job procedure for pile load test

Upload: pratimwhite

Post on 06-Jul-2018

235 views

Category:

Documents


3 download

TRANSCRIPT

  • 8/18/2019 Job Procedure for Pile Load Test

    1/30

    PROJECT TITLE: LNG IMPORT STORAGE & REGAS TERMINAL PROJ

    CLIENT NAME: IOCL

    SUPPLIER NAME: BLACK & VEATCH PVT. LTD.

    REQ NO: 19200-8820A102

    SUPPDOCNO: 19200-0102-8310-PR-0258

    CLDOCNO:

    PROJECT NO: --19200/09 PROJECT LOCATION: ENNORE, TN

    PO NO: 19200/102 CLIENT ORDER NO:

    SUPPLIER REV: O2

    AmecFW Rev: 2

    DOC TYPE: PRC

    DSN: 629

    Status:

    Signed:

    Dept:

    Date:

    COMMENT STATUS CODE: 1-Rejected; 2-Comments as Noted;

    3-Minor Comments Acceptable; 4-No Comments; 5-Info Only

    TAG NOS:

    PROJECT TITLE: LNG IMPORT STORAGE & REGAS TERMINAL PROJ

    CLIENT NAME: IOCL

    SUPPLIER NAME: BLACK & VEATCH CORPORATION

    REQ NO: 19200-8820A102

    SUPPDOCNO: 19200-0102-8310-PR-0258

    CLDOCNO:

    PROJECT NO: --19200/09 PROJECT LOCATION: ENNORE, TN

    PO NO: 19200/102830 CLIENT ORDER NO:

    SUPPLIER REV: O2

    AmecFW Rev: 2

    DOC TYPE: PRC

    DSN: 629

    Status: Code 4

    Signed: Kumaran Vadivelmurugan (J1981)

    Dept: D153 - Engineering

    Date: 20/Jan/2016

    COMMENT STATUS CODE: 1-Rejected; 2-Comments as Noted;

    3-Minor Comments Acceptable; 4-No Comments; 5-Info Only

    TAG NOS:

  • 8/18/2019 Job Procedure for Pile Load Test

    2/30

     IOCL LNG LIMITED

    LNG IMPORT, STORAGE ANDREGASIFICATION TERMINAL

    ENNORE, TAMIL NADU, INDIA 

    Comment Resolution Sheet Page 1 of 1

    Document No:  19200-0102-8310-PR-0258 , Rev: O1 DSN: 629

    Title: Job Procedure for Pile Load Test

    Sr.

    No.Client/PMC Comments Contractor’s Resolution

    1 At what level, test to be conducted Incorporated

    2 What is test Load Please refer clause no 5.2, 5.4, 5.8, 5.10, 5.14

    and mentioned in drawing No: 19200-0102-

    8310-42-0201, Rev S1 for Initial test.

    3 What is the acceptance criteria For acceptance criteria please refer clause no

    5.6, 5.12 & 5.18 and IS 2911, Sec IV.(same as

    IOCL Piling Spec- 19000-8310-SP-0018)

    4 Kentledge arrangement with load

    details to be provided

    Design calculation for 600mm dia X

    18000mm long pile attached and balance

    shall be made available prior to testing.

    5 Report formats shall be provided Already approved. Format No :

    189150.CIV.QC.006 REV 1

    6 Testing record format to be provided Format already approved as above and

    record will be submitted in the approved

    format after testing.

    7 Load vs settlement Load vs settlement curve shall be submitted

    after load test only.

  • 8/18/2019 Job Procedure for Pile Load Test

    3/30

  • 8/18/2019 Job Procedure for Pile Load Test

    4/30

     

    IOCL LNG LIMITED

    LNG IMPORT, STORAGE ANDREGASIFICATION TERMINAL

    ENNORE, TAMIL NADU, INDIA 

    JOB PROCEDURE

    FORPILE LOAD TEST 

    DOCUMENT NO. AND REV:

    19200-0102-8310-PR-0258Rev O2 

    BV DOCUMENT NO. 

    189150_87.1200Rev.1

    DSN : 629  Page 2 of 12

    Revision History

    Rev. Date Details of Revision

    O1 18.11.2015 Issued for Approval

    O2 29.12.2015 Comments Incorporated

    L A C K V E A T C H

    In d i a n O i l L N G

    Build ing

    w o r l d of

    dif ference

    mec

    fost r

    whee l e r

    azSro

    Service

  • 8/18/2019 Job Procedure for Pile Load Test

    5/30

     

    IOCL LNG LIMITED

    LNG IMPORT, STORAGE ANDREGASIFICATION TERMINAL

    ENNORE, TAMIL NADU, INDIA 

    JOB PROCEDURE

    FORPILE LOAD TEST 

    DOCUMENT NO. AND REV:

    19200-0102-8310-PR-0258Rev O2 

    BV DOCUMENT NO. 

    189150_87.1200Rev.1

    DSN : 629  Page 3 of 12

    TABLE OF CONTENTS 

    Sr. No. Description Page no.

    1. Purpose 4

    2. Scope 4

    3. Reference 4

    4. Responsibilities 45. Methodology 5

    6. Appendix-I

    L A C K V E A T C H

    In d i a n O i l L N G

    Build ing

    w o r l d of

    dif ference

    amec

    fost r

    whee l e r

    S

    azSuro Service

  • 8/18/2019 Job Procedure for Pile Load Test

    6/30

     

    IOCL LNG LIMITED

    LNG IMPORT, STORAGE ANDREGASIFICATION TERMINAL

    ENNORE, TAMIL NADU, INDIA 

    JOB PROCEDURE

    FORPILE LOAD TEST 

    DOCUMENT NO. AND REV:

    19200-0102-8310-PR-0258Rev O2 

    BV DOCUMENT NO. 

    189150_87.1200Rev.1

    DSN : 629  Page 4 of 12

    1. PURPOSE 

    The purpose of this procedure is to describe the system to be followed for load test on pile for

    IOCL LNG Regasification Project, Ennore, Tamilnadu, India. 

    2. SCOPE

      To install the piles as per approved drawing issued.

      Conducting load test (Pile Load Test to be carried on Test Pile and working Pile as

    per the Approved drawing.)

      Recording of data, preparation of report and submission to Client for their approval.3. REFERENCES

      Project Spec. for Pilling works 19000-8310-SP-0018 Rev. A2

      19200-0102-8310-CA-0201; Calculation report for Structural Design of Piling Initial

    Load Test.

      Approved drawing of pile.

      Scheme for load testing arrangement.

      Contract documents. 

      IS: 2911 (Part4) 1985-Code of Practice for Design and Construction of Pile.  

      IS: 516, 1959- Methods of Tests for Strength of Concrete. 

    4. RESPONSIBILITESFollowing are the responsibilities and reporting structure of personnel involved in thescope of the procedure:

    A. Field Project Manager

    Shall report to Project Coordinator. Shall be responsible for providing resources for the

    implementation of this procedure.

    B. Field Construction Manager

    Shall report to the Project Manager. Ensure Compliance to project specifications.  Fulfill all required safety measures provide adequate resources for Execution of Work.

    C. Surveyor

    Shall report to RCM. Shall be responsible for day to day planning of site Construction activities andMaintained Records. Shall Submit the Record for PMC for approval. Shall be responsible forimplementation of Survey activity as per this procedure.Monitored and implement all identifiedcontrol.

    D. Field Construction EngineerShall report to RCM, Shall be responsible for day to day planning of site construction activities andpreparation of construction records.

    E. Field QC In chargeShall be responsible for implementation of Pile Load Test activity as per this procedure. Monitor andimplement all identified control Responsible to monitor & ensure the quality of work is in accordancewith this procedure. Report non-compliance to the concerned supervisor and ensure rectificationsprior to the next process activity. Shall carry out inspection as per the approved ITP.

    F. Field HSE In chargeShall ensure work Permit is in place before commencement of work. Shall ensure that all personals inthe work area wear personnel protective equipment (PPE).The area is cordoned off with tape.

  • 8/18/2019 Job Procedure for Pile Load Test

    7/30

     

    IOCL LNG LIMITED

    LNG IMPORT, STORAGE ANDREGASIFICATION TERMINAL

    ENNORE, TAMIL NADU, INDIA 

    JOB PROCEDURE

    FORPILE LOAD TEST 

    DOCUMENT NO. AND REV:

    19200-0102-8310-PR-0258Rev O2 

    BV DOCUMENT NO. 

    189150_87.1200Rev.1

    DSN : 629  Page 5 of 12

    5. TEST PROCEDURE:

    I. VERTICAL (COMPRESSION LOAD TEST)

    Compression load test on piles will be conducted as per IS: 2911 (Part IV) - 1985 

    5.1 EQUIPMENT & TOOLS:

      Hydraulic jacks of suitable capacity with one pump.

      Pre-calibrated pressure gauge with a sensitivity of 20 kg/cm2.

      LVDT/Dial Gauges - 4 nos.  Four bearing plates.

      Two glass plates of size 40 x 40 mm.

      Two datum Bar, MS angle of length minimum 8 x diameter of pile.

      Additional Reinforcement rods to weld pile reinforcement, if required.

      Welding set, electrodes.

      Bricks, cement, sand to support the jack, MS pipe and datum bars, if required.

      Tools for Excavation.

      Record Book and graph sheets.

    5.2 TEST PROCEDURE:

      Piles to be load tested shall be so designated on the drawings or specified/Selected by

    client in the field. (For Initial Test load is 145, 275 & 427.5 Ton and for Routine test

    load shall be finalized only after initial load test.) 

      The kentledge consisting of RSJ or suitable steel section capable of taking reaction

    shall be used. The CG of kentledge should be on the axis of pile and the load applied

    by the jack should be co-axial with the piles.

      Test load shall be applied to the piles by a hydraulic jack with a control pump. Test load

    applied shall be such that a constant load is maintained under increasing settlement.

      The required reaction shall be derived from adjacent existing pile or vertical cut made

    in the ground. Load tests shall in general be carried out after 28 days from the time of

    casting the pile. All load tests shall be conducted under the supervision of the client. All

    responsibilities for conducting the tests safely and properly rest with contractor.

    5.3 INITIAL LOAD TEST:

      Initial vertical load tests shall be carried out at Pile COL(Cut off Level). The pile head

    shall be cut off at cut off level and capped by an R.C. cap to provide a horizontal plane

    bearing surface. Earth around the test pile shall be scooped out so that the pile can

    have no soil support. Thereafter, the jacks and other accessories in the pit pertaining to

    and necessary for conducting the test shall be set up. 

      The test load shall be applied by basis of Maintained Load Method. In this method

    application of increment of test load and taking of measurement or displacement in

    each stage of loading is maintained both Initial and routine load tests. 

      The displacement of the test pile shall be related to a fixed datum. This may consist ofa reference beam (datum bar) supported by two foundations positioned outside the

    zones of influence of the reaction support area. The settlement measuring equipment

    must be set up in such a way that any tilting of the pile will not cause errors in the

    L A C K V E A T C H

    In d i a n O i l L N G

    Build ing

    w o r l d of

    dif ference

    amec

    fost r

    whee l e r

    S

    azSuro Service

  • 8/18/2019 Job Procedure for Pile Load Test

    8/30

     

    IOCL LNG LIMITED

    LNG IMPORT, STORAGE ANDREGASIFICATION TERMINAL

    ENNORE, TAMIL NADU, INDIA 

    JOB PROCEDURE

    FORPILE LOAD TEST 

    DOCUMENT NO. AND REV:

    19200-0102-8310-PR-0258Rev O2 

    BV DOCUMENT NO. 

    189150_87.1200Rev.1

    DSN : 629  Page 6 of 12

    measurement. LVDTs/Dial gauges shall be used for measurement of settlement. The

    least count of LVDT/Dial gauge shall be at least 0.01 mm. At least two but preferably

    four LVDTs/Dial gauges shall be used and shall be placed at diagonally opposite

    corners.

      The total test load shall be as per AFC drawings or specified and shall be applied in

    equal increments of 20 percent of the estimated safe load. Settlement of pile shall be

    measured by at least two LVDTs / Dial gauges each positioned at equal distances

    around the pile and held datum bars resting in immovable support at least 3D awayfrom the test pile face. At each load increment, pile settlement shall be observed

    accurate to 0.02 mm at an interval of 2, 4, 8, 15, 30 and 60 minutes and thereafter at

    half hourly intervals up to a time when the rate of settlement of the pile top reduces to

    0.1mm in half hour or 0.2mm in one hour, which will occur first. The test load shall be

    maintained for 24 hours. Unloading shall be carried out in same decrements at 30min

    interval and rebound for each decrement shall be noted. The final rebound shall be

    recorded 3 hours after the entire load is removed.

    5.4 ROUTINE LOAD TEST:

      Routine load test will be carried out in working piles as designated by

    Client/consultant. The pile head shall be cut off at cut off level and capped by an

    R.C. cap to provide a horizontal plane bearing surface. Earth around the test pile

    shall be scooped out so that the pile can have no soil support. Thereafter, the jacks

    and other accessories in the pit pertaining to and necessary for conducting the test

    shall be set up.

      The total test load shall be 1.5 times the estimated safe load carrying capacity of the

    pile or failure, whichever is earlier, and shall be applied in equal increments of 20

    percent of the estimated safe load.

      The test procedure will be the same as mentioned for initial load test.

    5.5 RECORD OF LOAD TEST RESULTS:

    Soon after completion of each test, contractor shall furnish a copy of all recorded test data to

    the client in the approved format. 

    5.6 SAFE LOAD :

     As per IS: 2911 (Part4)1964, the safe load on single pile shall be least of the following.

      Two–third of the final load at which total displacement attains a value of 12 mm.

    Or  50 percent of the final load at which total displacement is equal to10% percent of the

    pile diameter of uniform diameter pile.

    II.LATERAL LOAD TEST:Lateral Load Test on piles will be conducted as per IS: 2911 (Part 4) — 1985,

    5.7 EQUIPMENT & TOOLS:

      Hydraulic jack of suitable capacity with pump

    L A C K V E A T C H

    In d i a n O i l L N G

    Build ing

    w o r l d of

    dif ference

    amec

    fost r

    whee l e r

    S

    azSuro Service

  • 8/18/2019 Job Procedure for Pile Load Test

    9/30

     

    IOCL LNG LIMITED

    LNG IMPORT, STORAGE ANDREGASIFICATION TERMINAL

    ENNORE, TAMIL NADU, INDIA 

    JOB PROCEDURE

    FORPILE LOAD TEST 

    DOCUMENT NO. AND REV:

    19200-0102-8310-PR-0258Rev O2 

    BV DOCUMENT NO. 

    189150_87.1200Rev.1

    DSN : 629  Page 7 of 12

      Pre-calibrated pressure gauge with a sensitivity of 10 kg/cm2

      Linear Variable Differential Transducers (LVDT) / Dial Gauges — Minimum 2 nos.

      Two bearing plates to suit the perimeter of the pile

      Two glass plates of size 40 x 40 mm

      Datum Bar, MS angle of length minimum 5 x diameter of pile

      MS pipe of suitable diameter & length to fill the gap between jack and pile

      Bricks, cement, sand to support the jack, MS pipe and datum bars

      Tools for Excavation  Record Book and graph sheets

    5.8 TEST PROCEDURE: 

      Piles to be load tested shall be so designated on the drawings or specified /

    selected.(For Initial test load is 11 & 16 Ton and for Routine test load not yet

    finalized)

      Test load shall be applied to the piles by a hydraulic jack with a remote control pump

    at Pile COL. Test load applied shall be such that a constant load is maintained under

    increasing settlement.

      The required reaction shall be derived from adjacent existing pile or vertical cut

    made in the ground. Load tests shall in general be carried out after 28 days from the

    time of casting the pile. Routine load test on working piles may be performed

    concurrently with the pile installation operations if permitted by the client.

      All load tests shall be conducted under the supervision of the client.

      All responsibilities for conducting the tests safely and properly rest with contractor. 

    5.9 INITIAL LOAD TEST: 

      The soil around the pile shall be removed up to the required depth and the pile

    surface shall be levelled. Place a steel plate on the pile side surface, jack and other

    accessories pertaining to and necessary for conducting the test shall be set up.

      The test load shall be applied by basis of Maintained Load Method. In this method

    application of increment of test load and taking of measurement or displacement in

    each stage of loading is maintained both Initial and routine load tests. Jacks shall be

    supported properly.

      The displacement of the test pile shall be related to a fixed datum. This may consist

    of a reference beam (datum bar) supported by two foundations positioned outside

    the zone of influence of the reaction support area. The settlement measuring

    equipment must be set up in such a way that any tilting of the test pile will not cause

    errors in the measurements. LVDTs/Dial gauges shall be used for measurement of

    settlement. The least count of LVDT/Dial gauge shall be at least 0.01 mm.

    LVDT/Dial Gauge shall be placed diagonally opposite to jack.

      The total test load shall be as per AFC drawing and load shall be applied in equal

    increments of 20 percent of the estimated safe load. Unloading may however be in

    higher decrements with total number not less than four. At each load increment, pile

    L A C K V E A T C H

    In d i a n O i l L N G

    Build ing

    w o r l d of

    dif ference

    amec

    fost r

    whee l e r

    S

    azSuro Service

  • 8/18/2019 Job Procedure for Pile Load Test

    10/30

     

    IOCL LNG LIMITED

    LNG IMPORT, STORAGE ANDREGASIFICATION TERMINAL

    ENNORE, TAMIL NADU, INDIA 

    JOB PROCEDURE

    FORPILE LOAD TEST 

    DOCUMENT NO. AND REV:

    19200-0102-8310-PR-0258Rev O2 

    BV DOCUMENT NO. 

    189150_87.1200Rev.1

    DSN : 629  Page 8 of 12

    settlement shall be observed accurate to 0.02 mm at an interval of 2, 4, 8, 15 and 30

    minutes and thereafter at half hourly intervals up to a time when the rate of

    settlement of the pile top reduces to 0. 1mm in half hour or 0. 2 mm in one hour,

    which will occur first.

      During the release stage, each load decrement shall be maintained at least for 30

    minutes and the readings of settlement noted. When the load is fully released to

    zero, measurements of rebound shall be continued till the settlement of the pile top

    is not more than 0. 1 mm per half an hour.

    5.10 ROUTINE LOAD TEST:

      Routine load test will be carried out in working piles as designated in drawing or by

    client/consultant. The soil around the pile shall be excavated up to the required

    depth and the pile surface shall be levelled. Place a steel plate on the pile side

    surface, jack and other accessories pertaining to and necessary for conducting the

    test shall be set up.

      The total test load shall be 1.5 times the estimated safe load carrying capacity of the

    pile or failure, whichever is earlier, and shall be applied in equal increments of 20

    percent of the estimated safe load. 

      The test procedure will be the same as mentioned for initial load test.

    5.11 RECORD OF LOAD TEST RESULTS:

    Soon after completion of each test, contractor shall furnish a copy of all recorded test data to

    the client in the approved format.

    5.12 SAFE LOAD:

      50% of the final load at which the total displacement increases to 12 mm.

      Final load at which the total displacement corresponds to 5 mm

    III.PULL OUT LOAD TEST:

    PuII out load test on piles will be conducted as per IS: 2911 (part -IV) - 985, “LOAD TEST ON

    PILES “. The acceptance criteria for safe load shall be as per clause 8.4 of the above code.

    5.13 EQUIPMENT & TOOLS: 

    The following equipment is required for pile testing:

      Hydraulic jack of suitable capacity with pump

      Pre-calibrated pressure gauge with a sensitivity of 20 kg/cm2

      Linear Variable Differential Transducers (LVDT) / Dial Gauges — Minimum 2 nos.

      Four bearing plates to suit the perimeter of the pile

      Two glass plates of size 40 x 40 mm

      Datum Bar, MS angle of length minimum 5 x diameter of pile

      Additional reinforcement to weld to pile reinforcement if required

      Welding set with Electrodes

      Bricks, cement, sand to support the jack, MS pipe and datum bars

      Tools for Excavation

    L A C K V E A T C H

    In d i a n O i l L N G

    Build ing

    w o r l d of

    dif ference

    amec

    fost r

    whee l e r

    S

    azSuro Service

  • 8/18/2019 Job Procedure for Pile Load Test

    11/30

     

    IOCL LNG LIMITED

    LNG IMPORT, STORAGE ANDREGASIFICATION TERMINAL

    ENNORE, TAMIL NADU, INDIA 

    JOB PROCEDURE

    FORPILE LOAD TEST 

    DOCUMENT NO. AND REV:

    19200-0102-8310-PR-0258Rev O2 

    BV DOCUMENT NO. 

    189150_87.1200Rev.1

    DSN : 629  Page 9 of 12

      Record Book and graph sheets

    5.14 TEST PROCEDURE:

      Piles to be load tested shall be so designated on the drawings or specified. /

    selected by client in the field.(For Initial test load is 105.5, 191.3 & 237.9 Ton and for

    Routine test load not yet finalized.)

      Test load shall be applied to the piles by a hydraulic jack with a remote control pump

    at pile COL. Test load applied to the piles shall be such that a constant load ismaintained under increasing settlement.

      The required reaction shall be derived from adjacent existing piles or shallow

    foundations. Load tests shall in general be carried out not earlier than 28 days from

    the time of casting the pile. Routine load test on working piles may be performed

    concurrently with the pile installation operations if permitted by the client.

      All load tests shall be conducted under the supervision of the client. All

    responsibilities for conducting the tests safely and properly rest with the contractor.

    5.15 INITIAL LOAD TEST:

      Install pile for conduction initial lateral load test. The soil around the pile shall be

    removed up to the required depth and the pile surface shall be leveled. Place a steel

    plate on pile side surface and jack and other accessories pertaining to and

    necessary for conducting the test shall be set up.

      The test load shall be so applied that it reaches the pile in a static manner. Reaction

    frame shall be supported properly.

      The displacement of the test pile shall be related to a fixed datum. This may consist

    of a reference beam (datum bar) supported by two foundations positioned outside

    the zones of influence of the reaction support area. The settlement measuring

    equipment must be set up in such a way that any tilting of the test pile will not cause

    errors in the measurements. Dial gauges shall be used for measuring settlement.

    The least count of the dial gauges shall be at least 0.02 mm. Dial gauge shall be

    placed at diagonally opposite to jack.

      The total test load shall be as per design/drawing and shall be applied in equal

    increments of 20 percent of the estimated safe load. Unloading may however be in

    higher decrements with total number not less than four. At each load increment, pile

    settlement shall be observed accurate to 0.02 mm at an interval of 2, 4, 8, 15 and 30

    minutes and thereafter at half hourly intervals. Up to a time when the rate of

    settlement of the pile top reduces to 0.1 mm in half an hour of 0.2 mm in one hour,

    which will occur first. The load increment in general will be as per IS.2911.

      During the release stage, each load decrement shall be maintained at least for 30

    minutes and readings of settlement noted. When the load is fully released to zero,measurements of rebound shall be continued till the settlement of the pile top is not

    more than 0.1 mm per half an hour.

    L A C K V E A T C H

    In d i a n O i l L N G

    Build ing

    w o r l d of

    dif ference

    amec

    fost r

    whee l e r

    S

    azSuro Service

  • 8/18/2019 Job Procedure for Pile Load Test

    12/30

     

    IOCL LNG LIMITED

    LNG IMPORT, STORAGE ANDREGASIFICATION TERMINAL

    ENNORE, TAMIL NADU, INDIA 

    JOB PROCEDURE

    FORPILE LOAD TEST 

    DOCUMENT NO. AND REV:

    19200-0102-8310-PR-0258Rev O2 

    BV DOCUMENT NO. 

    189150_87.1200Rev.1

    DSN : 629  Page 10 of 12

    5.16 ROUTINE LOAD TEST :

      The test procedure is same as detailed above. The test load will be 1.5 times of the

    pile capacity or specified.

    5.17 RECORD OF LOAD TEST RESULTS:

      Soon after completion of each test, contractor shall furnish a copy of all recorded

    test data to the client in the approved format.

    5.18 SAFE LOAD:

    The safe tensile load on pile will be least of the following:

      Two — thirds of the load at which the total displacement is 12 mm or the load

    corresponding to a specified permissible uplift.

      Half of the load at which the load — displacement curve shows a clear break (down

    — word trend)

    L A C K V E A T C H

    Ind ianOi l LN

    Building a worl of difference.

    mec

    foster

    wheeler

    ,

    azSroServce

    kenedge

    hnok

    JL L t S—

    Unvĉ ^̂Mu

     ̂ ll

    Slirtcricrs

    Grder

    :

    Lnod cell

    Seel Li

    ,

    t

    a

    T*

    Concrete

    block

    Referen

    D

    HydrauJic

    jack

    eam

    Testple

    Diagram

    of ompression

    LoadTest Setup using Kentledge

    System

  • 8/18/2019 Job Procedure for Pile Load Test

    13/30

     

    IOCL LNG LIMITED

    LNG IMPORT, STORAGE ANDREGASIFICATION TERMINAL

    ENNORE, TAMIL NADU, INDIA 

    JOB PROCEDURE

    FORPILE LOAD TEST 

    DOCUMENT NO. AND REV:

    19200-0102-8310-PR-0258Rev O2 

    BV DOCUMENT NO. 

    189150_87.1200Rev.1

    DSN : 629  Page 11 of 12

    Tentative Sketch for arrangement of Initial Lateral Load Test 

    Tentative Sketch for arrangement of Routine Lateral Load Test 

    L A C K V E A T C H

    Ind ianOi l LNG

    Build ing a wor ld

    of

    dif ference.

    a m e c

    foster

    whe e l e r

    ,

    azSro

    Service

    Retiring

    plate

    I

    J tSf

    piste

    Deariiti n

    ..

    , - S '

    Eh.il

    Rjef rerce

    ~t~ T beartL

    5

    f

    r-uackjn

    i

    1

    I

    ^

    I

    •>

    - r

    COL

    v .j

    E ;

    mm

    l

    PRCSSUR£ CAUSE

    'REACTION

    PI L C

    T E S T

    PILE.

    JACK

    HZ

    —O H

    1AL

    6AUGE KEPI

    KEPT   T CUT

    OFF

    LEVEL

    -GLASS PLATEL* —s-i-

    n r c.

    SECTION A.A

    C

    TIMBER PAOIKO

    A

    ©

    EST

    PILE

    REACTION

    PILE

    V

    o

    o

    PLAN

  • 8/18/2019 Job Procedure for Pile Load Test

    14/30

     

    IOCL LNG LIMITED

    LNG IMPORT, STORAGE ANDREGASIFICATION TERMINAL

    ENNORE, TAMIL NADU, INDIA 

    JOB PROCEDURE

    FORPILE LOAD TEST 

    DOCUMENT NO. AND REV:

    19200-0102-8310-PR-0258Rev O2 

    BV DOCUMENT NO. 

    189150_87.1200Rev.1

    DSN : 629  Page 12 of 12

    PLAN AT B-B

    Tentative Arrangement for Routine Pullout Load Test

    Tentative Arrangement for Initial Pullout Load Test 

    L A C K V E A T C H

    In d i a n O i l L N G

    Build ing a

    w o r l d of

    dif ference.

    m e c

    foster

    whe e l e r

    azSro

    Service

    S C H E M A TI C A R R A N G E M E N T F D R PULL OUT ( T E N S I O N ) T E S T I N G O F P I L E S

    I

    m

    a

    V I E W

    A T A - A

    E -S S Q U A R E x 2 T W C

    P L A T E

    T O P )

    51

    £ •

    a

    —I

    T

    iC

    :

    - H Y U R A U L I L

    J A C K C O F A D E Q U A T E C A P A C I T Y )

    S U I T A B L E S m J C T L R A L

    M E M B E R

    T O

    T R A N S F E R

    R C A C T X M S F R O M J A C K

    T E A C T E K P I L E S

    A

    N D S

    3/V

    D I A DR

    Z

    D I A

    T I E

    R O D S

    2 - - S ' S Q U A R E x E T H K P L T E < B O T T C M >

    S U I T A B L E

    T U B E

    O R C O L L A R

    V E L D E B T O

    P L A T E

    < S E E D E T A I L T P )

    A

    - B A S E

    P L A T E

    XU I T A B L E T H I C K N E S S

    H Y B R A L U C J A C K

    W I T H

    A

    P R E S S U R E

    GAUGE-

    S U I T A B L E B O L T S T T I A N W T

    THE

    U P V A R B

    L O A D

    FR f i N

    J A C K

    TO

    ~

    =

    .PILE R E I N F O R C E M E N T W E L D E D W I T H

    C O L L A R S E E

    D E T A I L )

    - S P I R A L

    R E P t f T W C E K E N T

    |C

    R E A C T I O N P I L E

    Aj

    ai

    A

    r

    3

    3

    — R E A C T I O N jX

    .PILE

    I A L

    G A U G E -

    VIEW T

    C-C

    I L E

    V

    I M P L E X

    P I L E

    • S U I T A B L E F I X I N G A R R A N G E M E N T

    X

    D I A L G A U G E

    • P L A T E

    ;

    /

    x

    S T E E L T U B E

    O R C O L L A R

    - V E L D E B T P L A T E

    • P I L E

    R E I N F O R C E M E N T V E U J E D

    V I T H

    C O L L A R

    limJ

    N t O

    - S U I T A B L E

    A N G L E I C H A N N E L

    DR J O I S T S

    at

    P I L E

    - B R I C K

    P I L L A R

    O R

    B A L L I P O S T

    O R O T H E R I M M O V A B L E

    S U P P O R T S

    DET IL

    D

    Welded Steel

    Steel

    Plate

    ISMB

    v

    ydraulic jack nam

    Steel

    bearing plate

    I

    I

    T D

    n

    Dial gauge

    Concrete Block

    Ground level

    J1

    Test

    Pile

    Refrence

    beam

  • 8/18/2019 Job Procedure for Pile Load Test

    15/30

    DESIGN

    CALCULAT ION

    FOR

    KENTLEDGE RR NG EM ENT 600 DI

    18

    Mtrdepth)

    3

    Nos.

    ISMB550

    [l 42-M

    Mp = BpZp

    fy/vmo

    Bp

    = 1.0 plastic

    Zp =

    2711.98

    CM

    3

    h

    Fy = 250

    Mpa

    So

    vmo = 1 10

    3-ISMB

    550

    are

    Laterally Supported by

    ISMB

    350

    Mp =

    1.0 x

    2711.98

    x

    250/1.10 = 616 KN.M

    (1-ISMB

    550)

    3 Nos. =3x616 = 1848 KN.M

    M fcll 8 1848

    N

    x 6 5

    2

    /8

    W

    =349.9

    KN/M.

    Load = 349.9

    x

    6.5 = 227.4

    MT

    Safe

    Load

    3-ISMB

    550

    Vd =

    Avfy

    = 3x550x11 2x250 = 242

    MT

    Safe

    Load

    V x 1.10

    mo

    v* -

    In addition stiffener

    are

    also

    provided

    which

    will

    enhance

    the

    Load

    x

    S

    j

    m

    SAFE

    a

    gNQ^

    KSS

    Petron Private Limited

    (Formerly

    known as

    KazStroyService

    Infrastructure India

    Private Limited )

    Corporate

    office:

    1

    st

    Floor,

    Vatika

    Towers,

    A

    -

    Wing,

    Sector

    4

    Gurgaon

    22002,

    India

    Tel: +91 124

    4566800,

    4029700, FAX:

    +91

    124 4566866, Email:

    [email protected]

    Website: www.kazstroyservice.com

    ~t

    r .

  • 8/18/2019 Job Procedure for Pile Load Test

    16/30

    DESIGN C L C U L T IO N F O R KENTLEDGE ARRANGEMENT 600 DIA 18Mtr depth

    2-ISMB

    -50

    As per 2007

    Code

    of

    IS:800

    5

    ISMB-550 Plastic

    Mp = Bp x Zp x

    fy/

    vmo

    Bp = 1.0 (Plastic)

    Zp = 2711.98 CM

    3

    6 50

    M

    h

    Fy = 250

    Mpa

    v o

    1 10

    ISMB-550

    Laterally supported

    by ISMB 350

    Mp 1 0

    x 2711 98 x

    1000

    x

    250/1 10

    = 616 KN.m (1-ISMB 550)

    For 2 Nos. = 2

    x

    616 =

    1232

    KN.m

    M Wl

    2

    /8

    1232 Wx6.5

    2

    /8

    W = 233 KN/m

    Therefore

    : otal Load = 233

    x

    6.5 = 1514.5

    KN

    Say

    = 150

    MT SAFE LOAD

    2 Nos. ISMB-550

    Vd =

    Av fy = 2x550x11.2x250

    =

    1616.1KN

    V3

    vmo

    ii Jx.

    x

    1 10

    n

    ;

    ay

    = 150

    MT SAFE SHEAR

    LOAD/POINT

    LOAD

    01

    J

    r

    In additionStiffenerare also

    Provided

    r

    S'

    NO

    Therefore SO S FE

    KSS

    Petron Private Limited

    (Formerly

    known

    as KazStroyService Infrastructure India Private

    Limited )

    Corporate office:

    1

    st

    Floor,

    Vatika Towers,

    A

    -

    Wing, Sector

    -

    4

    Gurgaon

    -

    22002,

    India

    Tel: +91 124

    4566800, 4029700, FAX:

    +91 124

    4566866, Email:

    [email protected]

    Website: www.kazstroyservice.com

  • 8/18/2019 Job Procedure for Pile Load Test

    17/30

    t

    r

    I

    I

    I

    \

    y

    v r

    n r ,

    m

    r

    -n

    »

    2

    I

    ^

    O

    >-

    rr,

    r-

    H* I

    :

    fip'-l

    J

    i

    LE£

    r

     

    ^

    M i

    5a

    r t

    i

    t

    £

    A

    £

    &

    g

    r *

    ff

    o

    7 1

    X

    T>

    0->

    2

    O

    o

    *

    i>

    O

    in

    m

    P

    > o

    C7

    i s c

    OD

    *

    *

    -P

    M

    r W

    3

    N >

    41

    g G W v >

    cr

    I

    r

    < r

    z

    u

    u

    ® L

    X

    r

    00

    H

    TTl

    a

    X

    -H

    o

    a

    oo

    a| C o

    ^ I

    ?

    ^

    x

     

    » J 3

    o

    o-

    5

    z , < 5 ^

    3

    v

    r

    st

    •x o

    o

    A5 -

    4

    *

  • 8/18/2019 Job Procedure for Pile Load Test

    18/30

    A J

    S

    g

    L J

    t

    S

    t

    l

    r

    < U f T

    r

    M

    •4—

    C ^QS5

    9pV

    Z OSS

    A

    i

    y

    a

    a

    Ui

    l t

    \7

    /;

    V

    I

    I

  • 8/18/2019 Job Procedure for Pile Load Test

    19/30

    I m

    V

    4

    o

    v

    5

    0

    O

    > <

    ~ o

    r-\

    £

    6

    3

    §

    i r

    X

    a

    1—

     

    - E 3

    J

    J

    X

    o r

    i

    I

    ao

    I

    A

    < o

    X

    u

    IT

    r

    »

    I

    _ ^ _ r

    §

    9 :

    u »

    IIJ

    £

    t

    (V

    £

    \

    k.

    *

    H Q

    *>

    k ,

    Ki

    v

    t i

    £

    e

    J L

    8

    1 »

    < £

    s

    H

    i

    r

    X

    £

    L .

    £

    &

    £

    L

    J

    L

    k

    £

    .

    t

    O o

    i

    n

    j—L

    a

    f

    A O

    ;

    1 7

    -

    i—f^i

    tT~

    j

    i

    77

    A Ô l

  • 8/18/2019 Job Procedure for Pile Load Test

    20/30

    PILING WORK INSPECTION REPORTLoad Test 

    Project LNG Regasification Terminal-Ennore Project No. 19200

    Client IOCL LNG BV Project No. 189150Consultant Amec Foster Wheeler Report No.EPC Contractor Consortium-BV & KSS EPCC-02 Report Date

    Ref. Drawing No. Name of the Structure

    Form no. 189150.CIV.QC.006 REV 1

    Location Pile No

    Pile Casting Date Diameter of Pile

    Type of Pile Length of Pile Below COL

    Type of Test Ground LevelRam Dia Ram Area

    Pressure Gauge No. Dial Gauge No.

    Date TimeTotal Time

    ( Mts )Increment

    PressureGauge Reading

    (Kg/Sq.m)

    Total appliedload (MT)

    Dial Gauge reading in mm

     AverageDisplacement

    in mm

    Rate ofdisplacementper Hr. ( mm

    )

    Reboundmm

    Remarks A B C D

    Description Performed byChecked & Reviewed by

    BVPMC OWNER

    NAME

    SIGN

    DATE

    LACK

    VEATCH

    Building worl

    of

    difference

    Ku

  • 8/18/2019 Job Procedure for Pile Load Test

    21/30

     

    METHODOLOGY OF CYCLIC VERTICAL LOAD TEST

    CONDUCTED ON 600 MM DIA OF TEST PILE

    Test Arrangement:

    The top of the Test pile was chipped to remove the overflowed concrete and dry Bentonite slurry till to sound

    concrete get if required the pile shall be built up to COL. The top of the pile to be finished at cut of level. An

    average loading platform of 7.00m x 8.00m was formed using 3Nos ISMB 550 joists as the main beam shall

     be placed centrally above the pile top, 15 No’s of ISMB 400 joists will be used as cross / distribution girders.

    Required quantities of concrete blocks will be loaded on top of this platform.

    The Test load on the pile is 145 MT as mentioned in drawing no: 19200-0102-8310-42-0201, Rev S1. Hence

    the total weight of Kent ledge will be 182.00MT (25% extra)

    A 30mm steel plate will be placed over the pile top. The 600 MT capacity of hydraulic one jack will be

     placed centrally over the pile top in such a way that the centre of gravity of the pile, pile top and the

    kentledge shall be co-axial. The gap between the jack and the main beams will be filled using steel

     beam/plate as packing material. Datum bars with supports at a distance 4.00 m from the face of the pile will

     be placed on either side of pile. Dial gauges will be placed over those datum bars using magnetic bases. 

    Test Procedure

    The cyclic procedure consisted of applying and releasing a large number of unidirectional loads. The time to

    complete one load cycle varies from approximately 60 minutes the loading and unloading frequency was

    controlled by the capacity of the hydraulic pump and extended length of the ram plunger. After 12”th cycles

    from loading frequency was decreased. During 12”th cycle load were applied in every 60 minutes. In

     between increment reading will be noted during this cycle using same incremental procedure.

    Sustained loads will be applied by incrementally increasing and decreasing the load up to a Final load and

    maintaining this load for 24 hours.

    Each load increment will be 12.94 MT (approx). Each increment will be maintained for 60 minutes or till the

    rate of settlement of the pile top was less than 0.1mm in 30 minutes or 0.2mm in 1hr which will be occurred

    first. After every loading and maintain 60 minutes the load shall be released and reading shall be recorded at

    15minutes. After that next increment to be applied. This is to be followed for every increment and

    decrement. The maximum load of 145.00 MT was maintained for 24hrs and hourly readings shall be noted.

    At the end of 24hrs unloading shall be done gradually till the load was released. After releasing the load,

    reading observation to be recorded at least for 2 hrs.

  • 8/18/2019 Job Procedure for Pile Load Test

    22/30

    TEST RESULTS

    The results of the load test are tabulated in table – 1 & 2 and the load settlement curve presented in Fig – 2

    From the curve it may be observed that the maximum settlement at 145 MT was -------mm and net

    settlement was ------mm as against a permissible settlement of 12mm as per IS code 2911 – part IV.

    CONCLUSION

    Since the total maximum settlement ……..  at the load ……is within/without limits specified in

    IS2911 – part IV – 1985 the pile is safe for a design load of …… MT.

    Load vs Settlement Graph: To be furnished after Load test. 

    TEST DETAILSTypes of test : Cyclic Load Test

    Design load : 58 MT.

    Test Load : 2.5 Times of the Design Load

    2.5 X 58 = 145.00 M.T.

    Total Load on Kent ledge : 187.00MT

    PILE DETAILS

    Type of pile : Board-cast-in-situ-pile

    Dia of pile : 600 mm

    Pile no : C6

    Bore Depth from ground level : 18 m

    Bore Depth from COL : 18.50 m

    Date of Boring : 05-11-2015

    Date of Casting : 05-11-2015

    CONCRETE / REINFORCEMENT DETAILS

    Design mix : M30

    Type / Grade of cement : OPC – 53 Grade

    Theoretical Consumption of Cement : 44 bags.

    Actual Consumption of Cement : 42.96 bags.

    Main Reinforcement : As per drawing.

    Stirrups : As per drawing.

    Date of Testing (Start) : 30-12-2015

    Date of Testing (Completion) :

  • 8/18/2019 Job Procedure for Pile Load Test

    23/30

    EQUIPMENT

    1.  Reaction by Concrete blocks Kent ledge.

    2.  Loading by 1 No. of hydraulic jack of 600 MT Capacity.

    3.  Type of jack: Single acting spring return.

    4. Effective cylindrical area of jack: 1288.77 cm2

    5.   No. of dial gauged Used: 4 Nos.

    Make : Baker

    Range : 0 to 25mm

    Least Count : 0.01mm

    Identification : YFD3568, ULQ617

    K2437, YJA1929

    Pressure Gauge

    Make : MASS

    Range : 0 to 420 kg/cm2

    Identification : PG-010

    Least Count : 10kg/cm2

    DETAILS OF KENTLEDGE WEIGHT

    Weight of ISMB 550 : 3 Nos X 9.04 mtr X 92.40 kg/m = 2.50 MT

    Weight of ISMB 350 : 12 Nos X 7.30 mtr X 56.70 kg/m = 4.97 MT

    Weight of Concrete blocks

    3rd Layer: 10Nos X 1.60m X 0.80m X 0.80m X 2.35 = 24.06 MT

    2 nd Layer: 31Nos X 1.60m X 0.80m X 0.80m X 2.35 = 74.60 MT

    1st Layer: 30Nos X 1.20m X 1.20m X 0.80m X 2.35 = 81.22 MT

    -------------------

    TOTAL WEIGHT = 187.35MT

    -------------------

    Say - 187.00 M.T.

  • 8/18/2019 Job Procedure for Pile Load Test

    24/30

    Reqd. Load on Kent ledge:

    Design Load : 58.00 M.T.

    Test Load : 58 X 2.5times = 145 M.T.

    Reaction Load At 25% Extra

    Total required Load : 181.25M.T 

    LOADING CHART

    Design Load : 58.00MT

    Test Load : 58.00 X2.5 times = 145 M.T.

    Ram Dia : 405 mm

    Effective Cylindrical area of Jack : 1288.77 cm2

    Load increment : 20% of the design Load, .20 x 58 = 11.60M.T.

    Pressure : Load / Area

    : 11.60X 1000 / 1288.77 Kg/cm2 

    For 11.60 MT, Pressure required is : 9.00 Kg / cm2

    For 10.00 Kg / cm2, Pressure Applied: 12.88 MT

    S

    N.

    DIV

    LOAD IN

    M.TPRESSURE IN kg / cm

    2  REMARKS

    ACTUAL APPLIED ACTUAL 

    APPLIED

    1 1.0 11.60 12.88 9.00 10.00

    2 2.0 23.20 25.76 18.00 20.00

    3 3.0 34.80 38.64 27.00 30.00

    4 4.0 46.40 51.52 36.00 40.00

    5 5.0 58.00 64.40 45.00 50.00 DESIGN LOAD

    6 6.0 69.60 77.28 54.00 60.00

    7 7.0 81.20 90.16 63.00 70.00

    8 8.0 92.80 103.04 72.00 80.00

    9 9.0 104.40 115.92 81.00 90.00

    10 10.0 116.00 128.80 90.0 100.00

    11 11.0 127.60 141.68 99.00 110.00

    12 11.5 145.00 148.10 108.0 115.00 Final LOAD

  • 8/18/2019 Job Procedure for Pile Load Test

    25/30

  • 8/18/2019 Job Procedure for Pile Load Test

    26/30

    TEST PROCEDURE

    Initially the pump was operated such that jack just touched the loading Pile

    and the pressure shows zero, the setting load applied and released. The initial

    readings of the dial gauges were noted.

    The loads were applied in increments 0.88MT. The maximum load of 11 MT.

    Each percentage increase was maintained for ½ hr or till the rate of displacement of

    the pile was less than 0.1mm in ½ hr or 0.2mm in 1 hr or 2 hrs after applying the

    load. Unloading was done gradually till the load was released.

    TEST RESULTS

    The results of the load test are tabulated in Table – 1 and the load displacement

    curve presented in Fig. 1.

    Displacement at 11MT Test load Total Displacement ----mm, Rebound ----

    mm, Net Displacement -----mm as against a permissible Displacement of 5mm per

    IS2911 – Part IV – 1985.

    .

  • 8/18/2019 Job Procedure for Pile Load Test

    27/30

    LATERAL PIL E LOAD TEST

    Design load in MT - 4.4MT

    Test load in MT - 11MT

    20 MT capacity hydraulic jack - 1No.

    Dia of Ram - 75 mm

    Effective area of the ram - 44.15cm2 

    Least count of the gauge - 20.0 kg/cm2 

    Maximum pressure gauge reading - 11x 1000 / 44.15cm2 

    249.150 kg / cm

    2

     

    Say 250 kg / cm

    Pressure = Load/ Area 0.88x1000/44.15 = 19.93Kg/cm2 

    LOADING INCREMENT STAGES

    Sl.

    No.Load Increment

    Loadrequired

    to be

    Actual in

    MT

    Load

    required

    to be

    applied in

    MT

    Pressurefor load

    required

    to be

    applied in

    Kg/cm2 

    ActualPressure

    rounded

    off and

    applied in

    Kg/cm2 

    Duration

    01 0 Increment 0 0 0 0 0

    02 1st Increment 0.88 0.883 19.93 20 30 mins

    03 2nd

     Increment 1.76 1.766 39.85 40 30 mins

    04 3

    rd

     Increment 2.64 2.65 59.78 60 30 mins05 4

    th Increment 3.52 3.53 79.71 80 30 mins

    06 5th

     Increment 4.4 4.416 99.63 100 30 mins

    07 6th

     Increment 5.28 5.29 119.56 120 30 mins

    08 7th

     Increment 6.16 6.18 139.49 140 30 mins

    09 8th

     Increment 7.04 7.065 159.42 160 30 mins

    10 9th

     Increment 7.92 7.94 179.34 180 30 mins 

    11 10th

     Increment 8.8 8.83 199.27 200 30 mins 

    12 11th

     Increment 9.68 9.72 219.20 220 30 mins 

    13 12th Increment 11 11.07 249.09 250 30 mins 

  • 8/18/2019 Job Procedure for Pile Load Test

    28/30

    EQUIPMENT TO BE

    USED I N LATERAL PI LE LOAD TEST

    20 capacity of hydraulic jack : 1no

    (0-25)mm dial gauges : 2nos

    (0-700)kg/cm2 pressure gauge  :  1no

    Magnetic stand : 2nos 

    Test Pile Details

    TEST DETAILS

    Type of test : Lateral load test

    Design load : 4.4MT

    Test load : 4.4 x 2.5 times = 11MT

    PILE DETAILS

    Type of Pile : Bored cast – in – situ pile

    Dia of pile : 600 mm

    Depth of pile : 18.00m

    Pile location : L6

    Date of concreting the pile : ----------

    Date of Testing start : ------------

    Date of Testing Completion : --------------

  • 8/18/2019 Job Procedure for Pile Load Test

    29/30

    GRADE OF CONCRETE  : ----

    DETAIL OF REINFORCEMENT

    Main Reinforcement bars : --------------

    Stirrups : ----------------

    Resting Block Details

    3nos x 1.60 x 0.80 x 0.80 x 2.35 : 7.22 MT 

    5nos x 1.20 x 1.20 x 0.80 x 2.35 : 13.54 MT 

    TOTAL : 20.76 MT

    Details of Jack

    Capacity : 20MT

    Ram Diameter : 7.5cm

    Maximum pressure : 360 bar

    Effective Area of Jack : 44.15 cm2 

    Details of Dial Gauges 

    Make : BAKER

    Range : 0 to 25mm

    Least count : 0.01mm

    Identification No : YEC2103, YJA1900, YJA1929

  • 8/18/2019 Job Procedure for Pile Load Test

    30/30

    Details of Pressure Gauge 

    Make : MASS

    Range : 0 -700 kg/cm2 

    Least Count : 20 Kg / cm2

    TABLE

    (DIPLACEMENT/REBOUND )

    Sl. No.Applied Load

    (MT)

    Displacement

    (mm)

    Rebound

    Displacement in

    (mm)

    1. 0 0

    2.

    3.

    4.

    5.

    6.

    7.

    8.

    9

    10

    11

    12