    Class RoomAt site

    Presentation On Pile foundation

    Conducted By:- Mr. Pramod Kumar Singh( Sr. Manager

    !MRC"CC:#$%o& 'o : )*

  • 8/14/2019 piling presentation 06 07 2013.pdf

    2/20

    2

    +ntroduction:

    When it becomes impossible to provide the suitable surfacefoundation for a structure; the use of pile foundationsbecomes necessary, this situation arose from either the soil

    condition or the order of bottom layers, the nature of theloads transferred to the soil or the nature of the site andoperational conditions. Many factors prevent the selection ofsurface foundation as a suitable foundation such as the

    nature of soil and intensity of loads, we use the piles whenthe soil have low bearing capacity or in building in water likebridges and dams The main components of the foundationare the pile cap and the piles.

  • 8/14/2019 piling presentation 06 07 2013.pdf

    3/20

    ,unction of iles:

    !s other types of foundations, the purpose ofpile foundations is"

    To transmit the buildings loads to thefoundations and the ground soil layerswhether these loads vertical or inclined

    #iles are a convenient method of foundationfor works over water, such as $etties or bridgepiers.

  • 8/14/2019 piling presentation 06 07 2013.pdf

    4/20

    %

    Classification of ilesClassification of pile with respect to load

    transmission and functional behavior

    &nd bearing piles 'point bearing piles( )riction piles 'cohesion piles ( *ombination of friction and cohesion piles

  • 8/14/2019 piling presentation 06 07 2013.pdf

    5/20

    +

    End bearing piles

    These piles transfer their load on to a firm stratum located at a considerable depth below the base of the structure and they

    derive most of their carrying capacity from the penetration resistance of thesoil at the toe of the pile . The pile behaves as an ordinary column andshould be designed as such. &ven in weak soil a pile will not fail by bucklingand this effect need only be considered if part of the pile is unsupported, i.e.

    if it is in either air or water. oad is transmitted to the soil through friction orcohesion. -ut sometimes, the soil surrounding the pile may adhere to thesurface of the pile and causes /egative 0kin )riction on the pile. This,sometimes have considerable effect on the capacity of the pile. /egative

    skin friction is caused by the drainage of the ground water and consolidationof the soil. The founding depth of the pile is influenced by the results of thesiteinvestigate on and soil test.

  • 8/14/2019 piling presentation 06 07 2013.pdf

    6/20

    Figure 1:End bearing piles Figure 2:Friction orcohesion pile

    Friction or cohesion piles Carrying capacity is derived mainly from the adhesion or friction of the soil incontact with the shaft of the pile (fig 2).

  • 8/14/2019 piling presentation 06 07 2013.pdf

    7/20

    Cohesion piles

    These piles transmit most of their load to the soil through skin friction.This process of driving such piles close to each other in groups greatlyreduces the porosity and compressibility of the soil within and around thegroups. Therefore piles of this category are sometimes called compactionpiles. 3uring the process of driving the pile into the ground, the soil

    becomes molded and, as a result loses some of its strength. Therefore thepile is not able to transfer the e4act amount of load which it is intended toimmediately after it has been driven. 5sually, the soil regains some of itsstrength three to five months after it has been driven.

    Friction piles

    These piles also transfer their load to the ground through skin friction. Theprocess of driving such piles does not compact the soil appreciably. Thesetypes of pile foundations are commonly known as floating pilefoundations.

  • 8/14/2019 piling presentation 06 07 2013.pdf

    8/20

    6

    An extension of the end bearing pile when the bearing stratum is not hard,such as firm clay.

    The pile is driven far enough into the lower material to develop adequatefrictional resistance. A farther variation of the end bearing pile is piles withenlarged bearing areas.

    This is achieved by forcing a bulb of concrete into the soft stratumimmediately above the firm layer to give an enlarged base.

    A similar effect is produced with bored piles by forming a large cone orbell at the bottom with a special reaming tool. Bored piles which are providedwith a bell have a high tensile strength and can be used as tension piles

    Combination of friction piles and cohesion piles

  • 8/14/2019 piling presentation 06 07 2013.pdf

    9/20

    7

    S /0 'C O, CO'S1R0C1+O':

    1. Setting out

    The position of the pile location is set out with respect to the control points and

    checked by &ngineer8s 9epresentative by suitable pin marked on location. 1.+m

    deep cutting is done manually at the pile location to check for undergroundutilities..

  • 8/14/2019 piling presentation 06 07 2013.pdf

    10/20

    1:

    # !ri2ing of 1em orary Casing "

    )irst .:m depth of the dry boring will be done before driving of temporary casing. Then the

    casing will be lifted and lowered in the bore hole. There after driving of casing will be done

    by alternate boring and pushing method to the re uired level. ocation of casingerticality *heck"

    ?ydraulic 9ig is positioned on firm and level ground with use of inbuilt gauges.

    *asing driven is checked for plumb up to m from top of casing.

  • 8/14/2019 piling presentation 06 07 2013.pdf

    11/20

    11

    !rilling "Boring:

    -oring operation is done by ?ydraulic 9otary 9ig with the help of @elly and bucket. The

    siAe of the bucket shall not be less than 112+ mm for 12:: mm dia pile. In addition to

    speeding construction, Tested bentonite should pour into the bore to avoids the

    noise ,vibration and side soil collapse problems that influence conventional

    foundation. !fter completion of boring the founding level is checked with sounding

    chain. Bmmediately after completion of boring the reinforcement cage is lowered,

    which was pre=fabricated as per detailed drawing and approved bar bending schedule.

    Bf, due to any reason starting of reinforcement cage lowering is delayed 2 ?rs, the bore

    hole is cleaned by cleaning bucket and founding level is checked at four location along

    the inside circumference of the pile with sounding chain.

  • 8/14/2019 piling presentation 06 07 2013.pdf

    12/20

    12

    3 Reinforcement Cage 4o5ering "

    The bar bending schedule prepared based on approved drawing. 9einforcement is cut

    and bent to re uired siAe and shape. 9einforcement steel shall be transported to #ierlocation by trailer and the cage is tied using C.B. -inding wire of gauge 16=2:. ength of

    top cage will be as per the full length of reinforcement steel and the bottom piece will be

    fabricated as per the length of pile. -ottom cage is lowered inside the bore hole up to

    dowel length and the second cage is lifted and lapped as per relevant drawing. ?elical

    rings are tied as per drawing and main reinforcement lap is welded at three locations. To

    facilitate cage lowering, the cage is lowered up to re uired level and the cage is fi4ed to

    pile casing with the help of reinforcement hooks for possible up lift and maintaining cover

    at bottom. The side cover for the reinforcement will be maintained by circular concrete

    cover blocks fi4ed to helical of cage three blocks per location at 1+:: mm c

  • 8/14/2019 piling presentation 06 07 2013.pdf

    13/20

    1

    ) ,lushing O eration "

    Bmmediately after lowering of the cage, tremmie pipes of 2::ertical pump. 3uring flushing contaminated

    bentonite will be collected in the steel tank through a fle4ible hose connected to the

    tremmie outlet D fresh bentonite will be replaced to maintain the bentonite at re uired

    level. )lushing shall be confirmed till the density of the return mud is less than 1.2:gm "176+

  • 8/14/2019 piling presentation 06 07 2013.pdf

    14/20

    1%

    Testing of Bentonite "

    3ensity" = The density measured by ?ydrometer. The slurry sample is taken in a 1:::cc

    cylinder and the hydrometer is inserted into this suspension. The calibration shown on

    the hydrometer directly gives the density in gm

  • 8/14/2019 piling presentation 06 07 2013.pdf

    15/20

    1+

    * Concreting "

    Tremmie pipe of 2::

  • 8/14/2019 piling presentation 06 07 2013.pdf

    16/20

    1

    6 7traction of casing "

    !fter the concreting is over the casing is loosened. The casing is e4tracted slowly

    without disturbing the pile concrete with e4tra care with the help of crane after :

    minutes of last pour and totally after 1 hour.

  • 8/14/2019 piling presentation 06 07 2013.pdf

    17/20

    1

    SA, 18 PR CA0S1+O'S Working area should be properly barricaded.

    !ll site personnel shall be provided with safety helmet, safety $ackets, safety shoes and

    other personal safety devices as re uired.

    Traffic marshals shall guide the traffic during progress of work.

    Traffic shall be diverted as per approved scheme wherever and whenever re uired.

    0wing area of the rig should be barricaded or demarcated. Cround stability < leveling will be checked before rig marching.

    Everhead electric cables and wires to be checked before marching < swing of rig.

    !ll swing alarms and swing lights should be in working condition.

    #ile bore muck should not be staked too high.

    #ile cage < muck not to be loaded on the barricades.

    !ll idle pile bores should be covered with grating.