PIMMPilot for Industrial Mobile Communication in Mining
Phot
o: B
olid
en
March 2016
![Page 2: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/2.jpg)
PROJECT GOALS
To evaluate new mobile communication infrastructure in an industrial context where we can validate the technology, applications and business models.The project will work with the tough requirements for safety, robustness and productivity required of operations in underground mines.
![Page 3: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/3.jpg)
REQUIREMENTS IN FOCUS: SAFETY
How can safety be improved by using a 5G mobile system?
• Robustness• Coverage ratio• Applications
![Page 4: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/4.jpg)
REQUIREMENTS IN FOCUS: PRODUCTIVITY
How can the productivity of a mine be improved by using a 5G mobile system?
• Bandwidth• Flexibility• Coverage ratio• Efficient network expansion
![Page 5: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/5.jpg)
PROJECT PARTNERS
Boliden will participate with domain knowledge, test site and experts on mine environment, applications and installation.
ABB will work on interfaces for monitoring and control using mobile based communication.
Ericsson will participate with the latest mobile technology and with knowledge of technology and business models.
SICS will lead the project and will provide expert knowledge of industrial digitization, business models and complex systems as well as information dissemination.
Volvo Construction Equipment will adapt and provide equipment for testing automation and remote control.
Luleå University of Technology will contribute with domain knowledge of mobile communications in confined environments.
Wolfit will contribute system knowledge of installation and operation in mining environments.WOLFIT
Telia will provide core network as well as contribute expertise and business innovation.
![Page 6: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/6.jpg)
Kankberg
HOW?
• The project builds a state-of-the-art mobile network in the Kankberg mine.
• Several applications will be implemented, tested and evaluated. From voice communications to control of machines.
Photo: Boliden
![Page 7: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/7.jpg)
KANKBERG MINE OVERVIEW
![Page 8: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/8.jpg)
KANKBERG MINE RADIO DESIGN
Map on previous slide
![Page 9: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/9.jpg)
First underground Dot ever
Wheel loader with installation equipment
WHERE ARE WE TODAY?
The PIMM pickup outside Boliden office The Radio Dot in its enclosure
Installation discussions
![Page 10: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/10.jpg)
PROJECT PLAN
UseCasesandrequirements
Siteinstallationandverification Pilot1 Pilot2Site
preparations
Ecosystemandbusinessmodels
Projectmanagement
2015-07 2016-01 2016-07 2017-01 2017-06
WP1
WP3
WP4
WP0
DisseminationandexploitationWP5
TechnologyandapplicationdevelopmentWP2
![Page 11: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/11.jpg)
HOW WE RUN THE PROJECT
• Lean setup using Scrum of Scrum
• Self organizing WP teams• Kanban boards• Distributed teams –
organizations and localisations• Weekly online meetings
![Page 12: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/12.jpg)
“As a mine operator I want to use a standard smartphone for my communication because it will be more efficient”
USER STORY: UNDERGROUND SMARTPHONES
![Page 13: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/13.jpg)
“As emergency doctor I want to monitor sick or injured people in the mine and the whole way to the hospital because it can save lives”
USER STORY: UNDERGROUND CHECKUP
![Page 14: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/14.jpg)
“As mine operator I want to remotely control my wheel loader, because it will improve productivity”
USER STORY: REMOTE LOADING
![Page 15: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/15.jpg)
“As an automation engineer I want to install I/O without data cabling because it will be more efficient”
USER STORY: WIRELESS SENSORS
![Page 16: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/16.jpg)
EXPECTED RESULTS 1(2)• Safety
ü Fewer people in the production areaü More connected equipmentü Seamless above-below ground integration in critical situations
• Productivityü Enables automation and remote controlü Seamless above-below ground integration with mobile systemsü Monitoring of equipmentü Preventive maintenance through remote diagnostics
![Page 17: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/17.jpg)
EXPECTED RESULTS 2(2)• Determining requirements for industrial 5G
ü Environmental requirements – Improved energy performanceü Improved robustness and performance – Network slicesü Transport performance – Lower latency, increased bandwidthü Economy – Improved total cost for deployment and operations
• Business models and rolesü Technology provider and operatorü The industryü Contractors etc.
![Page 18: Pilot for Industrial Mobile Communication in Mining March 2016](https://reader033.vdocuments.us/reader033/viewer/2022051201/58a029171a28ab774a8c4a7a/html5/thumbnails/18.jpg)
sics.se/projects/pimm