plan and profile of proposed state highway federal … · 2019. 9. 24. · plan and profile sheets...

3
C A N A D I A N N A T I O N A L 18 13 14 16 15 16 17 9 21 23 24 19 20 21 22 9 12 11 10 28 30 29 25 28 27 26 7 R16 W R15 W T 8 N T 8 N R16 W R15 W T o P r e n ti ss T o L a u r e l 107936 301000 107936 NH-0015-02(124) NH-0015-02(124) NH-0015-02(124) NONE NONE NONE 732+63.354 BK = 32+63.354 AH (70,000) 691+08.606 BK = 690+51.097 AH (54.509) 630+49.409 BK = 630+18.775 AH (30.634) 589+04.063 BK = 589+59.234 AH (-55.171) LT LN 732+63.354 BK = 32+63.354 AH (70,000) 689+04.063 BK = 690+51.097 AH (-57.511) 589+68.992 BK = 589+13.791 AH (55.201) RT LN B.O.P. STA. 530+00 COVINGTON E.O.P. STA. 732+64 20,262 20,262 COVINGTON COUNTY COLLINS BYPASS U.S. 84 { EQUATIONS EXCEPTIONS LENGTH DATA LENGTH OF ROADWAY LENGTH OF BRIDGES LENGTH OF PROJECT (NET) LENGTH OF PROJECT (GROSS) LENGTH OF EXCEPTIONS FT. FT. FT. MI. MI. MI. MI. MI. 3.529 0.308 3.838 3.838 1,628 18,634 1 SCALES PLAN PROFILE LAYOUT HOR. VERT. STATE OF MISSISSIPPI PLAN AND PROFILE OF PROPOSED STATE HIGHWAY 1 IN.= 100 FT. 1 IN.= 100 FT. 1 IN.= 10 FT. MISSISSIPPI DEPARTMENT OF TRANSPORTATION DESIGN CONTROL ADT ( ) = : ADT ( ) = DHV = : D = % T= % MPH = V (SPEED DESIGN) 1 IN.= 3,551 FT. ROADWAY DESI GN DI VI SI ON MI SSI SSI PPI DEPARTMENT OF TRANSPORTATI ON TI TLE PERMITS ACQUIRED BY MDOT NATIONWIDE #14 NATIONWIDE (OTHER)* GENERAL* INDIVIDUAL (404)* WETLANDS AND WATERS PERMITS WATERS WETLANDS APPROVED BY: STORMWATER PERMIT N N N N N N N N NO STORMWATER PERMIT REQUIRED (<1 ACRE) Y S N REQUIRED, CNOI SUBMITTED BY MDOT REQUIRED, SCNOI TO BE SUBMITTED BY N (DISTURBED AREA=5 ACRES) CONTRACTOR (1 TO 4.99 ACRES) COUNTY FEDERAL AID PROJECT NO. DA TE R E V I S I ON S B Y APPROVED: MISSISSIPPI DEPARTMENT OF TRANSPORTATION P S & E DATE: 7-25-19 DEPUTY EXECUTIVE DIRECTOR / CHIEF ENGINEER EXECUTIVE DIRECTOR 1 STATE SHEET NO. PROJECT NUMBER MISSISSIPPI / BRIDGE STRUCTURES REQ'D. BOX BRIDGES REQ'D. COUNTY LINE TOWN CORPORATION LINE SECTION LINE RAILROAD SURVEY LINE BRIDGES CONVENTIONAL SYMBOLS EXISTING ROAD OR TRAVELED WAY PROPOSED ROAD OR TRAVELED WAY NOTE INDICATES APPROXIMATE LOCATION OF PROJECT. PASCAGOULA GULFPORT LUCEDALE HATTIESBURG LAUREL MC COMB BROOKHAVEN PORT GIBSON NATCHEZ VICKSBURG FOREST MERI DI AN YAZOO CITY KOS CI US KO WEST POINT COLUMBUS GREENW OOD I NDI ANOL A GREENVI L LE GRENADA HOUSTON OXFORD BATES VI LL E CL ARKDAL E HOLLY SPRINGS NEW ALBANY T UP EL O F ULT ON C O R I N T H ABERDEEN JACKSON (APPROX. MIDDLE OF PROJECT) STATE MAP LAT. 31°39'15.69" N LONG. 89°34'19.82" W 8/19/2019 10:06 (01) TITLE SHEET.dgn AM P.E. GENERAL INDEX PROJECT THIS INCLUDED SHEET WITH BEGIN 9001 8001 7501 7001 6001 5001 4001 3001 2001 1001 1 ROADWAY . . . . . . . . . . . . . . . . . . . . PERMANENT SIGNS . . . . . . . . . . . TRAFFIC SIGNALS . . . . . . . . . . . . . ITS COMPONENTS . . . . . . . . . . . . . LIGHTING . . . . . . . . . . . . . . . . . . . . (RESERVED) . . . . . . . . . . . . . . . . . . . ROADWAY STANDARD DWGS . . BRIDGE . . . . . . . . . . . . . . . . . . . . . . CROSS SECTIONS . . . . . . . . . . . . . BOX CULVERT STD. DRAWINGS (LRFD) BOX CULVERT STD. DRAWINGS (STD. SPEC.) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S L S L S L / FMS CON. NO. SP-0015-02(124) 101000 1 8 / 18 / 19 P R O J E C T NU MB E R C HANG E S G 1 1 R O A D S U N S E T R O A D M O O N E Y R O A D C A G L E K O L A R O A D S T A W A T O R A W I L L I A M S B U R G R O A D C U T O F F R O A D A Y T O N R O A D T o w n C r e e k O k a t o m a C r e e k e k C r e e k D u n k B i g Sunset McDonald Kola 84 184 84 588

Upload: others

Post on 03-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • CAN

    ADIA

    N

    NATIONAL

    18131416

    15

    1617

    9

    2123 24 19 202122

    9 121110

    283029

    252827

    26

    7

    R 16 W R 15 W

    T 8 N

    T 8 N

    R 16 W R 15 W

    To Prentiss

    To La

    urel

    107936 301000

    107936

    NH-0015-02(124)

    NH-0015-02(124)

    NH-0015-02(124)

    NONE

    NONE

    NONE

    732+63.354 BK = 32+63.354 AH (70,000)691+08.606 BK = 690+51.097 AH (54.509)630+49.409 BK = 630+18.775 AH (30.634)589+04.063 BK = 589+59.234 AH (-55.171)

    LT LN

    732+63.354 BK = 32+63.354 AH (70,000)689+04.063 BK = 690+51.097 AH (-57.511)589+68.992 BK = 589+13.791 AH (55.201)

    RT LN

    B.O.P. STA. 530+00

    COVINGTON

    E.O.P. STA. 732+64

    20,262

    20,262

    COVINGTON COUNTYCOLLINS BYPASS

    U.S. 84

    {

    EQUATIONS EXCEPTIONS

    LENGTH DATA

    LENGTH OF ROADWAY

    LENGTH OF BRIDGES

    LENGTH OF PROJECT (NET)

    LENGTH OF PROJECT (GROSS)

    LENGTH OF EXCEPTIONS

    FT.

    FT.

    FT.

    MI.

    MI.

    MI.

    MI.

    MI.

    3.529

    0.308

    3.838

    3.838

    1,628

    18,634

    1

    SCALES

    PLAN

    PROFILE

    LAYOUT

    HOR.VERT.

    STATE OF MISSISSIPPI

    PLAN AND PROFILE OF PROPOSED

    STATE HIGHWAY

    1 IN.= 100 FT.

    1 IN.= 100 FT.1 IN.= 10 FT.

    MISSISSIPPI DEPARTMENT OF TRANSPORTATION

    DESIGN CONTROL

    ADT ( ) = : ADT ( ) =

    DHV = : D = % T= %

    MPH = V (SPEED DESIGN)

    1 IN.= 3,551 FT.

    RO

    AD

    WA

    Y

    DESIG

    N

    DIVISIO

    NMIS

    SIS

    SIP

    PI D

    EP

    AR

    TM

    EN

    T

    OF

    TR

    AN

    SP

    OR

    TA

    TIO

    N

    TIT

    LE

    PERMITS ACQUIRED BY MDOT

    NATIONWIDE #14

    NATIONWIDE (OTHER)*

    GENERAL*

    INDIVIDUAL (404)*

    WETLANDS AND WATERS PERMITS

    WATERS WETLANDS

    APPROVED BY:

    STORMWATER PERMIT

    N

    N

    N

    N

    N N

    N

    N

    NO STORMWATER PERMIT REQUIRED (

  • FILE NAME:

    DESIGN TEAM CHECKED DATEDA

    TE

    RE

    VISIO

    NB

    Y

    WORKING NUMBER

    SHEET NUMBER

    MISSISSIPPI DEPARTMENT OF TRANSPORTATION

    RO

    AD

    WA

    Y

    DESIG

    N

    DIVISIO

    NMIS

    SIS

    SIP

    PI D

    EP

    AR

    TM

    EN

    T

    OF

    TR

    AN

    SP

    OR

    TA

    TIO

    N

    PL

    AN

    8/15/2019

    8:01

    (02)

    DE

    TAI

    L I

    ND

    EX.dgn

    AM

    2

    STATE

    MISS.

    PROJECT NO.

    COUNTY:

    PROJ. NO.:

    FMS CON: /

    107936 301000

    DESCRIPTION OF SHEET NO. NO.WKG. SH.

    DESCRIPTION OF SHEET NO. NO.WKG. SH.

    DETAILED INDEX

    NH-0015-02(124)

    GREER

    (02) DETAIL INDEX.dgn

    NH-0015-02(124)

    COVINGTON

    TITLE SHEET

    DETAIL INDEXGENERAL NOTES

    TYPICAL SECTIONS (2) TYPICAL SECTION (MAINLINE)

    QUANTITY SHEETS (3)SUMMARY OF ESTIMATED QUANTITIESESTIMATED QUANTITIES FOR U.S. 84ESTIMATED QUANTITIES FOR TRAFFIC CONTROL SIGNS

    PLAN AND PROFILE SHEETS (12)

    SPECIAL DESIGN SHEETS (8)DETAIL CONSTRUCTION SIGNSCURB AND ISLAND STRIPINGDETAIL OF STRIPING CHENNELIZED INTERSECTIONTYPICAL PAVEMENT MARKING DETAIL FOR MEDIAN CROSSOVERSGUARDRAIL TYPICAL INSTALLATION AT BRIDGE APPROACHES FOR DIVIDED HIGHWAYS

    STANDARD DRAWINGS (15)

    2-WAY RAISED PAVEMENT MARKERS AT INTERSECTING ROADS (4-LANE)

    TYPICAL CROSSOVER DELINEATIONTYPICAL GUARDRAIL DELINEATIONTRAFFIC CONTROL PLAN WITH FLAGGERTRAFFIC CONTROL PLAN FOR POSTED SPEED LIMIT LESS THAN 65 MPH

    TRAFFIC CONTROL PLAN FOR POSTED SPEED LIMIT OF 65 OR 70 MPH (WORK DAY ONLY)HIGHWAY SIGNS AND BARRICADE DETAIL FOR CONSTRUCTION PROJECTSTRAFFIC CONTROL PLAN MOBILE OPERATIONS MULTILANE ROADS AND TWO-LANE ROADSTRAFFIC CONTROL PLANS UNEVEN PAVEMENT DETAILSTEMPORARY STRIPING FOR TRAFFIC CONTROL 2-LANE AND 4-LANE DIVIDED HIGHWAYS

    TRAFFIC CONTROL DETAILS DRUM PLACEMENT AND SHOULDER CLOSURE

    RURAL DRIVEWAYS

    TRAFFIC CONTROL PLAN FOR POSTED SPEED LIMIT OF 65 OR 70 MPH (EXTENDED PERIOD)

    PAVEMENT MARKING DETAILS FOR 2-LANE AND 4-LANE DIVIDED ROADWAYS

    RUMBLE STRIPES 4-LANE HIGHWAYS

    STOP SIGN RUMBLES

    TOTAL SHEETS = 43

    PM-1

    PM-12

    SN-8BSN-8CTCP-1TCP-2TCP-4TCP-5TCP-8TCP-9TCP-12TCP-13RD-1

    DI-1GN-1

    TS-1

    SQ-1EQ-1TCPQ-1

    WK3

    WK4

    WK5WK6

    WK7WK8WK9

    WK10

    DCS-1DCIS-1PMD-4SDXO-1GR-4-MOD

    RS-2

    SDSSR-1

    1

    23

    4

    678

    9101112

    14151617

    6051

    6062

    63166317635163526354635563586359636263636403

    212223

    2425

    6065

    26

    TYPICAL SECTION (RAMPS, LOCAL ROADS, CROSSOVERS)

    STA. 520+00 - STA. 550+00

    STA. 550+00 - STA. 580+00

    STA. 580+00 - STA. 610+00STA. 610+00 - STA. 640+00

    STA. 640+00 - STA. 670+00STA. 670+00 - STA. 700+00STA. 700+00 - STA. 730+00

    STA. 730+00 - STA. 45+00

    RAMP ALIGNMENTS WK6A

    13

    TS-2 5

    PM-9 6059TYPICAL PAVEMENT MARKING DETAIL FOR MEDIAN CROSSOVERS

    27UNDERSEALING CONCRETE PAVING DETAIL UCPD-1

    LOCAL ROAD PAVING LIMIT

    LOCAL ROAD PAVING LIMIT

    LOCAL ROAD PAVING LIMIT

    WK3A

    WK4A

    WK9A181920

    28

    DI-1

    SDTCP-16

    REVISIONS

    DATE SHEET NO. BY

    PS & E PLANS-DATE 7-25-19

    FMS CON. # 107936/301000

    8-19-19 1, 4 SG

  • 107936 301000

    ARE APPROXIMATE AND MAY BE ADJUSTED AS NECESSARY TO FIT FIELD CONDITIONS.THE LOCATION AND SPACING OF SIGNS AS SHOWN ON THE TRAFFIC CONTROL PLANS

    MUTCD (LATEST EDITION).ALL TRAFFIC CONTROL DEVICES ON THIS PROJECT SHALL COMPLY WITH PART 6 OF THE

    AND BORDER ON WHITE BACKGROUND.CONTROL SIGNS EXCEPT FOR THOSE DESIGNATED ON THE PLANS TO BE BLACK LEGENDFLUORESCENT ORANGE SHEETING SHALL BE USED ON ALL CONSTRUCTION AND TRAFFIC

    TIRES OR SUITABLE MATERIAL.ALL PLASTIC DRUMS SHALL HAVE A BALLASTING COLLAR MADE FROM RECYCLED TRUCK

    PAY ITEMS. SHALL BE REMOVED AND RESET BY THE CONTRACTOR; COST TO BE ABSORBED IN OTHERALL SIGNS AND DELINEATORS THAT CONFLICT WITH THE CONSTRUCTION OF THIS PROJECT

    IN OTHER PAY ITEMS.SHOULDER MATERIAL BY LIGHTLY BLADING OR CLOSELY MOWING; COST TO BE ABSORBED THE GRASS ON EXISTING SHOULDERS SHALL BE REMOVED PRIOR TO THE PLACEMENT OF

    WATER ON MILLED SURFACE; COST TO BE ABSORBED IN OTHER PAY ITEMS.IN THE EXISTING SHOULDER AT SUFFICIENT INTERVALS TO PREVENT POOLING OR STANDING WHERE MILLING OF THE ROADWAY IS REQUIRED, THE CONTRACTOR SHALL PROVIDE OUTLETS

    REPLACEMENT OR REPAIR OF DAMAGED ITEMS.STRUCTURES DAMAGED DURING THE LIFE OF THE CONTRACT. NO PAYMENT WILL BE MADE FORCONSTRUCTION. THE CONTRACTOR SHALL REPLACE OR REPAIR, AS DIRECTED BY THE ENGINEER, ANYAS PIPES, INLETS, APRONS, BRIDGES, ETC., FROM DAMAGE WHICH MIGHT OCCUR DURINGIT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT EXISTING STRUCTURES SUCH

    COST TO BE ABSORBED IN OTHER PAY ITEMS. THE CONTRACTOR SHALL REMOVE EXISTING PAVEMENT MARKERS PRIOR TO PLACING ASPHALT;

    TO BE ABSORBED IN OTHER PAY ITEMS. SHALL BE PAINTED ( TWO APPLICATIONS ) WITH WHITE TRAFFIC PAINT AND TRAFFIC BEADS ; COSTALL ASPHALT AND CONCRETE CURBS ALONG RAMPS, LOCAL ROADS, ETC. FROM B.O.P. TO E.O.P.

    CURB WILL BE REMOVED AS DIRECTED BY THE ENGINEER; COST TO BE ABSORBED IN OTHER PAY ITEMS.IF THE ASPHALT CURB ALONG THE LOCAL ROAD IS SEVERELY DAMAGED, THE ENTIRE ASPHALT

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    ALL LOCAL ROADS SHALL BE PAVED TO THE R.O.W. LIMITS OR AS DIRECTED BY THE ENGINEER.

    17

    18

    19

    20

    12

    22

    23

    IF ANY ADDENDA HAVE BEEN POSTED FOR THIS PROJECT. FOR THIS PROJECT WILL NOT BE MAILED. IT'S THE BIDDERS'S RESPONSIBILITY TO CHECK AND SEE PROPOSAL ADDENDA COLUMN. BIDDERS ARE ADVISED THAT HARD COPIES OF ANY ADDENDAALL ADDENDA FOR THIS PROJECT WILL BE POSTED ON WWW.MDOT.MS.GOV UNDER THE

    15

    16

    MARKS ON WET OR DRY SURFACES.HALF OF ALL SIGNS WITH A PERMANENT MARKING STICK THAT IS WATERPROOF, FADE RESISTANT AND INSTALLATION DATES SHALL BE CLEARLY WRITTEN IN BOLD BLACK MARKINGS ON THE BACK BOTTOM

    SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR PRIOR TO FABRICATION.ALL POST, PIPE, AND I-BEAM LENGTHS IN THESE PLANS ARE ESTIMATES. POST LENGTHS FOR ALL SIGNS

    OF THE CONTRACTOR AND ARE NOT A SEPARATE PAY ITEM.ALL EXISTING SIGNS AND SUPPORTS REMOVED UNDER THIS PROJECT SHALL BECOME THE PROPERTY

    WITH THE UNIQUE ID NUMBER. EACH SIGN SHALL BE SUBMITTED IN BITMAP FORMAT. THE PHOTO FILE NAME SHALL CORRESPOND APPLICABLE. EACH SIGN SHALL BE ASSIGNED A UNIQUE ID NUMBER AND A DIGITAL PHOTO OF DIRECTION, ROUTE NAME OR NUMBER, DIRECTION OF VEHICLE TRAVEL, AND LEGEND ON SIGN IF (POST, PIPE, SQUARE POST, OR I-BEAM), NUMBER OF SUPPORTS, DATE INSTALLED, SIGN FACE COORDINATES), MUTCD SIGN CODE, SIZE, BACKGROUND AND LEGEND COLORS, SUPPORT TYPE INVENTORY DATA CAPTURED FOR EACH SIGN: LOCATION OF SIGN (LATITUDE - LONGITUDE GPS PROJECT ENGINEER A DIGITAL COPY OF A MICROSOFT EXCEL SPREADSHEET WITH THE FOLLOWING AFTER THE PERMANENT SIGNS HAVE BEEN INSTALLED, THE CONTRACTOR SHALL SUBMIT TO THE

    ENGINEER, THE COST OF WHICH SHALL BE ABSORBED IN OTHER ITEMS BID.WITH CONSTRUCTION SHALL BE REMOVED AND RELOCATED BY THE CONTRACTOR AS DIRECTED BY THE NOTED OR DIRECTED OTHERWISE BY THE PROJECT ENGINEER. ROADWAY SIGNS THAT ARE IN CONFLICT CONFLICT WITH CONSTRUCTION SHALL REMAIN IN PLACE UNTIL NEW SIGNS ARE INSTALLED UNLESS ALL EXISTING SIGNS WHICH ARE TO BE REMOVED AS A PART OF THIS PROJECT THAT ARE NOT IN

    WRITTEN APPROVAL FROM MDOT'S PROJECT ENGINEER.PRODUCED SIGN COPY, SHIELDS, LEGEND, SYMBOLS, OR IMAGES WILL NOT BE ALLOWED WITHOUT DIRECT-APPLIED LEGEND, BORDER, AND/OR SHIELDS ARE TO BE USED ON ALL GUIDE SIGNS. DIGITALLY

    AS DIRECTED BY THE ENGINEER WITHIN THE R.O.W. LIMITS. ALL RAMPS AND DRIVEWAY PADS SHALL BE PAVED TO THE SHOULDER LINE, MINIMUM OR FURTHER,

    USED AND APPROVED BY THE PROJECT ENGINEER. ASPHALT, BUT MUST BE PLACED DIRECTLY ON THE GRAVEL SHOULDER OR A ROAD WIDENER MACHINE GRANULAR MATERIAL WILL NOT BE ALLOWED TO BE PLACED DIRECTLY ON THE SURFACE LIFT OF

    STORAGE OF FLAMMABLE MATERIALS WILL NOT BE ALLOWED UNDER ANY BRIDGE STRUCTURES.

    GENERAL NOTES GENERAL NOTES (CONT.)

    S. GREER

    (03) GENERAL NOTES.dgn

    COVINGTON

    NH-0015-02(124)

    GN-1

    NH-0015-02(124)

    FILENAME:

    DESIGN TEAM CHECKED DATEDA

    TE

    RE

    VISIO

    NB

    Y

    WORKING NUMBER

    SHEET NUMBER

    MISSISSIPPI DEPARTMENT OF TRANSPORTATION

    RO

    AD

    WA

    Y

    DESIG

    N

    DIVISIO

    NMIS

    SIS

    SIP

    PI D

    EP

    AR

    TM

    EN

    T

    OF

    TR

    AN

    SP

    OR

    TA

    TIO

    N

    PL

    AN

    8/15/2019

    8:01

    (03)

    GE

    NE

    RA

    L

    NO

    TE

    S.dgn

    AM

    3

    STATE

    MISS.

    PROJECT NO.

    COUNTY:

    PROJ. NO.:

    FMS CON: /

    GENERAL NOTES

    24

    25

    BE MADE FOR SUCH WORK EXCEPT AS PROVIDED BY SPECIFIC PAY ITEMS IN THE PLANS. SOME WORK IS REQUIRED OUTSIDE OF THE PROJECT LIMITS. NO ADDITIONAL COMPENSATION WILL

    ROADS, AND RAMPS ARE TO BE PAVED WITH 9.5MM ST ASPHALT. MAINLINE TO BE PAVED WITH 9.5MM HT POLYMER MODIFIED ASPHALT. CROSSOVERS, LOCAL

    MAY BE DELAYED FOR A PERIOD NOT TO EXCEED THREE (3) DAYS. (2) TEMPORARY EDGE LINES ON PROJECTS REQUIRING SHOULDERS CONSTRUCTED OF GRANULAR MATERIAL DAYS FOR A TWO OR THREE LANE ROAD(1) REPLACEMENT OF NO-PASSING STRIPES MAY BE DELAYED FOR A PERIOD NOT TO EXCEED THREE (3)

    PERMIT, EXCEPT THAT: WORK IS DISCONTINUED FOR THE DAY OR AS SOON THEREAFTER AS WEATHER CONDITIONS WILL BEEN REMOVED DURING THE DAY'S OPERATIONS SHALL BE REPLACED WITH TEMPORARY STRIPE BEFORE EDGE LINES, AND NO-PASSING STRIPES THAT HAVE SHALL BE PLACED IN THE SAME LOCATIONS AND LAYOUT AS PERMANENT STRIPE. ALL CENTERLINE, LANE LINES, TEMPORARY STRIPING SHALL BE REQUIRED AFTER MILLING AND OVERLAYING OPERATIONS; TEMPORARY STRIPING

    26

    SHALL BE COVERED OR REMOVED AS DIRECTED BY THE ENGINEER. IMPLEMENTING TRAFFIC CONTROL PLAN AS DIRECTED BY THE ENGINEER. ALL CONFLICTING SIGNS THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTOR FROM ADJACENT PROJECT(S) IN