PIPING BOQ OF UF CIP LINE FOR JP NIGRIE PROJECT S.NO DESCRIPTION SIZE NB MATERIAL SPECIFICATION QUANTITY UNIT SPEC 1 Pipe 80 NB SS 304 30 MTR. ASTM A - 312, ERW 2 FLANGE 80 NB SS 304 2 NOS. AS PER ANSI B 16.5 3 GASKET 2 NOS. IS 2712 4 M 16 x 140 Long MS / GI 4 NOS. 5 90° BEND 80 NB SS 304 4 NOS. ANSI B -16.9, BW 6 EQAUL TEE 80 NB SS 304 1 NOS. ANSI B -16.9, BW 7 STUB END 80 NB SS 304 2 NOS. ANSI B -16.9, BW NUT & BOLT WITH WASHER IS: 1367 CLASS 4.6/4.0

Upload: kaushal

Post on 14-Sep-2015

7 views

Category:

Documents


0 download

DESCRIPTION

PIPING BOQ

TRANSCRIPT

PIPING BOQ OF UF CIP LINE PIPING BOQ OF UF CIP LINE FOR JP NIGRIE PROJECTS.NODESCRIPTIONSIZE NBMATERIAL SPECIFICATIONQUANTITYUNITSPECThickness/ Schedule/Rating.1Pipe80 NBSS 30430MTR.ASTM A - 312, ERWSch. 102FLANGE80 NBSS 3042NOS.AS PER ANSI B 16.5Rating 150 #3GASKET2NOS.IS 2712NEOPRENE RUBBER, 3MM THK.4NUT & BOLT WITH WASHERM 16 x 140 LongMS / GI4NOS.IS: 1367 CLASS 4.6/4.0590 BEND80 NBSS 3044NOS.ANSI B -16.9, BWSch. 106EQAUL TEE80 NBSS 3041NOS.ANSI B -16.9, BWSch. 107STUB END80 NBSS 3042NOS.ANSI B -16.9, BWSch. 10