plan of procedures

Upload: mikesosa

Post on 01-Jun-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/9/2019 Plan of Procedures

    1/12

    Sosa 1

    Mike Sosa

    Mr. Cuttrell and Ms. Green

    Systems Engineering 2

    23 January, 2015

    Quadcoter Electronics and !rogramming" !lan o# !rocedures

    $ur Systems Engineering 2 grou looks to roduce a Quadcoter caa%le o# collecting

    &ater samles #rom 'ard to reac' areas. My role in t'e grou is to design an electrical system

    t'at &ill control t'e (uadcoter and allo& t'e (uad to #ly.

    )a%les o# Comonents

    !arts

    *e#erenc

    e

    !art +ame Quantit

    y

    escrition Si-e se

    !1 !cuino 1 Microcontrolle

    r running

    /%untu

    inu

    istri%ution

    121mm5mm sed to

    rocess data

    #rom

    electronics

    and na4igate

    t'e

    (uadcoter.

    !2 rus'less Motor 6 700k4

    %rus'less

    Motor

    6mm 8engt'9

    3:mm

    8iameter9

    )o sin

    roellers and

    ro4ide li#t.

    !3 Electronic Seed 6 12a ESC 21 22 6mm )o control t'e

  • 8/9/2019 Plan of Procedures

    2/12

    Sosa 2

    Controller amount o#

    current %eing

    ro4ided to

    t'e motor and

    to re4ent

    o4er'eating.

    !6 and

    !5

    i!o attery 2 it'ium

    !olymer

    atteries

    $ne arge8105

    33 26mm9;

    !6 and $ne

    small

    85.:1227mm9

    ;!5

    )o o&er

    (uadcoter

    electronics.

    ! read%oard

    d

    2 or 3 oards

    allo&ing

    electrical

    connection.

    6: 35

    10mm

    )o allo& easy

    connection o#

    electrical

    comonents.

    !: =M 1 =nertial

    Measurement

    nit &it' 10

    egrees o#

    #reedom

    37233mm !ro4ide

    sensory data

    #or t'e

    microcontrolle

    r to interret.

    !7 G!S Module 1 Glo%al

    !ositioning

    nit

    25.535.5m

    m

    !ro4ides

    location data

    #or t'e

    (uadcoter.

    !> *? *ecei4er 1 *adio recei4er 1> 30 >mm *ecei4es

  • 8/9/2019 Plan of Procedures

    3/12

    Sosa 3

    signals #rom

    t'e

    transmitter.

    !10 )ransmitter 1 @and'eld

    Controller

    6:321nm sed to

    control t'e

    (uadcoter

    remotely.

    !11 ?!A Camera 1 Camera 30 30mm sed to

    ro4ide real

    time #ootage

    o# t'e

    (uadcoters

    surroundings.

    !12 *adio )ransmitter 1 Bireless

    transmitter

    5521:mm Connects to

    t'e ?!A

    camera and

    sends #ootage

    &irelessly.

    !13 *adio *ecei4er 1 Bireless

    recei4er

    :55615mm *ecei4es

    #ootage #rom

    transmitter

    and dislays

    on moniter.

    !16 and

    !15

    ullet Connectors 26 Male and

    ?emale

    connectors

    6.5.5mm Dllo&s easy

    connection

    %et&een ESC

  • 8/9/2019 Plan of Procedures

    4/12

    Sosa 6

    and motors

    )ools

    )ool +ame escrition =n4ol4ementSoldering Station @ot iron used #or melting

    solder to create an electrical

    connection %et&een

    comonents.

    sed to solder &ires #rom t'e

    microcontroller to t'e sensors

    and ot'er arts toget'er.

    Multimeter sed to test #or electrical

    connection

    sed to test #or electrical

    connection

    Ste 1" Motors

    1. )ake eac' motor 8!29 and #ind t'e connection ins at t'e end o# t'e rotruding &ires.

    2. ?ind your %ullet connectors and #ind t'e male comonents 8!169.

    3. Connect t'e male %ullet connectors 8!169 to connection &ires on eac' motor 8!29.

    Motors

    ullet Connectors

  • 8/9/2019 Plan of Procedures

    5/12

    Sosa 5

    ullet Connectors on motor

    Ste 2" ESC

    1. )ake eac' ESC 8!39 and #ind t'e connection ins at t'e end.

    2. ?ind your %ullet connectors and #ind t'e #emale comonents 8!159

    3. Connect t'e #emale %ullet connectors 8!159 to t'e connection &ires eac' ESC 8!39.

    ESC and ullet Connectors

  • 8/9/2019 Plan of Procedures

    6/12

    Sosa

    Ste 3" ESC to motor

    1. Grou t'e ESC 8!39 and Motors 8!29 in airs 81 ESC 8!39 to 1 Motor 8!29.9

    2. Connect t'e male %ullet connectors 8!169 in t'e ESC 8!39 to t'e #emale %ullet connectors

    8!159 in t'e motors 8!293. Solder t'e connections toget'er using t'e soldering station 8)19

    a. Start %y taking your solder in one 'and. )'e solder metal s'ould %e solid at t'is

    oint.

    %. )ouc' t'e solder metal to t'e connectors.

    c. )urn on t'e soldering station and &'en t'e soldering iron reac'es desires

    temerature touc' t'e soldering iron to t'e solder.

    d. Melt t'e solder around t'e connectors to #orm a connection.

    Connection

  • 8/9/2019 Plan of Procedures

    7/12

    Sosa :

    Ste 6" Ste 6" ESC;Motor System to !cuino

    1. )ake t'e ESC;Motor system and #ind t'e ESCs 8!39 inut &ires.2. Connect t'ese &ires to t'e !cuino 8!19 igital $utut ins. 8)'e !cuino 8!19s %oard

    sc'ematic is t'e same as t'e Drduino, so it can %e used #or re#erence.93. Connect inut 4oltage to t'e large i!o %attery 8!69. )'e ESC 8!39 'as a %uilt in 4oltage

    steer so dont &orry a%out a larger 4oltage t'at needed.

    Drduino Sc'ematic

    !cuino ayout

  • 8/9/2019 Plan of Procedures

    8/12

    Sosa 7

    i!o

    Ste 5" Sensors to !cuino

    1. )ake t'e =M 8!:9, G!S 8!79, and *ecei4er 8!>9 and #ind t'eir outut ins.

    2. Bire t'ese ins to t'e !cuino 8!19 Dnalog inut ins. )'e in num%er does not matter.

    *e#er to t'e Drduino comarison i# you are lost.3. Connect t'e inut 4oltage ins o# t'e sensors to t'e ositi4e long terminal o# t'e

    %read%oard 8!9 s'o&n %elo& denoted %y t'e red lus.

    6. Connect t'e outut 4oltage ins o# t'e sensors to t'e negati4e long terminal o# t'e

    %read%oard 8!9 s'o&n %elo& denoted %y t'e %lue minus.5. +ot in stes 3 and 6 &'ere you lace t'e ins does not matter.

    read%oard

  • 8/9/2019 Plan of Procedures

    9/12

    Sosa >

    =M

    G!S

  • 8/9/2019 Plan of Procedures

    10/12

    Sosa 10

    *ecei4er

    Ste " !o&er #or !cuino and Sensors

    1. )ake your large i!o attery 8!69 and connect t'e ositi4e outut in to t'e red terminal

    o# t'e %read%oard.

    2. )ake t'e negati4e outut in and connect to t'e negati4e terminal o# t'e %read%oard

    3. )ake one o# t'e i!o 8!69 o&er oututs and connect to !cuino 8!19

    Ste :" ?!A System

    1. )ake your ?!A Camera 8!119 and connect to your transmitter 8!129 4ia ro4ided ca%les.

    2. Dttac' your small i!o attery 8!59 to your transmitter 8!129 4ia o&er ca%les ro4ided.3. Dttac' AGD ca%les to recei4er 8!139 and a monitor.

    ?!A Camera

  • 8/9/2019 Plan of Procedures

    11/12

    Sosa 11

    ?!A *ecei4er and )ransmitter

    Borks Cited

    Drduino Sc'ematic. igital image. )'iet%ic'etao. +.., n.d. Be%. 5 Jan. 2015.

    oscam )ransmitter lus *ecei4er. igital image. Dma-on. +.., n.d. Be%. 22 Jan. 2015.

  • 8/9/2019 Plan of Procedures

    12/12

    Sosa 12

    read%oard. igital image. Dda#ruit. +.., n.d. Be%. 1: Jan. 2015.

    rus'less motor. igital image. 'gate. +.., n.d. Be%. 1: Jan. 2015.

    rus'less motor &it' connections. igital image. Sa%est. +.., n.d. Be%. 20 Jan. 2015.

    ullet connectors. igital image. @eli#reak. +.., n.d. Be%. 22 Jan. 2015.

    ullet connection. igital image. Cycleterminal. +.., n.d. Be%. 22 Jan. 2015.

    ESC &it' connections. igital image. Biki.arduilot. +.., n.d. Be%. 20 Jan. 2015.

    G!S Module. igital image. Dda#ruit. +.., n.d. Be%. 10 Jan. 2015.

    GF;70 10 $?. igital image. 6troni. +.., n.d. Be%. 15 Jan. 2015.

    ?!A Camera. igital image. )eam lack S'ee. +.., n.d. Be%. 15 Jan. 2015

    it'ium!olymer attery. igital image. @o%%ying. +.., n.d. Be%. 22 Jan. 2015.

    !cuino. igital image. Sainsmart. +.., n.d. Be%. 5 Jan. 2015.

    Sektrum *ecei4er. igital image. Dma-on. +.., n.d. Be%. 22 Jan. 2015.