CorporateProfile

(14 3959-V)PLB- Bina Sdn. Bhd.

Amemberof

R

PLB- Bina Sdn. Bhd.

Committed to provide our customers with quality

products and services which not only meet their

requirements but drive their success.

In fulfilling our commitment, we shall keep abreast

with technological advancement; be innovative and

continually seek improvement in everything we do. We

shall live quality as a way of life and shall pursue

excellence at every level so that we may consistently

and continually delight our customers in their

associations with

As a

certified company, we are...

MS ISO 9001:2000

MSISO9001:2000REG. NO.AR2341

Contents

page 1

page 2

page 3

page 4

page 6

page 7

page 9

page 10

page 11

Executive Summary

The Company - PLB-KH Bina

Corporate Information

Organization Structure

Management Team

Financial Highlights

List of Assets - Heavy Machinery& Equipment

Project Information

Corporate Structure

Value of Contracts fortheLast5Years- List ofPrestigious Projects- List of On-Going Projects(per type of project)- List ofCompleted Projects (per type of project)

This profile was lastupdated on 1st October 2005

Corporate Profile

MSISO9001:2000REG.NO.AR2341

ExecutiveSummary

Executive Summary

Corporate Profile 1

TheCompany

Management Team

Financial Highlights

List of Assets - Heavy MachineryandEquipment

Expertise

PLB-KH Bina Sdn Bhd (“PKH/ The Company”) is awhollyownedsubsidiaryofPLBEngineeringBerhad;a public-listed companyonBursaMalaysia. PKH isthe construction arm and one of the major revenuecontributortoPLBEngineeringBerhad.

The Company had its inception in 1973 when itcommenced business in foundry works, steelfabrication,and the fabricationofmachineryparts.Todate,PKHhasgrowntobeapremiercontractor withapaid up capital of RM3 million.

thereby allowing the Company toundertake building construction projects of unlimitedvalue.

Our Management playsanimportant role to lead theCompany to meet the discerning needsof our clientsthrough , , , and

; the cornerstones of our success.

PKHcanaddvaluetoyourconstructionrequirementswith the support of our experienced professionals ledby the Executive Chairman, Dato' Ong Choo Hoonwho has been involved in the construction andproperty development industries for more than 30years. Intheareaofprojectplanning, redesigning andoperations management, Dato' Dr. Ong Seng Soon,theManagingDirectorofPKH, leadsawell-balancedteamofengineersandprojectmanagers.

The company isregistered as a PKK-Class A and CIDB-G7contractor

PKH has also been certified by Sirim QASSdn Bhdof MS ISO: 9001 : 2000 for Provision ofConstruction Services In Building and CivilEngineering Works and Design Coordination andManagementofTurnkeyProjects.

Flexibility Innovation TeamworkExpertise

PKH has had an average turnover of more than RM100 millionperyear for thepast5financialyears. Ourshareholders' fund and total assets are RM25.7million and RM128 million respectively. In addition,theCompany isonasoundfinancialfootingtoassumesizeable projects with the strong back- up of ourprincipalbankers.

For flexibility in machinery and equipment supply tothe construction site, PKH has its own fleet of heavy

machinery and motor vehicles to support ourconstruction activities. The logistics support enablesus to manage our projects more efficiently to ensureon-timecompletionofourconstructions.

PKH hasextensive experience inhandling industrial,commercial, hotel and residential buildingconstructions including turnkey projects that are“Design and Build” in nature. The Company hassuccessfully completed an array of projects with atotal projectvalueofmorethanRM1billion.SomeofPKH's valued customers include PermodalanNational Berhad (PNB), Majlis Perbandaran PulauPinang (MPPP),KumpulanWang Simpanan Pekerja(KWSP), Acidchem International Sdn Bhd,Carrefour, AcerTechnologiesandXerox.

We, the BoardofDirectors,trustthatthisprofilewillbe able to provide you with sufficient informationabout PKH to make an informed decision on ourcapabilities in meeting your constructionrequirements.

We thank you for according us the opportunity tosubmit our proposal and we look forward to amutuallybeneficialrelationship.

BoardofDirectorsPLB-KHBinaSdnBhd

Pic:PLBEngineeringBerhad’sHeadOfficeatPrai,Penang.

MSISO9001:2000REG.NO.AR2341

CorporateStructure

Corporate Structure

Sebadi Corporation SdnBhd100%

VestingoldSdnBhd51%

PLB Green Construction Sdn Bhd70%

PLB Steel Engineering Sdn Bhd70%

PLB- Bina Sdn Bhd100%

Gaintrend Sdn Bhd100%

PLB Land Sdn Bhd100%

ConstructionMaterial

Manufacturing

PropertyDevelopment

PLB Ventures Sdn Bhd100%

Era Pujaan SdnBhd100%

ImbasKaya Sdn Bhd100%

Pelangi Sehati Development Sdn Bhd100%

Hektar PujaanSdnBhd100%

Excelgrand Properties Sdn Bhd100%

InvestmentHolding

InformationTechnology

PLB.Com Ventures Sdn Bhd100%

FattigoldSdnBhd51%

DilligentSuccess SdnBhd50%

Corporate Profile 2

MSISO9001:2000REG.NO.AR2341

Builtonlands Palm SdnBhd33.5%

Construction

Dynabricks Sdn Bhd100%

SubsidiaryAssociated Company

Indah MuliaDevelopment SdnBhd100%

LandsdaleDevelopment Sdn Bhd100%

PLB - Wonder Bay DevelopmentSdnBhd50.0%

PLB Leisure SdnBhd100%

The Company

- PLB-KH Bina

The Company

PLB- Bina SdnBhdKH

Pic:OurstaffatourprojectsiteinPenang.

PLB-KH Bina Sdn Bhd (“PKH/ the Company”) wasincorporated in Malaysia on 22 August 1985 as aprivate limited company. The Company is a whollysubsidiary of PLB Engineering Berhad; a public-listed company on Bursa Malaysia with a paid-upcapitalofRM91.3 million.

The principal activity of PKH is the construction ofbuildings and infrastructure in the industrial,commercial, hotel and residential sectors. PKHprovides designing, planning and managementsupport services in civil engineering, structural andpiling projects. The Company has also accumulatedexperience and expertise in the management ofTurnkeyprojects where we provide a comprehensivepackageofservicesindesign,constructionandprojectmanagement. To date, PKH has undertaken amultitude of construction projects of various designsandstructuresthroughoutthenation withanemphasisonindustrialbuildings.

The strong foundation and experience of PKH'smanagement team in the construction industry hasbeen honed for almost 30 years since 1973. Led byDato' Ong Choo Hoon, the Executive Chairman ofPKH andthefounder ofthecompany, the Company'sbusinesscommenced with steeland metal fabricationand later expanded into construction in 1976.Currently, the day to day operations, planning andstrategic management come under the purview ofDato'Dr.OngSengSoon,theManagingDirector,whohas propelled the Company to greater heights withconstructionastheprimecontributor.

which allows the Company totender and participate in the construction ofgovernment andprivateprojectsofunlimitedvalue.Inthe course of providingquality constructions to meetthe discerning requirements of our clients, we haveadopted standardized procedures through a provenQuality Management System. PKH is the firstconstruction-based company to be certified by SirimQAS Sdn Bhd of the standardunder the scope of

Ournetworkofcementedpartnershipswitharchitects,consultants and specialist contractors in the variousrelated fields enables us to service the total projectrequirementsofourclients.

PKHisproudof theexcellentback-up andafter-salesservicethat weoffertoourclients.

PKH has emphasized the importance of training anddevelopment of our human resource to ensurecompetence. With the rising significance ofInformation Technology, the Company has investedheavily in software and hardware for greaterefficiencyinoperationsmanagementandcontrol.Asaresponsible corporate citizen, PKH diligentlysubscribes to the strict conformance of SafetyStandards atourjobsites.

With theexpertise and commitment of the team, ourproven track record and a sound financial backing,PKH can continue to undertake and implementprojectsto thehigheststandardofquality.

PKH is registered as a PKK Class A and CIDBGrade G7 contractor

MS:ISO 9001 : 2000Provision of Construction

Services in Building and Civil Engineering Worksand Design Coordination and Management ofTurnkeyProjects.

Corporate Profile 3

MS ISO 9001:2000 REG.NO.AR2341

MSISO9001:2000REG.NO.AR2341

CorporateInformation

Corporate Information

Date of Incorporation

Authorised Capital

Paid-upCapital

Board ofDirectors

Company Secretaries

Shareholder

Registered Office

22 August, 1985

RM25,000,000.00 divided into 25,000,000ordinary shares of RM1.00 each

RM20,000,000.00 divided into 20,000,000ordinary shares of RM1.00 each

Dato' Ong Choo HoonDato' Dr. Ong SengSoonMs. Ong Guat BengMr. Ong Seng ChyeEncik Mardzukhi Bin Abu BakarMr. Happy Ng Neoh Soo

Mr. Tan Choong Khiang

PLB Engineering BerhadListed on the Main Board of the Kuala Lumpur Stock ExchangePaid-upcapital as at1stApril 2005 is RM91,279,667.00 dividedinto91,279,667 ordinary shares of RM1.00 each

51-8-B Menara BHLBank, Jalan SultanAhmad Shah, 10050 Penang

(Executive Chairman(Managing Director)

(Executive Director)(Executive Director)

(Executive Director)(Executive Director)

(MAICSA7018448)

)

Datin Ooi A h Yew

1320,Jalan Baru, Taman Chai Leng,13700Prai, Penang,West MalaysiaTelephone No: 604-3905737 FaxNo:604-3996579E-mail Address: [email protected] or [email protected]

JB Lau & Associates,51-8-A Menara BHLBank, Jalan SultanAhmad Shah, 10050 Penang

RHBBank BerhadMalayan Banking BerhadEONBank BerhadHong Leong Bank BerhadAlliance Bank Malaysia Berhad

(Director)

BusinessAddress

Auditor

Bankers

Corporate Profile 4

MSISO9001:2000REG.NO.AR2341

Corporate Information (cont’d)

Solicitors

Government Registration

RelevantAssociationsMembership

MessrsKhor,Anuar&KhongMessrs SAN & AssociatesMessrs Ghazi & LimMessrs Ban Eng,Anual & Foong

1. Pusat Khidmat Kontraktor (PKK) Class “A” Contractor2. Construction IndustryDevelopment Board Malaysia (CIDB)

GradeG7Contractor3. Jabatan Perkhidmatan Pembetungan,

Kementerian PerumahandanKerajaan Tempatan, Lesen KelasD

1.

2.Committee Member

3.Honorary Treasurer @ AlternateCommittee

4.

5. N ational Instituteof Occupational Safety & Health (NIOSH)Member

6. Malaysia Institute of ManagementMember

7. Malaysian Employers FederationMember

Messrs Salina Lim Kim Chuan & Co.Messrs Ibrahim & KimMessrs Shahrizat, Rashid & LeeMessrs Zaid Ibrahim & Co.

Master BuildersAssociation MalaysiaMemberPenang Chinese Chamber of Commerce

Penang Builders' & Building Materials Dealers' Association

Penang State Foundry & Engineering IndustrialAssociationHonourary President

Corporate Profile 5

MSISO9001:2000REG.NO.AR2341

OrganizationStructure

ManagementTeam

Management Team

With over 31 years of experience in the constructionindustry, the Group Executive Chairman Dato' OngChoo Hoon, plays an importantrole in the company.On the day-to-day management, he is s upported by astrong team of qualified engineers and professionalswho have proven track record in the constructionindustry.

, aged 39 is the

. He holds a degree of Doctorate ofPhilosophy (Ph.D.) in Construction Managementfrom Clayton University, United States of America.He joined PLB-KH Bina Sdn.Bhd asaSiteEngineerin 1989 and was promoted to Project Engineer thefollowing year, was responsible for the site andconstruction management of all major constructionprojects undertaken by the Company. He wasappointed to the board of directors in 1993 and wassubsequently appointed to the current position in1995. He has more than 15 years of experience invarious aspects oftheconstruction industry includingsite management, project management, constructionmanagement, marketing, corporate planning andbusinessdevelopment.

, aged 39, is the. HegraduatedfromTunkuAbdulRahman

College i n 1992. HejoinedtheCompanysince1997and waspromoted tothecurrentpositionin2001. Hehas more than 12years of working experience. Priorto the current position, he was with an internationalauditing firm with the last held position as AssistantAudit Manager. He is a member of the MalaysianInstituteofCertifiedPublicAccountants,amemberofMalaysian Institute of Accountants, an associatememberofMalaysianInstituteofTaxation,amemberof the Company Secretaries Practice Group of theMalaysian Association of the Institute of CharteredSecretaries and Administration and a certifiedmember of Financial Planning Association ofMalaysia.

, aged 50, is the. She graduated in Master of

Business Administration from Southern PacificUniversity, United States of America in 2003. In1999, she joined the Company to head theProcurement Department in the areas of Purchasing,Store and Facilities, which consist of a fleet ofmachineries. Under her supervision, theDepartmentexpanded to include TradingofConstruction Material

DATO' ONG CHOO HOON

ONG GUAT BENG

, aged 65, is the. He is thefounder of the PLB

Groupandhasmorethan39yearsofexperienceinthemachinery, engineering and construction industry.He was actively involved in machine engineeringcontracts andprovisionofmaintenance servicesfrom1962to1975beforehesubsequentlyventuredintotheconstructionbusinessin1976. Dato' Ong ChooHoonhas alsoembarkedonanumberofsuccessfulpropertydevelopment projects over the years. He representsPLB-KH Bina Sdn. Bhd. as thepatron of the PenangState Foundry and Engineering IndustriesAssociation. He is responsible for the overallmanagement and strategic planning of the Group.Currently, he also sits on the board of several privatelimitedcompanies.

, aged 47, is an. She joinedPLB-KHBinaSdn.Bhd.(PKH)

in1977toassistDato'OngChooHoon to oversee theoverall operation of PKH. She has over 25 years ofworking experience in purchasing, accounting andoffice administration. Subsequently, she wasspeciallyassigned to overseetheFinance andHumanResource and Administration Departments.Currently, she oversees the Human Resource,Procurement and Internal Audit Divisions of theCompany. Madam Ong Guat Beng also assists theGroup Executive Chairman and Group ManagingDirector in the overalloperationsandmanagementoftheCompanyespeciallyinsitemanagement,financialmanagement, human resource management, etc.Currently,shealsosits ontheboardofseveralprivatelimitedcompanieswithintheGroup.

Executive Chairman

ExecutiveDirector

DATO' DR. RICKSON ONG

CH'NG HEAN LAY

NANCY SOON TET SIM

Managing Director and Project ManagementDivision Head

FinancialController

SeniorProcurement Manager

He isMajor(AssociateOfficer)of theDepartmentofCivil Defence (Ministry of Internal Security), amember of the Board of Engineers of Malaysia, aGraduate Member of Institute of EngineeringsMalaysia, a Committee Memberof Penang ChineseChamber of Commerce, represent PKH as anAlternate Committee Member of Penang MasterBuilders & Building Materials Dealers Associationand a Director of Penang Han Chiang AssociatedChineseSchoolAssociation.

HAPPYNG, aged 44, i s an . Hegraduated fromTunkuAbdulRahman Collegewith aDiploma in Technology (Building) in 1982. HejoinedtheCompanyin1989asQuantity Surveyorandwas then promoted to GeneralManager of ContractDepartment in 1997 and to theboard in 1999. Withmore than 20 years of experience in contractadministration, contract management, businessdevelopment and property management, he isresponsible to lead the Project Administration andQualitySystemManagementDepartment..

Executive Director

Corporate Profile 7

MSISO9001:2000REG.NO.AR2341

Management Team (cont’d)

LIM KEAN SOON

CHELLAPPA DURAI MURUGAN

, aged 49, is ainContractDepartment.Hegraduatedfrom

Kolej Tunku Abdul Rahman, Kuala Lumpur with aDiploma in Technology(Building) in 1978. Withmore than 26 years of experience in QuantitySurveying, he has handled a variety of projectsranging from highrise commercial buildings,condominiums, residential houses to industrialfactory.HejoinedtheCompanyin2002.

, aged 37 is a. He holds Bachelor of

Engineering degreeinCivilEngineering andobtainsaMaster of Engineering (Geotechnical) fromAnnamalai University,India in 1990.

He joined PLB-KH in1996. He has more than 14years of working experience in the constructionindustry and involved in various types of projectsincluding many highrise office complexes andcondominiums,

ContractsManager

Senior Project Manager

,aged43,isanPriortojoining PLB-KH,hehas 23yearsof

experience in construction and involved in projectssuch as housing, shophouses, road bridge andbuildings.HejoinedtheCompanyin2002.

, aged 49, is anand oversees the business

development oftheGroup. He obtained a Certificatein Building StructuralDraughtsmanship from MARAInstitute in 1979 and subsequently, a Diploma inBusiness Administration from the Institute ofBusiness Administration and Management in 2002.He hasbeen involvedin the construction industry formore than 21years.HewasappointedasaCouncillorto Majlis Perbandaran Seberang Perai from 1989 to1990. Currently, he oversees the Safety andAdministration Department of the Company and alsosits on the boardofseveral private limited companieswithintheGroup.

aged 31, is a Human ResourceManager. She holds an ABE Diploma in BusinessAdministration and has over 9 years' experience inHumanResource.ShejoinedtheCompanyin2000.

CHENWOONHIM

MARDZUKHI BINABU BAKAR

NG HOOI KEAM,

AssistantProjectManager.

Executive Director

POHSIAMHUANG,aged48,isholdingthepositionof in Contract Department. Shegraduated in Master ofBusinessAdministration fromUniversity of Dubuque, IOWA USA in 1998 afterobtaining her Bachelor of Science (Business Admin)from BemidjiStateUniversity,USAin1991. Prior tothis, she obtained her certificate in Technology(Building) from TARCollege, KL in1980. She hasmore than 23 years of experience in QuantitySurveyingworkofvariousprojects.

Contracts Manager

Currently, he isundergoing a MBA degreecourseinforeignbusiness.

various commercial and industrialbuildings.

Support ing Departments from PLBENGINEERINGBERHAD

Corporate Profile 8

MSISO9001:2000REG.NO.AR2341

FinancialHighlights

Financial Highlights

Turnover:1999-2004 ProfitBeforeTaxation:1999-2004

Shareholders’Funds:1999-2004 Total Assets: 1999 - 2004

Corporate Profile 9

MSISO9001:2000REG.NO.AR2341

*:Restated

2000 2001 2002* 2003* 2004RM RM RM RM RM

('000) ('000) ('000) ('000) ('000)Turnover 109,076 113,652 88,944 142,523 110,865Profit/(Loss) Before Taxation 14,097 6,045 (32,605) 1,096 469Shareholders' Funds 50,411 58,837 26,631 25,717 26,280Total Assets 142,164 162,343 136,023 125,458 128,171

0

2 0 , 0 0 0

4 0 , 0 0 0

6 0 , 0 0 0

8 0 , 0 0 0

1 0 0 , 0 0 0

1 2 0 , 0 0 0

1 4 0 , 0 0 0

1 6 0 , 0 0 0

R M ( ' 0 0 0 )

2 0 0 0 2 0 0 1 2 0 0 2 * 2 0 0 3 * 2 0 0 4

0

10,000

20,000

30,000

40,000

50,000

60,000

RM ('000)

2000 2001 2002* 2003* 2004

- 3 5 , 0 0 0- 3 0 , 0 0 0

- 2 5 , 0 0 0- 2 0 , 0 0 0

- 1 5 , 0 0 0

- 1 0 , 0 0 0- 5 , 0 0 0

05 , 0 0 0

1 0 , 0 0 0

1 5 , 0 0 0

R M ( ' 0 0 0 )

2 0 0 0 2 0 0 1 2 0 0 2 * 2 0 0 3 * 2 0 0 4

0

20,000

40,000

60,00080,000

100,000

120,000140,000

160,000180,000

RM ('000)

2000 2001 2002* 2003* 2004

List of Assets

- Heavy Machinery& Equipment

List of Assets- Heavy Machinery & Equipment

Corporate Profile 10

MSISO9001:2000REG.NO.AR2341

ITEMS DESCRIPTION QUANTITY

Static Pump Putzmeister concrete pump 2

Passenger Hoist EUROLIFT DH 10 1WICKHAM GP 1500 HS 1

Tower Crane BKT BN135 1BKT BN140 1BKT BN165 1Raimondi LR60 1

Crane 16ton Nissan Tadano 200L 125 tonne P & H T250M 1

Backhoe Loader Loader JCB-3D 2Loader John Deere 310C 1JCB 3CX 1

Forklift Toyota 2.5 tonnes (w/o registration card) 1

1 Tonner Truck Toyota Dyna Hi-Ace LY100-TBMBS3 1

6 - 8 Tonner Truck Mitsubishi Fuso FM15LRDGI 1Hino FF174A 2Nissan CPB15NE 2

10 Tonner Truck Nissan CW45HD Dump Truck 1Hino ZM500 1

Cargo Truck Nissan CK31 1

Mixer Truck Nissan CWM430M 10

Pick-up Van Daihatsu S70T 1Daihatsu Hijet S89R-LPR 1

ProjectInformation

- Value of Contracts forthe Last 5 Years

- List of PrestigiousProjects

- List of On-Going Projects- List of Completed Projects

Project Information

Value Of Contract Secured For Past 5 Years (2000 to 2004)

Corporate Profile 11

MSISO9001:2000REG.NO.AR2341

83,652,646.40

91,095,332.52

62,064,088.19112,574,447.90

105,861,138.27

2000 2001 2002 2003 2004

Year Contract Value (RM)2000 83,652,646.402001 91,095,332.522002 62,064,088.192003 112,574,447.902004 105,861,138.27

455,247,653.28

Total Contract Value for the past 5 years:

List of Prestigious Projects

Industrial Projects Commercial Projects

Manufacturingplant,warehouse,officeblock,2storeynew factory, renovation to existing warehouse, sportcomplex and canteenatSeberang Jaya Industrial Parkfor AcerTechnologiesSdn.Bhd.

3storeyfactory in Prai IndustrialEstatefor(now occupied byFuji-Xerox

CorporationMalaysia)

Reconstruction of Plant, Substation, Sports Complex,Canteen and Drumming Shed, New Workshop,Laboratory, Chemical Store, Warehouses, BeadingPlant, Soap Plant, Guard House, Open Drum Shed, 3S to rey Of f i ce Block , Ta n k Founda t ion ,Refurbishmentworks, Piling works and New FatSplittingPlant& HydrogenationPlantinPraiIndustrialEstatefor

CAMPrecision Sdn Bhd

Acidchem(M)Sdn.Bhd.

Parkson Grand Phase I in Ipoh, Perak for

12 storey officecomplex on Lots2315 & 2332,Section 2, BandarButterworth,Seberang PeraiUtara for

Commercial complex with 6-storey office and 1-storey basement carpark on Lot 1436 & 261, Mk 4,S.P.T.,Penangfor

SeritawanSdn.Bhd.

SiramPermai Sdn.Bhd.

S.J.DevelopmentSdn.Bhd.

Corporate Profile 12

MSISO9001:2000REG.NO.AR2341

List of Prestigious Projects (cont’d)

Commercial Projects

Complet ion o funcompleted 27-storey office withmazzanine floora n d 2 l e v e l sbasement carparkon Lot 1406,Section 46, JalanRaja Laut, KualaL u m p u r f o r

Mixed development (Ipoh Parade Phase 2) in Ipoh,Perak DarulRidzuanfor

Hypermarket on Lots 197, 207, 208, 209&4466andpart of lots 4485 & 340, Mukim 1, Seberang PeraiTengah, Pulau Pinang for

275unitsof3storeyshops/offices,105unitsof2storeyshops/offices and relevant infrastructure works onPT23787-PT23918,PT23751-PT23771,PT24046andPT22815-PT22919onParcelA&I3,Phase1,Sector6,Bandar Amanjaya, Mukim Sungai Petani, KedahDarulamanfor

12 storey office building with a 3 storey podium, 9storey office tower andcar parking facilityat Lot PT3858 Mk. 1, Daerah Seberang Perai (T) for

P e r m o d a l a nNasional Bhd.

SeritawanSdn.Bhd.

Magnificient DiagraphSdn.Bhd.(CarrefourSeberangJaya)

KejoraHartaBerhad

KumpulanWangSimpananPekerja (KWSP)

Corporate Profile 13

MSISO9001:2000REG.NO.AR2341

List of Prestigious Projects (cont’d)

Corporate Profile

ResidentialProjects

11StoreyapartmentonLot-lot2315&2332,Section2,Bandar Butterworth, S.P.U. for

2 blocks of 5 storey medium-cost apartment whichconsist of 200 residential units on Lot 301, Mk 14,SeberangPeraiTengah,ProvinceWellesleyfor

Siram Permai Sdn.Bhd.

ZhengDeMaiEnterpriseSdn.Bhd.

Low and medium cost housing development on Lot953, MukimSidamKanan,Daerah Kulim, Kedah for

Construction and completion of 69 units of doublestorey terrace house and 44 units of double storeysemi-detached house on Lot 599, Mukim 13, BukitMinyak, Seberang Perai Tengah for

Mixeddevelopmentonpartof Lot816,824,825,1410and 1518, Mk. 12, Dearah Barat Daya, JalanPermatang Damar Laut, Penang for

MsAndalasDevelopmentSdnBhd

Ms DNP LandSdn.Bhd.

ArchlawDevelopmentSdn Bhd

MsPLBLand SdnBhd

12Unitsof Shop Office,79UnitsofD/STerrace,10Units of S/S Terrace, 18 Units of D/S Semi-D & 2Units of Detached House onLot867, Mk. 13,S .P.T.,JlnTok Kangar,Juru,Penang for

.

Corporate Profile 14

MSISO9001:2000REG.NO.AR2341

TurnkeyProjects

Turnkey project for low and medium-low incomegroup mixeddevelopmentonapart of Lot945 Section.9W, Georgetown, Pulau Pinang for

2storey factory and 4 storey office in Bayan Lepas,Penangfor

4storeyoffice&warehouseinPraiIndustrialEstatefor

FactoryinPhaseIV,PraiIndustrialEstatefor

MajlisPerbandaranPulauPinang(MPPP)

BagudaSdnBhd

FuHaoManufacturing(M)SdnBhd

Molex(M)SdnBhd

List of Prestigious Projects (cont’d)

Corporate ProfileCorporate Profile 15

MSISO9001:2000REG.NO.AR2341

List of On-Going Industrial Projects

Description of Projects Consultants Contract Period & Amount (RM)

1 Proposed Extension Of Building For New Works Division Wong Ying & San Consultants Sdn Bhd 12/05/2005 - 06/10/2005 Office; Proposed Civil Works Demolition, Machine (21 weeks) Foundation And Associated Works At No. 1, Jalan RM 3,790,000.00Tunku Abdul Rahman, Mergong, Alor Setar, Kedah Darulaman for Sime Tyres International (M) Sdn. Bhd.

ON-GOING INDUSTRIAL PROJECTS

PLB-KH Bina Sdn Bhd Corporate Profile

List of On-Going Residential Projects

Description of Projects Consultants Contract Period & Amount (RM)

1 Cadangan skim perumahan kos sederhana rendah B.L. Tay Architect 15/05/02-14/09/03mengandungi Blok A satu blok 16 tingkat 165 unit Jurutera T & T Sdn Bhd (16 months)rumah pangsa kos sederhana rendah dan 6 unit lot kedai TA Perunding RM 15,550,000.00dan Blok B satu blok 18 tingkat 322 unit rumah pangsa HKH Jurukur Bahankos sederhana rendah dan 10 unit lot kedai serta 4paras podium tempat letak kereta di atas Lot 18, Mukim 13,Jalan Bukit Kukus (off Lebuhraya Thean Teik), DTL,Pulau Pinang untukEternal Eight Property Sdn Bhd

2 Cadangan Pembangunan 140 Unit Apartmen Di Atas Y Architects 01/04/2003 - 30/03/2006PTD 57837, Mukim Tebrau,Daerah Johor Bahru, TY Lin (SEA) Sdn Bhd (156 Weeks)Johor Darul Takzim untuk Perunding Brightech RM 23,935,000.00M/s Builtonlands Palm Sdn. Bhd. Escape Landscape Consultants

Total QS Services Sdn Bhd

3 The Construction And Completion Of 369 Units Double L. A. Architect 22/12/2003 - 24/10/2005 Storey Cluster House, Two Units Substation and External Jurutera Perunding Tegap Sdn Bhd (95 Weeks) Infrastructure Works (Phase 5), 52 Units Single Storey Semi APT-Tech Consulting Sdn Bhd RM 46,136,077.00Detached House and External Infrastructure Works Zaidun-Leeng Sdn Bhd (Phase 8A), 41 Units Double Storey Bungalow House and Kumpulan Kuantikonsult Sdn BhdExternal Infrastructure Works (Phase 8A) on Part Of Lot 22,607, 776, 618 To 634 At Mukim Beranang, Daerah HuluLangat, Selangor Darul Ehsan for M/s Araprop Development Sdn. Bhd.

4 The Construction And Completion Of 171 Units Double L. A. Architect 01/07/2004 - 25/12/2005Storey Bungalow House, 1 Unit TNB Substation and External Jurutera Perunding Tegap Sdn Bhd (60 Weeks) Infrastructure Works At Phase 5 on Part Of Lot 22, 607, 776, APT-Tech Consulting Sdn Bhd RM 31,835,000.00618 To 634 At Mukim Beranang, Daerah Hulu Langat, Zaidun-Leeng Sdn Bhd Selangor Darul Ehsan for Kumpulan Kuantikonsult Sdn BhdM/s Araprop Development Sdn. Bhd.

ON-GOING RESIDENTIAL PROJECTS

PLB-KH Bina Sdn Bhd Corporate Profile

List of On-Going Mixed Development Schemes

Description of Projects Consultants Contract Period & Amount (RM)

1 Cadangan projek pembinaan pengkalan Polis Marin Zon Pulau East Design Architect Sdn. Bhd (24 months)Pinang, Batu Uban, Pulau Pinang Untuk Jurutera T & T Sdn. Bhd RM 35,000,000.00Tetuan Kementerian Dalam Negeri (Malaysia) GH Consultants

Unitech QS Consultancy

2 Cadangan Pembangunan Perdagangan & Perumahan 32 Unit Kedai John Kok Chartered Architects 26/08/2004 - 25/11/2006Pejabat (22' x 70'), 16 Unit Kedai Pejabat (22' x 75'), 88 Unit Rumah Jurutera JRK Sdn. Bhd. (27 Months)Teres Dua Tingkat (20' x 65'), 92 Unit Rumah Teres Dua Tingkat BES Perunding Sdn. Bhd. RM 23,180,000.00(18' x 65') (Fasa 2) Di Atas Lot 3066 & 3067, Jalan Skudai, Mukim JUBM Sdn. Bhd.Tebrau, Daerah Johor Bahru, Johor Darul Takzim for M/s Che Kiang Realty Sdn. Bhd.

3 Proposed Sales Office And Show Apartments For Cadangan BEP Akitek Sdn. Bhd. 15/07/2005 - 7/10/2005Pembangunan 2 Blok Pangsapuri Servis 20 Tingkat Di Atas 2 Tahir Wong Sdn. Bhd. (12 Weeks)Tingkat Podium Kedai & Kemudahan Awam Dengan Tempat Letak Norman Disney & Young Sdn. Bhd. RM 1,500,000.00Kereta Dan 2 Paras Tempat Letak Kereta Bawah Tanah Di Atas Lot Baharuddin Ali & Low Sdn. Bhd.PT 12586, Mukim Damansara, Daerah Petaling, Selangor Darul Ehsan for M/s Saujana Heights Sdn. Bhd.

ON-GOING MIXED DEVELOPMENT SCHEMES

PLB-KH Bina Sdn Bhd Corporate Profile

List of On-Going TPM Projects

Description of Projects Consultants Contract Period & Amount (RM)

1 Proposed Design And Construction Of New Factory 16/05/2005 - 15/11/2005 (Size 42m x 90m) At 2600, Jalan Perusahaan Baru, (6 months) Kawasan Perusahaan Prai, 13600 Prai, Penang for RM 2,799,999.00Teco Industry (Malaysia) Sdn. Bhd.

ON-GOING TURNKEY PROJECT MANAGEMENT PROJECTS

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Industrial Projects

Description of Projects Consultants Contract Period & Amount (RM)

1 Factory on Plot 535 & 539, Jalan Perusahaan GNK Management Sdn Bhd 1990 (6 months)Baru, Kawasan Perusahaan Prai, 13600 Prai for Jurutera Jaya Usaha RM 8,135,000-00Ms Teco Industry (M) Sdn Bhd Konsultant S/ B

2 Acetylene and oxygen cylinder factory at Plot 75, Juru Reka Konsult Johor Baru 1990 (3½ months)Tebrau Industrial Estate, Johor Baru, Johor for RM 598,818-00Ms Sri Oxygen Sdn Bhd

3 Extension to existing factory at Lot 2806, 683 and Juantara Konsultant Sdn Bhd 1990 (3½ months)692, Mk 1, Kawasan Perusahaan Perai for RM 525,000-00Ms Loytape Industries Sdn Bhd and Central Industrial Corporation Berhad

4 Renovation and extension to existing godown Jurutera Konsultant (S.E.A.) S/B 1990 (5 months)building and toilet block at Lot 287, Mk CID Perai for RM 1,453,690-00Ms Malayan Sugar Manufacturing Co Berhad

5 Factory on Lot 73 & 74 (part of Lot 004005) GTP Jurutera Perunding Sdn Bhd 1990 (3 months)Mk Naga Daerah Kubang Pasu, Kedah for RM 1,674,530-00Ms Centape (M) Sdn Bhd

6 Factory on Lot 85 Bakar Arang Estate, Sungai WNG Jurutera Perunding Sdn Bhd 1990 (3 months)Petani, Kedah for RM 2,840,000-00Ms Echo Electronics (M) Sdn Bhd

7 Factory on Plot 100 (i) Mk 1, Kaw. Perindustrian Akitek Ketika 1990 (4 months)Perai for Jurutera Perunding Utara Sdn Bhd RM 1,710,000-00Ms Howezen Industry Sdn Bhd

8 Factory on Plot 552, Kaw. Perusahaan Perai, GTP Jurutera Perunding Sdn Bhd 1990 (4 months)Seberang Perai (Block A) for RM 995,000-00Ms Tehdex (M) Sdn Bhd

9 Extension (Factory D) to existing factory on Plot Derrick David & Associates 1990 (4 months)67, Kulim Industrial Estate, Kulim, Kedah for Ooi Teik Boon Consulting Engineer RM 1,500,000-00Ms Miyao Toki (M) Sdn Bhd

10 Extension to existing factory on Plot 521, Prai GTP Jurutera Perunding Sdn Bhd 1990 (4 months)Industrial Estate, S.P.T. for RM 1,190,000-00Ms Phoenix Press Sdn Bhd

11 Factory on Plot 383, Kaw. Perindustrian Perai, WNG Jurutera Perunding Sdn Bhd 1991 (6 months)Seberang Perai for RM 3,125,173-00Ms Oriental-Hitachi Construction Machinery Sdn Bhd

12 Single storey Warehouse with Mezzanine Floor Akitek Antara Sdn Bhd 1991 (4 months)on Lot 692, Mk 1, Kawasan Perusahaan Perai Juantara Konsultant Sdn Bhd RM 1,890,000-00Seberang Perai for Ms Loytape Industries Sdn Bhd

13 Kilang dan pejabat 2 tingkat di atas Plot 1433, WNG Jurutera Perunding Sdn Bhd 1991 (5 months)Persimpangan Tingkat Perusahaan 6 & Lorong RM 3,670,000-00Perusahaan 8, Kaw. Perindustrian Perai untukTetuan Teo Guan Lee Packaging Sdn Bhd

14 New factory on Plot 2 (P2) Phase IV , Prai Akitek Ketika 1991 (6 months) Industrial Estate, Prai for Jurutera Perunding Utara RM 3,096,634-00Ms Lucky-Palmco Sdn Bhd Sdn Bhd

15 New factory on Plot 6 Prai Industrial Estate GTP Jurutera Perunding Sdn Bhd 1991 (5 months)Fasa IV S.P.T. for RM 1,130,000-00Ms Western Manufacturing (M) Sdn Bhd

16 Single storey factory complex & 2 storey office Ismail Dan Rakan-Rakan 1991 (6 months)building on Lot 35A, Kaw. Perusahaan Kulim, RM 3,763,939-00 Kulim, Kedah forMs Inter-Pacific Cycles Sdn Bhd

COMPLETED INDUSTRIAL PROJECTS

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Industrial Projects

Description of Projects Consultants Contract Period & Amount (RM)

17 Factory on Lot 1159 Mk 15, Daerah Seberang GTP Jurutera Perunding Sdn Bhd 1991 (5 months)Perai Tengah for RM 3,172,288-00Ms New Starlight Garment Factory (M) Sdn Bhd

18 Sebuah kilang dua (2) tingkat diatas Plot 70, Loh & Loh Architects 1991 (14 weeks)Bandar Seberang Jaya Fasa IV, Prai Industrial Perunding Sdn Bhd RM 1,760,000-00Estate untukMs Utsui Consumer Plastics Sdn Bhd

19 Godown on Plot 399, Lorong Perusahaan Lapan, GTP Jurutera Perunding Sdn Bhd 1991 (3½ months) Prai Industrial Estate, S.P.T. for RM 510,000-00Ms San Yong Enterprise Sdn Bhd

20 Extension & alterations to existing factory on Lot C. Slaun Consultants 1991 (17 weeks)682, 2806, 683 & 692, Prai Industrial Estate, RM 1,050,000-00Prai for Ms Loytape Industries Sdn Bhd

21 Factory cum office block on Lot 1244, Mk 12, Chrison Konsultant Sdn Bhd 1992 (5 months)Kaw. Perusahaan Valdor, Sbg. Perai Selatan for RM 3,240,000-00Ms Taigene Metal (M) Sdn Bhd

22 Factory on Lot 74, Phase IV, Seberang Perai GTP Jurutera Perunding Sdn Bhd 1992 (6 months)Tengah for RM 5,870,000-00Ms Amalgamated Containers Sdn Bhd

23 New Factory on Plot 20A & 20B, Prai Akitek Ketika 1992 (6 months)Industrial Estate for Jurutera Perunding Utara Sdn. Bhd. RM 6,506,600-00 Ms Linear Corporation Manufacturing Sdn Bhd& Ko Lim Sdn Bhd

24 Factory (Phase III) on Plot 521, Kaw. Perindustrian GTP Jurutera Perunding Sdn Bhd 1992 (5 months)Prai for RM 1,903,863-00Ms Phoenix Press Sdn Bhd

25 New Canteen Block and Conversion of existing Derrick David & Associates 1992 (6 months)Canteen to new General Office at Prai Industrial Estate Ooi Teik Boon Consulting Eng RM 1,145,492-60Estate Seberang Perai for Ms Viking - Askim Sdn Bhd

26 Double storey Office / Factory complex on Lot 391, Perunding AJZ Sdn Bhd 1992 (5½ months)Seberang Perai, Penang for RM 6,701,910-86Ms VDO Components Sdn Bhd

27 Factory on Plot 53, Prai Industrial Estate IV, Jurutera Perunding O.S. 1992 (4 months)Seberang Perai for RM 2,870,000-00Ms Medal Star (M) Sdn Bhd

28 4-storey & 1-storey factory on Plot 14, Bayan Teh Theam Seng 1992 (4 months) Lepas Industrial Estate, F.T.Z. Phase IV, Jurutera Jayausaha Konsultant S/B RM 2,437,000-00Bayan Lepas, Penang for Ms Zentron Sdn Bhd

29 Factory on Plot 262, Tingkat Perusahaan 5, GTP Jurutera Perunding Sdn Bhd 1992 (5 months)Prai Industrial Estate, S.P.T. for RM 1,800,243-80Ms Heap Seng Huat Sdn Bhd

30 Extension to the existing factory on Plot 104 & 198, GTP Jurutera Perunding Sdn Bhd 1992 (4 months)Tingkat Perusahaan 2 'A' Prai Industrial Estate, RM 2,062,000-00Seberang Perai Tengah for Ms Century Chemical Works Sdn Bhd

31 Factory on Plot 69, Prai Industrial Estate, Phase Chrison Konsultant Sdn Bhd 1992 (4½ months)IV, Seberang Perai for RM 3,732,400-00 Ms Malayan Fibre Containers Sdn Bhd

32 Extension to existing factory complex on Plot 5, MWA Jurutera Perunding 1993(3 months)Prai Industrial Estate, Prai for RM 832,146-00Ms Keat Radio Co. Sdn Bhd

33 Factory & 2-storey office on Lot 1664 & 1671, GTP Jurutera Perunding Sdn Bhd 1993 (4½ months)Lrg Mak Mandin 7, Mak Mandin Industrial Estate, RM 1,082,618-70Seberang Perai Utara for Ms Khong Guan Vegetable Oil Sdn Bhd

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Industrial Projects

Description of Projects Consultants Contract Period & Amount (RM)

34 Extension to existing factory on Plot 2 (P2) Akitek Ketika 1993 (22 weeks)Phase IV, Prai Industrial Estate, Prai for Jurutera Perunding Utara Sdn Bhd RM 1,810,000-00Ms Lucky-Palmco Sdn Bhd

35 Manufacturing plant warehouse, office block, Loh & Loh Architects 1993 - 1995 (14 months)2 storey new factory & renovation to existing Jurutera Perunding L.O.T. Sdn Bhd RM 20,682,400-00warehouse and canteen at SeberangJaya Industrial Park forMs Acer Technologies Sdn Bhd 1993 (4 ½ months)

36 Factory on Plot 37, Bayan Lepas Industrial C. Slaun Consultants RM 2,027,017-00Estate IV, Penang forMs Sun Loong Onn Jewellery Enterprise Sdn Bhd

37 Three storey extension to existing factory on Plot Akitek Ketika 1993 - 1994100(i), Mk 1, Prai Industrial Estate, S.P.T., Prai for Jurutera Perunding Utara Sdn Bhd (8 months)Ms Howezen Industry Sdn Bhd RM 1,855,000-00

38 Reconstruction of plant 8,, sub-station 2 & 3, part of Akitek Ketika 1994 - 1995sports complex, repairing works for the canteen Jurutera Perunding Utara Sdn Bhd (12½ months)building, reconstruction of the drumming shed, workshop RM 10,184,274-00laboratory, chemical store, warehouse 2, beading plant soap plant, new guard house extension and open drum shed on lot 346 (ii), Prai Industrial Estate forMs Acidchem (M) Bhd

39 Factory on Plot 3, Kaw Perindustrian Bayan Lepas East Design Architect 1994 (6 months)(Bayan Lepas Technoplex), Penang for Chrison Konsultant Sdn Bhd RM 4,398,000-00Ms Leader Optic Fibre Cable Sdn Bhd

40 Additions to existing factory on plot 399, Lorong Derrick David & Associates 1994 (4 months)Perusahaan 8C, Kawasan Perusahaan Perai for Ooi Teik Boon Consulting Eng RM 1,207,205-24Ms San Yong Enterprise Sdn Bhd

41 Warehouse on plot 255 IV, Jalan Mak Mandin, Kaw. Loh & Loh Architects 1994 (3 months)Perusahaan Mak Mandin, Seberang Prai Utara for Jurutera Perunding L.O.T. Sdn Bhd RM 746,000-00Ms Dupasar Sdn Bhd

42 Tambahan 1 Block gudang / kantin kepada kilang Jurutera Jaya-Usaha Konsultant S/B 1994 (5 months)sediada diatas Plot No. 461 A, Tingkat Perusahaan 6, RM 1,742,000-00Kaw. Perusahaan Prai (KPB), 13600 Prai, Penang for Ms Action Industries (M) Sdn Bhd

43 Factory extension (Phase 2) on part of Plot 383, Prai WNG Jurutera Perunding Sdn Bhd 1994 (16 weeks)Industrial Estate, Seberang PeraiTengah for RM 1,340,000-00Ms Oriental-Hitachi Construction Machinery Sdn Bhd

44 28 buah perusahaan servis 1 ½ Tingkat diatas Plot 3281 GTP Jurutera Perunding Sdn Bhd 1994& 3282, Section 4, Town of Butterworth, S.P.U. for RM 3,872,367-00Ms Gainbliss Sdn Bhd

45 Tambahan setor diatas Plot 51, Jalan Perusahaan Baru, CBS Jurutera Konsultant 1994 (3 months)Zon Kompleks Perusahaan Perai, Seberang Perai untuk RM 315,000-00Tetuan Canon Electronics (M) Sdn Bhd

46 New guard house, boilder bouse, new 250T Fat Splitting Akitek Ketika 1995 (6 months)Plant/Fatty Acid Plant new control room pump house / Jurutera Perunding Utara Sdn Bhd RM 2,653,923-00switchgear room on Lot 346 (iii) Prai Ind. Estate for Ms Palmchem (M) Sdn Bhd

47 New warehouse, guard house, laboratory & office Akitek Ketika 1994 - 1995 block external works on Plot P.T. 51, Prai Industrial Jurutera Perunding Utara Sdn Bhd (4½ months)Complex, Prai for RM 2,793,391-00 Ms Stabilchem (M) Sdn Bhd

48 Sebuah kilang 3 tingkat (pemasangan precisi) diatas Akitek Antara Sdn Bhd 1995 - 1996 Plot 14, Kaw. Perusahaan Perai IV, Prai untuk Juantara Konsultant Sdn Bhd (10½ months)Ms CAM Precision Components Sdn Bhd RM 21,100,000-00

49 Tambahan dan ubahsuai kpd kilang tayer sedia ada Beh & Associate 1995 (5 months)di Plot 223 dan sebahagian plot 416, Lrg. Perusahaan Jurutera T & T Konsultant Sdn Bhd RM 1,385,000-008, Kaw. Perusahaan Prai (Non) Free Trade Zone) forMs Kayel Retreads S/B

50 Double storey factory with 2 storey office on Plot P98, Loh & Loh Architects 1995 (33 weeks)Taman Industri Bukit Tengah, Mk 11, S. P. T. for Jurutera Perunding L.O.T. Sdn Bhd RM 5,533,400-00Ms Pensia Electronic Sdn Bhd

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Industrial Projects

Description of Projects Consultants Contract Period & Amount (RM)

51 Formaldehyde / resin plant expansion in the Borden Petareka Perunding (M) Sdn Bhd 1995 (6 months)Chemical plant at Lot 2823 (101) Mk 1, Lorong RM 2,584,481-98Perusahaan 2, Kaw. Perindustrian Perai, 13600 Prai forMs Borden Chemical (M) Sdn Bhd

52 Sebuah kilang membuat komputer diatas Plot 574, Lee Architectural Consultancy 1995 (4 months)Lorong Perusahaan 4, Zon Perindustrian Bebas, Jurutera Jayausaha Konsultant S/B RM 13,777,736-00Prai, Mk 1 Daerah Tengah, Seberang Perai,Pulau Pinang for Ms Unico Technology Sdn Bhd

53 1 block 3 tingkat pusat latihan di atas Lot H.S. (D) 27, Akitek Antara Sdn Bhd 1995 - 1996 (No.P.T.149) Mk 12, D.B.D., Bayan Lepas FTZ Juantara Konsultant Sdn Bhd (10½ months)Pulau Pinang untuk RM 2,980,000-00 Ms Hitachi Semiconductor (M) Sdn Bhd

54 19 units 1 ½ storey light industries on Lot 1228, Mk 12, Akitek Permata 1995 - 1996 Seberang Perai Selatan for GTP Jurutera Perunding Sdn Bhd (9 months)Ms Kok Hoon Sdn Bhd RM 4,742,162-73

55 Single storey terrace house, semi-detach, 1 ½ storey Fang & Associates 1994 - 1997

light industrial on Lot 130, 131 Mk of Lunas Daerah Arkitek T.Y. Che (30 months)Daerah Kulim, Lot 2798, Mk Tawar Daerah Baling, Arkitek Narabina RM 60,922,492-55Lot 669 Mk 13, SPT., Lot 1745, 1765, 1774 Mk 14, Arkitek Rekabina Sdn BhdBukit Minyak, Seberang Perai Tengah for Khoo Dan Rakan-RakanKok Hoon Development Sdn Bhd Jurutera Pakatan (Kedah) Sdn Bhd

GTP Jurutera Perunding Sdn Bhd Chrison Konsultant Sdn Bhd

56 Pindaan dan tambahan kepada sediada diatas Plot 258, Jurutera Perunding Cahaya S/B 1996 (26 weeks)Lorong Perusahaan 10, Kaw. Perindustrian Prai, RM 3,512,248-00Prai, Seberang Perai Tengah untuk Ms Kilang Rantai S.A. Sdn Bhd

57 Industries on Plot 1, 2, 3, 4 & 6, (Old 3196, 3295, 3187, Nathan-Jones Architect 28/06/96 - 06/12/965002-5005) Mk Sungai Petani, Daerah Kuala Muda, CBS Jurutera Konsultant (5.5 months)Kedah for RM 17,621,392-68Ms PJS Industries Sdn Bhd

58 1 1/2 tingkat kilang di atas Plot 40, Kaw. Perindustrian Jurutera Tang & Rakan Rakan 01/08/96 - 14/11/96Bukit Minyak, Mk 14, SPT, Pulau Pinang untuk (15 weeks)Tetuan Amazing Technology (M) Sdn Bhd RM 900,000-00

59 Pusat pemeriksaan kenderaan berkomputer diatas Arkitek ATMA 26/07/96 - 12/08/96sebahagian Lot 14263, Mk durian sebatang, Daerah Perunding Insan (2.4 weeks)Hilir Perak, Teluk Intan, Perak Darul Ridzuan, di Teluk RM 656,420-25Kumbar, Pulau Pinang & di Alor Setar, Kedah untukTetuan Imatex Berhad

60 Construction of Modenas 11 warehouse building at Arkitek ATMA 01/06/96 - 03/07/96National Motorcycle Plant on Lot 7416 (P.T. 1273), Mk Perunding Insan (1 month)Gurun, Daerah Kuala Kedah, Kedah Darulaman for RM 255,678-20Ms Imatex Berhad

61 Mendirikan sebuah bangunan pemeriksaan kenderaan Arkitek ATMA 03/08/96 - 04/10/96dagangan diatas Lot 74, Mk Mergong, Daerah Kota Perunding Insan (9 weeks)Setar, Bandar Alor Setar, Kedah Darul Aman untuk RM 2,900,000-00Ms Imatex Berhad

62 3 storey factory on Lot PT. 3604 (Plot 51), Hilir Sg. G & A Architectural Consultancy 1996 (30 weeks)Keluang 14, Mk 12, Daerah Baratdaya, FTZ, Phase 4, Jurutera Jayausaha Konsultant S/B RM 5,000,000-00Bayan Lepas, Penang forMs Sanmatech Sdn Bhd

17/10/96 - 20/02/9763 New spray cooling plant cum warehouse & short Akitek Ketika (18 weeks)

path distillation plant on part of Lot 51 Mk 1 Prai Jurutera Perunding Utara Sdn Bhd RM 1,900,000-00Industrial Complex for Ms Stabilchem (M) Sdn Bhd

64 Sebuah bangunan pemeriksaan kenderaan dagangan Arkitek ATMA 15/10/96 - 16/12/96diatas Lot-Lot 979 & 981, Mk 9, Daerah Barat Daya, Perunding Insan (9 weeks)Jln. Ginting, Pekan Teluk Kumbar, Pulau Pinang untuk RM 2,900,000-00Ms Imatex Berhad

65 One pack of new stabilizer plant cum packing area on Akitek Ketika 17/01/97-20/03/97part of Lot P.T. 51 Prai Industrial Complex, Prai for Jurutera Perunding Utara S/B (2 months)Ms Stabilchem (M) Sdn Bhd RM 388,000-00

01/03/97 - 31/05/97

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Industrial Projects

Description of Projects Consultants Contract Period & Amount (RM)

66 Concrete support foundation & Grd. Floor for the Jurutera Perunding Utara S/B (3 months)physical refining & fractionation plant, oil receiving RM 1,230,000-00bay for the existing warehouse, cooling tower foundationsand weighbridge foundation at Kawasan PerusahaanMak Mandin for Ms Golden Agricultural Oils Sdn Bhd 10/05/97 - 10/10/97

67 Tambahan dan perubahan (Base Store Phasell Extension) Y. Wong & Sekutu (5 months) kepada kilang sediada di Kawasan Perusahaan Mergong, RM 610,000-00Alor Setar, Kedah untukMs Sime Tyres International (M) Sdn Bhd

68 Single storey factory and canteen, double storey Jurutera Perunding Cahaya 1997 (16 weeks)guard house on lot 1218 Mk 12, Daerah Seberang Sdn Bhd RM 7,500,000-00Perai Selatan Pulau Pinang for, Ms Lion Containers Sdn Bhd

69 Garment factory on plot 142 Bukit Tengah, Kaw. MWA Jurutera Perunding 01/08/97 - 31/12/97Perusahaan Bukit Minyak Seberang Perai Tengah, (5 months)Pulau Pinang for RM 2,520,800-00Ms Dart Garment Industries Sdn Bhd

70 Factory on Plot 1147 & 1148, Mk. 14, Bukit Minyak, GTP Jurutera Perunding Sdn Bhd 15/11/97 - 15/05/98Seberang Perai Tengah, Penang for TA Perunding (25.9 weeks)Ms Chung Yih Steel Sdn Bhd & RM 5,950,000-00Ms Shiuh Dong Industrials Sdn Bhd

71 Sebuah kilang dan pejabat 2 tingkat diatas Plot 8, GTP Jurutera Perunding Sdn Bhd 27/11/97 - 11/06/98Kawasan Perusahaan Technoplex, Bayan Lepas, S.G. Wong Perunding Sdn Bhd (28.0 weeks)Fasa IV, Mukim 12, S.W.D., Pulau Pinang untuk RM 12,910,000-00Ms Dynacraft Industries Sdn Bhd

72 1 unit single storey godown with 5 storey office on Keoh Lam Chai Consultant Engineer 07/05/98 - 03/09/98Plot 155, Bkt. Minyak Ind. Estate, Mk 13, SPT for C.H. Ong & Associates (17.0 weeks)Ms Mega Wijaya Sdn Bhd RM 709,977-52

73 Sebuah pejabat / kilang / gudang diatas Pelot 18 Lee Architectural Consultancy 08/06/98 - 21/10/98(P.T. 474), Mk. 6, H.S. (D) 578 di Lrg. Perusahaan Chrison Konsultant Sdn Bhd (4.4 months)Maju 1, Kawasan Perusahaan Bukit Tengah, RM 4,070,113-28Seberang Perai Tengah forMs Alu Paste & Pigments Sdn Bhd

74 Tambahan 1 blok pejabat sediada diatas No. PT 31 K. H. Tan Architect 08/06/98 - 21/10/98(No. (D) 1173), Lrg. Perusahaan 1, Prai Industrial Jurutera Perunding Utara Sdn Bhd (4.4 months)Estate, Mukim 1, Daerah Tengah, Seberang Perai, RM 1,088,000-00Pulau Pinang untuk Ms Acidchem Industrial Sdn Bhd

75 One unit 2 storey office block complete with one unit Perundingan Jurucita 26/03/99-24/9/991 storey factory, and complete with civil & structure (26 weeks)infrastructure works on plot PT62, Lrg. Perusahaan 8, RM 3,500,000-00Prai II, Mukim I, Seberang Prai Tengah forMs Crystal Dignity Sdn Bhd

76 260 units of light industrial building type A (83 units), Akitek Rekaria 08/11/96 - 02/02/00type B (177 units), 82 (units) terrace factory / office & Sentosa Reka Sdn. Bhd. (40 months)53 (units) terrace industrial showroom / office at Mk RM 104,421,691-00Pulai, Daerah JohorBahru works forMs Bukit Pedoman Sdn Bhd

77 Extension to the existing factory on Lot 2367, Mk 12, GTP Consultant Sdn Bhd 04/03/99-10/05/99D.B.D. Bayan Lepas FTZ., Penang for (9 weeks)Ms Dynacraft Industries Sdn Bhd RM 285,748-00

78 Construction of factory on Lot 8, Industrial Ikatan Cipta Bina 22/06/99 - 28/07/99Zone Phase 2, Kulim Hi-Tech Industrial Park, Ranhill Bersekutu Sdn. Bhd. (5.1 weeks)Mukim Padang Cina, Daerah Kulim, Kedah for RM 6,417,781-00 Ms Wafer Technology (M) Sdn Bhd

79 Construction of factory on Lot 8, Industrial Ikatan Cipta Bina 08/10/99 - 23/02/00Zone Phase 2, Kulim Hi-Tech Industrial Park, Ranhill Bersekutu Sdn. Bhd. (4.5 months)Mukim Padang Cina, Daerah Kulim, Kedah for RM 4,611,500-00 Ms Wafer Technology (M) Sdn Bhd - Office Building

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Industrial Projects

Description of Projects Consultants Contract Period & Amount (RM)

80 Construction of factory on Lot 8, Industrial Ikatan Cipta Bina 25/10/99 - 30/11/99Zone Phase 2, Kulim Hi-Tech Industrial Park, Ranhill Bersekutu Sdn. Bhd. (5.1 weeks)Mukim Padang Cina, Daerah Kulim, Kedah for RM 160,000-00 Ms Wafer Technology (M) Sdn Bhd - NUR Building

81 Membina tambahan kepada LRC (HP) Pilot Jurutera Sepakat 24/01/00-31/08/00Plant di atas Plot 1A & 1B, di Kawasan TA Perunding (7 months)Perindustrian Kulim, Kedah for RM 11,526,288-90 Ms LRC Hospital Products Sdn. Bhd.

82 Membina satu unit K33KV pencawang letrik Y. Wong dan Sekutu 30/10/00- 29/01/00dan satu unit pencawang letrik untuk mixerline (3 months)No. 1, Jalan Tunku Abdul Rahman, Mergong, Alor Setar, RM 726,712-00

Alor Setar, Kedah untuk Ms Sime Tyres International (M) Sdn Bhd

83 Tank foundations for fatty acid plant on Plot 6241 Jurutera Perunding Utara 25/04/01 – 30/07/01

& 6245, Prai Industrial Complex, Prai for Sdn Bhd (10.7 weeks)Ms Acidchem International Sdn Bhd (“Acidchem”) RM 2,060,000-00

84 The proposed refurbishing of existing laboratory, Jurutera Perunding Utara Sdn Bhd 01/07/01 – 31/10/01canteen, workshop, boilers house, weighbridge, (4 months)loading bay, warehouse extension, new guard RM 3,050,000-00house, pump house and sub-station on Plot 6241 & 6245, Prai Industrial Complex, Lrg. PerusahaanSatu, Prai, Seberang Perai Utara forMs Acidchem International Sdn Bhd

85 Proposed new fat splitting, fatty acid & glycerine Jurutera Perunding Utara Sdn. Bhd. 31/07/2001 - 28/02/2002plant, hydrogenation plant, boiler house, loading bay, (7 months)tank foundations and cooling tower foundations on Plot RM 7,300,000.006241 & 6245 and 346 (ii) & (iii), Prai Industrial Complex, Lorong Perusahaan Satu, Prai, Seberang Perai Utara forM/s Acidchem International Sdn Bhd

86 Proposed Extension To Existing Palm Oil Unloading Platform Jurutera Perunding Utara Sdn. Bhd. 17/06/2002 - 03/11/2002 At Butterworth Port And 4 Nos Of Storage Tank Foundations (20 weeks) At Site 2 Acidchem Site On Plot 6241 & 6245, Lorong RM 5,269,782.05Perusahaan Satu, Prai Industrial Complex, Prai forM/s Palmco Oil Mill Sdn Bhd

87 Proposed M.S. Platform Extension And Raised Roof Of Wong Ying & San Consultants 16/06/2003 - 16/11/2003 Existing Banbury At Existing Factory At No. 1 Jalan Tunku Sdn. Bhd. (20 weeks) Abdul Rahman, Mergong, Alor Setar for RM 1,030,803.36M/s Sime Tyres Internatinal (M) Sdn. Bhd.

88 Proposed 600 TPD De-Gumming & Bleaching Plant Jurutera Perunding Utara Sdn. Bhd. 29/11/2004 - 26/02/2005And Bulk Silo At Acidchem International On Plot (13 Weeks)6241 & 6446 At Prai Industrial Complex, SPT, RM 850,000.00Pulau Pinang

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Commercial Projects

Description of Projects Consultants Contract Period & Amount (RM)

1 Superstructure works to mixed development on Lot Akitek MAA Sdn Bhd 1993 - 1994 10488, 11129, and 11116, Jalan Abdul Jalil / Sultan Zaidun-Leeng Sdn Bhd (40 weeks)Idris Shah, Ipoh, Perak Darul Ridzuan for RM 17,950,000-00Ms Seritawan Sdn Bhd

2 Construction of 12 storey office complex and 11 storey Akitek Permata 1994 - 1995 apartment on Lot-Lot 2315 & 2332, Section 2, Bandar GTP Jurutera Perunding Sdn Bhd (18 months)Butterworth, S.P.U. for RM 10,051,669-00 Ms Siram Permai Sdn Bhd

3 1 blok kompleks perniagaan 5 Tingkat dengan basement Wan Shahreman Dan Rakan 2 1995 (52 weeks)tempat letak kereta di atas Lot 396, Seksyen 2, Bandar Jurutera Jayausaha Konsultant RM 7,950,000-00Butterworth, Seberang PeraiUtara untuk Ms Sumbumas Sdn Bhd

4 Commercial complex with 6-storey office & 1-storey H'D Architect 1995 - 1997basement carpark on Lots 1436 & 261, Mk 4, Jimmy Khoo Consulting Engineers (15 months)Seberang Perai Tengah, Penang for RM 12,375,829-09 Ms S.J. Development Sdn Bhd

5 1 block 4/5 tingkat pejabat dan kedai dgn. 1 tingkat Akitek K. E. Koay 1997 – 2000bawah tanah dan 1 block 2 tingkat 42 unit kedai Perunding Rekabina (67.0 weeks)“Lock-Up” di atas Lot 1553, Sek.2, Jalan Fettes, H.P. Beh & Associates Sdn Bhd RM 25,610,573-51Bandar Tanjung Tokong, D. T. L. Penang forMs Supreme Enterprise Sdn Bhd

6 Main building works for hypermarket on Lot 197, East Design Architect Sdn Bhd 27/03/98 - 18/09/98 207, 208, 209 & 446, Mk. 1, Seberang Perai Tengah Jurutera Perunding L.O.T. Sdn Bhd (25.0 weeks)Pulau Pinang for EAB Consulting Engineers Sdn Bhd RM 22,691,000-00Ms Magnificient Diagraph Sdn Bhd

7 Superstructure works to the mixed development S N Low Associate Sdn Bhd 01/03/97 - 01/02/99(Ipoh Parade, Phase 2), Jalan Abdul Jalil / Sultan Zaidun-Leeng Sdn Bhd (23 months)Idris Shah, Ipoh, Perak Darul Ridzuan for Majutek Perunding RM 96,800,000-00Ms Seritawan Sdn Bhd Yong Dan Mohamad Faiz Sdn Bhd

8 Two units of coldroom and a double storey shop E.H. Low Architect 21/01/99-20/06/99office on existing premises nos. 4503-L, 4503-M Perundingan Timor (Pg) Sdn Bhd (5 months)and 4503-N, Jalan Kerapu, , Section 3, Butterworth, RM 420,000-00Seberang Prai untukMs Chop Tong Guan Sdn Bhd

9 Pembangunan 12 tingkat bangunan pejabat KWSP Bernas Konsultant Arkitek 01/11/99-30/04/01yang mengandungi 3 tingkat podium, 9 tingkat Yusof & Hoe Associates Sdn Bhd (17.9 months)Menara pejabat & ruang letak kereta di atas Lot Perunding Teras Sdn Bhd RM 27,885,881-29PT 3858 Mk. 1, Daerah Seberang Perai (T) untuk Five-H Associates Sdn BhdMs Kumpulan Wang Simpanan Pekerja

10 Partially completed lowest basement slab and site Perunding Alam Bina 23/3/2000-22/9/2000works for the development on Lot 692, Section 57, Arup Jururunding Sdn Bhd (6 months)Jalan Nagasari, Kuala Lumpur for J. Perunding Valdun Sdn Bhd RM 2,250,000-00Ms Visionwell Sdn Bhd Baharuddin Ali & Low Sdn Bhd

11 Completion of uncompleted proposed 27-storey office GDP Architect Sdn Bhd 25/4/2001 – 24/10/2002with mezzanine floor and 2 levels basement carpark on Hashim & NEH Sdn Bhd (18 months)Lot 1406, Section 46, Jalan Raja Laut, Kuala Lumpur for RM 62,874,884-26Ms Permodalan Nasional Bhd

12 Construction of columns and beams for Block A & B Perunding Alam Bina 16/04/02-15/08/02basement for the proposed development on Lot 692 Arup Perunding Sdn Bhd (4 months)Section 57, Jalan Nagasari, Kuala Lumpur for Jurutera Perunding Valdun S/B RM 2,857,350.65Visionwell Sdn Bhd Baharuddin Ali & Low Sdn Bhd

13 Cadangan Pembinaan sebuah Hypermarket Yang John Kok Chartered Architects 30/04/2004 - 30/10/2004Mengandungi 1 Tingkat Ruang Perniagaan Dan 1 Jurutera JRK Sdn. Bhd. (6 Months)Tingkat Ruang Letak Kereta Separa Bawah Tanah Di BES Perunding Sdn. Bhd. RM 18,311,905.27Atas Sebahagian Lot 3066 & 3067, Jalan Skudai, JUBM Sdn. Bhd.Mukim Tebrau, Daerah Johor Bahru, Johor DarulTakzim untukM/s Che Kiang Realty Sdn. Bhd.

COMPLETED COMMERCIAL PROJECTS

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Residential Projects

Description of Projects Consultants Contract Period & Amount (RM)

1 2 blocks of 6 storey flats (Block D & E) for Phase II Chong Kum Kwan 1993 (15 months)Development, Tmn. Ayer Itam on Lot 688, Seksyen 2, Jurutera T & T Konsultant Sdn Bhd RM 10,500,000-00George Town D.T.L. at Rifle Range Road, Penang forMs Urban Resources Sdn Bhd

2 Perumahan kos rendah dan sederhana di atas Lot 19, A.S.A.S. Architects Sdn. Bhd. 1994-1995Mk Karangan, Kulim, Kedah Darul Aman untuk Chrison Konsultant Sdn Bhd (90 weeks)Tetuan Vestingold Sdn Bhd RM 5,703,788-00

3 Construction of 11 storey apartment on Lot-lot 2315 & Akitek Permata 1994 - 19952332, section 2, Bandar Butterworth, S.P.U. for GTP Jurutera Perunding Sdn Bhd (18 months)Ms Siram Permai Sdn Bhd RM 9,200,000-00

4 2 Blok 5 Tingkat Rumah Pangsa harga sederhana Arkitek PN Loh 1995 (10 months) mengandungi 200 yunit kediaman di atas Lot 301, Perunding Jurucita RM24,400,000-001483 Mk 14, S.P.T., Province Wellesley untukMs Zheng De Mai Enterprise Sdn Bhd

5 13 storeys 96 units 1250 sq.ft. Apartment, 30 units 3 Nil 01/11/96 - 01/11/2001storeys shoplots, 16 storeys 120 units 880 with Podium (60 months)at Mk. of Kuah, Daerah Langkawi, Kedah for RM 140,000,000-00Ms SBD Corporation (M) Sdn Bhd

6 Building works for 1 Block of 9-storey low cost flats, Loh & Loh Architects 29/5/96 - 10/12/971 Block of 9-storey Apartments & 1 block of 10 storey Jurutera Tang & Rakan Rakan (78 weeks)Apartment on part of Lots 950 & 338, Mk 6, S.P.T., RM 16,152,700-00Pulau Pinang for Ms Piala Mutiara Sdn Bhd

7 External works for housing development on Lot 130 Fang & Associates 01/05/96 - 01/08/97& 131 Mk of Lunas, Daerah Kedah Darulaman for Khoo Dan Rakan-Rakan (15 months)Ms Kok Hoon Development Sdn Bhd RM 2,144,902-00

8 10 blocks of 6 - storey low cost flats on lots 1257 & PI Architect 10/10/96 - 30/07/991501 & 16 blocks of 5 storey low medium cost Kemas Reka Sdn Bhd (34 months)apartments on lots 2307, 2309 & 2828, Cheras, RM 90,602,490-83Hulu Langat , Selangor Darul Ehsan forMs Matang Emas Sdn Bhd

9 Unfinished Works for 5 blocks apartment (Total 209 Wong T.C. & Architects & Associates 02/11/98 - 01/07/99units ) known as Menara Kuda Lari at Lot no. 701 & Jurutera Tang & Rakan - rakan (7.9 months)717, Jalan Lahat, Georgetown, Sec. 2, NED., for RM 6,900,000-00Ms Ever Noble Sdn Bhd

10 86 units of 1 ½ storey terrace house on plot 105-156, Arkitek TY Chew 15/07/99 - 13/07/2000180-185, 186-189, 235-242 & 256-271, Taman Desa Jurutera Pakatan (Kedah) S/B (12 months)Jaya, (Phase III B), Mk. Sungai Petani, Daerah Kuala RM 4,251,294-00Muda, Kedah Darulaman forMs Kok Hoon Development Sdn Bhd

11 34 units single storey terrace houses, 33 units double Fang & Associates 15/06/99 - 14/06/00storey terrace houses & 8 units double storey semi-d Kuantibina Sdn Bhd (12 months)houses on Lot 599, Mk 13, Bkt. Minyak, S.P.T. for Chrison Konsultant Sdn Bhd RM 6,400,000-00Ms DNP Land Sdn Bhd HC Toh Perunding Sdn Bhd

12 Construction and completion of 69 units of double Fang & Associates 16/5/2000 - 14/5/2001storey terrace house and 44 units of double storey Kuantibina Sdn Bhd (52 weeks)semi-detached house on Lot 599, Mukim 13, Chrison Konsultant Sdn Bhd RM 10,649,646-00Bukit Minyak, Seberang Perai Tengah for HC Toh Perunding Sdn BhdMs DNP Land Sdn Bhd

13 Construction 1 block of 5-storey low cost flat on Lot 599, Fang & Associates 10/7/2000 - 14/5/2000Mukim 13, Bukit Minyak, Seberang Perai Tengah for Kuantibina Sdn Bhd (44 weeks)Ms DNP Land Sdn Bhd Chrison Konsultant Sdn Bhd RM 2,999,999-00

HC Toh Perunding Sdn Bhd

COMPLETED RESIDENTIAL PROJECTS

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Residential Projects

Description of Projects Consultants Contract Period & Amount (RM)

14 Construction low and medium cost housing development Andalas Dev. Sdn Bhd 20/05/00 – 10/09/03on Lot 953, Mukim Sidam Kanan, Daerah Kulim, OKS Consulting Engineer (39.6 months)Kedah Darulaman for Juru Ukur Bahan Malaysia RM 40,500,000-00Ms Andalas Development Sdn Bhd

15 Construction and completion of 70 units of Arkitek TY Chew 16/4/2001 – 15/4/20022 storey terrace house on Plot 512-517 and 520-583, Jurutera Pakatan (Kedah) S/B (12 months)Taman Desa Jaya (Phase IV), Mk. Sg. Petani, RM 2,500,000-00Daerah Kuala Muda, Kedah Darulaman forMs Kok Hoon Development Sdn Bhd

16 Construction And Completion Of Two (2) Units Double L. A. Architect 02/01/2003 - 26/03/2003Storey Cluster Semi Detached Show House And One (1) Unit Jurutera Perunding Tegap Sdn Bhd (12 Weeks)Of Double Storey Bungalow Show House On Part Of Lot 22, APT-Tech Consulting Sdn Bhd RM 395,000,00607, 776, 618 To 634 At Mukim Beranang, Daerah Hulu Langat, Zaidun-Leeng Sdn BhdSelangor Darul Ehsan for Kumpulan Kuantikonsult Sdn BhdM/s Araprop Development Sdn Bhd

17 Construction And Completion Of 178 Units Single Storey L. A. Architect 01/02/2002 - 13/03/2003 Terrace, 164 Units Double Storey Terrace House (20' x 60'), Jurutera Perunding Tegap Sdn Bhd (58 Weeks)78 Units Double Storey Terrace House (22' x 75') & 102 Units APT-Tech Consulting Sdn Bhd RM 31,500,000,00Single Storey Semi Detached House (Phase 8) on Part Of Lot Zaidun-Leeng Sdn Bhd 22, 607, 776, 618 To 634 At Mukim Beranang, Daerah Hulu Kumpulan Kuantikonsult Sdn BhdLangat, Selangor Darul Ehsan for M/s Araprop Development Sdn. Bhd.

18 Construction And Completion Of 2 Units John Kok Chartered Architects 15/04/2004 - 30/06/2004 Temporary Sample House, One Unit Corner Each For Type Jurutera JRK Sdn. Bhd. (2 1/2 Months)18' x 65' And 20' x 65' On Part Of Lot 3066 & 3067, Jalan BES Perunding Sdn. Bhd. RM 170,000.00Skudai, Mukim Tebrau, Daerah Johor Bahru, Johor Darul JUBM Sdn. Bhd.Takzim forM/s Che Kiang Realty Sdn. Bhd.

19 Cadangan Sekim Perumahan Terdiri Daripada Rumah Altinum PMC Sdn. Bhd. 14/10/2003 - 13/10/2005Sesebuah 2 Tingkat (3 unit), Rumah Berkembar 2 Tingkat Loh & Loh Architects (24 Monhs)(28 Unit) & Rumah Teres 2 Tingkat (28 Unit) Di Atas Perunding YAA Sdn. Bhd. RM 26,000,000.00Lot 6216 (PT 1541) Dan Sebahagian Lot 5772 & Lot 5731, H. C. Toh PerundingMukim 13, DTL, Lintang Pantai Jerejak 3, PulauPinang untukM/s Talian Selasih Development Sdn. Bhd.

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed & Hospital Projects

Description of Projects Consultants Contract Period & Amount (RM)

1 Alteration, extension & addition to existing 12 storey Jurutera Nasional 15/10/96 - 15/01/98108 roomed hotel cum 3 storey split level carpark at (60 weeks)premises No. 5, Penang Road on Lot 23 & 24, T. S. 19 RM 20,854,500-00N. E. D., for Ms Hotel Continental Sdn. Bhd.

COMPLETED HOTEL & HOSPITAL PROJECTS

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Mixed Development Schemes

Description of Projects Consultants Contract Period & Amount (RM)

1 26 units semi-detached factory and 78 units double Fang & Associates 1990storey terrace factory including infrastructure works GTP Jurutera Perunding Sdn Bhd (12 months)at Taman Nagasari on Lot 1509 & 1510, 1515-1527, RM 13,128,888-981612, 1615 & 1616, 872, 874, 876 Mk 6, Central District, Province Wellesley for Ms Grand Eastern Realty & Development Sdn Bhd

2 Light industrial (Technical back-up industries), market, Akitek Permata 1992 - 1993 hawker centre and supply, repair and complete the Chrison Konsultant Sdn Bhd (8½ months)existing Imhoff Tank on Lot 2223,2224 and 2225, RM 6,808,005-37Sec. 1, Bandar Butterworth, Seberang Perai forMs Qiwess Sdn Bhd

3 Light industrial development on Lot 450,452', Akitek Permata 1992 (12 months)452", 453' & 453", Mk 15, Seberang Perai Utara for GTP Jurutera Perunding Sdn Bhd RM 9,200,000-00Ms Siram Permai Sdn Bhd

4 Building and Infrastructural works of light industrial Akitek Permata 1993 - 1994 factories on Lot 1286 Mk 14, Seberang Perai for Chrison Konsultant Sdn Bhd (8 months)Ms Kelana Baiduri Sdn Bhd RM 12,200,757-53

5 Pembinaan 27 yunit rumah kedai 2 tingkat & 63 yunit Akitek Ketika 1993 - 1994rumah teres dua tingkat di atas Lot 1537, Mk 15, GTP Jurutera Perunding Sdn Bhd (14 months)Seberang Perai Selatan for RM 7,518,431-00Ms Fattigold Sdn Bhd

6 51 units 3-storey commercial building, 94 units Fang & Associates 1994 - 1996 terrace factory, 12 units semi-detached factory, GTP Jurutera Perunding Sdn Bhd (24 months)earthworks, sanitary and plumbing installation, RM 29,800,469-453 units sub-station, 1 unit refuse depot and 27 nos.refuse bin on Lot 1509-1510, 1515-1527, 1612 & 1616,872-874, 875 & 876, Mk 6, Central District Province Wellesley forMs Grand Eastern Realty and Development Sdn Bhd

7 145 units of mixed light industrial factories on Lots Akitek Melati 1994 - 1995 2927, 2928, 2929 and 2930, Mk 16, S.P.U. for Jurutera T&T Konsultant S/B (14 months)Ms Southtech Development Sdn Bhd RM 12,000,000-00

8 Projek perniagaan dan membina serta menyiapkan Arkitek Cahaya 1995infrastruktur dan bangunan di Parcel A, Sektor 6, Arkitek Farid H. Kamal (16 months)Bandar Amanjaya, Mk Sungai Petani, Daerah BNK Consultant Sdn Bhd RM 52,763,077-81Kuala Muda, Kedah Darulaman untuk Perunding Timur (K) Sdn BhdMs Kejora Harta Berhad

9 34 unit 3 1/2 tingkat kilang perusahaan ringan on HD Architect (9 months)Lot 977, 1067, 1068 & 1069, Mk 14, S.P.U. for Perunding Yaa Sdn Bhd RM 7,510,738-80Ms GCH Development Sdn Bhd

10 Mixed development on Lot 183 & 184 at Tawar, Loh & Loh Architects 02/01/97 - 02/06/2001Baling, Negeri Kedah Darulaman for Jurutera Jayausaha Konsultant (53 months)Ms Khai Hoon Sdn Bhd RM 78,616,070-00

11 Taman Yew Lean on Lots 663 & 664, Section 2, Architect OA 20/11/98 - 17/12/99Town of Jelutong, Ned., Perak Road, Penang for Jurutera T & T Konsultant Sdn Bhd (56.0 weeks)Ms Yew Lean Development (M) Sdn Bhd RM 9,130,007-78

12 Pembangunan bercampur di atas sebahagian Lot 816, M.K. Teoh Architect 02/11/2000 - 02/11/2002824, 825, 1410 dan 1518, Mk 12, Daerah Barat Daya, Jimmy Khoo Consulting Engineers (24 months)Jalan Permatang Damar Laut, Penang untuk RM15,000,000-00Ms Archlaw Development Sdn Bhd

13 Cadangan mendirikan rumah kedai 2 tingkat jenis B Ng Kweng Sim Architects 18/01/2003 - 17/07/2004(39 unit), rumah teres 1 tingkat jenis C1 (87 unit) dan Chrison Konsultant Sdn. Bhd (18 months)rumah pangsa kos rendah 5 tingkat jenis E (120 unit) H.C. Toh Perunding RM 15,678,222.45di atas Lot 1636, Mk. 4, SPS untuk Unitech QS ConsultancyTetuan Pelangi Sehati Development Sdn Bhd

14 Cadangan mendirikan rumah teres 2 tingkat jenis C Ng Kweng Sim Architects 18/01/2003 - 17/07/2004(200 unit) dan rumah berkembar 2 tingkat jenis D Chrison Konsultant Sdn. Bhd (18 months)(30 unit) di atas Lot 1636, Mk. 4, SPS untuk H.C. Toh Perunding RM 14,729,345.10Tetuan Pelangi Sehati Development Sdn Bhd Unitech QS Consultancy

COMPLETED MIXED DEVELOPMENT SCHEMES

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed TPM Projects

Description of Projects Consultants Contract Period & Amount (RM)

1 Factory on Plot 59 at Kawasan Perindustrian GTP Jurutera Perunding Sdn Bhd 1990 (6 months)Senai (Fasa 2) Mk Senai, Kulai, Daerah Johor RM 2,300,000-00Baru, Johor for Ms CP Industrial Product Sdn Bhd

2 Factory on Plot 75, Jalan Perusahaan Kulim Chrison Konsultant Sdn Bhd 1990 (3 months)Industrial Estate, Kulim, Kedah for RM 1,067,430-00Ms Penbox Sdn Bhd

3 Factory on Plot 3, Fasa IV, Kawasan Perusahaan GTP Jurutera Perunding Sdn Bhd 1991 (7 ½ months)Perai Seberang Perai Tengah for RM 7,000,000-00Ms Molex (M) Sdn Bhd

4 Pembinaan 2 block Pangsapuri 9 tingkat dan Arkitek Haluan Reka 01/11/96 - 01/05/99sebuah rumah Kelab 2 tingkat serta lain-lain Perunding Aras (30 months)kemudahan rekreasi diatas Lot 1992 dan 1993, RM 18,500,000-00Mk Kuah, Daerah Langkawi, Kedah for Ms SBD Corporation (M) Sdn Bhd

5 Sebuah kilang 2 tingkat dan pejabat 4 tingkat diatas Loh & Loh Architect 07/07/97-31/12/97Plot 16, Kawasan Perindustrian Bayan Lepas, Jurutera Jayausaha Konsultant S/B (7 months)Fasa IV, Mk.12 D.B.D., Pulau Pinang untuk RM 4,606,066-34Ms Baguda Sdn Bhd

6 4-storey office & warehouse at Kawasan Loh & Loh Architect 23/10/97 - 15/03/98

Perusahaan Perai for Jurutera Jayausaha Konsultant S/B (6 months)Ms Fu Hao Manufacturing (M) Sdn Bhd TA Perunding RM 2,700,000-00

7 Project “Turnkey” bagi Cadangan pembangunan Asas Architect Sdn Bhd 17/07/99-16/07/2001bercampur untuk golongan berpendapatan rendah Chrison Konsultant Sdn Bhd (24 months)dan sederhana rendah di atas sebahagian Lot 945 RM 65,641,860-41Sek. 9W, Georgetown, Pulau Pinang untukMs Majlis Perbandaran Pulau Pinang

COMPLETED TURNKEY PROJECT MANAGEMENT PROJECTS

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Civil Engineering Projects

Description of Projects Consultants Contract Period & Amount (RM)

1 Earthworks for the Proposed Development on GTP Jurutera Perunding Sdn Bhd 1990 (4 months)Lot 1219, 1220, 1243, 1765, 1774, 1745 & 1746, RM 2,585,507-00Mk 12, Permatang Tinggi, Seberang Perai for Ms Gunung GTS Development Sdn Bhd

2 Earthwork on part of Lot 1244, Mk 12, Kawasan Chrison Konsultant Sdn Bhd 1991 (2 months)Perusahaan Valdor, Seberang Perai Selatan for RM 256,800-00Ms Taigene Metal (M) Sdn Bhd

3 Earthwork for the Proposed extension to the GTP Jurutera Perunding Sdn Bhd 1992 (2 weeks)existing factory on Plot 552, Lorong Perusahaan 4, RM 40,000-00Prai Industrial Estate, S.P.T. for Ms Tehdex (M) Sdn Bhd

4 Earthworks on Plot 6 & part of Plot 4, Mk 1, Loh & Loh Architects 1992 (1 ½ months)Daerah Tengah Seberang Perai for RM 210,185-00Ms Pan International Wire & Cable (M) Sdn Bhd

5 Earthworks for the proposed development on Lot 450, GTP Jurutera Perunding Sdn Bhd 1992 (1 month)452-1, 452-11, 453-1 & 453-11 Mk 15, S.P.U. for RM 57,741-60Ms Siram Permai Sdn Bhd

6 Earthworks (Phase 1) on part of Lot 1286, Mk 14, Akitek Permata 1993 (3 months)Seberang Perai Utara for Chrison Konsultant Sdn Bhd RM 763,209-00Ms MKDV Sdn Bhd

7 Earthworks (Phase 1), Mk 14, Seberang Perai WNG Jurutera Perunding Sdn Bhd 1993 (1½ months)Utara for Ms Evermak (M) Sdn Bhd RM 258,096-50

8 Mixed development on Lot 10488, 11129, & 11116, Akitek MAA Sdn Bhd 1994 (4 months)Jalan Abdul Jalil / Sultan Idris Shah, Ipoh, Perak Zaidun-Leeng Sdn Bhd RM 555,000-00Darul Ridzuan for Ms Seritawan Sdn Bhd (Aluminium & Glazing Works)

9 Main access road and RC box culverts for GTP Jurutera Perunding Sdn Bhd 1994-1995 (3 months)Ms Gunung GTS Development Sdn Bhd RM 469,340-00

10 Road and car park along Lorong Perusahaan Prai Jurutera Perunding Utara Sdn Bhd 1995 (1 month)

Satu, Prai Industrial Complex, Perai for RM 157,000-00Ms Palmco Holdings Berhad

11 Remedial works for Jurutera Perunding Utara Sdn Bhd 1995 - 1996 (3 months)Ms Conner Peripherals (M) Sdn Bhd RM 600,000-00

12 Air separation unit project at Prai II, Malaysia for GTP Jurutera Perunding Sdn Bhd 16/08/96 - 29/09/96Ms Sitt Tatt Industrial Gases Sdn Bhd (1.4 months)

RM 448,177-00

13 Site Clearance and fencing for development on Lot Akitek Akiprima Sdn Bhd 24/12/96 - 10/03/971184, 1155, 1743, 1744, 1294, 1618, 564, 1166, Pakatan Cergas (Pg) Sdn Bhd (2.5 months)1187, 1188, 1133, 1130 & 1255 at Alma , Bukit RM 147,273-07Mertajam, Penang for Ms DNP Land Sdn Bhd

14 Pembinaan sebuah masjid di atas Lot 5388, Kampong Perunding Insan 01/02/97 - 01/04/97Rhu Rendang, Daerah Marang, Trengganu Darul (2 months)Iman for the supply, deliver and erect steel structure RM 50,000-00work untuk Ms Imatex Berhad

15 Road, Drainage & Sewerage Reticulation Sub-Package H. S. Liao Sdn. Bhd. 01/12/2001 - 31/07/20022 (SP2) For Proposed Mixed Development On (8 months) Plot 6026 (Lot 5094 CT 14498) Lenggeng Estate, RM 11,800,000.00Mukim Lenggeng, District Of Seremban, Negeri Sembilan Darul Khusus for M/s Akurjaya Sdn Bhd

COMPLETED CIVIL ENGINEERING PROJECTS

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Civil Engineering Projects

Description of Projects Consultants Contract Period & Amount (RM)

COMPLETED CIVIL ENGINEERING PROJECTS

16 Road, Drainage & Sewerage Reticulation Phase 3B H. S. Liao Sdn. Bhd. 16/12/2002 - 30/04/2003 For Proposed Mixed Development On Plot 6026 (4.5 months) (Lot 5094 CT 14498) Lenggeng Estate, Mukim RM 3,850,000.00Lenggeng, District Of Seremban, Negeri SembilanDarul Khusus for M/s Akurjaya Sdn Bhd

17 Construction And Completion Of Proposed Sludge Treatment Facility At Mukim Assam Kumbang, Daerah Larut Matang, Taiping, Perak Darul Ridzuan for M/s Indah Water Konsortium Sdn Bhd

Shakti Engineering Consultants Sdn. Bhd. 28/10/2002 - 27/07/2003 (10 months)

RM 2,673,332.41

18 Road, Drainage & Sewerage Reticulation Works For H. S. Liao Sdn. Bhd. 03/03/2004 - 02/08/2004Zone 2 - Phase 5A For Proposed Mixed Development (5 months) On Plot 6026 (Lot 5094 CT 14498) Lenggeng Estate, RM 5,480,000.00Mukim Lenggeng, District Of Seremban, Negeri Sembilan Darul Khusus for M/s Akurjaya Sdn Bhd

19 Road, Drainage & Sewerage Reticulation Works For H. S. Liao Sdn. Bhd. 13/10/2004 - 12/03/2005Zone 2- Phase 6 For Proposed Mixed Development (5 months) On Plot 6026 (Lot 5094 CT 14498) Lenggeng Estate, RM 4,998,000.00Mukim Lenggeng, District Of Seremban, Negeri Sembilan Darul Khusus forM/s Akurjaya Sdn Bhd

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Piling Projects

Description of Projects Consultants Contract Period & Amount (RM)

1 Sebuah bangunan sekolah 3 tingkat di J.K.R. 1982 (1 month)Sekolah Rendah Kebangsaan Mergong, RM 104,400-00Alor Setar, Kedah

2 New mooring structures besides existing jetty for Jurutera Konsultant (S.E.A) S/B 1982 (20 days)Ms Malayan Sugar Manufacturing Co Bhd RM 191,000-00

3 Packing station extension at Prai for Jurutera Konsultant (S.E.A) S/B 1982 (1 month)Ms Malayan Sugar Manufacturing Co Bhd RM 337,641-00- Board Building,Weld Quay,Pg.

4 Perumahan kos rendah (4 blok 6 tingkat) di J.K.R. 1982 (2 months)Mak Mandin Rumah Hijau, Seberang Perai RM 1,188,070-00

5 8-storey apartment building (42 units) with ground Lee & Tay Associate 1983 (1 month)floor recreational facilities and car parks on Lot RM 269,179-001307, 1306, 1758 and part of Lot 142 Section 1,Georgetown, NED, Jln Berjaya, Penang for Ms Bina Nusa Sdn Bhd

6 12-storey commercial building with basement carpark Lee & Tay Associate 1984 (2 months)on Lot 113, TS 12 at the junction of Anson Road / RM 784,214-00Dunlop Road N.E.D., Penang for Ms Fop Corporation Sdn Bhd

7 12-storey commercial building with basement carpark Lee & Tay Associate 1984 (1 month)on Lot 1354, TS at the junction of Anson / Dunlop RM 741,625-00Road, N.E.D., Penang for Ms Komplek Mutiara Sdn Bhd

8 Jitra - Butterworth toll expressway for Ret-Ser Engineering Agency 1984 (1 month)Ms Ret – Set Engineering Agency RM 515,860-00

9 Vocational School for J.K.R. 1984 (1 month)Ms Kulim Shiah Brother Trading Sdn Bhd RM 350,900-00

10 Dinding water project at Bota Kiri, Setiawan for Binie & Rakan 1983 (2 months)Ms Japan Development Construction Sdn Bhd RM 765,600-00

11 12" x 12" r.c. piles and foundation for microwave Telekom 1985 (12 months)tower station at Seberang Jaya, Sungai Bakap, RM 578,981-00Selama, Pendang, Alor Setar and Jitra forTelekom

12 Piling works on Plot 27 Mak Mandin, Town of GTP Jurutera Perunding S/B 1986 (3 weeks)Butterworth, Province Wellesley for RM 53,974-00Ms Aik Joo Can Factory Sdn Bhd

13 6" x 6" r.c. piles for Proposed factory on Lot 444, GTP Jurutera Perunding S/B 1987 (2 months)Prai Ind. Estate, for RM 82,873-00Ms B. H. Limela Industries Sdn Bhd

14 Piling for 6" x 6" r.c. pile and 4"f bakau pile for GTP Jurutera Perunding S/B 1988 (1 month)proposed factory Prai for RM 99,682-50Ms Aik Poh Rubber Sdn Bhd

15 Piling work on Plot 521, Prai Industrial Estate, GTP Jurutera Perunding S/B 1989 (1 month)N.E.D., Seberang Perai Tengah for RM 422,505-90Ms Phoenix Press Sdn Bhd

COMPLETED PILING PROJECTS

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Piling Projects

Description of Projects Consultants Contract Period & Amount (RM)

16 Piling work for Proposed factory on Plot 20A & 20B, Jurutera Perunding Utara S/B 1991 (1 month)Prai Industrial Estate, Phase 4, Prai for RM 521,225-00Ms Linear Corp. Mfg. Sdn Bhd & Ms Ko Lim Sdn Bhd

17 Office / factory complex on Lot 391, Seberang Perai Perunding AJZ Sdn Bhd 1992 (1 ½ months)(foundation work) for RM 594,585-24Ms VDO Instruments Sdn Bhd

18 Piling work for factory on Plot 87, Prai Industrial Arup Jururunding Sdn Bhd 1992 (3 weeks)Estate IV for RM 121,994-82Ms Leader Steel Sdn Bhd

19 Piling works for light industrial 1 ½ storey shophouses Akitek Permata 1992 (2 months)(46 units) on Lot 2223 – 2225, Sec. 1, Raja Uda Chrison Konsultant Sdn Bhd RM 357,197-50Seberang Perai for Ms Qiwess Sdn Bhd

20 Piling, earthworks and external works forKompleks Derrick David & Associates 1992 (4 months)Sembahyang dan Dewan Pelbagaiguan setingkat Ooi Teik Boon Konsulting Eng RM 355,000-00diatas Lot 2234 (No. H.S.6) 1681, Mk 1, Taman ChaiLeng, Seberang Perai Tengah forThe Titular R.C. Bishop of Penang

21 Piling for new extension to existing factory on Plot 2 Akitek Ketika 1993 (5 weeks)(P2) fasa IV, Kws Perindustrian Perai, Perai for Jurutera Perunding Utara S/B RM 500,174-00Ms Lucky-Palmco Sdn Bhd

22 Piling & pilecap and column stump to Light Industrial Akitek Permata 1993 (3 months)Development (phase 1) on Lot 809, 820, 281, 174, Chrison Konsultant Sdn Bhd RM 1,806,523-181406 & 1407 Mk. 12, Pmtg. Damar Laut, Penang for Ms MKDV Sdn Bhd

23 2 storey factory at Lot 4681A, Plot 501, Mk 1, Central Prime Consultants Sdn Bhd 1993 (8 weeks)District, Prai Penang for Prima Runding and Rakan-Rakan RM 1,662,710-13Ms NatSteel Electronics (M) Sdn Bhd

24 5 storey office and single storey factory in Bayan Akitek Antara Sdn Bhd 1993 - 1994

Lepas, Pulau Pinang for Jurutera Hosepakat Sdn Bhd (10 weeks)Ms Lenser Automatik System Sdn Bhd RM 707,776-84

25 Test pile and load pile on Plot 255 & 295, Bayan Akitek Ketika 1994 (3 weeks)Lepas Free Trade Zone, Penang for Jurutera Perunding Utara S/B RM 25,425-68Ms Hewlett-Packard, Penang

26 Piling works for building 5 to existing factory on Akitek Ketika 1995 (10 weeks)Plot 255 & 295, Jln. Kampung Jawa, Sg. Kluang Jurutera Perunding Utara S/B RM 1,755,344-93Phase 3, FTZ., Bayan Lepas, Penang forMs Hewlett-Packard Storage Products Sdn Bhd

27 Piling works for sebuah kilang membuat komputer Lee Architectural Consultancy 1995 (1 month)diatas Plot 574, Lrg. Perusahaan 4, Zon Perindustrian GNK Management Sdn Bhd RM 1,251,410-86Bebas, Prai, Mk1 Daerah Tengah, Seberang Perai, Pulau Pinang for Ms Unico Technology Sdn Bhd

28 Piling works for 6 units of 4-storey shop / office, 119 Arkitek Melati 1995 (4 months)units 3-storey shop/office and 58 units of 2-storey Kuantibina Sdn Bhd RM 2,187,640-76shop / office on Lot 885, Mk 15, Central District of Province Wellesley for Ms Par-Advance Sdn Bhd

29 Piling works for 1 Block of 10-storey Apartments, Loh & Loh Architects 1995 (8 weeks)1 Block of 9-storey Apartments and 1 Block of Jurutera Tang & Rakan Rakan RM 1,483,847-629-storey low cost flats on part of Lots 950 & 338, Mk 6, Seberang Perai Tengah, Penang for Ms Piala Mutiara Sdn Bhd

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Piling Projects

Description of Projects Consultants Contract Period & Amount (RM)

30 Concrete flat slab & piling at Lot 2367, Mk. 12 GTP Jurutera Perunding Sdn Bhd 20/04/98 - 10/05/98DBD Zon Bebas, Bayan Lepas, Pulau Pinang for (2.9 weeks)Ms Dynacraft Industries Sdn Bhd RM 47,500-00

31 Piling and pile caps for Cadangan Pejabat KWSP Bernas Konsultant Arkitek 29/04/99-28/09/99yang mengandungi 3 tingkat podium, 9 tingkat Perundingan Teras Sdn Bhd (5 months)ruang pejabat dan 5 tingkat ruang letak kereta RM 5,170,765-22diatas Lot PT3858, Mukim I, Daerah Seberang Perai Tengah, Pulau Pinang untuk Tertuan Kumpulan Wang Simpanan Pekerja

32 The supply and installation of 150m x 150m Jurutera Perunding Utara Sdn Bhd 15/06/01 – 28/07/01and 250mm x 250mm reinforced concrete (6 weeks)piling work to : RM 1,339,142-26The proposed refurbishing of existing laboratory,canteen, workshop, boilers house, weighbridge, loading bay, warehouse extension, new guardhouse, pump house and substationThe proposed new fat splitting fatty acid and glycerine plant, hydrogenation plant, boiler house,loading bay, tank foundations and cooling tower foundations on Plot 6241 & 6245 and 346(ii) & (iii) Prai Industrial Complex, Lorong Perusahaan Satu,Prai, S.P.U. forMs Acidchem International Sdn Bhd

PLB-KH Bina Sdn Bhd Corporate Profile

List of Completed Government Projects

Description of Projects Consultants Contract Period & Amount (RM)

1 Replacement of perimeter fencing at Lembaga Letrik Negara 1981 (3 months)Lembaga Letrik Negara, Prai (5908 linear feet) RM 212,688-00

2 8” A/C emergency water supply piping for Lembaga Letrik Negara 1982 (1 ½ month)Lembaga Letrik Negara, Prai RM 89,000-00

3 Kerja-kerja yang tertinggal di projek 25 units 2 bilik Pejabat Pengarah 1982 (2½ months)rumah-rumah papan di Kuala, Muda, Pejabat Jurutera Daerah RM 158,718-00Mk 1, S.P.U. (Phase 2) di bawah Kontrak Bil S/P & PW 272/79

4 Kerja-kerja yang ditinggalkan bagi sebuah bangunan Pejabat Pengarah 1982 (10 months)sekolah 3 tingkat dan lain-lain kerja yang berkait Pejabat Jurutera Daerah RM 545,174-21dengannya di Sekolah Rendah Kebangsaan Mergong, Alor Setar, Kedah

5 2 buah bangunan sekolah 2 tingkat serta kerja-kerja Jabatan Kerja Raya 1982 (9 months)berkaitan di RM 668,898-00Sekolah Rendah Jenis Kebangsaan (Tamil) LadangKuala Ketil, Baling, Kedah

6 Sambungan ban batu dengan ban batu yang sediada Jabatan Parit & Taliair 1982untuk pencegahan hakisan tebing di RM 450,000-00Kuala Sungai Pinang, Pulau Pinang

7 Kerja-kerja yang belum siap bagi sebuah bangunan Jabatan Kerja Raya 19823 tingkat kantin serta kerja-kerja yang berkaitan RM 399,755-00dengannya di Sekolah Rendah Kebangsaan Kuala Kupang, Kupang, Baling, Kedah

8 Terusan konkrit bagi taliair barat dari rantaian Jabatan Parit & Taliair 1983 (26 weeks)O' hingga 3311' Mk 1 RM 209,389-50Kawasan Pengairan Sungai Muda, S.P.T.

9 Perumahan kos rendah (4 blok 6 tingkat) di Jabatan Kerja Raya 1982 (2 years)Mak Mandin Rumah Hijau, Seberang Perai RM 6,788,060-00(Sub-contractor)

10 Rehabilitation works for Jabatan Parit & Taliair 1985 (1 year)Seberang Perai Pilot Scheme (Jarak-Padang Jurutera Projek RM 1,150,000-00Menora) Scheme

11 Kontrak JPT. PP. no. 7-1985. Membaiki hakisan Jabatan Parit & Taliair 1985 (2 months)Sg. Tembus, S.P.T. untuk RM 169,909-60Jabatan Parit and Taliair

12 Laying of 12" cement lined steel pipe on Lot 2916, Penang Development Corp. 1985 (5 months)Mk 13 NED, Bukit Jambul, Penang for RM 264,599-00Penang Development Corporation

13 275 unit rumah klaster bersambung diatas sebahagian Penang Development Corp. 1986 (9 months)Lot 340, Mk 1, S.P.T., Pulau Pinang untuk RM 2,993,126-91Kontrak :PPPP/ARCH/286Perbadanan PembangunanPulau Pinang

14 Surau, dewan dan stor Ibu Pejabat Polis, Daerah Polis DiRaja Malaysia (PDRM) 25/4/2001 – 22/8/2001Jalan Patani, Pulau Pinang (4 months)

RM474,289.36

COMPLETED GOVERNMENT PROJECTS

PLB-KH Bina Sdn Bhd Corporate Profile

For more information, please contact:

1320, Jalan Baru, Taman Chai Leng,13700Prai,Penang, Malaysia.

Tel: 604-390 5737 Fax: 604-3998323E-mail:[email protected]

R