Page 1: Pile load test & Pile foundation works

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

in expansion 6 portion

School Building - Testing of CFA Piles by low strain integrity test in expansion 1

School building. - Concrete Temperature Test (SRC M30) for 600mm dia CFA Piles

Page 2: Pile load test & Pile foundation works

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

in expansion 6 portionSchool building. - Slump Test ( SRC M30) for for 600mm dia CFA Piles.

School building -Concrete Cube Test (SRC M30) for for 600mm dia CFA Piles

Page 3: Pile load test & Pile foundation works

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

in expansion 6 portion

School building -SRC M30 Poured into Concrete Pump.

School building -Boring of 600mm dia CFA Piles @ 1m Below Ground Level

Page 4: Pile load test & Pile foundation works

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

upto Pile Head level in expansion 6 portion.

at 13m Below Ground Level in expansion 4 portion.School building -Termination Depth of 600 mm dia Bored CFA Piles

School building -Installation of Epoxy coated rebar Cages for 600 mm dia CFA piles

Page 5: Pile load test & Pile foundation works

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

Expansion-3- Pile Static load Test for CFA Pile No- P206 in School building

Page 6: Pile load test & Pile foundation works

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

level to receive Pile Caps in exp-2.

Pile Foundation - Earthwork excavation to receive Pile Caps in exp-3.

Pile Foundation -Trimming of CFA pile head upto Pile cut off

Page 7: Pile load test & Pile foundation works

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

level to receive Pile Caps in exp-2.

in expansion- 1 portion

Pile Foundation - Earthwork excavation& Trimming of Concrete upto Pile cut off

School Building - Levelling ,Compaction & formworks for pile cap P.C.C concrete

Page 8: Pile load test & Pile foundation works

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

expansion 1 portion

expansion 1 portion

School building Pile Cap Works - Setting out for Pile cap P.C.C concrete in

School building Pile Cap Works - P.C.C concrete for Pile caps in

Page 9: Pile load test & Pile foundation works

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

works expansion 1 portion

works expansion 1 portion

School building -Temperature Test (SRC M15) for Pile Cap P.C.C Concrete

School building -Slump Test (SRC M15) for Pile Cap P.C.C Concrete

Page 10: Pile load test & Pile foundation works

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

in expansion 6 portionSchool building - Testing of piles by Static load test (set-up works) on pile no 71

Irrigation Tank - Levelling,Compaction work including laying of polythene sheet