.jpg)
2
Presentation Outline
• Introduction
• Industry Chemical Flooding Activity
• Discussion of Workflow & Screening
• Coleville Main Reservoir Parameters
• Geologic Setting
• Core Flood Results
• Simulation
• Pilot Review
• Results, Monitoring
• Commercial Project
![Page 3: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/3.jpg)
3
Introduction
• Penn West Exploration has significant Heavy Oil
assets with over 1 billion bbls OOIP in
Saskatchewan, Canada
• Penn West is currently piloting an ASP flood in
Coleville, Saskatchewan
• This is the most viscous oil to ever be ASP flooded
with in-situ viscosities in the 700 - 2000 cp range
![Page 4: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/4.jpg)
4
Coleville Main Pushing Limits of ASP Application
Successful Field Applications of Chemcial Flood
0
5
10
15
20
25
30
35
40
0 200 400 600 800 1000 1200 1400 1600 1800 2000
Oil Viscosity, cp
Oil
Gra
vit
y,
oA
PI
Polymer Alkali-Polymer Alkali-Surfactant-Polymer Polymer (East Bodo)
POLYMER FLOOD
East Bodo
AS
P F
LO
OD
AP flood
Thompson
Creek, WY
Coleville Main
Pelican
![Page 5: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/5.jpg)
Chemical Flood Projects in Canada Industry Active and Proposed
Penn West land position
Penn West has the most
leverage to large scale oil
development using
horizontal multi-stage
fracturing technology
in North America
Cardium Viking
Spearfish
Carbonates
Penn West
Operated Pilot
Coleville / Hoosier
![Page 6: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/6.jpg)
6
Workflow Coleville Project
1. Screening – Reservoir characteristics and performance
2. Preliminary modeling /forecasts and economics
3. Laboratory determination of flood performance
4. Simulation – Core and up-scaled predictions
5. Facilities Design
6. Procurement
7. Installation
8. Pilot
9. Lab and Simulation – Ongoing
10. Decision – Commercial or not?
Complete cycle to Commercial can take up to 5 years
![Page 7: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/7.jpg)
7
Chemical FloodingPenn West Primary Screening Criteria
Key AttributePenn West
Acceptable Range
Coleville
MainComment
In-situ Viscosity (cp) 5-2000 700-2000 There must be an improvement in mobility ratio
Water Quality (TDS) 0-20000 9700Directly affects cost of chemical and water treatment.
Fe and H2S are also be considered
Target Formation Sandstone Sandstone Based on current worldwide experience
Permeability (md) >200 500Specific to Heavy Oil –
Formation must tolerate high MW polymers
Waterflood Performance Good to Excellent GoodFlood must show good conformance and
recoveries near theoretical for a water flood
Clay Content < 5% 0-5 %Low clay content and absence of
anhydrite prime considerations
Anhydrite Content 0 0
Underlying water/active
AquiferNone None
Pool Size (bbls) >10MM 475MM Larger fields provide economies of scale
![Page 8: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/8.jpg)
8
Coleville Main Reservoir Parameters and Performance
Pool Area 9815 acres (39.6 km2)
Lithology Sandstone
Average Net Pay 36' (12 m)
Original Oil in Place, OOIP 475MM bbls (75.5 MM m3)
Cumulative Oil Produced 65.5 MM bbls (10.4 MM m3)
Current Oil Production Rate 1800 bpd (286 m3opd)
Current Water Cut 96%
Recovery Factor to Date 13.80%
Initial Pressure 993 psi (6850 kPa)
Current Pressure 725 psi (5000 kPa)
Bubble Point pressure, Pb 993 psi (6850 kPa)
Oil Viscosity at Pb 700
Oil API Gravity 13
Formation Volume Factor, Bo 1.07
Initial Solution GOR, Rs 22
Reservoir Temperature 84 F (29 C)
Average Water Saturation, Sw 24%
Average Porosity 24%
Depth 2667' (813 m)
Well Spacing 20 acre (300 m)
Current # of Wells
Producing/Injecting190/109
![Page 9: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/9.jpg)
Coleville Main production
9
• Production
Initiated in 1951
• Water-flood
initiated in 1959
• Penn West
acquired 2004
![Page 10: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/10.jpg)
10
Geology Regional Bakken Deposition
• The intervening areas between
the sand accumulations are filled
with shale and silt
• An erosional low truncates the
Bakken and is filled with
Mannville sediments
• The Bakken sand was deposited
in the form of offshore bars in a
near-shore, shallow marine
environment
• The sands were deposited in a
NE-SW trend and can attain a
thickness greater than 15 meters Coleville Main Field
![Page 11: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/11.jpg)
11
Depositional Setting
Deposition of offshore mudstone and lower, middle and upper shoreface quartz sandstone lithofacies
of the Middle Bakken Member in a coastal marine environment
(From Smith and Bustin. 1996)
![Page 12: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/12.jpg)
12
Coleville Main Type Well
![Page 13: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/13.jpg)
13
Fluids Analysis Core Floods
![Page 14: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/14.jpg)
14
Coleville Main Relative Permeability
• High Residual
Oil Saturation
![Page 15: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/15.jpg)
15
Typical Phase Behavior Testing
There is approximately a 10 fold
reduction in IFT when Surfactant
is combined with Alkali.
![Page 16: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/16.jpg)
16
Typical Linear Coreflood
78% OOIP Recovery
![Page 17: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/17.jpg)
17
Radial Flood ASP
![Page 18: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/18.jpg)
18
Coleville Main PoolCore Analysis
OOIP Recoveries
Area DateCoreflood
TypeWaterflood Polymer AP SP ASP Total
Coleville Main April 2010 Linear 50.3% 20.9% 6.8% 78.0%
Coleville Main April 2010 Radial 34.5% 31.9% 66.4%
Coleville Main April 2010 Radial 30.9% 26.8% 57.8%
Coleville Main April 2010 Radial 32.9% 22.8% 55.7%
Coleville Main April 2010 Radial 36.4% 23.4% 59.8%
Surtek Coreflood Results
![Page 19: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/19.jpg)
19
Coleville Main Generic Simulations
Pattern Spacing (m)Injection
Well Type
Production
Well Type
Producing
Layers
Incremental Recoveries (%)Notes
Waterflood Polymer ASP
Line Drive 300 Vertical Vertical All 22.7 4.5 14
Line Drive 150 Horizontal Vertical Lower 6.4 11
Line Drive 150 Horizontal Vertical Upper/Lower 6.4 17
Inverted 5 Spot 150 Vertical Vertical All 5 12.5Injectors converted
to producers
Inverted 5 Spot 150 Vertical Vertical All 7 17.6Infill wells are
producers only
Simulations by Kade Technologies
Calgary, Alberta
![Page 20: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/20.jpg)
20
Coleville Main ASP PilotSummary
• Number of injection wells in pilot: 4 (Vertical Line Drive)
• Injection rates per well: 440 bpd (70 m3/d)
• Project start: March 28, 2011
• Pore volumes injected to date
• 11.0% (to Hz Wells ~150 m)
• 5.0% (to Vertical Wells ~300 m)
• Lab coreflood response: 15 to 22% range
• Average well-head injection pressure: 798 PSI (6200 kPa)
• Chemical Additives: 0.75% Na2CO3, 0.1% surfactant, 1500 ppm HPAM
![Page 21: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/21.jpg)
21
Coleville Main ASP Pilot
![Page 22: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/22.jpg)
22
Coleville Main ASP Pilot Process Flow
0
![Page 23: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/23.jpg)
23
Coleville Main ASP Pilot
![Page 24: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/24.jpg)
24
Coleville Main PilotReservoir Simulation Results
• Polymer
Response time
< 1 year
assuming an
injection rate of
100 m3/d
![Page 25: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/25.jpg)
25
Coleville Main PoolPilot Results
• Pilot is still in early phases
• 6 to 12 months until pilot enters sufficient pore volume to see strong results
![Page 26: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/26.jpg)
26
Coleville Main ASP PilotBreakthrough Indicators - Water Analyses
Water Analyses
• Decreasing TDS
• Decreasing Cl
• Increasing pH
• Increasing CO3/HCO3 ratio
• Presence (concentration)
of polymer
![Page 27: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/27.jpg)
27
Coleville Main PoolPilot Results: Section 19-31-23W3M
ASP Discussion
• Injection initiated March 2011
• Good flood conformance to date
• Injected 11% PV with no fresh
source water breakthrough
• Offsetting wells have seen Oil
cut increases from 10-17.6%Daily Oil (bbl)
Daily Water Injection (bbl)
WH Injection Press (psig)
Daily Water Cut (%)
ASP Injection Start
Oil Cut Increase
![Page 28: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/28.jpg)
Shows Response
28
Coleville Main ASP PilotResponse Summary
![Page 29: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/29.jpg)
29
Coleville Main PoolPilot Results
• Early pilot results to date, show oil cut increasing in some wells
![Page 30: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/30.jpg)
30
Coleville Main ASP Injector Performance
Indication of Injection
Pressure Sensitivity
to the Initiation of
Offsetting Horizontal
Well production
![Page 31: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/31.jpg)
31
Coleville MainCommercial Chemical Flood Strategy
• ASP flood to target residual oil Estimated 45% residual oil after waterflood
• Drill infill wells to increase recovery factor Assumed 3% average but could be up to 10%
• Increase current injection rates by 4x per well
• Rebuild and expand infrastructure New facility at Coleville Main, replace production lines,
cleanout and repair all existing injectors
• Access available source water Bakken or Mannville most likely zones
![Page 32: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/32.jpg)
32
Proposed Coleville Main Phase 1
Pilot Area
Project Area
Coleville South
• Phase 1 Area – Selection Criteria
• Main battery located at 10 - 30
• Favorable Geology
• Relatively low recovery factor
• Good surface access
• Offset to pilot
• Plan Summary
• 10 acre spacing Inverted 5 spot
• 45 patterns
• Conversion of existing producers to injection
• 98 MM bbls OOIP in Phase 1
• Current EUR - 15 % OOIP
R23W3
T31
![Page 33: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/33.jpg)
33
Coleville Main Pool Development Plan Overview
Each phase will consist of the following
• An infill program creating a 10 acre inverted 5 spot pattern
• All new wells will be producers
• Existing producers will be converted to injectors
• Expecting response time 6 to 8 months
• Chemical injection period - 5 to 6 years
![Page 34: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/34.jpg)
34
Questions?
![Page 35: Planning a Chemical Flood EOR Asia 2012 MB Dupont](https://reader034.vdocuments.us/reader034/viewer/2022042502/58ee70611a28abed728b4633/html5/thumbnails/35.jpg)
Stock Exchange
Toronto: PWT
New York: PWE
Legal Counsel
Burnet, Duckworth & Palmer LLP
Independent Reserves Evaluators
GLJ Petroleum Consultants Ltd.
Sproule Associates Limited
Transfer Agent
CIBC Mellon Trust Company
c/o Canadian Stock Transfer Company
Toll Free: 1-800-387-0825
Email: [email protected]
Website: www.canstockta.com
Investor Relations
Clayton Paradis, Manager, Investor Relations
Telephone: (403) 539-6343
Email: [email protected]
Toll Free: 1-888-770-2633
Email: [email protected]
Website: www.pennwest.com
Penn West Exploration
Suite 200, Penn West Plaza
207 – 9th Avenue SW
Calgary, Alberta, Canada T2P 1K3
Telephone: (403) 777-2707
Toll Free: 1-866-693-2707
Facsimile: (403) 777-2699
Website: www.pennwest.com